Contents
Commercial Building ...............................................................................................................3
Building Data: ......................................................................................................................3
Basic 2-D drawing of Building:...........................................................................................3
Real pictures of the building: ..............................................................................................4
Building Location: ...............................................................................................................4
Heating and Cooling load calculation: ...............................................................................4
Measurements of building:..................................................................................................4
Roof ...................................................................................................................................4
Floor ..................................................................................................................................5
Window: ............................................................................................................................5
Zones Of Building ................................................................................................................5
Construction Of Windows ...................................................................................................6
Occupancy Schedule ............................................................................................................7
Appliance Operation Schedule ...........................................................................................8
Appliances Rated Power......................................................................................................8
List of Tables
Table 1 Building Data Extension MED..................................................................................3
Table 2 Zones of Building .......................................................................................................5
Table 3 Data of Windows ........................................................................................................6
Table 4 Occupancy Schedule ..................................................................................................7
Table 5 Operational Schedule .................................................................................................8
List of Figures
Figure 1 2-D Drawing ..............................................................................................................3
Figure 2 Extension Front Door ...............................................................................................4
2
Commercial Building
Building Data:
Table 1 Building Data Extension MED
Thickness 6 ′′ 9 ′′ 1.5′′ 4 ′′
3
Real pictures of the building:
Building Location:
Address: Extension Mechanical Engineering Department UET Taxila
Longitude: 73.53994
Latitude: 32.22816
Measurements of building:
Roof
Thickness: 6inch
Material: Reinforcement cement concrete
Length: 115 ft
Width: 140 ft
Ceiling height: 12 ft
4
Floor
Thickness: 4inch
Material: Cement concrete finished with cement plaster.
Length: 24 ft
Width: 17.3 ft
Walls
Length: 115 ft
Ceiling height: 12 ft
Material:
9′′ brick and 12′′inner and outer cement plaster
Window:
Material: Iron net having aluminum rods
Back side = 7 * 3 (H*W)
Front side = 7 * 3 (H*W)
Doors:
Doors = 7 * 4 (H*W)
Thickness=1.5 inch
Material: Wood
Average person per class: 50
Floor
Thickness: 4inch
Material: Cement concrete finished with cement plaster.
Zones Of Building
Table 2 Zones of Building
Mechanics
1
Lab
1
cement plaster
5
IC Engine 9′′ brick and
lab 11 1 2
′′inner and outer 66.25 762 66.25
cement plaster
Plant Lab
1
cement plaster
Offices
1
3 1 16 515.66 16
′′inner and outer
2
cement plaster
Offices
1
cement plaster
Professor 2 1 2
′′inner and outer
room 14 1 2
′′inner and outer
cement plaster
1 8 1
1
cement plaster
2 8 1 2
′′inner and outer
cement plaster
3 8 1 2
′′inner and outer
cement plaster
Construction Of Windows
Table 3 Data of Windows
6
Conference room 14 double glazed 8=east 21 per
Aluminum panes 5=south window
with glass
Office 1 3 double glazed 3=West 21 per
Aluminum panes window
with glass
Office 2 6 double glazed 6=West 21 per
Aluminum panes window
with glass
Office 3 2 double glazed 2=west 21 per
Aluminum panes window
with glass
Class room 1 double glazed 6= north 21 per
8 Aluminum panes 2=west window
with glass
Class room 2 double glazed 6= north 21 per
8 Aluminum panes 2=west window
with glass
Class room 3 double glazed 6= north 21 per
8 Aluminum panes 2=west window
with glass
Class room 4 double glazed 4= east 21 per
4 Aluminum panes window
with glass
Occupancy Schedule
Table 4 Occupancy Schedule
Hou Fractu CA IC Pow Cla Cla Cla Cla offic Confere Total
rs re D II engi er ss ss ss ss es nce (max.
Mech LA ne plan roo roo roo roo room No. of
Lab B lab t lab m1 m2 m3 m4 occupan
ts)
1 0 0 0 0 0 0 0 0 0 0 0
2 0 0 0 0 0 0 0 0 0 0 0
3 0 0 0 0 0 0 0 0 0 0 0
4 0 0 0 0 0 0 0 0 0 0 0
5 0 0 0 0 0 0 0 0 0 0 0
6 0 0 0 0 0 0 0 0 0 0 0
7 0 0 0 0 0 0 0 0 0 0 0
8 0 0 0 0 0 0 0 0 0 0 0
9 51 0 51 52 51 51 51 51 1 0 359
10 51 0 51 52 51 51 51 51 1 10 369
11 51 0 51 52 51 51 51 51 1 10 369
12 51 0 51 52 51 51 0 0 1 10 267
13 51 0 51 52 51 51 0 0 1 6 261
14 0 0 51 52 0 51 51 0 1 0 206
15 0 0 0 0 0 51 51 0 1 0 103
16 5 0 4 0 0 0 0 0 1 0 10
7
17 5 0 4 0 0 0 0 0 0 0 9
18 0 0 0 0 0 0 0 0 0 0 0
19 0 0 0 0 0 0 0 0 0 0 0
20 0 0 0 0 0 0 0 0 0 0 0
21 0 0 0 0 0 0 0 0 0 0 0
22 0 0 0 0 0 0 0 0 0 0 0
23 0 0 0 0 0 0 0 0 0 0 0
24 0 0 0 0 0 0 0 0 0 0 0