Executive Summary
Project Name: Document Management Solutions (shortly called as “Docu”)
Department: Client Services
Last Updated: 27-Dec-2006
Author: Ganesh
Project Manager(s): Ganesh (CS) / Bala (Eng) / Lenin (IT)
Executive Sponsor: Krishnaji / Prajit Foundations
Project Department Owner: Murali Krishnan/PK
Project Overview
a) To centralize the storage of the different drawings, documents that are created from the
present applications of Prajit foundations.
b) Creating a distribution list for the different users to perform functions like add, edit and
delete the documents and drawings that are created.
c) To create an authorizations and approval process flow for the different drawings and
documents that are submitted to the decision makers.
d) To have control on the documents that are modified through a version control system
for the drawings for any future review process.
e) Creating a log system to monitor the usage and access information of the drawings for
the different users.
f) Creating an IT secured environment and infrastructure for the drawings and the
information to be accessed by restricted users only.
g) Creating a global access system for these documents and information to be accessed
over a secured intranet facility.
Business Issue/Opportunity
Confidential
8691996.doc
Last printed
Project Overview Statement—Executive Summary
a) Delay in reviews and back checks of the different documents and drawings.
c) Lack of monitoring to track the access of the documents or history of the documents
that are being made.
a) Centralized storage of drawings and information for the different users to access across
WAN, LAN, Intranet and through web.
b) Secured and Authentic environment for the drawings and documents for authorization and
approval process.
c) Creating an IT infrastructure for hosting the same for a stable application.
Project Benefits
Project Benefits
• Centralized communication channel of information for easier and quicker decision making
at critical situations which will reduce around 80 % of present communication channel cost
of access to this information.
• Controls and business rules for unauthorized access of information will keep the drawings
and documents safe.
• Common repository of information of all the drawings and documents will benefit the
customer by reducing around 90% of the time spent in search of unidentified drawings and
documents.
• Implementation of the 3rd party software for all the different end users.
• Deployment and Integration of Trans E Software in the Repository Server.
• Check for the connectivity through the different network channels for the drawings and
documents
• Training and Support Manual for all the software being implemented.
• Two day training program for different end users on the system.
• Live Run Support for end users to start using the system
• Kosmic Music – Solutions provided for Kosmic Music could be ported on the same platform
of this project as both the offices are in the same floor.
• FMS – Status of this application and need for those information in to the proposed solution
sets.
Project Conditions
Project Assumptions
• Auto CAD Design Review would be the software that would be used to review the drawings
at the client machine.
• Draftsman who are creating the drawings should convert the same in to a .dwf file and then
store it in the repository
• IT Resources that are presently available are being shared for this solution.
• Simple Linear Work flows for the authorizations and approvals.
Project Issues
• Adaptability of the Draftsman to create a .dwf file for all the drawings being made.
• Present IT Infrastructure and also the connectivity of internet through a DSL.
• Usage of Windows environment, the AutoCAD design review would not open in a Mac
Version. As the Executive Sponsor is using a Mac System the changes in the IT Assets
should be taken care.
Project Risks
• Many external vendors and implementation of their software and hardware is involved. So
there could be a risk of schedule delay if any vendors don’t turn up on time.
• As the Key End users travel most frequently the availability of their time for implementation
and training is mandatory.
Project Constraints
• Delay or Schedule changes by the end users would be a major constraint for coordinating
the different vendors and hence the implementation would get longer.
•
• Schedule Performance index against milestone stages should not be more than (+) (-) 5%
deviation.
• Cost performance index for project cost against the revenue with not more than (+) (-) 10%
deviation.
• Project Controls tracking and review for future projects should be continuous
APPROVALS
Prepared By ______________________________________
Project Manager
Approved By ______________________________________
Project Sponsor
______________________________________
Executive Sponsor
______________________________________
Client Sponsor