Minimum Horizontal Clearances To A Structure. TABLE "1"
Minimum Horizontal Clearances To A Structure. TABLE "1"
DIMENSION 'H' STRUCTURE CATEGORY AND DESCRIPTION TABLE "3" ITEMS ALLOWED IN ZONE 'A' 1500 mm BELOW RAIL LEVEL
3500 TO ALL STRUCTURES < 40m LONG ALONG TRACK. - TRACK STRUCTURE.
- FORMATION.
4500 TO ALL STRUCTURES > 40m LONG ALONG TRACK. - PLATFORM FOOTINGS.
- LEVEL CROSSING PAVEMENT OR STRUCTURE.
MID-SECTION FOOTBRIDGES (REFER TO CIVIL-SR-006). - RAIL BRIDGE OR DRAINAGE STRUCTURE.
- SERVICES INSTALLED IN ACCORDANCE WITH CIVIL
3750 FOOTBRIDGES ON STATION PLATFORMS. (REFER TO CIVIL-SR-006). ENGINEERING TECHNICAL REQUIREMENTS CE-SR16 OR CE-SR17.
- OTHER STRUCTURES AS APPROVED BY THE DISCILPLINE HEAD
3000 ELECTRIFICATION SUPPORT MASTS. TRACK AND STRUCTURES.
TUNNEL WHICH INCLUDES A WALKWAY (ALLOWS A 1200mm WIDE WALKWAY 1800mm FROM TRACK CENTRE LINE).
"HORIZONTAL" PLUS "HORIZONTAL" PLUS
CURVE AND CANT EFFECT CURVE AND CANT EFFECT
2650** SUPPORTS FOR LOADING FACILITIES, GANTRY CRANES ETC OVER DEDICATED SIDINGS WHERE TRACK IS FIXED TO 'H' 'H'
TUNNEL OR BRIDGE SUPERSTRUCTURE WHERE REFUGES OR ESCAPEES ARE PROVIDED 300 MIN. 300 MIN.
N.
ONLY CONTACT & CATENARY WIRES AND
300 MI
OVERHEAD SUPPORT STRUCTURES PERMITTED
IN THESE ZONES.
2300** STATION PLATFORM AWNING A MINIMUM OF 3300mm ABOVE RAIL LEVEL. (ZONE 'B')
N.
300 MI
SIGNAL POST OR CAGE, POLES AND SIGNS, (RAILWAY INFRASTRUCTURE ONLY) (ZONE 'B' & 'C') - ENSURE AWNING DOES NOT OBSTRUCT SIGNALS. A 300 MIN.
ZONE 'C'
ONLY FRANGIBLE STRUCTURES OR RAILWAY
RELATED INFRASTRUCTURE (E.G. SIGNALS AND SIGNAL
2150** FOR TEMPORARY CONSTRUCTION HOARDING OR STRUCTURE.
N.
CAGES) PERMITTED IN THIS ZONE.
300 MI
300 MIN.
1800** DEMARCATION FENCE OR SECONDARY HANDRAIL (810mm MAXIMUM HEIGHT ABOVE LOW LEG
CAL"
RAIL LEVEL).
V'
"VERTI
'
ZONE 'B'
1550** HIGH LEVEL STATION / CREW CHANGE PLATFORMS (1050mm HIGH ABOVE LOW LEG RAIL LEVEL) A ONLY STATION PLATFORM AWNINGS A
PERMITTED IN THIS ZONE.
300 MIN.
1370** LOW LEVEL STATION / CREW CHANGE PLATFORMS OR LOADING BANK IN
ACCORDANCE WITH THE RELEVANT STANDARD DRAWINGS (810mm HEIGHT ABOVE RAIL LEVEL)
MINIMUM STRUCTURE GAUGE ST2
REFER STD DRG No QR-C-S3304.
ADDITIONAL HORIZONTAL CLEARANCE REQUIREMENTS NOTES
1500
ZONE 'A'. REFER TABLE 3.
INSIDE OF CURVE
OUTSIDE OF CURVE
TABLE "2" FOR "HORIZONTAL" AND "VERTICAL" VALUES REFER TABLE "1"
MINIMUM VERTICAL CLEARANCES TO A STRUCTURE.
(MEASURE FROM TRACK CENTRE LINE TO NEAREST POINT OF STRUCTURE) MINIMUM CLEARANCES REQUIRED TO STRUCTURES
SCALE 1 : 50
DIMENSION 'V'
9000 ALL STRUCTURES >40m WIDE CROSSING THE TRACK, EXCEPT TUNNELS.
6400 STATION FOOTBRIDGES IN BRISBANE SUBURBAN AREA, - GREATER CLEARANCE MAY BE REQUIRED - GENERAL NOTES
WITH A MINIMUM 500mm CLEARANCE FROM CATENARY WIRE AND 200mm FROM THE RETURN CONDUCTOR. 1. STRUCTURES OVER MULTIPLE TRACKS ARE TO CLEAR SPAN ALL TRACKS
WITH NO SUPPORTING COLUMNS OR PIERS BETWEEN TRACKS.
5300 TUNNEL WHERE TRACK IS FIXED TO A CONCRETE SLAB. ALLOWS 4700mm CONTACT 2. FOR TRACK CENTRE SPACING REQUIREMENTS REFER TO DRAWING QR-C-S3307
(1) CLEARANCE MAY BE REDUCED BY 300mm FOR TRACKS ON FULL DEPTH (250mm) 4. VERTICAL CLEARANCE SHALL BE INCREASED AS NECESSARY ABOVE OVERHEAD MASTS AND