3 BKR Operational Procedure
3 BKR Operational Procedure
Manual transfer
Check BTS ready
Select the transfer direction
CB STATUS CB STATUS
TRANSFER BREAKER CHECKED
BEFORE AFTER
DIRECTION CONFIGURATION STATUS
TRANSFER TRANSFER
I/C-1=OFF
I/C-1=OFF I/C-1=ON
BUS A=>SOURCE 1 B/C=ON
B/C=ON B/C=OFF
I/C-2=ON
I/C-1=ON
I/C-1=ON I/C-1=OFF
BUS A=>SOURCE 2 B/C=OFF
B/C=OFF B/C=ON
I/C-2=ON
I/C-1=ON
I/C-2=ON I/C-2=OFF
BUS B=>SOURCE 1 B/C=OFF
B/C=OFF B/C=ON
I/C-2=ON
I/C-1=ON
I/C-2=OFF I/C-2=ON
BUS B=>SOURCE 2 B/C=ON
B/C=ON B/C=OFF
I/C-2=OFF
I/C-1=ON
I/C-1=ON I/C-1=OFF
BUS A+B=>SOURCE 2 B/C=ON
I/C-2=OFF I/C-2=ON
I/C-2=OFF
I/C-1=OFF
I/C-1=OFF I/C-1=ON
BUS A+B=>SOURCE 1 B/C=ON
I/C-2=ON I/C-2=OFF
I/C-2=ON
I. Fast mode
|PHASE DIFFERENCE|<20°,|BUS V|>80%|,TIME WINDOW:100ms|,MAXIMUM
FREQUENCY DIFF.1.5 Hz.
Phase Reference : R&Y