Professional Documents
Culture Documents
Page 9 From 342065582-Flushing-Procedure
Page 9 From 342065582-Flushing-Procedure
He supervises the flushing activities at the site. He makes sure the equipment is
in good working condition, Rig up the equipment and supervises the work from
start to finish. He reports to the Project Engineer.