- INSPECTION OF PANELS
- MOUNTING OF CANOPY THY
FANS , PANEL METERS ETC.,
- INTERPANEL WIRINGS
- EXTERNAL CABLING &
OPERATING INSTRUCTION
FOR TERMINATION
- EARTHING
STATIC ( PANEL
EXCITATION &
EQUIPMENT
ELECTRONIC )
- TIGHTNESS OF ALL TBs
- AVAILABILITY OF
CONTROL SUPPLY
- MEGGERING
- HEALTHYNESS OF
ELECT. COMPONENTS LIKE
COILS FUSES, RESISTORS AND
AUX.CONTACTS.
- LOCATION OF MODULES
OPERATING INSTRUCTION
- SECURING
FOR ELECTRONIC
MODULES PROPERLY
STATIC EXCITATION TO THE
EQUIPMENT
CONNECTORS.
- HEALTHYNESS OF
THY.DEVICES
• STATIC CHECKS ON
CONTROL AND POWER
ELEMENTS .
• SETTING OF MODULES AS
PER TEST REPORT
• MAKING GEN.CT CIRCUIT
OPERATING INSTRUCTION
THROUGH
FOR
• PANEL CHARGINGEQUIPMENT
STATIC EXCITATION
• DISTRIBUTION OF AC/DC
• PHASE SEQUENCE
• HEALTHYNESS OF POWER
SUPPLIES
• HEALTHYNESS OF
ELECTRONIC MODULES
REF: 18-06-2004 / PR3
• SIMULATION OF Ug , Ig & If .
CALIBRATION AND DISPLAY
ON TERMINAL
•PROTECTION AND
INTERLOCKS.
•CHANNEL HEALTHYNESS
OPERATING INSTRUCTION
•PROTECTION
FOR CHANGE-OVER
•ALARM AND SIGNALLING
STATIC EXCITATION EQUIPMENT
•LOCAL / REMOTE CONTROLS
/ INDICATIONS
• FIELD BREAKER OPN.
• PROTECTION TRIPPING
REF: 18-06-2004 / C1