PROVISION OF PAN MALAYSIA CORROSION MONITORING

SERVICES

Schedule A: Provision of Advanced Corrosion Monitoring


Method
a) Standby rate will be 50% of daily rate and shall not be
applicable to monthly rate
b) Rates for weekend and public holiday to be escalated from daily or hourly rate, whichever lower. Escalation factor for weekend and Public Holiday
are 1.5 and 2 respectively.
c)OPUs shall reserve the right to utilise hourly, daily,
monthly or combination of rates
d) Refer to App - 1, App - 2 and App - 3 for List of Location
for PDB and PGB (GTR)
Turnaround/ Shutdown Daily Plant Operation
Applicable
Mobilisation / Demobilisation Fee (RM) (Return Trip) (12 hours inclusive one hour (9 hours inclusive one hour
for both
break) break)

RM/ month
Southern RM/ month
(5 days per
(MRCSB, PRPC Central (PDB (5 days per week)
Advanced Corrosion Monitoring Northern (PDB Eastern (PDB RM/day RM/day week) not
No UF, PC INA, & PGB not inclusive RM/Hour
Method & PGB (GTR)) & PGB (GTR)) Weekdays Weekdays inclusive
PePSB, PDB, (GTR)) weekend & Public
weekend &
PGB (GTR)) Holiday
Public Holiday
Cathodic Protection Potential
1
Measurement 1,500.00 1,500.00 1,500.00 1,500.00 2,520.00 50,400.00 1,890.00 37,800.00 210.00
2
Soil Resistivity Testing 1,600.00 1,600.00 1,600.00 1,600.00 2,760.00 55,200.00 2,070.00 41,400.00 230.00
Cathodic Protection Inspection,
3
Fine, Tuning & Troubleshooting 1,200.00 1,200.00 1,200.00 1,200.00 2,400.00 48,000.00 1,800.00 36,000.00 200.00
4
MIJ/ IF Inspection 850.00 850.00 850.00 850.00 1,440.00 28,800.00 1,080.00 21,600.00 120.00
Close Interval Potential Survey
5
(CIPS) 1,600.00 1,600.00 1,600.00 1,600.00 2,760.00 55,200.00 2,070.00 41,400.00 230.00
Direct Current Voltage Gradient
6
(DCVG) 1,600.00 1,600.00 1,600.00 1,600.00 2,760.00 55,200.00 2,070.00 41,400.00 230.00
7
Pipeline Current Mapper (PCM) 1,600.00 1,600.00 1,600.00 1,600.00 2,760.00 55,200.00 2,070.00 41,400.00 230.00
PROVISION OF PAN MALAYSIA CORROSION MONITORING SERVICES

Schedule B: Corrosion Monitoring Services Personnel

a. Personnel Mobilisation and Demobilisation Fee

Mobbilisation /
Demoblisation
No COMPANY Region
Fee (RM) Return
Trip

1 All COMPANY in Southern region Southern


including PDB, PGB (GTR) 3500.00
2 PDB & PGB (GTR) Northen 3500.00
3 PDB & PGB (GTR) Eastern 2000.00
4 PDB & PGB (GTR) Central 3500.00

a) Refer to App - 1, App - 2 and App - 3 for List of Location for PDB and PGB (GTR)

b. Standby Rate, Daily Rate, Monthly Rate and Hourly Rate

a) Standby rate will be 50% of daily rate and shall not be applicable to monthly rate
b) Rates for weekend and public holiday to be escalated from daily or hourly rate, whichever lower. Escalation factor for weekend and Public Holiday are
1.5 and 2 respectively.
c) COMPANY shall reserve the right to utilise hourly, daily, monthly or combination of rates

Turnaround/ Shutdown Daily Plant Operation Applicable for


(12 hours inclusive one hour break) (9 hours inclusive one hour break) both

RM/ month
No Category Remark RM/ month
(5 days per week)
RM/day RM/day (5 days per week) not
not inclusive RM/Hour
Weekdays Weekdays inclusive weekend &
weekend & Public
Public Holiday
Holiday

Project Management Team


1 Operation Manager
Corrosion Monitoring Services Personnel
1 CP NACE Level IV (Specialist) 3600.00 72000.00 2700.00 54000.00 300.00
2 Senior Corrosion Technician 720.00 14400.00 540.00 10800.00 60.00
3 Corrosion Technician 672.00 13440.00 504.00 10080.00 56.00
4 Chargeman 624.00 12480.00 468.00 9360.00 52.00
5 Wireman 576.00 11520.00 432.00 8640.00 48.00

PROVISION OF PAN MALAYSIA CORROSION MONITORING SERVICES

Schedule C: Cathodic Protection System Survey

a) Schedule of rate for one team cathodic protection personnel consist of one NACE CP Level 2 and one NACE CP Level 1 to perform comprehensive site cathodic
protection system survey (including trouble shooting and fine tuning of the existing cathodic protection system) and to produce the final report with agreed
format
b) The scope shall covers WORKS in clause 4.2.1, item no 1, 2, 3 & 4 under Exhibit I - SCOPE OF WORKS
c) The report shall be approved by CP NACE Level IV (Specialist)

No COMPANY Region Lump Sum (RM)


1 Malaysian Refining Company Sdn Bhd Southern 180,000.00
2 PRPC Utilities and Facilities Sdn Bhd Southern 75,600.00
3 PETRONAS Chemicals Isononanol Sdn Bhd Southern 6,400.00
4 Pengerang Power Sdn Bhd Southern 5,200.00
5 PETRONAS Gas Berhad (GTR) Southern 96,200.00
6 PETRONAS Gas Berhad (GTR) Northen 91,500.00
7 PETRONAS Gas Berhad (GTR) Eastern 91,750.00
8 PETRONAS Gas Berhad (GTR) Central 97,500.00
9 PETRONAS Dagangan Berhad Southern 14,750.00
10 PETRONAS Dagangan Berhad Northen 25,800.00
11 PETRONAS Dagangan Berhad Eastern 6,950.00
12 PETRONAS Dagangan Berhad Central 29,900.00