LB 2027 JLT Id Add 1003 30th Floor All Day Dining Furniture Layout 1002

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1000 290

DOOR
GLASS
FF-14 AcDbWipeout (WipeOut)

FF-15
AcDbWipeout (WipeOut)

DOOR
GLASS
FF-14

(WipeOut)
AcDbWipeout
(WipeOut)
AcDbWipeout
(WipeOut)
AcDbWipeout
ST1

(WipeOut)
AcDbWipeout
STEP-

(WipeOut)
AcDbWipeout
LT-06

(WipeOut)
AcDbWipeout
0
Ø127

(WipeOut)
AcDbWipeout
(WipeOut)
AcDbWipeout
JF-07 KEY PLAN
ECE PTION E
1" (3.2%
)
R -01 RAMP 12 SHEET NOTES:
tural
Sculp k
FP CORRIDOR
r t w or l Trim
A Meta · This drawing is for design intent purposes only and is not to
UP A
JF-09
be scaled.
FF-14 · All dimensions shown are in millimeters and are set out
from the applied finish surface.
· All dimensions are to be verified on site by the contractor
FF-15 prior to creation of shop drawings, manufacture and installation.
· Any omissions or discrepancies found shall be reported to
FF-14 the ID consultant / Engineer immediately for clarification.
Art wo
rk
VEST. · This drawing is to be read in conjunction with the relevant
JF-06

rk
section of the specifications, schedules and drawings referenced

Art wo
· All necessary structural supports to all items including
ceiling hung, wall hung, built-in units or cantilevered items shall be
TRASH of adequate strength to ensure stability and shall be considered by
FP-01 the contractor.

NTER
10 20
JF-09
· The contractor shall submit full shop / setting out drawings

OU
for approval (based on site verified dimensions) prior to

BAR C
commencement of any site works, placing any orders or
manufacture of any fittings, fixtures and components shown.
LT-08 Sculp
tural A
r t work · All work must conform to municipality regulations, national
and international building code and all regulations by governing
LT-08 authorities.
· The contractor must ensure all coordination between his
work, his subcontractors and the ID Consultant's design.
LT-16 1 · All interior finishes must have a flame-spread rating and
SFT-0 smoke density rating to meet or exceed local code requirements.
· All MEP design shown on the ID drawings is MEP design
requirements only. All MEP Design is to be verified by the MEP
JF-08 Consultant.

door
flip up FF-10
FF-13
a FF-11 FF-12
FF-09b
FF-15 a
FF-09 00
a
FF-09 FF-10
FF-13 FF-11
Ø9
OUT SCOPE
FF-12
Ø750
50
Ø7
LT-07 STORE 1 24.05.2023 IFC SUBMISSION SPS
750

FF-12
1 28.03.2023 DD PACKAGE REVISED SUBMISSION-01 SPS
FF-10
FF-14 0 30.11.2022 DD PACKAGE SUBMISSION SPS

1495
FF-09 FF-09b
FF-15 580

FF-12 870
FF-10
FF-14 515
870

JF-08
ISSUE FOR CONSTRUCTION
FF-12
FF-09
FF-09 FF-11 LT-07 PASS THROUGH
FF-12 FF-12
FF-13
FF-09
FF-15 FF-12 PROJECT
FF-12 800

FF-13
FF-09 JUMEIRAH LIVING TOWER
BUFFET COUNTER
FF-12

Fridge
(Kitchen equipment CLIENT
FF-11

1880
FF-14 JF-08 by kitchen consultant)
FF-09 b
FF-09
FF-11
FF-15
a FF-10
1
SFT-0
Waite OS

Ø750
FF-14 JF-10
+ P
r
n
waite

Statio

900
INTERIOR CONSULTANT
r sta

FF-12
FF-13 FF-12 JF-08a AV RACK
tion

a 450
a FF-09
00
FF-09 FF-09b
FF-15
Ø9 100 FF-11
1000 100
FF-12 FF-10
FF-12
Ø750 1200

FF-13
1800

a JF-10 FF-09a.1
JF-10 Al-Nahda First, Office 104 Saheel 2 Building Dubai, United Arab Emirates
270 Direct +971 50 3002975
Ø1

FF-12 FF-11 Waiter


FF-14 FF-11 FF-11
LIGHTING CONSULTANT
400

FF-09
Station+POS
FF-09
a
FF-09 FF-12
FF-09
00
a Ø9
FF-15 FF-11 Ø900 a
Ø 750
FF-12 FF-11 FF-09 FF-11
FF-14 FF-12 FF-11
1 SFT-01
SFT-0
PROJECT MANAGEMENT
13 13
FF- 15 FF- 15
FF- 13 FF- 13
FF- FF-

SHEET NAME

14
FF- 09 30TH FLOOR - ALL DAY DINING
FF- 14 FURNITURE LAYOUT
FF-

SCALE DATE DRAWN


A1@1:50 24.05.2023 SPS

SHEET NUMBER REVISION

LB-2027-JLT-ID-ADD-1003 0

You might also like