D C B A A B C D

5 FRONT ELEVATION 6 REAR ELEVATION


A-04 scale: 1:100m A-04 scale: 1:100m

5 4 3 2 1 1 2 3 4 5

7 LEFT SIDE ELEVATION 8 RIGHT SIDE ELEVATION


A-04 scale: 1:100m A-04 scale: 1:100m

PROJECT NAME & LOCATION: SHEET CONTENTS: PREPARED AND SUBMITTED BY: CHECKED BY: REVIEWED/VERIFIED BY: RECOMMENDED BY: APPROVED BY: SET NO. SHEET NO.

AS-STAKED PLANS FOR THE DPWH STP


FFJJ CONSTRUCTION CONSTRUCTION/REHABILITATION OF THE PUERTO FRONT, REAR, LEFT AND RIGHT ELEVATIONS ALBERTO R. COLLANTES RODERICK F. ROMASANTA EDWIN A. CABRAL ERWIN DG. UMALI NESTOR L. DEL ROSARIO CY - 2018
ARCHITECTURAL

GALERA SEWERAGE TREATMENT PLANT 04 06


MODEO
BRGY. SABANG, PUERTO GALERA, ORIENTAL MINDORO PROJECT DIRECTOR RESIDENT ENGINEER CHIEF, PLANNING AND DESIGN SECTION ASST. DISTRICT ENGINEER DISTRICT ENGINEER