Minutes of Meetings Held On 3rd August 2023
Minutes of Meetings Held On 3rd August 2023
Page 1 of 4
Pumping arrangement to be used to pump sewerage to the tank outside the compound wall.
Suitable pipe lines to be laid to use this water for gardening.
For Canteen, Administrative building, and packing plant area local soak pits to be made.
Drawings to be made for the soak pits and decide their location.
To be discussed and finalised the location with VAASTU Consultant on 17th August.
Page 2 of 4
List of own fabrication items (Turbovent & Site) and their estimates to be made.
14. NITROGEN GAS PLANT FOR UNIT 1 & UNIT 2 COAL MILL
Proposal to be discussed.
16. PREHEATER-1
Top Cyclone replacement with KHD design.
17. KILN-1
Burner pipe to be replaced.