Professional Documents
Culture Documents
Downsteam Package
Downsteam Package
SERVICES
RM/ month
Southern RM/ month
(5 days per
(MRCSB, PRPC Central (PDB (5 days per week)
Advanced Corrosion Monitoring Northern (PDB Eastern (PDB RM/day RM/day week) not
No UF, PC INA, & PGB not inclusive RM/Hour
Method & PGB (GTR)) & PGB (GTR)) Weekdays Weekdays inclusive
PePSB, PDB, (GTR)) weekend & Public
weekend &
PGB (GTR)) Holiday
Public Holiday
Cathodic Protection Potential
1
Measurement 1,500.00 1,500.00 1,500.00 1,500.00 2,520.00 50,400.00 1,890.00 37,800.00 210.00
2
Soil Resistivity Testing 1,600.00 1,600.00 1,600.00 1,600.00 2,760.00 55,200.00 2,070.00 41,400.00 230.00
Cathodic Protection Inspection,
3
Fine, Tuning & Troubleshooting 1,200.00 1,200.00 1,200.00 1,200.00 2,400.00 48,000.00 1,800.00 36,000.00 200.00
4
MIJ/ IF Inspection 850.00 850.00 850.00 850.00 1,440.00 28,800.00 1,080.00 21,600.00 120.00
Close Interval Potential Survey
5
(CIPS) 1,600.00 1,600.00 1,600.00 1,600.00 2,760.00 55,200.00 2,070.00 41,400.00 230.00
Direct Current Voltage Gradient
6
(DCVG) 1,600.00 1,600.00 1,600.00 1,600.00 2,760.00 55,200.00 2,070.00 41,400.00 230.00
7
Pipeline Current Mapper (PCM) 1,600.00 1,600.00 1,600.00 1,600.00 2,760.00 55,200.00 2,070.00 41,400.00 230.00
PROVISION OF PAN MALAYSIA CORROSION MONITORING SERVICES
Mobbilisation /
Demoblisation
No COMPANY Region
Fee (RM) Return
Trip
a) Refer to App - 1, App - 2 and App - 3 for List of Location for PDB and PGB (GTR)
a) Standby rate will be 50% of daily rate and shall not be applicable to monthly rate
b) Rates for weekend and public holiday to be escalated from daily or hourly rate, whichever lower. Escalation factor for weekend and Public Holiday are
1.5 and 2 respectively.
c) COMPANY shall reserve the right to utilise hourly, daily, monthly or combination of rates
RM/ month
No Category Remark RM/ month
(5 days per week)
RM/day RM/day (5 days per week) not
not inclusive RM/Hour
Weekdays Weekdays inclusive weekend &
weekend & Public
Public Holiday
Holiday
a) Schedule of rate for one team cathodic protection personnel consist of one NACE CP Level 2 and one NACE CP Level 1 to perform comprehensive site cathodic
protection system survey (including trouble shooting and fine tuning of the existing cathodic protection system) and to produce the final report with agreed
format
b) The scope shall covers WORKS in clause 4.2.1, item no 1, 2, 3 & 4 under Exhibit I - SCOPE OF WORKS
c) The report shall be approved by CP NACE Level IV (Specialist)