TABLE OF CONTENTS
1) Electrical Power 4
1.2. Transformer 4
1.3. Genset 6
2) Electronic System 9
2.3. Telephone 12
2.4. CCTV 13
4) Plumbing 23
2
4.5. Piping 32
5) Fire Protection 33
5.1. Hydrant 33
5.2. Sprinkler 33
5.3. Piping 34
6) Elevators 38
6.1. General 38
8) Garbage 43
9) Emergency Staircase 44
16) Contractor 52
3
1. ELECTRICAL POWER (PLN, TRANSFORMER, GENSET)
PLN Connection
No Hotel
100 rooms 200 rooms 300 rooms
Fave, Neo
1 275 KVA 555 KVA 830 KVA
Notes:
1. Power connection rate follows PLN rate standard.
2. PLN room size, 4.5x4.5 m2 for Connection until 865 kVA, more than that
please discuss with local PLN
3. Room Air circulation, 30 times air change.
4. Ventilation system could use Fan for exhaust and use Louvre for Intake, with
air speed at louvre max. 500 cfm, and noise max. 65 Db.
5. There should be a Smoke Detector, Emergency lamp, and Fire Extinguisher
(NO Sprinkler)
6. All cable distribution must use cable rack / ladder.
7. Cables size of MV cable from PLN to Hotel MV Cubicle minimum using size
150 mm.
8. PLN rooms can be built by Owner or by PLN, depending on local regulation.
4
1.2. Transformer & LVMDP
Transformer Capacity
No Hotel
100 rooms 200 rooms 300 rooms
2 Neo+, Aston city, Aston 500 KVA 1.000 kVA 1.250 KVA
Inn, Aston Inn
5
Transformer and Medium Voltage Cubicle
2 Neo+, Aston City, Aston 500 KVA 1.000 KVA 1.250 KVA
Inn, Aston Inn
● Genset could be Silent type or Open type with residential type noise silencer;
and must be Prime or Continuous Rated type.
● Genset Capacity must be 10%-20% above the total maximum electricity load.
● Alternator - Class H rotor & stator insulation, Semi-automatic with motor
driven circuit breaker can be manual changeover maximum 1 minute;
● Fuel - Diesel or LNG if available
● Controllers - Semi automatic with motor driven circuit breaker;/ Air circuit
Breaker
● Genset Room must be sound proofed and free flood area
● Noise levels - Maximum emitted noise level 65 dB 3 m from Genset
● Fuel storage:
o Fuel storage could be Grounded or upper tank
o Daily tanks must be filled automatically from Weekly tank, by pumping
system or gravitation system.
6
o Fuel meters must be fitted at the inlet pipe of the weekly tank and outlet
pipe of daily tank.
o Fuel must be well treated and drain fuel on a yearly basis to avoid water
coagulant in the diesel fuel.
o Must be there a manual pump and electric pump to lift fuel oil.
o Capacity of Fuel Storage:
Genset
7
Smoke Detector in Genset room Sound proof in genset room
● Note:
Lightning Rod
10
▪ Sound system will announce if the hazzard can not overcome by
team, and needs City/Local Fire Brigades Team (General Alarm)
o PABX, autodial to Local Fire Brigades, note: use 10 minutes delay time
from General Alarm activated;
o Genset Status monitoring;
o Fire Pump Status monitoring.
o Door Contact Control, to open access lock.
● General Alarm status can be activated manually by pushing the General
Alarm button on MCFA or Annunciator.
General Alarm status also will be activated if the time as setted up. General
Alarm will be activated view minutes after General Alarm status, As follow:
11
Main Central Fire Alarm Heat Detector
● Note:
12
Smoke Detector Extinguisher Hydrant Box Break glass Red light Bell alarm
● Should use speakers in all guest rooms, public areas and offices (back of
house). We should use the speakers for each room because it is safer. The
speakers on the corridor mounted at every 8 meters distance.
● Server room and Control room must have a speaker.
● Speakers in corridors and lobby suggested using fire resistant cable;
● Sound System grouping:
1. Guest room (without control volume) is one group separately
2. Main Lobby, corridor/ public area (parking area, swimming pool and
rooftop) and office are one group (using volume control)
3. Restaurant/ coffee shop and banquet are one group
Note:
If the fire occurs in all group areas, it could be controlled by one selector and the
sound could be heard in all that group area. The announcement will be announced
through one microphone.
● Must have UPS.
● Paging Mic must be at the Reception, Security Room, and Control Room.
● Zone Selector Paging must be put at Reception.
2.3. Telephone
Transtel PABX
Telephone Console
14
Notes: For signal amplifier (Phone)
1. Will be provided by phone provider and supposed to be multi BTS (Base
Transceiver Station)
2. Management suggests to the provider installing the BTS or provider can
come to the management.
3. BTS room usually in the basement or ground floor and antenna on the
rooftop of building
4. It should be installed before the hotel opening or during project
5. Never use Panasonic as they are not designed for hotels and do not work with
VHP or billing systems.
2.4. CCTV
DVR CCTV
CCTV Monitor
Note:
CCTV positions:
1. Drop off area
2. Reception
15
3. Main Lobby area and Restaurant
4. BOH Corridor
5. Cash drop in FO room
6. Loading dock area
7. Finger print (Attendance of employees)
8. In and out of the car parking area
9. Each car lifts
10. Each floor-lift lobby
11. Each emergency exit
12. Room corridor
13. Kids Swimming pool area
14. Power House area (Generator, transformer and panels LVMDP)
15. Kitchen-Leads to the Work Area
2. TV Content
16
Hotels should have 2 internal hotel channels that consist of hotel promotional
channels and corporate office promotional channels.
Hotels should use the digital MATV technology that will increase the TV
content quality and also reduce the number of devices used in the old analogue
TV content distribution technology.
This technology simplifies the use of equipment, it doesn’t use too much space
and reduces energy consumption.
We suggest not to use fiber optic cable to deliver TV content from the TV
provider. This is because the fiber optic cable is most likely used by the
internet connection as well which will increase the risk of having both services
unavailable when there is a problem with the fiber cable. This also means
there will be no redundancy for the TV content when there is an issue with the
fiber cable.
It is best to use the C-Band satellite dishes to deliver the digital TV content.
We can have half/some of the channels delivered by 1 dish and the others by
another dish. Since it is a C-Band satellite, then it will not be affected by
weather, and it will be available nationwide.
4. TV Content Pricing
17
2.6. Control Room and Server Room
● For Fave and Neo hotels class, control room and server room could be
combined, located next to FO room.;
● For Aston City, Aston, Grand Aston hotels class, Control Room and Server
room could be separated. IT Server, MDF telephone, and PABX are put at the
Server Room. Sound System, CCTV DVR, and MATV modulator are put in
the Control Room.
● DVR CCTV is placed in the Control room but must be there the display
monitor at Security room;
● MCFA put at Security office; and the annunciator must be there at
reception/operator;
● Lift intercom must be put at Security Room and Reception/Operator room
(where the duty staff 24 hours and quick responses);
● Fire jack intercom put at the Security room.
● For safety, the control room and server room must have a thermatic sprinkler,
extinguisher and don’t use a water sprinkler.
● For the hotel that is already using a cloud server, no need to have a back up
AC.
18
TelkomVision / Closed Indovision / TransVision
19
● Central chiller - Capacity 450 RT(1265 KWr) at LCWT 7 deg C, AECT 35
deg C per 800m2, refrigerant R134A (300 Rooms);
● Cooling tower - Roof mounted dual flow water based, water make up tank
and treatment unit pumps supply and return 1 operational 1 standby
● Piping - WEFA Plastic PP-R supply and return chilled water
● Fan coil units rooms -Fan coil units recessed in ceiling nominal capacity 9000
btu/h per 16m2, air volume minimum 300 cfm
● External static pressure 75 Pa / 0.3 WG, evaporator with fin tube aluminum
inner grooved copper coils
● Forward curved Double inlet Centrifugal fan minimum 3 speed motor noise
level maximum 45 db at 1 meter below grill outlet
● All public toilets to have A/C
● Cold Kitchen area, Butcher room, and Pastry room must have A/C supply.
● DAIKIN and Mitsubishi brand is recommended.
● Every floor supposed to have a light indicator
● Must be able to achieve room temperature of 18 degrees Celsius
● The length of pipe for indoor and outdoor should be based on the
manufacturers’ recommendations – so make sure to be checked.
● Hotels with unstable electricity supply area should use stabilizer for AC PRV
(Inverter)
● AC outdoor units must be put at the foundation base with rubber mounting.
● AC condensate drain pipes must have v-trap to avoid bad smell coming from
sumpit or gutters.
Note:
● 16m2 to 20m2 hotel rooms - 1 PK to 1.5PK
● 20m2 to 30m2 hotel rooms – 1.5 PK to 2PK
● 30m2 to 40m2 hotel rooms - 2 PK to 3PK
● Should be in the range Minimize Indoor and Outdoor pipes not exceeding
10m
● The AC compressors outside should not face each other, and they should
have good air circulation, so they work efficiently.
20
● The Outdoor AC should be located in a proper place in order to have good
air circulation, easy to access during maintenance and meet the aesthetic
function.
● All piping should be well insulated, indoor outdoor should be well
presented.
● For individual/split AC, the minimum length of refrigerant pipe is 6 meters.
1) Central Water Chiller require more space and good water quality
2) When the Central Chiller is placed on the rooftop Engine Mounting system
must be good to avoid vibration space underneath
3) Central Air Chiller space is usually smaller than Central Water Chiller and
should be located at the roof top and Engine Mounting good
4) Central Chiller in operation more simple and faster cold achieved in Central
Chiller always room for standby
5) The first initial Central Chiller investment is more expensive because in
addition to the Chiller it also requires additional equipment such as
Contribution Water Pipe, Cooling Tower, Child Water Pump and Pump
condenser when using a Cooling Tower
6) Chiller System usually use three (3) compressors, the compressor will work
automatically i.e. When the load is full, all three (3) compressors will work
simultaneously and on the other hand when the load of the chiller is not
full, the chiller might use 1 or 2 compressors to work.
7) Usually Total Chiller in TR (Ton Refrigerant), 2 Chiller operates and 1
Chiller Standby
8) We recommend that when using the Central Chiller, Hotel Occupancy per
day is above 60% considering the large amount of power electric needed for
Chiller
9) The heat from the condenser of Central Chiller can be used to produce
water added heat to the room with Heat Exchanger
21
AC Central with Compressor Reciprocating
22
Exhaust Bathroom Central Exhaust Fan in the Bathroom
1
Pump Room 15 – 20 times
5 Storage 7 – 15 times
7
Floor Panel Room 10 – 20 times
10 STP 30 – 40 times
23
11 Guest room Toilet 30 – 50 cfm/wc
24
3.4. Fan and Ducting of Kitchen Hood
1 Fave, Neo 95 m2 8.000 cfm 7.000 cfm Axial 850 x 600 mm2
2 Neo+, Quest 130 m2 11.000 cfm 9.500 cfm Centrifugal 1100 x 600 mm2
3 Aston, Harper, 155 m2 13.000 cfm 11.000 cfm Centrifugal 1300 x 600 mm2
Alana
25
4. PLUMBING SYSTEM
(CLEAN & HOT WATER, WASTE WATER, AND DRAINAGE WATER)
Water sources
Water Consumption
No Hotel
(m3/room/day)
26
100 rooms 200 rooms 300 rooms
Note: Roof tank capacity is approximately 30%-35% of Clean Water Tank Capacity.
● GWT capacity is the sum of CWT and RWT. GWT capacity follow table below:
27
2 Neo+, Aston city, Aston 180 m3 240 m3 360 m3
Inn, Aston Inn
● The water must be tested by a government laboratory before the hotel opens,
then every 6 six months and the results reported to the corporate office.
● Water quality must follow Indonesia government standards, PERMENKES
1990, as Daftar Persyaratan Kualitas Air (Drinking water quality requirement)
below:
28
29
● Water filtration is conducted depending on the quality of the water resource.
However, for deep water; a sand filter and carbon filter are a must; the silica
and carbon should be replaced at a minimum of once a year. ( see the test result
from proper lab government/sucofindo) see the lab recommendation.
● TDS (total dissolved solids) should be below 450 ppm, if above 450 ppm not
recommended to use.
● After the filter (Sand Filter and Carbon Filter) - A water treatment for
corrosion, scale, algae and bio-fouling is recommended.
● Water softener is needed if the water containing hard ions is more than
standard.
● Kitchen water supply must be separately filtered - minimum 5 Micron plus UV
sterilizer;
Equipment:
● Filter pumps and Transfer pumps must be dual pumps, one duty and one
standby.
● The building with more than 5 stories from the pump room floor is needed to
be fitted with a Water Hammer Absorber/Arrester on the Vertical Transfer Pipe
to avoid vertical back pressure. You must install a non return valve for
guaranteeing no water hammer noise.
● Roof tank must have two compartments
● Water Level Control (WLC) must be installed at Roof tank and GWT, in order
to make sure the water is always available by manual control and electronic
control.
30
● Booster pump package must be completed with VSD (Variable Speed Drive)
control.
● Booster pump package at roof top must be low noise type, Grundfos brand is
recommended.
● Water Pressure at head shower must be approximately 2 bars (12-15 liters per
minute);
● Height of the Head shower is 2 meters from the floor, or 2.15 meter from the
floor to the branch of Head shower.
● Showerhead level of the pool shower is 2.2-2.4 meters.
● High recommend using a cover roof to avoid direct rainwater into the booster
pump.
● A utility room like Pump room, Booster pump and roof tank area, and also A/C
outdoor area, need to be installed with a water tap/faucet.
31
Omron Water Level Control (WLC) Stick WLC
32
4.2. Central Hot Water
● Heat pumps - dual air to water sized to provide heat recovery at 75 liters per
hour per room at ambient temperature 25° C
● Storage tanks - Hot water storage capacity @ 50 liters per room pressurized
insulated tanks SS to SUS 304, minimum divided into 2 tanks with
temperature 55° C in system (storage capacity depends on total rooms and
hotel facilities).
● Piping–use PPR high-temperature maximum 70c.
● Pumps:
o Must have circulation dual pumps (1 duty, 1 standby) that circulate hot
water between heat pump and storage tank.
o Must have return dual pumps (1 duty, 1 standby) that circulate hot water
between Storage Tank and Guest Room Shower.
o Hot water system and Cold-water system must use the same pump
package.
● Please check if Pressure Reducing Valve(PRV), for low zone hot water
system is already installed
● Power cable installation for the heat pump at the roof must use a cable cage.
● Hot water storage tank:
o Must be well insulated with rock wool 80 kg/m3 and aluminium sheet, in
order to avoid lost energy.
o All hot water piping should be well insulated to avoid energy losses.
o Must be tested at 1.5 times of working pressure and minimum at 6 bar
pressures, well documented the water test pressure.
o Must have pressure release safety devices and safety valves to protect the
system from high/overpressure or heat/overheat.
o Must have a temperature indicator and pressure indicator (pressure gauge
and thermometer control)
o High recommend using a cover roof to avoid direct rainwater into the hot
water tank and Heat pump.
33
Heat Pump Hot Water Storage
● It's recommended not to use the floor drain near the closet of the guest
bathroom, unless the shower area uses a dike.
● At a public toilet using floor cleanout instead of floor drain.
● The waste pipe must have a u-trap or gully trap before sumpit or sewage pit.
● Sumpit and Sewage pit must be equipped by a venting pipe.
● The hotel must have a Sewage Treatment Plant system, except if the
government has centralized STP.
● Waste water and Sewage water must be treated at STP.
● Waste water pipe and Sewage water pipe must have separated the Venting
pipe.
● Vent Cup of Venting pipe must be put at roof level.
● Sewage Treatment Plant (STP), The system should be an Extended Aeration
system.
● RBC System is not recommended.
● The capacity of STP is 120 % of daily water consumption or in accordance
with local regulations; we need a minimum of 24 hours for the bacteria to
digest the solid waste to become water in proper BOD (30 ppm) and COD
(50 ppm) results.
● Where possible the STP water is used as water flashing and ideally have
extended aeration;
● Exhaust fans must be used in STP with capacity 30 times air change per hour.
● Main V-Trap must be installed at horizontal main sewage (grey) pipe, just
before entering the STP.
● The drain for sumpit, sewage pit, grease trap, and STP must use
double-pump, (single pump is not allowed). Set them parallel alternately.
● Height of the mezzanine of STP 1.8-2.0 meters.
34
● STP must be equipped with effluent water flow metering.
4.4.1 General
● Swimming pools to be maximum 1.4 meters deep.
● 60 cm deep for kid’s pools with a 3-meter separation from the adult pool
● Suitable handrails fitted to allow safe entry and exit;
● Non-slip surfaces to all walking areas around the pool;
● “Floor safe” suitable for treatment of stone, concrete, ceramic tile or marble;
● Point return jets to the bottom of the pool as it is the best filtration position.
● Must have CCTV camera installed at kiddy pool area for safety;
● Water treatment for prevention of corrosion, scale, algae to minimize the
volume of chemical dosing should be installed in the pre-filter return piping
from the pool.
● Inlet nozzle 30cm - 50cm from surface water level.
35
● Make sure to maintain the water quality, keep clear, pH level (7,2-7,8)
Chlorine level ideally 1,5 ppm. recorded on a daily basis
● Do a vacuum and put chemicals on a daily basis to make sure water quality is
good and healthy.
4.4.3 System
● Turnover time of swimming pool water, 6-7 hours
● 2 (two) Electrical circulation pumps mounted above the floor of the pump
room to avoid damage by flooding of the pool pump room and turn over 7
hours.
● Circulation pump must be completed with a see glass/tube to check whether
there are air bubbles or not.
● “Hayward” recommended sterilization by way of manual or automatic dosing
system; it could be Hayward/Astral/ or Pentair.
● Filtration should be sand type a minimum of two units and sized to suit the
volume of pool water. “Hayward” recommended; the silica and carbon should
be replaced minimum once a year depending on the situation.
● Filter position should not be far from the pump to avoid slow circulation.
● Ensure no suction or pressure leaks that will cause low water pressure.
● No Iron accessories in the pump room, try PVC for less corrosion.
● Piping installation must be accommodated by the vacuuming system using a
circulation pump: must have vacuum piping and the suction outlet.
● Heating of swimming pool in certain locations using heat pump with titanium
heat exchanger sized to suit the volume of pool water and ambient
temperature variations;
4.4.4 Accessories
● Depth indicators must be visible from any entry point to the pool
● User regulations must be visible from any entry point to the pool
● Must provide a life ring and safety precautions/rules announcement board
near the pool
● No Lifeguard on Duty and No Jumping signage must be in clear sight around
the pool area
4.4.5 Operation
36
● pH and Chlorine must be checked every day.
● Pool water quality must be laboratory checked every 3 months
● Water quality must follow Indonesia government standard, as below:
4.5 Piping
37
Piping PPR for Cold Water (blue line) Piping PPR for Hot Water (Red line)
5. FIRE FIGHTING
5.1. Hydrant
● Fire Pumps consists of Electric Pump, Diesel Pump, and Jockey Pump.
● Fire Pump could be Centrifugal End Suction, Horizontal Split Case, or
Vertical Split Case type.
● Jockey Pump could be Vertical Multistage type.
● Electrical/Diesel Pump Capacity:
o 100 rooms: 500GPM-750GPM
o 200 rooms: 750GPM-1000GPM
o 300 rooms: 1000GPM-1500 GPM
● Jockey pump vertical multistage 25 gpm to 50 gpm connected to pressure
tank steel plate 250 liters 10-20 bar;
● Suction must be Positive suction. Putting the fire pumps above gwt is
prohibited.
● Diesel pumps must have an auto charger for the accumulator.
● Fire Pumps on-off setting:
● Hydrant Box pressure is 7 bar -12 bar with 250 liter/minute capacity for 2.5”
hose.
● But for 1.5” hose , the pressure is 5-7 bar.
● IHB (Indoor Hydrant Box) is installed every 800 sqm area.
● IHB must be maximum 30 meter from hazards.
● IHB must be completed with alarm, indicator lamp, manual push button &
intercom jack;
● Hose reel - Hose reel “machine” coupling valve with brass hose nozzle;
● IHB bottom level must be at 20 cm above the floor.
● Siamese connection - Siamese connection at ground level front of building
and minimum separated 5 meter from building;
● Siamese Connection must be affordable by DAMKAR.
38
● OHB (Outdoor Hydrant Box) and Hydrant Pillar should be installed around
the building with the maximum distance between OHB is 60 meters.
● OHB and Hydrant Pillar should be installed minimum separated 5 meter apart
from building;
● OHB Must have concrete foundation 20 cm above ground level.
● The Hydrant Pillar must have a gate valve.
● Outdoor hydrant pipes better put up the upper ground instead of underground.
5.2. Sprinkler
● Distance between Sprinkler is 3-4 meters for general area and 3 meters for
parking area;
● Sprinkler Type:
o Room: Sidewall type sprinkler;
o Corridor, Public area, BOH: Pendant sprinkler;
o Parking area: Upright sprinkler.
o Kitchen: Using 94 degree celsius sprinkler, with green color of liquid.
● Each end of the sprinkler pipe at each floor needs one valve drain;
● At the beginning of Sprinkler Branch pipe, must install BCV (Branch Control
Valve) that consists of Flow switch, Tamper switch, and Test Drain Valve.
Temper switch and Flow switch are connected to MCFA;
● Automatic Air Vent (AAV) must be fitted at the top of hydrant and sprinkler
pipe;
5.3. Piping
39
Electric Fire Pump Diesel Fire Pump
40
Sprinkler Head Hydrant Box, Hydrant Pillar, and Accessories
41
5.4. FIRE EXTINGUISHERS (ALL HOTELS)
Max. Distance
NO Room/Area Extinguisher Capacity
to Hazard
CO2 2x@3kg
CO2 2x@3kg
42
5.5. FIRE TROLLEY
● Fire Trolley is a trolley containing emergency equipment such as
fire-resistant clothing and shoes, masks, axes, hammers, flashlights, safety
helmets, extinguisher, etc.
● Fire Trolley is located at a visible location on the Evacuation Floor,
commonly the evacuation floor is ground level.
● The equipment on the Fire Trolley will be used when a Fire accident occurs.
Powder Extinguisher
Foam Extinguisher
CO2-Extinguisher
43
6. ELEVATORS
6.1. General
44
6.2. Passenger and Service Lift Qualification:
Lift Capacity
More lifts may be required if for example the ballroom is located on the roof etc.
Lift Speeds
Passenger Lifts
Speed
Number of Floor
Mpm m/s
Service Lifts
Speed
Number of Floor
Mpm m/s
10 – 17 floors 60 1
45
Lift Dimensions
Passenger Lifts
Service Lifts
46
7. KITCHEN AND GAS ROOM
7.1 General
47
Here is the contact for any information needed:
● Mobile : 0817 0383 9710 Kidde Vendor
● Mobile : 0819 3197 5408 Range guard
● Mobile : 0816 730 579 Amerex
● If a hotel dont have Fire suppression system yet at the exhaust hood, the hotel can
not be opened and operated.
● Make sure the 'Nozzle' position of the automatic extinguishing system is suitable
and leads to the equipment installed in the hot kitchen area, especially the Deep
Fryer and Wok Areas
● Ansul, Amerex, Kidde and Range guard brands are recommended.
● Fire Suppression systems have two release valves: automatic release valve that is
triggered by bimetal heat sensor, and manual release valve (mechanically by
man).
● When the system detects a fire, the Fire Suppression system can
automatically (pneumatic) shut-off gas supply to the Kitchen appliance.
● Gas system has a solenoid valve (electronically automatic) that is triggered
by a gas detector and manual emergency button in the Kitchen area.
● Gas Emergency turn-off button panel must be located at easy to operate area
in the kitchen;
● Gas system also must have a manual shut-off valve near the turn-off button
panel.
● Gas Detectors are put in the kitchen and bottle gas storage. Gas kitchen
detector is installed at every nozzle of the gas pipe at 10 cm to 30 cm height
from floor.
● Bottle Gas Room must have a gas detector at least 2 pcs installed at 5-10 cm
from the floor.
● Gas detector must be connected to the emergency alarm/lamp at the Security
room and Engineering room, or the gas panel control is connected to MCFA.
● Gas bottle storage: Maintain room air at warm temperatures, can help
maximizing usage of gas in storage bottles by installing A/C outdoor units or
other form of heating in the bottle area.
● Gas system must be equipped by a gas metering.
48
● Gas bottle room must have a hot water supply.
● Gas bottle room must be waterproofed and finished by ceramic tile.
● Gas bottle room must be equipped with a valved floor drain.
● Gas room must have a ventilation system or the gas bottle room is an open
air room.
49
8. GARBAGE
● Garbage room consists of Dry garbage room, Wet garbage room,Hazard and
Toxic garbage (B3) (sewage of B3).
● Room dimension:
Fave 4 m2 4 m2 4 m2
Quest 4 m2 4 m2 4 m2
Aston 6 m2 6 m2 4 m2
Grand Aston 6 m2 6 m2 4 m2
● Floor and Wall of Dry, Wet, and B3 garbage room must be covered by white
ceramic tiles.
● Dry and B3 garbage room must have ventilation system
● Wet garbage rooms must have AC systems, clean water faucet, and floor drainage.
● Garbage room door must be made from metal material
50
9. EMERGENCY AREA
● Assembly point should be placed in a safe area (away from gas tank and any
other danger areas) The sign must be clearly visible (proper size and height)
51
10. EMERGENCY DOOR
● The emergency door should be made of two layers of metal door, and have
rockwool in the middle
● Door must use Panic Bar
● The emergency stairs must be set with a Speaker and Emergency lamps
● Direction of pressure rise fan should inflow, so that emergency stairs have
positive pressure
52
One speaker mounted the stairs Chemical Room to the 2nd floor emergency
53
Engineering Tool Kits Engineering Store Room
54
11. GUEST ROOM TOILET
V-Trap V-Trap
55
12. UNIVERSAL OUTLETS / BEDROOM OUTLETS
● All hotel rooms must have at least one – normally located at the writing desk.
● Universal socket outlets must have standby electricity power even when the room
key tag is opened.
● If the socket and switch are located side by side, then they must be in one frame.
● Bedside Areas need a minimum of one free outlet on each side of the bed for
King/Queen beds and one each for twin beds. Outlets are recommended to have
additional USB ports
56
13. NOISE LEVELS
3 Aston, Harper, Alana 1500 x 500 mm2 2000 x 700 1600 x 600
57
15. MAINTENANCE CONTRACT AND GUARANTEE LETTER
1. Guarantee letter
● Content of the guarantee letter:
o To ensure that the equipment that is purchased is original and fulfil the
promised specifications
o To ensure that the equipment/parts will be replaced if there is/are faults in the
equipment
o To ensure that the guarantee period is at least 1 year after the purchase
● Every equipment that is purchased (fire suppression, lifts, gensets, MCFAs, and heat
pump, etc.) must be accompanied by a guarantee letter from the vendor
16. CONTRACTOR
58
● Contractor shall submit shop drawings to the consultant or owner representative for
approval
● The Contractor shall obtain approval from consultants and Archipelago, for the
system or installation that do not conform to the drawings and MEP Specification
● Contractor must perform partial test and commissioning tests for all systems
● Contractor must submit the following items in the acceptance of overall work:
o As Built Drawings
o Partial test and Commissioning Test Reports
o Manual operation and Maintenance Procedure of All Equipment and
accessories
o Engineering Training Report
o Supplier and vendors list included company name and contact person
o Guaranty Letter from Supplier and Vendors
o Guaranty Certification from relevant government departments
o Engineering Checklist Report
● The following maintenance contracts are required to ensure the proper maintenance of both the
Fire and Safety systems and the larger and more expensive systems in the hotel. Outside
maintenance contracts are to safeguard the owners assets and to lengthen the lifespan of the
equipment through professional outsourced maintenance programs.
59
2. Guest Bathroom area
a. All bathroom floor
b. Shower area wall, 1.8 meters from the floor
c. Wastafel area wall, 1.2 meters from the floor
d. Closet area wall, 0.8m if the wall used is the corridor wall
e. Closet area wall, 0.2m if the wall used is the room wall
3. Kitchen in the wet area
a. All kitchen floors if there is room below the Kitchen.
b. All wet area walls, 1.2 meters from the floor.
4. Public Toilet
5. Swimming Pool
6. Gas bottles basin
Kone
distributor /
Kone
Hyundai
1 Elevator/Lift Hyundai Roomless type
distributor
Mitsubishi
/ Mitsubishi
distributor
Local
Daikin distributor/Ja
2 AC VRV/Inverters
Mitsubishi karta
distributor
HiCop
3 Heat Pump Solarhart COP 4-5
Rheem
Electric water
4 Solarhart Efficiency 85%
heater
Transfer Pump /
Grundfos
6 Submersible based on capacity
Ebara
Pump
Engine:
Perkins, Mitsubishi,
7 Genset silent type
Cummins
Alternator: Stamford
60
8 PABX Transtel Latest type
Simplex
Semi addressable/full
9 MCFA Edward
addressable
Notifier
Jockey Hydrant
12 Grundfos Follow NFPA
Pump
GuardAll
HooSeki
Hydrant pillar, Gunnebo
13 Follow NFPA
Hydrant Hose Ozeki
ProEx
Viking
Range Guard
Fire Suppression Kidde
15 Follow NFPA
system Amerex (with stainless steel)
Ansul
Schneider
17 Transformer Dry or Oil
Trafindo
Schneider
18 ACB
ABB
Schneider
LVMDP/ MCCB/
19 ABB
MCB
Merlin Gerin
61
Kabelindo
Supreme
Low tension
21 KabelMetal size based on required
cable
Kabelindo
Supreme
22 Outdoor cable KabelMetal size based on required
Kabelindo
Rucika
26 Waste water Pipe PVC AW Class
Vinilon
Hydrant pipe
28 HDPE size based on required
under ground
Wash
30 Toto Brand Any type
basin/fitting
Kruger
Exhaust Fan Nicotra
33
Central Maxwell
Lavfill
CKE
35 Utility Room Fan
VANCO
Kruger
36 Kitchen FAN Nicotra Bifurcated
Maxwell