Professional Documents
Culture Documents
Risk Assessment For Anti Termite Works
Risk Assessment For Anti Termite Works
TRA-UM-RA-027
Project
RISK RISK
RESIDUAL RISK
EVALUATION LEVEL IMPLEMENTED
CAUSES OF CONSEQUENCES/ ACCEPT
SN ACTIVITY HAZARD CONTROL ADDITIONAL
HAZARD IMPACT Y/N?
H/ MEASURES CONTROL
L S L S H/M/L
M/L MEASURES
Page 1 of 7
Ref. No. TRA-UM-RA-027
Project
2 (a)Chemica Insecticide Unsafe Activity Respiratory Area were chemical Work shall be
l Mixing contact & diseases. mixing should be performed in close
Inhalation Drowsiness, on a specified supervision.
3 3 9 1 2 L Y
Headache & location. Site safety should
Dizziness Only trained inform personnel
technicians shall working adjacent
conduct the mixing to the application
of insecticide. area that they
Person in charge should have at
shall demonstrate 30mtrs radius
knowledge of away.
pesticide label and
Material Safety
Data Sheet prior to
mixing of
chemicals.
Must use of PPE
(Chemical resistant
gloves, respirator
with filter mask,
goggles and long
sleeved shirt)
during chemical
preparations.
3 (b) Hose Unsafe Explosion Make sure that the Site safety should
Spreading entanglem Condition hose is properly laid inform personnel
the hose ent. and spread along working adjacent
3 2 6 1 2 L Y
on target. the area to give to the application
proper of solution area that they
inside. should have at
Page 2 of 7
Ref. No. TRA-UM-RA-027
Project
4 (c) Usage Whole Unsafe Ergonomic related Personnel working Make sure that the
with pressure
of the body Condition injuries. pressure machine
equipment will be
pressure vibration. Explosion. trained to operate is well conditioned
3 2 6 1 2 L Y
machine. White the equipment. at all times prior to
finger, Mandatory PPE will usage
Diesel be used at all
spillage times.
and tank Making sure that
the tank cap is
ignition.
tightly closed
before switching
the machine.
5 Chemical Unsafe Activity Chronic respiratory Personnel doing the Site safety should
(d)
inhalation diseases. treatment should be inform personnel
Spraying of
and Ergonomic related well trained working adjacent
the target
contact injuries. technicians to the application
area. with eyes Irritant 3 2 6 (Chemical area that they 1 2 L Y
and skin eyes & Skin. handling). should have at
and other application rate and 30mtrs radius
body parts. MSDS of the away.
Chemical material being used
spillage on to prevent chemical
target spillage.
area. The body posture
Wrong should be
body ergonomically done
posture to prevent injury to
during personnel while
application doing the
. application
Page 3 of 7
Ref. No. TRA-UM-RA-027
Project
6 (e) Pulling Possibility Unsafe Physical injuries Personnel should Quarterly training
the hose of tripping Condition remove the hose of personnel
back to the if the hose from the application conducting the
is not 3 2 6 1 2 L Y
pickup area after usage to treatment on
truck. immediatel prevent tripping MSDS, application
y removed hazard to and handling of
from the personnel. sprayer machines
area of Maintain good and chemicals.
application. housekeeping in the
working area.
Page 4 of 7
Ref. No. TRA-UM-RA-027
Project
Persons in danger
Page 5 of 7
Ref. No. TRA-UM-RA-027
Project
RISK MATRIX
Risk Rating (RR) – Severity x Likelihood
LIKELIHOOD
Remote possibility Could happen but rare Could happen Could happen often Could happen
(once every 3 years (typically once in a occasionally (on (on average once a frequently (once a
S
or more) year) average quarterly) month or more) week or more)
L
1 2 3 4 5
SEVERITY
(IMPACT)
Page 6 of 7
Ref. No. TRA-UM-RA-027
Project
1-4 Quick, easy controls should be implemented immediately and further action planned for when resources permit. Monitoring required
ensuring controls are maintained. Manage through routine procedures. Go for economic improvements where possible. Incident
Low report must be completed.
Aim to reduce risks but costs of prevention may be limited. Undertake a risk assessment of the situation / task and implement the
appropriate actions. Actions should have a timescale and should be monitored. Where the risk involves work in progress undertake
5-12
a risk assessment as soon as possible to ensure the safety of the situation or task. Work should not start until the risk is
reduced to an acceptable level. Considerable resources may have to be allocated. Contact your Manager and Risk Manager by
Medium
telephone about the actions that should be taken to reduce the risk/s. incident report must be completed. Incident must be added
to service risk register.
Do not commence the activity until a risk assessment has been completed to ensure the safety of the situation or task. If it is
15-25
not possible to reduce or eliminate the risk even with unlimited resources, work must remain prohibited. Inform your relevant
Director, your Manager and the Risk Manager immediately by telephone. Incident report must be completed. Incident must be
High
added to service risk register.
Signature: Signature:
Date: Date::
Page 7 of 7