RA For Form Work
RA For Form Work
RA For Form Work
TRA-UM-RA-025
Project
Probability
Probability
Severity
Severity
PxS
PxS
S.I Activity Hazards / Possible Risks Control Measures Risk Owner
01 Form Work( Shuttering Falls from Height - Back 4 5 20 Approved method statement 1 5 5 Project Manager/
& De shuttering ) for Injury, Fractures, Cuts, must be in place prior to start Construction
wall, column, slab and Bruises, permanent/partial the work activity. Manager/ Sr. Project
etc Engineer
disability and Fatal.
Obtain work permit system if
applicable to work. Project Engineer,
Foremen
Ensure JSA before starting of
work.
Project Lead HSE
Engineer for
Provide Full body harness
monitoring
and ensure it is safe to use.
Provide individual Life
line(2500kg capacity) while
working nearby edges,
Page 1 of 11
Ref. No. TRA-UM-RA-025
Project
approved by competent
person.
Use suitable ladders for
access and egress.
Ensure all scaffolding
platforms should be erected
4 5 20 by competent person and 1 5 5
Falling of Materials Head Injury,
certified by competent
Fatal, Fractures, Cuts, and
person.
Bruises.
Provide toe board protection
nearby floor openings and
platform opening area.
Safety nets to be place in
opening areas.
Page 2 of 11
Ref. No. TRA-UM-RA-025
Project
Manual Handling-injury to
personnel (Musculoskeletal), Follow color coding system
Page 3 of 11
Ref. No. TRA-UM-RA-025
Project
Page 4 of 11
Ref. No. TRA-UM-RA-025
Project
drawing.
Don’t allow the work until
proper approval of method
statements.
Maintain good housekeeping
in the working area.
Ensure form work materials
are in good condition before
starting of work.
Get necessary approval for
staging and maintain records.
Provide adequate bracings and
locks at every 6 mtr height.
Any scaffolding structure more
3 4 12 than 10Mtr height must have 1 4 4
a design drawing with
approval of competent person
for every interval of usage and
erection.
Slip and Trip – Injury to Provide adequate access and
person, fracture. egress.
Provide adequate illumination
in the working area during
night time.
Maintain good housekeeping
in the working area.
Remove all unwanted
3 4 12 materials from work station. 1 4 4
Clean the oil spillage area.
Grease should be stored in
safe place.
Page 5 of 11
Ref. No. TRA-UM-RA-025
Project
Page 6 of 11
Ref. No. TRA-UM-RA-025
Project
be connected through
RCCB/ELCB.
Ensure all power tools are
110Volt and ensure color
coding in monthly basic.
Ensure all electrical DB’s are
inspected periodically.
Never place live power cable
in water/access.
Ensure usage of correct rating
sockets for correct rating
power supply.
All power tools must be
carried out PAT test for every
3 months once.
4 3 12 Ensure machine in good 1 3 3
condition and, maintain in
periodically.
Provide adequate earing
protection to persons.
Noise- Losing of hearing and Remove the wood saw power
headache. from working area by
4 3 12 periodically. 1 3 3
Provide dusk masks while
working dust area.
Provide adequate blowers for
circulations of fresh air.
Dust- Damage to respiratory
track, and lungs. General Precautions:
Page 7 of 11
Ref. No. TRA-UM-RA-025
Project
Page 8 of 11
Ref. No. TRA-UM-RA-025
Project
Persons in danger
RISK MATRIX
Page 9 of 11
Ref. No. TRA-UM-RA-025
Project
LIKELIHOOD
Remote possibility Could happen but rare Could happen Could happen often Could happen
(once every 3 years (typically once in a occasionally (on (on average once a frequently (once a
S L or more) year) average quarterly) month or more) week or more)
SEVERITY 1 2 3 4 5
(IMPACT)
Page 10 of 11
Ref. No. TRA-UM-RA-025
Project
1-4 Quick, easy controls should be implemented immediately and further action planned for when resources permit. Monitoring required
ensuring controls are maintained. Manage through routine procedures. Go for economic improvements where possible. Incident
Low report must be completed.
Aim to reduce risks but costs of prevention may be limited. Undertake a risk assessment of the situation / task and implement the
appropriate actions. Actions should have a timescale and should be monitored. Where the risk involves work in progress undertake
5-12
a risk assessment as soon as possible to ensure the safety of the situation or task. Work should not start until the risk is
reduced to an acceptable level. Considerable resources may have to be allocated. Contact your Manager and Risk Manager by
Medium
telephone about the actions that should be taken to reduce the risk/s. incident report must be completed. Incident must be added
to service risk register.
Do not commence the activity until a risk assessment has been completed to ensure the safety of the situation or task. If it is
15-25
not possible to reduce or eliminate the risk even with unlimited resources, work must remain prohibited. Inform your relevant
Director, your Manager and the Risk Manager immediately by telephone. Incident report must be completed. Incident must be
High
added to service risk register.
Signature: Signature:
Date: Date::
Page 11 of 11