COST CENTERCOST

PRODUCT ACCOUNTING
CONTROLLING
END USER TRAINING DOCUMENTS

KKS6 -

Functionality

You use this transaction to calculate the variances for one or all product cost collectors for
a particular material in the plant. As you want to calculate variances only for one particular
product cost collector, you have to specify a production version.
The system compares the control costs with the target costs and assigns the variances to
variance categories.
Target cost version 0 is used to explain the difference between the debit and credit of the
product cost collector or manufacturing order. The target costs calculated on the basis of
the current standard cost estimate are compared with the actual costs from which the work
in process has been deducted. The difference is assigned to different variance categories
depending on the cause. Only the variances calculated with target cost version 0 can be
transferred to Profitability Analysis (CO-PA).
With target cost version 1, production variances for the product cost collector are calculated
using the target costs determined on the basis of the preliminary cost estimate for the
product cost collector. If you are using a product cost collector, the target costs cannot be
determined on the basis of the preliminary cost estimate for the manufacturing order.
Target cost version 1 is used for informational purposes. It cannot be settled.

Scenario

At month end, you want to calculate the variance of individual product cost collector created
for a particular material and production version.

Requirements

Product cost collectors were created. WIP was calculated.

Menu Path Accounting  Controlling  Product Cost Controlling 


Cost Object Controlling  Product Cost by Period 
Single Functions: Product Cost Collector  Variances 
KKS6 - Individual Processing
Transaction Code KKS6

1. Double click on KKS6 - Individual Processing

SAPTOPJOBS Page 1 of 4
COST CENTERCOST
PRODUCT ACCOUNTING
CONTROLLING
END USER TRAINING DOCUMENTS

Variance Calculation: Initial Screen

2. Update the following fields:

Field Name Field Description Values


Material Code identifying a product or Example: 20000424
component
Plant Code identifying the operational Example: 1200
unit of the company where the
material is manufactured and
stored

3. Press [F4] or click the Search button in the Production process number
(production version) field.

SAPTOPJOBS Page 2 of 4
COST CENTERCOST
PRODUCT ACCOUNTING
CONTROLLING
END USER TRAINING DOCUMENTS

Choose production processes for material/plant

4. Double click on the PVersion:VS2 (production version) in list box.

5. Update the following fields:

Field Name Field Description Values


Period Number identifying a fiscal Example: 10
month.
Fiscal year Number identifying a fiscal year. Example: 2002

6. Click the Test run checkbox to deselect.

7. Click the Execute button.

SAPTOPJOBS Page 3 of 4
COST CENTERCOST
PRODUCT ACCOUNTING
CONTROLLING
END USER TRAINING DOCUMENTS

Variance Calculation: List

8. Select the Target Cost for variances - Preliminary (1)


in dropdown.

Tip: Click the Variance Categories button to display


detailed explanation of variances on the product cost collector.

9. Click the Back button.

SAPTOPJOBS Page 4 of 4