Download as pdf or txt
Download as pdf or txt
You are on page 1of 1159

INFORMATION ON

INVESTMENT ENVIRONMENT
AND
INDUSTRIAL ZONES
IN VIETNAM

KOTRA HANOI – FIA VIETNAM


2023
TABLE OF CONTENT

INVESTMENT ENVIRONMENT IN AN GIANG........................................................................... 1


BINH LONG INDUSTRIAL ZONE .......................................................................................................................... 5
BINH HOA INDUSTRIAL ZONE ............................................................................................................................. 8
XUAN TO INDUSTRIAL ZONE ............................................................................................................................. 12

INVESTMENT ENVIRONMENT IN BA RIA – VUNG TAU ...................................................... 20


MY XUAN B1- TIEN HUNG INDUSTRIAL PARK ............................................................................................. 23
CAI MEP INDUSTRIAL PARK ............................................................................................................................... 25
CHAU DUC INDUSTRIAL PARK .......................................................................................................................... 27
DONG XUYEN INDUSTRIAL PARK .................................................................................................................... 29

INVESTMENT ENVIRONMENT IN BAC GIANG ...................................................................... 33


HOA PHU INDUSTRIAL ZONE ............................................................................................................................. 37
QUANG CHAU INDUSTRIAL ZONE .................................................................................................................... 40
DINH TRAM INDUSTRIAL ZONE........................................................................................................................ 46
VAN TRUNG INDUSTRIAL ZONE ....................................................................................................................... 49
SONG KHE – NOI HOANG SOUTH INDUSTRIAL ZONE ................................................................................ 52
SONG KHE – NOI HOANG NORTH INDUSTRIAL ZONE ............................................................................... 55

INVESTMENT ENVIRONMENT IN BAC KAN ........................................................................... 60


THANH BINH INDUSTRIAL ZONE ..................................................................................................................... 63

INVESTMENT ENVIRONMENT IN BAC LIEU ......................................................................... 69


TRA KHA INDUSTRIAL ZONE ............................................................................................................................. 72
LANG TRAM INDUSTRIAL ZONE ...................................................................................................................... 74

INVESTMENT ENVIRONMENT IN BAC NINH......................................................................... 78


QUE VO I INDUSTRIAL ZONE ............................................................................................................................. 83
QUE VO II INDUSTRIAL ZONE ........................................................................................................................... 89
QUE VO III INDUSTRIAL ZONE .......................................................................................................................... 93
TIEN SON INDUSTRIAL ZONE ............................................................................................................................ 96
YEN PHONG INDUSTRIAL ZONE (PHASE I, II) ............................................................................................. 104
YEN PHONG II-C INDUSTRIAL ZONE ............................................................................................................. 109
DAI DONG - HOAN SON INDUSTRIAL ZONE ................................................................................................ 112
VSIP BAC NINH INDUSTRIAL ZONE ............................................................................................................... 118
VSIP BAC NINH INDUSTRIAL ZONE – BUSINESS HUB............................................................................... 124
VSIP BAC NINH II INDUSTRIAL ZONE ........................................................................................................... 127
THUAN THANH II INDUSTRIAL ZONE ........................................................................................................... 130
THUAN THANH III INDUSTRIAL ZONE .......................................................................................................... 133
NAM SON HAP LINH INDUSTRIAL ZONE ...................................................................................................... 135
GIA BINH I INDUSTRIAL ZONE ........................................................................................................................ 138

INVESTMENT ENVIRONMENT IN BEN TRE ......................................................................... 143


GIAO LONG INDUSTRIAL ZONE ...................................................................................................................... 146
AN HIEP INDUSTRIAL ZONE ............................................................................................................................. 149
PHU THUAN INDUSTRIAL ZONE ..................................................................................................................... 151

INVESTMENT ENVIRONMENT IN BINH DINH .................................................................... 154


BECAMEX VSIP BINH DINH .............................................................................................................................. 158
NHON HOI INDUSTRIAL PARK - PARK A ...................................................................................................... 162
PHU TAI INDUSTRIAL PARK ............................................................................................................................. 166

INVESTMENT ENVIRONMENT IN BINH DUONG ................................................................ 169


BECAMEX-BAUBANG INUDSTRIAL PARK .................................................................................................... 173
BINH AN INUDSTRIAL PARK ............................................................................................................................ 187
DAI DANG INUDSTRIAL PARK ......................................................................................................................... 189
DAI DANG INUDSTRIAL PARK ......................................................................................................................... 191
MAI TRUNG INUDSTRIAL PARK...................................................................................................................... 192
KIM HUY INUDSTRIAL PARK ........................................................................................................................... 194

INVESTMENT ENVIRONMENT IN BINH PHUOC ................................................................. 198


VIET KIEU INDUSTRIAL ZONE ........................................................................................................................ 202
BECAMEX – BINH PHUOC INDUSTRIAL ZONE ........................................................................................... 204
BINH DUONG MAPLETREE INUDSTRIAL PARK ......................................................................................... 205
MINH HUNG SIKICO INDUSTRIAL ZONE ...................................................................................................... 207

INVESTMENT ENVIRONMENT IN BINH THUAN ................................................................. 211


PHAN THIET PHASE 1 INDUSTRIAL PARK ................................................................................................... 215
PHAN THIET PHASE 2 INDUSTRIAL PARK ................................................................................................... 220
HAM KIEM I INDUSTRIAL PARK ..................................................................................................................... 224
HAM KIEM II INDUSTRIAL PARK ................................................................................................................... 228
SONG BINH INDUSTRIAL PARK ....................................................................................................................... 232
TUY PHONG INDUSTRIAL PARK ..................................................................................................................... 236
TAN DUC INDUSTRIAL PARK ........................................................................................................................... 239
SON MY 1 INDUSTRIAL PARK .......................................................................................................................... 242
SON MY 2 INDUSTRIAL PARK .......................................................................................................................... 244

INVESTMENT ENVIRONMENT IN CA MAU........................................................................... 247


KHANH AN INDUSTRIAL ZONE ....................................................................................................................... 249
HOA TRUNG INDUSTRIAL ZONE ..................................................................................................................... 253
SONG DOC INDUSTRIAL ZONE ........................................................................................................................ 255

INVESTMENT ENVIRONMENT IN CAN THO ........................................................................ 259


TRA NOC 1 INDUSTRIAL ZONE ........................................................................................................................ 262
TRA NOC 2 INDUSTRIAL ZONE ........................................................................................................................ 264
HUNG PHU 1 INDUSTRIAL ZONE ..................................................................................................................... 266
HUNG PHU 2A INDUSTRIAL ZONE .................................................................................................................. 268
HUNG PHU 2B INDUSTRIAL ZONE .................................................................................................................. 270
VINH THANH INDUSTRIAL ZONE (STATE 1)................................................................................................ 274

INVESTMENT ENVIRONMENT IN CAO BANG ...................................................................... 277


DE THAM INDUSTRIAL ZONE .......................................................................................................................... 281
CHU TRINH INDUSTRIAL ZONE ...................................................................................................................... 283

INVESTMENT ENVIRONMENT IN DA NANG ........................................................................ 287


DANANG HI-TECH PARK.................................................................................................................................... 292
DA NANG HI-TECH PARK .................................................................................................................................. 293
LIEN CHIEU INDUSTRIAL ZONE ..................................................................................................................... 297
HOA CAM - PHASE I INDUSTRIAL ZONE ...................................................................................................... 301
EXPANDED HOA KHANH INDUSTRIAL ZONE ............................................................................................. 304

INVESTMENT ENVIRONMENT IN DAK LAK ......................................................................... 309


INVESTMENT ENVIRONMENT IN DAK NONG ..................................................................... 314
TAM THANG INDUSTRIAL PARK .................................................................................................................... 317
NHAN CO INDUSTRIAL ZONE .......................................................................................................................... 319

INVESTMENT ENVIRONMENT IN DIEN BIEN ..................................................................... 322


INVESTMENT ENVIRONMENT IN DONG NAI ...................................................................... 326
AMATA INDUSTRIAL ZONE .............................................................................................................................. 329
BAU XEO INDUSTRIAL ZONE ........................................................................................................................... 330
HO NAI INDUSTRIAL ZONE............................................................................................................................... 332

INVESTMENT ENVIRONMENT IN DONG THAP ................................................................... 336


TAN KIEU INDUSTRIAL ZONE.......................................................................................................................... 339

INVESTMENT ENVIRONMENT IN GIA LAI ........................................................................... 342


TRA DA INDUSTRIAL ZONE .............................................................................................................................. 347
SOUTH PLEIKU INDUSTRIAL ZONE ............................................................................................................... 349

INVESTMENT ENVIRONMENT IN HA GIANG ...................................................................... 353


BINH VANG INDUSTRIAL ZONE ...................................................................................................................... 357

INVESTMENT ENVIRONMENT IN HA NAM .......................................................................... 362


DONG VAN I INDUSTRIAL ZONE ..................................................................................................................... 365
DONG VAN II INDUSTRIAL ZONE ................................................................................................................... 369
DONG VAN III INDUSTRIAL ZONE .................................................................................................................. 374
DONG VAN IV INDUSTRIAL ZONE .................................................................................................................. 377
HOA MAC INDUSTRIAL ZONE.......................................................................................................................... 381
CHAU SON INDUSTRIAL ZONE ........................................................................................................................ 386
THANH LIEM INDUSTRIAL ZONE ................................................................................................................... 390
THAI HA INDUSTRIAL ZONE ............................................................................................................................ 392

INVESTMENT ENVIRONMENT IN HA TINH ......................................................................... 397


GIA LACH INDUSTRIAL ZONE ......................................................................................................................... 400
VUNG ANG ECONOMIC ZONE .......................................................................................................................... 403
PHU VINH INDUSTRIAL ZONE ......................................................................................................................... 407
VUNG ANG I INDUSTRIAL ZONE ..................................................................................................................... 410
CAU TREO INTERNATIONAL BORDER GATE ECONOMIC ZONE ......................................................... 412

INVESTMENT ENVIRONMENT IN HAI DUONG ................................................................... 417


DAI AN INDUSTRIAL ZONE ............................................................................................................................... 421
DAI AN EXPANSION INDUSTRIAL ZONE ....................................................................................................... 426
LAI CACH INDUSTRIAL ZONE ......................................................................................................................... 431
AN PHAT HIGH-TECHNOLOGY INDUSTRIAL PARK ................................................................................. 435
AN PHAT 1 INDUSTRIAL ZONE ........................................................................................................................ 439
CONG HOA INDUSTRIAL ZONE ....................................................................................................................... 442
CAM DIEN – LUONG DIEN INDUSTRIAL ZONE (VSIP HAI DUONG) ...................................................... 446
LAI VU INDUSTRIAL ZONE ............................................................................................................................... 450
PHU THAI (NAM TAI) INDUSTRIAL ZONE .................................................................................................... 453
TAN TRUONG INDUSTRIAL ZONE .................................................................................................................. 458
NAM SACH INDUSTRIAL ZONE........................................................................................................................ 463
PHUC DIEN INDUSTRIAL ZONE ....................................................................................................................... 467

INVESTMENT ENVIRONMENT IN HAI PHONG ................................................................... 473


DEEP C INDUSTRIAL ZONES ............................................................................................................................ 477
TRANG DUE INDUSTRIAL PARK ..................................................................................................................... 480
NAM DINH VU INDUSTRIAL ZONE ................................................................................................................. 486
TIEN THANH INDUSTRIAL ZONE .................................................................................................................... 489

INVESTMENT ENVIRONMENT IN HANOI ............................................................................. 493


HOA LAC HI- TECH PARK ................................................................................................................................. 497
QUANG MINH I INDUSTRIAL ZONE................................................................................................................ 504
QUANG MINH II INDUSTRIAL ZONE .............................................................................................................. 507
HANOI SOUTHERN SUPPORTING INDUSTRIAL PARK ............................................................................. 510
PHU NGHIA INDUSTRIAL ZONE ...................................................................................................................... 513
THACH THAT- QUOC OAI INDUSTRIAL ZONE............................................................................................ 516
THANG LONG INDUSTRIAL ZONE .................................................................................................................. 519
NAM THANG LONG INDUSTRIAL ZONE ....................................................................................................... 522
SAI DONG B INDUSTRIAL ZONE ...................................................................................................................... 525
NOI BAI INDUSTRIAL ZONE ............................................................................................................................. 528
CONG VIEN CONG NGHE THONG TIN INDUSTRIAL PARK ..................................................................... 531
SACH SOC SON INDUSTRIAL ZONE ................................................................................................................ 532

INVESTMENT ENVIRONMENT IN HAU GIANG ................................................................... 536


SONG HAU INDUSTRIAL PARK ........................................................................................................................ 539

INVESTMENT ENVIRONMENT IN HO CHI MINH................................................................ 542


DONG NAM INDUSTRIAL ZONE ....................................................................................................................... 546
HIEP PHUOC INDUSTRIAL PARK .................................................................................................................... 550
LE MINH XUAN 3 INDUSTRIAL ZONE ............................................................................................................ 553
LE MINH XUAN INDUSTRIAL ZONE ............................................................................................................... 557
TAN PHU TRUNG INDUSTRIAL ZONE ............................................................................................................ 560
TAN THUAN EXPORT PROCESSING ZONE ................................................................................................... 564
TAY BAC CU CHI INDUSTRIAL ZONE ............................................................................................................ 568
VINH LOC INDUSTRIAL PARK ......................................................................................................................... 572

INVESTMENT ENVIRONMENT IN HOA BINH ...................................................................... 577


LUONG SON INDUSTRIAL PARK ..................................................................................................................... 580
DA RIVER LEFT-BANK INDUSTRIAL PARK ................................................................................................. 583
BINH PHU INDUSTRIAL PARK.......................................................................................................................... 585
NHUAN TRACH INDUSTRIAL PARK ............................................................................................................... 586
LAC THINH INDUSTRIAL PARK ...................................................................................................................... 588
YEN QUANG INDUSTRIA1:E41AL PARK ........................................................................................................ 589

INVESTMENT ENVIRONMENT IN HUNG YEN ..................................................................... 593


PHO NOI A INDUSTRIAL PARK ........................................................................................................................ 597
THANG LONG II INDUSTRIAL ZONE .............................................................................................................. 605
MINH DUC INDUSTRIAL ZONE ........................................................................................................................ 614
MINH QUANH INDUSTRIAL ZONE .................................................................................................................. 619
YEN MY INDUSTRIAL ZONE ............................................................................................................................. 623
YEN MY II INDUSTRIAL ZONE ......................................................................................................................... 627
CLEAN INDUSTRIAL PARK ............................................................................................................................... 631
INDUSTRIAL PARK NO.3 .................................................................................................................................... 633
INDUSTRIAL PARK NO.4 .................................................................................................................................... 635

INVESTMENT ENVIRONMENT IN KHANH HOA .................................................................. 639


SUOI DAU INDUSTRIAL ZONE .......................................................................................................................... 645
NINH THUY INDUSTRIAL ZONE ...................................................................................................................... 649

INVESTMENT ENVIRONMENT IN KIEN GIANG .................................................................. 654


TAC CAU INDUSTRIAL ZONE ........................................................................................................................... 658
INVESTMENT ENVIRONMENT IN KON TUM ........................................................................ 662
INVESTMENT ENVIRONMENT IN LAI CHAU ....................................................................... 667
INVESTMENT ENVIRONMENT IN LAM DONG ..................................................................... 672
PHU HOI INDUSTRIAL ZONE ............................................................................................................................ 675
LOC SON INDUSTRIAL ZONE ........................................................................................................................... 677

INVESTMENT ENVIRONMENT IN LANG SON ...................................................................... 681


DONG BANH INDUSTRIAL PARK ..................................................................................................................... 685
HUU LUNG INDUSTRIAL PARK ........................................................................................................................ 687

INVESTMENT ENVIRONMENT IN LAO CAI .......................................................................... 690


DONG PHO MOI INDUSTRIAL ZONE .............................................................................................................. 694
TANG LOONG INDUSTRIAL ZONE .................................................................................................................. 696

INVESTMENT ENVIRONMENT IN LONG AN ........................................................................ 700


DUC HO III-HONG DAT IZ INDUSTRIAL PARK ............................................................................................ 705
HUU THANH IDICO INDUSTRIAL ZONE ........................................................................................................ 708
TAN DUC INDUSTRIAL ZONE ........................................................................................................................... 710
LONG HAU INDUSTRIAL PARK........................................................................................................................ 713
AN THANH INDUSTRIAL ZONE ........................................................................................................................ 715
TAN KIM INDUSTRIAL PARK ........................................................................................................................... 717

INVESTMENT ENVIRONMENT IN NAM DINH ..................................................................... 721


MY TRUNG INDUSTRIAL ZONE ....................................................................................................................... 725
HOA XA INDUSTRIAL ZONE ............................................................................................................................. 728
BAO MINH INDUSTRIAL ZONE ........................................................................................................................ 735
RANG DONG TEXTILE INDUSTRIAL ZONE .................................................................................................. 739

INVESTMENT ENVIRONMENT IN NGHE AN ........................................................................ 743


WHA INDUSTRIAL ZONE 1 - NGHE AN .......................................................................................................... 747
HOANG MAI I INDUSTRIAL PARK .................................................................................................................. 751
VSIP NGHE AN I INDUSTRIAL PARK .............................................................................................................. 753
VSIP NGHE AN II INDUSTRIAL PARK............................................................................................................. 758
NAM CAM INDUSTRIAL ZONE ......................................................................................................................... 761

INVESTMENT ENVIRONMENT IN NINH BINH .................................................................... 768


GIAN KHAU INDUSTRIAL ZONE ...................................................................................................................... 771
TAM DIEP I INDUSTRIAL ZONE ....................................................................................................................... 773
KHANH PHU INDUSTRIAL ZONE ..................................................................................................................... 774

INVESTMENT ENVIRONMENT IN NINH THUAN................................................................. 778


DU LONG INDUSTRIAL ZONE ........................................................................................................................... 782
PHUOC NAM INDUSTRIAL ZONE .................................................................................................................... 784
INVESTMENT ENVIRONMENT IN PHU THO ........................................................................ 789
PHU HA INDUSTRIAL PARK .............................................................................................................................. 793
CAM KHE INDUSTRIAL PARK .......................................................................................................................... 795

INVESTMENT ENVIRONMENT IN PHU YEN......................................................................... 799


HOA HIEP 1 INDUSTRIAL ZONE ...................................................................................................................... 802
HOA HIEP 2 INDUSTRIAL ZONE ...................................................................................................................... 806
AN PHU INDUSTRIAL ZONE .............................................................................................................................. 810
DONG BAC SONG CAU INDUSTRIAL ZONE – ZONE 1 ................................................................................ 813
DONG BAC SONG CAU INDUSTRIAL ZONE – ZONE 2 ................................................................................ 818

INVESTMENT ENVIRONMENT IN QUANG BINH................................................................. 823


NORTH-WEST DONG HOI INDUSTRIAL ZONE ............................................................................................ 826
NORTH DONG HOI INDUSTRIAL ZONE ......................................................................................................... 829
NORTH-WEST QUAN HAU INDUSTRIAL ZONE ........................................................................................... 832
CAM LIEN INDUSTRIAL ZONE ......................................................................................................................... 835
BANG INDUSTRIAL ZONE.................................................................................................................................. 838
HON LA PORT INDUSTRIAL ZONE ................................................................................................................. 841
HON LA II INDUSTRIAL ZONE ......................................................................................................................... 845
WESTERN GATE INDUSTRIAL ZONE ............................................................................................................. 848

INVESTMENT ENVIRONMENT QUANG NAM ....................................................................... 852


DONG QUE SON INDUSTRIAL ZONE .............................................................................................................. 857
TAM HIEP PORT INDUSTRIAL AND LOGISTIC PARK INDUSTRIAL ZONE ......................................... 861
NORTH CHU LAI INDUSTRIAL ZONE ............................................................................................................. 864
THUAN YEN INDUSTRIAL ZONE ..................................................................................................................... 867
CHU LAI PORT INDUSTRIAL & LOGISTIC PARK ....................................................................................... 870
TAM THANG II INDUSTRIAL ZONE ................................................................................................................ 874
CHU LAI - TRUONG HAI AUTOMOTIVE MECHANICAL INDUSTRIAL ZONE ..................................... 877
DIEN NAM- DIEN NGOC INDUSTRIAL ZONE................................................................................................ 879
TAM ANH- KOREA INDUSTRIAL PARK ......................................................................................................... 884
AGRO-FORESTRY INDUSTRIAL PARK .......................................................................................................... 886
EXPANDED TAM THANG INDUSTRIAL ZONE ............................................................................................. 888

INVESTMENT ENVIRONMENT IN QUANG NGAI ................................................................. 892


DUNG QUAT INDUSTRIAL TOWN .................................................................................................................... 897
VSIP QUANG NGAI ............................................................................................................................................... 899

INVESTMENT ENVIRONMENT IN QUANG NINH ................................................................ 904


DONG MAI INDUSTRIAL ZONE ........................................................................................................................ 908
TEXHONG HAI HA INDUSTRIAL ZONE ......................................................................................................... 911
HAI YEN INDUSTRIAL ZONE ............................................................................................................................ 914
CAI LAN INDUSTRIAL ZONE ............................................................................................................................ 917

INVESTMENT ENVIRONMENT IN QUANG TRI .................................................................... 922


NAM DONG HA INDUSTRIAL ZONE ................................................................................................................ 927
QUAN NGANG INDUSTRIAL ZONE.................................................................................................................. 931
LAO BAO SPECIAL ECONOMIC – COMMERCIAL ZONE .......................................................................... 938
DONG NAM QUANG TRI ECONOMIC ZONE ................................................................................................. 944
AMBER TAY BAC HO XA INDUSTRIAL PARK .............................................................................................. 952

INVESTMENT ENVIRONMENT IN SOC TRANG .................................................................... 959


AN NGHIEP INDUSTRIAL ZONE ....................................................................................................................... 963
TRAN DE INDUSTRIAL ZONE ........................................................................................................................... 963

INVESTMENT ENVIRONMENT IN SON LA ............................................................................ 965


MAI SON INDUSTRIAL ZONE ............................................................................................................................ 969
VAN HO INDUSTRIAL ZONE ............................................................................................................................. 972

INVESTMENT ENVIRONMENT IN TAY NINH ....................................................................... 976


INVESTMENT ENVIRONMENT IN THAI BINH ..................................................................... 981
CAU NGHIN IDICO INDUSTRIAL ZONE ......................................................................................................... 985
LIEN HA THAI (GREEN iP-1) INDUSTRIAL PARK ........................................................................................ 989
TIEN HAI INDUSTRIAL ZONE ........................................................................................................................... 991

INVESTMENT ENVIRONMENT IN THAI NGUYEN............................................................... 995


DIEM KHUY ZONE A INDUSTRIAL ZONE ..................................................................................................... 999
SONG DONG II INDUSTRIAL ZONE ............................................................................................................... 1002
YEN BINH INDUSTRIAL ZONE........................................................................................................................ 1004
SONG CONG I INDUSTRIAL ZONE ................................................................................................................ 1006
NAM PHO YEN INDUSTRIAL ZONE ............................................................................................................... 1008

INVESTMENT ENVIRONMENT IN THANH HOA ................................................................ 1012


NGHI SON ECONOMIC ZONE ......................................................................................................................... 1017
LAM SON-SAO VANG HIGH-TECH INDUSTRIAL ZONE .......................................................................... 1019
HOANG LONG INDUSTRIAL ZONE ............................................................................................................... 1023
BIM SON A INDUSTRIAL ZONE ...................................................................................................................... 1028
BIM SON B INDUSTRIAL ZONE ...................................................................................................................... 1031
DINH HUONG - TAY BAC GA INDUSTRIAL ZONE ..................................................................................... 1034
LE MON INDUSTRIAL ZONE ........................................................................................................................... 1043

INVESTMENT ENVIRONMENT IN THUA THIEN HUE...................................................... 1049


PHU BAI INDUSTRIAL ZONE ........................................................................................................................... 1052
TU HA INDUSTRIAL ZONE............................................................................................................................... 1055
LA SON INDUSTRIAL PARK ............................................................................................................................ 1057
PHONG DIEN INDUSTRIAL PARK .................................................................................................................. 1059
QUANG VINH INDUSTRIAL PARK ................................................................................................................. 1062
PHU DA INDUSTRIAL PARK ............................................................................................................................ 1064
SAIGON-CHANMAY INDUSTRIAL PARK AND NON-TARIFF ZONE ..................................................... 1067

INVESTMENT ENVIRONMENT IN TIEN GIANG................................................................. 1072


LONG GIANG INDUSTRIAL PARK ................................................................................................................. 1075
DICH VU DAU KHI SOAI RAP INDUSTRIAL PARK .................................................................................... 1078

INVESTMENT ENVIRONMENT IN TRA VINH ..................................................................... 1082


LONG DUC INDUSTRIAL ZONE ...................................................................................................................... 1085

INVESTMENT ENVIRONMENT IN TUYEN QUANG ........................................................... 1090


HOA PHU INDUSTRIAL ZONE ......................................................................................................................... 1093

INVESTMENT ENVIRONMENT IN VINH LONG .................................................................. 1096


HOA PHU INDUSTRIAL ZONE ......................................................................................................................... 1100
BINH MINH INDUSTRIAL ZONE ..................................................................................................................... 1100

INVESTMENT ENVIRONMENT IN VINH PHUC .................................................................. 1104


BA THIEN I INDUSTRIAL ZONE ..................................................................................................................... 1109
BA THIEN II INDUSTRIAL ZONE .................................................................................................................... 1113
TAM DUONG II INDUSTRIAL ZONE - ZONE A............................................................................................ 1117
BINH XUYEN INDUSTRIAL ZONE .................................................................................................................. 1120
KHAI QUANG INDUSTRIAL ZONE ................................................................................................................. 1127
BINH XUYEN II INDUSTRIAL ZONE .............................................................................................................. 1133
DONG SOC INDUSTRIAL PARK ...................................................................................................................... 1138

INVESTMENT ENVIRONMENT IN YEN BAI ........................................................................ 1142


AN GIANG
INVESTMENT ENVIRONMENT IN AN GIANG
USD/VND 23.510

GENERAL INFORMATION

▪ Area: 3.536,68 km2


Area, Population
▪ Population: 1.909,5 thousand people (2022)

▪ Located in the key economic region of Vietnam’s Mekong Delta including Can Tho, An Giang,
Kien Giang, Ca Mau

▪ Located near the Kingdom of Cambodia with a border of nearly 100 km (with An Giang border-
gate economic zone, identified as one of the national key economic zones, with 02 international
Geographical Location
border gates: Tinh Bien and Vinh Xuong and 01 national border gate: Khanh Binh)

▪ Located in the center of 3 big cities, including: Ho Chi Minh - Can Tho and Phnom Penh (Kingdom
of Cambodia) with the respective distances of 180km - 60km and 80km (from the Khanh Binh
national border gate); At the same time, it is the gateway and the center of the Mekong sub-region

▪ Dong Thap province to the Northeast, Kien Giang province to the the Southwest, Can Tho city the
Adjacent provinces
Southeast borders

2022 statistic:

▪ Real GRDP: 102.720 billion VND (4.38 billion USD)

▪ GRDP growth: 6.87%

▪ Real GRDP per capita: 48,424 million VND (2.105,4 thousand USD)

GRDP ▪ Economic Structure:

- Industry and Construction: 14.84%

- Service: 45.91%

- Agriculture, Forestry and Fishery: 35.72%

- Product tax - product subsidies: 3.53%

2021 statistic:

▪ Industry - Construction growth: 10.90%

▪ Agriculture, forestry and fishery growth: 3.16%

Industry growth ▪ Service growth: 8.66%

▪ Import – Export:

- Export turnover: 1.158.6 million USD

- Import turnover: 220.2 million USD

PCI ▪ Score: 62.37 – ranked 54th out of 63 cities and provinces in Vietnam (2022)

SOCIAL INFRASTRUCTURE

1
▪ Roadway: National Road 91 (route Long Xuyen - Chau Doc - Tinh Bien), National Road N1 (route
Chau Doc - Ha Tien), National Road 91C (route An Phu). Ongoing projects: route connecting
National Road 91 and Long Xuyen bypass; the route linking Tan Chau - Chau Doc region connecting
3 provinces of Dong Thap, An Giang and Kien Giang; Upgrading the inter-provincial road
connecting Chau Phu district with Hon Dat district, Kien Giang province (DT.945).

Transportation ▪ Expressway: Chau Doc - Can Tho - Soc Trang expressway has a total length of 188.2 km. It is
expected to be implemented from 2023 - 2025. The project has been submitted to the National
Assembly for decision on investment policy by the Government.

▪ Waterway: 03 major ports: My Thoi seaport, Binh Long domestic port, Chau Doc passenger port

▪ Airway: from the center of the province can be connected to Can Tho International Airport, Can
Tho city via National Road 91.

Electricity ▪ Supplied from the national power network

Water ▪ Quality underground water is mainly used in water supply system

▪ 01 major university (An Giang University), 02 vocational colleges (An Giang Vocational College
Education
and An Giang Medical College).

Medicare ▪ 06 provincial hospitals, 13 district hospitals and private hospitals

INVESTMENT CONDITION

Human resource ▪ Around 54% of population in working age (2021)

Education level ▪ Trained labor rate: 68% (2022)

▪ The minimum salary for the province is applied as follows:

- Area II: including: Long Xuyen City, Chau Doc City


Salary - Area III: including: Tan Chau Town, Chau Phu District, Chau Thanh District, Thoai Son District

- Area IV: including: : Phu Tan districts, Tri Ton districts, Tinh Bien districts, Cho Moi districts, An
Phu districts

▪ Incentives according to government regulations:

Exemption and reduction for land and water rent fee


Investment incentives
- Preferential tax rates and exemption period, reduction for corporate income tax.

Import tax exemption

▪ Prioritized Projects:

- High-tech agricultural, Digital transformation, Sustainable development.


Fields Attracting
- Projects using high technology, modern techniques; ecological environment preservation.
Investment
- Development of trade, service and tourism.

- Construction and development of infrastructure and transport.

- Development of education, training, health.

2
Map

An Giang Department of Planning and Investment

Address: No 3 Le Trieu Kiet, My Binh Ward, Long Xuyen City, An Giang

Contact Tel: 0296.3852 913

Fax: 0296.3853380

E-mail: sokhdt@angiang.gov.vn

3
LIST OF INDUSTRIAL ZONES IN AN GIANG

No Industrial zone Name Total Area Occupancy Status


(ha) Rate
1 Vam Cong Industrial Zone 193,3 0% In land clearance process
2 Hoi An Industrial Zone 100 0% Licensed
3 Dinh Thanh Industrial Zone 155 0% Licensed
4 Binh Hoa Industrial Zone 98,68 98,68% In operation
Binh Hoa Industrial Zone – Expanded area 120 0% In land clearance process
5 Binh Long Industrial Zone 21,5 100% In operation
6 Xuan To Industrial Zone 11,6 36,6% In operation
Xuan To Industrial Zone – Expanded area 82 0% Licensed

AN GIANG’S LOCATION MAP OF INDUSTRIAL ZONES

4
BINH LONG INDUSTRIAL ZONE

GENERAL INFORMATION
National Road 91, Binh Long district, An Giang Province, Vietnam
ADDRESS
An Giang Economic Zone Authority
▪ Address: No 2, 20 Street, My Hoa Ward, Long Xuyen City, An Giang province, Vietnam.
INVESTOR
▪ Tel: (84-296) 3955994
▪ Website: http://www.bqlkkt.angiang.gov.vn
▪ Mr Nguyen Thanh Cuong – Head of An Giang Economic Zone Authority - Email:
CONTACT PERSON
ntcuong@angiang.gov.vn
- 33 Km from Long Xuyen City Center
LOCATION - 40 Km from My Thoi Port
- 215 Km from Ho Chi Minh City
Priority Sectors for Agricultural processing and fishery industry, supporting industries for
Investment feeding, planting and agricultural processing and fishery for inbound
need and export, garment and leather shoes, food processing, consumer
INVESTMENT AREA
goods, mechanical engineering.
Restricted Sectors for According to Article 9, Law of Investment No. 61/2020/QH14 on
Investment 17/06/2020
MINIMUM WAGE [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
▪ Start date: 2005
LEASE TERM
▪ End date: 2055
MINIMUM LEASE AREA 2,400 m2
LIMIT FOR In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
CONSTRUCTION Residential Planning regulation (QCXDVN 01: 2008/BXD)
HEIGHT Construction area is not more than 65% of the total leased land lot
PERMITTED
CONSTRUCTION RATE
▪ Total area: 114 ha
PLANNED AREA
▪ Total vacant leasable area: Unavailable
FACTORY AVAILABLE ▪ Total area: Unavailable
FOR RENT
OPERATION STATUS ▪ In operation
OCCUPANCY RATE AND ▪ 100%
NUMBER OF PROJECTS ▪ 10 Projects
NUMBER OF KOREAN ▪ 02 projects
PROJECTS
▪ Land lease fee: 55 USD/m2 /year
LEASE FEE
▪ Payment : Every year
▪ Management fee: 0.4 USD/m2/month (included VAT)
▪ Electricity fee: 0,05 USD/kWh .According to the Circular by Ministry of Industry and Trade,
OPERATING FEE valid from March 16th, 2015 (excluded VAT) for voltage from 22KV-110KV.
▪ Water fee: 7,333 VND (~0.31 USD) /m3 (excluded VAT)
▪ Wastewater treatment fee: 27,963 VND (~1.19 USD)/m3 (excluded VAT)
INFRASTRUCTURE AND FACILITY
FINANCIAL BIDV, Vietin Bank, Vietcombank, Agribank
INSTITUTION
TAX SERVICE, STATE 3 km from Chau Phu Tax Office
FINANCE OFFICE 23 km from Chau Doc State Treasury Office
22 km from Customs Agency Chau Doc
CUSTOMS SERVICE
POST OFFICE 2 km from Vietnam Post Office
MEDICARE 5 km from Chau Phu General Hospital
POLICE, PUBLIC 1 km from Chau Phu Police Station
SECURITY
UNIVERSITIES, 11 km from Chau Phu Vocational Education Center
TRAINING FACILITIES,
ETC.

5
WORKER'S CHILD 5 Km from the zone
EDUCATION FACILITY
ONE-STOP SERVICE 3 Km from the nearest Facility
ROAD WIDTH Main road: 7m, 2 lanes
IT & TELE- The telecommunication system complies with international standards and is always available for
COMMUNICATION communication demand with high data transmission service
FACILITIES
EMERGENCY POWER Available
GENERATOR
FIRE-FIGHTING Available. Water supply system for firefighting is located along each road.
FACILITY

ACTUAL VIEW

6
LIST OF SOME NOTABLE TENANTS
No. Company Name Nationality Location Business line
1 Chang Woo Jin Vina Food Company Korea Lot D Sweet potato starch
Limited and rice noodle
processing factory
2 Kovie Vina Company Limited Korea Lot D Fish fat and fish meal
processing factory
3 Hoa Phat Seafood Processing Import and Vietnam Lot A Frozen seafood
Export Joint Stock Company processing factory
4 Binh Long Company Limited Vietnam Lot E Seafood processing
factory

5 Dong A Seafood Import and Export Vietnam Lot B Seafood processing


Company Limited factory
6 Cuu Long Seafood Import and Export Vietnam Lot C Seafood processing
Joint Stock Company factory
7 An Giang Food vegetables Joint Stock Vietnam Lot D Food vegetables
Company processing factory

8 An Giang Fish meal Import and Export Vietnam Lot A Fish fat and fish meal
Company Limited processing factory

9 An Giang Water and Electricity Joint Vietnam Water supply


Stock Company construction for Binh
Long Industrial Zone
10 An Giang Port Joint Stock Company Vietnam Port exploration at
Binh Long River

7
BINH HOA INDUSTRIAL ZONE

GENERAL INFORMATION
▪ Binh Hoa Commune, Chau Thanh District, An Giang Province
ADDRESS
An Giang Economic Zone Authority
▪ Address: No 2, 20 Street, My Hoa Ward, Long Xuyen City, An Giang province, Vietnam.
INVESTOR
▪ Tel: (84-296) 3955994
▪ Website: http://www.bqlkkt.angiang.gov.vn
▪ Mr Nguyen Thanh Cuong – Head of An Giang Economic Zone Authority - Email:
CONTACT PERSON
ntcuong@angiang.gov.vn
- Located in the three-cornered Lo Te, near National Road 91 and Provincial road 941
- 15 Km from Long Xuyen City Center
LOCATION
- 23 Km from My Thoi Port
- 205 Km from Ho Chi Minh City
Priority Sectors Manufacturing and processing sport shoes, garment; producing animal
for Investment foodstuff, plastic, cosumer goods, processing agro-aqua-animal
products; food, vegetables; mechanical industries, manufacturing
INVESTMENT AREA machinery and equipment.
Restricted According to Article 9, Law of Investment No. 61/2020/QH14 on
Sectors for 17/06/2020
Investment
MINIMUM WAGE [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
▪ Start date: 2007
LEASE TERM
▪ End date: 2057
MINIMUM LEASE AREA 400 m2
LIMIT FOR In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
CONSTRUCTION HEIGHT Residential Planning regulation (QCXDVN 01: 2008/BXD)
PERMITTED
CONSTRUCTION RATE
▪ Total area: 100 ha
PLANNED AREA
▪ Total vacant leasable area: 1,32 ha
FACTORY AVAILABLE None
FOR RENT
▪ Current area: In operation
OPERATION STATUS
▪ Expanded area: In land clearance process
OCCUPANCY RATE AND Current area: 98,68%, 19 projects
NUMBER OF PROJECTS
NUMBER OF KOREAN 02 projects
PROJECTS
▪ Land lease fee: 50 USD/m2 /year (excluded VAT)
LEASE FEE
▪ Payment : Every year
▪ Management fee: 0.4 USD/m2/month (included VAT)
▪ Electricity fee: 0,05 USD/kWh .According to the Circular by Ministry of Industry and
OPERATING FEE Trade, valid from March 16th, 2015 (excluded VAT) for voltage from 22KV-110KV.
▪ Water fee: 11,428 VND (~0.487 USD) /m3 (excluded VAT)
▪ Wastewater treatment fee: 29,250 VND (~1.247 USD)/m3 (excluded VAT)
INFRASTRUCTURE AND FACILITY
FINANCIAL INSTITUTION Agribank, Techcombank, Sacombank,Vietinbank
TAX SERVICE, STATE 2 km from Chau Thanh -Thoai Son Tax office
FINANCE OFFICE
CUSTOMS SERVICE 23 km from My Thoi Custom Agency
POST OFFICE 3 km from Chau Thanh Post Office
MEDICARE 3.7 km from Chau Thanh General Hospital
POLICE, PUBLIC 2.3 km from Chau Thanh Police station
SECURITY
UNIVERSITIES, TRAINING 15 km from An Giang University
FACILITIES
WORKER DORMITORY 1 km from the zone
WORKER'S CHILD 1 km from the zone
EDUCATION FACILITY
8
ONE-STOP SERVICE 3 km from Public Service Center
ROAD WIDTH Road Width: 8-15m m, 2 lanes
IT & TELE- The telecommunication system complies with international standards and is always available
COMMUNICATION for communication demand with high data transmission. Provider: FPT, VNPT and Viettel
FACILITIES
EMERGENCY POWER Non applicable
GENERATOR
FIRE-FIGHTING FACILITY Available. Water supply system for firefighting is located along each road.

LAYOUT PLAN

LOCATION MAP

9
ACTUAL VIEW

LIST OF SOME NOTABLE TENANTS

No Company Name Nationality Location Bussiness line


1 Tien Bo Limited Company Vietnam Lot C2 Construction steel
manufacturing factoty

2 Truong Thang Limited Company Vietnam Lot C2 Centrifugal concrete


culvert manufacturing
factory
3 An Giang Centrifugal concrete Vietnam Lot C2 Centrifugal concrete pile
Joint Stock Company manufacturing factory

10
4 An Giang Building One Member Vietnam Lot C2 Hot asphalt concrete and
Limited Company Centrifugal concrete
culvert manufacturing
factory
5 An Giang Water and Electricity Vietnam Lot C1 Water supply construction
Joint Stock Comapny for BinhHoa Industrial
Zone
6 Oriental Garment Limited Thailand Lot K Producing and
Company outsourcing garment

7 An Giang Samho Limited Korea Lot C3,C5 Producing and


Company outsourcing footwear

8 Pacific Energy One Member Vietnam Lot C6 Producing solar energy


Limited Company

9 Lu An Garment Limited Company China Lot C4 Producing and


outsourcing garment

10 NV Apparel Limited Company Thailand Lot C1 Producing and


outsourcing garment

11 Thanh Nhuy Huy One Member Vietnam Lot C2 Producing blankets and
Limited Company pillows

12 Thang Loi Restaurant Vietnam The area adjacent Catering service in Binh
to Road number 1 Hoa Industrial Zone

13 Chi Cong Joint Stock Company Vietnam Lot C2 Food processing , barrel
and industrial equipment
production.

14 Angimexpharm Medicine Joint Vietnam Lot C4 Medicine trading and


Stock Company production
15 Foodant Limited Company Vietnam Lot C2 Agricultural processing
factoty
16 Ching Luh Footwear Limited United of Kingdom Lot K Producing and
Company outsourcing footwears and
shoes
17 Samduk Vietnam Limited Korea Lot C6 Producing and
Company outsourcing footwears and
handbags
18 Phuc Tien Agricultural Product Vietnam Lot C2 Vegetables processing
Joint Stock Company factoty

19 Spectre An Giang Vietnam Denmark Lot C6 Garment production


Garment and Technology Limited
Company

11
XUAN TO INDUSTRIAL ZONE

GENERAL INFORMATION
ADDRESS Tinh Bien District, Tinh Bien Town, An Giang Province
An Giang Economic Zone Authority
▪ Address: No 2, 20 Street, My Hoa Ward, Long Xuyen City, An Giang province, Vietnam.
INVESTOR
▪ Tel: (84-296) 3955994
▪ Website: http://www.bqlkkt.angiang.gov.vn
▪ Mr Nguyen Thanh Cuong – Head of An Giang Economic Zone Authority - Email:
CONTACT PERSON
ntcuong@angiang.gov.vn
▪ Located along National Road 91
▪ 1 km from Tinh Bien International Border Gate
▪ 120 km from Phnom Penh, Cambodia.
LOCATION
▪ 75 km from Long Xuyen City Center
▪ 84 km from My Thoi Port
▪ 252 km from Ho Chi Minh City
Priority Sectors for Production and oursourcing of garment, footwear, athletic shoes,
Investment agricultural products processing and beverages,packaging
INVESTMENT AREA industry,electronicassembly industry
Restricted Sectors According to Article 9, Law of Investment No. 61/2020/QH14 on
for Investment 17/06/2020
MINIMUM WAGE [Area 4] According to Decree 90/2019/NĐ▪CP dated 15th November 2019
▪ Start date: 2022
LEASE TERM
▪ End date: 2072
MINIMUM LEASE AREA 54,110 m2
LIMIT FOR In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
CONSTRUCTION HEIGHT Residential Planning regulation (QCXDVN 01: 2008/BXD)
PERMITTED
CONSTRUCTION RATE
▪ Total area: 31.69 ha
PLANNED AREA
▪ Total vacant leasable area: 20.09 ha
FACTORY AVAILABLE FOR None
RENT
OPERATION STATUS ▪ In operation
OCCUPANCY RATE AND Occupancy Rate: 36,6%
NUMBER OF PROJECTS
NUMBER OF KOREAN None
PROJECTS
▪ Land lease fee: 59 USD/m2/year
LEASE FEE
▪ Payment : Every year
▪ Management fee: 0.5 USD/m2/year
▪ Electricity fee: as regulated by the Government
OPERATING FEE ▪ Water fee: 2,871 VND (~ 0.12 USD)/m3
▪ Wastewater treatment fee: 27,963 VND (~ 1.19 USD/m3 ), estimated fee because the
wastewater treatment factory is under construction.
INFRASTRUCTURE AND FACILITY
FINANCIAL INSTITUTION Vietcombank, Sacombank,Maritimebank
TAX SERVICE, STATE 7.1 km from Tinh Bien Tax Department
FINANCE OFFICE
CUSTOMS SERVICE 1 km from Tinh Bien Customs Department
LOGISTICS None
POST OFFICE 1.7 km from Tinh Bien Post Office
MEDICARE 8.3 km from Tinh Bien General Hospital
POLICE, PUBLIC SECURITY 7.2 km from the zone
UNIVERSITIES, TRAINING 2 km from Tinh Bien Vocational Education Center
FACILITIES, ETC.
WORKER'S CHILD Non applicable
EDUCATION FACILITY

12
ONE-STOP SERVICE 10 km from the zone
ROAD WIDTH Road Width: 8-15m m, 2 lanes
IT & TELE- Telecommunication systems and international standards are always ready to meet the
COMMUNICATION communication needs
FACILITIES
EMERGENCY POWER Non applicable
GENERATOR
FIRE-FIGHTING FACILITY Available. Water supply system for firefighting is located along each road.

LAYOUT PLAN

LOCATION MAP

ACTUAL VIEW

13
LIST OF SOME NOTABLE TENANTS

No Company Name Nationality Location Business Line

1 Sportline Limited Company Taiwan From Lot C1 to C8 Garment production

2 Xuan To Agricultural Products Vietnam From Lot A1 to A4 Garment production


Processing Limited Company

14
LIST OF FDI ENTERPRISES INVESTING IN AN GIANG PROVINCE

No. Name of Investors Investment Nationality Bussiness line Address


Stt Capital
(USD)

1 Oriental Garment An 9.000.000 Hong Kong Investment project and Lot K, Binh Hoa
Giang One Member Co., construction of a factory to Industrial Park Binh Hoa
Ltd process garments for export Commune, Chau Thanh
District, An Giang
Province
2 Chang Woo Jin Vina 1.000.000 Korea Investment project to build Lot D, Binh Long
Food Co., Ltd a factory processing sweet Industrial Park, Binh
potato starch and vermicelli Long Commune, Chau
Phu District, An Giang
Province
3 An Giang SAMHO Co., 70.000.000 Korea Investment project in Binh Hoa Industrial Park,
Ltd Footwear manufacturing Chau Thanh District, An
and processing factory for Giang Province
export
4 Kovie Vina Co., Ltd 8.000.000 Korea Project to build a factory to Lot D, Binh Long
process fishmeal and fish Industrial Park, Chau Phu
fat from by-products of District, An Giang
pangasius and basa fish Province
5 Lu An Co., Ltd 30.000.000 China Garment factory project Lot C4 Binh Hoa
Industrial Park, Chau
Thanh District, An Giang
Province
6 Apparel NV Co., Ltd 25.000.000 Thailand Garment factory project Lot C1 Binh Hoa
Industrial Park, Chau
7 Ching Luh Shoes 45.000.000 England Garment Lot K Binh Hoa Industrial
Park, Chau Thanh
District, An Giang
Province
8 Spectre Real Estate A/S 11.000.000 Denmark Lot C6 Binh Hoa
Company Industrial Park, Chau
Thanh District, An Giang
Province
9 Samduk Vietnam Co., Ltd 10.000.000 Korea Lot C6 Binh Hoa
Industrial Park, Chau
Thanh District, An Giang
Province

10 Grand Sport Inc Somoa 13.000.000 Somoa Lot 8 Xuan To Industrial


Company Park, Tinh Bien District,
Cty Grand Sport Inc An Giang Province
Somoa Lô 8,KCN Xuân Tô,
huyện Tịnh Biên, tỉnh An
Giang
11 Victoria Hangzhou One 8.800.000 Hong Kong Hotel business No. 1 Le Loi, Chau Doc
Member Co., Ltd City, An Giang
12 Angimex Kitoku Joint 4.500.000 Japan Rice production and rice National Road 91, My
Venture Company export Thoi Ward, Long Xuyen
City, An Giang Province
13 Branch of Jollibee 200.000 Philippines The project of establishing a Co.opMart Long Xuyen
Vietnam Co., Ltd fast food chain in Long Supermarket, No. 12,
Xuyen Nguyen Hue A, My Long
Ward, Long Xuyen City,
An Giang Province
Siêu thị co.opMart

15
14 Branch of MM Mega 17.811.000 Thailand MM Mega Market Long
Market Co., Ltd Xuyen Center 414 Tran Hung Dao, My
(Vietnam) Phuoc Ward, Long Xuyen
city, An Giang province
15 Hoang Kim - CNC Co., 7.842.105 Korea Complex entertainment My Luong town, Cho Moi
Ltd centers and residential areas district, An Giang
province
16 Branch of ACACI.T 100.000 Singapore Computer installation No. 11 Luong Van Cu,
Vietnam Co., Ltd in An consulting service My Long Ward, Long
Giang Xuyen City, An Giang
Province
Số 11 Lương Văn Cù,
phường Mỹ Long,
TP.Long Xuyên, tỉnh An
Giang
17 Branch of KFC VN Joint 319.000 Thailand Processing and trading No. 59B, Ly Tu Trong,
Venture Company Thái Lan food, fast food My Long Ward, Long
Limited Chế biến và kinh doanh Xuyen city, An Giang
Chi nhánh Công ty Liên thực phẩm, thức ăn nhanh province
doanh TNHH KFC VN
18 Lotteria Co., Ltd. branch 326.190 Korea Processing and trading food Co.opMart Long Xuyen
in An Giang and beverages Supermarket, No. 12,
Nguyen Hue A, My Long
Ward, Long Xuyen City,
An Giang
Siêu thị co.opMart
19 Branch of Kubota 0 Japan Maintenance and servicing No. 20/7B, My Quoi
Vietnam Co., Ltd of tractors, harvesters, clump, p. My Quy, Long
agricultural and forestry Xuyen city, An Giang
machine tools province

20 Great Canyon Co., Ltd 350.000 Hong Kong Factory manufacturing and Tan Hoa handicraft
processing bags cluster (Lo Su residential
cluster - Tan Hoa
commune), Tan Hoa
commune, Phu Tan
district, An Giang
province
21 Fistex An Giang One 400.000 Taiwan Garment factory Ham Nghi Street, Binh
Member Co., Ltd Khanh 5 Hamlet, Binh
Khanh Ward, Long
Xuyen City, An Giang
22 VPDD of DKSH 0 Switzerland Displaying, introducing and No. 46/11/5 and 46/11/6
Technology Technology consulting products Tran Hung Dao, Dong
Co., Ltd in An Giang Thanh B cluster, My
Thanh ward, Long Xuyen
city, An Giang province
23 Branch of Victoria Hotel 0 Hong Kong Hotel business Vinh Dong B Hamlet,
Hangzhou Co., Ltd - Sam Nui Ward, Chau Doc
Vitoria Mountain Sam city, An Giang province
Tourist Village
24 Lotteria Vietnam Co., 0 Korea Processing and trading food No. 92 Nguyen Trai, My
Ltd. Branch in An Giang and beverages Long Ward, Long Xuyen
city, An Giang province
25 Angimex-Kitoku Co., 1.600.000 Japan Producing specialty rice and Son Hoa Hamlet, Vong
Ltd-Ba The Branch rice-based products for Dong Commune, Thoai
export.. Son District, An Giang
Province
26 New Horizon Vietnam 5.197.349 Israel Investment in production Thanh Phu Hamlet, Binh
Co., Ltd and trading of all-male giant Thanh Commune, Chau
freshwater prawns Thanh District, An Giang
Province
27 Representative Office of 0 Malaysia Displaying, introducing and No. 130/1.Tran Hung
Bach Ma Ceramic Co., consulting products Dao, ward. My Phuoc,
Ltd. (Vietnam) AG

16
Long Xuyen city, An
Giang province
28 Binh Minh Partners 5.000 Finland Garment 50 Le Van Luong, My
Import-Export Co., Ltd Phuoc Ward, Long Xuyen
city, An Giang Province.
29 Anh Duong Plant 175.000 Canada Buying and selling My Binh Hamlet, Nhon
Protection Import Export fertilizers and pesticides My Commune, Cho Moi
Joint Stock Company District, An Giang
Province
30 An Giang Branch-CJ 0 Korea Producing feed for No. 1249E/63, Binh Duc
VINA AGRI Co., Ltd livestock, poultry, aquatic Ward, Long Xuyen city,
products An Giang province.
31 Representative office of 0 Canada Exhibition, introduction, 24/C Tran Hung Dao, My
Anh Duong Plant consultation Xuyen Ward, Long
Protection Import Export product Xuyen City, An Giang
Joint Stock Company province
32 JIC Vietnam Co., Ltd 15.000.000 Japan Project for production of Tan Trung Industrial and
Cty TNHH MTV JIC Việt protective materials Handicraft Cluster, Phu
Nam insulation (hot) - calcium Tan District, An Giang
silicate insulation and Province..
processing (cold) urethane
insulation
33 Branch of LG VINA 290.000 Korea Cosmetics business 3rd floor, 9 Tran Hung
Cosmetics Co., Ltd in AN Dao, My Xuyen ward,
GIANG Long Xuyen city, An
Giang province
34 De Nhat Badminton Co., 350.000 Korea Badminton factory No. 346, My Hoa hamlet,
Ltd My Luong town, Cho Moi
district, An Giang
province
35 Lottecinema Vietnam Co., 2.506.684 Korea Cinema business 5th floor, Vincom Long
Ltd Xuyen Shopping Center,
My Binh Ward, Long
Xuyen City, An Giang
Province
36 Werterwer Co., Ltd 197.345 Germany My Khanh Commune,
Binh Khanh Ward, Long
Xuyen City, An Giang
Province
37 LG Vina Cosmetics Co., 19.111 Korea Cosmetics business No. 24/12 Tran Hung
Ltd Dao, My Binh ward, Long
Xuyen city, An Giang
province.
38 Loc Troi - Vien Thi Joint 3.000.000 Vietnam - Production of plant seeds; Hoa Tan Hamlet, Dinh
Stock Company China Propagation and care of Thanh Commune, Thoai
agricultural seedlings; Son District, An Giang
Consulting on agronomy, Province.
agricultural technology
39 J.Y Co., Ltd. International 12.924.629 Hong Kong Producing stuffed animals, Long Dinh Hamlet, Long
garments, hats, socks, Dien A Commune, Cho
slippers, pillows, Moi District, An Giang
backpacks, bags Province
40 Wilmar Argo Vietnam 1.984.000 Singapore Processing Industry Long Hoa 2 Hamlet, Long
Co., Ltd Hoa Commune, Phu Tan
District, An Giang
Province

17
[- This Page is intentionally left blank -]

18
BA RIA – VUNG TAU

19
INVESTMENT ENVIRONMENT IN BA RIA – VUNG TAU

USD/VND 23.510

GENERAL INFORMATION

Area 1987 km2


Population 1,178 million people (2022)
▪ Ba Ria – Vung Tau is located in Southeast region.
Geographical Location ▪ Located at the Southeast region. There is a common boundary line of 16.33 km long with Ho Chi
Minh City in the west
▪ The province is adjacent to Dong Nai province in the North, with Ho Chi Minh City. Ho Chi
Adjacent provinces Minh City is in the west, with Binh Thuan province in the east, and the South is bordered by the
East Sea.
2022 statistic:
▪ Nominal GRDP (billion
390.293 (16,478488494828 billion USD)
VND):
▪ Real GRDP (billion VND): 224.480 (9,4777411864049 billion USD)
▪ GRDP growth: 7,15%
▪ GRDP per capita (million
GRDP 331,10 (45183 USD)
VND/year):
▪ Economic structure:
- Industry - Construction: 70,37%
- Agriculture. forestry and
5,87%
fishery:
- Service: 15,98%
▪ Industry - Construction growth: 5,39%
▪ Agriculture, forestry and
Industry growth 2,40%
fishery growth:
▪ Service growth: 21,06%
Import turnover (billion USD): 9,30 (Growth rate: 0,101)
Import - Export
Export turnover (billion USD): 0,64 (Growth rate: 0,0874)
▪ Key industrial products: oil and gas production, processing and manufacturing industry,
production and distribution
Key Industry
of electricity, hot water, steam
▪ In addition, the province focuses on producing canned beer, liquefied butane and natural gas
PCI 70.26
Ranking 4
SOCIAL INFRASTRUCTURE
▪ Roadway: The main roads connecting important districts and communes in the province are also
asphalted such as provincial roads 328, 329, Lang Cat - Long Son roads, provincial roads 44, 52,
Phuoc Buu - Ho Tram roads... The main roads connecting important districts and communes in the
Transportation province are also asphalted such as provincial roads 328, 329, Lang Cat - Long Son roads,
provincial roads 44, 52, Phuoc Buu - Ho Tram roads...
▪ Waterway: Ba Ria - Vung Tau province has 110km of inland waterways, with more than 60 ports,
inland wharves, 21 river channels and canals with regular waterways.
▪ The province has a thermal power plant. The total electricity output produced by Ba Ria Thermal
Electricity
Power Company is more than 41.91 billion kWh.
▪ BR - VT currently has 30 medium and small-scale water reservoirs, these reservoirs have the
function of supplying water for agriculture, domestic use, industry and services. The total amount
of water stored in dams is 308 million m3, of which the useful capacity is about 276.06 million m3.
Water Water supply for domestic use in the province is taken from 8 water reservoirs: Da Den, River Ray,
Song Hoa, Kim Long, Nui Nhan, Da Bang, Suoi Cac, Chau Pha (excluding Con Dao district). In
which, Da Den reservoir and Song Ray lake are the main and main supply sources for people in the
whole province.
20
▪ 453 preschools and high schools, 137 elementary schools, 90 middle schools and 37 high schools.
Education & Training
In particular, there are nearly 280 schools meeting national standards, accounting for 60%.
▪ At the provincial level, there are only 3 medical facilities: Ba Ria Hospital is received from Chau
Thanh district hospital with a size of 300 beds, Le Loi Hospital with a scale of 180 beds. At the
Medicare district level, there were only two health centers in Long Dat and Xuyen Moc districts. Most
communes and wards do not have medical stations. The total number of hospital beds/ten thousand
people has 9.96 beds.
INVESTMENT CONDITION
Human resource 54,9% of population are in the working age (2022)
Education level Trained labor rate: 67% (2022)
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): Vung Tau City, Phu My Town
- Area II (4,160,000 VND/month): Ba Ria City
Salary - Area III (3,640,000 VND/month): Long Dien, Dat Do, Xuyen Moc, Chau Duc, Con Dao District.
- Area IV (3,250,000 VND/month): N/A
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum
wages paid to employees working under employment contracts)
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
Investment incentives
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
▪ Prioritized projects:
Fields Attracting - Industrial field: electronics, consumer goods
Investment - Agriculture: modern agricultural production models
- Service: finance and banking; entertainment center...
▪ Investment capital growth in the area in 2022 reached VND 41,655.1 billion, an increase of
Investment attraction
8.64% over the same period last year, of which: Foreign direct investment capital was VND
situation
9,017.4 billion
My Xuan Industrial Park B1 – Conac
My Xuan Industrial Park B1- Tien Hung
Cai Mep Industrial Park
Chau Duc Industrial Park
Industrial zones
Phu My 3 Intensive Industrial Park
Da Bac Industrial Park
My Xuan Industrial Park B1- Dai Duong
Dat Do Industrial Park

Map

21
▪ Address: 198, Bach Dang, Ba Ria – Vung Tau city, Ba Ria – Vung Tau
Contact ▪ Tel: (84-254) 3852401

▪ Email: Nhauyen83@gmail.com

▪ Contact person: Nha Uyen

22
MY XUAN B1- TIEN HUNG INDUSTRIAL PARK

GENERAL INFORMATION
Address My Xuan B1 – Tien Hung Industrial Park, My Xuan Ward , Phu My town, Ba Ria – Vung Tau
Province, Vietnam
TIEN HUNG PRODUCING - TRADING CO.,LTD
Investor
61, Street No. 17, My Thai Area 2-S4, Tan Phu Ward, District 7, Ho Chi Minh City
▪ Tel: 028 38552757
▪ Email : info@tienhungcorp.com
▪ Website:www.tienhungcorp..com
Contact Person VÕ TUẤN CƯỜNG – Phó Giám đốc – 0913637638 – votuancuong638@gmail.com

Location Adjacent location [Các khu vực xung quanh]


[Vị trí KCN] - 60 km from HO CHI MINH city/ the capital
Nêu bật vị trí thuận lợi của - 70 km from Tan Son Nhat airport
KCN
- 20 km from Long Thanh airport
- 15 km from Cai Mep port
- 2 km from 51 highway
Investment Sectors Priority Sectors for Industry of mechanical manufacture, repair and assembly
Các lĩnh vực đầu tư Investment Industry of processing forestry, agricultural products
Light industry: leather shoes, garment, stationery, plastic things...
Assembling industry of electronics, refrigeration electricity.
Industry of construction materials.
And some other light industrial branches …

Investment Restricted
Sectors
Polluted industries

Minimum wage
4,680,000 VND/month

Lease term From 2023 to 2056


Minimum Lease Area 20.000 m2 (2 Ha)
Permitted Construction Permissible building rate
Rate - Factory construction area: 70%
- Operating area] : 50%

Land area ▪ Total area: 200 Ha


[Diện tích đất] ▪ Total leasable area: 138 Ha
▪ Total vacant leasable area: 10 Ha
▪ Total area with full infrastructure ready to build factory: 10 Ha
Factory Available for Rent ▪ Total area: 16.000 m2
▪ Total vacant leasable area 4.800 m2
Operation Status ▪ Active

Occupancy Rate and ▪ 81%


Number of Projects ▪ 26 Projects

No. of Korean projects ▪8

Lease fee ▪ Land lease fee: 135USD/m2


▪ Factory lease fee: 3.9 USD/m2/month

23
Operating fee ▪ Management fee: 0.4 USD/m2/year
▪ Electricity fee: according EVN
▪ Water fee: 12.500 đồng/m3
▪ Wastewater treatment fee: 0.4USD/m3

INFRASTRUCTURE AND FACILITY

Layout plan

24
CAI MEP INDUSTRIAL PARK

GENERAL INFROMATION

Address: Cai Mep Industrial Park, Road 965, Tan Phuoc Ward and Phuoc Hoa Ward, Phu My Town, Ba Ria -
Vung Tau Province.
Infrastructure development Saigon Construction Corporation – One member limited
enterprise
- Address: 18A Dinh Tien Hoang, Dakao Ward, District 1, Ho Chi Minh City
- Phone number: 028 39 104 801
- Email: info@saigoncons.com.vn
- Website: saigoncons.com.vn
Contact: - Tên: Nguyễn Phúc Nhật Yên
- Chức vụ: Chuyên viên Ban Quản lý Khu công nghiệp Cái Mép.
- Số điện thoại: 0374 233 298
- Email: banquanlykcncaimep@gmail.com
Industrial park location: - Located in the southern key economic region; convenient transportation by road,
waterway and air.
- The national deep-water port system, in the group V port system of Ho Chi Minh
City, Ba Ria - Vung Tau and Dong Nai, can receive ships with a tonnage of up to
200,000DWT.
- Convenient transportation system:
+ The road system connects with National Highway 51 (Ho Chi Minh City - Vung
Tau).
+ 70km from the center of Ho Chi Minh City.
+ 40km from Vung Tau city center.
+ 55km from Bien Hoa city center.
+ In the industrial park, there is a railway station of the Ho Chi Minh City - Bien Hoa
- Vung Tau railway line.
Investment fields: Cai Mep Industrial Park is entitled to receive the industries of food processing, foodstuffs,
processing petrochemical products, petroleum, chemical industry, metallurgy and serving
heavy industry; does not accept investment projects in 05 types of industries that are at
risk of causing serious environmental pollution, including processing tapioca starch,
processing rubber latex, producing basic chemicals (with water generation). industrial
waste), dyeing and tanning;
(According to Decision No. 2005/QD-BXD dated October 27, 2005 of the Ministry of
Construction approving the adjustment of detailed planning of Cai Mep Industrial
Park, Ba Ria - Vung Tau province and Decision No. 1683/QD- BTNMT dated
November 14, 2006 of the Ministry of Natural Resources and Environment on the
approval of the Environmental Impact Assessment Report)
Minimum wage: N/A
Lease term To 10/5/2052.
Minimum rental area: According to businesses’ demand
Building height limit and Construction density 60%, average height 1.5 stories and land use coefficient 0.9 times
building scale: (According to Decision No. 2005/QD-BXD dated October 27, 2005 of the Ministry of
Construction on approval detailed planning of Cai Mep Industrial Park, Ba Ria - Vung
Tau province).
Land area: - Total area: 670.0875ha

25
- Area of industrial land for lease: 462,5352ha
- Vacant land area for rent: 138,5189ha
- Area with infrastructure ready for factory construction: more than 50ha
Factory for rent: None
Operation status: In Operation
Occupancy rate and number of - 69,86%
projects:
- 19 projects
Number of Korean investment 02 projects
projects:
- Polypropylene factory and Liquefied petroleum gas underground storage (Hyosung
Vina Chemical Co., Ltd.).
- Hyosung Vina Chemicals Port (Hyosung Vina Chemicals Co., Ltd.).
Lease fee: The sub-lease price of land use rights is determined depending on the location and sub-
lease area at each time of leasing.
Operating fee: - Management fee: determined at the time of contract negotiation and negotiation.
- Electricity charges: Enterprises directly sign contracts with Phu My Town Power
Company
- Water charges: Enterprises directly sign contracts with Toc Tien Water Supply
Company Limited.
- Waste water treatment fee: determined at the time of contract negotiation and
negotiation.
- Waste treatment fee: The enterprise directly signs a contract with the unit with the
function of collecting, transporting and treating waste.

INFRASTRUTURE
- The road system is planned according to standards, including road systems: 34m, 40m.
- Power supply system: 110/22kV line. Water supply system from Toc Tien water supply plant (D150 – D300).
- Rainwater collection and drainage system (D600 – D2000).
- Wastewater collection and treatment system according to Vietnamese standards.
- Gas supply system for projects in need.
- Communication system, fire protection, trees,

26
CHAU DUC INDUSTRIAL PARK

GENERAL INFORMATION
Address [Địa chỉ] Floor 9, Sonadezi Building, No.1, Street 1, Bien Hoa 1 IP, An Binh Ward, Bien Hoa City, Dong
Nai Province

Công ty CP Sonadezi Châu Đức / Sonadezi Chau Duc Shareholding Company


Investor ▪ Address: Chau Duc Industrial Park, Chau Duc Distrtict, Ba Ria – Vung Tau Province, Viet
[DN phát triển hạ tầng] Nam.
▪ Tel: 84-251-8860784/8860785
▪ Email: sales@sonadezichauduc.com.vn
▪ Website: www.sonadezichauduc.com.vn hoặc www.sonadezi.com.vn
Contact Person Mr Vu Quan – Sales Manager – 0389.33.66.88 – vuquan79@gmail.com

Location Adjacent location


15 km from Ba Ria city, 44 km from Vung Tau city, 75 km from HCM city
54 km from Long Thanh airport
85 km from Tan Son Nhat airport
- 16 km from Thi Vai port
- 19 km from Cai Mep port
- 21 km from Go Dau port
- Connect directly to The National Road No. 56
- 13 km from The National Road No.51
- 40 km from Ho Chi Minh – Long Thanh – Dau Giay Expressway
Investment Sectors Priority Sectors for Investment
Electronic components parts, computer and semi-conductors assembling industry;
Plastic products, household appliances;
Car accessories, manufacturing and assembling automobiles;
Production of new materials and nanotechnologies;
High grade garment and textile, footwear (excluding dying and tanning process), etc.

Investment Restricted Sectors


Rubber processing;
Manufacturing basic chemicals (generating industrial wastewater);
Steel refinery from wasted metal in discontinuous furnace technology;
Industries that are not priority in the Industrial Park and industries that are not welcome or
restricted in the Industrial Park (according to Directive No. 43-CT/TU dated August 6th,
2014 of the Board of Provincial Committee).
Minimum wage [Regional minimum wage] Chau Duc Industrial Park is located in region 3, Minimum salary is
3,640,000 VND
Lease term To the year 2058
Minimum Lease Area 1 ha
Limit for Construction According to the national technical regulation on construction planning QCVN01: 2021/BXD
Height

Permitted Construction The maximum net construction density of a land lot for building factories and warehouses is
Rate 70%. For land plots for factory construction with more than 05 floors used for production, the
maximum net construction density is 60%.
According to the national technical regulation on construction planning QCVN01: 2021/BXD
Land area ▪ Total area: 1.556 ha
▪ Total leasable area: 1.108,9 ha
▪ Total vacant leasable area: 561,69 ha
▪ Total area with full infrastructure ready to build factory: 83 ha

27
Factory Available for Rent ▪ Total area: 7.510 m2
▪ All Sonadezi Chau Duc Company’s Ready-Built-Factories are leased.
Operation Status In operation: 42 investors/infrastructure construction and expected completion: 17 investors/site
clearance: Prepare and approve compensation plan for site clearance accumulated up to the time
of BIZA report April 2023: 1,328.55 ha remaining area 156.27 ha]
Occupancy Rate and ▪ 49,35%
Number of Projects ▪ 88 projects

No. of Korean projects ▪ 30 projects

Lease fee ▪ Land lease fee: 95 USD/m2/ to the year 2058

▪ Factory lease fee: N/A

Operating fee ▪ Management fee: 0.5 USD/m2


▪ Electricity fee:
According to Decision No. 1062/QD-BCT dated May 4, 2023 of the Ministry of Industry and
Trade, the unit price of electricity for voltage level from 22KV to below 110KV applies as follows:

- Giờ cao điểm : VND 2.959/kWh

- Peak time : VND 2,9591/kWh

- Giờ thấp điểm : VND 1.037/kWh

- Off peak : VND 1,037/kWh

- Giờ bình thường : VND 1.604/kWh

- Normal time : VND 1,604/kWh

▪ Water fee: [Cước nước]


Price according to regulations of Ba Ria – Vung Tau province.
▪ Wastewater treatment fee: [Phí xử lý nước thải] khoảng 0,32 USD / m3
According to the State regulations, the volume of wastewater is calculated by 80% of the
supplied water volume.
▪ Waste treatment fee:[Phí xử lý chất thải] N/A
INFRASTRUCTURE AND FACILITY
Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities, Training
facilities, etc., Road width, …
The utility infrastructure around the area and the distance from the area to those facilities:
Credit institutions: Vietcombank, Sacombank, BIDV in Phu My: 15km
Tax office, Customs: Phu My Customs Branch / Phu My Customs: 18km;
Logistics: Thi Vai Seaport, Cai Mep Seaport: 16-19km,
Post Office: Suoi Nghe Post Office 5km
Medical facilities: Ba Ria Hospital / Ba Ria Hospital: 15km,
Universities & vocational training institutions, Human resource facilities, Dormitories for workers,
Educational facilities for children of workers: Ngo Quyen High School: 7km, Quang Trung Secondary School: 5km, Suoi Nghe
Primary School: 3km;
Road system & width:

- East-West Road (Song Hanh Street): 80m, 8 lanes, 2m median strip, 14m sidewalk;
- Northern road (Main axis): 50m, 6 lanes (4m/lane), 2m median strip, 12m sidewalk;
- Southern road (Main axis): 54m, 6 lanes (4m/lane), median strip 6m, sidewalk 12m;
- Main roads include roads 05 - 12 - 15 25: 32m, 4 car lanes (3m/lane), sidewalks: 10m;
- Main road 08: 29m, 4 lanes (3m/lane), sidewalk: 8.5m;
- Internal road: 29m, 2 lanes for cars (4.5m/lane), sidewalk: 10m.

Post and telecommunications infrastructure; Backup generator; Fire protection utilities: equipped

28
DONG XUYEN INDUSTRIAL PARK

GENERAL INFORMATION
Address Phường Rạch Dừa, thành phố Vũng Tàu, tỉnh Bà Rịa – Vũng Tàu
Name of Investor: Dong Xuyen and Phu My 1 Industrial Park Infrastructure Investment and
Investor Exploitation Company (IZICO Company)
▪ Address / Address: No. 20, 3/2 Street, Ward 8, Vung Tau City, Ba Ria-Vung Tau Province
Tel: 02543.593.440
▪ Email: izico@gmail.com
▪ Website: www.izico.com.vn
Contact Person Name - Position - Mobile: - Email:
Nguyễn Ngọc Sơn –Director - Email: sonizico@gmail.com

Location - Dong Xuyen Industrial Park is located along National Highway 51A
- Distance to big city: 125km from Ho Chi Minh city by road, about 50 nautical miles by sea;
About 7km from Vung Tau city center
- Nearest seaport: 37km from Phu My Port in Ba Ria-Vung Tau province and 38km from Thi Vai-
Cai Mep Port in Ba Ria-Vung Tau province
- Nearest airport: To Long Thanh international airport (Dong Nai province): 80km
- Nearest railway station: To Bien Hoa station (Dong Nai province): 87km
Investment Sectors Priority Sectors for Investment
- Oil and gas service industry
- Marine service industry
- General clean industries

Minimum wage
4.680.000 VND/ month

Lease term To 31/10/2046


Thời hạn cho thuê
Minimum Lease Area No require

Limit for Construction - Factory construction area 30m


Height - Operating area 1-7 floors

Permitted Construction - Factory construction area up to 70%


Rate - 50% operating area

Land area ▪ Total area: 160,81 ha


▪ Total leasable area: 137,47 ha
▪ Total vacant leasable area: 0
▪ Total area with full infrastructure ready to build factory: 0

Factory Available for Rent ▪ Total area: none


▪ Total vacant leasable area: 0
Operation Status ▪ Active/

Occupancy Rate and ▪ 100%


Number of Projects ▪ 90 project

No. of Korean projects ▪ None

Lease fee ▪ Land lease fee: 1,76 USD/m2/year

▪ Factory lease fee: none

29
Operating fee - Industrial park management fee: according to regulations of the People's Committee of Ba Ria-
Vung Tau province
- Waste water treatment fee: Treatment unit price for 01m3 of local wastewater with pollution
levels from column A to column B of QCVN 40/2011/BTNMT before being discharged into the
wastewater treatment plant's collection system is 4,400 VND/m3; from column B QCVN
40/2011/BTNMT is 9,800 VND/m3 (unit price includes VAT)
- Other fees: fees and charges as prescribed by the State
- Electricity price: According to the selling price of electricity provided by Vung Tau City Power
Company directly to investors in the industrial park.
- Price of water supply: 12,500 VND/m3 (VAT not included)
INFRASTRUCTURE AND FACILITY

- Infrastructure:
+ Internal road system: The road of the Industrial Park has a road surface structure of hot asphalt concrete with a total length of
9.22 km. The entire system of roads in the IZ has been fully invested and built to meet the needs of investors in the IZ. The traffic
system includes: the main road of the industrial zone: Road No. 1, 45m wide; The remaining roads have width from 22m to 30m .
+ Power supply system: Power is taken from 110/22KV intermediate transformer station located at Road No. 1 of the Industrial
Park. From the intermediate substation to build a 22KV overhead line to supply power to the whole industrial park
+ Water supply system: The entire water supply for Dong Xuyen Industrial Park uses the water source of Vung Tau Water Supply
Joint Stock Company with a capacity of 35,000m3/day.
+ Communication system: Vung Tau is a focal point of the international fiber optic system, so it is very convenient. In Dong Xuyen
Industrial Park, it is also invested to build a fiber optic cable and communication network installed according to the requirements
of each factory.
- Centralized wastewater treatment plant: Waste water is treated locally in each enterprise, then according to the wastewater
collection system, it is brought to the centralized wastewater treatment station of the Industrial Park. Dong Xuyen Industrial Park
has built and put into use a centralized wastewater treatment plant system with a capacity of 3,000m3/day and night, ensuring
wastewater treatment for all investors in the industrial park.
+ Quality after treatment: Currently, the concentrated wastewater treatment plant in Dong Xuyen Industrial Park is applying column
B standards QCVN 40/2011/BTNMT (according to environmental protection commitments and discharge permits) before
discharging. to the receiving environment.
- Service and service works: In Dong Xuyen Industrial Park, an operation center has also been built on Road No. 1 of the Industrial
Park.

30
[- This Page is intentionally left blank -]

31
BAC GIANG

32
INVESTMENT ENVIRONMENT IN BAC GIANG

GENERAL INFORMATION

▪ Area: 3,895.9 km2


Area, Population
▪ Population: 1.89 million

▪ Bac Giang province is included in Hanoi capital region, on the economic corridor of Lang Son -
Hanoi - Hai Phong- Quang Ninh.
Geographical Location ▪ It is 50 kilometres from Bac Giang city to Hanoi center and Noi Bai international airport, 130
kilometres to Hai Phong and Cai Lan ports and 110 kilometres to Huu Nghi border gate (Lang Son
province).

▪ Lang Son Province to the north, Thai Nguyen Province to the northwest and Hanoi Capital to the
Adjacent provinces
southwest, Hai Duong & Bac Ninh Province to the south, Quang Ninh Province to the east.

2022 statistic:

▪ GRDP: 155,876 billion VND (6.5 billion USD)

▪ GRDP growth: 19,3%

▪ GRDP per capita: 3.400USD/year


GRDP
▪ Economic Structure:

- Industry and Construction: 62.30%

- Service: 22.08%

- Agriculture, Forestry and Fishery: 14.90%

2022 statistic:

▪ Industry - Construction growth: 26.65%


Industry growth
▪ Agriculture, forestry and fishery growth: 1.97%

▪ Service growth: 7.49%

PCI ▪ Score: 72.80 – ranked 2nd out of 63 cities and provinces in Vietnam (2022)

SOCIAL INFRASTRUCTURE

▪ Roadway: Including Hanoi – Lang Son expressway and 05 National Routes: National Route 1,
National Route 31, National Route 37, National Route 17, National Route 279 and Vanh Dai 5 of
Hanoi capital, convenient connections to economic centers, airports, seaports

▪ Railway: Including Hanoi – Lang Son route (trading to China); Hanoi – Bac Giang (Kep) – Quang
Transportation Ninh. Especially, Kep station has been put into operation for international transport, contributing to
improving the transport capacity for the entire Hanoi – Lang Son route through China to Europe.

▪ Waterway: Including Cau River, Thuong River and Luc Nam River.

▪ Airway: 50 minutes from Noi Bai International Airport by car.

▪ Supplied from the national power network with 01 500kV station, 03 220kV stations and 16 110kV
Electricity
stations in the entire province

33
▪ Quality underground water is mainly used in water supply system
Water ▪ 02 plants with capacity of 25,000 to 50,000 m3/day & night and clean water supply plans in the
district satisfy living and production demands of the industrial parks and clusters in the province

▪ 01 university, 05 colleges, 06 professional intermediate schools and 25 vocational training centers and
Education institutions, in which, there are 02 high-quality vocational colleges: College of Industrial Technologies
and Vietnam – Korea Vocational College of Technology.

▪ Modern hospital system including the provincial General Hospital, Obstetric and Pediatric Hospital,
Medicare Oncology Hospital, General Hospital and Ophthalmic Hospital and Medical Centers in all the districts
and Bac Giang city.

INVESTMENT CONDITION

Human resource ▪ About 1.2 million people of working age (2022)

Education level ▪ Trained labor rate: 74% (2022)

▪ The minimum salary for the province is applied as follows (see appendix for detail amount):

- Area III including Bac Giang city, Viet Yen Districts, Yen Dung Districts, Hiep Hoa Districts, Tan
Yen Districts, Lang Giang Districts: 3.640.000 VND/month or 17.500 per hour.
Salary - Area IV including Yen The Districts, Luc Ngan Districts, Son Dong Districts, Luc Nam Districts:
3.250.000 VND/month or 15.600 per hour.

▪ The lowest wage for trained labor (including those trained by the enterprises) must be at least 7%
higher than the above referenced basic salary.

▪ Incentives according to government regulations:

- Exemption and reduction for land and water rent fee


Investment incentives
- Preferential tax rates and exemption period, reduction for corporate income tax.

- Import tax exemption

▪ Industry: Focus on attracting industries and products:

- Mechanical engeering, manufacture, food-processing, water supply, electronic products,


wastewatermangement and treatment, computers and optical products, manufacture of electrical
equipment (mainly batteries), garment and textile, products from rubber and plastic..

Fields Attracting ▪ Tourism, Trade - Service:


Investment
- Cultural – spiritual tourism; history – culture; eco-re-sport; community tourism; high-class sport
tourism (golf tourism)

▪ Agriculture: Attract business to invest in the formation of specialized agricultural production areas to
serves as a basis for concentration, land accumulation, development in the direction of effiency, high-
tech agriculture, smart and clean agriculture.

34
Map

Bac Giang Department of Planning and Investment

Address: Nguyen Gia Thieu Street, Bac Giang City, Bac Giang

Tel: (84-204) 3 854 317

E-mail: so_khdt_vt@bacgiang.gov.vn

Website: https://skhdt.bacgiang.gov.vn

Contact Center for Investment Promotion and Enterprise Development Bac Giang/Korea Desk Bac Giang

Address: 164 Xuong Giang Street, Bac Giang City, Bac Giang

Mr: Dong Anh Quan – Director of the Center

Tel: 0904 109 996

E-mail: anhquanskhdt@gmail.com

Website: https://ipcbacgiang.com

35
LIST OF INDUSTRIAL ZONES IN BAC GIANG

No Industrial zone Name Total Area (ha) Occupancy Rate Status


1 Dinh Tram Industrial Zone 127 100% In operation
2 Quang Chau Industrial Zone 426 100% In operation
Quang Chau Industrial Zone (expand) 90 100% In operation
3 Van Trung (Fujiang) Industrial Zone 238 100% In operation
4 Van Trung (S&G) Industrial Zone 113 100% In operation
5 Hoa Phu Industrial Zone 208 91% In operation
Hoa Phu Industrial Zone – expand phase 1 85 0% Under
construction
6 Song Khe – Noi Hoang Industrial Zone 150 100% In operation
7 Viet Han Industrial Zone 50 100% In operation
8 Tan Hung Industrial Zone 105,3 0% Under
construction
9 Yen Lu Industrial Zone 377 4% In operation

BAC GIANG LOCATION MAP OF INDUSTRIAL ZONES

36
HOA PHU INDUSTRIAL ZONE

GENERAL INFORMATION
Address Lot HC – Hoa Phu Industrial Park, Mai Dinh Commune, Hiep Hoa District, Bac Giang Province
Hoa Phu Invest Co., Ltd
Investor ▪ Address: Lot HC – Hoa Phu Industrial Park, Mai Dinh Commune, Hiep Hoa District, Bac
Giang Province
▪ Tel: 0204 358 6868
▪ Email: hoaphu@phumygroup.com.vn
▪ Website: www.hoaphuip.com.vn
Contact Person Name - Position - Mobile: - Email:
Le Cong Long
093 6941989
Email: lelong@phumygroup.com.vn
Location Adjacent location
- 45km from Ha Noi city
- 40km from Bac Giang Province
- 20km from Noi Bai airport;
- 110km from Hai Phong port;
- 150km from Lang Son border gate
Investment Sectors Priority Sectors for Encourage the production industry that is not harmful to the
Investment environment (assembly, electronic components, ...)
Investment Restricted Industries that affect the environment (textiles, plating, ...)
Sectors
Minimum wage 3.640.000 VND/person/month (According to Decree 38/2022/ND-CP)
Lease term ▪ End date: 20/05/2066
Minimum Lease Area 10.000m2
Limit for Construction The number of floors is limited to 5 floors no limit to the height of each floor
Height

Permitted Construction Construction density: 3.5


Rate

Planned area ▪ Total area: 292ha


▪ Total area is filled: 207ha
▪ The total remaining area is in the process of clearing ground: 85ha

Factory Available for Rent ▪ Total area: None

Operation Status ▪ Active and continues to be in the ground clearance phase of expanded 85ha section. This site is
expected to be handed over in the fourth quarter of 2023.
Occupancy Rate and - 207ha area: 95% filled
Number of Projects - 85ha is in the process of clearing ground
- Total projects in Hoa Phu Industrial Park: 27
Number of Korean projects ▪ 6 projects

Lease fee ▪ Land lease fee: Depending on the location and size of the area

Operating fee ▪ Management fee: 11.750 VND/m2/year


▪ Electricity fee: According to the unit price of Vietnam Electricity (EVN)
▪ Water fee: 11.000 VND/m3
▪ Wastewater treatment fee: 9.900 VND/m3
(The above costs do not include VAT)

37
INFRASTRUCTURE AND FACILITY

Financial institution Vietcombank, Vietinbank


Tax service, State finance
Internal Service
office

Customs Service Internal Service

Logistics Internal Service

Post office Internal Service

Medicare 19 km to Bac Ninh General Hospital

Police, public security 24/7 security service.

Universities, training
10 km from nearest University
facilities, etc.

Recruitment Available From the 02 towns, Thắng Town and Chờ Town, with the population of 220,000

Worker dormitory Internal Service

Worker's child education


NA
facility

One-stop service Internal Office

Road Width Main entrance: 77 m width

IT & Tele-communication
Telecommunication systems and international standards are always ready to meet the
Facilities of Industrial
communication needs
Zone
Emergency Power
Available in the zone
generator
Fire brigade station away from 1km; extinguishing water pipe and fire hydrants are located
Fire-fighting facility
along the main roads and branches in the park.

Layout Plan

38
Location Map

39
QUANG CHAU INDUSTRIAL ZONE

GENERAL INFORMATION

Quang Chau Commune, Viet Yen District, Bac Giang Province


Address
Saigon – Bac Giang Industrial Park Corp.
▪ Address: Quang Chau Industrial Zone, Bac Giang Province
Investor ▪ Tel: (84-204) 356 6888
▪ Fax: (84-204) 386 8449
▪ Website: http://www.kinhbaccity.vn/news/
▪ Tran Thi Huong - Sales & Marketing Deputy Manager – (84) 915 636 139 -
Contact Person
tthuong.kbc@gmail.com/ tthuong@kinhbaccity.com
- 15 Km from Bac Giang City Center
- 40 Km from Noi Bai International Airport
Location - 115 Km from Hai Phong Seaport
- 500 m from Highway No.01 and 15 Km from Hanoi – Lang Son (border with China) –
NanNing (China) Railway
Engineering, manufacturing and assembling automobiles and
motorcycles; Production of electronics and home appliances;
Priority Sectors for Investment
supporting industry; textiles, etc. (Decision No. 1062/QĐ-
Investment Area UBND on 07/07/2016)
Restricted Sectors for
As regulated by Bac Giang Authority
Investment

Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

▪ Start date: 2006


Lease term
▪ End date: 2056

Minimum Lease Area 1.86 ha

Limit for Construction


18 m
Height
Permitted Construction
60%
Rate
▪ Total area: 426 ha
Planned area ▪ Total vacant leasable area: Unavailable
▪ Total area with full infrastructure ready to build factory: Unavailable
Factory Available for
▪ Total area: Unavailable
Rent

Operation Status ▪ In operation

Occupancy Rate and ▪ 100%


Number of Projects ▪ 40 projects
Number of Korean
5 projects
Projects
▪ Land lease fee: 75 USD/m2
▪ Factory lease fee: 3.5 USD/m2/month
▪ Payment:
Lease fee
- Method: Bank Transfer in VND
- Period: 40% after signing In-principle Agreement + 40 % after signing Land Sublease Contract
+ 20% after Land Hand-over
▪ Management fee: USD 0.5/sqm/year (excluded VAT)
▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from March
Operating fee
16th, 2015 (excluded VAT) for voltage from 22KV-110KV.
▪ Water fee: 12,000 VND /m3 (excluded VAT)

40
▪ Wastewater treatment fee: VND 9,400 / m3 (excluded VAT)

INFRASTRUCTURE AND FACILITY

Financial institution VietinBank

Tax service, State


7 Km from Vietnam State Treasury in Viet Yen District
finance office

6 Km from the nearest Customs Agency


Customs Service
25 Km from ICD Tien Son, Bac Ninh

Logistics Kerry Integrated Logistics JSC, Dragon Logistics

Post office 2 km from Vietnam Post Office

- Bac Ninh General Hospital is 7km from IP.


Medicare
- Bac Giang General Hospital is 5 km from IP.

Police, public security 700 m

Universities, training
8 Km from Bac Giang Agriculture and Forestry University
facilities, etc.

Recruitment Available

Worker dormitory 2 Km

Worker's child
2 Km
education facility

One-stop service 15 Km

▪ Main road: 32m, 4 lanes;


Road Width
▪ By Road: 23m, 2 lanes
IT & Tele-
communication
Available
Facilities of Industrial
Zone
Emergency Power
Available
generator

Fire-fighting facility Available

41
Layout Plan

Location Map

42
Actual View

43
LIST OF TENANTS
No Name of Company Nationality
1 Nichirin Vietnam Co.,Ltd Japan
2 Inoue Vietnam Co.,Ltd Japan
3 Hosiden Vietnam (Bac Giang) Co.,Ltd South Korea
4 L&C Tech Vietnam Co.,Ltd Co.,Ltd Taiwan
5 Umec Vietnam Co.,Ltd Taiwan
6 Crystal Martin (VN) Co.,Ltd Hong Kong
Crystal Intimate (VN) Co.,Ltd Hong Kong
7 ShunSin Technology Co.,Ltd China
8 Vietnam Tequ Hope Animal Feed Co.,Ltd China
9 Wintek Vietnam Co.,Ltd Taiwan
10 LY Vietnam Co.,Ltd China
11 Trung Nguyen Instant Coffee Jsc. Vietnam
12 NewHope Hanoi – (Bac Giang Branch) China
13 Vinafor Bac Giang Plywood Single-Member Co.,Ltd Vietnam- Japan
14 Si flex Vietnam Co.,Ltd South Korea
15 Luxshare ICT (Vietnam) Co.,Ltd Hong Kong
16 Ja Solar Vietnam Co.,Ltd Co.,Ltd Hong Kong
17 Lens Technology Vietnam Co.,Ltd Hong Kong
18 Blue & Green Home Articles Viet Nam Co.,Ltd China
19 Kinh Bac Services Corporation Vietnam
20 Samkwang Vietnam Co.,Ltd South Korea
21 Lien Minh (LIMICO) Co.,Ltd Vietnam
22 HIQ VINA Co.,Ltd South Korea
23 T/S Vina Co.,Ltd South Korea
24 Exwin Co.,Ltd Taiwan
25 Lucky Dragon Co.,Ltd Taiwan
26 Electric Motocyce Yadea Vietnam Co.,Ltd China
27 Jufeng New Marterials Vietnam Co.,Ltd China
28 Et Solar Technology (Vietnam) Co.,Ltd China
29 Fu Hong Co.,Ltd China
30 Huimei Precisions Plastics Co.,Ltd China
31 BOI Vietnam Co.,Ltd China
32 Fousine Vietnam Technology Co.,Ltd Hong Kong
33 Jiafeng Packaging Vietnam Co.,Ltd China
34 Degoo Adhesive (Vietnam) Co.,Ltd China
35 Great Uninon International Vietnam Co.,Ltd China
36 Chen Feng New Materials Vietnam Co.,Ltd China
37 Naise New Materials Vietnam Co.,Ltd China
38 RunYang Technology Vietnam Co.,Ltd China
39 FuYu Precision Componen Co.,Ltd China

44
40 Cheng Loong Viet Nam Investment Co.,Ltd China

45
DINH TRAM INDUSTRIAL ZONE

GENERAL INFORMATION

▪ Hoang Ninh Commune, Viet Yen district, Bac Giang Province


Address
Infrastructure Development Company of Industrial Park in Bac Giang
▪ Address: Song Khe –Noi Hoang Industrial Park (the Northern area),
Bac Giang
Investor
▪ Tel: (84-204) 3 866 767
▪ Fax: (84-204) 3 866 767
▪ Email: congtypthtkcn@bacgiang.gov.vn

Contact Person ▪ Mr. Nguyen Van Nhien – Sale Director – (84) 913 030 201 - nhiennv_ctptht@bacgiang.gov.vn

▪ 13 Km from Bac Giang City Center


▪ 45 Km from Noi Bai International Airport
Location ▪ 110 Km from Hai Phong Seaport
▪ 500 m from Highway No.01 and 15 Km from Hanoi – Lang Son (border with China) – NanNing
(China) Railway

Priority Sectors for Investment Electronics, High Technology


Investment Area
Restricted Sectors for Investment Polluted Sector

Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

▪ Start date: 2004


Lease term
▪ End date: 17/06/2054.

Minimum Lease Area 10,000 m2

Limit for Construction Factory area: 3 levels


Height Operating area: 2 levels
Permitted
65%
Construction Rate
▪ Total area: 127 ha
Planned area ▪ Total industrial land: 93 ha
▪ Total vacant leasable area: 0 ha
Factory Available for
▪ Total area: NA
Rent

Operation Status ▪ In operation

Occupancy Rate and ▪ 100%


Number of Projects ▪ 54 projects
Number of Korean
▪ 2 projects
Projects
▪ Land lease fee: 60 USD/m2
Lease fee
▪ Factory lease fee: NA
▪ Management fee: 11,120 VND (~0.4USD)/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee
▪ Water fee: 12,072 VND (~0.52 USD)/m3 (production)
▪ Wastewater treatment fee: 9,000 VND (~0.39 USD)/m3

INFRASTRUCTURE AND FACILITY

Financial institution None

Tax service, State


10 km from nearest Tax Service Department
finance office

46
Located inside the industrial zone
Customs Service
NA

Logistics Nhat Tin Logistic within 11 km

Post office Bac Giang Post Office within 11 km

Medicare Viet Yen General Hospital within 5km, Bac Giang General Hospital within 10 km

• 3km from nearest Police Station


Police, public security
• Industrial Park’s security team keeps watching 24/24h
Universities, training
• 10 Km from Kinh Bac University
facilities, etc.

Recruitment None

Worker dormitory None

Worker's child
None
education facility

One-stop service 17.8 km from Yen Dung District One – Stop service

Road Width NA

IT & Tele-
communication Modern communication system reaches the international standard and ready to meet full demands
Facilities of Industrial concerning on national and international communication services.
Zone
Emergency Power
None
generator

Fire-fighting facility Extinguishing water pipe and fire hydrants are located along the main roads and branches in the park.

Layout Plan

47
Actual View

48
VAN TRUNG INDUSTRIAL ZONE

GENERAL INFORMATION

▪ Viet Yen District, Bac Giang Province


Address
Fugiang Company (Taiwan Foxconn Group)
▪ Address: Van Trung Industrial Park, Viet Yen District, Bac Giang Province
▪ Tel: (84-204) 3661 968
Investor
▪ Fax: (84-221) 3 974 624
▪ Website: www.fugiang.com
▪ Email: contact.fugiang@gmail.com
Mr. Nguyen Manh Dung – Head of Project Department – (84) 904 868 557 -
Contact Person
manhdung.fugiang@gmail.com
- 10 Km from Bac Giang City Center
- 45 Km from Noi Bai International Airport
- 110 Km from Hai Phong Seaport
Location
- 110 km from Cai Lan Deep Sea Port Quang Ninh
- 500 m from Highway No.01 and 15 Km from Hanoi – Lang Son (border with China) –
NanNing (China) Railway

Priority Sectors for Investment Electronics, High Technology


Investment Area
Restricted Sectors for Investment Polluted Sectors

Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

▪ Start date: 24/12/2009


Lease term
▪ End date: 12/11/2065

Minimum Lease Area 10,000 m2

Limit for Construction Factory area: 3 levels


Height Operating area: 2 levels
Permitted Construction
60%
Rate
▪ Total area: 238.3 ha
Phase I: 150 ha
Planned area
Phase II: 88.3 ha
▪ Total vacant leasable area: 0 ha

Factory Available for Rent ▪ Total area: NA

Operation Status ▪ In operation

Occupancy Rate and


100% with 97 projects
Number of Projects

Number of Korean Projects 21

Lease fee ▪ Land lease fee: 80 USD/m2/over project life

▪ Management fee: 0.5 /m2/year


▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee
▪ Water fee: 12,072 VND (~0.52 USD)/m3/year
▪ Wastewater treatment fee: 9,000 VND (~0.39 USD)/m3

INFRASTRUCTURE AND FACILITY

Financial institution Vietcombank and Agribank within 5km

49
Tax service, State finance
3 km from nearest Tax Service Department
office

Customs Service Located inside the industrial zone

Logistics NA

Post office Nhat Tin Logistic within 5 km

Medicare Bac Giang Post Office within 11 km

Police, public security Bac Giang General Hospital within 10 km

Universities, training • 3km from nearest Police Station


facilities, etc. • Industrial Park’s security team keeps watching 24/24h

Recruitment • 10 Km from Kinh Bac University

Worker dormitory None

Worker's child education


None
facility

One-stop service 17.8 km from Yen Dung District One – Stop service

Main Road: 4 lanes; 33/25m width


Road Width
Route Road: 2 lanes; 18 m width
IT & Tele-communication
Modern communication system reaches the international standard and ready to meet full
Facilities of Industrial
demands concerning on national and international communication services.
Zone
Emergency Power
2 power generators with 400kVA and 180kVA capacity
generator

Fire-fighting facility Available in the zone

Layout Plan

50
Location Map

Actual View

51
SONG KHE – NOI HOANG SOUTH INDUSTRIAL ZONE

GENERAL INFORMATION

▪ Yen Dung District, Bac Giang Province


Address
Bac Giang FuJi Development JSC
▪ Address: Song Khe-Noi Hoang Industrial Park (the Northern area),
Bac Giang
Investor
▪ Tel: (84-204) 6529 010
▪ Fax: (84) 918 273 656
▪ Website: http://fujiip.com/ko/
▪ Mr. Giang – (84) 913 275 656 - giangnguyen@fujiip.com
Contact Person
▪ Mr. Nguyen Anh Van – (84) 986 832 704 - Vanfuji.ip@gmail.com
- 7 Km from Bac Giang City Center
- 45 Km from Noi Bai International Airport
Location
- 90 Km from Hai Phong Seaport
- 1km from Highway No.01
Priority Sectors for
High Technology
Investment
Investment Area
Restricted Sectors for
Garment and Chemical
Investment

Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

▪ Start date: 22/5/2013


Lease term
▪ End date: 22/5/2063
Minimum Lease
10,000 m2
Area
Limit for - Factory area: 4 levels
Construction Height - Operating area: 4 levels
Permitted Factory area: 60%
Construction Rate Operating area: 40%
▪ Total area: 45 ha
Planned area
▪ Total Industrial Land: 32.8 ha (Phase I)
Factory Available
No
for Rent

Operation Status ▪ In operation

Occupancy Rate and ▪ 100%


Number of Projects ▪ 20 projects
Number of Korean
7
Projects
▪ Land lease fee: 65 USD/m2
Lease fee
▪ Factory lease fee: 2.8 – 3.2USD/m2/month
▪ Management fee: 11,120 VND (~0.5USD)/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee
▪ Water fee: 12,072 VND (~0.51 USD)/m3
▪ Wastewater treatment fee: 9,000 VND (~0.38 USD)/m3

INFRASTRUCTURE AND FACILITY

Financial institution Vietcombank Branch Song Khe, Agribank

52
Tax service, State
4 km from nearest Tax Service Department
finance office

Customs Service 6km from Bac Giang Customs Deaprtment

Logistics Nhat Tin Logistic within 7 km

Post office Bac Giang Post Office within 11 km

Medicare Bac Giang General Hospital within 5 km

Police, public
5 km from nearest Police Station
security
Universities, training
11.5 Km from Bac Giang Agriculture and Forestry University
facilities, etc.

Recruitment Support recruitment is available

Worker dormitory None

Worker's child
None
education facility

One-stop service 11 km from Yen Dung District One – Stop service

Main Road: 4 lanes; 33 m width


Road Width
Internal Road: 2 lanes; 23 m width
IT & Tele-
communication Modern communication system reaches the international standard and ready to meet full demands
Facilities of concerning on national and international communication services.
Industrial Zone
Emergency Power
Available
generator

Fire-fighting facility Available

Layout Plan

Location Map

53
Actual View

54
SONG KHE – NOI HOANG NORTH INDUSTRIAL ZONE

GENERAL INFORMATION

▪ Song Khe Commune, Yen Dung District, Bac Giang Province


Address
Infrastructure Development Company of Industrial Park in Bac Giang
▪ Address: Song Khe-Noi Hoang Industrial Park (the Northern area),
Investor Bac Giang
▪ Tel: (84-204) 355 9266
▪ congtypthtkcn@bacgiang.gov.vn

Contact Person ▪ Mr. Nguyen Van Nhien – Sale Director – (84) 913 030 201 - nhiennv_ctptht@bacgiang.gov.vn

- 5 Km from Bac Giang City Center


- 45 Km from Noi Bai International Airport
Location - 110 Km from Hai Phong Seaport
- 110 Km from Cai Lan Quang Ninh Deep Sea Port
- 1km from Highway No.01
Priority Sectors for
High-tech industry, clean industry
Investment
Investment Area
Restricted Sectors for
Restricted Heavy industry, industries affecting the environment
Investment

Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

Lease term ▪ End date: 12/11/2066

Minimum Lease Area 10,000 m2

Limit for Construction - Factory area: 3 levels


Height - Operating area: 2 levels
Permitted Construction Factory area: 60%
Rate Operating area: 60%
▪ Total area: 105 ha
Planned area
▪ Total area with full infrastructure ready to build factory: 175ha
Factory Available for
No
Rent

Operation Status In operation

Occupancy Rate and ▪ 100%


Number of Projects ▪ 20 projects
Number of Korean
6
Projects

Lease fee ▪ Land lease fee: 65 USD/m2

▪ Management fee: 10,000 VND (¬0.47USD) /m2/year


▪ Infrastructure maintenance fee: 4,600 VND/m2/year
Operating fee ▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 12,072 VND (~0.51 USD)/m3
▪ Wastewater treatment fee: 9,000 VND (~0.38 USD)/m3

INFRASTRUCTURE AND FACILITY

Financial institution Vietcombank Branch Song Khe, Agribank

Tax service, State


4 km from nearest Tax Service Department
finance office

Customs Service 6km from Bac Giang Customs Deaprtment

55
Logistics Nhat Tin Logistic within 7 km

Post office Bac Giang Post Office within 11 km

Medicare Bac Giang General Hospital within 5 km

Police, public security 5 km from nearest Police Station

Universities, training
11.5 Km from Bac Giang Agriculture and Forestry University
facilities, etc.

Recruitment Support recruitment is available

Worker dormitory None

Worker's child
None
education facility

One-stop service 11 km from Yen Dung District One – Stop service

Main Road: 4 lanes; 33 m width


Road Width
Internal Road: 2 lanes; 23 m width
IT & Tele-
communication Modern communication system reaches the international standard and ready to meet full
Facilities of Industrial demands concerning on national and international communication services.
Zone
Emergency Power
Available
generator

Fire-fighting facility Available

Layout Plan

Location Map

56
57
[- This Page is intentionally left blank -]

58
BAC KAN

59
INVESTMENT ENVIRONMENT IN BAC KAN
USD/VND 23.510

GENERAL INFORMATION

▪ Area: 4,859.96 km2


Area, Population
▪ Population: 0.4547 million (2022 statistic)
▪ Located in the Northeast region, due north of the capital Hanoi
Geographical Location
▪ Located 160 km from Hanoi
▪ Cao Bang Province to the north, Lang Son Province to the East, Thai Nguyen
Adjacent provinces
Province to the South, Tuyen Quang Province to the west.
2022 statistic:
▪ GRDP: 8,297 billion VND (0.35 billion USD)
▪ GRDP growth: 6.01 %
▪ GRDP per capita: 1,970 USD/year
GRDP
▪ Economic structure:
- Industry - Construction: 16.1 %;
- Agriculture. forestry and fishery: 28.9 %;
- Service: 51 %;
- Tax on Goods: 3 %
2022 statistic:
Industry growth ▪ Industry - Construction growth: 8.96 %
▪ Agriculture, forestry and fishery growth: 3.83%
▪ Service growth: 6.25%

PCI ▪ Score: 65.15– ranked 35 out of 63 cities and provinces in Vietnam. (2022)

SOCIAL INFRASTRUCTURE

▪ Roadway: Bac Kan has National Highway No. 3 passing from Cao Bang, Thai
Nguyen to Ha Noi.National highway 3b connects north kanj with Lang Son.The
Transportation connecting route from Ba Be Lake to Tuyen Quang is also under construction

▪ Railway: None
▪ Waterway: None

Electricity Supplied from the national power network

The limited water resources development in the province is managed by the


Water communes through better water management practices (government supported
initiatives)

Education ▪ 0 university, 01colleges,

Medicare ▪ 8 hospitals

INVESTMENT CONDITION

Human resource ▪ 80% of population are in the working age (2022)

Education level ▪ Trained labor rate: 00% (2022)

▪ The minimum salary for the province is applied as follows:


- Area III: Bac Kan city
Salary - Area IV: Other District
▪ The lowest wage for trained labor (including those trained by the enterprises)
must be at least 7% higher than the above referenced basic salary
Exemption and reduction for land and water rent fee
Investment incentives
- Preferential tax rates and exemption period, reduction for corporate income tax.

60
-Import tax exemption

▪ Prioritized projects:
Mining, forest products, agriculture
Fields Attracting Investment High technology, industrial electronics, information technology; mechanical
engineering products;
- Supporting industry;

Map (Add Province map)

Department of Planning and Investment


▪ Address: No 9 Truong Chinh, Phung Chi Kien, Bac Kan
▪ Tel: 0209 3878 217
Contact
▪ Fax :
▪ Email: sokhdt@backan.gov.vn
▪ Contact person: Tran Cong Hoa

61
LIST OF INDUSTRIAL ZONES

No Industrial zone Name Total Area (ha) Occupancy Rate Status

1 Thanh Binh Industrial Zone 73.5 100% In Operation

LOCATION MAP OF INDUSTRIAL ZONES

62
THANH BINH INDUSTRIAL ZONE

GENERAL INFORMATION

Thanh Thinh commune, Cho Moi district, Bac Kan Province, Vietnam
ADDRESS
Bac Kan Industrial Zone Infrastructure Development Company
▪ Address: Thanh Binh commune, Cho Moi district, Bac Kan
INVESTOR
▪ Tel: (84-209) 3 865 232 Fax: (84-209) 3 865 232
▪ Email: congtypthtbk@gmail.com
CONTACT Mr. Ma Doan Hieu- Department of Professional Management
PERSON Mobile: (84) 982 385 575- Email: madoanhieu@gmail.com
▪ 35 km to Bac Kan city
▪ 120 km to Ha Noi
LOCATION
▪ 120 km from Noi Bai International Airport
▪ 230 km to Hai Phong Port
▪ Processing agricultural and forestry products;
▪ Processing minerals, non-ferrous metals;
▪ Manufacturing and assembling mechanics;
Priority Sectors for
▪ Production of building materials
INVESTMENT Investment
▪ Eco-friendly Industries High technology, industrial electronics,
AREA
information technology; mechanical engineering products;
- Supporting industry;

Restricted Sectors None

MINIMUM WAGE [Area 4] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

MINIMUM LEASE
50 years
AREA
LIMIT FOR
CONSTRUCTION
HEIGHT In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Planning regulation (QCXDVN 01: 2008/BXD)
PERMITTED Construction area is not more than 65% of the total leased land lot
CONSTRUCTION
RATE
▪ Total area: 72,5 ha
PLANNED AREA
▪ Total vacant leasable area: Unavailable
FACTORY
AVAILABLE FOR No
RENT
OPERATION
▪ In operation
STATUS
OCCUPANCY
RATE AND ▪ 100%
NUMBER OF ▪ 12 Projects
PROJECTS
NUMBER OF
KOREAN 0 projects
PROJECTS

LEASE FEE

OPERATING FEE ▪ Management fee: 9 800 VND /m2/year (excluded VAT)

63
▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from March 16th,
2015 (excluded VAT) for voltage from 22KV-110KV.
▪ Water fee: 11 300 VND (~0.37 USD) /m3 (excluded VAT)
▪ Wastewater treatment fee: 7 100 VND (~0.3 USD)/m3 (excluded VAT)

INFRASTRUCTURE AND FACILITY

FINANCIAL
BIDV, Vietin Bank, Agribank
INSTITUTION
TAX SERVICE,
STATE FINANCE 4 km to Tax Department and State Treasury of Cho Moi
OFFICE

CUSTOMS SERVICE 35 km to Customs Department of Bac Kan province

LOGISTICS

POST OFFICE 6 km m to Post Office of Cho Moi district

MEDICARE 3 km to Cho Moi General Hospital

POLICE, PUBLIC
5 km to Police station of Cho Moi district
SECURITY
UNIVERSITIES,
TRAINING 50 km to Thai Nguyen University
FACILITIES, ETC.
WORKER
None
DORMITORY
WORKER'S CHILD
EDUCATION 500m from the zone
FACILITY
ONE-STOP
SERVICE

ROAD WIDTH Main road:, 2 lanes

IT & TELE-
Fully-communication system ensures national and international contact easily, include telephone,
COMMUNICATION
mobile phone, Fax, Internet..
FACILITIES
EMERGENCY
POWER Available
GENERATOR
FIRE-FIGHTING
Available. Water supply system for firefighting is located along each road.
FACILITY

LAYOUT PLAN

64
LOCATION MAP

ACTUAL VIEW

65
LIST OF SOME NOTABLE TENANTS

No. Company Name Nationality Location


1 Misaki Vietnam Co., Ltd. Japan A5+A6

2 Ba Be Agricultural Comnany Vietnam D


3 Nam A Bac Kan Company Limited Vietnam D
4 Khanh Linh Gas Company.,Ltd Vietnam F1+F2
5 Kim An An Company Limited Vietnam B1
6 Hong Ngoc Plywood Join Stock Company. Vietnam E1
7 Ke Go Company Limited Vietnam G1
8 Anh Binh Plywood Company Limited Vietnam F2
9 Lechenwood Vietnam Co., Ltd. China E1
10 Govina Investment Joint Stock Company Vietnam D1
11 Materials and Complete Equipment Export- Vietnam F2
Import Corporation (MATEXIM)
12 Beer and Beverage joint stock Bac Kan Company Vietnam B1

66
[- This Page is intentionally left blank -]

67
BAC LIEU

68
INVESTMENT ENVIRONMENT IN BAC LIEU

USD/VND 23.510

GENERAL INFORMATION
Area 2468,7 km2
Population 0,204 million people (2022)
Geographical ▪ Bac Lieu is located in Mekong Delta River region.
Location Bac Lieu is a province on the Ca Mau peninsula, the southernmost land of Vietnam
The province shares a common border connecting Hau Giang and Kien Giang provinces in the northwest,
Adjacent
Soc Trang in the northeast, Ca Mau in the southwest, and the East Sea in the southeast. Bac Lieu has a 56
provinces
km long coastline connecting with important seas such as Ganh Hao, Nha Mat and Cai Cung.
2022 statistic:
▪ Real GRDP (billion VND): 31.744 (1,38 billion USD)
▪ GRDP growth: 9,60%
▪ GRDP per capita (million VND/year): 60.53 (2,787 USD)
GRDP
▪ Economic structure:
- Industry - Construction: 19,31%
- Agriculture. forestry and fishery: 41,62%
- Service: 34,10%
▪ Industry - Construction growth: 14,45%
Industry
▪ Agriculture, forestry and fishery growth: 3,12%
growth
▪ Service growth: 2.32%

Import - Import turnover (billion USD): 0,55


Export Export turnover (billion USD): 853,00 (Growth rate: 9.92%)
Agriculture still represents a very important part in Bac Lieu. The province is the Bac Lieu is a center for
Key Industry
hatchery production, shrimp farming and processing
PCI 61.25
Ranking 55
SOCIAL INFRASTRUCTURE
▪ Roadway: National Road 1A (route Hanoi – Bac Ninh – Lang Son), National Road North Song Hau. There
are provincial road namely ĐT.982, ĐT.977B, ĐT.979B, ĐT.982B.
Transportation
▪ Water way" Bac Lieu has two natural rivers located in the north and south of the province: Ganh Hao river
- the natural boundary with Ca Mau province and Cai river - the natural boundary with Hau Giang province.
▪ Bac Lieu has attracted 3,200MW LNG Power Project and 8 completed wind power projects put into
operation, with a capacity of nearly 470MW, ranking third in the country. These projects are the main
Electricity
drivers of local GRDP growth. In addition, the Bac Lieu Liquefied Natural Gas (LNG) Power Project with
an investment of 4 billion USD is being implemented
▪ Regarding the source of fresh water for production and people's daily life, it is mainly rain water, partly
Water supplemented from the Hau river water source. In which, the water source from Hau River is estimated to
flow into Bac Lieu about 1.4 billion m3/year.
Education & ▪ The province has 79 public preschools and kindergartens, 119 primary schools, 62 junior high schools, and
Training 20 high schools.

INVESTMENT CONDITION
Human
57,7% of population are in the working age (2022)
resource
Education level Trained labor rate: 69,43% (2022)
▪ The minimum salary for the province is applied as follows:
Salary
- Area I (4,680,000 VND/month): N/A

69
- Area II (4,160,000 VND/month): Bac Lieu City
- Area III (3,640,000 VND/month): Gia Rai Town, Hoa Binh District
- Area IV (3,250,000 VND/month): Hong Dan, Phuoc Long, Vinh Loi, Dong Hai District
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages
paid to employees working under employment contracts)
▪ Incentives according to government regulations:
Investment - Exemption and reduction for land and water rent fee
incentives - Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
▪ Bac Lieu strives to become the center of shrimp seed production, farming and processing, the center of
Fields
shrimp industry of the country.
Attracting
Currently, the province is aiming to become one of the clean energy centers of the country by 2030, with a
Investment
focus on wind power, solar power and gas power.
Investment ▪ Up to now, the province has attracted 184 projects, of which: 167 domestic projects with a total registered
attraction investment capital of more than 53 trillion VND; 17 foreign projects with a total registered capital of more
situation than 4.5 billion USD and many other motivational projects.
Tra Kha Industrial Zone
Industrial zones Lang Tram Industrial Zone
Ninh Quoi Industrial Zone

Map

Bac Lieu Department of Planning and Investment


▪ Address: Provincial administrative center, Bac Lieu city, Bac Lieu
Contact
▪ Tel: 0291. 3823874

▪ Email: skhdt@baclieu.gov.vn

70
▪ Contact person:
- Mr. Pham Thanh Hien - Deputy Director of Department of Planning and Investment

LIST OF INDUSTRIAL ZONES IN BAC LIEU PROVINCE

No Industrial zone Name Total Area (ha) Occupancy Rate Status

1 Tra Kha Industrial Zone 64.86 100% In Operation

2 Lang Tram Industrial Zone 377 N/A Licensed in 1/2022

LOCATION MAP OF INDUSTRIAL ZONES

71
TRA KHA INDUSTRIAL ZONE

GENERAL INFORMATION
Address Ward 8, Bac Lieu city, Bac Lieu province.
Bac Lieu Industrial Park Infrastructure Development Company
Investor ▪ Address: No. 294, 23/8 Street, Tra Kha A Area, Ward 8, Bac Lieu City, Bac Lieu Province
▪ Tel: 0781-3954811

Contact Person
Ngo Huu Tien – Director.
Tel: 0913892414.
Location Adjacent location:
Tra Kha Industrial Park is located in Ward 8, Bac Lieu Town:
- 3km from Bac Lieu town center
- 25km from the multi-purpose seaport
- 125km from Can Tho airport, 65km from Ca Mau airport
The internal road connects directly with the existing National Road 1A and the bypass of
National Highway 1A (under construction). Water transport is adjacent to Bac Lieu - Ca Mau
river, ensuring traffic for 1,000 tons.
Investment Sectors Priority Sectors for N/A
Investment
Investment Restricted N/A
Sectors
Minimum wage [Area 2] According to Decree 38/2022/ND-CP
Lease term 50 years
Permitted Construction
+ Building 1 floor: < 65%
Rate
+ Building 2 floors: <55%
+ Building on 3 floors: <40%
Planned area ▪ Total area: 64.86 ha
▪ Total vacant leasable area: 9,343.6 m2
▪ Total area with full infrastructure ready to build factory: 44.112 ha

Factory Available for Rent ▪ Total area: 2,772.4 m2

Operation Status ▪ Active

Occupancy Rate and 25 projects, Occupancy Rate: 98.04%


Number of Projects

Number of Korean projects 0

Lease fee ▪ Land lease fee: 1,935 VND (USD 0.082)/m2/year


▪ Factory lease fee: N/A

Operating fee ▪ Management fee: 0.35 USD/m2/year


▪ Electricity fee: 0.05 USD/month
▪ Water fee: 0.4 USD/m3
▪ Wastewater treatment fee: 0.28 USD/m3

INFRASTRUCTURE AND FACILITY


Internal transportation system:
+ Main road (4 lanes)
+ Side branch road (2 lanes)

72
Power system:
The power supply system has a voltage of 110/22KV with a power capacity of 16MVA

Water supply system:


The water supply system has the highest capacity of 2,500m3/day.

Wastewater treatment system:


Waste water from factories in the industrial park will be treated centrally with a capacity of 2,400m3/day.

Human Resources
The population in Bac Lieu province is 913,481 people, of which the population of working age is 542,528 people,
accounting for 57.7% of the total population of the province. In the near future, Bac Lieu will invest over 241 billion VND in
the employment program in the 2021 - 2025 period and implement the Vocational training project for rural workers with a
total investment of 544 billion VND. By 2020, the proportion of trained workers in Bac Lieu will reach 63.44%, the number
of workers with certificates and diplomas will reach 23.97%.

In Bac Lieu province, there were 34,132 people working in the entire enterprise sector, up 7.68%, of which 31,311 people
were employed in non-state enterprises.

Thus, Bac Lieu can completely provide labor for investors in both quantity and quality.

Investment incentives

- Incentives for corporate income tax: 10% preferential rate for a period of 15 years

- Reducing VAT on imported goods in order to create fixed assets and import equipment, machinery and raw materials for
production in accordance with the law on import and export taxes;

- Increase or decrease land use levy and land rent incentives for land resource tax; raise the deductible value when
determining taxable income.

Picture:

73
LANG TRAM INDUSTRIAL ZONE

GENERAL INFORMATION

Address Hamlet Xom Moi, Tan Thanh Commune, Gia Rai Town, Bac Lieu Province;
Bac Lieu Industrial Park Infrastructure Development Company
Investor ▪ Address: No. 294, 23/8 Street, Tra Kha A Area, Ward 8, Bac Lieu City, Bac Lieu Province
▪ Tel: 0781-3954811

Contact Person
N/A
Location Adjacent location:
Distance from Bac Lieu town center: 55km, Ca Mau city: 15km
Ca Mau Airport: 11km, Can Tho Airport: 180km
To seaport Bac Lieu: 55km

Investment Sectors Priority Sectors for Seafood processing industry, services and industries serving
Investment aquaculture and fishing.
Investment Restricted N/A
Sectors
Minimum wage [Area 2] According to Decree 38/2022/ND-CP
Lease term 50 years
Permitted Construction
+ Building 1 floor: < 65%
Rate
+ Building 2 floors: <55%
+ Building on 3 floors: <40%
Planned area ▪ Total area: 94.19 ha
▪ Total vacant leasable area: N/A
▪ Total area with full infrastructure ready to build factory: 63.33

Factory Available for Rent ▪ Total area: N/A

Operation Status ▪ Active

Occupancy Rate and N/A


Number of Projects

Number of Korean projects 0

Lease fee ▪ Land lease fee: 1,935 VND (USD 0.082)/m2/year


▪ Factory lease fee: N/A

Operating fee ▪ Management fee: 0.35 USD/m2/year


▪ Electricity fee: 0.05 USD/month
▪ Water fee: 0.4 USD/m3
▪ Wastewater treatment fee: 0.28 USD/m3

INFRASTRUCTURE AND FACILITY


Internal transportation system:
The internal road in the industrial park connects directly with National Highway 1A with a length of about 300m, and at the same
time connects to Quan Lo - Phung Hiep Highway about 15km.
Water supply system:
Water transport is adjacent to Bac Lieu - Ca Mau rivers, ensuring traffic for 1,000 tons of vehicles

Communication:
Fully meet postal and telecommunications services in the industrial park.

74
Picture:

75
[- This Page is intentionally left blank -]

76
BAC NINH

77
INVESTMENT ENVIRONMENT IN BAC NINH
USD/VND 23.510

GENERAL INFORMATION

▪ Area: 822,7 km2


Area, Population
▪ Population: 1.488.250 people

▪ Located in the Northern key economic region, Ha Noi capital region as well as two major economic
corridors: Con Minh – Lao Cai – Ha Noi – Hai Phong – Quang Ninh and Nanning– Lang Son – Ha
Noi – Hai Phong – Quang Ninh.

Geographical Location ▪ It is adjacent to and 30km away from Ha Noi capital, 32km from Noi Bai International Airport,
110km from Hai Phong Seaport.

▪ Important routes running through such as 1A, 18, 38 national highways, Trans-Vietnam railway to
China; connecting the province with economic, cultural and commercial centers of the North.

▪ Bac Giang Province to the north, Hanoi Capital City to the west and southwest, Hai Duong
Adjacent provinces
Province to the east, Hung Yen Province to the south.

2022 statistics:

▪ GRDP: 133,609 billion VND (at constant 2010 prices)

▪ GRDP growth: 7.39%

▪ GRDP per capita: 6,696 USD

GRDP ▪ Economic Structure:

- Industry and Construction: 76.5%

- Service: 17.2%

- Agriculture, Forestry and Fishery: 2.5%

- Product Tax: 3.8%

2022 statistic:

▪ Industry - Construction growth: 6.49%

▪ Agriculture, forestry and fishery growth: 0.52%

▪ Service growth: 13.67%


Industry growth
▪ Product Tax: 2.83%

▪ Import – Export:

- Export turnover: 45.1 billion USD

- Import turnover: 38.5 billion USD

PCI ▪ Score: 69.08 – ranked 7h out of 63 cities and provinces in Vietnam (2022)

SOCIAL INFRASTRUCTURE

Transportation ▪ Roadway: National Road 1A (route Hanoi – Bac Ninh – Lang Son), National Road 18 (route Noi
Bai Airport – Bac Ninh – Ha Long), National Road 38 (route Bac Ninh – Hai Duong – Hai Phong),

78
National Road 1B new (Lang Son – Thai Nguyen), National Road 17 (Hanoi- Thai Nguyen). Bridge
Phat Tich- Dai Dong with a total length of 1,518 m is under construction.

▪ Railway: Railway route Hanoi - Bac Ninh – Ha Long; Railway route Hanoi- Dong Dang

▪ Waterway: 06 major ports: Dap Cau port; Dap Cau Glass Factory and floating glass Port ; Duc
Long Port (both river ports and dry ports); Ben Ho port, Kenh Vang Port, Tri Phương Port.

▪ Airway: 30 km from Noi Bai International Airport by National Road 18.

Electricity ▪ Supplied from the national power network; 9% annual growth.

▪ Quality underground water is mainly used in water supply system

▪ In urban area: 08 water stations, in which 06 stations in operation with total capacity of 33,000
m3/day
Water
▪ In rural area: 39 clean water supply construction in operation with 240,000 m3/day-night capacity

▪ In industrial zones, industrial clusters: 04 water stations in operation with total capacity of 24,400
m3/day

Education ▪ 6 Universities, 8 Colleges and 58 schools and vocational training centers in the province.

Medicare ▪ 20 public and private hospitals

INVESTMENT CONDITION

Human resource ▪ Labor force of the province is quite young and the trained labor force which accounts for 77%

Education level ▪ Trained labor rate: 34.1%

▪ The minimum salary for the province is applied as follows (see appendix for detail amount):

- Area II: including: Bac Ninh City, Tu Son town, Que Vo, Tien Du, Yen Phong, Thuan Thanh, Gia
Salary Binh, Luong Tai District

▪ The lowest wage for trained labor (including those trained by the enterprises) must be at least 7%
higher than the above referenced basic salary

▪ Incentives according to government regulations:

Exemption and reduction for land and water rent fee


Investment incentives
- Preferential tax rates and exemption period, reduction for corporate income tax.

Import tax exemption

▪ Prioritized Projects:

- High-tech industry; Supporting industry, modern, environmentally friendly (semiconductor


industry, chip manufacturing,…)
Fields Attracting
- Hi-tech agriculture; clean agriculture;
Investment
- New occupations on the industrial platform 4.0;

- Service trades having advantages and high added value: Health care, education and training,
international financial services, logistics and other modern services.

79
- Investment in construction of infrastructure works, development of urban areas, high-class service
and trade complexes, high-class eco-resort,…

Map

Bac Ninh Department of Planning and Investment

Address: No 6 Ly Thai To, Suoi Hoa Ward, Bac Ninh

Contact Tel: (84-241) 3 824 902

Fax: (84-241) 3 825 777

E-mail: skhdt@bacninh.gov.vn

80
LIST OF INDUSTRIAL ZONES IN BAC NINH

No Industrial zone Name Total Area (ha) Occupancy Rate Status


1 Que Vo I Industrial Zone 611 100% In operation
2 Que Vo II Industrial Zone – Phase 1 269.48 70% In operation
Que Vo II Industrial Zone – Phase 2 277 0% Licensed
3 Que Vo III Industrial Zone 303.8 55% In operation
4 Tien Son Industrial Zone 350 100% In operation
5 Yen Phong Industrial Zone – Phase 1 344 100% In operation
Yen Phong Industrial Zone – Phase 2 314 60% In operation
Yen Phong II-C Industrial Zone 221 20% In operation
6 Dai Dong - Hoan Son Industrial Zone 400 Phase I: 100% In operation
Phase II: 0%
7 VSIP Bac Ninh Industrial Zone 700 100% In operation
VSIP Bac Ninh (Business Hub) 20 0% In operation
8 VSIP Bac Ninh 2 Industrial Zone 273 0% Under Construction
9 Thuan Thanh I Industrial Zone 250 0% Under Construction
10 Thuan Thanh II Industrial Zone 250 100% In operation
11 Thuan Thanh III Industrial Zone 300 100% In operation
12 Nam Son Hap Linh Industrial Zone 300 0% In operation
13 Gia Binh I Industrial Zone 300 100% Under Construction
14 Gia Binh II Industrial Zone 250 0% Licensed
15 Hanaka Industrial Zone 74 60% In operation
16 An Viet – Que Vo 6 Industrial Zone 78,68 0% applying for
permission

81
BAC NINH’S LOCATION MAP OF INDUSTRIAL ZONES

82
QUE VO I INDUSTRIAL ZONE

GENERAL INFORMATION

Nam Son and Phuong Lieu commune, Que Vo district, Bac Ninh Province, Vietnam
Address
KinhBac City Development Holding Corporation
▪ Address: Lot B7, Que Vo Industrial park, Phuong Lieu commune, Que Vo district, Bac Ninh
Investor province, Vietnam.
▪ Tel: (84-222) 3634 034
▪ Website: http://www.kinhbaccity.vn
▪ Tran Thi Huong - Sales & Marketing Deputy Manager - Mobile: +84 - 915-636 139 - Email:
Contact Person
tthuong.kbc@gmail.com
- 06 Km from Bac Ninh City Center
- 35 Km from Noi Bai International Airport
Location - 110 Km from Hai Phong Seaport
- 03 Km from Highway No.01 and 09 Km from Hanoi – Lang Son (border with China) –
NanNing (China) Railway
Electronics industry, high-tech industry and supporting industries,
Priority Sectors for
banking, insurance, research and development activities, consulting ...
Investment
(Decision No. 293/QĐ-UBND on 12/08/2013)
Investment Area
Production of iron, steel, construction materials, paper, chemicals,
Restricted Sectors for
textiles and textile products ... ((Decision No. 293/QĐ-UBND on
Investment
12/08/2013)

Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

▪ Phase 1: 2002 - 2052


Lease term
▪ Phase 2: 2007 - 2017

Minimum Lease Area 10,000 m2

Limit for Construction


Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residential Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction Construction area is not more than 65% of the total leased land lot
Rate
▪ Total area: 611 ha
Planned area
▪ Total vacant leasable area: Unavailable

Factory Available for Rent ▪ Total area: 30,000 m2 (4,000-5,000 per factory, expected at the end of 2019)

Operation Status ▪ In operation

Occupancy Rate and ▪ 100%


Number of Projects ▪ 125 Projects

Number of Korean Projects ▪ 46 projects

▪ Land lease fee: 85 USD/m2


▪ Factory lease fee: 3.5 USD/m2/month
▪ Payment:
Lease fee
- Method: Bank Transfer in VND
- Period: 40% after signing In-principle Agreement + 40 % after signing Land Sublease
Contract + 20% after Land Hand-over
▪ Management fee: 0.5 USD/m2/year (excluded VAT)
▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from March
Operating fee 16th, 2015 (excluded VAT) for voltage from 22KV-110KV.
▪ Water fee: 8,700 VND (~0.37 USD) /m3 (excluded VAT)
▪ Wastewater treatment fee: 7,200 VND (~0.3 USD)/m3 (excluded VAT)

83
INFRASTRUCTURE AND FACILITY

Financial institution BIDV, Vietin Bank, Vietcombank, Agribank

Tax service, State finance 6 km from Bac Ninh Tax Office


office 7 km from Bac Ninh State Treasury Office
2 Km from Customs Agency Que Vo
Customs Service
15 Km from ICD Tien Son

Logistics 2 Km from the nearest Logistic Center: Yusen Logistics

Post office 1 km from Vietnam Post Office

Medicare 4 Km from Bac Ninh General Hospital

Police, public security 500 m from Que Vo Police Station

Universities, training
500 m from Viet Nhat College
facilities, etc.

Recruitment Kinh Bac will support in recruitment

Worker dormitory 5 Km from the zone

Worker's child education


5 Km from the zone
facility

One-stop service 6 Km from the nearest Facility

Road Width Main road: 32m, 4 lanes; By Road: 23m, 2 lanes

IT & Tele-communication The telecommunication system complies with international standards and is always available
Facilities for communication demand with high data transmission s
Emergency Power
Available
generator

Fire-fighting facility Available. Water supply system for firefighting is located along each road.

Layout Plan

84
Location Map

Actual View .

85
LIST OF SOME NOTABLE TENANTS

No. Company Name Nationality Location


1 Kinh Bac Service Joint Stock Company Vietnam L3, L4, L7, L8, C3, H16, H17
2 Viet Nhat Joint Stock Company Vietnam E6-1
3 Canon Vietnam Company Limited Japanse B1, B2
4 Jing Heng Metal Treatment Co., Ltd. Taiwan H7-1
5 Nam Viet Hoang Company Limited Vietnam C8-2
6 Vinh Loc Trading Company Limited Vietnam C8-1
7 Viet Duc Construction Company Limited Vietnam C7-1
8 Tid Glass Wall Joint Stock Company Vietnam C7-2
9 Keysheen Company Taiwan K1, 2, 5, 6
10 Vs Industry Vietnam Joint Stock Company Malaysia K4-2D, K4-2E
11 Jebsen & Jessen Packaging Vietnam Company Limited Singapore K1, G4-1
12 Funing Precision Component Company Limited Taiwan C3
13 Elegant Team Manufacturer Limited Liability Company Hongkong I2-03, I2-04
14 Sheng Electric Wire & Cable (Vietnam) Company Taiwan D4-2
15 Tenma Vietnam Limited Liability Company Japanse E1,
16 Ncc Vietnam Co., Ltd China H10
17 Chih Ming Co., Ltd Taiwan H3-3
18 Bujeon Vietnam Electronics Co., Ltd Korea C-2
19 Sentec Hanoi Co., Ltd Taiwan H1, H2, H5, H6
20 Mitac Computer (Vietnam) Limited Liability Company Taiwan L1-2-3-5-6-7,
21 Seiyo Vietnam Limited Liability Company Taiwan D1
22 Goldsun Vinh Nam Packaging Co., Ltd Vietnam H12, T2
23 Liwayway Food Industry Co., Ltd Hanoi Malaysia C4-C5
24 Jenway Technology Vn Co., Ltd Taiwan H4-2
25 Nssb Steel Service Co., Ltd Hanoi Japanse D1
26 Longtech Precision Vietnam Co., Ltd Taiwan E1
27 Toyo Ink Compounds Vietnam Co., Ltd Japanse G9
28 Yamato Industries Vietnam Co., Ltd Japanse E6
29 Vietnam Dragonjet Co., Ltd Taiwan D3
30 Mitac Precision Technology Vietnam Co., Ltd Taiwan G1-3-4-6-8 và E9-1
31 Henry Hardware Industry Co., Ltd Taiwan H7-2
32 Vietnam Teasan Company Limited Korea H3-2
33 Mitac Precision (Vietnam) Co., Ltd Taiwan G1-3-4-6-8
34 Jang Won Tech Vina Co., Ltd. Korea Lô G1
35 Uil Vietnam Company Limited Korea F1
36 Sr Hanoi Daedong Co., Ltd Korea H-04
37 Yuto Packaging Co., Ltd China H-02, H-03, K13, K14, K15
38 Schramm Sscp Hanoi Co., Ltd Hongkong I2-1
39 Spica Elastic Vietnam Company Limited India I2-01, I2-02
40 Hanam Electricity Vina Co., Ltd Korea H2-02
41 Vietnam Enshu Sanko Co., Ltd Japanse H4-2
42 Sakura Paint Viet Nam Co., Ltd Japanse I4-2

86
43 Topla Vietnam Limited Liability Company. Japanse J4
44 Konishi Vietnam Biological Technology Co., Ltd Japanse H8 và H9,
45 Hanoi Doo Sung Tech Co., Ltd Korea J3
46 Eunsung Electronics Vina Co., Ltd Korea K1
47 Bac Ninh Pharmaceutical Joint Stock Company Vietnam C1-1
48 Branch Of Shinhan Vina In Bac Ninh Co., Ltd Korea C7-1
49 Yestech Vina Co., Ltd Korea KT1-C
50 Yoon Il Vietnam Limited Liability Company Korea C8-2
51 Goertek VINA CO., LTD China K-08, K-09, K16, K2, K3, L2, L3,
L6, L7
52 E Lite Com Company Korea K07
53 Mirae Eic Company Korea K-06
54 M&C Electronics Vina Co., Ltd Korea J1
55 Aac Technologies Vietnam Co., Ltd Singapore K4-2F, G10, K4-2
56 Sampo Vina Co., Ltd Korea B8
57 S-Mac Vina Limited Liability Company Korea E8, E7
58 Ethertronics Vina Limited Liability Company Korea K-05
59 Vietnam Woojinwtp Limited Liability Company Korea K-05-2
60 Sit Vina Limited Liability Company Korea K-05-1
61 Vinayama Construction Co., Ltd Japanse H4-1
62 Segyung Vina Co., Ltd Korea H1
63 Son Duong Packaging Factory Vietnam H3-1B
64 Laird Vietnam Co., Ltd UK K10
65 Chau Thai Son Packaging Company Limited Vietnam C1-3
66 Youngbo Vina Co., Ltd Korea G3, G4-2
67 Aq Pacific Company Limited Korea H1-01
68 Galtronics Vietnam Co., Ltd Israel G-01,
69 Sanchine Company Limited (Vietnam) China K-06
70 Sung Il Vina Co., Ltd Korea H3
71 Samho Press Vietnam Co., Ltd Korea C6-1
72 Daeil Tech Vietnam Co., Ltd Korea F4-1
73 Fine Ms Vina Co., Ltd Korea G2
74 Sena Tech Co., Ltd Korea G12-1+H3-1C
75 Sehyun Vina Co., Ltd Korea C1-2
76 Ryong-In Vina Co., Ltd Korea K-1-1
77 Samin Vina Limited Liability Company Korea C7-1, T-1
78 Jsk Vietnam Co., Ltd Korea C6-1
79 Boryeng Company Ltd Korea K12
80 Hanpad Investment Joint Stock Company - Bac Ninh Korea G12-1
Branch
81 Vietnam Lege Limited Liability Company Taiwan G11
83 Vonmax Industrial Vietnam Co., Ltd. Taiwan E6
84 Vietnam Hongguang Plastic Co. China E3-3
85 Bac Ninh Ace Vina Co., Ltd Korea G4-3
86 Technology Co., Ltd Packaging Yuzhan Vietnam China H2-01
87 Hanwha Techwin Security Vietnam Co., Ltd Korea O-2
88 Jm Tech Vina Co., Ltd Korea E3-2

87
89 Mys (Group) Vietnam Company Limited China KT1-B,
90 Company Limited Youngwoo Hi-Tech Korea KT1-B-1
91 Jeyeyung Vina Co., Ltd Korea C2-1
92 Nano Tech Co., Ltd Korea J.1
93 Seah Vina Co., Ltd Korea O-1
94 Tops Vina Co., Ltd Korea O-3
95 Esd Company Ltd Korea J.4
96 Vunh Giang Trading Joint Stock Company Vietnam J.3
97 Phuc Son Technology Co., Ltd Japanse J.2
98 Dit Company Ltd Korea N-7
99 Company Limited Lim Korea N-7
100 Anyone Vina Co., Ltd Korea M
101 Nokwon Co. Ltd Korea T-3

88
QUE VO II INDUSTRIAL ZONE

GENERAL INFORMATION

▪ Ngoc Xa Commune, Que Vo District, Bac Ninh Province


Address
Phase 1: City and IP Development & Investment Corporation (IDICO)
▪ Address: 13th floor, Sudico Building, Me Tri Road, My Dinh 1 Ward, Hanoi
Investor ▪ Tel: (84-24) 3 787 7937 Fax: (84-24) 3 734 7162
▪ Email: invest@idicoquevo.com.vn
Phase 2: Nhan Dat Tien Co., Ltd.

Contact Person Phase 1: Mr. Ho Anh – Investment Manager – 0912 578 589 – hoanh@idicoquevo.com.vn

▪ Land: Located next to the National Road 18 (Noi Bai - Ha Long route), 50km away from Hanoi
Capital
Location
▪ Seaport: 90km from Cai Lan Seaport; 100 km from Hai Phong Seaport
▪ Airport: 50km from Noi Bai International Airport
Priority Sectors for Electronics industry, high-tech industry and supporting industries,
Investment banking, insurance, research and development activities, consulting ...
Investment Area
Restricted Sectors for Production of iron, steel, construction materials, paper, chemicals,
Investment textiles and textile products ...

Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

▪ Start date: 2007


Lease term
▪ End date: 2057

Minimum Lease Area 10,000 m2

Limit for Construction


Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Permitted Planning regulation (QCXDVN 01: 2008/BXD)
Construction Rate
▪ Total area:
Planned area - Phase I: 269.48 ha
- Phase II: 277 ha
Factory Available for
None
Rent
▪ Phase I: In operation
Operation Status
▪ Phase II: Licensed
Occupancy Rate and
Phase I: 70%
Number of Projects
Number of Korean
Over 10 projects
Projects

Lease fee ▪ Land lease fee: 87 USD/m2

▪ Management fee: 0.35 USD/m2/year


▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee ▪ Water fee: approximately 0.5 USD/m3
▪ Wastewater treatment fee: 8,000 VND/m3 (~0.35 USD) (include VAT)
▪ Waste treatment fee: According to contract

INFRASTRUCTURE AND FACILITY

Financial institution Agribank, LienViet Post Bank, Nam Viet Bank

Tax service, State 18 km from Bac Ninh Tax office


finance office 18 km form Bac Ninh Treasury Office

89
Customs Service 30 km from Bac Ninh ICD

Logistics Inside the zone

Post office 3.2 km from Que Vo Post Office

Medicare 19 km from Bac Ninh General Hospital

Police, public security Near the zone

Universities, training
20 km from Kinh Bac University
facilities

Recruitment Supported by IZ developers

Worker dormitory NA

Worker's child
NA
education facility

One-stop service 10 km from Public Service Center

Road Width Road Width: 8-15m m, 2 lanes

IT & Tele-
The telecommunication system complies with international standards and is always available for
communication
communication demand with high data transmission. Provider: FPT, VNPT and Viettel
Facilities
Emergency Power
NA
generator

Fire-fighting facility Available. Water supply system for firefighting is located along each road.

Layout Plan

Location Map

90
Actual View

91
LIST OF SOME NOTABLE TENANTS

No Company Name Nationality Bussiness line


1 Chien Thang Industry Co., Ltd. Vietnam Metal scrap recycling
2 E-Zone Tech Vina Co., Ltd Korea Electronic equipment maintenance
3 Bfs Construction And Trading Co., Ltd. Vietnam Service industry
4 Bnc Tiles Jsc Vietnam Building material manufacturing
5 Dai Tan Co., Ltd Vietnam Logistics
6 Dkpharma Pharmaceutical Factory - Bac Vietnam Pharmaceutical
Ninh Branch Duoc Khoa Pharmaceutical
Join Stock Company
7 Dnr Engineering Vina Limited Liability Korea 3D glass production
Company
8 Duong Hong Import Export Co., Ltd Vietnam packing
9 Hancorp Equipment And Material.,Jsc Vietnam Building material manufacturing
10 Highsun Optoelectronic Co., Ltd Korea Plastic products manufacturing
11 Innotek Joint Stock Company Vietnam Motorcycle parts manufacturing
12 Interplex Precision Technology (Hanoi) Singapore Metal processing
Co., Ltd
13 Jat Autoparts And Industrial Equipments Vietnam Motorcycle parts manufacturing
Manufacturing Joint Stock Company
14 Jmi Viet Nam Co., Ltd Korea Plastic tray manufacture
15 Jmt Vn Co., Ltd Korea Electronic component manufacturing
16 Jungbu Eschem Vietnam Co., Ltd Korea Mobile phone parts manufacturing
17 Jy Tech Co., Ltd Korea Speaker manufacture
18 Kukje Jewelry Vina Co., Ltd Korea Jewelry production
19 Lixco Jsc – Bac Ninh Brach Vietnam Detergent production
20 Osaka Vina.,Jsc Vietnam packing
21 Pyung Ahn Vina (One Member) Co., Ltd Korea Electronic component manufacturing
22 St Vina Co., Ltd Korea Electronic component manufacturing
23 Sunway Precision Steel Corporation Vietnam Steel production
24 Tatra Pharmaceutical Co., Ltd Vietnam Pharmaceutical

92
QUE VO III INDUSTRIAL ZONE

GENERAL INFORMATION

Address Viet Hung Commune, Que Vo District, Bac Ninh Province

EIP Investment Development JSC – TNI Holdings Viet Nam


Investor ▪ Address: Viet Hung Commune, Que Vo District, Bac Ninh Province
▪ Email: sale@tniholdings.vn
Mr. Huan – Sales Executive – Mobile: (84) 989 768 586 –huannm2@tniholdings.vn
Contact Person
/huan792003@gmail.com
▪ Located next to the National Road 18 (Noi Bai - Ha Long route)
▪ Distance to Hanoi city center: 45 km
▪ Distance to Noi Bai International Airport: 40 km
Location
▪ Distance to Hai Phong port: 80 km
▪ Distance to Cai Lan – Quang Ninh deep seaport: 105 km
▪ Distance to China border checkpoint: 120 km
Electronics industry, high▪tech industry and supporting
Priority Sectors for
industries, banking, insurance, research and development
Investment
Investment Area activities, consulting ...
Restricted Sectors for Production of iron, steel, construction materials, paper,
Investment chemicals, textiles and textile products ...

Minimum wage [Area 2] According to Decree 90/2019/NĐ▪CP dated 15th November 2019

▪ Start date: 2016


Lease term
▪ End date: 2066

Minimum Lease Area 10,000 m2

Limit for Construction Height


1-2 floors for the factory, 1-4 floors for office, maximum height of each one is 4 meters.
Entire works of the construction “footprints” is not exceed 65% of the total area of the plot.
Permitted Construction Rate

▪ Total area: 303.8 ha


Planned area
▪ Total vacant leasable area: 120 ha

Factory Available for Rent None

Operation Status ▪ In operation

Occupancy Rate and Number of


Occupancy Rate: 55%
Projects

Number of Korean Projects 10

Lease fee ▪ Land lease fee: 100 USD/m2/whole project life

▪ Management fee: 0.5 USD/m2/year


▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee ▪ Water fee: 11,500 VND (~ 0.5 USD)/m3
▪ Wastewater treatment fee: 0.6 USD/m3 for C level, 0.45 USD/m3 for B level, 0.18 USD/
m3 for A level

INFRASTRUCTURE AND FACILITY

Financial institution Maritime Bank, Vietcombank - Hưng Yên branch, ACB, Agribank, Techcombank

Tax service, State finance office 13 km from Bac Ninh Tax Department

Customs Service 13 km from Bac Ninh Customs Department

Logistics N/A

93
Post office 16 km from Bac Ninh Post Office

Medicare 16 km from Bac Ninh General Hospital

Police, public security 24/7 security service.

Universities, training facilities,


16.2 km from Kinh Bac University
etc.

Recruitment Support from IZ developers and Bac Ninh IZ Management Board

Worker dormitory Worker Dormitory project available and demanding from tenants

Worker's child education facility NA

One-stop service Inside the zone

Road Width Main road 60 m, 36 m and branch road 22 m in width

IT & Tele-communication Telecommunication systems and international standards are always ready to meet the
Facilities communication needs

Emergency Power generator Available in the zone

The water supply network for firefighting is designed in conjunction with the potable water
Fire-fighting facility supply network, which is located along the roads. The distance among fire hydrants is 120
m -150 m with a diameter of D125 mm.

Layout Plan

Location Map

94
Actual View

LIST OF SOME NOTABLE TENANTS

No Company Name Nationality Business Line


1 Tay Dong Co., Ltd Vietnam construction company
2 HS Chemical Co., Ltd Korea Chemical production
3 Plastics & People Co., Ltd Korea Plastic manufacturing
4 Cargill Co., Ltd USA Livestock feed production

95
TIEN SON INDUSTRIAL ZONE

GENERAL INFORMATION

▪ Tu Son District, Bac Ninh Province


Address
Viglacera Corporation JSC
▪ Address: Viglacera Tower, No.1 Thang Long Boulevard, Me Tri, Nam Tu Liem, Hanoi, Vietnam
Investor ▪ Tel: (84-24) 3553 6660
▪ Fax: (84-24) 3553 6671
▪ Website: http://www.viglacera.com.vn/
▪ Mr. Dang The Nam - Deputy Manager of Business Department –
(84) 903 405 099 - namdt.vir@viglaceraland.vn
Contact Person
▪ Ms. Nguyen Ha Phuong – Senior Marketing Executive – (84) 97 344 8994 -
phuongnh.vir@viglaceraland.vn
▪ Land: Located between the existing National Road 1A and the new National Road 1A, 22 km from
Hanoi Capital
Location
▪ Seaport: 120 km from Cai lan Sea port, 110 km from hai Phong Sea port
▪ Airport: 30 km from Noi Bai International Airport
Priority Sectors for
Electronics, Mechanics, High-Tech, Automotive industry
Investment

Investment Area Restricted Sectors for


Heavy-Industry, Textile & dying, Polluting industries
Investment

Minimum wage [Area 2] According to Decree 157/2018/ND-CP dated 16th November 2018

Lease term ▪ End date: 2049~2056

Minimum Lease Area 10,000 m2

Planned area ▪ Total area: 350 ha

Factory Available for


NA
Rent

Operation Status ▪ Active

Occupancy
▪ 100%
Rate/Number of
▪ 126 projects
Projects
Number of Korean
43 projects
Projects

Lease fee Land lease fee: Depend on location and leasing land plot area.

▪ Management fee: 0.5 USD/m2/year


▪ Infrastructure maintenance fee: 0.5 USD/m2/year
Operating fee ▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 8,250 VND (~0.37 USD)/m3
▪ Wastewater treatment fee: 6,500 VND (~0.29 USD)/m3

INFRASTRUCTURE AND FACILITY

Financial institution Vietcombank, Vietinbank (inside the zone)

Tax service, State


12 Km from Yen Phong District Tax Office and Treasury Department
finance office

Customs Service Inside the Industrial Zone

Logistics Inside the Industrial Zone

96
Post office Inside the Industrial Zone

Medicare 7 km from Bac Ninh General Hospital

Police, public security Inside the Industrial Zone

Universities, training
4.5 Km from Viglacera Vocational College
facilities, etc.

Recruitment NA

Worker dormitory Inside the Industrial Zone

Worker's child
Inside the Industrial Zone
education facility

One-stop service NA

Road Width Main road: 71 m

IT & Tele-
communication Telecommunication systems and international standards are always ready to meet the communication
Facilities of industrial needs
park
Emergency Power
Available
generator

Fire-fighting facility Available in the zone

Layout Plan

Location Map

97
Actual View

98
LIST OF TENANTS

No. Company Nationality Business


1 Ngan Son Joint Stock Co. Vietnam Processing tobacco materials
2 Vietnam Tobacco Corp. Vietnam Tobacco production
3 Vietnam EH Agriculture and Animal Feed Co. China Producing animal feed, admixture to animal feed,
Ltd. mixed animal feed
4 Thang Long Plastics Joint Stock Co. Vietnam Producing template, model and plastic products
5 A Chau Beer Company Vietnam Beer production
6 TID Door World Joint Stock Co. Vietnam Production of various doors
7 Thanh Tung Co. Ltd. (Vina Wrapping and Vietnam Construction of warehouse, showroom, trading
Bottle Cap) services
8 TRENDSETTERS FASHIONS CO. LTD. Singapore Producing garment for export
9 Vietnam Atlantic Welding Rod Co. Ltd. China Producing and trading welding rod
10 Thuan Thanh Services and Trading Production Vietnam Warehouse for rent, business agent of glass and
Co. Ltd. building material, processing after-glass goods,
window aluminium frame
11 VISSAN Animal Husbandary Products Vietnam Producing, trading various kinds of frozen food
Industry Co.
12 Asia Food Technology Co. Ltd. Vietnam Food processing
13 Tien Hung Co. Ltd. Vietnam Producing wrapping, wheat flour, non-alcohol soft
drinks
14 Vinafco Vietnam Agent of international transportation, logistics
15 Vietnam Warhouse, goods yard, container yard, bonded
warhouse for rent
16 Vietinbank – Tien Son IZ Branch – Bac Ninh Vietnam Business in currencies
17 Institute of Beverage Vietnam Producing, processing and trading agricultural and
forestry products
18 Hanoi Construction and Investment Co. Ltd. Vietnam Production of buidling materials and equivalent
products
19 Thanh Nam Glass Co. Vietnam Production of safety glass
20 Asean Tire Co. Ltd. Thailand Production of inner tube, tire for motorbike,
bycicle and other products from rubber
21 Hoang Hac J.S.C. Vietnam Processing, producing machine details, steel
structure and technological equipments
22 Tien Dat Co. Ltd. Vietnam Producing, processing and trading metal,
comsumption goods
23 Duc Viet Trading and Production Co. Vietnam Production of CDR, VCD, original disks
24 Dat Viet Industrial Production and Trading Vietnam Processing mechanics, electricity, electronics
J.S.C.
25 LB Vocational Training, Teaching Vietnam Fine arts for export and equipments for teaching,
Equipments Co. Ltd. vocational training
26 Thai Duong Trading and Advertising Co. Vietnam Production of printing products and the
(Tisu Paper Co. Ltd.) equivalents
27 TCT Tourism and Construction Trading Co. Vietnam Production of interior woodwork in accordance
Ltd. with investment license issued by competent
authority
28 Pacific Ocean J.S.C. (Thaicom) Vietnam
29 Tran Hung Dao Mechanics Co. Vietnam Producing and trading machines, appliances and
mechanic products
30 Tuong Cat Trading Co. Ltd. (Thai Duong Vietnam Producing and trading printing products
Printing Equipment Co. Ltd.)
31 Bac Ninh Province Post Office Vietnam Supply of post and telecom services
32 Niem Tin Viet Technology Development and Vietnam Exploiting logistics, producing high quality
Investment J.S.C. panels, industrial arch, products of preservation
technology, metallic roofing, covering and the
equivalents.

99
33 K.Long Co. Ltd. Vietnam Garment, embroidery and industrial auxilary
materials consumed in domestic market and for
export
34 3H Vinacom Co. Ltd. Korea Producing cover of electrical cable
35 Huphavet Diem Uyen Veterinary Medicine Vietnam Producing veterinary medicine
Production and Trading Co. Ltd.
36 MTS Vietnam Co. Ltd. Italia Production, assemble for consumption and
distribution of water heater products
37 Dong Anh Pressure Equipment J.S.C. Vietnam Producing, trading mechanic equipments, boiler
pressure, gas tank, steel structure, refrigeration
38 Hau Giang Pharmacy J.S.C Vietnam Producing pharmaceutical products
39 Northern Vietnam Dong Yun Plate Making Vietnam Mechanic products
Co. Ltd.
40 Vinh Thai Co. Ltd. Vietnam Producing, trading electrical fans, electronics,
household electricity and other products
41 Yen Vien Mechanics Factory Co. Ltd. Vietnam Producing steel structure
42 Vellpharm Vietnam Pharmacy Co. Ltd. China Producing new medicine for human
43 3C Industry Co. Vietnam Producing, trading electronic appliances
44 Liksin Co. Vietnam Producing compound wrapping
45 Malt Sugar Co. Ltd. Vietnam Processing, trading beer malt to provide materials
for beer factories
46 AQA Industrial Gantry Production Co. Ltd. Vietnam Erection of double girder gantry, single girder
gantry, revolving gantry, chain block crane, winch
and gantry appliances
47 Ngoc Lan Trading and Production Co. Ltd. Vietnam Producing and assembling motorbike spare parts
to consume in domestic market and for export
48 VINAMILK Vietnam Producing milk products, beverage and processing
products
49 Kobelco Vietnam Co., Ltd. Japan Repair and guarantee construction equipments
50 TISU paper Co., Ltd. Taiwan Process paper
51 Bank for Investment and Development – Bac Vietnam Supply financial service
Ninh branch
52 Mai Phuong Co., Ltd. Vietnam Produce thin plastic film for consumption in
domestic market and export
53 Viet Thang Co., Ltd. Vietnam Process mechanic, assemble and warehouse
finished products
54 Minh Xuan Joint Stock Company Vietnam Produce oil, resin and polymer glue
55 Dainichi Color Vietnam Co., Ltd Japan Produce and process chromatic grain and blended
chromatic plastic grain for export
56 Thien Thanh Cable Co., Ltd Vietnam Produce telecommunication cable
57 Bao Viet Company – Bac Ninh branch Vietnam Supply insurance service
58 Ha Thong joint stock company Vietnam Process mechanic and manufacture pressure
equipments
59 Nissin Vietnam electricity Co., Ltd. Japan Manufacture electrical products
60 Leadertek precise mechanic Co., Ltd Taiwan Manufacture precise mechanical products
61 Rang Dong Plastic Joint Stock Company Vietnam Produce tole, plastic boards and similar products
62 UHM Vietnam Co., Ltd. Thailand Manufacture water meters and accessories, tube
and pipe fittings, valves, equipment, tools and
other products related to water
63 Hanel export-import and manufacturing joint Japan Process and assemble electronic components
stock company
64 Ngai Mee Vietnam package Co., Ltd. Singapore Produce package and plastic beads and print color
labels on package
65 Anh Phuong Co., Ltd. Vietnam Building concrete mixing plant
66 Fujikasui environmental technique and energy Japan Produce products for treating waste water and
Co., Ltd. environmental pollution
67 Postal Materials Joint Stock Company Vietnam Manufacture telecommunication cables and
similar products

100
68 Rishi Vietnam Co., Ltd. China Design, manufacture and repair molds
69 with high accuracy and produce high-grade plastic
70 Viet Ha beer and soft drink joint stock Vietnam Produce beer and soft drink
company
71 Viglacera Mechanical execution company Vietnam Construction works
72 Huawei - TST Vietnam Joint Stock Company Vietnam Produce telecommunication equipments
73 Armstrong Weston Vietnam Co., Ltd Japan Produce components cut by molds including name
sign, marks, labels printed with silk techniques to
sell to other export-processing enterprises in
Vietnam and to export
74 Shihen Vietnam Co., ltd. Japan Manufacture, fabricate and assemble electric and
electronic machinery, equipment and components
75 Tin Thanh Co., Ltd. Vietnam Produce packages and similar products
76 Indo-Trans delivery and logistics joint venture US Delivery services (not including shipping agency
company services, maritime towage services and inland
transport services by sea), services of customs
declaration, warehousing and logistics services ,
reverse logistics, retail store services
77 Kinyosha Co., Ltd. Japan Manufacture rubber rollers and similar products
78 Lili of France joint venture company Vietnam Produce pharmaceutical and functional food,
cosmetics, medicinal materials
79 Sara VNPC Computer Manufacturing Joint Vietnam Manufacture and assemble computers and similar
Stock Company products
80 Tien Quoc Co., Ltd. Vietnam Produce electric equipments, components for
motorbike
81 Trong Thanh trade and manufacturing Co., Vietnam Produce plastic grain and similar products
Ltd.
82 Vietnam Industrial Gas Joint Stock Company Vietnam Produce industrial gas
83 Truong Hong glass technology development Vietnam Produce and process safe glass and similar
Joint Stock company products
84 Vietnam Coffee Corporation Vietnam Process coffee, nutritional flour, agricultural
products and foodstuff, warehouse and similar
occupations
85 Sumitomo Vietnam Electric Interconnect Japan Produce and trade electronic parts including
products Co., ltd. bearing roller, fixed film roller.
86 THK Manufacturing Vietnam Co., Ltd. Japan `Produce, process, assemble and trade equipments
of sliding rails
87 Bac Ky Investment Joint Stock Company Vietnam Build factory, warehouse and supply logistic
service
88 Kingmo New Materials Vietnam China Produce and trade metal sheet and molybdenum
metal products
89 AGRIBANK – Bac Ninh branch Vietnam Setting up office of Agribank in Tien Son
Industrial park - Bac Ninh province
90 An Viet Mechanic Joint Stock Company Vietnam Produce, process and complete steel structures for
power sector and transportation sector
91 Phuc Lam trade development joint stock Vietnam Produce nutritious food and functional food
company
92 ACECOOK Vietnam Joint Stock Company Japan Produce and process food
93 Tan Tien plastic package joint stock company Vietnam Produce complex film package
94 Hai Thien trade and manufacturing Co., ltd. Vietnam Produce plastic sandals
95 Vinabima Tien Son construction machine joint Vietnam Produce, assemble and trade equipments for
stock company cement concrete mixer plant and construction
equipments
96 Joyo Mark Vietnam Co., Ltd. Japan Manufacture and trade all kinds of labels, guide
stamps and other printed materials used to attach
to other products
97 ABB Co., Ltd. Switzerland 1. Manufacture products for measuring, testing,
direction and controlling
2. Manufacture motors, generators, electrical
transformers, distribution equipment and electrical
control
101
3. Manufacture electrical wiring devices
4. Produce components and high voltage
equipment, medium-and low-voltage and other
electrical equipment
5. Produce ball, gears, gearboxes, parts motion
control and communication
6. Design, install, repair, maintenance and
98 Tien Du Construction Company Vietnam Supply service of supermarket and restaurants for
the industrial park
99 Canon Co., Ltd. Japan Produce and process all kinds of inkjet printers,
components, semi-finished products for inkjet
printer, detailed parts for electronic products, all
kinds of laser printers, semi-finished components
for laser laser
100 Gia Long Co., Ltd. Vietnam Produce PU roofing, painted metal and welding
materials
101 Duc Giang Industrial chemical Co., Ltd Vietnam Produce and process finished products for treating
water, waste water and environmental pollution
102 Keosan Vina Mechanical Co., Ltd. Korea Produce crane, machinery and equipment for the
mill line and recycling line
103 Ngoc Viet service and trade Co., Ltd. Vietnam Produce instant noodle, wine and soft drink
104 Vietnam Parkerizing Hanoi Co., Ltd Japan Produce and trade materials for surface treatment
of metal and corrosion, implement design service,
install machinery, spare parts and related technical
consulting service; use products to handle the
metal parts
105 Dai Phat Joint stock company Vietnam Produce diapers, tampons, wet paper towel or
nonwovens
106 COTEC construction joint stock company Vietnam Manufacture and trade mechanical equipments
and maintain buildings, warehouses and similar
products
107 Hawee electromechanic joint stock company Vietnam Manufacture electrical and industrial equipments
108 Thanh Trang Private Enterprise Vietnam Manufacture and trade equipments, products
related to water
109 Khanh Hoa Co., Ltd. Vietnam Process metal ware, metal roofing and similar
products
110 Mechanical product export-import state owned Vietnam Produce tightening components such as bolts,
one member company limited nuts, threaded rods, washers, zinc coated metals
and similar products
111 Phi Kha trade in service and manufacturing Vietnam Manufacture and assemble aluminum glass and
Co., Ltd. aluminum coating line. Purchase construction
materials, aluminum and glass building, glass art,
interior decoration materials, plaster ceiling.
Manufacture aluminum doors, interior decoration
materials. Process engineering products.
112 Minh Vien Co., Ltd Vietnam Produce functional food and tea
113 Kosung Joint stock company Vietnam Produce electrical lines and cables
114 Anh Duc trade joint stock company Vietnam Assemble electronic
115 Phuoc An Co., Ltd. Vietnam Produce agricultural food and drink
116 Akebono Kansei Vietnam Co., Ltd Japan Produce, manufacture and assemble the plastic
parts and products
117 Seojin System Vina Co., Ltd Korea Produce, assemble, fabricate, galvanize and coat
all types of aluminum molds
118 Tue Tinh Pharmaceutical Economic – Vietnam Pharmaceutical training
Technical Secondary School
119 Ariston Thermo Vietnam Co., Ltd Italia Produce water heater and other interior products
for bathroom
120 Taixin Printing Vina Co., Ltd Korea Produce and print packages
121 Nam Phuong V.N Co., Ltd Vietnam Produce food
122 Curious Seiki Japan Produce mechanic parts
123 Tomoe Shokai Japan Produce medical equipments

102
124 Sai Gon Ha Noi Petroleum Co., Ltd. Vietnam Produce Gas oil
125 An Phuc Co., Ltd. Vietnam Construct Gas station and provide other services
126 Kinh Bac Star Vietnam Construct Gas station and provide other services

103
YEN PHONG INDUSTRIAL ZONE (PHASE I, II)

GENERAL INFORMATION

Yen Phong District, Bac Ninh Province, Vietnam


Address
Viglacera Corporation JSC
▪ Address: Viglacera Tower, No.1 Thang Long Boulevard, Me Tri, Nam Tu Liem, Hanoi, Vietnam
Investor ▪ Tel: (84-24) 35536688
▪ Fax: (84-24) 35537666
▪ Website: http://www.viglacera.com.vn/ www.viglaceraip.com
▪ Mr. Dang The Nam – Business Development Manager –
Mobile: (84) 903 405 099 - Email: namdt.vir@viglaceraland.vn
Contact Person
▪ Ms. Nguyen Ha Phuong – Senior Marketing Executive –
Mobile: +84 97 344 8994 - Email: phuongnh.vir@viglaceraland.vn
Yen Phong IP is located next to National Highway No.18 (Noi Bai - Ha Long Highway) from Hanoi to
Quang Ninh
Location - To Noi Bai International Airport: 22 km
- To Hanoi city: 35 km
- To Hai Phong Seaport: 110 km

Priority Sectors for Investment Electronics, powers industry, high-techs, material for

Restricted Sectors for construction and mechanics, pharmaceuticals, foodstuffs, light industry,
Investment Area
Investment consumer goods, etc.

Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

Lease term Until 2066

Minimum Lease
10,000 m2
Area
Total area: 658 ha
Planned area - Phase 1: 344 ha
- Phase 2: 314 ha
Factory Available
Only 2 factories left – Unit size: 5,940 m2/unit
for Rent

Operation Status Active

Occupancy Rate
▪ Phase 1: 100%
& Number of
▪ Phase 2: 60% - 43 projects
projects
Number of
47
Korean Projects
▪ Land lease fee: 125 USD/m2/whole project life (VAT excluded)
Lease fee
▪ Factory lease fee: 4 USD/m2/month (VAT excluded)
▪ Management fee: 0.9 USD/m2/year
▪ Electricity fee:
(1) - Normal hours: 1,555 VND/Kwh (equivalent to 0.067 USD/Kwh)
(From Monday to Saturday: 4h - 9h30’, 11h30’ - 17h and 20h - 22h; Sunday: 4h - 22h)
(2) - Night hours: 1,007 VND/Kwh (equivalent to 0.04 USD/Kwh)
Operating fee (Everyday: 22h - 4h)
(3) - Rush hours: 2,871 VND/Kwh (equivalent to 0.123 USD/Kwh)
(From Monday to Saturday: 9h30’ - 11h30’ and 17h - 20h/Not Sunday)
▪ Water fee: 9,200 VND/m3 (equivalent 0.4 USD/m3) excluded VAT - monthly payment.
▪ Wastewater treatment fee: 6,500 VND/m3 excluded VAT (equivalent 0.309 USD/m3) - monthly
payment. The quantity is defined by 80% the amount of water supply.

INFRASTRUCTURE AND FACILITY

104
Financial
VIETINBANK, VIETCOMBANK, BIDV
institution
Tax service, State
12 Km from Yen Phong District Tax Office
finance office
Bac Ninh Custom Office is located in the management center of the IP. All the sealed procedures and
Customs Service
claims are carried out timely in enterprises of the IP.

Logistics Inside the Industrial Zone

Post office 3 Km, inside Yen Phong Industrial Park – 1st phase

Bac Ninh Province Hospital is 10 km from the IP.


Medicare
There is a polyclinic in Yen Phong IP
Police, public
Police station is inside the IP.
security
Universities,
Viglacera Vocational college in Yen Phong Urban area trains 6,000 workers and labors yearly for
training facilities,
enterprises in the IP.
etc.

Recruitment Viglacera will support in recruitment

Yen Phong Urban Area (51 ha) and Yen Phong Dormitories for workers (20 ha) ensure
Worker dormitory
houses,dormitories, apartments for workers in the IP.
Worker's child
N/A
education facility

One-stop service N/A

Road Width N/A

IT & Tele-
communication The telecommunication system complies with international standards and is always available for
Facilities of commnunication demand with high data transmission speed.
industrial park
Emergency Power
N/A
generator
Fire-fighting
Inside the Industrial Zone
facility

Layout Plan

105
Location Map

Actual View

LIST OF SOME NOTABLE TENANTS

No. Company Nationality Business


1 Young Jin Vina Co., Ltd Korea Manufacturing materials made of
plastic (phone components)
2 Samho Gunyoung Vina Co., Ltd Korea Manufacturing machinery
3 Atlantic Welding Company China Manufacturing welding rod
4 DIC Vina Co., Ltd Korea Manufacturing and processing the
raw materials for the production of
flexible electronic circuit board
5 Thai Hoa Co., Ltd China Formalin glue
6 AK Investment and Development Co., Ltd Vietnam Producing wooden pallets, wooden
packaging
7 Hanpo Vina Vietnam Producing plastic and metal for
supporting industry

106
8 Seil Ens Vietnam Co., Ltd Korea Machining
9 Dae Sun Co., Ltd Korea Refrigeration system
10 Aermec Vietnam Manufacturing and Trading Joint Vietnam Air conditioner and clean room
Stock Company equipment
11 LogisValley Co., Ltd Korea Logistics
12 Geo Nation Co., Ltd Korea Surface treatment of metalic
component
13 Shinhan Elevator Company Korea Elevator
14 Alpha Food Joint Stock Company Vietnam Food
15 Thien Viet Technology Joint Stock Company Vietnam Mechanical
16 LogisValley Co., Ltd Vietnam Logistics
17 Cty Xây Dựng Tiên Du (TNHH) Vietnam
18 Yulay Tech Vina Co., ltd. Korea Manufacturing the mobile phone
cover
19 Bumchun Precision Vietnam Co., Ltd. Korea Manufacturing the mental parts of
headphones
20 Orion Vina Co., Ltd. Korea Food and Cakes Products
21 SamSung Electronics Vietnam Co., Ltd. Korea Electronics Products
22 Flexcom Vietnam Co., Ltd. Korea Flexible printed circuit board
23 User Interface Technology Vietnam Co., Ltd. Korea Laser printer components and high
tech electronic spare parts
24 Mobase Vietnam Joint Stock Company Korea Mobile phone cases and refrigerator
gasket and high tech electronic spare
parts
25 Seoul Metal Vietnam Co., Ltd. Korea Hi-tech precision screws and other
hi-tech electronic parts used for
mobile phones, computers and other
high tech electronic products
26 Em Tech Vietnam Co., Ltd. Korea Manufacturing and supplying hi-
tech micro SPK & RCV, other audio
equipments and electrical &
electronic parts
27 Intops Vietnam Co., Ltd. Korea Mobile key pads and precision
electronic rubber parts
28 Seowonintech Hanoi Co., Ltd. Korea Mobile key pads
29 P&TEL Vietnam Co., Ltd. Korea high-tech products
30 Crucialtec Vina Co., Ltd. Korea high-tech optical navigation key for
cell phone
31 Hanjin Vietnam chemiscal joint stock company Korea paint products
32 Phat Van Loi Co., Ltd. Vietnam Gas station
33 P&Q Vina Technical Co., Ltd. Korea Mobile Phone cases
34 Lock & Lock HN Co., Ltd. Korea Warehouse
35 M Tech Vietnam Co., Ltd. Korea mobile cover
36 Vietnam Japan hospital construction and Vietnam hospital service
consultant joint stock company
37 Toyo Brazing Vietnam Co., Ltd. Japan Processing heat treatment, metal
weld and related auxiliary industries
38 Sahara Industry Vietnam Co., Ltd. Japan Plastic moulding processing and
related auxiliary industries
39 AK Chemtech Co., Ltd. Korea Producing paints, solvents for
phones, cars, computers and plastics
40 Nano Chem Tech Co., Ltd. Korea Manufacturing the plastic resin,
antistatic protective film and plastic
bags
41 Dongsin Tube Glass Co., Ltd. Korea Manufacturing glass container for
pharmaceutical injection use
42 3H Vina Co., Ltd. Korea Manufacturing plastic resin PC,
ABS
107
43 Dae Myung Electronics Co., Ltd. Korea Manufacturing electronic
components
44 Fine Tech Vina Technology Co., Ltd. Korea Manufacturing mold of mobile
phone's cover and mold of mobile
phone's component made from wood
and steel
45 KCC Vietnam Corporation Korea Manufacturing paint
46 Dawon Vina Co., Ltd. Korea Manufacturing painting plate and
printing of the cover of mobile
phone
47 Nguyen Son Co., ltd. Vietnam Food and Cakes Products
48 Muu Sinh GI Co., Ltd. Vietnam Manufacturing furniture
49 Air Liquide Vietnam Co., Ltd. France Manufacturing industrial gas
50 Ottogi Vietnam Co., Ltd. Korea Food products
51 PV Compressed Natural Gas Distribution JSC Vietnam Supply Compressed Natural Gas
52 Halla Investment Co., Ltd. Vietnam Build Offices for lease
53 Vinafco HTNS Korea Logistics
54 Hanaro Korea Logistics
55 Cong Ha Mechanical Company Vietnam Mechanical
56 Airport Services Joint Stock Company Vietnam Logistics
57 Logistics Aviation Joint Stock Company Vietnam Logistics
58 Century Logistics Joint Stock Company Vietnam Logistics
59 Unitech Asia Co., Ltd Korea Chemicals for the water and sewage
treatment industry
60 Tae Sung Eng Vina Co., Ltd Korea Automation display device

108
YEN PHONG II-C INDUSTRIAL ZONE

GENERAL INFORMATION

Yen Phong District, Bac Ninh Province, Vietnam


Address
Viglacera Corporation JSC
▪ Address: Viglacera Tower, No.1 Thang Long Boulevard, Me Tri, Nam Tu Liem, Hanoi, Vietnam
Investor ▪ Tel: (84-24) 3553 6660
▪ Fax: (84-24) 3553 6671
▪ Website: http://www.viglacera.com.vn/
▪ Mr. Dang The Nam – Business Development Manager –
Mobile: (84) 903 405 099 - Email: namdt.vir@viglaceraland.vn
Contact Person
▪ Ms. Nguyen Ha Phuong – Senior Marketing Executive –
Mobile: +84 97 344 8994 - Email: phuongnh.vir@viglaceraland.vn
▪ 2km from Yen Phong IP
▪ Yen Phong II-C IP is located next to National Road No.18 (Noi Bai - Ha Long Highway) and Hanoi -
Thai Nguyen Highway.
Location
- To Noi Bai International Airport: 20 km
- To Hanoi city: 34 km
- To Hai Phong Seaport: 112 km
Electronics, powers industry, high-techs, material for construction and
Priority Sectors for Investment Mechanics, pharmaceuticals, foodstuffs, light industry, consumer goods,
etc.
Investment Area Restricted Sectors for
Polluted sectors
Investment

Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

Lease term ▪ End date: 2068

Minimum Lease
10,000 m2
Area

Planned area Total area: 221 ha

Factory Available
N/A
for Rent

Operation Status In Operation

Occupancy Rate
▪ Occupancy Rate: 25%
& Number of
▪ Number of projects: 6 Projects
projects
Number of
4 projects
Korean Projects

Lease fee Land lease fee: 125 USD/m2 (VAT excluded)

▪ Management fee: 0.9 USD/m2/year


▪ Electricity fee:
(1) - Normal hours: 1,555 VND/Kwh (equivalent to 0.067 USD/Kwh)
(From Monday to Saturday: 4h - 9h30’, 11h30’ - 17h and 20h - 22h; Sunday: 4h - 22h)
(2) - Night hours: 1,007 VND/Kwh (equivalent to 0.04 USD/Kwh)
Operating fee
(Everyday: 22h - 4h)
(3) - Rush hours: 2,871 VND/Kwh (equivalent to 0.123 USD/Kwh)
(From Monday to Saturday: 9h30’ - 11h30’ and 17h - 20h/Not Sunday)
▪ Water fee: According to regulation of supplier at the using time.
▪ Wastewater treatment fee: According to regulation of supplier at the using time.

INFRASTRUCTURE AND FACILITY

109
Financial
- Shinhan Bank, Vietcom Bank, Vietin Bank, BIDV, Techcom Bank
institution
Tax service, State
12 Km from Yen Phong District Tax Office
finance office
Bac Ninh Customs Office is located in the management center of Yen Phong IP which is 2 km from Yen
Customs Service
Phong II-C IP.

Logistics Inside the Industrial Zone

Bac Ninh Post Office has constructed its branch at the center of Yen Phong IP (which is 2 km from Yen
Post office Phong II-C IP) with modern informatics technology system for serving multi-service communication such
as data transfer, Internet, IP telephone and video conference, etc.
Bac Ninh Province Hospital is 12 km from the IP
Medicare
Yen Phong IP Clinic is 2 km from the IP
Police, public
Police station is inside the IP
security
Universities,
Viglacera Vocational college in Yen Phong Urban area trains 6,000 workers and labors yearly for
training facilities,
enterprises in the IP
etc.

Recruitment Viglacera will support in recruitment

Yen Phong Urban Area (51 ha) and Yen Phong Dormitories for workers (20 ha) ensure
Worker dormitory
houses,dormitories, apartments for workers in the IP.
Worker's child
3 Km, inside Yen Phong Industrial Zone – 1st phase
education facility

One-stop service N/A

Road Width N/A

IT & Tele-
communication The telecommunication system complies with international standards and is always available for
Facilities of commnunication demand with high data transmission speed.
industrial park
Emergency Power
Available
generator
Fire-fighting
Available. Water supply system for firefighting is located along each road.
facility

Layout Plan

110
Location Map

Actual View

111
DAI DONG - HOAN SON INDUSTRIAL ZONE

GENERAL INFORMATION

▪ Dai Dong and Hoan Son Commune, Tien Du District, Bac Ninh Province
Address
Saigon Telecommunication and Technologies Corporation – Kinh Bac Group
Investor ▪ Address: No.11, Tu Xuong, District 3, Ho Chi Minh City
▪ Tel: (84-8) 3 715 9909 Fax: (84-8) 3 932 2302
▪ Ms. Mai Lan – Sales Deputy Manager - (84) 936368613 – mailan.kbc@gmail.com
Contact Person
▪ Ms. Giang – Sales Executive- (84) 906918668
▪ Land: National Road 1A to Lang Son, National Road 18 to Cai Lan seaport – Quang Ninh,
National Road 18 to Noi Bai International Airport. Railway Hanoi – Lang Son – Nan Ning
Location (China) and Yen Vien- Cai Lan- Dong Xing (China) cross the province., 06km from Hanoi
▪ Seaport: 90 km from Hai Phong Seaport and 130 km from Cai Lan Deepwater seaport
▪ Airport: 30km from Noi Bai International Airport
Priority Sectors for
Multi-Industry
Investment
Investment Area
Restricted Sectors for Production of iron, steel, construction materials, paper, chemicals,
Investment textiles and textile products ...

Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

Lease term ▪ End date: 2057

Minimum Lease Area 10,000 m2

Limit for Construction


Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Permitted Construction Residential Planning regulation (QCXDVN 01: 2008/BXD)
Rate
▪ Total area:
Planned area Phase I: 272 ha
Phase II: 95.8 ha

Factory Available for Rent None

Operation Status ▪ In operation

Occupancy Rate and ▪ Phase I: 100%


Number of Projects ▪ Phase II: Under construction, to be in operation in 2020

Number of Korean Projects 93 projects

▪ Land lease fee: 81 – 100 USD/m2/whole project life


Lease fee
▪ Factory Lease fee: 3 – 3.5 USD/m2
▪ Management fee: 0.5 USD/m2/year
▪ Infrastructure maintenance fee: 0.2 USD/m2/year
Operating fee ▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 15,000 VND (~ 0.67 USD)/m3
▪ Wastewater treatment fee: 0.37 USD/m3

INFRASTRUCTURE AND FACILITY

Financial institution Navibank, Vietinbank, Vietcombank, Agribank

Tax service, State finance 14 km from Bac Ninh Tax Department


office 13 km from Bac Ninh Treasury Dearptment

Customs Service 15 km from Bac Ninh Customs Office

112
Logistics Inside the Industrial Zone

Post office 3 km from nearest Post office

Medicare 3 km from Tu Son General Hospital

Police, public security 24/7 security service.

Universities, training
17 km from Kinh Bac University
facilities, etc.

Recruitment Support from IZ developers

Worker dormitory Worker Dormitory project available and demanding from tenants

Worker's child education


NA
facility

One-stop service NA

Road Width Main road 57 m – 4 lanes, 36 m and branch road 23 m – 2 lanes

IT & Tele-communication Telecommunication systems and international standards are always ready to meet the
Facilities communication needs
Emergency Power
Available in the zone
generator
The water supply network for firefighting is designed in conjunction with the potable water
Fire-fighting facility supply network, which is located along the roads. The distance among fire hydrants is 120 m -
150 m with a diameter of D125 mm.

Layout Plan

113
Location Map

Actual View

114
LIST OF KOREAN TENANTS – PHASE I

No. Name of Investors Investment Capital (million USD)


1 LEE JEPUNG; JEIL TECHNICS CO., LTD 0.50
2 SONG MAL SOO 0.47
3 DO INNOVATION CO., LTD 0.60
4 KIM SIIL 0.50
5 DONGWOO PNT 0.60
6 JU HYUN CO., LTD 0.70
7 MPROTEK CO., LTD 1.00
8 VIETNAM JUNGWOO CO., LTD 1.26
9 PARK SANG HYUN, LIM BYUNG TAE 0.50
10 LOT VACUUM CO., LTD 1.00
11 SEO DONG JOE 0.50
12 DEVELOPMENT PLUS CO., LTD 1.00
13 JEONG MYONGCHUL 1.35
14 LINKELECTRONICS CO., LTD 0.80
15 ILGAK METAL CO., LTD 0.52
16 PARK GISOO 0.50
17 SOLITY CO., LTD 2.00
18 MOON YOUNG SIK 0.50
19 SUNGWON TECHWIN COMPANY 0.70
20 COMPANY YOO RIM; JU YOUNGRIM 0.75
21 NOH, TAESU; LEE, SANG KOO 0.50
22 PARK, CHUN SHIK. RYU, SUNG RYONG 0.55
23 MOON KONGUP 0.51
24 RHO PEEL DAE 0.50
25 SEONG LIMSA CO., LTD; YANG KISUNG; OH HEE HAN 0.60
26 SAMJIHITEK CO., LTD; YANG JINSEOK 1.20
27 CHOI HYOUNG SUCK; ICSN Korea, Inc.; ICSN TECHNOLOGIES; KIM 1.91
JUN IL
28 SIWOOFLEX CO., LTD 0.50
29 INNO6 INC 1.00
30 JINHO TECH CO., LTD. 0.28
31 SEOJIN SYSTEM CO., LTD 137.00
32 TEXON CO., LTD 37.90
33 PIAO, HONG LAN; CHOI SANG UNK 0.08
34 HK CO. LTD 0.58
35 KB ADHESIVES CO., LTD 0.50
36 KIM, KYUSUB; LEE, JAESUK 0.51
37 SHINWON METAL CO., LTD 0.50
38 KWON JINHA; BIN CHANWOO 0.50
39 PARK SANG SOO 1.00
40 PS SOFT JOINT STOCK COMPANY; KO SUNG MAN 0.50
41 NC LED CO., LTD 3.80
42 GLOBAL STANDARD TECHNOLOGY KOREA 1.50

115
43 JEIL TECHNICS CO., LTD 0.50
44 KANG JEABONG; YUN MIJA 5.00
45 ONE SYSTEM JOINT STOCK COMPANY 1.43
46 CO., LTD GSP COMPANY 0.25
47 MS FILTER CO., LTD; KANG JIN SUN 0.24
48 JAEGAL HYUNSEOB; DOO BYOUNG 0.67
49 JANG JAE HYEON 0.70
50 KAIROS COMPANY LIMITED 0.89
51 ANS CO., LTD 0.40
52 SINILL COMPANY LTD 1.00
53 PARK HO YOUNG; KIM JINSEOG; ZHANG GUONAN 0.97
54 SY TECH CO., LTD 1.40
55 COMPANY LIMITED DSR; Ku Ja Kyung 0.70
56 BAEK IN HWAN 2.00
57 Jungang Industry Co., Ltd; Mr. Kim Choong Hwan 0.73
58 Lee Sukki 0.35
59 Han Precision Co., Ltd., Ian Precision Co., Ltd 0.60
60 HANMIFLEXIBLE VINA CO., LTD; HANSUNG P.T.C CO., LTD; 4.50
SEWON HITEC
61 GM CLEAN TECH CO. LTD 0.33
62 CHOI BONG KI 0.50
63 SEJIN INDUSTRY CO., LTD 0.50
64 JK Korea Co., Ltd 0.45
65 KIM KYUNG WHAN 0.94
66 OH JIN SEI 0.60
67 PARK EUNJI; OH JEADO 0.50
68 TAESUNG CO., LTD 2.40
69 MMT LTD 0.40
70 PARK GISOO 0.92
71 Mr. Hwang Joon Heon, Mr. Jung Hee Chan, Mr. Kim Jung Kyun 0.50
72 SJSOLUTION COMPANY LTD 1.00
73 Elnoa Co., Ltd 0.42
74 KIM YOUNGKYU 0.22
75 YUIL SYSTEM CO., LTD 0.30
76 MOON YOUNG SIK 0.50
77 ASTEP CO., LTD 1.00
78 Diawintech Co., Ltd 1.10
79 Withsystem Co., Ltd; DEVELOPMENT PLUS CO., LTD 1.40
80 D-Max Co., Ltd 0.30
81 IAN ELECTRONICS CO., LTD 2.50
82 BAEK WOOIL 0.70
83 YG TECH CO., LTD 3.50
84 DASAN C&P JOINT STOCK COMPANY 4.00
85 HANKYONG C&T CO., LTD 0.45
86 Mr. Kwon Young Woon 0.60
87 ENGINEERING AND CONSTRUCTION COMPANY LIMITED KP 0.60
88 Seojin System Co., Ltd. 27.00

116
89 MUN SOOGYEONG 3.35
90 HAN JIN CHEMICAL COMPANY 3.90
91 GOMUNDANG PRINTING INC 36.00
92 KIM JIN GWON 0.50
93 SAMSUNG INDUSTRIAL CO., LTD 0.89

117
VSIP BAC NINH INDUSTRIAL ZONE

GENERAL INFORMATION

▪ Tu Son town, Bac Ninh province, Vietnam


Address
▪ VSIP Bac Ninh Co., Ltd
․ Address: No.1, Huu Nghi Rd, VSIP Bac Ninh, Tu Son town, Bac Ninh
province,
Investor Vietnam
․ Tel: (84-222) 3 765 668
․ Fax: (84-222) 3 765 666
․ Website: http://www.vsip.com.vn/
Mr. Cao Phan Tuan (Tony) – Marketing Manager - Mobile: (84) 946 050
Contact Person
520 - Email:Tuan.cp@vsip.com.vn
- 25 km from Hanoi city
- 15 km from Noi Bai International Airport
Location - 130 km from Hai Phong seaport
- Adjacent to Hanoi-Thai Nguyen Highway and HW no.18, 10 km from
Tu Son railway station.
Electronics, Precision Engineering, FMCG,
Priority Sectors
Automotive components, Logistics, Pharmacy
for Investment
and Medical Devices etc.
Investment Area
Restricted
Sectors for Polluting industries: dyeing, plating etc.
Investment
[Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on
Minimum wage
minimum salaries
▪ Start date: Feb 2007
Lease term
▪ End date: Feb 2057

Minimum Lease Area 10,000 m2

Limit for Construction Height


- 25 meters/ 6 storeys
- 50% to 60%
Permitted Construction Rate

▪ Total area: 700 ha (200 ha for commercial and residential, 500 ha for
Planned area industrial land)
▪ Total Industrial Land: 500 ha

Factory Available for Rent ▪ More than 1 ha

Operation Status ▪ In operation

▪ 100 %
Occupancy Rate and Number of Projects
▪ 125 projects

Number of Korean Projects 17 projects

Lease fee ▪ Land lease fee: 140 - 170 USD/m2/whole project life

▪ Management fee: 0.07 USD/m2/month


▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee ▪ Water fee: 9,000 VND (~0.4 USD)/m3
▪ Wastewater treatment fee: 4,700 VND (~0.21 USD)/m3
▪ Waste treatment fee: According to contract with supplier

INFRASTRUCTURE AND FACILITY

Maritime Bank, Vietcombank - Hưng Yên branch, ACB, Agribank,


Financial institution
Techcombank
118
Tax service, State finance office 02 km from Tax Agency

Customs Service Inside the industrial zone

Logistics Inside the industrial zone

Post office Inside the industrial zone

Medicare 2km from Tu Son Hospital, Medicare Center

Police, public security 24/7 security service.

Universities, training facilities, etc. 2km from Tu Son Hospital, Medicare Center

Recruitment Support from IZ developers

Worker dormitory Worker Dormitory project available and demanding from tenants

Worker's child education facility 0.5 km from the nearest Facility

One-stop service Inside the zone

Road Width 45m, 32m and 24m

Telecommunication systems and international standards are always ready to


IT & Tele-communication Facilities
meet the communication needs

Emergency Power generator NA

The water supply network for firefighting is designed in conjunction with the
Fire-fighting facility potable water supply network, which is located along the roads. The distance
among fire hydrants is 120 m -150 m with a diameter of D125 mm.

Layout Plan

Location Map

119
Actual View

120
LIST OF SOME NOTABLE TENANTS

No. Name of Tenants Nationality Business Line


1 Linfox Warehouse Bac Ninh Co., Ltd Australia Logistic
2 Emergent Cold Vietnam Ltd. - Bac Ninh Australia Cold warehouse
Branch
3 Puratos Grand-Place Vietnam Ltd Belgium Confectionary
4 Yuncheng Plate Making (Bac Ninh) Co., China Steel processing
Ltd
5 Branch of UNILEVER Vietnam England & Holand Homecare's product
International Company Limited in VSIP
Bac Ninh
6 J&C Joel Vietnam Co., Ltd England Theater curtain
7 Bati Ha Noi Co., Ltd France Logistics hub development
8 Dynaplast Packaging (Viet Nam) Co., Indonesia Packaging
Ltd - Bac Ninh Branch
9 A&D Viet Nam Limited Japan Blood pressure monitor
10 A.I.S Viet Nam Co., Ltd Japan Motorcycle parts
11 Asia Packaging Industries Vietnam Co., Japan- Hong Kong Can & bottle
Ltd – North
12 Branch of Ojitex Hai Phong Co., Ltd. in Japan Carton packaging
Bac Ninh
13 Daiichi Denso Buhin Vietnam Co., Ltd Japan Lamps, switches for automobile,
motorcycle
14 Enshu Vietnam Co., Ltd Japan Machine tools and transportation
equipment
15 Foster Electric (Bac Ninh) Co., Ltd Japan Electronic sound devices
16 Fujikin Bac Ninh Incorporated Japan Steel processing
17 Fujita Vietnam Co., Ltd Japan Engine, general purpose parts for
motorcycle
18 Hal Vietnam Co., Ltd - Bac Ninh Branch Japan Automotive parts
19 Ihara Manufacturing Vietnam Co., Ltd Japan Oil pump, water pump for motorcycle
20 Kurabe Industrial Bac Ninh Co., Ltd Japan Electrics wire
21 Malugo Vietnam Co., Ltd Japan Label printing
22 Nakamura Vietnam Co., Ltd Japan Motorcycle parts
23 Nittan Vietnam Co., Ltd Japan Valve for motorcycle
24 Nitto Vietnam Co., Ltd Japan Polarizing material
25 Ogino Vietnam Corporation - Bac Ninh Japan Motorcycle parts
Branch
26 Ogino Vietnam Tu Son Co., Ltd Japan Motorcycle parts
27 Printec Ohtomi Co., Ltd Japan Label printing
28 Sakata Inx Vietnam Co., Ltd Bac Ninh Japan Printing ink
Branch
29 Bac Ninh - Based Branch Office Shoei Japan Package printing
Vietnam Co., Ltd
30 Suntory Beverage & Food Viet Nam Co., Japan PET bottle preform
Ltd
31 Toho Precision (Vietnam) Co., Ltd Japan Rubber roll for printer
32 - Japan Precision engineering
33 Biel Crystal Manufactory (Vietnam) Hong Kong Electronic parts
Limited
34 Gaoqi Electronics (Vietnam) Co., Ltd Hong Kong Electronic parts
35 Chung Ho Nais Vina Co., Ltd Korea Assembly of water purifier
36 Dreamtech Vietnam Co., Ltd Korea Battery charger

121
37 Ehwa Tech Co., Ltd Korea Grinding stones, diamond stones
38 Foseca Vietnam Co., Ltd Korea Foods and Catering Services
39 HJ Corp Vina Co., Ltd Korea Electronic parts
40 ITM Semiconductor Co., Ltd Korea Electronic parts
41 J World Vina Co., Ltd Korea Tapes
42 Josung Vina Co., Ltd Korea Carrier tape
43 LS Electronic-Devices Vietnam Co., Ltd Korea SIM connector
44 Noroo Vina Co., Ltd Korea Paint for mobile phone
45 RF Tech Bac Ninh Co., Ltd Korea Battery charger
46 Samhwa Paints Vina Co., Ltd Korea Paint for mobile phones
47 Sang-A Frontec Co., Ltd Korea Component materials
48 Sumika Electronic Materials Co., Ltd Korea Electronic parts
49 Taixin Printing Vina Co., Ltd Korea Printing
50 - Korea Electronics parts
51 Wisol Hanoi Ltd Liability Company Korea Electronic parts
52 BE Packaging (Vietnam) PTE LTD Malaysia Packaging
53 Boxpak (Ha Noi) Co., Ltd Malaysia Packaging
54 Richfield Co., Ltd Malaysia Candy & gum packaging
55 Santomas Vietnam JSC - Bac Ninh Malaysia Precision plastic gears, molds and
Branch mechanical parts
56 Lintec Ha Noi Vietnam Co., Ltd Singapore Adhesive product
57 Peony Company Limited Singapore Garment and textile
58 Mapletree Logistic Park Co., Ltd Singapore Logistics hub development
59 Branch of SMC Pneumatics (Vietnam) Singapore Pneumatic cylinder, valve
Sole Member Company Limited
in Bac Ninh
60 Sorrento Vietnam Share Holding Singapore Furniture
Company
61 The Branch of Behn Meyer Vietnam Co., Singapore Plastic compounding
Ltd in Bac Ninh
62 Sika Limited (VietNam) - Branch in Bac Switzerland Concrete admixture, waterproofing,
Ninh concrete repair and
protection systems
63 Fortuna Advanced Materials (Bac Ninh) Taiwan Tapes
Co., Ltd
64 Fushan Technology (Vietnam) Limited Taiwan Mobile phone
Liability Company
65 Idea L Print Vietnam Co., Ltd Taiwan Package printing
66 King Power (Bac Ninh) Co., Ltd Taiwan Generator
67 King Win Material Technology Co., Ltd - Taiwan Steel processing
Bac Ninh Branch
68 Leadlink Bac Ninh Limited Taiwan Photo printers
69 Shih Lin Vietnam Electrical Engineering Taiwan Motorcycle parts
Co., Ltd - Bac Ninh Branch
70 Strong Light Bac Ninh Co., Ltd Taiwan Electronic parts
71 Sunzex Company Limited Taiwan Stationery
72 - Taiwan PCB board testing equipment
73 Transaction Branch-Tung Shin Industries Taiwan Aluminum products, mold
Co., Ltd
74 Advanex (Vietnam) Ltd Thailand Springs and precision components
75 Srithai (Ha Noi) Co., Ltd Thailand PET bottle preform

122
76 Branch of Avery Dennison (Vietnam) USA Adhesive technologies display
Limited in Bac Ninh graphics, packaging
materials
77 Branch of Suntory Pepsico Vietnam USA Food & beverage
Beverage Co., Ltd in Bac Ninh
78 Unigen Vietnam Ha Noi Co., Ltd USA Printed circuit boards, precision
mechanical parts
79 ALS East Hanoi JSC Viet Nam Air freight service, on-site air cargo
clearance
80 An Phu Irradiation JSC – Branch 02 Viet Nam Irradiation services
81 Asia Food Chemical JSC Viet Nam Food additive
82 Autotech Machinery., JSC Viet Nam Precision engineering
83 BW Industrial Development Joint Stock Viet Nam Warehouse, logictic service
Company
84 Cat An Corporation - Bac Ninh Branch Viet Nam Additives, raw materials for the food,
animal feed industry.
85 Dry Cell and Storage Battery Joint Stock Viet Nam Battery
Company
86 EC Joint Stock Company Viet Nam Supporting industry
87 Fortune - Nano Electrical Company Viet Nam Electric equipments
88 Hai Ha Confectionery Joint Stock Viet Nam Confectionery
Company
89 Asia Chemical Corporation (ACC) Viet Nam Plastic products
90 Hoang Lam Trading and Foods Viet Nam Food additive
Technology JSC
91 Kanto Vietnam Corporation Viet Nam Motorcycle parts
92 Kido Frozen Foods Co., Ltd - Bac Ninh Viet Nam Ice-cream and milk
branch
93 KIDO Group Corporation Viet Nam Instant noodle
94 Long Truong Auto JSC Viet Nam Automotive parts
95 Nanosome Techpharma., JSC Vietnam Pharmaceutical
96 Thanh Phat Trading, Commercial and Viet Nam Garments
Investment Co., Ltd
97 Binh Minh Infrastructure Investment and Viet Nam Garment
Trading JSC
98 Thanh Thu Development and Business Viet Nam Garment
Investment Joint Stock
Company
99 - Viet Nam Garment
100 Pharmaceutical Company Fito Pharma Viet Nam Traditional pharmacy
101 Post & Telecommunication Equipment Viet Nam Telecom products
JSC (POSTEF)
102 - Viet Nam Electrics& Electronics
103 Ton Dong A Bac Ninh Co., Ltd Viet Nam Steel processing
104 Trang An Serpro., JSC Viet Nam Medical equipment
105 VB Pharma Corporation Viet Nam Veterinary medicine
106 Vietnam Supporting Industry JSC Viet Nam Precision engineering
107 Zion Precision Moulds Co., Ltd Viet Nam Precision Moulds
108 Viet Huong Group JSC Vietnam Comestic
109 Vietnam Smart Technology Application Viet Nam Precision engineering
and Mechanical Trading
Company Limited

123
VSIP BAC NINH INDUSTRIAL ZONE – BUSINESS HUB

GENERAL INFORMATION

▪ Tu Son town, Bac Ninh province, Vietnam


Address
▪ VSIP Bac Ninh Co., Ltd
․ Address: No.1, Huu Nghi Rd, VSIP Bac Ninh, Tu Son town, Bac Ninh province,
Vietnam
Investor
․ Tel: (84-222) 3 765 668
․ Fax: (84-222) 3 765 666
․ Website: http://www.vsip.com.vn/
Mr. Cao Phan Tuan (Tony) – Marketing Manager - Mobile: (84) 946 050 520 -
Contact Person
Email:Tuan.cp@vsip.com.vn
- 25 km from Hanoi city
- 15 km from Noi Bai International Airport
Location - 130 km from Hai Phong seaport
- Adjacent to Hanoi-Thai Nguyen Highway and HW no.18, 10 km from
Tu Son railway station.
R&D centers, Data center, Design Center, Headquarter
Priority Sectors for Investment
Office, hi-tech industries, Showroom & repair
Investment Area
Restricted Sectors for Investment Polluting industries: dyeing, plating etc.

Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

▪ Start date: Feb 2007


Lease term
▪ End date: Feb 2057

Minimum Lease Area 3,000 m2

Limit for Construction


Height - 25 meters/ 6 storeys
Permitted Construction - 50% to 60%
Rate
▪ Total area: 20 ha
Planned area
▪ Total Leasable area: 10 ha
Factory Available for
▪ None
Rent

Operation Status ▪ Available for immediate construction

Occupancy Rate and


0%
Number of Projects
Number of Korean
None
Projects
▪ Land lease fee: 250 USD/m2/whole project life
▪ Payment
Accepting Letter of Offer (Booking fee): 10% of land price
Lease fee
- Issuance of the Licenses: 30% of land price
- Signing of Land Lease Agreement: 30% of land price
- Handover: 30% of land price
▪ Management fee: 0.07 USD/m2/month
▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee ▪ Water fee: 10,000 VND (~0.4 USD)/m3
▪ Wastewater treatment fee: 4,700 VND (~0.21 USD)/m3
▪ Waste treatment fee: According to contract with supplier

INFRASTRUCTURE AND FACILITY

124
Financial institution Maritime Bank, Vietcombank - Hưng Yên branch, ACB, Agribank, Techcombank

Tax service, State finance


02 km from Tax Agency
office

Customs Service Inside the industrial zone

Logistics Inside the industrial zone

Post office Inside the industrial zone

Medicare 2km from Tu Son Hospital, Medicare Center

Police, public security 24/7 security service.

Universities, training
2km from Tu Son Hospital, Medicare Center
facilities, etc.

Recruitment Support from IZ developers

Worker dormitory Worker Dormitory project available and demanding from tenants

Worker's child education


0.5 km from the nearest Facility
facility

One-stop service Inside the zone

Road Width 45m, 32m and 24m

IT & Tele-communication Telecommunication systems and international standards are always ready to meet the
Facilities communication needs
Emergency Power
NA
generator
The water supply network for firefighting is designed in conjunction with the potable water
Fire-fighting facility supply network, which is located along the roads. The distance among fire hydrants is 120 m -
150 m with a diameter of D125 mm.

Layout Plan

125
Location Map

126
VSIP BAC NINH II INDUSTRIAL ZONE

GENERAL INFORMATION

▪ Yen Phong district, Bac Ninh province, Vietnam


Address
▪ VSIP Bac Ninh Co., Ltd
․ Address: No.1, Huu Nghi Rd, VSIP Bac Ninh, Tu Son town, Bac Ninh province,
Vietnam
Investor
․ Tel: (84-222) 3 765 668
․ Fax: (84-222) 3 765 666
․ Website: http://www.vsip.com.vn/
Mr. Cao Phan Tuan (Tony) – Marketing Manager - Mobile: (84) 946 050 520 - Email:
Contact Person
Tuan.cp@vsip.com.vn
- 25 km from Hanoi city
- 15 km from Noi Bai International Airport
Location - 130 km from Hai Phong seaport
- Adjacent to Hanoi-Thai Nguyen Highway and HW no.18, 10 km from
Tu Son railway station.
Electronics, Precision Engineering, FMCG,
Priority Sectors for
Automotive components, Logistics, Pharmacy
Investment
Investment Area and Medical Devices etc.
Restricted Sectors
Polluting industries: dyeing, plating etc.
for Investment

Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

▪ Start date: Feb 2019


Lease term
▪ End date: Feb 2069

Minimum Lease Area 10,000 m2

Limit for Construction


Height - 18 meters/ 4 storeys
Permitted Construction - 50% to 60%
Rate
▪ Total area: 273 ha
Planned area
▪ Total vacant leasable area: 200 ha

Factory Available for Rent ▪ NA

Operation Status ▪ Under Construction

Occupancy Rate and


▪ 0%
Number of Projects

Number of Korean Projects None

▪ Land lease fee: 110 USD/m2/whole project life


▪ Payment:
Accepting Letter of Offer (Booking fee): 10% of land price
Lease fee
- Issuance of the Licenses: 30% of land price
- Signing of Land Lease Agreement: 30% of land price
- Handover: 30% of land price
▪ Management fee: 0.07 USD/m2/month
▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee ▪ Water fee: 9,000 VND (~0.4 USD)/m3
▪ Wastewater treatment fee: 4,700 VND (~0.21 USD)/m3
▪ Waste treatment fee: According to contract with supplier

INFRASTRUCTURE AND FACILITY

127
Financial institution Vietcombank, Agribank, Vietinbank

Tax service, State finance


02 km from Tax Agency
office
4 km from the nearest Customs Agency
Customs Service
15 km from the nearest Inland Container Depot

Logistics 4 km from the nearest Logistic Center

Post office 2 km from the nearest Mailing Post Office

Medicare 2km from Yen Phong Hospital, Medicare Center

Police, public security 2km from the nearest Police Station

Universities, training
5km from Vocational Training Center
facilities, etc.

Recruitment Support from IZ developers

Worker dormitory 0.5km from the nearest Facility

Worker's child education


0.5 km from the nearest Facility
facility

One-stop service Inside the zone

Road Width 45m, 32m and 24m

IT & Tele-communication Telecommunication systems and international standards are always ready to meet the
Facilities communication needs
Emergency Power
NA
generator
The water supply network for firefighting is designed in conjunction with the potable water
Fire-fighting facility supply network, which is located along the roads. The distance among fire hydrants is 120 m -
150 m with a diameter of D125 mm.

Layout Plan

128
Location Map

129
THUAN THANH II INDUSTRIAL ZONE

GENERAL INFORMATION

▪ Thanh Khuong Commune, Thuan Thanh District, Bac Ninh Province


Address
Shun – Far Land Deverlopment Co.ltd (Taiwan)
Investor
▪ Address: No 77 Thanh Cong, Chua Dan, Dinh Bang wards, Tu Son town, Bac Ninh Province

Contact Person N/A

- Land: Located alongside the National Road 38 and Ho Town, 30km from Hanoi Capital, 12km
from Bacninh City
Location
- Seaport: 90km from Haiphong seaport
- Airport: 55km from Noi Bai International Airport
Priority Sectors for Electronics, Precision Engineering
Investment
Investment Area
Restricted Sectors for
Polluting industries: dyeing, plating etc.
Investment

Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

▪ Start date: Feb 2011


Lease term
▪ End date: Feb 2061

Minimum Lease Area 10,000 m2

Limit for Construction


Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Permitted Construction Residential Planning regulation (QCXDVN 01: 2008/BXD)
Rate

Planned area Total area: 250 ha

Factory Available for Rent NA

Operation Status In Operation

Occupancy Rate and


▪ 100%
Number of Projects

Number of Korean Projects 16 companies

Lease fee ▪ Land lease fee: 50-100 USD/m2 (depending on location and lease area)

▪ Management fee: 0.4 - 0.6 USD/m2/year


▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee ▪ Water fee: approximately 0.5 USD/m3
▪ Wastewater treatment fee: 80% of clean water fee
▪ Waste treatment fee: According to contract with suppliers

INFRASTRUCTURE AND FACILITY

Financial institution Vietcombank, Agribank, Vietinbank

Tax service, State finance


16.9 km from Tax Agency
office
16.4 km from the nearest Customs Agency
Customs Service
22 km from the nearest Inland Container Depot

Logistics 10 km from the nearest Logistic Center

Post office 800 m from Thuan Thanh Mailing Post Office

130
Medicare 14 km from Yen Phong Hospital, Medicare Center

Police, public security 2km from the nearest Police Station

Universities, training
14 km from Bac Ninh University
facilities, etc.

Recruitment Support from IZ developers

Worker dormitory N/A

Worker's child education N/A


facility

One-stop service N/A

Road Width N/A

IT & Tele-communication Telecommunication systems and international standards are always ready to meet the
Facilities communication needs
Emergency Power
N/A
generator

Fire-fighting facility Available

Layout Plan

Location Map

131
Actual View

132
THUAN THANH III INDUSTRIAL ZONE

GENERAL INFORMATION

▪ Thanh Khuong Commune, Thuan Thanh District, Bac Ninh Province


Address
▪ Khai Son company Ltd
․Address:
- Head Office: Thuan Thanh 3 Industrial zone, Thanh Khuong Commune, Thuan Thanh
District, Bac Ninh province
- Representative: Room 5, 15th floor, Plaschem Building, No 562, Nguyen Van Cu St, Long
Investor Bien Dist., Hanoi, Viet Nam
․Tel: (84-241) 387 3062/ (84-24) 974 3582/ (84-24) 220 0495
Fax: (84-24) 220 0494
▪ Trung Quy Investment Stock company Bac Ninh
․Address: 263 Nguyen Trai road, Vo Cuong ward, Bac Ninh city, Bac Ninh province
․Tel/Fax: (84-241) 3 896 099

Contact Person ▪ Mr. Khai – (84) 913 305 029 - Email: Khaisoncompany@gmail.com

▪ Land: Located alongside the Provincial Road 282 (Ho - Phu Thuy Route), to the south of Ho
Town, 25km from Hanoi Capital, 17km from Bac Ninh City
Location
▪ Seaport: 85 km from Hai Phong seaport
▪ Airport: 47km from Noi Bai International Airport

Priority Sectors for Investment Electronics, Precision Engineering


Investment Area
Restricted Sectors for
Polluting industries: dyeing, plating etc.
Investment

Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

▪ Start date: NA
Lease term
▪ End date: NA

Minimum Lease Area 20,000 m2

Limit for Construction


Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Permitted Construction Residential Planning regulation (QCXDVN 01: 2008/BXD)
Rate

Planned area Total area: 300 ha

Factory Available for Rent N/A

Operation Status In Operation

Occupancy Rate and


100%
Number of Projects

Number of Korean Projects None

Lease fee Land lease fee: 50 - 100 USD/m2/whole project life

▪ Management fee: 0.794 USD/m2/year


▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee ▪ Water fee: approximately 0.515 USD/m3
▪ Wastewater treatment fee: 0.73 USD/m3
▪ Waste treatment fee: According to contract with suppliers

INFRASTRUCTURE AND FACILITY

Financial institution Vietcombank, Agribank, Vietinbank

133
Tax service, State finance
16.9 km from Tax Agency
office

Customs Service 16.4 km from the nearest Customs Agency

Logistics 22 km from the nearest Inland Container Depot

Post office 10 km from the nearest Logistic Center

Medicare 800 m from Thuan Thanh Mailing Post Office

Police, public security 14 km from Yen Phong Hospital, Medicare Center

Universities, training
2km from the nearest Police Station
facilities, etc.

Recruitment 14 km from Bac Ninh University

Worker dormitory Support from IZ developers

Worker's child education


NA
facility

One-stop service NA

Road Width NA

IT & Tele-communication
NA
Facilities
Emergency Power Telecommunication systems and international standards are always ready to meet the
generator communication needs

Fire-fighting facility NA

Layout Plan

Location Map

134
NAM SON HAP LINH INDUSTRIAL ZONE

GENERAL INFORMATION

Address Nam Son Commune, Bac Ninh city, Bac Ninh province

KinhBac City Development Holding Corporation


▪ Address: Lot B7, Que Vo Industrial park, Phuong Lieu commune, Que Vo district, Bac Ninh province,
Investor Vietnam.
▪ Tel: (84.222) 3634034
▪ Website: http://www.kinhbaccity.vn
Ms. Tran Thi Huong - Sales & Marketing Deputy Manager -
Contact Person
Mobile: (+84) 915-636 139 - Email: tthuong.kbc@gmail.com
- 5 Km from Bac Ninh City Center
- 35 Km from Noi Bai International Airport
Location - 110 Km from Hai Phong Seaport
- 02 Km from Highway No.01 and 09 Km from Hanoi – Lang Son (border with China) – NanNing
(China) Railway
Electronics industry, high-tech industry and supporting industries, banking,
Priority Sectors for
insurance, research and development activities, consulting ... (Decision No.
Investment
Investment Area 293/QĐ-UBND on 12/08/2013)
Restricted Sectors for Production of iron, steel, construction materials, paper, chemicals, textiles
Investment and textile products ... ((Decision No. 293/QĐ-UBND on 12/08/2013)

Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

▪ Start date: 2010


Lease term
▪ End date: 2060
Minimum Lease
2 ha
Area
Limit for
Construction Regulated by Bac Ninh Authority
Height
Permitted
Construction area is not more than 60% of the total leased land lot
Construction Rate
▪ Total area: 300 ha
Planned area ▪ Total vacant leasable area: 180 ha
▪ Total area with full infrastructure ready to build factory: unavailable
Factory Available
Not available
for Rent

Operation Status Under Construction and to be completed by 2021/In Land Clearance Process

Occupancy Rate
and Number of 0%
Projects
Number of
0
Korean Projects
▪ Land lease fee: 125USD/m2 (exclude VAT)
▪ Factory lease fee: N/A
▪ Payment:
Lease fee
- Method: Bank Transfer in VND
- Period: 40% after signing In-principle Agreement + 40 % after signing Land Sublease Contract + 20%
after Land Hand-over
▪ Management fee: N/A
▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from March 16th,
Operating fee
2015 (excluded VAT) for voltage from 22KV-110KV.
▪ Water fee: N/A
135
▪ Wastewater treatment fee: N/A

INFRASTRUCTURE AND FACILITY

Financial
BIDV, VIETIN BANK, VIETCOMBANK, AGRIBANK
institution
Tax service, State 10km from Bac Ninh finance office
finance office 8km from Bac Ninh provincial tax department
9 Km from Customs Agency Bac Ninh
Customs Service
10 Km from ICD Tien Son

Logistics 5-7 Km from the nearest Logistic Center

Post office 3 km from Vietnam Post Office

Medicare 3 Km from Bac Ninh General Hospital

Police, public 2km from Police Station


security
Universities, 8km from College of electromechanical & construction
training facilities,
etc.

Recruitment Available

Worker dormitory 5 Km

Worker's child 5 Km
education facility

One-stop service 6 Km from the nearest Facility

Road Width Main road: 32m, 4 lanes; By Road: 23m, 2 lanes

IT & Tele- Under construction


communication
Facilities
Emergency Power Available
generator
Fire-fighting Under construction
facility

Layout Plan

136
Location Map

137
GIA BINH I INDUSTRIAL ZONE

GENERAL INFORMATION

Nam Son and Phuong Lieu commune, Que Vo district, Bac Ninh Province, Vietnam
Address
KinhBac City Development Holding Corporation
▪ Address: Lot B7, Que Vo Industrial park, Phuong Lieu commune, Que Vo district, Bac Ninh
Investor province, Vietnam.
▪ Tel: (84-222) 3634 034
▪ Website: http://www.kinhbaccity.vn
▪ Tran Thi Huong - Sales & Marketing Deputy Manager - Mobile: +84 - 915-636 139 - Email:
Contact Person
tthuong.kbc@gmail.com
- 06 Km from Bac Ninh City Center
- 35 Km from Noi Bai International Airport
Location - 110 Km from Hai Phong Seaport
- 03 Km from Highway No.01 and 09 Km from Hanoi – Lang Son (border with China) –
NanNing (China) Railway
Electronics industry, high-tech industry and supporting industries,
Priority Sectors for
banking, insurance, research and development activities, consulting ...
Investment
(Decision No. 293/QĐ-UBND on 12/08/2013)
Investment Area
Production of iron, steel, construction materials, paper, chemicals,
Restricted Sectors for
textiles and textile products ... ((Decision No. 293/QĐ-UBND on
Investment
12/08/2013)

Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

▪ Phase 1: 2002 - 2052


Lease term
▪ Phase 2: 2007 - 2017

Minimum Lease Area 10,000 m2

Limit for Construction


Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residential Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction Construction area is not more than 65% of the total leased land lot
Rate
▪ Total area: 611 ha
Planned area
▪ Total vacant leasable area: Unavailable

Factory Available for Rent ▪ Total area: 30,000 m2 (4,000-5,000 per factory, expected at the end of 2019)

Operation Status ▪ In operation

Occupancy Rate and ▪ 100%


Number of Projects ▪ 125 Projects

Number of Korean Projects ▪ 46 projects

▪ Land lease fee: 85 USD/m2


▪ Factory lease fee: 3.5 USD/m2/month
▪ Payment:
Lease fee
- Method: Bank Transfer in VND
- Period: 40% after signing In-principle Agreement + 40 % after signing Land Sublease
Contract + 20% after Land Hand-over
▪ Management fee: 0.5 USD/m2/year (excluded VAT)
▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from March
Operating fee 16th, 2015 (excluded VAT) for voltage from 22KV-110KV.
▪ Water fee: 8,700 VND (~0.37 USD) /m3 (excluded VAT)
▪ Wastewater treatment fee: 7,200 VND (~0.3 USD)/m3 (excluded VAT)

INFRASTRUCTURE AND FACILITY

138
Financial institution BIDV, Vietin Bank, Vietcombank, Agribank

Tax service, State finance 6 km from Bac Ninh Tax Office


office 7 km from Bac Ninh State Treasury Office
2 Km from Customs Agency Que Vo
Customs Service
15 Km from ICD Tien Son

Logistics 2 Km from the nearest Logistic Center: Yusen Logistics

Post office 1 km from Vietnam Post Office

Medicare 4 Km from Bac Ninh General Hospital

Police, public security 500 m from Que Vo Police Station

Universities, training
500 m from Viet Nhat College
facilities, etc.

Recruitment Kinh Bac will support in recruitment

Worker dormitory 5 Km from the zone

Worker's child education


5 Km from the zone
facility

One-stop service 6 Km from the nearest Facility

Road Width Main road: 32m, 4 lanes; By Road: 23m, 2 lanes

IT & Tele-communication The telecommunication system complies with international standards and is always available for
Facilities communication demand with high data transmission s
Emergency Power
Available
generator

Fire-fighting facility Available. Water supply system for firefighting is located along each road.

Layout Plan

139
Location Map

Actual View .

140
[- This Page is intentionally left blank -]

141
BEN TRE

142
INVESTMENT ENVIRONMENT IN BEN TRE

GENERAL INFORMATION

▪ Area: 2.379,7 km2


Area, Population
▪ Population: 1.298 million (2022 statistic)
▪ Ben Tre is located in Mekong River Delta Region, 86 km away from Ho Chi Minh city
Geographical Location and 120 km away from Can Tho city.

▪ Tien Giang Province to the north, Vinh Long to the west and southwest, Tra Vinh
Adjacent provinces
Province to the south.
2022 statistic:

▪ GRDP: 63,585.3 billion

▪ GRDP growth: 7.33%

GRDP ▪ GRDP per capita: 49 million VND/year

▪ Economic Structure:

- Industry and Construction: 20.58%

- Service: 40.63%

- Agriculture, Forestry and Fishery: 35.37%


2022 statistic:

▪ Industry - Construction growth: 9.1%

▪ Agriculture, forestry and fishery growth: 4.43%


Industry growth
▪ Service growth: 0.2%

▪ Import – Export:

- Export turnover: 1,510 milion USD

- Import turnover: 570 milion USD

PCI ▪ Score: 68.04 – ranked 13th out of 63 cities and provinces in Vietnam (2022).

SOCIAL INFRASTRUCTURE

▪ Roadway: National highways 57 and 60 connect Ben Tre with the Mekong Delta region
and Ho Chi Minh city. Rach Mieu bridge, Ham Luong bridge, and Co Chien bridge play an
important role, connecting Tien Giang, Ben Tre and Tra Vinh.

▪ Waterway: The coastline is 65 km long. Besides, a 6.000 km-long network of rivers and
canals (4 major rivers including Tien river, Ba Lai river and Ham Luong river) is an arterial
Transportation
traffic route from Ben Tre to the Southwestern province and Ho Chi Minh city.

▪ Port:
- 1 River port: Tan Cang Giao Long.
- 3 Fishing port: Binh Thang, An Thuy, An Nhon.

Electricity ▪ Supplied from the national power network.

Water

143
Capacity of clean water supply 36.000 m3/day.

▪ Training Center of Ho Chi Minh city National University in Ben Tre, 2 colleges, 4
Education vocational secondary schools, 9 vocational training centers, 10 continuing education centers
at district and provincial levels.
▪ 04 provincial hospitals (1 general and 3 specialize hospital), 01 private general hospital,
Medicare
each district has 01 general hospital.

INVESTMENT CONDITION

Human resource ▪ Around 70.2% of population in working age (2022).

Education level ▪ Trained labor rate: 62.09% (2022).

▪ The minimum salary for the province is applied as follows (see appendix for detail
amount):

- Area II: including: Ben Tre city, Chau Thanh district.

- Area III: including: Ba Tri district, Binh Dai district, Mo Cay Nam district.
Salary
- Area IV: including: Cho Lach district, Giong Trom district, Mo Cay Bac district, Thanh
Phu district.

▪ The lowest wage for trained labor (including those trained by the enterprises) must be at
least 7% higher than the above referenced basic salary

▪ Incentives according to government regulations:


Investment incentives
- Preferential tax rates and exemption period, reduction for corporate income tax.
▪ Prioritized Projects:

- Projects in construction and infrastructure of industrial zones and clusters.

- Projects in tourism and complex resorts on the dunes, riverside, sea tourist; sea tourist
areas, coastal urban areas, sea enroachment.

- Factory processing value-added products from agriculture and fishery (coconut, shrimp-
fish, fruit).
Fields Attracting
Investment - Trade center, supermarket.

- Logistic infrastructure (ports, transportation services, warehouses..)

- Health, education (high quality), health care centers for the elderly.

- Construction and development of residential areas, new urban areas in Ben Tre city and
district centers.

- Projects in high-tech agriculture.

144
Map

Department of Planning and Investment (Ben Tre Start-up and Investment Promotion
Center)
▪ Address: 28 Le Dai Hanh Street, Ward An Hoi, Ben Tre City, Ben Tre Province.
▪ Tel: (84-275) 3 825340/ 3 575691
▪ Email: duyensipcbentre@gmail.com
Contact ▪ Website: www.sipcbentre.gov.vn
Industrial Zone Authority
▪ Address: 87A, 30/4 Street, Ward An Hoi, Ben Tre City, Ben Tre Province.
▪ Tel: (84-275) 3 817474
▪ Fax: (84-275) 3 817718
▪ Email: bqlcn@bentre.gov.vn

LIST OF INDUSTRIAL ZONES IN BEN TRE

No Industrial zone Name Total Area (ha) Occupancy Rate Status


1 Giao Long Industrial Zone 96,3 100% In Operation
2 An Hiep Industrial Zone 72 100% In operation
3 Phu Thuan Industrial Zone 231,78 0% Under Construction

145
GIAO LONG INDUSTRIAL ZONE

GENERAL INFORMATION
Address An Phuoc commune and Giao Long commune, Chau Thanh district, Ben Tre province
Project Management Board of Infrastructure Development of Industrial Zones
Investor ▪ Address: 87A, 30/4 Street, Ward An Hoi, Ben Tre City, Ben Tre Province.
▪ Tel: (84-275) 3 836688
▪ Fax: (84-275) 3 817675

Contact Person Mr. Son – Manager – (84) 918820868

Location ▪ Highway traffic: 06km away from National high way No.60, 12km away from the center of
Ben Tre City, ≤ 16Km away from expressway Trung Luong - Ho Chi Minh city.
▪ Port: 4.5 km from Tan Cang Giao Long Port
▪ Airport: 89km from Tan Son Nhat International Airport

Investment Sectors Priority Sectors for Multi-Industry


Investment
Investment Restricted Production of iron, steel, construction materials, chemicals...
Sectors
Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term ▪ Start date: 10/2007
▪ End date: 10/2077
Minimum Lease Area 10,000 m2
Limit for Construction
Height
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Permitted Construction Residential Planning regulation (QCXDVN 01: 2008/BXD)
Rate

Planned area ▪ Total area: 96.3 ha

Factory Available for Rent None

Operation Status In operation


Occupancy Rate and ▪ Occupancy Rate: 100%
Number of Projects ▪ Number of Projects: 36

Number of Korean 3 projects


projects
Lease fee ▪ Land lease fee: 206,730 – 320,000 VNĐ/m2/50 years

Operating fee ▪ Management fee and Infrastructure maintenance fee: 5,168 – 6,300 VNĐ/USD/m2/year
(VAT not included)
▪ Electricity fee: as regulated by the Government
▪ Water fee: 10,000 VND/m3
▪ Wastewater treatment fee: 3,101 – 4,200 VNĐ/m3 (VAT not included)

List of Projects in Industrial Zone

146
No. Name of Company Nationality Business line

1 Unihwasin Vina Co., Ltd Korea Silkscreen printing


2 Gen Nex Apparel Co., Ltd Thailand Make clothes
3 Green Creative Trading Production Joint Thailand Sewing accessories
Stock Company
4 Wally Vietnam Packaging Co., Ltd China plastic bag
5 Family Vietnam Handbag Textile Co., Ltd China Weaving, producing backpacks
and bags
6 Jea-Must Vietnam Co., Ltd China Garment processing
7 Unisoll Vina Co., Ltd Korea Garment production
8 Coronet Vietnam Co., Ltd Italy Synthetic leather production
9 Himaru Ben Tre Co., Ltd Korea Producing backpacks and bags
10 Sigma Vietnam Industry Co., Ltd China Producing all kinds of towels,
shoes
11 Min Wie Vietnam Co., Ltd China Producing all kinds of towels
12 Alliance One Garment Co., Ltd Thailand Make clothes
13 Viet World Co., Ltd Thailand Processing coconut products
and noodles, pho
14 Furukawa Automotive Systems VN Co., Japan Manufacture of car wiring
Ltd harness
15 Jacobi Carbons Vietnam Co., Ltd France Production of activated carbon
16 PungKook Ben Tre 1 TV Co., Ltd Korea Producing outsourcing, bags
17 Nidec Tosok Precision VN 1 TV Co., Ltd Japan Manufacture of components in
car gearboxes
18 Branch of Puratos Grand-Place Vietnam Belgium Processing cocoa beans
Co., Ltd
19 Yong Qing International Co., Ltd China Make clothes
20 Genoa Group Co., Ltd China Manufacture of all kinds of
garments
21 Phuong Dong Production Trading Joint Vietnam Production of industrial plastic
Stock Company packaging
22 Dinh Phu My Coconut Co., Ltd Vietnam Producing coconut products
23 CNN An Phat Joint Stock Company Vietnam Production of steel structures
24 Dong Hai Ben Tre Joint Stock Company Vietnam Paper production and business
25 Kien Giang Canned Food Joint Stock Vietnam Seafood production, canned
Company food
26 Winbee Food & Beverage Production Vietnam Food and confectionery
and Business Co., Ltd production
27 Mekong Plastic Joint Stock Company Vietnam Production of plastic and paper
(Ben Tre Branch) packaging
28 Viet Thanh Garment Trading Joint Stock Vietnam Make clothes
Company
29 Duc Hau Long CNC and Lighting Vietnam Manufacture of lighting
Equipment Joint Stock Company equipment

147
30 Asia Coconut Processing Joint Stock Vietnam Processing coconut products
Company
31 Thanh Cong Energy Service Joint Stock Vietnam Steam, electricity
Company
32 Ben Tre Packaging One Member Vietnam Producing paper carton
Company Limited packaging
33 Nam Viet Pharmaceutical Co., Ltd Vietnam Producing functional foods
34 VietNat One Member Company Limited Vietnam Food production, natural
essential oils
35 Asean Packaging Import-Export Joint Vietnam Producing of paper packaging
Stock Company

148
AN HIEP INDUSTRIAL ZONE

GENERAL INFORMATION
Address An Hiep commune, Chau Thanh district, Ben Tre province
Project Management Board of Infrastructure Development of Industrial Zones
Investor ▪ Address: 87A, 30/4 Street, Ward An Hoi, Ben Tre City, Ben Tre Province.
▪ Tel: (84-275) 3 836688
▪ Fax: (84-275) 3 817675

Contact Person Mr. Son – Manager – (84) 918820868


Location ▪ Highway traffic: 10km away from National high way No.60, 12km away from the center of
Ben Tre City, ≤ 16Km away from expressway Trung Luong - Ho Chi Minh city.
▪ Port: 20 km from Tan Cang Giao Long Port
▪ Airport: 97 km from Tan Son Nhat International Airport

Investment Sectors Priority Sectors for Multi-Industry


Investment
Investment Restricted None
Sectors
Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term ▪ Start date: 4/2007
▪ End date: 4/2077
Minimum Lease Area 10,000 m2
Limit for Construction Height

In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Permitted Construction Rate Residential Planning regulation (QCXDVN 01: 2008/BXD)

Planned area ▪ Total area: 72

Factory Available for Rent None

Operation Status In operation


Occupancy Rate and Number ▪ Occupancy Rate: 100%
of Projects ▪ Number of Projects: 16

Number of Korean projects None

Lease fee ▪ Land lease fee: 248.000 VNĐ/m2/50 years

Operating fee ▪ Management fee and Infrastructure maintenance fee: 5.168 VNĐ/USD/m2/year (VAT not
included)
▪ Electricity fee: as regulated by the Government
▪ Water fee: 10,000 VND/m3
▪ Wastewater treatment fee: 3.101 VNĐ/m3 (VAT not included)

149
List of Projects in Industrial Zone

No. Name of Company Nationality Business line


[STT] [Tên dự án] [Quốc gia] [Ngành nghề kinh doanh]

1 C.P Vietnam Joint Stock Company - Ben Tre Thailand Seafood processing
Frozen Branch
2 C.P Vietnam C.P. Joint Stock Company - Aqua Thailand Production of aquatic feed
feed manufacturing and trading industry
3 C.P Vietnam Joint Stock Company - Thailand biotechnology products and
Biotechnology Workshop Branch chemicals used in shrimp
farming
4 Viet Uc Co., Ltd. aqua feed Australia Processing coconut products
5 Covina Co., Ltd Vietnam Sugar production
6 Ben Tre Sugar Joint Stock Company Vietnam Processing coconut products
7 Luong Quoi Coconut CB Co., Ltd - Thanh Vinh Vietnam Processing coconut products
CB Factory 1
8 Luong Quoi Coconut CB Co., Ltd - Thanh Vinh Vietnam Processing seafood products
CB Factory 2
9 Hai Huong Seafood Joint Stock Company - Vietnam Processing aquatic food
CBTS Export Factory
10 Hai Huong Seafood Joint Stock Company - Vietnam Food Processing
CBTA
11 Go Dang An Hiep One Member Co., Ltd Vietnam Seafood processing and
fishmeal
12 One Member Company Limited Go Dang Ben Vietnam Food Processing
Tre
13 Truc Giang Seafood Processing Co., Ltd Vietnam Seafood processing
14 CBTS Hung Vuong Ben Tre Co., Ltd Vietnam Production of unburnt bricks
15 Nam Viet Brick Manufacturing Joint Stock Vietnam Seafood processing
Company

150
PHU THUAN INDUSTRIAL ZONE

GENERAL INFORMATION
Address Phu Thuan commune, Binh Dai district, Ben Tre province
Ben Tre Province Civil and Industrial Construction Investment Project Management
Investor Board
▪ Address: 14C1 Dong Khoi Boulevard (8th floor of Sacombank building), Ward 4, Ben Tre
City, Ben Tre Province.
▪ Tel: (84-275) 3 824798

Contact Person Mr. Hiep – Manager – (84) 913657856

Location ▪ Highway traffic: 10km away from National high way No.60, 17km away from the center of Ben
Tre City, ≤ 16Km away from expressway Trung Luong - Ho Chi Minh city.
▪ Seaport: 95 km from Cat Lai port, 10 km from Tan Cang Giao Long Port
▪ Airport: 102 km from Tan Son Nhat International Airport

Investment Sectors Priority Sectors for Multi-Industry


Investment
Investment Restricted None
Sectors
Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term ▪ Start date: 4/2007
▪ End date: 4/2077
Minimum Lease Area 10,000 m2
Limit for Construction
Height

In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Permitted Construction Planning regulation (QCXDVN 01: 2008/BXD)
Rate

Planned area ▪ Total area: 231

Factory Available for Rent None

Operation Status Under Construction


Occupancy Rate and ▪ Occupancy Rate: 0%
Number of Projects ▪ Number of Projects: None

Number of Korean projects None

Lease fee ▪ Land lease fee: under construction

Operating fee ▪ Management fee and Infrastructure maintenance fee: under construction
▪ Electricity fee: as regulated by the Government
▪ Water fee: 10,000 VND/m3
▪ Wastewater treatment fee: under construction

151
[- This Page is intentionally left blank -]

152
BINH DINH

153
INVESTMENT ENVIRONMENT IN BINH DINH

USD/VND 23.510

GENERAL INFORMATION
Area 6071 km2
Population 1,5 million people (2022)
▪ Binh Dinh is located in South Central Coast region.
▪ The province runs 110 km north-sou0th. It lies 1,065km south from Hanoi, 686 km north from Ho
Geographical Location
Chi Minh City, 300 km south from Da Nang City, and 300 km east from Bo Y Border Gate to Laos
in Kon Tum Province.
▪ Binh Dinh is surrounded by Quang Ngai province to the north, Gia Lai province to the east and
Adjacent provinces
Phu Yen province to the south.
2022 statistic:
▪ Real GRDP (billion VND): 106.349 (4,49014143972979 billion USD)
▪ GRDP growth: 8,57%
▪ GRDP per capita
70,79 (2997 USD)
(million VND/year):
GRDP
▪ Economic structure:
- Industry - Construction: 30,05%
- Agriculture. forestry and
27,38%
fishery:
- Service: 38,16%
▪ Industry - Construction
8,55%
growth:
Industry growth ▪ Agriculture, forestry and
3,26%
fishery growth:
▪ Service growth: 12,61%
Import turnover (billion USD): 0.46 (Growth rate: -0,01)
Import - Export
Export turnover (billion USD): 1.330 (Growth rate: 20.3%)
The major economic sectors of the province are fisheries and mineral, agricultural and forestry
processing industries, of which the manufacture of wood products makes Binh Dinh's reputation as
a big exporter of furniture.
▪ 70% of its population involving in agricultural activities, including rice, cereal, fruit and vegetable
crop cultivation, livestock growing and pepper growing (esp. in some mid-land or mountainous
areas where the soil is suitable for the crop). Binh Dinh is also suitable for industrial tree crops such
Key Industry as cashew, acacia and eucalyptus.
▪ With a good number of wood tree plantations in the province and Quy Nhon international Seaport
situated in Quy Nhon, there have been some good development and establishment of wood
processing and indoor and outdoor furniture factories in Binh Dinh Province.
▪ Whilst most industrial establishments for export purposes concentrates in Quy Nhon or its vicinity,
garment plants/factories are usually spread out to districts areas such as Tay Son, Phu Cat, Phu My,
Hoai Nhon and Hoai An for accessing to and attracting cheap laborers in the rural areas.
PCI 66.65
Ranking 21
SOCIAL INFRASTRUCTURE
▪ Roadway: Roads: National Highway 1A (118 km), National Highway 1D (21.6 km) and National
Highway 19 (69.5 km); National Highway 19B (60 km); National Highway 19C (151.4 km);
sufficient system of provincial, district and rural roads.
▪ Railway: The national railway (150 km long) going through the province (Dieu Tri is a national
station).
Transportation
▪ Waterway: Quy Nhon international port handling about 4 million tonnes per year. It is the most
convenient international gateway between the Central Highlands and neighboring countries of
Cambodia and Laos; Thi Nai port handling about 0.8 million tonnes per year. Nhon Hoi port with
capacity of 12 million tonnes per year is now under construction.
▪ Airway: Phu Cat Airport (domestic), 30 km from Quy Nhon City.
154
▪ According to EVN's price frame (for manufacturing industries, the average price is 1,536
Electricity
VND/kWh - 2,759 VND/kWh)
▪ In accordance with Decision No.1052/QD-UBND dated March 31, 2022 of Binh Dinh Provincial
People's Committee
Water
- Becamex Industrial Park: 8,500 VND/m3
- Industrial parks: 12,100 VND/m3
▪ 203 preschools, 243 primary schools, 146 junior high schools, 50 senior high schools, 5 colleges, 3
Education & Training
universities, 01 science center
▪ Proportion of population participating in health insurance: 96.02%
▪ Percentage of health stations with doctors: 100%
Medicare ▪ Rate of communes meeting national standards on health care: 100%
▪ Number of hospital beds per 10,000 people: 35 beds
▪ Percentage of rural population using hygienic water: 100%
INVESTMENT CONDITION
Human resource 60% of population are in the working age (2022)
Education level Trained labor rate: 60,9% (2022)
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): N/A
- Area II (4,160,000 VND/month): N/A
Salary - Area III (3,640,000 VND/month): An Nhon town
- Area IV (3,250,000 VND/month): The districts of Hoai Nhon, An Lao, Phu Cat, Phu My, Tuy
Phuoc, Tay Son, Van Canh, Vinh Thanh, Hoai An
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum
wages paid to employees working under employment contracts)
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
Investment incentives
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
5 groups of key sectors: ▪ Industrial development;
▪ Tourism development;
Fields Attracting
▪ Development of port and logistics services, including seaports and airports;
Investment
▪ Development of agriculture, forestry and fishery based on high technology;
▪ Urban economic development in association with urbanization
▪ Total development investment capital in the province by 2022 is estimated at 29,949.7 billion
VND, exceeding 10.3% of the year plan and increasing by 10.1% compared to 2021.
Investment attraction ▪ State capital reached 5,531.8 billion VND, up 1.2%; non-state capital reached 21,109.7 billion
situation VND, up 4.7%; foreign direct investment capital reached 3,308.2 billion VND.
▪ The localities attracting many projects and investment capital are Quy Nhon city, Hoai Nhon and
An Nhon towns, and Tuy Phuoc and Tay Son districts .
The province is home to six industrial parks, including Nhon Hoi EZ on the largest land plot of over
Industrial zones
14,000 hectares.

155
Map

Department of Planning and Investment Binh Dinh


▪ Address: No. 35 Le Loi Street, Quy Nhon City, Binh Dinh Province

▪ Tel: Tel: (84) 0256. 3818888


Contact
▪ Email: Email: ipcbinhdinh@gmail.com
▪ Contact person:
- Mr. Nguyen Thuc Dinh - Director
- Tel: 84-91401231
- Email: dinhnt@skhdt.binhdinh.gov.vn

156
LIST OF INDUSTRIAL ZONES IN BINH DINH PROVINCE

No Industrial zone Name Total Area (ha) Occupancy Rate Status


1 BECAMEX VSIP BINH 1,425ha 8% in phase I Ready for construction and
DINH obtaining LURC (Active)
2 HOA HOI INDUSTRIAL 266.18 ha - In Operation
PARK
3 NHON HOI INDUSTRIAL 394ha 58%
PARK - PARK A
4 Phu Tai Industrial park 345,8 ha 98%.

MAP OF INDUSTRIAL ZONES IN BINH DINH

157
BECAMEX VSIP BINH DINH

GENERAL INFORMATION
Address Subdivision 7, Nhon Hoi Economic Zone, Binh Dinh Province
Becamex Binh Dinh Joint Stock Company
Investor - Address: 11 Ngo May Str, Nguyen Van Cu Ward, Quy Nhon City, Binh Dinh Province
- Tel: 0256 3636 668
- Email: info@becamexbinhdinh.com.vn
- Website: www.becamexbinhdinh.com.vn

Contact Person ▪ Hien Nguyen (Bob), Marketing Director, +84 98 9966 936, hien.nt@becamexbinhdinh.com.vn
▪ Kang Ho-dong, Representative in Korea, +82 1053187861, becamex@naver.com

Location - 19km from Quy Nhon City


- 32km from Phu Cat Airport
- 22km from Quy Nhon International Seaport
- 9km from Dieu Tri railway station
- 8km to 1A highway, 11km to 1D highway, 18km to 19 highway

Investment Sectors Priority Sectors for - Electronics & electrical


Investment - Automobile manufacture and assembly
- Manufaturing mechanical engineering
- Products of support industries for hi-tech
- Textile and garment industry
- Leather and footwear
- Food and beverage industry
- Logistic, warehouse and support industry
Investment Restricted - Textile dyeing
Sectors - Plating
Minimum wage Area IV According to Decree 38/2022/ND-CP
Lease term Start date: 2020
End date : 2070
Minimum Lease Area 1 ha
Limit for Construction According to QCVN 01:2021/BXD national technical regulation on construction planning
Height

Permitted Construction The maximum construction density of a land lot for building factories and warehouses is 70%.
Rate In case of factory construction with more than 05 floors , the maximum construction density is
60%.

Planned area ▪ Total area: 1,425ha (1,000ha for industrial land + 425ha for service & urban land)
▪ Total vacant leasable area: 653ha (would be available in phases)
▪ Total area with full infrastructure ready to build factory: > 200ha

Factory Available for Rent N/A

Operation Status ▪ Ready for construction and obtaining LURC (Active)


Occupancy Rate and ▪ 8% in phase I
Number of Projects ▪ 2 projects

Number of Korean projects ▪ 1 project

Lease fee ▪ Land lease fee: USD60/m2/VAT exclusive


▪ Factory lease fee: N/A

158
Operating fee ▪ Management fee: USD0.07/m2/month/VAT exclusive (10% increase every 5 years)
▪ Electricity fee:
- Normal hours: VND 1.555/kwh

Mon – Sat: (04:00 to 09:30; 11:30 to 17:00; 20:00 to 22:00)


Sun: 04:00 to 22:00
- Peak hours: VND 2.871/kwh

Mon – Sat: (09:30 to 11:30, 17:00 to 20:00)


- Off-peak hours: VND 1.007/kwh

Daily from 22:00 to 04:00

▪ Water fee: ~USD0.63/m3


▪ Wastewater treatment fee: USD 0.36/m3 (10% increase every 5 years)

INFRASTRUCTURE AND FACILITY


Financial institution 19km from Bank for Investment and Development of Viet Nam –Binh Dinh Branch (BIDV)
Tax service, State finance 13km from Department of Taxation
office 23km from State finance office

Customs Service 22km from Customs Agency


22km from the nearest Inland Container Depot
Logistics Trans-shipment point of North-South railway station next to the Industrial Park
Post office 12.5km from nearest Post office (pick up service available)
Medicare 21km from nearest hospital (Binh Dinh General Hospital), walk-in clinics available within 5km
Police, public security 13km from nearest Police station, local stations available within 5km

Universities, training 23km from Quy Nhon University


facilities, etc.

Recruitment Job centers in Quy Nhon City ~ 21km


Worker dormitory Social housing for workers are available provided by Becamex
Worker's child education 3km from the nearest Kindergarten
facility

One-stop service 22km from the Public Administration Center of Binh Dinh province

Road Width Main road: 32.5m, Branch road: 25m


Communication Available
Infrastructure of industrial
park

Emergency Power Available


generator

Fire-fighting facility Available

159
Location/ Map

160
List of Projects in Industrial Zone

No Name of Company Investment Value Nationality Business line


(million USD)
1 KURZ Vietnam 100 Germany Stamping tech

2 HanHwang Ind 18 Korea Auto parts manufacturing

161
NHON HOI INDUSTRIAL PARK - PARK A

GENERAL INFORMATION
Address Nhon Hoi Commune, Phuong Mai peninsular, Quy Nhon City, Binh Dinh Province.
Investor Sai Gon - Nhon Hoi Industrial Park Corp.,
• Address: Lot A2.01, Road N3, Nhon Hoi Industrial Zone, Nhon Hoi Commune, Quy Nhon
City, Binh Dinh Province.
• Tel: +84 256 3822 427
• Email: kcnnhonhoia@gmail.com
• Website: www.nhonhoiip.vn
Contact Person Mr. Phan Vu Tuan
- Position: Sales Director
- Phone: +84 936 356 656
- Email: tuanpvsnp@gmail.com
Location Adjacent location
- 6km from Quy Nhon City;
- 1.065km from Ha Noi - the capital;
- 30km from Phu Cat Airport;
- 8km from Quy Nhon Port;
- 15km from Dieu Tri Railway Station;
- National high way.
Investment Sector • Priority Sectors for Investment
- Consumer goods industry group.
- Food and pharmaceutical industries.
- Construction industry, production of interior - exterior furniture.
- Supporting industries; Textile industry; Electronic industry.
- Industrial park service industry.
• Restricted Sectors for Investment
Sectors related to plating process, textile dyeing that pollute the environment.
Minimum wage [Area 4] VND 3,640,000 (150 USD/month) - According to Decree 38/2022/ND-CP.

Lease term 50 years, from the date investor receives the Decision of Investment Policy/Investment
Registration Certificate.
Minimum Lease Area 20.000m2
Limit for Construction - Factory:
Height
+ The height of building depends on the technology line.
+ If the height of 45 meters or more above the ground must be approved by the Operation
Department - Ministry of Defense under the height of works under Decree No. 32/2016 / ND-
CP of May 6, 2016.
- Service building: 5-9 floors
Permitted Construction - Factory: 70%
Rate - Service building: 50%
Planned area - Total area: 394ha
- Total vacant leasable area: 126,73ha
- Total area with full infrastructure ready to build factory: 126,73ha
Factory Available for rent - Total are: 8.000m2

Operation Status Active

Occupancy Rate and - Occupancy rate: 58%


Number of Projects - Number of projects: 52 projects

Number of Korean projects 0

162
Lease fee - Land lease fee: Price policy is issued by the Company at different times and may be changed
depending on land location, land scale and properties of the project.
- Factory lease fee: >1.5 USD/m2/month
Operating fee - Maintenance fee (Phí duy tu): 0,2 USD/m2/year (free for the first 3 years and shall be paid at
the fourth year)
- Electricity fee:
According to Price-list of EVN: (excluding VAT)
+ Low load hours: 1.100 VND /KWh (22 pm to 4 am).
+ Peak load hours: 3.076 VND /KWh (9.30 am-11.30 am and 5 pm-8 pm)
+ Off-peak load hours: 1.685 VND /KWh (other times)
- Water fee: 15.800VND/m3 (price in 2023, excluding VAT)
- Wastewater treatment fee:
According to the regulation of Binh Dinh Province People’s Committee.
Current price for referesnce:
COD ≤ 75: 5.121 VND/m3
COD ≤ 150: 6.091 VND/m3
151 ≤ COD ≤ 200: 10.446 VND/m3
201 ≤ COD ≤ 300: 15.669 VND/m3
301 ≤ COD ≤ 400: 20.892 VND/m3
401 ≤ COD ≤ 600: 31.338 VND/m3
COD > 600: 41.784 VND/m3
- Waste treatment fee: contact the service supplier for details.
INFRASTRUCTURE
Energy supply (Electricity) - Nhon Hoi 1 transformer station 110/22KV with capacity 2x63MVA.
- The power grid of 22KV is supplied to the fence of factory
- A transformer station shall be installed in the factory by Binh Dinh Power Company in
accordance with investor’s needs.
- Light electricity system in the IP.
Water supply - Water pumping station with capacity 24.000m3 /day (phase 1) and 100.000m3/day (phase 2).
- Water supply pine line is connected to the fence of the factory.
- Fire fighting devices are installed along the internal roads in the IP.
Price in 2023: 15.800 VND/m3 (excluding VAT).
Wastewater treatment Pipelines for collecting waste water D=300 to D=600 to Nhon Hoi wastewater treatment plant.

Wastewater type allowed - Standard of waste water: Waste water is required to treat to meet
- Type B of the National Technical Regulation on Industrial Wastewater (QCVN
40:2011/BTNMT) before being discharged to the drainage wastewater system of the IP.
Internal traffic system Concrete road with H30-XB80 loading capacity.
- Main roads: Lane width: 65-80m;
- Branch roads: Lane width: 65m, 45m, 29m, 27m, 20m;
- Total length of roads in the IP: 30km;
Floor load capacity (ton/m2) Axle load is 30tons
Internet & Tel. connection Investors sign contract with service providers (VNPT or Viettel) for using services

Situation for foreigners - Hotels and accommodation locating in Quy Nhon City (6km away from Nhon Hoi A IP).
(hotels, leisure time, ...) - Restaurant (local food, seafood..) and other entertainment (supermarket, cinema, coffee
shop….)

163
List of Projects in the Industrial Park

No. Name of Company Nationality Business line

1 Minerals Joint Stock Company - Quy Nhon Vietnam Standard factory area for rent

2 Nhon Hoi Concrete Joint Stock Company Vietnam Concrete factory

3 An Hai Seafood Co., Ltd Vietnam Frozen seafood processing factory

4 Phuc Son Cement single share-holder Co., Taiwan Cement grinding and transfer station
Ltd
5 Hoa Phat Binh Dinh single share-holder Co., Vietnam Electrical refrigeration manufacturing and
Ltd assembling factory
6 Silic Mien Trung single share-holder Co., Ltd Vietnam Silicon Metal factory
7 Southern Gas Trading Joint Stock Company, Vietnam LPG extraction station and painting, tank
Central Branch in Binh Dinh inspection and maintenance factory.
8 Petrolimex Da Nang Gas Co., Ltd Vietnam LPG filling station
9 Sa Thach Nhon Hoi Co.,Ltd Vietnam Concrete factory
10 Binh Dinh Power Company Vietnam Nhon Hoi 110KV transformer station and
branches
11 Bidiphar Non-Betalactam Co., Ltd Vietnam High-tech Bidiphar pharmaceutical production
12 Bidiphar Betalactam Co., Ltd Vietnam High-tech Bidiphar pharmaceutical production
13 Bidiphar Hi-Tech Co., Ltd Vietnam High-tech Bidiphar pharmaceutical production
14 Thien Phuc Binh Dinh Joint Stock Company Vietnam Factory producing pharmaceutical glass
packaging and industrial gas.
15 Rapid Vietnam Bio-Nutrition Joint Stock Vietnam The factory produces probiotics extracted from
Company marine fish, fertilizers from marine fish, and
feeds from marine fish.
16 Marubeni Lumber Vietnam Co., Ltd Japan Wood and polywood processing factory
17 DPack Co., Ltd Vietnam High-end packaging factory
18 Binh Dinh Telecommunications (VNPT) Vietnam Providing telecommunications services in Nhon
Hoi Industrial Park - Zone A
19 Hai Minh Construction Trading Production Vietnam The factory produces unburnt bricks,
Joint Stock Company commercial concrete and concrete structures.
20 Vinh Khang Glass Co., Ltd Vietnam Construction glass processing factory
21 Sao Viet Trading Service Co., Ltd Vietnam Factory manufacturing and assembling
educational equipment
22 Long Van Phat Service Investment Vietnam Factory areas, service offices for rent
Production Joint Stock Company
23 Fujiwara Binh Dinh Co., Ltd Vietnam Expanding 110Kv line, Nhon Hoi A Industrial
Park transformer station
24 Phong Dien Power Joint Stock Company Vietnam Expanding 110Kv line belonging to Phuong Mai
3 wind power plant
25 My Nghe Binh Dinh Joint Stock Company Vietnam Motor vehicle registration center
26 Tingco Binh Dinh Joint Stock Company Vietnam Producing and trading in soft drinks and canned
products
27 Binh Dinh Pharmaceutical - Medical Vietnam Building a warehouse to preserve
Equipment Joint Stock Company pharmaceuticals, medicinal herbs, medical
(BIDIPHAR) equipment and vaccines
28 QUIHUB Industrial Park Investment and Vietnam Factories for rent
Development Joint Stock Company

164
29 Bao Phat Glass Co., Ltd Vietnam Factory for processing tempered glass
30 Mekong Binh Dinh Co., Ltd Vietnam Factories for rent
31 Duc Toan Binh Dinh Co., Ltd Vietnam High-end interior and exterior wood processing
factory
32 Transportation Training Center Vietnam Motor vehicle training center
33 Moveo Binh Dinh Co., Ltd Vietnam Exhibition center to introduce automotive
auxiliary industry.
34 B&D Lingerie Vietnam Co., Ltd HongKong Textile facrorty
35 Fago Animal Feed Co., Ltd Vietnam Factory producing animal feed - veterinary
medicine FAGO Mien Trung.
36 Thien Bac Co., Ltd Vietnam High-end interior and exterior wood processing
factory
37 HD Group Joint Stock Company Vietnam High-end interior and exterior wood processing
factory
38 Eco Nhon Hoi Printing & Packaging Co.,Ltd Vietnam Produce packaging
39 Tan Dai Hung General Co.,Ltd Vietnam Produce wicker & wood furrniture
40 Thach Cat Tien Co.,Ltd Vietnam General service center
41 Central Indoor Furniture Co.,Ltd Vietnam Produce furniture
42 SaiGon Rise Co.,Ltd Vietnam Produce wood products and mattress
42 Tan Dai Nam General Co.,Ltd Vietnam Produce wicker & wood furniture

165
PHU TAI INDUSTRIAL PARK

GENERAL INFORMATION
Address Tran Quang Dieu ward, Quy Nhon city, Binh Dinh province.
Investor Sai Gon - Nhon Hoi Industrial Park Corp.,
• Address: Lot A2.01, Road N3, Nhon Hoi Industrial Zone, Nhon Hoi Commune, Quy Nhon
City, Binh Dinh Province.
• Tel: +84 256 3822 427
• Email: kcnnhonhoia@gmail.com
• Website: www.nhonhoiip.vn
Contact Person Mr. Phan Vu Tuan
- Position: Sales Director
- Phone: +84 936 356 656
- Email: tuanpvsnp@gmail.com
Location Adjacent location
Phu Tai Industrial Park is located in Tran Quang Dieu and Bui Thi Xuan wards, Quy Nhon
city, located on the intersection of National Highway 1A and National Highway 19; 12km
from Quy Nhon seaport; 20km from Phu Cat airport; 2km from Dieu Tri railway station.
Investment Sector • Priority Sectors for Investment
Processing agricultural, forest products, food, animal feed; Electronic and mechanical
assembly; Processing stone of all kinds, producing building materials; Packaging
manufacturer; Other industries such as garment, shoes, beer, gas extraction.
Lease term 2048

Planned area - Total area: 345,80 ha

Factory Available for rent - Total are: 8.000m2

Operation Status Active

Occupancy Rate and 95%


Number of Projects

Number of Korean projects 0

Lease fee Land rent: raw land according to provincial regulations, average 1,500 VND/m2

INFRASTRUCTURE
Power supply system: complete
- Water supply and drainage system: complete
- Wastewater and waste treatment system: completed centralized wastewater treatment plant with capacity of 2000m3/day
-Telecommunication system, internet: complete
- Fire prevention and fighting system: complete
- Internal traffic: complete

166
[- This Page is intentionally left blank -]

167
BINH DUONG

168
INVESTMENT ENVIRONMENT IN BINH DUONG

USD/VND 23.510

GENERAL INFORMATION
Area 2694,43 km2
Population 0,245 million people (2022)
▪ Binh Duong is located in Southeast region.
Geographical
▪ Located in the Eastern part of the Southern region of Vietnam, and being the part of the Southern Key
Location
Economic Zone.
Adjacent Binh Duong province to the north, Ho Chi Minh City (HCMC) to the south and southwest, Tay Ninh province
provinces to the west, and Đong Nai province to the east
2022 statistic:
▪ Nominal GRDP (billion VND):
▪ Real GRDP (billion VND): 166.000 (7,00865526704665 billion USD)
▪ GRDP growth: 8,00%
GRDP ▪ GRDP per capita (million VND/year): 166,00 (1891409 USD)
▪ Economic structure:
- Industry - Construction: 69,41%
- Agriculture. forestry and fishery: 2,95%
- Service: 20,15%
▪ Industry - Construction growth: 5,67%
Industry
▪ Agriculture, forestry and fishery growth: 3,10%
growth
▪ Service growth: 9,50%

Import - Import turnover (billion USD): 25,80 (Growth rate: 0,01)


Export Export turnover (billion USD): 35,70 (Growth rate: 0,09)
▪ High-tech application of livestock production continues to develop with 148 chicken farms; 255 pig farms; 45
duck farms; 01 dairy farm.
▪ The new rural construction program continued to be promoted.
Key Industry ▪ Industrial production index in 2022 increased by 8.8% over the same period. In which, the mining industry
increased by 14.8% over the same period; processing and manufacturing industry increased by 8.7%;
production and distribution of gas, hot water, steam and air-conditioning electricity increased by 7.7%; water
supply, management and treatment of waste and wastewater increased by 9.9%.
PCI 65.13
Ranking 36
SOCIAL INFRASTRUCTURE
▪ Roadway:
Transportation - National Road (NR) no. 13, NR no. 14, the HCMC Route and the Trans-Asian Highway.
- Binh Duong is only 10–15 kilometres from Tan Son Nhat International Airport and important ports.
▪ Binh Duong has thermal power plants, wind power plants, and solar power plants through investments from
Electricity
Korea and Denmark▪
▪ Binh Duong has underground water sources mainly fresh water with 5 main aquifers, including 4 porous
Water aquifers and 1 fissure aquifer. Total underground water potential exploitation reserve in the province is about
2,180,000m3/day, equivalent to about 797 million m3/year.
Education &
8 Universities, 9 Vocational Schools and 59 Training Centers (as of 2019)
Training
Medicare N/A
INVESTMENT CONDITION
Human
62% of population are in the working age ()
resource
Education level Trained labor rate: 80.5 (2021)

169
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): Thu Dau Mot City, Thuan An, Di An; Ben Cat and Tan Uyen Towns; Bau
Bang, Bac Tan Uyen, Dau Tieng, Phu Giao districts
- Area II (4,160,000 VND/month): N/A
Salary
- Area III (3,640,000 VND/month): N/A
- Area IV (3,250,000 VND/month): N/A
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to
employees working under employment contracts)
▪ Incentives according to government regulations:
Investment - Exemption and reduction for land and water rent fee
incentives - Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
Fields Industries (IT, electronics, micro-electronics, biotechnology, robotics, 3D printing, electric vehicles, supporting
Attracting industries, consumer goods, food and beverage processing). Services such as logistics, warehouse, cold storage,
Investment modern infrastructure (urban area, trade center, education and training).
For foreign direct investment, from the beginning of the year to December 15, 2022, attracted US$3.1 billion,
up 48.8% over the same period. In which: the number of projects with new investment certificates: 69 projects
Investment with a total registered capital of 1.9 billion USD (corresponding to a decrease of 2.8% and an increase of 3
attraction times over the same period) and 22 capital adjustment projects (down 18.5% over the same period) with a total
situation capital of 23.7 million USD (equivalent to 2.9% over the same period); the number of projects contributing
capital, buying shares 172 projects (up 3.6% over the same period) with a total capital of 1,169.7 million USD
(up 74.3% over the same period).
Binh Duong has 30 industrial parks (IP) with a total area surface of over 12,670 hectares and an average
occupancy rate of 87.4 percent as well as another 12 industrial clusters with a total area surface of 790 hectares
and an occupancy rate of 67.4 percent.

Some of the most developed IPs in the province include VSIP, VSIP2, My Phuoc IP, and Dong An IP.
Particularly for this year, the province has started the construction of two 1,000-hectares industrial parks to
increase the supply of industrial land with an eye on foreign investors.

The first phase is on the Vietnam-Singapore III (VSIP III) industrial park covering 1,000 hectares in Tan Uyen
Industrial Town and Bac Tan Uyen District, which started in March.
zones
The project with a total investment of US$280 million got the green light from the government in November
2016. This is the 10th project of VSIP, a leading industrial park developer in Vietnam.

The other project will be on the 1,000-hectare Cay Truong industrial park in Bau Bang District which is
expected to begin in the second quarter of this year. With these IPs, the province would prioritize high-tech
tenants and labor-intensive industries such as apparel and footwear.

Industrial parks have helped Binh Duong transform from a rural area into an industrial hub. Statistics show that
industries and services account for 97 percent of the province’s total economic output.

170
Map

Department of Planning and Investment Binh Duong


▪ Address: 4th Floor, Tower A, centralized administrative center of Binh Duong, Le Loi Street Intersection
Angle - Hung Vuong Boulevard - Hoa Phu Ward - Ho. Thu Dau Mot - Binh Duong Province
▪ Tel: 0274) 3822926
Contact
▪ Email: sokhdt@binhduong.gov.vn
▪ Contact person:
- Mr. Mai Hung Dung - Director
84.913.950.666
dungmh@binhduong.gov.vn

171
LIST OF INDUSTRIAL ZONES IN BINH DUONG PROVINCE

No Industrial zone Name Total Area (ha) Occupancy Rate Status


1 BECAMEX BAUBANG 3400ha 90% In Operation
2 Binh An Industrial Park 25,9 ha 96,04%. In Operation
3 Binh Duong Industrial Park 16,5 ha 97% In Operation
4 Dai Dang Industrial Park 274,35 ha 45,82% In Operation
5 Dat Cuoc Industrial Park 212,84 ha 38%. In Operation
6 Dong An Industrial Park 138,7 ha - In Operation
7 Dong An Industrial Park 2 158,1 ha 86,59%. In Operation
8 Kim Huy Industrial Park 213,63 ha 50.52% In Operation
9 Mai Trung Industrial Park 50,55 ha 65% In Operation
10 My Phuoc Industrial Park 376,92 ha 88%. In Operation

172
BECAMEX-BAUBANG INUDSTRIAL PARK

GENERAL INFORMATION
Address Lai Uyen Commune, Bau Bang District, Binh Duong Province

BECAMEX IDC
Investor ▪ Address: 08 Hung Vuong street, Hoa Phu ward, Thu Dau Mot city, Binh Duong province,
Vietnam
▪ Tel: +84 274 3 822 655
▪ Email: info@becamex.com.vn
▪ Website: becamex.com.vn
Contact Person ▪ Tran Le Chi Cong- Deputy Director - +84 913 685 916- cong.tlc@becamex.com.vn
▪ Kang Ho-dong - Representative in Korea - +82 1053187861-becamex@naver.com

Location Adjacent location:


- 55km from Ho Chi Minh City
- 25km from Binh Duong New City
- 60km from Tan Son Nhat Int’l airport;
- 60km from Cat Lai port;
- Adjacent to the national road 13, My Phuoc-Tan Van road

 Expressway from Ho Chi Minh City-Binh Duong-Binh Phuoc is supposed to be built by 2026.
5km from this expressway
Investment Sectors Priority Sectors for Electronics, machinery,
Investment food processing, automobile parts,
new material,
Bio,
Pharmaceutical,
Supporting industry,

Investment Restricted Sectors Natural rubber processing,
tanning, washing – cleansing, dyeing, plating/anodizing, basic
chemical production, detergent, colorant, printing ink,
paper production
Minimum wage [Area II] According to Decree 2022/ND-CP dated 15th November 2022
Lease term ▪ Start date: April 27, 2016
▪ End date: April 26, 2066
Minimum Lease Area 1ha

Limit for Construction 50m


Height
Permitted Construction Maximum 70% of the land area
Rate

Planned area ▪ Total area: 3,400ha (2,000ha for industrial land + 1,400ha for service & urban land)
▪ Total vacant leasable area: 300ha (would be available in phases)
▪ Total area with full infrastructure ready to build factory: 50ha

Factory Available for Rent ▪ 30ha

Operation Status Ready for construction and obtaining LURC


Occupancy Rate and ▪ 90%
Number of Projects ▪ 167 projects

173
Number of Korean projects ▪ 21

Lease fee ▪ Land lease fee: USD150/m2(VAT exclusive)


▪ Factory lease fee: USD4~4.5/m2/month (VAT exclusive)

Operating fee ▪ Management fee: USD0.04/m2/month (VAT exclusive)


▪ Electricity fee:
- Standard hour: VND1,685/kwh
- Off-peak hour: VND1,100/kwh
- Peak hour : VND3,076/kwh
▪ Water fee: VND13,800/m3
▪ Wastewater treatment fee: USD0.25/m3
▪ Waste treatment fee: None
INFRASTRUCTURE AND FACILITY
Financial institution Inside of IP. BIDV, Vietcombank, Sacombank, ACB bank, Techcombank....
Tax service, State finance Inside of IP
office

Customs Service Inside of IP


Inside of IP
Logistics Inside of IP
Post office Inside of IP
Medicare Inside of IP. BAUBANG HEALTH CENTER
My Phuoc General Hospital, 12km from the IP
Police, public security Inside of IP

Universities, training EIU Int’l Univ. German Tech, vocational training centers……
facilities, etc.

Recruitment Inside of IP
Worker dormitory Inside of IP
Worker's child education Inside of IP
facility

One-stop service Inside of IP

Road Width 24~64m


Communication VNTT provides ADSL, High-Speed Internet service
Infrastructure of industrial
park

Emergency Power National grid is connected with two substation


generator
Fire-fighting facility Available, inside of IP

174
Location/Map

175
List of Projects in Industrial Zone

No Company Name Country Business lines

1 KISWIRE VN CO., LTD (AGM) Korea Details: - Manufacture and processing of steel wires used in
automobile manufacturing and related industries; -
Manufacture and processing of cables used in automobile
manufacturing and related industries.

2 SAMHOO CO., LTD Korea Forging, stamping, pressing and rolling of metal; refining of
metal powder
Details: Manufacture and processing of zinc oxide, zinc
powder

3 KYUNGBANG Vietnam CO., Korea Fiber production


LTD
4 SUNWOOD VINA CO., LTD Korea Production of other products from wood; production of
products from bamboo, bamboo, straw, shavings and Tet
materials
Details: Manufacture and processing of wooden doors, wooden
door frames, materials from wood, building materials, other
products from wood.

5 FINE CHEMICAL Vietnam CO., Korea


LTD Footwear production

6 KYUNGBANG Vietnam CO., Korea Fiber production


LTD
7 SOOHO VINA CO., LTD Korea Manufacture of other general-purpose machines
Details: Manufacture of static electric paint sprayers, automatic
conveyor belts, paint spray chambers (liquid, static electricity),
industrial robots, static electric paint mixers. Production of
clean rooms used for surface treatment before electrostatic
paint coating. Production of static paint dust bombs Production
of paint spray solid-state actuators.

8 T.O.P OUTDOOR VINA CO., Korea Production of exercise equipment, sports equipment
LTD (LIVE OUTDOOR) Details: Production of tents, tent covers, temporary tents,
sheets, carpets, floorboards, ship covers

9 KOLON BINH DUONG Korea Tire cord, airbag


INDUSTRIAL CO., LTD/KVT-1
TYPE PRODUCTION PROJECT

10 KOLON BINH DUONG Korea Dormitory


INDUSTRIAL CO., LTD
11 JM TEXTILE VINA CO., LTD Korea Manufacture of diamond weaving
(JIN MYOUNG CORPORATION Details: Manufacture and processing of shuttle fabric.
LTD)
12 KYUNGBANG Vietnam CO., Korea Fiber production
LTD
13 SEWANG VINA CO., LTD Korea Manufacture of diamond weaving
Details: Manufacture and processing of shuttle fabric.
14 KOREA FINE CHEMICAL Korea
Vietnam CO., LTD Manufacture of plastic label accessories, plastic logos, plastic
sheets for the footwear, garment and handbag industries by
high-rise, thermal press method

176
15 VINA GLOBAL SEAH CO., LTD Korea
Manufacture of other metal products that have not yet been
excreted. Details: Networked steel pipe production

16 DSR VINA CO., LTD Korea


Manufacture of strands and nets. Details: Manufacture and
processing of synthetic ropes used in docking, lifting, and
shipbuilding

17 HAN MEN M3 VINA CO., LTD Korea Wood composite production

18 PARK'S VINA CO., LTD Korea


19 TURBO ENTERPRISE Korea
20 KINSCO CO., LTD Korea
21 DONGIL RUBBER BELT Korea
VIETNAM CO.,LTD
22 DUKSUNG VINA CO., LTD Korea
23 NCL Vietnam CO., LTD / Japan Manufacture of other products from wood; produce products
MARUTSU (Vietnam) CO., LTD from bamboo, cork, straw, and plaiting materials
Details: Producing and processing all kinds of frames, frame
stands

24 MOROFUJI Vietnam CO., LTD Japan


Producing all kinds of bags and bags made of polythene and
paper, Producing related accessories.

25 NH ENGINEERING CO., LTD Japan Manufacturing metal structures.


26 CONDOR Vietnam CO., LTD Japan Other production is not yet classified
Details: Manufacture, processing and assembly of carpets made
of cloth, plastic, wood; manufacture, processing and assembly
of cleaning, cleaning tools; manufacture and processing of
household products (fiber toilet sheets, indoor slippers, water-
spray bath caps); production, processing and assembly of waste
products

27 CONDOR Vietnam CO., LTD Japan Other production is not yet classified
Details: Manufacture, processing and assembly of carpets made
(BB FACTORY)/ BW CN of cloth, plastic, wood; manufacture, processing and assembly
DEVELOPMENT JSC of cleaning, cleaning tools; manufacture and processing of
household products (fiber toilet sheets, indoor slippers, water-
spray bath caps); production, processing and assembly of waste
products

28 T'S LAB CO., LTD (Factory) Japan Production of toys, games


Details: Toy manufacturing and processing
/ BW CN DEVELOPMENT
JOINT STOCK COMPANY
29 ATAGO Vietnam GARMENT Japan Garment of clothing (except clothing from fur leather)
CO., LTD Details: Production and export of sportswear, men's clothing,
women's clothing, bedclothes, underwear, uniforms and the
like

30 AMON Vietnam CO., LTD Japan Manufacture of spare parts and parts for motorized vehicles
and motor vehicles
Details: Manufacture of electrical wiring sets, rearview mirrors,
power lines, car parts.

31 Vietnam SIMON SAFETY Japan Footwear production


INDUSTRIES CO., LTD
32 SMF Vietnam CO., LTD Japan spare parts, automobile parts, electric appliances

177
33 TENG TSUN CO., LTD/ TENG Taiwan Manufacture of products from Plastic
TSUN CO., LTD
34 NS MILLENNIUM Vietnam CO., Malaysia_ĐL Manufacture of suitcases, bags and the like, manufacture of
LTD cushions
Details: Production of chair and bed mattress of all types

35 LEE WEN_JUNG Taiwan


36 DAI CHI Vietnam CO., LTD Taiwan
37 VIET_STAR CO., LTD Taiwan Production of metal structures
38 CHAN SHENG CO., LTD Taiwan
39 LONG TRIUMPH CO., LTD Taiwan
Weaving, raking, grinding, sewing all kinds of clothes (do not
carry out the process of washing and dyeing)

40 U TEX CO., LTD Taiwan Basic chemical production


detail: Manufacture of finishing dye additives.
41 CAT TR CO., LTD (BICHEN CO., Taiwan Manufacture of medical, dental, orthopedic and rehabilitation
LTD/Mr. BENNY LIN) equipment and instruments
Details: Producing all kinds of medical equipment.\

42 SHIH HUNG CO., LTD / MR Taiwan Manufacture of beds, cabinets, tables and chairs
CHRIS CHANG
43 EMC VN CO., LTD Taiwan Manufacture of paints, varnishes and similar coatings;
manufacture of printing ink and mastics
Details: Producing raw materials and additives of all kinds used
in the production of paints and oils; production of paints, oils
and additives used in the construction, industrial, metal and
plastic industries; processing and manufacturing all kinds of
sanding materials: water glue, paper glue, tape and paper

44 O_TA PRECISON INDUSTRY Taiwan


CO., LTD
45 YACHT TECHNOLOGY Taiwan Manufacture of batteries and accumulators
TECHNOLOGY CO., LTD Details: manufacturing all kinds of batteries (batteries, batteries
( Vietnam ) and accumulators).Manufacturing all kinds of UPS; computers
and related equipment; battery cover made of plastic; fiberglass
processing.

46 CHEN HO TEXTILE CO., LTD Taiwan Fiber production


(Vietnam) Details: Manufacture of industrial fibers, textiles and color
fibers; Production of thread, thread, thread and thread used in
the textile industry.

47 YUE CHANG CO., LTD Taiwan Fiber production


(Vietnam) Details: Textiles and colored fibers for industrial use
48 HUGE_BAMBOO TEXTILE Taiwan Textile finishing
INDUSTRIAL CO., LTD Details: Manufacture of dyed fabrics (no dyeing processing).

49 POLYTEX FAR EASTERN CO., Taiwan Fiber production


LTD (Vietnam)
50 REN DING TRADE LTD Taiwan
51 CHAIN YARN Vietnam CO., LTD Taiwan Fiber production
52 TAITAN Vietnam CO., LTD Taiwan Manufacture of batteries and accumulators
Details: - Manufacture of accumulators; - Manufacture of
electrode plate components and battery-related machinery and
equipment; - Processing battery materials.

178
53 WOLPAK Vietnam PACKAGING Taiwan Trading in real estate, land use rights belonging to owners,
CO., LTD /DDK Vietnam users or renters
INVESTMENT & Details: Factory for rent. Building and selling factories. Buy
DEVELOPMENT CO., LTD and sell factories .Buy assets attached to land .

54 DAI HAO TEXTILE CO., LTD Taiwan Finishing of textile products


Details: Production, processing, dyeing of fabrics, all kinds of
textile products, gluing fabrics

55 DE LICACY Vietnam Taiwan Fiber production


INDUSTRIAL CO., LTD
56 CAPCO WAI SHING Vietnam Taiwan Producing products from plastic
CO., LTD Details: Producing and processing all kinds of plastic clothes
hangers, plastic clothespins

57 SINGTEC CO., LTD Taiwan Production of knitted fabrics


58 ADVANCE WISDOM CO., LTD Taiwan Production of knitted fabrics
(SINGTEC)
59 ALPHA BRAVE CO., LTD Taiwan Manufacture of knitted fabrics, crocheted fabrics and other
nonwovens
Details: Production of knitted fabrics

60 YU WEI Vietnam CO., LTD Taiwan Non-ferrous metal casting


Details: - Manufacture of mold products of all kinds; metal
molds; plastic injection mold; mold reinforcement production;
Manufacture of mold-fixing components (mold cores, gaskets,
punching tools) (Enterprises can only operate after completing
investment procedures as prescribed by law); - Manufacture of
copper poles; - Producing metal connectors (cast lead, from
lead raw materials, not lead recycling)

61 TE ENRICHI CO., LTD Taiwan Manufacture of knitted fabrics, crocheted fabrics and other
nonwovens
Details: Production of warp knitted fabrics

62 ZHONG JU VIET NAM Taiwan Production of woven fabrics


INDUSTRIAL CO., LTD Details: Flat weave, warp fabric
63 HI_TECH J&B Vietnam CO., LTD Taiwan Finishing of textile products
Details: Producing and gluing film, making waterproof,
coating, fabric gluing

64 LEEDA Vietnam CO., LTD / DDK Taiwan Footwear production


Vietnam INVESTMENT & Details: Footwear Production; Footwear border; Leather
DEVELOPMENT CO., LTD
65 T-STAR ELECTRICAL CO., Taiwan Installation of electrical systems
LTD/ DDK INVESTMENT &
DEVELOPMENT CO., LTD
Vietnam CN
66 SWR CO., LTD (LUXWELL Taiwan Producing other products from rubber
HOLDING CO., LTD) Details: Raw-Edge (RE) loading line; PV/PVC conveyor belts,
conveyor belts (Curoa)

67 BRANCH OF A Chau (VN) Taiwan Production of feed for livestock, poultry and fisheries
NUTRITION COMPANY Details: Production of livestock feed, poultry and aquaculture
LIMITED IN BINH DUONG feed, additives for livestock feed, poultry and aquaculture.
Processing of feed for livestock, poultry and fisheries for
domestic individuals and organizations

68 PAIHONG Vietnam CO., LTD Taiwan Production of needle weaving, knitting and other nonwoven
fabrics
Details: Fabrication of all kinds.

179
69 PAIHONG Vietnam CO., LTD Taiwan Production of needle weaving, knitting and other nonwoven
fabrics
Details: Fabrication of all kinds.

70 SON YUNG SHYANG Vietnam Taiwan Manufacture of paints, varnishes and similar coatings;
CO., LTD/ DDK INVESTMENT manufacture of printing ink and mastics
& DEVELOPMENT CO., LTD. Details: Production of paints, oil paints, pigments, printing
inks, water-based paints, solvents (Not manufactured or
processed at the head office)

71 POLYTEX FAR EASTERN CO., Taiwan


LTD (Vietnam)
72 TOP POINT INTERNATIONAL Taiwan Production of bicycles and bicycles for the disabled
Vietnam CO., LTD / DDK Details: Manufacture of hooks (brake hands, support legs),
INVESTMENT & suspension tips, frame joints, oil shock absorption cover, oil
DEVELOPMENT CO., LTD. storage box, chain neck.

73 EVERISE CO., LTD/ Taiwan Production of other specialized machines


EVERYOUNG GROUP CO., LTD Details: Manufacture and manufacture of machinery and
/ DDK INVESTMENT & wastewater treatment equipment; drinking water purifier
DEVELOPMENT CO., LTD
Vietnam CN
74 DDK Vietnam INVESTMENT & Taiwan Real estate business, land use rights owned by owner, owner or
DEVELOPMENT CO., LTD tenant
Details: Leasing the factory. Building and selling factories.
Buy and sell factories, buy assets associated with land.

75 THUY DUONG Taiwan Manufacture of knitted fabrics, crocheted fabrics and other
INTERNATIONAL CO., LTD nonwovens
(Vietnam) Details: Producing knitted fabrics (not performing dyeing,
washing and bleaching).

76 SPOTY Vietnam CO., LTD / Trung Quốc Manufacture of suitcases, bags and the like, manufacture of
HOTTA VIET NAM CO., LTD seat cushions
TRANSFER Details: - Manufacture of bags, tool bags, backpacks, suitcases
- Manufacture of bags for pets

77 LEEDA Vietnam CO., LTD / DDK Taiwan Footwear production


INVESTMENT & Details: Footwear Production; Footwear border; Leather
DEVELOPMENT CO., LTD.

78 HUNG Nghiep WAYTEX Taiwan Manufacture of beds, cabinets, tables and chairs; Manufacture
(Vietnam) CO., LTD/ DDK of woven plastic and textioene mesh fabrics; Manufacturer of
Vietnam INVESTMENT & seats; Manufacture of ready-made goods (except for clothing),
DEVELOPMENT CO., LTD Manufacture of tents and umbrellas

79 POLYTEX FAR EASTERN CO., Taiwan Fiber production


LTD (Vietnam) Details: - Manufacture and processing of polyester synthetic
fiber products including filament long fiber; - Manufacture and
processing of short cut cotton fiber (coton spun fiber), natural
fiber and synthetic fiber

80 WAYTEX INTERNATIONAL Taiwan Production of beds, cabinets, tables, chairs


CO., LTD /DDK Vietnam Details: Production of beds, cabinets, tables, chairs
INVESTMENT &
DEVELOPMENT CO., LTD
TRANSFER
81 MPF Vietnam CO., LTD /DDK Taiwan Production of vehicles and other transportation equipment that
INVESTMENT & have not yet been classified
DEVELOPMENT CO., LTD. Details: Manufacture of baby strollers, strollers of all types,
trolley components

180
82 LACQUER CRAFT Vietnam Taiwan Other production is not yet classified
FURNITURE CO., LTD Details: Furniture production, interior decoration.
/WEALTHY BRIGHT (HK)
LIMITED
83 RT INDUSTRIES CO., LTD (L- Taiwan Production of other products from wood; production of
TREE RESOURCES) products from bamboo, bamboo, straw, shavings and Tet
materials
Details: Wooden sofa production and fabric sofa, mattress

84 POWER CREATION Trung Quốc Producing cutlery, hand tools and common metal products
INDUSTRIAL CO., LTD Details: hammer, ax, sledgehammer, chisel, mallet….

85 GRAND AURORA CO., LTD Taiwan Producing products from plastic


Details : Producing packaging from plastic ; plastic zipper,
zipper head (do not use plastic scrap materials).

86 FILTRAFINE (Vietnam) CO., Taiwan Manufacture of other metal products that have not yet been
LTD excreted
Details: Manufacture and processing of filters, filter bags, etc.
etc. made of metal parts.

87 REN DING TRADING LTD Taiwan


88 QUAN YU Vietnam Taiwan Other production n.e.c
INDUSTRIAL CO., LTD / DDK Details: Manufacture of wooden and metal stairs, manufacture
Vietnam INVESTMENT & of wooden or metal stair accessories, balustrades, posts, pillar
DEVELOPMENT CO., LTD. boxes, turners, stair treads, crimping heads .....) Enterprises
TRANSFER do not perform plating, processing and coating processing of
metal surfaces.

89 JIA BAO RUI Vietnam CO., LTD Taiwan Details: Producing hollow plastic sheets

90 START WIN INVESTMENT CO., Taiwan


LTD/ DDK Vietnam
INVESTMENT &
DEVELOPMENT CO., LTD
TRANSFER
91 ALTOP Vietnam Precision Taiwan Producing other metal products not elsewhere classified
Stamping Co., Ltd/DDK Vietnam Details: Producing and processing stamping products from
INVESTMENT & aluminum alloy (such as lawn mower cylinders, motorcycle
DEVELOPMENT CO., LTD engine boxes, automobile gearboxes, etc.) Bicycle front forks,
agricultural machinery components, telecommunications
equipment radiators, Medical ultrasound machine bottoms,
etc.)

92 CALLPACK PRINTING & Taiwan


PACKAGING CO., LTD/ DDK
Vietnam INVESTMENT &
DEVELOPMENT CO., LTD
93 PHARMA ALIANCE Vietnam Taiwan Trading in real estate, land use rights belonging to owners,
CO., LTD/ DDK Vietnam users or renters
INVESTMENT & Details: Factory for rent. Building and selling factories. Buy
DEVELOPMENT CO., LTD and sell factories .Buy assets attached to land .

94 ZHAO SHUN INDUSTRY CO., Taiwan Manufacturing and processing sandblasting machines,
LTD/ DDK Vietnam industrial vacuuming equipment, industrial exhaust gas
INVESTMENT & treatment equipment, conveyor systems, ball-shooting
DEVELOPMENT CO., LTD. machines, polishing machines, iron racks (scaffolding, frames,
TRANSFER iron shelves) ); sandblasting.

181
95 GUAN SHENG POLYMER Taiwan Production of Plastic Granules
TECHNOLOGY CO., LTD / DDK (TPE - Thermoplastic Elastomer and TPR
Vietnam INVESTMENT & - Thermoplastic Rubber)
DEVELOPMENT CO., LTD

96 GOLDEN VIETNAMTEX CO., Taiwan Production of ready-made goods (except for clothing)
LTD/ DDK Vietnam Details: Production and processing of ready-made goods
INVESTMENT &
DEVELOPMENT CO., LTD
transfer
97 FUMAO Vietnam MECHANICAL Taiwan Production and processing of oil pressure gauges, high pressure
CO., LTD watches, industrial watches
98 GLODEN VIETNAMTEX CO., Taiwan Production and processing of ready-made goods.
LTD/DDK Vietnam
INVESTMENT &
DEVELOPMENT CO., LTD
99 CHEONG MING Vietnam PAPER Taiwan Production of wrinkled paper, wrinkled cardboard, packaging
PACKAGING CO., LTD from paper and cardboard
Details: Carton box set production, lining paper

100 AMPACS INTERNATIONAL Taiwan Manufacture of wired headphones, wireless headphones


CO., LTD / DDK Vietnam
INVESTMENT &
DEVELOPMENT CO., LTD
101 SUMMIT ELEC-TECH Taiwan Manufacture of pumps, compressors, hoses and other valves
INDUSTRIAL CO., LTD Manufacture of pumps, compressors, hoses and other valves
INDUSTRIAL Vietnam details: manufacture of solenoid valves from categories

102 FOJO INTERNATIONAL CO., Taiwan Producing products from plastic


LTD Processing plastic injection molding, plastic industry.
103 REGA Vietnam CO., LTD Taiwan Production of flower printing processing and digital flower
printing on fabrics and paper, production of flower press on
fabrics.

104 FUMEI CO., LTD Taiwan manufacturing, processing, manufacturing all kinds of springs

105 SUNFIBER Vietnam Co., Ltd. Taiwan Manufacture of artificial fiber Details: Manufacture of garment
materials such as pad, lining, fabric and cotton construction.
Doughing from cloth and cotton (no washing process).

106 PAIHONG Vietnam CO., LTD Taiwan Manufacture of fabrics of all kinds.
107 YUYING INTERNATIONAL Hong Kong Garment of clothing from leather (except fur leather)
GROUP (HK)CO.,LIMITED/JH
INTERNATIONAL TRADE (HK)
LIMITED
108 MONOGRAM HOME Vietnam Hong Kong Production of beds, cabinets, tables, chairs
CO., LTD Details: Manufacture and processing of wooden cabinet door
panels and related products made of wood, wooden cabinet
body panels and related products made of wood; Production of
wood cabinet processing

109 MONOLAND WOOD PRODUCT Taiwan


Vietnam CO., LTD
110 RONG DAL WOOD Taiwan
INDUSTRIES CO., LTD
111 AMPACS INTERNATIONAL Taiwan
CO., LTD
112 CHEMICAL CANLEN Vietnam Taiwan
CO., LTD
182
113 HONOR TALENT CO.,LTD Taiwan
114 HAN CHANG INVESTMENT Taiwan
CO., LTD (Vietnam)
115 MINGZHI VIETNAM PLASTIC Taiwan
CO., LTD Production and processing of plastic beads, plastic components,
metal molds

116 CYCLETECH (Vietnam) CO., Taiwan


LTD
117 JING, GUANGHUA Taiwan
118 JIA BAO RUI CO., LTD Taiwan
119 HONG KONG ZHONGTONG Taiwan
INDUSTRY LIMITED
120 CHYFLY . TECHNOLOGY AND Taiwan
TRADING CO., LTD
121 TRAN VUNG/ ZHONG YI FENG Taiwan
INTERNATIONAL CO.,LIMITED
122 ANTOOL KIMBER TOOLS CO., Taiwan
LTD
123 AN VIET MANUFACTURING USA Producing products from plastic
CO., LTD (Factory)/ BW CN Details: Manufacture of cover products used to cover
DEVELOPMENT JSC machinery, equipment and tools

124 FORTUNA INVESTMENT AND Vietnam


TRADING COMPANY LIMITED Buying and selling building materials, interior decoration
products

125 FORTUNA INVESTMENT AND Vietnam


TRADING CO., LTD (store the Buying and selling building materials, interior decoration
file Fortuna 6,000m2) products

Do not count the order number


because this lot has been split into
3 lots
126 FORTUNA INVESTMENT AND Vietnam
TRADING COMPANY LIMITED Buying and selling building materials, interior decoration
products

127 FORTUNA INVESTMENT AND Vietnam


TRADING COMPANY LIMITED Buying and selling building materials, interior decoration
products

128 FORTUNA INVESTMENT AND Vietnam


TRADING COMPANY LIMITED Buying and selling building materials, interior decoration
products

129 INVESTMENT SERVICES Vietnam


CONSULTING JSC (ISC CO.)
130 TAN CAN CAN INVESTMENT Vietnam Trading in real estate, land use rights belonging to owners,
JOINT STOCK COMPANY users or renters
Details: Factory leasing, buying and selling ready-built
factories (according to the provincial planning)

131 HSING CHENG CO., LTD Vietnam Manufacture of machines for textile, garment and leather
(Vietnam/ Mr. YEH, CHIEH- industries
CHENG/ KIM ANH WOOD This class includes: Manufacture of machinery used in the
MANUFACTURER CO., LTD/ textile, dyeing and sewing industries: specifically for washing,
VIETNAM CONSTRUCTION cleaning, wringing, drying, steaming, pressing, bleaching,
INVESTMENT CONSULTATION dyeing, glazing, finishing, coating or impregnating : yarn,
CO., LTD/ BINH SPRING textiles, finished textiles
WINDOWS JOINT STOCK
COMPANY / BUSINESS AND
DEVELOPMENT JOINT STOCK

183
COMPANY DUONG (TDC)
transfer

132 CARGILL Vietnam CO., LTD Vietnam Production of feed for livestock, poultry and fisheries
Details: Production of livestock, poultry and fisheries feed

133 AN BINH PAPER JOINT STOCK Vietnam Manufacture of pulp, paper and board
COMPANY _ Vietnam Details: Producing sets of paper, paper and paperboard
134 SUCCESSFUL FEED Vietnam
PROCESSING CO., LTD
135 PHU AN VINH INVESTMENT Vietnam Manufacture of drugs, pharmaceutical chemicals and medicinal
JOINT STOCK herbs
COMPANY/HUNG MINH Details: Producing cosmetic products, processing latex
WOOD CO., LTD/ NGOC LAN
COMPANY - DOCTOR
KHUONG
136 PHU AN VINH INVESTMENT Vietnam
JOINT STOCK COMPANY
137 BINH DUONG NUTIFOOD Vietnam Processing milk and dairy products
NUTRITIONAL FOOD JSC Details: Production of liquid milk, powdered milk - Processing
fresh milk in liquid form, pasteurized milk, bactericidal milk,
homogenized or heated - Processing milk-based beverages; -
Manufacture of ice cream from fresh milk, pasteurized,
sterilized, homogenized milk - Manufacture of dried or
condensed milk sweetened or unsweetened - Manufacture of
milk or solid ice cream; manufacture of butter, yoghurt, cheese
or curd - Manufacture of liquid yogurt, manufacture of casein
or lac to - Manufacture of ice cream and other edible ice
products such as fruit ice cream

138 DAI THANH PHUONG JSC/ Vietnam


BRANCH OF GY Building non-residential houses
CONSTRUCTION COMPANY
LIMITED TRANSFER
139 NGAN HOANG PHAT Vietnam Manufacture of other specialized machines
SERVICES AND REAL ESTATE Details: Manufacture of woodworking machines, circular saw
COMPANY LIMITED blades and accessories

140 ANH SAO DUONG JOINT Vietnam


STOCK COMPANY
141 NGAN HOANG PHAT Real Estate Vietnam Leasing factory
Services TRADING COMPANY
LIMITED ( LUU VN DIFFERENT
TO THI HOI HOA )
142 HOANG NGAN PHAT REAL Vietnam Leasing factory
ESTATE TRADING SERVICE
COMPANY LIMITED (LUU VN
DIFFERENT TO THI HOI HOA)
143 TRINH GIA PHAT REAL Vietnam
ESTATE CO., LTD
144 MY PHUOC HOSPITAL JOINT Vietnam
STOCK COMPANY
145 INTERNATIONAL DAIRY Vietnam
JOINT STOCK COMPANY

184
146 BINH DUONG TOKYO AND Vietnam
INDUSTRIAL SERVICES CO.,
LTD
147 L&D INVESTMENT Vietnam
MANUFACTURING AND
TRADING CO., LTD
148 ARDA CO., LTD Ý Manufacture of beds, cabinets, tables and chairs
149 SUKMONO VIET NAM CO., Netherlands Manufacture of pasta, noodles and similar products
LTD (to lease the workshop to
Jimmy Food)
150 JIMMY HUNG ANH FOOD CO., Netherlands Manufacture of pasta, noodles and similar products
LTD (June 2011 under
construction)
151 RHINE PRECISION ALLOY Singapore Manufacture of suitcases, bags and the like, manufacture of
(Vietnam) CO., LTD\HTL seat cushions
FURNITURE Vietnam CO., LTD

152 EMIVEST FEEDMILL VIET Malaysia Production of feed for livestock, poultry and fisheries
NAM CO., LTD
153 EMIVEST FEEDMILL Vietnam Malaysia Production of feed for livestock, poultry and fisheries
CO., LTD - BRANCH OF
VETERINARY DRUG
PRODUCTION
154 Denmarkh footwear production

ECCO (Vietnam) CO., LTD -


factory/ BW CN DEVELOPMENT
JSC
155 Denmarkh footwear production

ECCO (Vietnam) CO., LTD -


factory/ BW CN DEVELOPMENT
JSC
156 ECCO (Vietnam) CO., LTD - Land Denmarkh footwear production
lease
157 BW BAU BANG Netherlands - real estate business
DEVELOPMENT CO., LTD Vietnam
BB01/BW INDUSTRIAL
DEVELOPMENT JOINT STOCK
COMPANY

(PROJECT 02 IN BAU BANG


Industrial Park)

A. Minh signed the contract


158 DKW GLOBAL COMPANY Thái Lan Manufacture of plastic products
LIMITED (FACTORY)
159 AN VIET PRODUCTION CO., USA Producing products from plastic
LTD -Land for rent Details: Manufacture of cover products used to cover
machinery, equipment and tools

160 TOP GLOVE Vietnam CO., Malaysia Producing products from plastic
LTD/INVESTMENT SERVICES Details: Producing gloves from plastic, manufacturing other
CONSULTING JSC (ISC CO.) products from plastic.
TRANSFER
161 BW BAU BANG INDUSTRIAL Netherlands - Warehousing and storage of goods
DEVELOPMENT JOINT STOCK Vietnam
COMPANY

162 BW INDUSTRIAL Netherlands - Warehousing and storage of goods


DEVELOPMENT JOINT STOCK Vietnam
COMPANY

(store the HQ/TH file basket)

185
163 BW INDUSTRIAL Netherlands - Warehousing and storage of goods
DEVELOPMENT JOINT STOCK Vietnam
COMPANY

(store the HQ/TH file basket)


164 A.J PLAST PUBLIC COMPANY Thái Lan Manufacture products from plastic
LIMITED
165 ARNEPLANT Vietnam CO., LTD Tây Ban Nha Manufacture of shoe insoles
(stored in VNam BB)
166 BW BAU BANG Netherlands
DEVELOPMENT CO., LTD -
BB06 (stored in Chinese BBMR)
167 BW BAU BANG Netherlands
DEVELOPMENT CO., LTD -
BB05 (stored in Chinese BBMR)

186
BINH AN INUDSTRIAL PARK

GENERAL INFORMATION
Address Binh Thang Ward - Di An City - Binh Duong

Binh Thang Investment Development Joint Stock Company


Investor

Investment Sectors Priority Sectors for Garment; Garment accessories; Paper packaging…
Investment

Lease term ▪ Start date: 2003


Minimum Lease Area N/A

Limit for Construction N/A


Height
Permitted Construction N/A
Rate

Planned area Total area: 25,9ha

Operation Status N/A


Occupancy Rate and ▪ 96,04%.
Number of Projects

Number of Korean projects N/A

Lease fee 60 USD/m2 Chưa bao gồm VAT

INFRASTRUCTURE AND FACILITY


Financial institution Inside of IP. BIDV, Vietcombank, Sacombank, ACB bank, Techcombank....
Tax service, State finance Inside of IP
office

Customs Service Inside of IP


Inside of IP
Logistics Inside of IP
Post office Inside of IP
Police, public security Inside of IP

Recruitment Inside of IP
Worker dormitory Inside of IP
Worker's child education Inside of IP
facility

One-stop service Inside of IP

187
Fire-fighting facility Available, inside of IP
View

188
DAI DANG INUDSTRIAL PARK

GENERAL INFORMATION
Address Phu Tan Ward - Thu Dau Mot City - Binh Duong

Dai Dang Construction and Investment Co., Ltd


Investor

Investment Sectors Priority Sectors for Woodworking and interior decoration; Mechanical assembly;
Investment Agricultural processing; Power electronics; Garment, packaging,
footwear; Assembling and repairing agricultural, forestry and
transportation machines

Lease term ▪ Start date: 2005


Minimum Lease Area N/A

Limit for Construction N/A


Height
Permitted Construction N/A
Rate

Planned area 274,35 ha

Factory Available for Rent N/A

Operation Status N/A


Occupancy Rate and ▪ 45,82%
Number of Projects

Number of Korean projects N/A

Lease fee 60 USD/m2 Chưa bao gồm VAT

INFRASTRUCTURE AND FACILITY


Financial institution Inside of IP. BIDV, Vietcombank, Sacombank, ACB bank, Techcombank....
Tax service, State finance Inside of IP
office

Customs Service Inside of IP


Inside of IP
Logistics Inside of IP
Post office Inside of IP
Police, public security Inside of IP

Recruitment Inside of IP
Worker dormitory Inside of IP

189
Worker's child education Inside of IP
facility

One-stop service Inside of IP

Fire-fighting facility Available, inside of IP

190
DAI DANG INUDSTRIAL PARK

GENERAL INFORMATION
Address Phu Tan Ward - Thu Dau Mot City - Binh Duong

Dai Dang Construction and Investment Co., Ltd


Investor

Investment Sectors Priority Sectors for Woodworking and interior decoration; Mechanical assembly;
Investment Agricultural processing; Power electronics; Garment, packaging,
footwear; Assembling and repairing agricultural, forestry and
transportation machines
Lease term ▪ Start date: 2005
Minimum Lease Area N/A

Limit for Construction N/A


Height
Permitted Construction N/A
Rate

Planned area 274,35 ha

Factory Available for Rent N/A

Operation Status N/A


Occupancy Rate and ▪ 45,82%
Number of Projects

Number of Korean projects N/A

Lease fee 60 USD/m2 Chưa bao gồm VAT

INFRASTRUCTURE AND FACILITY


Financial institution Inside of IP. BIDV, Vietcombank, Sacombank, ACB bank, Techcombank....
Tax service, State finance Inside of IP
office

Customs Service Inside of IP


Inside of IP
Logistics Inside of IP
Post office Inside of IP
Police, public security Inside of IP

Recruitment Inside of IP
Worker dormitory Inside of IP
Worker's child education Inside of IP
facility

191
One-stop service Inside of IP

Fire-fighting facility Available, inside of IP

MAI TRUNG INUDSTRIAL PARK

GENERAL INFORMATION
Address An Tay Commune - Ben Cat Town - Binh Duong

Enterprise Construction Investment and Service Mai Trung


Investor ▪ Tel: +0907770288

Location Adjacent location:


- Distance to nearest Big city: Ho Chi Minh City 43 km
- Distance to Provincial Center: 18 km from Thu Dau Mot
- Distance to nearest Airport: 44 km from Tan Son Nhat
- Distance to the nearest railway station: 50 km from Saigon station
- Distance to the nearest River Port: Saigon Port 51 km
- Distance to the nearest seaport: Cat Lai Port 55 km
Investment Sectors Priority Sectors for Fine art wood processing industry and interior decoration;
Investment Mechanical assembly industry; Agricultural product processing
industry - food; Electrical and electronic industry; Garment and
leather shoe industry; Light industry and packaging; Industry,
assembling and repairing agricultural, forestry and transportation
machinery.
Minimum wage [Area II] According to Decree 2022/ND-CP dated 15th November 2022
Lease term ▪ Start date: 2005
Minimum Lease Area ▪ Smallest rental area: 10000 (m2)

Limit for Construction N/A


Height
Planned area ▪ Total planned area: 50.6 (ha)
▪ Area available for rent: 12 (ha)
▪ Smallest rental area: 10000 (m2)

Factory Available for Rent ▪ 30ha

Operation Status In operation


Occupancy Rate and ▪ 65%
Number of Projects

Number of Korean projects ▪ None

Lease fee ▪ 30 USD/m2

INFRASTRUCTURE AND FACILITY


Financial institution Inside of IP. BIDV, Vietcombank, Sacombank, ACB bank, Techcombank....
Tax service, State finance Inside of IP
office

192
Customs Service Inside of IP
Inside of IP
Logistics Inside of IP
Post office Inside of IP
Medicare Inside of IP. BAUBANG HEALTH CENTER
My Phuoc General Hospital, 12km from the IP
Police, public security Inside of IP

193
KIM HUY INUDSTRIAL PARK

GENERAL INFORMATION
Address Binh Chuan, Thuan An district, Binh Duong province

Kim Huy Industrial Park Development Co., Ltd


Investor Address: 27/3 DT 743 – Binh Quoi, Binh Chuan commune, Thuan An town, Binh Duong
province.
- Telephone: (84-650) 3815015
- Fax: (84-650) 3815014
- Website: www.kcnkimhuy.com.vn
- Email: khip@kcnkimhuy.com.vn
Investment Sectors Priority Sectors for Garment industry, high-grade leather shoes; Mechanical
Investment manufacturing and assembly industry; Industrial production of
high-grade wooden products; Some other occupations do not
pollute the environment.
Lease term Start date: 2006
Minimum Lease Area N/A

Limit for Construction N/A


Height
Permitted Construction N/A
Rate

Planned area 213,63 ha


Area available for rent: 120 (ha)
Smallest rental area: 10000 (m2)
Factory Available for Rent N/A

Operation Status N/A


Occupancy Rate and 50.52%
Number of Projects

Number of Korean projects N/A

Lease fee 60 USD/m2

INFRASTRUCTURE AND FACILITY


Financial institution Inside of IP. BIDV, Vietcombank, Sacombank, ACB bank, Techcombank....
Tax service, State finance Inside of IP
office

Customs Service Inside of IP


Inside of IP
Logistics Inside of IP
Post office Inside of IP
Police, public security Inside of IP

Recruitment Inside of IP

194
Worker dormitory Inside of IP
Worker's child education Inside of IP
facility

One-stop service Inside of IP

Fire-fighting facility Available, inside of IP


View

195
[- This Page is intentionally left blank -]

196
BINH PHUOC

197
INVESTMENT ENVIRONMENT IN BINH PHUOC

USD/VND 23.510

GENERAL INFORMATION
Area 6,876.76 km2
Population 1,03 million people (2022)
▪ Binh Phuoc is located in Southeast region.
Geographical ▪ The province is located in the sourthern key economic region, bordering Binh Duong and Dong Nai
Location provinces with developed inđútry, an important bridge between the Southeast region and the Central
Highlands regions and the Kingdom of Cambodia with a borderline of 263km
▪ The East adjoins to Lam Dong province and Dong Nai province; the West adjoins to Tay Ninh province and
Adjacent
Kingdom of Cambodia; the South adjoins to Binh Duong province; the North adjoins to Dak Nong province
provinces
and Kingdom of Cambodia.
2022 statistic:
▪ Nominal GRDP (billion VND):
▪ Real GRDP (billion VND): 49.639 (2,09579734008866 billion USD)
▪ GRDP growth: 8,42%
GRDP ▪ GRDP per capita (million VND/year): 85,10 (3624 USD)
▪ Economic structure:
- Industry - Construction: 43.19%
- Agriculture. forestry and fishery: 21.46%
- Service: 31.43%
▪ Industry - Construction growth: 3,19%
Industry growth ▪ Agriculture, forestry and fishery growth: 14,46%
▪ Service growth: 8,62%
Import turnover (billion USD): 0,22 (Growth rate: -0,0183)
Import - Export
Export turnover (billion USD): 0,39 (Growth rate: 0,1)
▪ Agriculture still represents a very important part of Binh Phuoc economy. The main agricultural crops
practiced in Binh Phuoc province are hạt điều, coffee, pepper, rubber tree
Key Industry
▪ Key industrial products: manufacturing industry, electricity generation and water supply industry, waste
management and treatment
PCI 64.32
Ranking 43
SOCIAL INFRASTRUCTURE
▪ Roadway: Bình phuoc connects with the Central Highlands and the Southeast provinces through National
Transportation Highway 13 and National Highway 14. Curently the provine has 15 intra-provincial roads, 325 urban roads,
2135 commune roads, 241 specialized roads
▪ The province has hydroelectric power plants: Thac Mo, Can Don, and Srok Phu Mieng with a capacity of
nearly 400MW that have been operating and contributing an abundent power source for production and daily
Electricity
life of people here.
▪ Binh Phuoc also implements a project to generate electric from solar energy with a capacity of 800MW
▪ Binh Phuoc has many large water plants such as Dong Xoai water plant and water plants: Thac Mo, Phuoc
Water Binh, Binh Long, Loc Ninh, Bu Dang with a capacity of 60.000 m3 per day and night that fully meets the
drinking water needs of residents and industrial projects in industrial parks along National highway 13.
Education & ▪ The province currently has 149 preschools (including non-public), 173 primary schools, 107 junior high
Training schools, 33 high schools and 8 continuing education centers.
Medicare ▪ 17 hospitals
INVESTMENT CONDITION
Human resource 59,9% of population are in the working age (2022)

198
Education level Trained labor rate: 35% (2022)
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): N/A
- Area II (4,160,000 VND/month): Dong Xoai City, Chon Thanh Town and Dong Phu District
Salary - Area III (3,640,000 VND/month): Phuoc Long, Binh Long Towns and Hon Quan, Loc Ninh, Phu Rieng
Districts
- Area IV (3,250,000 VND/month): Bu Mang, Bu Mop, Bu Gia Map Districts
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid
to employees working under employment contracts)
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
▪ Incentives from the province:
Investment
▪ The preferential tax rate of 10% for a period of 15 years applies to: income of enterprises implementing
incentives
new investment projects in areas with extramely difficult socio-economic conditions, economic zones (hoa
Lu Border Gate Economic Zone) and high-tech zone.
▪ The tax rate of 17% for a period of 10 years applies to: income of enterprises implementing new investment
projects in areas with extramely difficult socio-economic conditions
▪ Exemption from import tax on machinery and equipment
Fields Attracting
▪ Woodworking industry, Food processing industry, Rubber products processing industry, Electronic industry
Investment
Investment
▪ In 2022, the province has attracted 34 foreign direct investment projects with a registered capital of 114.41
attraction
million USD.
situation
Minh Hung Industrial Park - Korea.
Minh Hung Industrial Park III.
Nam Dong Phu Industrial Park
Dong Xoai Industrial Park I.
Industrial zones
Dong Xoai Industrial Park II.
Bac Dong Phu Industrial Park
Becamex Industrial Park - Binh Phuoc.
Chon Thanh Industrial Park I.

199
Map

Department of Planning and Investment Binh Phuoc


▪ Address: 626/QL14, Dong Xoai town

▪ Tel: 2713879253
Contact
▪ Email: www.skhdtbinhphuoc.gov.vn
▪ Contact person:
- Mr. Vo Sa.
Tel: 0271.3879252
Email: sav.skhdt@binhphuoc.gov.vn

200
LIST OF INDUSTRIAL ZONE IN BINH PHUOC

No Industrial Zone Name Total Area (ha) Occupancy Status


1 Dong Xoai I Industrial Zone 153,49 ha 95% In operation
2 Dong Xoai II Industrial Zone 84,7ha 85% In operation
3 Dong Xoai III Industrial Zone 120,33ha In operation
4 Minh Hung – Korea Industrial Zone 192.28 ha 100% In operation
5 Chon Thanh Industrial Zone 98% In operation
6 Chon Thanh II Industrial Zone 76 ha 100% In operation
7 Becamex - Binh Phuoc Industrial Zone 2,448 ha 15% In operation
8 Minh Hung Industrial Zone – Sikico 655 ha 38% In operation
9 Viet Kieu Industrial Zone 101.8 ha - Under construction
10 Ledana Industrial Zone 425 ha - Under construction
11 Hoa Lu Industrial Zone 348 ha - Under construction
12 Minh Hung III Industrial Zone 577.63 ha - Under construction
13 Bac Dong Phu Industrial Zone 317 ha - Under construction
14 Nam Dong Phu Industrial Zone 480 ha - Under construction

BINH PHUOC’S LOCATION MAP OF INDUSTRIAL ZONES

201
VIET KIEU INDUSTRIAL ZONE

GENERAL INFORMATION
Address Thanh Binh commune, Hon Quan district, Binh Phuoc province
MINH KHANG INVESTMENT AND DEVELOPMENT JSC
Investor ▪ Address: Viet Kieu Industrial Park, Hon Quan District, Binh Phuoc Province
▪ Tel: 0931.808.060 and 0888.818.181
▪ Email: info@vietkieu-industrialpark.com
▪ Website: vietkieu-industrialpark.com

Contact Person +84 931 808 060 (Mr Hùng) / +84 8888 18181 (Mr Đức)

Location Adjacent location


- 2 Km – 0hr05’: To National Highway 13
- 53 Km – 1hr05’: To Hoa Lu Border
- 60 Km – 1hr00’: To Thu Dau Mot City, Binh Duong
- 106 Km – 2hr45’: To Cat Lai Port
- 100 Km – 2hr30’: To Ho Chi Minh City Center
Investment Sectors Priority Sectors for Rubber processing
Investment Plastic, packaging
Wood processing, Building materials
Mechanics and agricultural machines
Power electronics
Garment, Textile
Mixing animal feed
Food and beverage processing
Minimum wage [Area 3] According to Decree 38/2022/ND-CP
Lease term 50 years (2068)
Minimum Lease Area 10,000 m2.
Planned area ▪ Total area: 104ha

Operation Status ▪ Active

Occupancy Rate and ▪ 2 projects


Number of Projects
Number of Korean ▪ None
projects
Lease fee $70-75/m2

Operating fee ▪ Management fee: 0.04 USD/m2/month.

202
Map

203
BECAMEX – BINH PHUOC INDUSTRIAL ZONE

GENERAL INFORMATION
Address 995, National Highway 14, Minh Thanh Commune, Chon Thanh District, Binh Phuoc
Province.
Becamex - Binh Phuoc Technical Infrastructure Development Joint Stock
Investor Company
▪ Address: No. 08 Hung Vuong Street, Hoa Phu Ward, Thu Dau Mot City, Binh
Duong Province, Vietnam
▪ Tel: (+84) 274 3 822 655
▪ Email: info@becamex.com.vn
▪ Website: https://becamex.com.vn/
Contact Person N/A

Location Adjacent location


- 80 km from Ho Chi Minh City;
- 80 km from Tan Son Nhat airport;
- 100 km from Tan Cang port and other ports;
Investment Sectors Priority Sectors for Textile, food processing, production of building materials,
Investment electronic components, mechanics,…
Minimum wage [Area 2] According to Decree 38/2022/ND-CP
Lease term 50 years
Planned area - Total planning area: 1,993 ha.
- Natural land of the industrial zone: 1,993 ha.
- Land for administrative, service and industrial park management: 73.1 ha
- Industrial land for lease: 1393.84 ha.
- Land for green trees: 201.15 ha.
- Land for technical infrastructure: 30.93 ha.
- Land for traffic: 209.6 ha.
- Land for warehouse construction: 83.95 ha
Operation Status ▪ Active

Lease fee 680 Million/150m2

Actual view

204
BINH DUONG MAPLETREE INUDSTRIAL PARK

GENERAL INFORMATION
Address No. 18, Lot L2-1, Tao Force 5 Street, Vietnam - Singapore Industrial Park II, Hoa Phu Ward,
Thu Dau Mot City, Binh Duong Province.
- Investor's name: Mapletree Urban Business Co., Ltd (Vietnam)
Investor - Phone: (0274) 3543688; (0274) 3543678
- Website: www.mapletree.com.vn
Location Adjacent location:
- Distance to nearest big city: 31km from Ho Chi Minh
- Distance to provincial center: 5 minutes from Binh Duong administrative center
- Distance to nearest airport: 32 km (Tan Son Nhat)
- Distance to the nearest railway station: 25 km (Song Than)
- Distance to the nearest river port: 33 km (Cat Lai)
- Distance to the nearest seaport: 31km from Ho Chi Minh
Investment Sectors Priority Sectors for Electronics, machinery,
Investment food processing, automobile parts,
new material,
Bio,
Pharmaceutical,
Supporting industry,

Investment Restricted Sectors Natural rubber processing,
tanning, washing – cleansing, dyeing, plating/anodizing, basic
chemical production, detergent, colorant, printing ink,
paper production
Minimum wage [Area II] According to Decree 2022/ND-CP dated 15th November 2022
Lease term ▪ Start date: 2008
▪ End date: April 26, 2066
Minimum Lease Area 1ha

Limit for Construction 50m


Height
Permitted Construction N/A
Rate

Planned area ▪ Total area: 74,87 ha

Factory Available for Rent ▪ 30ha

Operation Status Ready for construction and obtaining LURC


Occupancy Rate and ▪ 44,95%,
Number of Projects

Number of Korean projects ▪ 21

Lease fee 1.8$/m2/month

205
Factory fee 4 USD/m2

Managemnet fee Management fee: 8,500VND/m/month


Electricity price: 1,406VND/kwh
Clean water price:10,600VND/m3

INFRASTRUCTURE AND FACILITY


Financial institution Inside of IP. BIDV, Vietcombank, Sacombank, ACB bank, Techcombank....
Tax service, State finance Inside of IP
office

Customs Service Inside of IP


Inside of IP
Logistics Inside of IP
Post office Inside of IP
Medicare Inside of IP. BAUBANG HEALTH CENTER
My Phuoc General Hospital, 12km from the IP
Police, public security Inside of IP

Universities, training EIU Int’l Univ. German Tech, vocational training centers……
facilities, etc.

Recruitment Inside of IP
Worker dormitory Inside of IP
Worker's child education Inside of IP
facility

One-stop service Inside of IP

Road Width 24~64m


Communication VNTT provides ADSL, High-Speed Internet service
Infrastructure of industrial
park

Emergency Power National grid is connected with two substation


generator
Fire-fighting facility Available, inside of IP

206
MINH HUNG SIKICO INDUSTRIAL ZONE

GENERAL INFORMATION
Address Dong No commune, Hon Quan district..
Minh Hung Sikico Joint Stock Company.
Investor The company invests in
infrastructure development and construction with a total realized investment
capital of 2,260/4,091 billion VND, reaching about 55%.
Hamlet 5, Dong No Commune, Hon Quan District, Binh Phuoc Province.
Phone: +84 981 555 777
Fax:
Email: sales@sikico.com
Website: www.minhhungip.vn
Location Adjacent location
- 89 km to Ho Chi Minh City
- 67 km to Thu Dau Mot
- Located on backbone road to Tay Nguyen- a potential supply of raw materials
for industries.
Investment Sectors Priority Sectors for Processing agricultural products & foodstuff, etc
Investment Tool machines, food processing machines, interior
furnishing, wood production, paper & toys
Wood processing
Construction materials, mechanics, coating and plating
Weaving and dyeing
Minimum wage [Area 3] According to Decree 38/2022/ND-CP
Lease term 30/5/2066
Minimum Lease Area 1.2 ha
Planned area ▪ Total area: 655 ha in area, developed under the model of a complex of Green
Industry - Trade - Service. Area available for rent
298 (ha)

Operation Status ▪ Active

Occupancy Rate and 37% - 35 secondary enterprises


Number of Projects (including 27 foreign enterprises and 08 domestic enterprises)

Number of Korean ▪ N/A


projects
Lease fee 68 USD/m2

207
Map

INFRASTRUCTRURE
Traffic road
Main road system: building line 42 – 60m, width 18m Internal road system: building line 18m, width 8m
Electricity
110 kv
Water
Water volume (m3/day): 89.000 m3/day-night
Wastewater treatment
Maximum treatment capacity (m3/day): 45.000 m3 /day-night Current treatment capacity (m3/day): 25.000 m3 /day-night
Garbage disposal
Training School
Contact Information
Internet: 5.500 subscribe

208
[- This Page is intentionally left blank -]

209
BINH THUAN

210
INVESTMENT ENVIRONMENT IN BINH THUAN

GENERAL INFORMATION

▪ Area: 7,942.46 km2


Area, Population
▪ Population: 1.2521 million (2022 statistic)
▪ Located in the South Central Coast, adjacent to the key econimic of Viet Nam – Ho Chi Minh
city.
Geographical Location
▪ Located 198 km from Ho Chi Minh city; 150 km from Vung Tau city; 175 km from Da Lat
city, 250 from Nha Trang city and 1,520 km from Hanoi city toward North.
▪ Borderd to Lam Dong province to the North, Ninh Thuan province to the North East, Dong
Adjacent provinces
Nai province to the West, Ba Ria – Vung Tau to the South West, Eastern Sea to the East.
2022 statistic:
▪ GRDP growth: 7.75 %
▪ GRDP per capita: 77.3 million VND/year
GRDP ▪ Economic structure:
▪ Industry - Construction growth: 33.51%
▪ Agriculture, forestry and fishery growth: 27.72%
▪ Service growth: 32.51%
▪ Taxes less subsidies on products: 6.23%
2022 statistic:
▪ Industry - Construction growth: 6.66%
Industry growth
▪ Agriculture, forestry and fishery growth: 2.5%
▪ Service growth: 14.88%
▪ Taxes less subsidies on products: 0.51%

PCI ▪ Score: 64.39 – ranked 42 out of 63 cities and provinces in Vietnam. (2022)

SOCIAL INFRASTRUCTURE

▪ Roadway: Some important roads including National Highway 1A along the length of the
province, passing through Phan Thiet City and 05 districts in the province with a length of 181
km, the South connects Binh Thuan to Dong Nai, Ho Chi Minh City, and Southern provinces;
The North connects Binh Thuan to Ninh Thuan, Khanh Hoa, and Northern provinces; National
Highway 55 is 152.5 km long, connecting with Ba Ria - Vung Tau - Binh Thuan - Lam Dong;
National Highway 28 connecting Phan Thiet to Lam Dong province and others in the Central
Highlands area; provincial roads and inter-district roads have been upgraded, repaired and
expanded. Furthermore, the expressway passing through Binh Thuan province including Dau
Giay - Phan Thiet and Phan Thiet - Vinh Hao sections are in the stage of construction
investment and will put into operation in late 2022. Upon completion of expressway project,
it takes only 2 hours to travel by car from Ho Chi Minh City to Phan Thiet City; Most industrial
Parks of the province are adjacent to National Highway 1A, and there are access roads to it,
so the transportation of goods from the Industrial Park to deep-water ports in Southern
Transportation
provinces such as Ba Ria - Vung Tau, Ho Chi Minh City, and Vinh Tan International Port of
Binh Thuan Province will be convenient and time-saving.
▪ Railway: The North-South railway passing through the length of the province, amongst that
Binh Thuan station located in Ham Thuan Nam district is far 15 km away from Phan Thiet
City, has a capable of receiving and transporting goods with great volumes. Besides, Binh
Thuan has a railway from Phan Thiet City to Ho Chi Minh City, meeting transportation needs
of tourists and experts.
▪ Waterway: Binh Thuan with a 192 km long coastline, adjoining the international maritime
route and Vinh Tan International Port that can receive vessels with a tonnage of up to
50,000DWT; Phu Quy Port and Phan Thiet Port of Binh Thuan province can receive vessels
up to 1,000 DWT, and Son My International Port in the Southern added to Master plan on
development of Vietnam's seaport system in a period of 2021 – 2030 with a vision to 2050 is
expected to invest in in a period of 2022 – 2035 and will receive vessels up to 70.000 DWT.

211
▪ Airway: Binh Thuan has been investing and constructing in Phan Thiet international airport
with a scale of grade 4E, a runway length of 3,050m with a designed capacity of 2 million
passengers/year, being capable of welcoming new airplanes A350-900, A321, B737, etc.
Binh Thuan has been planning and developing electric transmission network and distribution
in association with socio-economic development orientations. The power source has been
assuring from the national grid; the electricity quality and the reliability has been increasingly
Electricity improving, meeting the needs of production and business of investors. Besides, Binh Thuan is
one of Vietnam's major energy centers with Vinh Tan Power Center, LNG Son My Gas Power
Center, and solar, wind power projects, etc, contributing to ensuring energy security for the
region and the whole country.

Apart from large-capacity hydroelectric lakes such as Ham Thuan - Da Mi, Dai Ninh, ... Binh
Thuan has about 30 other large and small irrigation lakes including many lakes with large
water reserves such as Song Quao lake - Ham Thuan Bac district with a capacity of 80 million
Water m3, Song Dinh 3 - Ham Tan of 45.5 million m3; Ca Giay lake - Bac Binh district with a capacity
of 37 million m3, Long Song river lake - Tuy Phong district with 37 million m3; Song Mong
lake - Ham Thuan Nam district with 34 million m3 and other lakes with a capacity of 5-10
million m3.
▪ 01 university, 01 colleges, 01 vocational school, 15 proffessional training centers and 9 non-
Education
public vocational training facilities.

Medicare ▪ 14 hospitals

INVESTMENT CONDITION

Human resource ▪ 53.58% of population are in the working age (2022)

Education level ▪ Trained labor rate: 29.2% (2022)

▪ The minimum salary for the province is applied as follows:


- Area II: Phan Thiet city
- Area III: Ham Thuan Bac and Ham Thuan Nam district, Lagi communce.
Salary
- Area IV: Duc Linh, Tanh Linh, Phu Quy, Tuy Phong, Phu Quy, Ham Tan, Bac Binh district.
▪ The lowest wage for trained labor (including those trained by the enterprises) must be at least
7% higher than the above minimum salary
1. Incentives on corporate income tax:
- High-tech product production projects and auxiliary product production projects will be
entitled to the incentive tax rate of 10 % for 15 years, exemption for 4 years and 50% tax
reduction for the next 9 years.
Investment incentives - Projects not subject to Hi-tech product production and auxiliary product production group
will be entitled to exemption for 02 years and 50% tax reduction for the next 04 years.
2. Incentives on import-export tax: Projects will entitled to be free-duty to form fixed assets.
3. Investors are entitles to other supportive and preferential policies according to current
regulations.
▪ Prioritized projects:
1. Field of processing and preserving agricultural products
- Project of preservation/warehousr, irradiation/heat treatment for fruits and foodstuffs.
- Project of deep processing plant for dragon fruit (soft drinks, wine, jams, fruit jelly, etc)
2. Field of food processing
- Project of canned meat and food processing plant.
- Project of functional foods manufacturing plant.
- Project of manufacturing plant for algae, seaweed and post-salt product.
Fields Attracting Investment
3. Field of manufacturing medicinal herbd, cosmetics and preparations
- Project of madicinal herbs manufacturing plant.
- Project of cosmetics and finished product manufacturing plant.
4. Field of manufacturing packing, wooden furniture, building materials, consumer goods, etc
- Project of packing manufacturing (do nót produce pulp).
- Project of wooden product manufacturing plant.
- Project of manufacturung plant for glazed brcks and interior decoration porcelain.
- Textile, leather and footwear material manufacturing plant.

212
5. Mechanical and electronic fields
- Project of manufacturing plant for freezing systems and refrigeration equipment for
agricultural and aquatic produc preservation industry.
- Project of Manufacturing and doing out works for machinery and equipment on seafood
catching and agricultural mechanics activities.
- Project of Manufacturing, and doing out works for systems and equipment of agricultural
irrigation.
- Project of assembling and manufacturing plant for electric and electronic equipment; wind
power, solar power.
- Project of Manufacturing plant for automobile parts, and automobile assembly.
- Project of Manufacturing plant for steel and aluminum rolling (not making steel or
aluminum); processing and assembling mechanical component, nails, screws, etc.
6. Field of manufacturing fertilizer, animal feed
- Fertilizer manufacturing plant (not using raw materials).
- Project of Processing plant for animal feed of all kinds (not producing fish meal from raw
materials).
7. Field of warehouse, logistics service
- Warehousing and transshipment services (Logistics).
- Chemical storage (not accepting chemicals on the list of banned chemicals and minerals as
specified in Appendix II - Law on Investment 2014)
8. Field of titanium minerals processing
- Zircon compound processing plant (ZOC).
- Artificial Rutin processing plant.
- Titanium Ferro processing plant.

Map

Binh Thuan Industrial Parks Authority


▪ Address: 337 Vo Van Kiet street, Phan Thiet city, Phu Thuy ward, Binh Thuan province
Contact ▪ Tel: 0252.3821234
▪ Fax : 0252.3821234
▪ Email: bqlkcn@binhthuan.gov.vn

LIST OF INDUSTRIAL ZONES

No Industrial zone Name Total Area Occupancy Rate (%) Status


(ha)
1 Phan Thiet Phase 1 Industrial Zone 68 100 In Operation
2 Phan Thiet Phase 2 Industrial Zone 40.7 74.02 In Operation
3 Ham Kiem I Industrial Zone 132.67 59.29 In operation
4 Ham Kiem II Industrial Zone 402 22.5 In Operation

213
5 Song Binh Industrial Zone 300 41.22 In Operation
6 Tuy Phong Industrial Zone 150 Under construction
7 Tan Duc Industrial Zone 300 Under Construction
8 Son My 1 Industrial Zone 1,070 Under Construction
9 Son My 2 Industrial Zone 540 Under Legal

LOCATION MAP OF INDUSTRIAL ZONES

214
PHAN THIET PHASE 1 INDUSTRIAL PARK

GENERAL INFORMATION
Address Phong Nam commune, Phan Thiet city and Ham Liem commune, Ham Thuan Bac district, Binh
Thuan province
Name of Investor: Binh Thuan Construction Materials and Minerals Joint Stock Company
Investor ▪ Address: 33 Tu Van Tu street, Phu Tring ward, Phan Thiet city, Binh Thuan province
▪ Tel: 02523822060 - 02523824887
▪ Email: info@bcmc.com.vn
▪ Website: bcmc.com.vn

Contact Person Name: Dang Trung Hieu


Position: Director of the Factory
Mobile: 0909816592
Email: info@bcmc.com.vn
Location Adjacent location
- Situated at the crossroad between National Highway 1A and National Highway 28
- 198 km from Ho Chi Minh city
- 250 km from Nha Trang city
- 150 km from Da Lat city
Investment Sectors Priority Sectors for Manufacturing the ceramic tiles, woodwork, interior decoration;
Investment clothing industry manufacturing; household appliances
manufacturing; mechanics, electronics and electric industry;
constructional materials industry; agricultural, forestry and fishery
products processing plant; food, fruit, soft drinks processing plant;
consumer goods, knitting, leather shoes and household appliances
manufacturing; assembling and manufacturing of mechanics,
electricity and electronics; clean industries, not polluting the
environment, etc.
Investment Restricted Outside the list of allowed sectors for Investment
Sectors
Minimum wage [Area II] According to Decree 38/2022/ND-CP
Lease term 1998-2048
Minimum Lease Area No request
Limit for Construction Lower than 40 m, according to land area
Height
Permitted Construction From 35% to 70%, according to land area and height
Rate

Planned area ▪ Total area: 68 ha


▪ Total vacant leasable area: 50.23 ha

Operation Status ▪ In Operation

Occupancy Rate and ▪ 100% and 39 projects


Number of Projects

Number of Korean projects ▪ Non

215
Layout Plan

Location Map

216
Actual View

INFRASTRUCTURE AND FACILITY


The technical infrastructure was completed in roads, electricity, water supply, centralized wastewater treatment systems, etc.
The industrial Park is located in the Phan Thiet City, so it is very convenient for transport infrastructure systems, other social
infrastructure systems such as housing for workers, markets, schools, hospitals, amusement Parks, and other services, etc.

217
List of Projects in Phan Thiet Phase 1 Industrial Zone

No. Name of Company Nationality Business line

1 Trung Nguyen Steel Company Limited Vietnam Car auto parts

2 Vietnam Cotton Joint Stock Company Vietnam Cotton Processing

3 Bac My Joint Stock Company Vietnam Manufacture of Kraft paper

4 Tuynel Phan Thiet Brick Joint Stock Vietnam Manufacture of brick and warehouses
Company for rent
5 Thuan Tien Garment Company Vietnam Garments
Limited
6 An Binh Service Trading Vietnam Production of pure ice cubes
Manufacturing Company Litmited
7 Dong A Company Limited Vietnam Color plated products

8 Thang Long- Binh Thuan Packaging Vietnam Production of carton packaging


Trading Manufacturing Company
Limited
9 Hải Triều Company Limited Vietnam Seafood Processing and Preservasion

10 South Central Sabeco Trading Vietnam Beer and beverage


Company Limited
11 Long Son Gas Joint Stock Company Vietnam Extraction, installation of liquefied
gas pipelines
12 Tiumph Furniture Processing - Export Vietnam Furniture products for export
Joint Stock Company
13 Hoa Sen Group Joint Stock Company Vietnam Products such as galvanized steel,
galvanized steel purlin and plastic
products such as PVC pipe, plastic
beads, plastic ceiling panels
14 Dong Nam Viet vegetables and Fruits Vietnam Processing and heating dragon fruit
Import- Export Company Limited for export
15 Phú Nhuận Printing Packaging Joint Vietnam Manufacture of paper package
Stock Company
16 Son Tinh Block Brick Production Vietnam Block Brick Production
Factory
17 Thanh Bình Service Trading Vietnam Glass Processing
Manufacturing Company
18 Truong Thinh Building Materials Vietnam Manufacture of silicat
Company Limited
19 12B Dry Fruits Joint Stock Company Vietnam Dried Fruits

20 Binh Thuan Car Service Company Vietnam Trading and repairing all kinds of cars
Limited
21 Ngoc Phuong Car Company Limited Vietnam Trading and repairing all kinds of cars

22 Ky Lan Seafood Processing Joint Stock Vietnam Seafood Processing


Company
23 Lam Quang Dat Company Limited Vietnam Manufacture of unburnt building
materials
24 Binh Thuan Printing Packaging Joint Vietnam Manufacture of paper package and
Stock Company printing
25 Hoa Phu Joint Venture Company Malaysia Agricultural processing

26 Greenfield Fertilisers Company Hong Kong Organic fertilizers


Limited
27 Cty TNHH IST Vietnam Company Belgium Car auto spare parts and other
Limited products
28 SAS Coat Company Limted Belize Manufacture of premium adhesive
paper for export

218
29 Bernecker Vietnam Company Limited German Manufacture of pipe rack and steel
structure systems
30 Vietnam Intersnack Cashew Company Singapore Cashew processing
Limited
31 Nakagawa MFG Vietnam Company Japan Manufacture of products from paper
Limited
32 Kim Do Company Limited Luxembourg Manufacture of wood products for
export
33 Hai Wang Seafood Company Limited Taiwan Cold Storage for preservation of
seafood
34 Universal Communities Company Hong Kong Manufacture of interior and exterior
Limited products from artificial stone
35 Bex Company Limited Japan Manufacture of Seafood flavor
powdercake
36 Thang Long – Binh Thuan Packaging Vietnam Manufacture of package from paper
Production Trading Company Limited
37 Tan Ha Investment Company Limited Vietnam Manufacture of creasing paper and
cover
38 Binh Thuan Printing Packaging Joint Vietnam Manufacture of package from paper
Stock Company
39 Phu Nhuan Printing Packaging Joint Vietnam Manufacture of package from paper
Stock Company

219
PHAN THIET PHASE 2 INDUSTRIAL PARK

GENERAL INFORMATION
Address Phong Nam commune, Phan Thiet city and Ham Liem commune, Ham Thuan Bac district,
Binh Thuan province
Name of Investor: Trung Nguyen Steel Company Limited
Investor ▪ Address: Lot 1/3 Phan Thiet Industrial Park, Binh Thuan province
▪ Tel: 02523838850
▪ Email: congtytrungnguyen@yahoo.com

Contact Person Name: Nguyen Van Thanh


Position: General Director
Mobile: 0913883023
Email: congtytrungnguyen@yahoo.com
Location Adjacent location
- Adjacent to Phan Thiet Industrial Park Phase 1
- 200 km away from Ho Chi Minh city
- 250 km from Nha Trang city
- 150 km from Da Lat city
Investment Sectors Priority Sectors for Equipment manufacturing and assembling of electronics-
Investment informatics industry; manufacturing of pharmaceuticals, medical
instruments and products; manufacturing of packaging of all
kinds, synthetic resins, products from composite materials;
mechanical engineering, assembly of power machines and
machine tools, manufacturing of complete units, parts, spare parts
and components of bicycles, manufacturing of parts for special-
use vehicles and automobiles; mechanical engineering, repairing
tools, agriculture-fishery-industry machineries and equipment;
manufacturing of the wooden products and interior decoration;
manufacturing and assembling civil equipment; manufacturing of
purified water and bottled pure water; processing of milk and milk
products; building facilities for assorted printing and copying;
manufacturing of fire prevention equipment and products;
industrial laundry projects; knitting and shoe-leather industry;
beverage processing; food processing; Warehouse.
Investment Restricted Outside the list of allowed sectors for Investment
Sectors
Minimum wage [Area II] According to Decree 38/2022/ND-CP
Lease term 2007-2057
Minimum Lease Area No request
Limit for Construction Height From 1 to 3 floors accoding to land location

Permitted Construction Rate Lower than 60%

Planned area ▪ Total area: 40.7 ha


▪ Total vacant leasable area: 31 ha

Operation Status ▪ In Operation

Occupancy Rate and Number ▪ 100% and 11 projects


of Projects

Number of Korean projects ▪0

220
Layout Plan

Location Map

Actual View

INFRASTRUCTURE AND FACILITY


The basic technical infrastructure is invested in traffic roads, electricity, water supply, centralized wastewater treatment
systems, etc.

221
The Industrial Park is located in Phan Thiet City, therefore, very convenient for transport infrastructure systems, and other social
infrastructure systems such as housing for workers, markets, schools, hospitals, amusement park, and other services, etc.

222
List of Projects in Phan Thiet Phase 2 Industrial Zone

No. Name of Company Nationality Business line

1 Trung Nguyen Steel Company Limited Vietnam Warehouse for rent

2 Khang Nong Joint Stock Company Vietnam Fertilizer production

3 Lavite Company Limited Vietnam Cordyceps processing

4 Chien Thang – Binh Thuan Trading Vietnam Zircon Processing


and Manufacturing Company Limited
5 Phuong Giang Binh Thuan Import – Vietnam Manufacture of package
Export Trading Company Limited
6 Phu Nhuan Printing Packaging Joint Vietnam Manufacture of package from paper
Stock Company
7 Phu Thinh Real Estate Investment Vietnam Warehouse for rent and production of
Company Limited artificial quartz stone used in the
interior
8 Southern Electric Equiqment Vietnam Electric Experiment
Experiment Joint Stock Company
9 Chien Thang Biotechnology Company Vietnam Production of all kinds of biological
Limited products, microbiological feeds for
aquaculture
10 Trans Pacific Seafood Company Japan Seafood processing
Limited
11 Jin Guo Yuan Fruits Import – Export China Fruits processing for export
Company Limited

223
HAM KIEM I INDUSTRIAL PARK

GENERAL INFORMATION
Address Ham My and Ham Kiem commune, Ham Thuan Nam district, Binh Thuan province
Name of Investor: Hoang Quan Binh Thuan Consulting-Trading-Service Real Estate Joint
Investor Stock Company
▪ Address: 198 Nguyen Hoi, Phu Trinh Ward, Phan Thiet City, Binh Thuan Province
▪ Tel: 02523604 579 - 0984884209; Fax: 02523722727
▪ Website: www.hoangquanbinhthuan.com.vn
▪ Email: hoangquanbinhthuan@hoangquan.com.vn
Contact Person Name: Nguyen Anh Trang
Position: General Director
Mobile: 0985588585
Email: hoangquanbinhthuan@hoangquan.com.vn
Location Adjacent location
- Near National Highway 1A
- 5 km from North-South Highway of Phan Thiet – Dau Giay section
- 190 km from Ho Chi Minh City (more than 2 hours by car)
- 9 km from Phan Thiet city
- 10 km from Phan Thiet port,
- 110 km from Vinh Tan General Port (Binh Thuan)
- 120 km from Cai Mep - Thi Vai Port (Ba Ria-Vung Tau)
- 180 km from Cat Lai Port (Ho Chi Minh City)
- 4 km from Binh Thuan Station, 9 km from Phan Thiet Station
- 30 km from Phan Thiet Airport (The construction has already started and is expected to open in
2023)
Investment Sectors Priority Sectors for Food processing industry, processing meat and fruit; garment
Investment industry, leather shoes (not tanning); assembly industry of
machinery and equipment; electric - electronic assembly industry;
producing consumer goods, household goods, and packaging of all
kinds; Producing ceramic tiles and interior decoration materials;
mechanical industry, vehicle assembly; manufacturing wooden
products, household products, handicrafts and fine arts; producing
soap and cosmetics; assembly mechanics, manufacturing mechanical
components; shuttle services and transportation warehousing
Investment Restricted Outside the list of allowed sectors for Investment
Sectors
Minimum wage [Area III] According to Decree 38/2022/ND-CP
Lease term 2007-2057
Minimum Lease Area No request
Limit for Construction - Admistrative office: Maximum 10 floors (basement is not excluded)
Height - Factory: From 1 to 5 floors

Permitted Construction - Admistrative office: Bulding Density: Lower than 65%


Rate - Factory: Bulding Density: Lower than 40%

Planned area ▪ Total area: 132.67 ha


▪ Total vacant leasable area: 90.8 ha

Operation Status ▪ In Operation

Occupancy Rate and ▪ 59.3% and 16 projects


Number of Projects

Number of Korean projects ▪ 01 project

224
Lease fee ▪ Land lease fee: 4-5 USD/m2 per year (Annual payment, VAT excluded); 45 USD/m2 (One-
time payment, VAT excluded)

Operating fee ▪ Management fee: 0,3 USD/m2 per year


▪ Electricity fee: According to State prices
▪ Water fee: 14,000 VND/m3 (VAT excluded)
▪ Wastewater treatment fee: 0.3 USD/m3 x 80% of the total water supply (VAT excluded)

Layout Plan

225
Location Map

Actual View

INFRASTRUCTURE AND FACILITY


Social housing area, housing for workers with a total area of 13.5 ha has been gradually finishing with more than 300 apartments
and 950 houses, each are built with 1 ground 1 floor. In addition, the items related to entertainment and service areas for workers
were put into operation.
Technical infrastructure system is built in sync, ensuring the standards of a Green-Clean-Nice-Modern Industrial Park.
- Traffic: Main road is 45m, internal road is from 24 to 35m, which is asphalted by hot plastic concrete, is designed to be able to
load H30 in compliance with Vietnam standard.
- Electric: 110/22KV; capacity 2*63 MVA
- Water supply system: The projects is supplied with water by Phan Thiet Water Plant with a capacity of 18,000m3/day-night; The
waterworks of Ham Kiem Industrial Park (01 km from the Industrial Park) with a capacity of 20,000m3/day-night is under
construction to fulfill the demand of secondary projects.
- Contact information: 5,000-telephone lines are linked with telecommunication system of Binh Thuan Province.
- Wastewater treatment system: The plant has the capacity of 6,000m3/day-night. 2,000m3/day-night in the first period was put into
operation. The enterprises will treat the wastewater internally into column B – Vietnamese standard No. QCVN 40:2011/BTNMT,
the centralized wastewater treatment plant will treat wastewater into column A – Vietnamese standard No. QCVN 40:
2011/BTNMT.

List of Projects in Ham Kiem I Industrial Zone

No. Name of Company Nationality Business line

226
1 Nam Hong Company Limited Vietnam Warehouse for rent

2 CK&XD Single-Member Limited Vietnam Production of steel and concrete


Liability Company structures
3 Hieu Tien Trading and Production Vietnam Bags
Company Limited
4 Thanh Long Thanh Dao Company Vietnam Agricultural products packing and
Limited dragon fruit preservation
5 Binh Thuan Teyaco Company Limited Vietnam Yarn and thread production

6 Vietnam Fruita Company Limited Vietnam Dragon fruit processing and


preservation
7 Nhat Kien Binh Thuan Packaging Vietnam Manufacture of package
Company Limited

8 Nam Hong Company Limited Vietnam Warehouse for rent

9 Fine Fruit Asia Company Limited British Virgin Islands Agricultural processing

10 Shenzhen Yuanxing Fruit Company China Fruits and vegetables processing for
Limited export
11 Yuelaimei Import-Export Company China Production of all kinds of plastic
Limited packages and dragon fruit for export
12 Lotus Food Group Joint Stock Japan Production of dragon fruit wine
Company
13 Zenpix Vietnam Company Limited Korea Manufacture of suitcases, backpacks,
bags
14 Sun Pim Company Limited Taiwan Tempered glasses

15 Rong Phuong Bac Trading Company Vietnam Warehouse for rent


Limited
16 Hoang Quan Binh Thuan Consulting – Vietnam Warehouse for rent
Trading – Service Real Estate Joint
Stock Company
17 Lavela Joint Stock Company Vietnam Food production

227
HAM KIEM II INDUSTRIAL PARK

GENERAL INFORMATION
Address Ham Kiem commune, Ham Thuan Nam district, Binh Thuan province
Name of Investor: Binh Tan Investment Joint Stock Company
Investor ▪ Address: Lot DH5 - Cluster C7, Road N1, Ham Kiem II Industrial Park, Ham Kiem commune,
Ham Thuan Nam district, Binh Thuan province
▪ Tel: 02837540283; Fax: 02837540959
▪ Email: info@bitasic.com.vn
▪ Website: www.bitasic.com.vn
Contact Person Name: Le Minh Thai
Position: General Director
Mobile: 0834509288
Email: minhthai.le@bitasic.com.vn
Location Adjacent location
- Next to National Highway 1A
- 2 km from the North-South expressway of Phan Thiet - Dau Giay section
- 12 km from Phan Thiet City, 187 km from Ho Chi Minh City
- 12 km from Phan Thiet port
- 110 km from Vinh Tan General Port (Binh Thuan Province)
- 120 km from Cai Mep - Thi Vai Port (Ba Ria-Vung Tau)
- 7 km from Binh Thuan Railway Station
- 11 km from Phan Thiet Railway Station
- 32 km from Phan Thiet Airport (The construction has been started and expected to put into
operation in 2023)
Investment Sectors Priority Sectors for Spinning - textiles; canned food, beverage processing plant;
Investment manufacturing of consumer goods, household goods, packaging of
all kinds, leather shoes (non-tanning); mechanical assembly,
mechanical component manufacturing; processing wooden
household use, handicrafts; processing ceramic and porcelain tiles for
interior decoration; assembly of electronics, electrical appliances,
computer components, communications, and sensors; cosmetics and
preparations processing; Filling of liquefied gas (LPG); warehousing
services (intermediate transport and warehouse transport); organic
fertilizer manufacturing (without using raw materials); processing the
animal, poultry and shrimp feeds (not processing the fishmeal from
raw materials); medicinal herbs manufacturing; manufacturing
constructional materials, concrete and products from concrete,
cement and plaster.
Investment Restricted Outside the list of allowed sectors for Investment
Sectors
Minimum wage [Area III] According to Decree 38/2022/ND-CP
Lease term 2008-2058
Minimum Lease Area No request
Limit for Construction - Admistrative office: Maximum 10 floors (basement is not excluded)
Height - Factory: From 1 to 5 floors

Permitted Construction - Admistrative office: Bulding Density: Lower than 60%


Rate - Factory: Bulding Density: Lower than 60%

Planned area ▪ Total area: 402 ha


▪ Total vacant leasable area: 261 ha

Operation Status ▪ In Operation

Occupancy Rate and ▪ 22.5% and 16 projects


Number of Projects

228
Number of Korean projects ▪ Non

Lease fee ▪ Land lease fee: 55-65 USD/m2 (One-time payment, VAT excluded)

Operating fee ▪ Management fee: 0.5 USD/m2 per year


▪ Electricity fee: According to State prices
▪ Water fee: 14,000 VND/m3 (5% VAT included)
▪ Wastewater treatment fee: 0.42-0.5 USD/m3 (VAT excluded)

Layout Plan

Location Map

229
Actual View

INFRASTRUCTURE AND FACILITY


There are 20 blocks of apartments and 72 villas for experts with many utilities to serve the daily life of residents such as
kindergartens, schools, fitness centers, and commercial centers, convenience stores, traditional markets, parks, etc. The project
provides accommodation for 18,000 employees working in the industrial Parks and surrounding areas.
Technical infrastructure system is built in sync, ensuring the standards of a Green-Clean-Nice-Modern Industrial Park.
- Internal transportation systems: Two main roads are 40m in width. Other internal roads have the width of 24 - 35m. All roads were
asphalted with concrete and designed to be able to load H30 in compliance with Vietnamese standard.
- Power supply: 110/22KV; capacity 2x63 MVA
- Water supply: The projects are supplied with water by Phan Thiet Water Plant with a capacity of 18,000m3/day-night; The
waterworks of Ham Kiem Industrial Park (01 km from the Industrial Park) with a capacity of 20,000m3/day-night is under
construction to fulfill the demand of secondary projects.
- Contact information: 15,000-telephone lines are linked with telecommunication system of Binh Thuan Province.
- Wastewater treatment system: The plant has a capacity of 17,000m3/day-night with 2,500m3/day-night in the first period. The
enterprises will treat their wastewater into column B - Vietnamese standard No. QCVN 40:2011/BTNMT, the centralized
wastewater treatment plant will treat wastewater into column A- Vietnamese standard No. QCVN 40: 2011/BTNMT.

List of Projects in Ham Kiem II Industrial Zone

No. Name of Company Nationality Business line

1 Ho Chi Minh City Petroleum Single- Vietnam LPG filling


Member Limited Liability Company
2 Dai Ngan Transport Logistics Company Vietnam Production of plywood
Limited
3 Binh Tan Consumer Goods Vietnam Footwear processing
Manufacturing Company Limited
4 Right Rich International Company Taiwan Footwear processing
Limited
5 Thanh Vuong Footwear Accessories And Beliza Shoe materials processing
Materials Company Limited
6 Yuan Lin Footwear Materials Company Brunei Shoe materials processing
Limited
7 Du Hung Company Limited Taiwan Complete sole shoes processing

8 Hoang Phu Company Limited Taiwan Footwear processing

9 Fu Ding Company Limited Republic of Seychelles Manufacture of sports equipment

10 Sheh Fung Crews Company Limited Taiwan Manufacture of screws

11 Viet Nhat Binh Thuan Company Limited Vietnam Manufacture of iron and steel
mechanical products, wastewater
treatment system
230
12 Binh Tan Consumer Goods Vietnam Production of all kind of shoes
Manufacturing Company Limited
13 Nhat Tan Garment Company Limited Vietnam Garment

14 Phuoc Thanh Electrical Equipment Joint Vietnam Warehouse for electrical products
Stock Company
15 Southern Gas Trading Joint Stock Vietnam LPG storage and filling station
Company
16 Golden Accord Holdings Limited Republic of Seychelles Production of solar panel components

231
SONG BINH INDUSTRIAL PARK

GENERAL INFORMATION
Address Song Binh commune, Bac Binh district, Binh Thuan province.

Name of Investor: Rang Dong Joint Stock Company


Investor ▪ Address: J45 Ton Duc Thang street, Phan Thiet city, Binh Thuan province
▪ Tel: 02523 822301; Fax: 02523832317
▪ Email: rangdong@rangdonggroup.com.vn
▪ Website: www. rangdonggroup.com.vn
Contact Person Name: Le Van Nhi
Position: General Director
Mobile: 0918022261
Email: vannhi1977@gmail.com
Location Adjacent location
- Located near the major titanium mine (not included in the titanium investigation boundary, 12km
away from the mining area) facilitate the transport and process.
- 700m from National Highway 28B
- 5km from the South-North railway
- 2 km from Phan Thiet – Vinh Hao Expressway
- 10km from National Highway 1A,
- 50km from Phan Thiet City center, and
- 60km from the Vinh Tan International Deep-water Port, Tuy Phong district
Investment Sectors Priority Sectors for Processing sectors: As the only industrial Park which specialized in
Investment deep processing of titanium minerals with 03 major product groups
and Ancillary product group:
- Major product groups
+ Titanium Clinker, Artificial rutile, fine and superfine Zirconia.
+ Pigmentum (Anata), Zirconia compounds (such as zirconium
oxychloride).
+ Titanium sponge, titanium alloy.
- Ancillary product groups:
+ Ancillary products are input materials for factories in the main
product group: Separation of ore concentrates; Production of sulfuric
acid (H2SO4), acid chloride (HCl), sodium hydroxide (NaOH) and
other chemical production facilities supporting deep processing.
+ Group of auxiliary products using products of the main product
group: Manufacture of cast iron and steel, welding rods, raw
materials for ceramic industry, whiteners, heat-resistant materials
(For titanium slag, core rutile group). create, smooth and superfine
zircon); Manufacture of paints and raw materials for plastics,
coatings, paper, ink and fibers (for pigments, zircon compounds);
Metal alloy casting, hot rolling, alloy cold (For the group of porous
titanium, metallic titanium, titanium alloy).
Titanium ores after extraction from the coastal area of Binh Thuan
Province such as Bac Binh - Tuy Phong, Luong Son Sub-region,
Northern Phan Thiet Region, Ham Thuan Nam region, Ham Tan
region, etc. will be transported to the processing plant in the industrial
Park for deep-processing to produce the high economic value
products for export and domestic production needs.
Investment Restricted Outside the list of allowed sectors for Investment
Sectors
Minimum wage [Area IV] According to Decree 38/2022/ND-CP
Lease term 2013-2063
Minimum Lease Area No request
Limit for Construction Lower than 40 m, according to land area
Height

Permitted Construction From 35% to 70%, according to land area and height
Rate

232
Planned area ▪ Total area: 300 ha
▪ Total vacant leasable area: 202.32 ha

Operation Status ▪ In Operation

Occupancy Rate and ▪ 41.23% and 3 projects


Number of Projects

Number of Korean projects ▪ Non

Lease fee ▪ Land lease fee: 60-66 USD/m2 (One-time payment, VAT excluded); 4 USD/m2 (Annual
payment, VAT excluded)

Operating fee ▪ Management fee: 0.4 USD/m2 per year (VAT excluded)
▪ Electricity fee: According to State prices
▪ Water fee: 0.4 VND/m3 (VAT excluded)
▪ Wastewater treatment fee: 0.5 USD/m3 (VAT excluded)

Layout Plan

233
Location Map

Actual View

INFRASTRUCTURE AND FACILITY


Technical infrastructure system is built in sync, ensuring the standards of a modern Industrial Park.
- Transport: Transport system in the industrial Parks is arranged in a rectangular grid, among which is 50m wide main road from
28B NHW connecting the functional areas, the other roads connected to the main road to create a smooth transportation system,
ensuring to access to each plot. The total length of internal roads is 17.51 km.
- Power supply: There is a 110KV/22KV transformer station on D3 road, connected from 110 KV of Dai Ninh - Phan Ri Line to
Song Binh Industrial Park, which is the electricity source for the production of the Industrial Park. The total capacity of 02 phases
is 126 MVA (period to 2015, the capacity of 63 MVA; period of 2016-2020, the capacity of 63 MVA); 22KV power line connected
63 MVA station (total capacity of 02 phases is 120 MVA) and run along the roads in the industrial Park to provide factories.

234
- Water supply: The daily-life water treatment area is constructing with a capacity of 30,000 m3/day-night, incorporating HDPE,
D150cm and D100cm piping systems to reach each land lot in the industrial Park to secondary investors under their demand.
- Telecommunications: Communications systems for the industrial park will be paired in the telecommunication network of Binh
Thuan Province through the local postal system, and junction boxes shall be connected to gates of the factories in the Industrial
Park.
- Wastewater treatment system: Industrial & services wastewater must be collected to a central processing system (30,000 m3/day-
night) of the Industrial Park and processing to meet the grade A under standards No. QCVN 40:2011/BTNMT.

List of Projects in Song Binh Industrial Zone

No. Name of Company Nationality Business line

1 Song Binh Minerals Joint Stock Vietnam Zircon powder


Company
2 GPM_RDG Titanium Company British Virgin Islands Titanium slag processing
Limited
3 Song Binh Minerals Joint Stock Vietnam Pigment processing
Company

235
TUY PHONG INDUSTRIAL PARK

GENERAL INFORMATION
Address Vinh Hao commune, Tuy Phong district, Binh Thuan province.
Name of Investor: Tan Dai Tien Limited Company
Investor ▪ Address: Service operations area of Tuy Phong Industrial Park, Vinh Hao commune, Tuy
Phong district, Binh Thuan province, Vietnam
▪ Tel: 02837815238; Fax: 02837815238
▪ Email: tandaitienbinhthuan@yahoo.com.vn
Contact Person Name: Ngo Trong Nghia
Position: General Director
Mobile: 03272033.88
Email: nghia@tpip.vn
Location Adjacent location
- 6km from Vinh Tan General Port
- 0.9 km from Vinh Hao Railway station
- Adjacent to 1 National Highway and Phan Thiet – Vinh Hao – Cao Lam Highway

Investment Sectors Priority Sectors for Steel & aluminum rolling industry (no operation of steel & aluminum
Investment refining); Manufacturing industry of pharmaceuticals, cosmetics and
medical equipment; Agro-forestry-seafood processing industry;
Manufacturing industry group of construction materials; Mechanical
assembly industry group; Paper industry group (no operation of pulp
manufacturing); Manufacturing industry group of household
appliances; Manufacturing industry of wood products;
Manufacturing industry group of electronics, microelectronics,
software; Rubber industry group (no rubber latex processing); Grease
blending (no regeneration); Manufacturing and processing industry
of products from salt and salt post-products and plastic products;
Chemical warehouse and storage (no receipt of chemicals on the list
of banned chemicals and minerals defined in Appendix II - the
Investment Law of 2014).
Investment Restricted Outside the list of allowed sectors for Investment
Sectors
Minimum wage [Area IV] According to Decree 38/2022/ND-CP
Lease term 2008-2058
Minimum Lease Area No request
Limit for Construction - Admistrative office: The height of the ground floor is from 5 to 7m, the remaining floors
Height are from 3 to 5m
- Factory: No request

Permitted Construction - Admistrative office: Bulding Density: 40-45%


Rate - Factory: Building Density: Lower than 70%

Planned area ▪ Total area: 150 ha


▪ Total vacant leasable area: 97.9 ha

Operation Status ▪ Under construction

Occupancy Rate and ▪ Under construction


Number of Projects

Number of Korean projects ▪ Non

Lease fee ▪ Land lease fee: 40-60 USD/m2 (One-time payment, VAT excluded)

236
Operating fee ▪ Management fee: 0.3 USD/m2 per year (VAT excluded)
▪ Electricity fee: According to State prices
▪ Water fee: According to State prices
▪ Wastewater treatment fee: 0.3 USD/m3 (VAT excluded)

Layout Plan

Location Map

237
Actual View

INFRASTRUCTURE AND FACILITY

- Internal traffic roads: Two main roads are 30m in width. Other internal roads have the width of 24 - 18m, have elastic modules
under A1 high-quality road and Eyc ≥ 155Mpa, ensuring that containers and other vehicles can transport easily and conveniently.
- Electricity: 110/22KV, total capacity of 40 MV, may increase under actual use demand, the power-grid along the roads is 22kV.
- Water: Water treatment plant with capacity of 7,500m3/day-night. Main pipeline system is Ø 200 - 300mm, branch pipeline is Ø
150mm - Ø 100mm.
- Wastewater treatment system: The plant has a capacity of 4,000m3/day-night with 2,000m3/day-night in the first period. The
enterprises will treat their wastewater into column B - Vietnamese standard No. QCVN 40:2011/BTNMT, the centralized
wastewater treatment plant will treat wastewater into column A- Vietnamese standard No. QCVN 40: 2011/BTNMT.
- Telecommunication: Telecommunication is smooth by using FTTx Internet technology with high speed up to 2.5 Gb/s and postal
service to meet investors' demands on Information technology in the Industrial Park.

238
TAN DUC INDUSTRIAL PARK

GENERAL INFORMATION
Address Tan Duc commune, Ham Tan district, Binh Thuan province
Name of Investor: Sonadezi Binh Thuan Shareholding Company.
Investor ▪ Address: Floor 12th of Sonadezi Tower – No. 1, Street 1, Bien Hoa 1 Industrial Park, An Binh
Ward, Bien Hoa City, Dong Nai Province, Vietnam
▪ Tel: 0251883656; Fax: 02518836060
▪ Email: sonadezibinhthuan@szt.com.vn
Contact Person Name: Phan Thuy Doan
Position: Deputy General Manager
Mobile: 0943393963
Email: sonadezibinhthuan@szt.com.vn
Location Adjacent location
- Adjacent to National Highway 1A,
- About 3 km from the boundary of Dong Nai Province
- About 60 km from Phan Thiet City
- About 95 km from Ho Chi Minh City
- 3 km from Phan Thiet – Dau Giay Expressway
Investment Sectors Priority Sectors for Manufacturing and processing industries such as Food products and
Investment beverages; Textiles and weaving of textiles (except Dyeing); Wood
and products of wood and cork; Paper and paper products;
Pharmaceuticals, medicinal chemical and botanical products;
Fabricated metal and other non – metallic mineral products (except
Plating); Rubber and plastic products; Computer, electronic and
optical products; Electrical equipment; Machinery and equipment;
Motor vehicles, other motor vehicles and other transport equipment;
Manufacture and distribution of electricity, gas, hot water, steam and
air conditioning; Some service activities.
Investment Restricted Outside the list of allowed sectors for Investment
Sectors
Minimum wage [Area IV] According to Decree 38/2022/ND-CP
Lease term 2021-2071
Minimum Lease Area No request
Planned area ▪ Total area: 300 ha
▪ Total vacant leasable area: 209.33 ha

Operation Status ▪ Site clearance and compensation works are in progress; Expected investment in the
construction of technical infrastructure in 2022 and attraction of secondary projects in 2023.
Occupancy Rate and ▪ Non
Number of Projects

Number of Korean projects ▪ Non

239
Layout Plan

Location Map

240
Actual View

241
SON MY 1 INDUSTRIAL PARK

GENERAL INFORMATION
Address Son My commune, Ham Tan district, Binh Thuan province
Name of Investor: Son My Industrial Park Investment Construction and Trading
Investor Infrastructure Joint Stock Company
▪ Address: Son My commune, Ham Tan district, Binh Thuan province
▪ Tel: 0924768568
▪ Email: info@ipico.com.vn
▪ Website: www.ipico.com.vn
Contact Person Name: Khuong Trung Thuy
Position: Chairman of the Board and General Director
Mobile: 0924768568
Email: thuy.khuong@ipico.com.vn
Location Adjacent location
- Adjacent to 55 National Highway connecting Ba Ria - Vung Tau Province to Binh Thuan -
Lam Dong
- 10 km from La Gi Town
- 90 km from Phan Thiet City
- 60 km from Thi Vai - Cai Mep Deep-water Port
Investment Sectors Priority Sectors for Manufacturing the ceramic tiles, woodwork, interior decoration;
Investment clothing industry manufacturing; household appliances
manufacturing; mechanics, electronics and electric industry;
constructional materials industry; agricultural, forestry and fishery
products processing plant; food, fruit, soft drinks processing plant;
consumer goods, knitting, leather shoes and household appliances
manufacturing; assembling and manufacturing of mechanics,
electricity and electronics; clean industries, not polluting the
environment, etc.
Investment Restricted Outside the list of allowed sectors for Investment
Sectors
Minimum wage [Area II] According to Decree 38/2022/ND-CP
Lease term 2018-2068
Minimum Lease Area No request
Limit for Construction - Administrative Office: Depending on operating conditions and terrain
Height - Factory: From 1-3 floors

Permitted Construction Buiding density: 45.01%


Rate

Planned area ▪ Total area: 1,070 ha


▪ Total vacant leasable area: 740 ha

Operation Status ▪ The project has approved the investment policy by the Prime Minister and the completed the
legal procedures; tasks related to technical infrastructure, site clearance and compensation are in
progress (the construction start date is August 30th 2022); expected to attract secondary
investors in late 2023.

Occupancy Rate and ▪ Non


Number of Projects

Number of Korean projects ▪ Non

242
Layout Plan

243
SON MY 2 INDUSTRIAL PARK

GENERAL INFORMATION
Address Son My commune, Ham Tan district, Binh Thuan province
Location Adjacent location
- Adjacent to Son My 1 Industrial Park
- Next to Nationak Highway 55 connecting to Ba Ria – Vung Tau to Binh Thuan – Lam Dong
- 10 km from Lagi commune
- 90 km from Phan Thiet city
- 60 km from Thi vai – Cai Mep Deep-water Port
Minimum wage [Area IV] According to Decree 38/2022/ND-CP
Lease term ▪ Under legal, is in the process of preparation for investment
Minimum Lease Area No request

Planned area ▪ Total area: 540 ha


▪ Total vacant leasable area: 330 ha

Operation Status ▪ Under legal, is in the process of preparation for investment

Occupancy Rate and ▪ Non


Number of Projects

Number of Korean projects ▪ Non

Layout Plan

244
[- This Page is intentionally left blank -]

245
CA MAU

246
INVESTMENT ENVIRONMENT IN CA MAU

GENERAL INFORMATION

Area and ▪ Area: 5,221 km2


population ▪ Population: 1.2 Million (2022)
▪ Ca Mau province is the southernmost province of Vietnam, in the Mekong Delta.
Geographical
▪ Ca Mau province is located far from the city. Ho Chi Minh City 350 km and far from Ho Chi Minh City. Can
Location
Tho 180 km.
Adjacent ▪ Ca Mau province borders Kien Giang province to the North, Bac Lieu province to the Northeast, the East
provinces and Southeast borders to the East Sea, and the West and Southwest borders to the Gulf of Thailand.
2022 statistic:
▪ Real GRDP: 73.529 Billion VND. (3,10 Billion USD)
▪ GRDP growth: 10,41%
▪ GRDP per capita: 60,9 million VND/year.
GRDP ▪ Economic structure
- Industry - Construction: 28,5%;
- Agriculture: 34,6%;
- Service: 32,9%;
- Tax on goods: 4,0%.
2022 statistic:
Industry ▪ Industry - Construction growth: 1,8%
growth ▪ Agriculture growth: 0,8%
▪ Service growth: 0,7%.

PCI Score: 61.60 - Rank: 58th

SOCIAL INFRASTRUCTURE

▪ Roadway: National Highway 1, National Highway 63, Quan Lo - Phung Hiep National Highway, Southern
Coastal Corridor Road, Ho Chi Minh Road very well meet the needs of travel, production and transportation
of goods of the country. people and businesses inside and outside the province.
▪ Airway: Ca Mau airport is 2 km from the center of Ca Mau city, with a total runway length of 1,500 m.
▪ Waterway: Cua Lon, Tam Giang, Ganh Hao, Bay Hap, Doc, Dam Doi, Cai Tau, Trem Trem rivers are very
Transportation
convenient for waterway transport, freight transport and circulation with the provinces of the River Delta.
Kowloon. Ca Mau has 1 seaport and 4 river ports, connecting with Can Tho City and Ho Chi Minh City by
waterway through the Ho Chi Minh City - Nam Can route.
▪ Seaport: Nam Can seaport is located upstream of Cua Lon river in Nam Can town, Nam Can district.
Currently, the port is capable of receiving ships of 3,000 DWT.

Electricity ▪ Electricity supplied from the national grid 220/110/22KW provides electricity for Ca Mau province.

▪ Ca Mau has 03 main water sources, including: rainwater, saltwater and groundwater. In addition, there are 3
Water
sources of mineral water, so the water supply system is good and stable.
Education & ▪ 02 universities, 03 colleges, 01 professional secondary school and vocational education institutions, ...
Training distributed in most localities in the province.
▪ There are 133 medical examination and treatment facilities in Ca Mau province. In which, there are 15
Medicare hospitals; 01 Nursing and rehabilitation hospital; 01 Dermatology Hospital; 21 regional polyclinics; 94
Commune and ward health stations and 01 other medical facility.

INVESTMENT CONDITION

Human
▪ 62,55% of population are in the working age (2022)
resource

Education level ▪ Trained labor rate: 34% (2022)

▪ Salary division by region I, II, III: Salary according to regulations of each region.
Salary
▪ Minimum wage for skilled workers: According to the agreement between the Enterprise and the employee.
▪ Incentives decided by the government: According to regulations on land rent, corporate income tax, import
Investment
and export tax.
incentives
▪ Incentives decided by the province: None.

247
▪ Key projects: Hon Khoai General Seaport Project; Projects on eco-tourism, resort, entertainment,...; the
projects of airport urban area, new urban area, ecology, resort and sport in Ca Mau province; infrastructure
Fields projects of industrial parks, economic zones, industrial clusters,...
Attracting ▪ Focused areas: Agricultural, forestry and fishery processing industries; invest in innovation in production
Investment technology of new, high-value-added products; The field of energy, renewable energy (wind power, gas power,
solar power, biomass power) - orientation in the near future will be to export electricity to foreign countries;
Infrastructure of industrial parks, economic zones, industrial clusters;

Map

Economic Zone Management Board of Ca Mau Province


▪ Address: 91 - 93 Ly Thuong Kiet, Ward 5, Ca Mau City
Tel: 0290.3825866
Contact
▪ Fax: 0290.3825477
▪ Email: banqlkkt@gmail.com.
▪ Person in charge of contact: Duong Hoai Nam - Head of Economic Zone Management Board.

248
LIST OF CA MAU PROVINCE INDUSTRIAL PARK

NO. NAME TOTAL AREA OCCUPANCY STATUS


(HA) RATE
1 Khanh An Industrial Zone 235,86 100% In operation
2 Hoa Trung Industrial Zone 326 100% In operation
3 Song Doc Industrial Zone in the South 100 100% In operation

KHANH AN INDUSTRIAL ZONE

GENERAL INFORMATION

Located in Khanh An commune, U Minh district, Ca Mau province (adjacent to Ca Mau Gas -
Address Electricity - Fertilizer Industrial Complex)

- Name: Duong Hoai Nam, Position: Head of Economic Zone Management Board.
Contact Person - Phone number: 0913.767.866, Email: duonghoainam71@gmail.com

- 10 km from the center of Ca Mau City;


- 12 km from Ca Mau airport;
Location - 40 km from Song Doc estuary (Tran Van Thoi district, Ca Mau province), 63 km from Nam Can
port (Nam Can district, Ca Mau province), 295 km from Can Tho port, 2,000-ton ships can travel
easily easy.

Areas of investment As a multi-industry industrial park, focusing on orienting main


promotion business lines such as: port services, agricultural product processing,
seafood processing, mechanical industry, animal feed and fertilizer
processing industry ; electronic industry, textile, consumer goods
production; forestry products processing industry; natural gas
Investment Area liquefaction industry, post-gas industry; construction materials
manufacturing industry, packaging production, PA bags, PE bags;
recycled plastic pellets, biomass electricity, gas electricity, food CO2,
industrial gas.
Restricted areas of According to regulations of the Law.
investment
Minimum wage Minimum regional salary according to 38/2022/ND-CP: Belongs to area III.
49 years.
Lease term ▪ Starting time: Since the decision to lease the land.
▪ End time: According to the land lease decision.
Minimum Lease Area Not specified.

- Factory construction area: The height of the building depends on the type of production and the
Limit for Construction technological line of the factory.
Height - Administrative - service area: Up to 5 floors.

- Factory construction area: Maximum construction density: 70%; The factory has more than 05
Permitted Construction floors used for production with a construction density of 60%.
Rate - Administrative - service area: 40%.

▪ Total area: 235.86 ha.


Planned area ▪ Leaseable area: 164.11 ha.
▪ Area with infrastructure ready for factory construction: No.

Factory Available for None


Rent

249
Operation Status In operation

Occupancy Rate and 91%.


Number of Projects

Number of Korean None


Projects

▪ Land rental cost: Land price along road N1 and D6 road in Khanh An Industrial Park: 450,0000
VND/m2/land lease term (one-time payment form) (applicable only to land areas leased by the
Lease fee State)).

▪ Workshop rental cost: No.

▪ Management cost (Infrastructure usage fee): VND 4,872/m2/year.


▪ Electricity cost: According to EVN's price, according to the Electricity Price Notice of Ca Mau
province.
Operating fee ▪ Water cost: 10,000 VND/m3
▪ Waste water treatment fee: There is no specific price. Because the investor's wastewater
treatment plant project is being completed, the price list has not been issued.
▪ Waste treatment fee]: No specific price yet. Because the investor's wastewater treatment plant
project is being completed, the price list has not been issued.
INFRASTRUCTURE AND FACILITY

Distance to banks, educational institutions, healthcare, main roads, city center...: 10 km from Ca Mau city center and 12 km from
Ca Mau airport, convenient in transactions with Banks, educational institutions, healthcare,...

Map

250
LIST OF SOME NOTABLE TENANTS

No. Company Name Nationality Bussiness line


1 Ca Mau gas processing plant Vietnam Ca Mau gas processing plant
2 Khanh An water plant Vietnam Khanh An Water Plant
construction investment
project
3 A Hui Packaging Factory - Vietnam A Hui Packaging Factory -
Aquabest Aquabest
4 Ca Mau unburnt brick Vietnam Ca Mau unburnt brick construction
construction factory factory
5 Khanh An service port Vietnam Investment in construction of
construction investment Khanh An service port
project
6 Ca Mau LPG storage and filling Vietnam Ca Mau LPG storage and filling
station project station project
7 Factory producing high-tech Vietnam Factory producing high-tech
building materials, light building materials, light building
building materials, rare materials, rare materials
materials
8 Operation Manager of Ca Mau Vietnam Operation Manager of Ca Mau
Power Transmission Team Power Transmission Team
9 Invest in building BTS station Vietnam Invest in building BTS station and
and self-standing Antenna self-standing Antenna
10 110KV substation and Vietnam 110KV substation and connection
connection line line
11 Hong Lam high-tech concrete Vietnam Hong Lam high-tech concrete
factory factory
12 Aquatic feed and Vietnam Aquatic feed and microbiological
microbiological fertilizer fertilizer processing factory
processing factory
13 Seafood processing factory Vietnam Seafood processing factory
14 Factory for processing Vietnam Factory for processing agricultural
agricultural products and products and extracting essential
extracting essential oils oils
15 C.P Ca Mau aqua feed factory Thailand C.P Ca Mau aqua feed factory
16 Construction of LPG filling Vietnam Construction of LPG filling stations
stations and warehouses and warehouses
17 A Hui Packaging Factory - Vietnam A Hui Packaging Factory - Plastic
Plastic
18 Investment project to build a Vietnam Investment project to build a
wood processing factory wood processing factory
19 Khanh An Wood Power Plant Vietnam Khanh An Wood Power Plant
Project Project
20 Construction of concentrated Vietnam Construction of concentrated
wastewater treatment plant in wastewater treatment plant in
Khanh An Industrial Park Khanh An Industrial Park

251
21 Investment project to build Vietnam Investment project to build Minh
Minh Phu Seafood Processing Phu Seafood Processing Factory
Factory
22 Investment project to build ice Vietnam Investment project to build ice
factory + Technical zone for factory + Technical zone for
production production
23 Investment project to build Vietnam Investment project to build Minh
Minh Qui seafood processing Qui seafood processing factory
factory
24 Investment project to build Vietnam Investment project to build Minh
Minh Phat seafood processing Phat seafood processing factory
factory
25 Investment project to build Vietnam Investment project to build Quang
Quang Minh Packaging Factory Minh Packaging Factory
26 Trung Diep Mekong Packaging Vietnam Trung Diep Mekong Packaging
Factory Factory

252
HOA TRUNG INDUSTRIAL ZONE

GENERAL INFORMATION

Luong The Tran commune, Cai Nuoc district, Ca Mau province.


Address

- Name: Duong Hoai Nam, Position: Head of Economic Zone Management Board.
Contact Person - Phone number: 0913.767.866, Email: duonghoainam71@gmail.com

Surrounding Areas
- 05 km from Ca Mau city center;
Location - 07 km from Ca Mau airport;
- 48 km from Nam Can port (Nam Can district, Ca Mau province), convenient for both road and
waterway traffic.

Areas of investment Exporting seafood processing industries, products


promotion from animal husbandry, production of animal and
poultry feed; Food processing industry, food,
biological products, feed for aquaculture and
Investment Area supporting industries for production and processing;
mining industry and other building materials
production; Warehousing, services

Restricted areas of According to regulations of the Law.


investment
Minimum wage Minimum regional salary according to 38/2022/ND-CP: Belongs to area III
Lease term 49 years.

Minimum Lease Area Not specified.

- Factory construction area: Maximum construction height of 20 m.


Limit for Construction - Administrative - service area: Maximum building height is 25m.
Height

Allowable building density


Permitted Construction - Factory construction area: 50%
Rate - Administrative - service area: up to 40%

▪ Total area: 326 ha.


Planned area ▪ Leaseable area: 197.6 ha.
▪ Area with infrastructure ready for factory construction: None

Factory Available for Rent None

Operation Status In progress of site clearance

Occupancy Rate and 11%.


Number of Projects

Number of Korean Projects 0 projects.

▪ Land rental cost: Currently, Hoa Trung Industrial Park has no investor in infrastructure business,
Lease fee so the State directly leases land to investors. Therefore, the price is applied according to the land
price issued in the 5-year periodic land price list for the period 2020-2024 according to Decision
41/2019/QD-UBND dated December 20, 2019 of the Provincial People's Committee. and
253
Decision 33/2021/QD-UBND dated November 4, 2021 of the Provincial People's Committee on
Supplementing the Price List of all types of land every five years for the period 2020-2024
according to Decision 41/2019/QD-UBND December 20, 2019.
▪ Workshop rental cost: No.
▪ Management cost (Infrastructure usage fee): No.
▪ Electricity cost: According to EVN's price, according to the Electricity Price Notice of Ca Mau
Operating fee province.
▪ Water cost: 10,000 VND/m3
▪ Waste water treatment fee: There is no specific price. Because there are no investors.
▪ Waste treatment fee]: No specific price yet. Because there are no investors.

INFRASTRUCTURE AND FACILITY

Distance to banks, educational institutions, healthcare, main roads, city center...: Adjacent to National Highway 1A, 5 km from Ca
Mau city center, 7 km from Ca Mau airport, convenient in transactions with banks, educational institutions, healthcare,...

List of enterprises in Hoa Trung Industrial zone

Company Name Nationality Bussiness line


No.

1 Hoa Trung Seafood Processing Vietnam Hoa Trung Seafood Processing


Factory Factory
2 Investment project to build Vietnam Investment project to build
Minh Chau import and export Minh Chau import and export
seafood processing factory seafood processing factory
3 Investment project to build Vietnam Investment project to build
chintin factory and invest in the chintin factory and invest in the
production of hydrolyzed production of hydrolyzed
protein, shrimp powder protein, shrimp powder
4 The factory produces shrimp Vietnam The factory produces shrimp
paste, shrimp meal and paste, shrimp meal and products
products from seafood waste from seafood waste
5 Investment project on factory Vietnam Investment project on factory
processing fish cakes, salted processing fish cakes, salted fish
fish with chili and fish sauce with chili and fish sauce
production. production.
6 Ice factory Vietnam Ice factory
7 Dai Duong seafood processing Vietnam Dai Duong seafood processing
and exporting factory and exporting factory
8 Factory producing food, food Vietnam Factory producing food, food
materials, raw materials for materials, raw materials for
animal and aquaculture feeds animal and aquaculture feeds
from aquatic by-products from aquatic by-products
9 Seafood processing plants Taiwan Seafood processing plants
10 Seafood processing and Vietnam Seafood processing and
processing factory processing factory
11 Investment project to build Vietnam Investment project to build
seafood processing factory seafood processing factory
254
SONG DOC INDUSTRIAL ZONE

THÔNG TIN TỔNG QUAN

Address Phong Dien commune, Tran Van Thoi district, Ca Mau province.

Song Doc Industrial Park Infrastructure Investment Construction Joint Stock Company.
▪ Address: Song Doc Industrial Park, Phong Dien Commune, Tran Van Thoi District, Ca Mau
Province, Vietnam.
Investor
Tel: 0902.678.080
▪ Email: khucongnghiepsongdoc@gmail.com.
▪ Website: No.
- Name: Hua Kien Thanh, Position: Director.

Contact Person - Phone number: 0902.678.080,

- Email: khucongnghiepsongdoc@gmail.com

- 50 km from Ca Mau city center;


- 52 km from Ca Mau airport;
Location - Located adjacent to Song Doc estuary (Tran Van Thoi district, Ca Mau province) about 1.5
km, adjacent to the Gulf of Thailand, 3,000-ton ships can travel easily.

Areas of investment Processing aquatic products, processing agricultural


promotion and forestry products, repairing ships, processing
aquaculture feeds, household products and
Investment Area handicrafts from aquatic shells.

Restricted areas of According to regulations of the Law.


investment

Minimum regional salary according to 38/2022/ND-CP: Belongs to regional


Minimum wage
salary 3.

Lease term 49 years.


Minimum Lease Area Not specified.

Factory construction area: average height 13m; for buildings other than industrial, up to 5
Limit for Construction
floors.
Height

- Factory construction area: 70%


Permitted Construction Rate - Administrative - service area: up to 40%

▪ Total area: 100 ha.


Planned area ▪ Area with infrastructure ready for factory construction: No.

Factory Available for Rent ▪ Total factory space for lease: No.

[In operation/under construction of infrastructure and expected to be


Operation Status
completed in…./in progress of site clearance]: Site clearance in progress.

255
Occupancy Rate and ▪ Occupancy rate and number of projects in the area: No.
Number of Projects

Number of Korean Projects ▪ Number of Korean projects in the area: 0 projects.

▪ Land rental cost: Land rental price for Song Doc Industrial Park
Infrastructure Construction Investment Joint Stock Company implementing
the Southern Song Doc Industrial Park Infrastructure Investment and
Business Project: applied according to land price. promulgated in the 5-year
periodic price list of all types of land for the period 2020-2024 according to
Lease fee
Decision 41/2019/QD-UBND dated December 20, 2019 of the Provincial
People's Committee and Decision 33/2021/QD-UBND dated November 4,
2021 of the Provincial People's Committee on Supplementing the 5-year
periodic price list of all types of land for the period 2020-2024 according to
Decision 41/2019/QD-UBND dated December 20, 2019;
▪ Administration cost (Infrastructure usage fee): No.
▪ Electricity cost: According to EVN's price, according to the Electricity Price Notice of Ca
Operating fee Mau province.
▪ Water cost: 10,000 VND/m3
▪ Waste water treatment fee: There is no specific price. Because there are no investors.
▪ Waste treatment fee]: No specific price yet. Because there are no investors.

INFRASTRUCTURE AND FACILITY

Distance to banks, educational institutions, healthcare, main roads, city center...: Adjacent to National Highway 1A, 50 km from
Ca Mau city center, 52 km from Ca Mau airport, convenient in transactions with banks, educational institutions, healthcare,...

Map

256
[- This Page is intentionally left blank -]

257
CAN THO

258
INVESTMENT ENVIRONMENT IN CAN THO

GENERAL INFORMATION

Area. Population  Area: 1.442,4 km2


 Population: 1.295.700 People (2022 statistic)
 Located in the Northeastei n/South region of Vietnam.
 Located 1,877 km from Hanoi, 169 km from Ho Chi Minh City , more than 150 km
Geographical Location from Ca Mau city, nearly 120 km from Rach Gia , 264 km from Phnom Penh
( Cambodia ).

 To the north, to the west, to the east, and to the south.


 The North borders An Giang
Adjacent provinces  The East borders Dong Thap and Vinh Long
 The West borders Kien Giang
 To the South, it borders Hau Giang .
2022 statistic:
 GRDP: 117.500 billion VND
 GRDP growth: 12,64 %
 GRDP per capita: 85,99 million VND/year
GRDP  Economic structure:
- Agriculture, forestry and fishery accounted for 9.65%;
- Industry and construction accounted for 31.03%;
- Service sector accounted for 52.47%;
- Product tax minus product subsidies accounted for 6.85%

2022 statistic:
 Agriculture, forestry and fishery increased by 0.63%;
Industry growth
 Industry and construction increased by 9.22%;
 The service sector increased by 8.55%;
 Product tax minus product subsidies increased by 2.76%
PCI Score: 66,94 - ranked 19 out of 63 cities and provinces in Vietnam. (2022)
SOCIAL INFRASTRUCTURE

 Roadway: FreeWay: Cần Thơ – Hồ Chí Minh; Châu Đốc – Cần Thơ – Hậu Giang - Sóc
Trăng; Cao tốc Lộ Tẻ - Rạch Sỏi
Transportation  Railway: Cần Thơ – Hồ Chí Minh (project)
 Waterway: Cái Cui Port, Hoàng Diệu Port, Thốt Nốt Port.
 Other: Cần Thơ International Airport

Can Tho Thermal Power Company manages and operates 2 plants with a total capacity of
848 MW, including: Can Tho Thermal Power Plant (188 MW) and O Mon I Thermal Power
Electricity
Plant (660 MW).

Water

Education Can Tho city currently has 9 universities, 16 colleges, 1 institute, 2 branches and 12
professional secondary schools in the province
In 2020, the city will have 34 hospitals. In which, there are 28 general and specialized
Medicare
hospitals and 7 hospital lines in districts.

INVESTMENT CONDITION

Human resource  49,51% of population are in the working age (2022)

Education level  Trained labor rate: 82,12% (2022)

Salary  The minimum salary for the province is applied as follows: 4.160.000 VND

259
 Incentives according to government regulations:
 Incentives from the province:
- Infrastructure investors: During basic construction time, To be exempted from land rent
Investment incentives for a maximum of 03 (three) years from the date of issuance of the land lease decision.
ect.
- Secondary investor: Preferential corporate income tax rate of 17% for 10 years, tax
exemption for 2 years and 50% reduction of payable tax for the next 4 years.

Fields Attracting Investment  Prioritized projects: Industry

Map

 Address: No. 17 Tran Binh Trong street, Ninh Kieu, Can Tho city, Can Tho
 Tel: (0292) 3830235
Contact  Fax: (0292) 3830570
 Email: sokhdt@cantho.gov.vn

260
LIST OF INDUSTRIAL ZONES IN CAN THO PROVINCE

NO INDUSTRIAL ZONE NAME TOTAL AREA OCCUPANCY STATUS


(HA) RATE

1 Tra Noc 1 Industrial Zone 135 99.89% In Operation


2 Tra Noc 2 Industrial Zone 155 93.53% In Operation
3 Thot Not Industrial Zone 104 64.33% In Operation
4 Hung Phu 1 Industrial Zone 262 15.82% In Operation
5 Hung Phu 2A Industrial Zone 134 43.59% In Operation
6 Hung Phu 2B Industrial Zone 67 98.00% In Operation
7 Vinh Thanh Industrial Zone (phrase 293.7 -- Under construction
1)

LOCATION MAP OF INDUSTRIAL ZONES IN CAN THO PROVINCE

261
TRA NOC 1 INDUSTRIAL ZONE

GENERAL INFORMATION
Address Tra Noc ward, Binh Thuy District, Can Tho city
CAN THO INDUSTRIAL PARKS INFRASTRUCTURE CONSTRUCTION JSC
Investor Address: 72 Mau Than Streets, An Nghiep Ward, Ninh Kieu Distric, Can Tho City
Tel: 02923 733 609 – Fax: 02923 830 374
Email: cipcocantho@gmail.com
Website: www. xaydunghatangkcncantho.com

Contact Person Name: Mr Vo Ngoc Ho


Position: Member of Management Council
Email: hongocvo20@gmail.com
Location Adjacent location:
- 10 km from Can Tho city center
- 1 km from Tra Noc airport, 2.5 km from Can Tho airport
- 3 km from Can Tho seaport
Investment Sectors Priority Sectors for Food and food processing; mechanical, electrical, electronic,
Investment machinery parts manufacturing, automobile industry, building
material industry, consumer goods manufacturing industry,
pharmaceuticals...
Investment Restricted N/A
Sectors
Minimum wage [Area 2] According to Decree 38/2022/ND-CP
Lease term 50 years
Minimum Lease Area N/A
Limit for Construction - N/A
Height

Permitted Construction N/A


Rate
Planned area ▪ Total area: 130.8 (ha)
▪ Total vacant leasable area: 0.2 (ha)
Factory Available for Rent N/A

Operation Status ▪ Active


Occupancy Rate and 133 Projects
Number of Projects

Number of Korean 0 Project


projects

Lease fee ▪ Land lease fee: 40-60 USD/m2/year;


▪ Factory lease fee: 2,5-4,0 USD/m2/year

Operating fee ▪ Management fee: 0.4 USD/m2/year


▪ Electricity fee: 0.05 USD/month
▪ Water fee: 0.4 USD/m3/month
▪ Wastewater treatment fee: 0.28 USD/m3/month

262
263
TRA NOC 2 INDUSTRIAL ZONE

GENERAL INFORMATION
Address Phuoc Thoi ward, O Mon District, Can Tho city
CAN THO INDUSTRIAL PARKS INFRASTRUCTURE CONSTRUCTION JSC
Investor Address: 72 Mau Than Streets, An Nghiep Ward, Ninh Kieu Distric, Can Tho City
Tel: 02923 733 609 – Fax: 02923 830 374
Email: cipcocantho@gmail.com
Website: www. xaydunghatangkcncantho.com

Contact Person Name: Mr Vo Ngoc Ho


Position: Member of Management Council
Email: hongocvo20@gmail.com
Location Adjacent location:
- 10 km from Can Tho city center
- 1 km from Tra Noc airport, 2.5 km from Can Tho airport
- 3 km from Can Tho seaport
Investment Sectors Priority Sectors for Food and food processing; mechanical, electrical, electronic,
Investment machinery parts manufacturing, automobile industry, building
material industry, consumer goods manufacturing industry,
pharmaceuticals...
Investment Restricted N/A
Sectors
Minimum wage [Area 2] According to Decree 38/2022/ND-CP
Lease term 50 years
Minimum Lease Area N/A
Limit for Construction - N/A
Height
Permitted Construction N/A
Rate
Planned area ▪ Total area: 157.7 (ha)
▪ Total vacant leasable area: 16.5 (ha)

Factory Available for Rent N/A

Operation Status ▪ Active


Occupancy Rate and 79 projects
Number of Projects

Number of Korean 01 project


projects
Lease fee ▪ Land lease fee: 40-60 USD/m2/year;
▪ Factory lease fee: 2,5-4,0 USD/m2/year

Operating fee ▪ Management fee: 0.4 USD/m2/year


▪ Electricity fee: 0.05 USD/month
▪ Water fee: 0.4 USD/m3/month
▪ Wastewater treatment fee: 0.28 USD/m3/month

264
265
HUNG PHU 1 INDUSTRIAL ZONE

GENERAL INFORMATION
Address Tan Phu ward, Cai Rang district, Can Tho city
Investor SAIGON-CANTHO INDUSTRIAL PARK CORPORATION
Address: 28, Bui Quang Trinh Street, Phu Thu Ward, Cai Rang District, Can Tho City.
Tel: 0292 3918 386
Email: cadif@cantho.gov.vn

Contact Person N/A


Location Adjacent location:
- 4km from Can Tho city center
- 12km from Can Tho airport to the Southeast
- 11km from Can Tho port, 01km from Cai Cui port
- 6km from Can Tho Bridge
- 2km from National Highway 1A
- 180 km from Ho Chi Minh city center
Investment Sectors Priority Sectors for Food and food processing; mechanical, electrical, electronic,
Investment machinery parts manufacturing, automobile industry, building
material industry, consumer goods manufacturing industry,
pharmaceuticals...
Investment Restricted N/A
Sectors
Minimum wage [Area 2] According to Decree 38/2022/ND-CP
Lease term 50 years
Minimum Lease Area N/A
Limit for Construction N/A
Height
Permitted Construction N/A
Rate
Planned area ▪ Total area: 262 ha
▪ Total vacant leasable area: N/A

Factory Available for Rent N/A

Operation Status ▪ Active


Occupancy Rate and 79 projects
Number of Projects

Number of Korean 01 project


projects

Lease fee ▪ Land lease fee: 40-60 USD/m2/year;


▪ Factory lease fee: 2,5-4,0 USD/m2/year

Operating fee ▪ Management fee: 0.4 USD/m2/year


▪ Electricity fee: 0.05 USD/month
▪ Water fee: 0.4 USD/m3/month
▪ Wastewater treatment fee: 0.28 USD/m3/month

INFRASTRUCTURE

Electricity distribution 22 kW power source runs along the industrial park.


system

266
Water system With a clean water plant with a capacity of 5000m3/day and night

Internal road Road 1A with a width of 47m

Logistics There is Cai Cui international port located in the industrial zone ready to serve ships with a tonnage
of up to 20,000 tons.

Wastewater treatment with a wastewater treatment plant with a treatment capacity of more than 10,000m3/day
system

Others Hung Phu 1 Industrial Park also provides a series of other convenient services including: 24/7
security service, fire prevention, logistics, maintenance. maintenance, construction of factories,
waste collection, banks,...
Location/Map

267
HUNG PHU 2A INDUSTRIAL ZONE

GENERAL INFORMATION
Address Tan Phu ward, Cai Rang district, Can Tho city
Investor BRANCH OF BMC CAN THO CONSTRUCTION MATERIAL AND TRADE
CONSTRUCTION COMPANY LIMITED
Address: 48B Ba Trieu street, Tan An Ward, Ninh Kieu District, Can Tho City
Tel: 02923 733 609 – Fax: 02923 830 374
Email: cipcocantho@gmail.com
Website: www. xaydunghatangkcncantho.com
Contact Person Name: Mr NGUYEN TIEN DUNG
Position: Director
Mobile: 0939000999
Location Adjacent location:
- 4km from Can Tho city center
-

Investment Sectors Priority Sectors for Mechanical manufacturing, electronic assembly, agricultural, aquatic,
Investment seafood processing, livestock and poultry frozen, canning,
construction materials manufacturing, pharmaceutical production...
Investment Restricted N/A
Sectors
Minimum wage [Area 2] According to Decree 38/2022/ND-CP
Lease term 50 years
Minimum Lease Area N/A
Limit for Construction N/A
Height
Permitted Construction N/A
Rate
Planned area ▪ Total area: 134 (ha)
▪ Total vacant leasable area: 0.2 (ha)
Factory Available for Rent N/A

Operation Status ▪ Active


Occupancy Rate and 9 projects
Number of Projects

Number of Korean 0 project


projects
Lease fee ▪ Land lease fee: 40-60 USD/m2/year;
▪ Factory lease fee: 2,5-4,0 USD/m2/year

Operating fee ▪ Management fee: 0.4 USD/m2/year


▪ Electricity fee: 0.05 USD/month
▪ Water fee: 0.4 USD/m3/month
▪ Wastewater treatment fee: 0.28 USD/m3/month

INFRASTRUCTURE

Electricity distribution 22 kW power source runs along the industrial park.


system
Water system With a clean water plant with a capacity of 5000m3/day and night

268
Internal road Road 1A with a width of 47m

Logistics There is Cai Cui international port located in the industrial zone ready to serve ships with a tonnage
of up to 20,000 tons.

Wastewater treatment with a wastewater treatment plant with a treatment capacity of more than 10,000m3/day
system

Others Hung Phu 2A Industrial Park also provides a series of other convenient services including: 24/7
security service, fire prevention, logistics, maintenance. maintenance, construction of factories,
waste collection, banks,...
Location/Map

269
HUNG PHU 2B INDUSTRIAL ZONE

GENERAL INFORMATION
Address Tan Phu ward, Cai Rang district, Can Tho city
Investor CAN THO INDUSTRIAL PARKS INFRASTRUCTURE CONSTRUCTION JSC
Address: 72 Mau Than Streets, An Nghiep Ward, Ninh Kieu Distric, Can Tho City
Tel: 02923 733 609 – Fax: 02923 830 374
Email: cipcocantho@gmail.com
Website: www. xaydunghatangkcncantho.com

Contact Person Name: Mr Vo Ngoc Ho


Position: Member of Management Council
Email: hongocvo20@gmail.com
Location Adjacent location:
- 167km from Ho Chi Minh City
- 170km from Tan Son Nhat International Airport, 201km from Long Thanh International
Airport
- 164km from New Saigon Port, 173km from Cat Lai Port, 220km from Thi Vai Port,
260km from Vung Tau Port
Investment Sectors Priority Sectors for Mechanical manufacturing, electronic assembly, agricultural,
Investment aquatic, seafood processing, livestock and poultry frozen,
canning, construction materials manufacturing, pharmaceutical
production...
Investment Restricted N/A
Sectors
Minimum wage [Area 2] According to Decree 38/2022/ND-CP
Lease term 50 years
Minimum Lease Area N/A
Limit for Construction N/A
Height
Permitted Construction N/A
Rate
Planned area ▪ Total area: 62.63 (ha)
▪ Total vacant leasable area: N/A

Factory Available for Rent N/A

Operation Status ▪ Active


Occupancy Rate and 1 project
Number of Projects

Number of Korean projects 1 project

Lease fee ▪ Land lease fee: 40-60 USD/m2/year;


▪ Factory lease fee: 2,5-4,0 USD/m2/year

Operating fee ▪ Management fee: 0.4 USD/m2/year


▪ Electricity fee: 0.05 USD/month
▪ Water fee: 0.4 USD/m3/month
▪ Wastewater treatment fee: 0.28 USD/m3/month

INFRASTRUCTURE

Electricity distribution 22 kW power source runs along the industrial park.


system
Water system With a clean water plant with a capacity of 5000m3/day and night

Internal road Road 1A with a width of 47m

270
Logistics There is Cai Cui international port located in the industrial zone ready to serve ships with a
tonnage of up to 20,000 tons.
Wastewater treatment with a wastewater treatment plant with a treatment capacity of more than 10,000m3/day
system

Others Hung Phu 2B Industrial Park also provides a series of other convenient services including:
24/7 security service, fire prevention, logistics, maintenance. maintenance, construction of
factories, waste collection, banks,...
Location/Map

THOT NOT INDUSTRIAL ZONE

GENERAL INFORMATION
Address Thoi Thuan ward, Thot Not District, Can Tho city

271
Investor CAN THO EXPORT PROCESSING & INDUSTRIAL ZONES AUTHORITY
Address: National Route No.91, Thoi Thuan ward, Thot Not district, Can Tho city
Tel: 0710.3 854 408 - 0710. 3851 903; Fax: 0710.3 854 408
Email: ttxdhtkcnthotnot@cantho.gov.vn;
Website: www. xaydunghatangkcncantho.com

Contact Person Name: Mr Le Van Tran - Position: Director


Mobile: 0918.294.880; Email: levantran1964@gmail.com
Location Adjacent location:
- 167km from Ho Chi Minh City
- 170km from Tan Son Nhat International Airport, 201km from Long Thanh International
Airport
- 164km from New Saigon Port, 173km from Cat Lai Port, 220km from Thi Vai Port, 260km
from Vung Tau Port
Investment Sectors Priority Sectors for Mechanical manufacturing, electronic assembly, agricultural,
Investment aquatic, seafood processing, livestock and poultry frozen, canning,
construction materials manufacturing, pharmaceutical production...
Investment Restricted N/A
Sectors
Minimum wage [Area 2] According to Decree 38/2022/ND-CP
Lease term 50 years
Minimum Lease Area N/A
Limit for Construction N/A
Height
Permitted Construction N/A
Rate
Planned area ▪ Total area: 134 (ha)
▪ Total vacant leasable area: 0.2 (ha)
Factory Available for Rent N/A

Operation Status ▪ Active


Occupancy Rate and 20 projects
Number of Projects

Number of Korean 0 project


projects

Lease fee ▪ Land lease fee: 40-60 USD/m2/year;


▪ Factory lease fee: 2,5-4,0 USD/m2/year

Operating fee ▪ Management fee: 0.4 USD/m2/year


▪ Electricity fee: 0.05 USD/month
▪ Water fee: 0.4 USD/m3/month
▪ Wastewater treatment fee: 0.28 USD/m3/month

INFRASTRUCTURE

Electricity distribution 22 kW power source runs along the industrial park.


system
Water system With a clean water plant with a capacity of 5000m3/day and night

Internal road Road 1A with a width of 47m

Logistics There is Cai Cui international port located in the industrial zone ready to serve ships with a tonnage
of up to 20,000 tons.
Wastewater treatment with a wastewater treatment plant with a treatment capacity of more than 10,000m3/day
system

272
Others Hung Phu 1 Industrial Park also provides a series of other convenient services including: 24/7
security service, fire prevention, logistics, maintenance. maintenance, construction of factories,
waste collection, banks,...
Location/Map

273
VINH THANH INDUSTRIAL ZONE (STATE 1)

GENERAL INFORMATION
Address Tra Noc ward, Binh Thuy District, Can Tho city
Investor VSIP CAN THO JOINT STOCK COMPANY
Address: Vinh Trinh ward, Vinh Thanh district, Can Tho city
Contact Person Name: Mr Bui Chi Vu
Mobile: 0907355411

Location Adjacent location:


- 10 km from Can Tho city center
- 1 km from Tra Noc airport, 2.5 km from Can Tho airport
- 3 km from Can Tho seaport
Investment Sectors Priority Sectors for Food and food processing; mechanical, electrical, electronic,
Investment machinery parts manufacturing, automobile industry, building
material industry, consumer goods manufacturing industry,
pharmaceuticals...
Investment Restricted N/A
Sectors
Minimum wage [Area 2] According to Decree 38/2022/ND-CP
Lease term 50 years
Minimum Lease Area N/A
Limit for Construction - N/A
Height

Permitted Construction N/A


Rate
Planned area ▪ Total area: 130.8 (ha)
▪ Total vacant leasable area: 0.2 (ha)

Factory Available for Rent N/A

Operation Status ▪ Under construction


Occupancy Rate and N/A
Number of Projects

Number of Korean 0 Project


projects
Lease fee ▪ Land lease fee: N/A;
▪ Factory lease fee: N/A

Operating fee ▪ Management fee: N/A


▪ Electricity fee: N/A
▪ Water fee: N/A
▪ Wastewater treatment fee: N/A

274
[- This Page is intentionally left blank -]

275
CAO BANG

276
INVESTMENT ENVIRONMENT IN CAO BANG

USD/VND 23.510

GENERAL INFORMATION
Area 6703,42 km2
Population 0,543 million people (2022)
▪ Cao Bang is located in Northeast region.
▪ Located in North-East of Vietnam, the North and North-East side of the province shares border with Guangxi
Geographical
Province (China)
Location
▪ 286 km from Hanoi Center, 267 km from Noi Bai Airport, 324 km from Hai Phong Port, 125 km from Lang
Son
Adjacent ▪ The Province has Guangxi (China) to the North and Northeast, Bac Kan and Lang Son Province to the South
provinces and Tuyen Quang Province and Ha Giang Province to the West.
2022 statistic:
▪ Nominal GRDP (billion VND):
▪ Real GRDP (billion VND): 21.635 (0,49 billion USD)
▪ GRDP growth: 5,04%
GRDP ▪ GRDP per capita (million VND/year): 37,00 (1612 USD)
▪ Economic structure:
- Industry - Construction: 20,76%
- Agriculture. forestry and fishery: 21,74%
- Service: 53,75%
▪ Industry - Construction growth: 3,91%
Industry
▪ Agriculture, forestry and fishery growth: 3,00%
growth
▪ Service growth: 6,01%

Import - Import turnover (billion USD): 0,59 (Growth rate: 3,85)


Export Export turnover (billion USD): 0,15 (Growth rate: -0,55)
Key Industry Mineral Processing
PCI 56,29
Ranking 63
SOCIAL INFRASTRUCTURE
▪ Roadway: The road system has total of 4,608 km in length, including national roads, provincial roads, civic
roads, roads in districts and villages. National roads run through the province are: National Road 03 (Hanoi-
Thai Nguyen- Bac Can- Cao Bang), 4A (Hanoi- Lang Son- Cao Bang) and 34 (connecting the Province and Ha
Giang). The Highway Project Dong Dang (Lang Son)- Tra Linh (Cao Bang) is under Geological examination,
which will decrease time to travel Hanoi- Cao Bang into 2.5 hours.
▪ Railway: None
Transportation ▪ Waterway: The Province has diversified water system: 113 km of Bang Giang River originated from China,
55km of Gam River, 77 km of Bac Vong River, 76 km of Quay Son River. However they are not favourable for
waterway development.
▪ Airway: None
▪ Other: Ta Lung International Border gates and 03 main border gates (two-sided) including Tra Linh Border
Gate, Soc Giang and Ly Van Border gates and other sub-border gates, open-ways on the borderland between
Vietnam and China
Cao Bang’s power authority is currently in charge of managing approx. 85km of 110kV power network, more
than 600km of 35kV power network. Besides national power network, Cao Bang has developed its own such as
Electricity Cun stream hydroelectricity plant in Cao Bang town, Na Tau hydroelectricity plant in Quang Hoa district, etc.
The province is constructing Na Loa hydroelectricity plant which is the ever largest hydroelectricity plant of the
province to serve local household and production needs.
Cao Bang town is supply water by a water treatment station using French technology and other townlets were
Water
supplied by gravity water supplies.

277
Education &
▪ 02 colleges; 03 technical high schools; 04 vocational centers.
Training
▪ There are 38 public medical facilities, including Cao Bang General Hospital, Cao Bang Hospital of Traditional
Medicare
Medicine, 14 District General Hospitals and many Medical Clinics located in districts.
INVESTMENT CONDITION
Human
65.67% of population are in the working age (2022)
resource
Education level Trained labor rate: 48,2% (2022)
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): N/A
- Area II (4,160,000 VND/month): N/A
Salary - Area III (3,640,000 VND/month): Cao Bang City
- Area IV (3,250,000 VND/month): Trung Khanh, Ha Quang, Bao Lac, Bao Lam, Ha Lang, Hoa An, Nguyen
Binh, Phuc Hoa, Thach An, Tra Linh, Thong Nong, Quang Uyen district
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to
employees working under employment contracts)
▪ Incentives according to government regulations:
Investment - Exemption and reduction for land and water rent fee
incentives - Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
▪ Prioritized projects:
Fields Manufacturing of new materials and energies, products of high technology, biotechnology, Information
Attracting Technology; mechanism; aquaculture, agro-forestry cultivation, salt production; the production of artificial seed,
Investment plant seeds and new animal breeds; utilizing the advantages of high technology and modern techniques;
ecological environment protection.
Investment
Up to now, Cao Bang has 17 FDI projects with the total investment capital is about 36.43 million US dollars.
attraction
Investors mainly come from China
situation
Cao Bang's Cao Bang Border Gate Economic Zone, which is divided into four regions. Each region has one key
Industrial economic border gate which directly connects with China's border gate system., including Ta Lung, Soc Giang,
zones Ta Linh, Ly Van. It used to have 2 industrial zones, including Chu Trinh, De Tham. However, De Tham Ip has
been converted to industrial complex, while Chu Trinh IP is under construction.

Map

Cao Bang Department Of Planning And Investment


Contact
▪ Address: No. 30, Xuan Truong Street, Hop Giang Ward, Cao Bang City, Cao Bang Province.

278
▪ Tel: (84-206) 3 852 182

▪ Email: sokhdt@caobang.gov.vn
▪ Contact person:
- Mr. Be Xuan Tien - Head of Cao Bang Department Of Planning And Investment

279
LIST OF INDUSTRIAL ZONES IN CAO BANG

No. Industrial zone Name Total Area (ha) Occupancy Rate Status

1 De Tham Industrial Zone 92.21 ha 15.81% In Operation


2 Chu Trinh Industrial Zone 81 ha 0% Under Construction,
Ready in 2020
3 Cao Bang Economic Zone 30,130 ha N/A Active, Under
construction
4 Tra Linh Border Gate Economic Zone N/A N/A Active, Under
construction

CAO BANG’S LOCATION MAP OF INDUSTRIAL ZONES

280
DE THAM INDUSTRIAL ZONE

GENERAL INFORMATION
▪ Hoang Dinh Giong Road, Hop Giang Ward, Cao Bang City, Cao Bang province
Address
Investor Department of Urban Management - People’s Committe of Cao Bang City
▪ Address: No. 032 Dam Quang Trung street, Hop Giang Ward, Cao Bang city, Cao Bang
Province
▪ Tel: (84-206) 3 852 500 Fax: (84-206) 3 854 643
▪ Email: quanlydothi.thixa@gmail.com
Contact Person Contact person of Cao Bang Economic Zone Management Board:
▪ Mr. Nguyen Kien Cuong- Head of Management Board-
(84) 912 695 168 - cuongnk@caobang.gov.vn
▪ Mr. Nguyen Van Thanh- Head of Department of Environment and Natural Resource
Management - (84) 912 221 563 - thanhnv@caobang.gov.vn
Location ▪ 280 km to Hanoi Center
▪ 310 km to Hai Phong Deep Sea Port
▪ 250 km to Noi Bai International Airport
Investment Area Priority Sectors for • Precision mechanical engineering industry; electronics industry,
Investment information technology; consumer goods industry (textiles,
footwear, ceramics ...)
• Agro-forestry processing industry
• Other industries such as manufacturing high-class construction
materials, packaging, assembling and manufacturing motorbike
spare parts ...
Restricted Sectors for Polluted Industries
Investment
Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term 50 years
Minimum Lease Area Unlimited
Limit for Construction N/A
Height
Permitted Construction N/A
Rate
Planned area ▪ Total area: 92.21 ha
▪ Total leasable area: 79.5 ha
Factory Available for N/A
Rent
Operation Status In Operation
Occupancy Rate and ▪ Occupancy rate: 15.81%
Number of Projects ▪ Number of projects: 02
Number of Korean None
Projects
Lease fee ▪ Land lease fee: 2,760 VND (~ 0.12 USD)/m2/year
Operating fee ▪ Infrastructure maintenance fee: 828 VND (~0.037 USD)/m2
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 11,500 VND (~ 0.5 USD)/m3
▪ Wastewater Treatment: N/A
▪ Waste Treatment: N/A
INFRASTRUCTURE AND FACILITY
Financial institution BIDV, Vietcombank, Vietinbank, LienViet PostBank, Agribank,… have their bank branches
located nearby
Tax service, State finance ▪ Located nearby the IZ
office
Customs Service ▪ 2 km to Customs Department of Cao Bang
Logistics N/A
Post office Cao Bang Post Office is located nearby the IZ
Medicare ▪ 1 km to Cao Bang Hospital of Traditional Medicine
▪ 2 km to Cao Bang General Hospital

281
Police, public security Located nearby Police station of Cao Bang city and Police Station of Cao Bang Province
Universities, training ▪ 4 km to Cao Bang Vocational School, 15 km to Cao Bang Economic Technical School
facilities, etc.
Recruitment N/A
Worker dormitory Not available
Worker's child education 9 kindergartens are located nearby (0.5-2 km)
facility
One-stop service N/A
Road Width N/A
IT & Tele- Full service available for domestic and international communication via telecommunication, Fax,
communication Facilities Internet
Emergency Power N/A
generator
Fire-fighting facility Available
Layout Plan

Location Map

Actual View N/A

282
CHU TRINH INDUSTRIAL ZONE

GENERAL INFORMATION
Chu Trinh commune, Cao Bang city, Cao Bang province
Address
Cao Bang Industrial Park Infrastructure Development Company
Investor
▪ 10km to Cao Bang Center
Location
• Warehouses, wharves, yards and warehouses for transshipment
Priority Sectors for
Investment Area of goods, production and processing of agricultural, forestry and
Investment
fishery products, production, business and import-export services
Lease term 50 years
Minimum Lease Area 1ha
Limit for Construction
N/A
Height
Permitted Construction 60% for factory building
Rate 40% for managing area
▪ Total area: 80,941 ha
Planned area
▪ Total leasable area: 54,655 ha
Factory Available for
N/A
Rent
Operation Status In Operation
Occupancy Rate and ▪ Occupancy rate: 0.5%
Number of Projects
Number of Korean
None
Projects
Lease fee 20-30 USD
Operating fee 0.2USD/m2
INFRASTRUCTURE AND FACILITY
BIDV, Vietcombank, Vietinbank, LienViet PostBank, Agribank,… have their bank branches
Financial institution
located nearby
One-stop service N/A
Road Width N/A
IT & Tele- Full service available for domestic and international communication via telecommunication, Fax,
communication Facilities Internet
Emergency Power
N/A
generator

283
Layout Plan

Actual View N/A

284
[- This Page is intentionally left blank -]

285
DA NANG

286
INVESTMENT ENVIRONMENT IN DA NANG

GENERAL INFORMATION

Area, Population ▪ Area: 1.285 km2


▪ Population: 1,189,275 people (2021 statistic)
Geographical Location Located in the Central of Vietnam.

Adjacent provinces ▪ Thua Thien Hue province to the north


▪ Quang Nam province to the south.
2022 statistic:
▪ GRDP: 125.219 billion VND
▪ GRDP growth: 14,05%
GRDP ▪ GRDP per capita: 4.313 USD/year (102.6 millionVND)
▪ Economic structure:
- Industry - Construction: 20,43 %;
- Agriculture. forestry and fishery: 1,95 %;
- Service: 63,38 %;
- Tax on Goods: 9,24 %
2022 statistic:
Industry growth
▪ Industry - Construction growth: 6,39 %
▪ Agriculture, forestry and fishery growth: 3,39 %
▪ Service growth: 17,85 %

PCI ▪ Score: 68.52 – ranked 09 out of 63 cities and provincesin Vietnam. (2021)

SOCIAL INFRASTRUCTURE

▪ Roadway: The system of roads inside and outside the


city is constantly being expanded and constructed, linkingthe city center with
neighboring urban areas.
- Being the Eastern gateway to the Pacific Ocean of the East-West Economic
Corridor connecting Laos, NortheastThailand and Myanmar, strengthening Da
Nang's
connection with neighboring countries in Indochina,creating opportunities to
develop a modern logistics
cluster and a modern trade center serving Southeast Asia.
- Along with National Highway 1A, National Highway 14B and Ho Chi Minh Road
Transportation running along the domestic border to the South of Vietnam, the Da Nang - Quang
Ngai Expressway with a length of 130km and a width of 26m facilitates the
circulation of goods and economic development in the region, connecting Da Nang
with ChuLai Open Economic Zone, Dung Quat Economic Zone and Central
Highlands cities such as Kon Tom, Pleiku andBuon Ma Thuot.
- La Son - Tuy Loan Expressway of 80 km long, from LaSon junction (Thua Thien
Hue) to Tuy Loan junction (DaNang) is to strengthen the connection between
provinces in the Central Key Economic Zone.
▪ Railway: The Ministry of Transport has approved to relocate the existing
railway station out of the city center

287
and build a dedicated passenger and freight station. Thus, by integrating and
enhancing the connectivity ofthese infrastructures, the potential for tourism
and
logistics of Da Nang has been enhanced, forming a stronglogistics cluster for the
expanded Da Nang region.
▪ Seaway: Tien Sa seaport with a capacity of 12 millionDWT can receive general
cargo ships with a tonnage of 50,000 DWT, container ships of 4,000 TEUs,
passengerships of 150,000 GRT; 25 container ships/week, with
international shipping routes to Hong Kong, Singapore, Japan, Taiwan, South
Korea, Europe, U.S.A and countriesaround the world. The current cargo handling
capacity is estimated at 8 million tons/year.
The city is calling for investment in Lien Chieu Port in the North of the city with
a capacity of 50,000 DWT to meet the economic development of the city in
particular
and the central region in general in the coming time. AfterLien Chieu Port is
invested and operated, Tien Sa Port will be converted into a tourist port.
▪ Airway: Da Nang Airport is one of the three largest andmost modern
international airports in Vietnam, with a capacity of 15 million passengers
annually, including 31 direct international routes to Da Nang with a total
frequency of 480 trips/week. The city is promoting the construction of terminal
T3 of the Da Nang International Airport with a capacity of 30 million passengers
per year,increasing the capacity of Da Nang International Airport to 42 million
passengers per year.

▪Education and training institutions in the city are providing training in the
direction of multi-disciplinaryand multi-field with prioritized areas including
tourism,information technology, high technology, logistics and international
business. The whole city currently has 06 professional intermediate schools,
13 colleges, 17 universities and 03 international universities including Pegasus
Education
(Singapore), AUV (USA) and VNUK (UK).
▪More than 64,000 graduates annually, 112/398 schoolsthat meet national
standards, there are joint programs between the University of Da Nang and
foreign universities (in English, Japanese and French).

▪ The number of general hospitals in the city is 13, of which there are 08 private
hospitals, 09 specialized hospitals and 01 international general hospital
(Vinmec),with 03 hospitals having international departments including Da Nang
General Hospital, Hoan My Hospitaland Family Hospital), together with 07
commune/ward medical centers.
Medicare
▪ Number of human resources in the health sector: the totalnumber of doctors in
the city is 1,824, of which 82.5% are working in public hospitals and 17.5% are
working inprivate hospitals.

288
INVESTMENT CONDITION

▪ In 2021, the labor force aged over 15 working in economic sectors is 534,865
Human resource people, accounting for 45%of the total city population. The trained workforce
reached 47.7%.

▪ Labor productivity and average income have steadilyincreased over the


years. The education and technical qualifications of the workforce are
gradually improving.It is forecasted that by 2025, Da Nang City will have
about 690,000 employees, by 2030 there will be about 798,000 employees
serving the sectors of service, industry - construction with an average of
Education level 75 - 80%; 20-25% respectively and the rest is working in fisheries -
agriculture - forestry sector. The rate of additional employment will reach
5-5.5%/year, the rate of trainedworkers will reach over 70%.

▪ Regional minimum salary: 161 USD/month


▪ Average salary (USD/month)
- Manufacturing
Salary + Workers: 203 USD
+ Engineer: 311 USD
+ Manager: 621 USD
- Service
+ Office staff: 316 USD
+ Manager: 1,058 USD

Investment incentives Proposed by investors

▪ Prioritized projects: (1) Microelectronics,


Fields Attracting mechatronics and opto-electronics, (2) Biotech, (3)
Investment information and communication technology (ICT), (4) Automation, Precision
mechanics, (5) New energies, nanotech, new materials, (6) Tech applied for
petrochemistry and other special industries.

Map

289
Da Nang Hi-tech Park and Industrial Zones Authority
Contact ▪ Address: Lot A17, Center Road, Hoa Lien Commune,Hoa Vang District, Da
Nang City
▪ Tel: (84) 236 3666117
▪ Email: dhpiza@danang.gov.vn

290
LIST OF INDUSTRIAL ZONES IN DA NANG

No Industrial zone Name Total Area Occupancy Rate Status


(ha)
1 Da Nang Hi-tech Park 1,128.4 42.31% In operation
2 Lien Chieu Industrial Zone 289.35 56.14% In operation
3 Da Nang Industrial Zone 50.1 100% In operation
4 Hoa Khanh Industrial Zone 394 100% In operation
Expanded Hoa Khanh Industrial Zone 132.6 100% In operation
5 Da Nang Seafood Service Industrial Zone 50.63 100% In operation
6 Hoa Cam - Phase I Industrial Zone 136.73 100% In operation
Hoa Cam - Phase II Industrial Zone 120 0% Finding
Developers
7 Hoa Nhon Industrial Zone 360 0% Finding
Developers
8 Hoa Ninh Industrial Zone 400 0% Finding
Developers

DA NANG’S LOCATION MAP OF INDUSTRIAL ZONES

291
DANANG HI-TECH PARK

GENERAL INFORMATION

Address Hoa Lien Commune, Hoa Vang District, Da Nang City


Da Nang Hi-tech Park and Industrial Zones Authority
Investor
▪ Address: Lot A17, Center Road, Hoa Lien Commune, Hoa VangDistrict, Da Nang
City
▪ Tel: (84) 236 3666117
▪ Email: dhpiza@danang.gov.vn
Contact Person Mr. Vu Quang Hung – Director - Mobile: (84) 236 3666117
- Email: hungvq@danang.gov.vn

Location Adjacent location


- 22 km from city center;
- 17 km from Da Nang international airport;
- 25 km from Tien Sa port;
- 22 km from Da Nang station.
Investment Sectors Priority Sectors for (1) Microelectronics, mechatronics and opto-
Investment electronics, (2) Biotech, (3) information and
communication technology (ICT), (4) Automation, Precision
mechanics, (5) New energies, nano tech, new materials, (6) Tech
applied for petrochemistry and other specialindustries

Investment In accordance with current lawsRestricted


Sectors
Minimum wage Zone II According to Decree 38/2022/ND-CP
Lease term Proposed by investors

Minimum LeaseArea Proposed by investors

Limit for 1 – 6 floors


Construction Height

Permitted 50-60%
Construction Rate

Planned area Total area: 1.128,4 ha

Factory Available for Proposed by investors


Rent
Operation Status Active

Occupancy Rate and Da Nang Hi-Tech Park has so far attracted 29 projects totalling more
Number of Projects than 900 million USD in registered investment capital.

Number of Korean 02
projects
Lease fee To be considered for incentives for land rent exemption and
reduction under the Government's Decree No. 04/2018/ND-CP dated January 4, 2018
stipulating the preferential mechanisms and policiesfor Da Nang Hi-tech Park

292
DA NANG HI-TECH PARK

GENERAL INFORMATION

▪ Hoa Lien and Hoa Ninh Communes, Hoa Vang District, Danang City
Address
Danang Hi-tech Park and Industrial Zones Authority
▪ Address: Lot A17 Centre Road, Da Nang Hi-tech Park, Hoa Lien, Hoa
Vang, Da Nang
Investor
▪ Tel: (84-236) 3 211 088
▪ Email: dhpiza@danang.gov.vn
▪ Website: dhpiza.danang.gov.vn
▪ Mr. Pham Truong Son –Head of Da Nang Hi-tech Park and Industrial Zone – (84) 903 502 131
- sonpt.dng@gmail.com/ sonpt@danang.gov.vn
Contact Person
▪ Mr. Nguyen Xuan Dai – Manager of Investment Promotion Department –
(84) 905 117 212 - dainx1@danang.gov.vn
▪ 5km from Lieu Chieu Port.
▪ 17km from Danang International Airport.
Location
▪ 22km from the center city
▪ 25km from Tien Sa seaport.
Microelectronics, mechatronics and opto-electronics, Biotechnology,
Priority Sectors for ICT, Automation, Precision mechanics, New energies, nano
Investment technology, new materials, Tech applied for petro chemistry and other
Investment Area special industries
Restricted Sectors for
Restricted by the Law
Investment

Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

Lease term 50~70 years

Minimum Lease Area 1ha (Expected average investment rate: 15million USD/ha)

Limit for Construction In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Height Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction
No more than 6 floors- Construction area is not more than 60% of the total leased land lot
Rate
▪ Total area: 1,128.4 ha:
- Hi-tech production area: 202.58ha
- Logistics and hi-tech services area: 27.45ha
Planned area - R&D, training and incubation area: 99.93ha
- Residential area (31.4ha), Administrative area (28.35ha), Central
technical infrastructure area (9.75ha)
▪ Vacant leasable area: 329.96 ha

Factory Available for Rent ▪ Ready built factory (RBF) for lease: Under development

Operation Status ▪ In operation

▪ Occupancy Rate: 42.31%


▪ Number of Projects: 26 (Total investment: 818 million USD)
Occupancy Rate and
- Tenants include Tokyo Keiki, Niwa Foundry, Yamato Sewing, Hatsuta Seisakusho, Inaba
Number of Projects
Rubber, Fujikin International (Japan), Universal Alloy Asia, United States Enterprises (semi
conductors) (USA), Trung Nam EMS, ATOMA, Dapharco, Petrolimex (Vietnam), etc

Number of Korean Projects ▪ 02 projects, including Dentium, VK Plus

▪ Land lease fee: from 0.3 ~ 0.45 USD/m2/year, (depending of type of project and payment
Lease fee
method)
▪ Management fee: 0.2 USD/m2/year
Operating fee
▪ Electricity fee: N/A
293
▪ Water fee: N/A
▪ Wastewater treatment fee: 0.2~0.3 USD/m3

INFRASTRUCTURE AND FACILITY

Financial institution Bidv, Vietin Bank, Vietcombank, Agribank

Tax service, State finance 13 km from Thanh Khe – Lien Chieu Tax Office
office 13 km from Thanh Khe – Lien Chieu State Treasury Office

Customs Service 9.4 from Hoa Khanh Customs Office

Logistics NA

Post office 8 km from Hoa Son Post Office/

13.8 km far from Lien Chieu Medical Center (25 min by car)
Medicare
21 km far from Da Nang General Hospital (35min by car)

Police, public security 500 m from nearest Police Station

25 universities and colleges in Da Nang City. Far from IZ 4km is some of the popular university
Universities, training and college in Da Nang City such as Da Nang Polytechnic University, Da Nang Pedagogical
facilities, etc. University, and Da Nang Planning and Economics College…
19 professional secondary schools and 59 vocational training centers.

Recruitment Management Board will support in recruitment

Worker dormitory NA

Worker's child education


NA
facility
Da Nang Hi-tech Park and Industrial Zones Authority is in charge of implementing all
One-stop service administrative procedures. Office of Da Nang Hi-tech park and Industrial Zones Authority will
be located in Da Nang Hi-tech Park in the early 2020.
▪ The center route with cross-section width: W = 51m
▪ The subdivision routes with cross-section width: W = 22.5 m ÷ 33m
Road Width ▪ The internal roads in each functional area with cross-section width: W =
8m ÷15m.
▪ The roads are connected in chessboard arrangement, convenient for transportation in the Park.
IT & Tele-communication The telecommunication system complies with international standards and is always available for
Facilities communication demand with high data transmission s
▪ Danang Hi-Tech Park’s electricity is planned to be supplied by a 110/22KV station with a
capacity of 2x63MVA which will be built in Hoa Lien. It is expected that by 2015 one 63MVA
transformer will be put into operation ahead. The 110kV double circuit line power station will be
Power Supply
connected to the 110kV line from Hoa Khanh to Hai Van Tunnel.
▪ Currently, the 110 kV substation with the capacity of 40MVA has started
operation.
Emergency Power
Available
generator

Water Supply 10,000 m3 /day-night.

▪ Total capacity: 18.000 m3/day, including 4 modules, each with the


Waste-water treatment capacity of 4.500 m3/day.
System ▪ Wastewater from projects must reach class B before entering the Waste
water treatment plant.

Fire-fighting facility Available. Water supply system for firefighting is located along each road.

294
Layout Plan

Location Map

Actual View

295
296
LIEN CHIEU INDUSTRIAL ZONE

GENERAL INFORMATION

Address ▪ Hoa Hiep Bac Ward, Lien Chieu District, Da Nang City

▪ Saigon-Danang Investment Corporation (SDN)


․ Address: 61 A Nguyen Van Cu Street, Lien Chieu District, Da Nang City
Investor
․ Tel: (84-236) 3 770 998 Fax: (84-236) 3 770 997
․ Web: www.dananginvest.com
▪ Ms. Le Thi Yen Nhi - Business Director – Mobile: (84) 908 312 030 - Email:
Contact Person
yennhi.sdn@gmail.com/ nhi.le@dananginvest.com
▪ 15 Km from Danang City center
▪ 15 Km from Danang International Airport
▪ 25 Km to Danang Deep Seaport (Tien Sa Terminal) & Located right next to Lien Chieu
Location
Deep Seaport (under construction)
▪ Located right next to National Highway 1A and 15 Km from the national North-South
railway station.
▪ Information technology, biotechnology, automation technology and
mechatronics, new materials technology;
Priority Sectors ▪ Environmental friendly industries, supporting industries in the field
for Investment of mechanics, precision engineering, electricity - electronics;
Investment Area ▪ High quality service sectors, especially trade, tourism, logistics,
health and education. (Decision No. 4286/QD-UBND on 4/7/2016)
Restricted Sectors Production of iron, steel, construction materials, paper, chemicals,
for Investment textiles and textile products ...

Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

▪ Start date: 1996


Lease term
▪ End date: December 12th 2046 (12/12/2046)

Minimum Lease Area 1 ha

In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Limit for Construction Height
Residential Planning regulation (QCXDVN 01: 2008/BXD)

Permitted Construction Rate Construction area is not more than 60% of the total leased land lot

▪ Total area: 289.35 ha


Planned area ▪ Total vacant leasable area: 83 ha
▪ Total area with full infrastructure ready to build factory: 63.3 ha

Factory Available for Rent ▪ Total area: Unavailable (Planning to build RFB)

Operation Status In operation

Occupancy Rate and Number ▪ 53.7%


of Projects ▪ 25 projects

Number of Korean Projects N/A

▪ Land lease fee: 90 USD/m2 for the rest of Project’s life to December 12th 2046 (VAT
excluded)
▪ Factory lease fee: 3 USD/m2/month (VAT excluded)
Lease fee ▪ Payment: In advance every 3 months of rental
- Method: Bank transfer
- Period: Deposit 40% after signing In principle Agreement – 55% After signing Land
sublease contract – 5% after signing Land handover minutes.
▪ Management fee: 0.4 USD/m2/year (before VAT)
▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from
Operating fee
March 16th, 2015 (excluded VAT) for voltage from 22KV-110KV.
▪ Water fee: USD 0.37/m3 (Before Taxation and fees)

297
▪ Wastewater treatment fee: 0.37 – 0.92 USD/ m3 depending on Chemical Oxygen demand
(COD) (mg/l)

INFRASTRUCTURE AND FACILITY

Financial institution There are branches of all popular banks in Danang city

▪ 10 km from Da Nang Tax office


Tax service, State finance office
▪ 10 km form Da Nang Treasury Office
▪ 6 Km from the nearest Customs Agency (inside Hoa Khanh IZ)
Customs Service
▪ 16km from Da Nang port

Logistics VNPOST, Yusen, Logitem, Nippon Konpo, Binh Vinh: 5 km far from the industrial park

Post office 4 Km from the nearest Mailing Post Office

Lien Chieu General Hospital 8 km from the IZ


Medicare
Danang General Hospital 15 km from the IZ

Police, public security 1 Km from the nearest Police Station

25 universities and colleges in Danang City. Far from IPs 4km is some of the popular
Universities, training facilities university and college in Danang City such as Danang Polytechnic University, Danang
Pedagogical University, and Danang Planning and Economics College…

Recruitment Supported by IZ developers

Worker dormitory 5 km from the IZ

Worker's child education


5 km from the IZ
facility

One-stop service 20 Km from the nearest Facility

Road Width Roads connecting to land lots with width of 34.50m and 16.50m

IT & Tele-communication
Available
Facilities

Emergency Power generator Available

Fire-fighting facility Available

298
Layout Plan

Location Map

299
Actual View

LIST OF PROJECTS IN LIEN CHIEU INDUSTRIAL ZONE

No Company Name Nationality


1 Crown Beverage Packaging Danang Co., Ltd. Singapore
2 Endo Chuuzou Vietnam Company Limited Japan
3 Vietnam Craft Beer Company Limited US
4 Danang Chemical Industry Joint Stock Company Vietnam
5 Ngu Hanh Son Cement Joint Stock Company Vietnam
6 Vicem Hai Van Cement Joint Stock Company Vietnam
7 Da Nang Railway Material Company Limited Vietnam
8 875 Construction One Member Company Limited Vietnam
9 Vietnam TBV Joint Stock Company (formerly: Cosani) Vietnam
10 Southern Gas Trading Joint Stock Company Vietnam
11 Non Nuoc Joint Stock Company Vietnam
12 Da Nang Steel Joint Stock Company Vietnam
13 Danang Rubber Joint Stock Company Vietnam
14 Viet A Power Cable Company Limited Vietnam
15 Young Power Co. Ltd. Vietnam
16 Post and Telecommunication Joint Stock Company Vietnam
17 Thinh Phu Company Limited Vietnam
18 Northern Liquefied Gas Company Vietnam
19 Lilama 7 Joint Stock Company Vietnam
20 Song Da Someco Joint Stock Company Vietnam
21 Ton Dong A Joint Stock Company Vietnam
22 Tin Thanh Industrial Steam Co., Ltd Vietnam
23 Tay Ninh Industrial Infrastructure Development Joint Stock Company Vietnam
24 Viet Thai Plastic Joint Stock Company Vietnam
25 Kinh Bac Service Joint Stock Company Vietnam

300
HOA CAM - PHASE I INDUSTRIAL ZONE

GENERAL INFORMATION

Address ▪ Street No1, Hoa Cam Industrial Park, Hoa Tho Tay Commune, Cam Le District, Da Nang city

▪ Hoa Cam Industrial Zone JSC.


․ Address: Street No1, Hoa Cam Industrial Park
Investor ․ Tel: (84) 914 109 667
․ Fax: (84-236) 3 898 077
․ Website: hoacamizi.com.vn
Mr. Nguyen Ba Cong- Head of Sales Department – Mobile: (84) 905 454 479 -
Contact Person
baconghoacamizi@gmail.com
Land: 8 km from Da Nang city center, and 8 km from railway station
Location Seaport: 18 km from Tien Sa Seaport
Airport: 7 km from Da Nang International Airport
Priority Sectors Electric and electronic equipment, assembly, food product, construction
for Investment material, interior décor, logistics, other industries (cosmetics, packaging..)
Investment Area Restricted
Sectors for Polluted Industry
Investment

Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

▪ Start date :30/9/2007


Lease term
▪ End date : 08/8/2054

Minimum Lease Area 4,000 m2

Limit for Construction In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Height Planning regulation (QCXDVN 01: 2008/BXD)

Permitted Construction Minimum rate: 50%


Rate Maximum rate: 60%
▪ Total area:
Planned area - Phase I: 136.73 ha (in which industrial land: 96.13ha; vacant leasable area: 12 ha)
- Phase II (Extended): 131 ha

Factory Available for Rent NA

Operation Status ▪ In operation

Occupancy Rate and


▪ 100%
Number of Projects
Number of Korean
N/A
Projects
▪ Land lease fee: 891,000 VND (~38.2 USD)/m2/whole project life
Lease fee
▪ Payment: One-time payment until 08 August 2054
▪ Management fee: 14,950 VND (~0.64 USD)/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: (prescribed by the supplier)
Operating fee
▪ Wastewater treatment fee:
Above 100m3: 12,000 VND (~0.51 USD)/m3
Under 100m3: 1,000,000 VND (~42.9 USD)/month

INFRASTRUCTURE AND FACILITY

Financial institution Vietcombank, ACB, Agribank, Techcombank

Tax service, State finance


03 km from Da Nang Treasury Office
office

301
5 km from nearest Customs Office
Customs Service
0.2 km to nearest ICD

Logistics Located inside the IZ

Post office 0.2 km from nearest Post Office

Medicare 1 km from nearest Hospital

Police, public security 0.1 km from nearest Police Station

Universities, training
6km from Dong A University and Da Nang Foreign Language University
facilities, etc.

Recruitment 1 km from Provincial Human Resources Center

Worker dormitory 0.2 km from the IZ

Worker's child education


8 km from the IZ
facility

One-stop service Inside the zone

Road Width Main road 60 m, 36 m and branch road 22 m in width

IT & Tele-communication Telecommunication systems and international standards are always ready to meet the
Facilities communication needs
Emergency Power
Available in the zone
generator

Fire-fighting facility Available

Layout Plan

Location Map

302
Actual View

303
EXPANDED HOA KHANH INDUSTRIAL ZONE

GENERAL INFORMATION
Address ▪ Hoa Khanh Bac Ward, Hoa Lien & Hoa Son Commune, Lien Chieu District, Da Nang City
Investor ▪ Saigon-Danang Investment Corporation (SDN)
․ Address: 61 A Nguyen Van Cu Street, Lien Chieu District, Da Nang City
․ Tel: (84-236) 3 770 998 Fax: (84-236) 3 770 997
․ Web: www.dananginvest.com
Contact Person ▪ Ms. Le Thi Yen Nhi - Business Director – Mobile: (84) 908 312 030 - Email:
yennhi.sdn@gmail.com/ nhi.le@dananginvest.com
Location ▪ 10 Km from Danang City center
▪ 10 Km from Danang International Airport
▪ 20 Km to Danang Deep Seaport (Tien Sa Terminal) 5km to Lien Chieu Deep Seaport
▪ 3 Km from National Highway 1A and 10 Km from the national North-South railway station
Priority Sectors for ▪ Information technology, biotechnology, automation technology and
Investment mechatronics, new materials technology;
Investment Area ▪ Environmental friendly industries, supporting industries in the field
of mechanics, precision engineering, electricity - electronics;
▪ High quality service sectors, especially trade, tourism, logistics,
health and education. (Decision No. 4286/QĐ-UBND on 4/7/2016)
Restricted Sectors for Heavy-Industry, Textile & dying, Polluting industries
Investment
Minimum wage [Area 2] According to Decree 157/2018/ND-CP dated 16th November 2018
Lease term End date: March 25th 2054
Minimum Lease Area 1 ha
Limit for Construction In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Height Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction
Rate
Planned area ▪ Total area: 132.6 ha
▪ Total vacant leasable area: 0.9 ha
▪ Total area with full infrastructure ready to build factory: 6.9 ha
Factory Available for Total area: Unavailable (Planning to build RFB)
Rent
Operation Status In Operation
Occupancy Rate and ▪ Occupancy Rate: 100%
Number of Projects
Number of Korean N/A
Projects
Lease fee ▪ Land lease fee: USD 110/m2/ for the rest of Project’s life to March 25th 2054 (before VAT)
▪ Factory lease fee: Unavailable
▪ Payment:
- Method: Bank transfer
- Period: Deposit 40% after signing Inprinciple Agreement – 55%After signing Land sublease
contract – 5% after signing Land handover minutes
Operating fee ▪ Management fee: 0.4 USD/m2/year (before VAT)
▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from March
16th, 2015 (excluded VAT) for voltage from 22KV - 110KV.
▪ Water fee: USD 0.37/m3 (Before Taxation and fees)
▪ Wastewater treatment fee: 0.37 – 0.92 USD/ m3 depending on Chemial Oxygen demand (COD)
(mg/l)
INFRASTRUCTURE AND FACILITY
Financial institution There are branches of all popular banks in Danang city.
Tax service, State finance 5 Km from the nearest State Tax Office and Treasury Office
office
Customs Service 600 m from the nearest Customs Agency in Hoa Khanh IP
11km from Da Nang port
Logistics [VNPOST, Yusen, Logitem, Nippon Konpo, Binh Vinh] inside the industrial park
Post office 4 Km from the nearest Mailing Post Office

304
Medicare Lien Chieu General Hospital (Far from IPs 3 km)
Danang General Hospital (Far from IPs 10 km)
Police, public security 1 Km from the nearest Police Station
Universities, training 25 universities and colleges in Danang City. Far from IPs 4km is some of the popular university
facilities, etc. and college in Danang City such as Danang Polytechnic University, Danang Pedagogical
University, and Danang Planning and Economics College…
Recruitment Available
Worker dormitory 5km from the IZ
Worker's child education 5km from the IZ
facility
One-stop service 15 Km from the nearest Facility
Road Width Roads connecting to land lots with width of 34.50m and 16.50m
IT & Tele- Telecommunication systems and international standards are always ready to meet the
communication Facilities communication needs
of industrial park
Emergency Power Available
generator
Fire-fighting facility Available in the zone
Layout Plan

305
Location Map

Actual View

306
[- This Page is intentionally left blank -]

307
DAK LAK

308
INVESTMENT ENVIRONMENT IN DAK LAK

USD/VND 23.510
GENERAL INFORMATION
Area 13125,37 km2
Population 1,9 million people (2022)
Geographical ▪ Dak Lak is located in the Central Highlands region.
Location Dak Lak is 1,410 km far from Hanoi and 350 km from Ho Chi Minh City.
- The East borders Khanh Hoa, Phu Yen provinces;
Adjacent - The North borders Gia Lai province;
provinces - The South borders Lam Dong, Dak Nong provinces;
- The West borders the Kingdom of Cambodia.
2022 statistic:
▪ Nominal GRDP (billion VND): 58.355 (4,13 billion USD)
▪ Real GRDP (billion VND): 52.481 (2,29 billion USD)
▪ GRDP growth: 8,94%
GRDP ▪ GRDP per capita (million VND/year): 62,3 (2.630 USD)
▪ Economic structure:
- Industry - Construction: 16,48%
- Agriculture. forestry and fishery: 36,87%
- Service: 42,36%
▪ Industry - Construction growth: 13,46%
Industry growth ▪ Agriculture, forestry and fishery growth: 4.56%
▪ Service growth: 7.37%
Import turnover (billion USD): 3,93 (Growth rate: 0,083)
Import - Export
Export turnover (billion USD): 1,50 (Growth rate: 0,3032)
▪ Processing coffee, avocado, cocoa, rubber, pepper
Key Industry ▪ Wind power production, solar power,
▪ Mechanical engineering, assembly, repair
PCI 60.91
Ranking 60
SOCIAL INFRASTRUCTURE
▪ Roadway: National Highway 14 to Ho Chi Minh City (350km), to Gia Lai (180km from Pleiku city) and
connecting with Ho Chi Minh Road in Kon Turn province, National Highway 26 to Khanh Hoa (180km from
Nha Trang city); National Highway 27 to Lam Dong (200km from Da Lat city) and National Highway 29 to
Transportation
Phu Yen (185km).
▪ Airway: Buon Ma Thuot Airport is located 7 kilometers southeast of the city center, directly connecting flight
routes to Hanoi, Ho Chi Minh City, Da Nang, Thanh Hoa, Vinh, Can Tho, and Hai Phong.
Dak Lak electricity generating company can basically ensure to supply sufficient electric power for production
Electricity and daily life. At present, the electric network has covered all of the communes in the province with 84% of the
households having access to electricity.
▪ A centralized water supply and treatment system will be installed for residents of Buon Ma Thuot city, Buon
Water
Ho town, and district centers.
Education &
▪ 04 universities, 8 colleges, 01 academy.
Training
Medicare ▪ 06 provincial hospitals, 02 district hospitals and 03 private hospitals
INVESTMENT CONDITION
Human resource 59.75% of population are in the working age (2022)
Education level Trained labor rate: 62% (2022)
▪ The minimum salary for the province is applied as follows (see appendix for
Salary
detail amount):
309
- Area III: including Buon Ma Thuot
- Area IV: including Buon Ho town and remaining districts
▪ The lowest wage for trained labor (including those trained by the enterprises)
must be at least 7% higher than the above referenced basic salary

Incentives for investment


According to the Investment Law, the entire Dak Lak province is eligible for investment incentives, Investment
projects in these areas are exempt from land rent for a period of seven to fifteen years, or for the entire term of
the lease, depending on the fields of investment incentives and other investment incentive policies as prescribed.

Besides, when investing in the field of socialization, investorswill be entitled to land rent exemption in 25 years
Investment and a reduction of 70-85% of land rent or 100% exemption for all other areas.
incentives
Investment support
Investment projects in agriculture and rural areas are eligible for policies on access to credit and investment
credit support.

Investment projects on the technical infrastructure of industrial clusters are supported to invest in items such as
centralized wastewater treatment systems; foreign roads; main roads; leveling.
Agriculture: Promote large-scale agricultural production; focus on agricultural development in the direction of
organic, high-tech applications, associated with preservation, processing, and consumption along the value
chain; promote the formation of concentrated, large-scale, bio-secure, and modern livestock production areas;
strengthen forest management, protection, and development; and focus on afforestation, contributing to
increased forest cover. Industry: Encourage the development of industries with advantages such as deep
processing, renewable energy, and mechanical engineering for production and processing in agriculture, animal
husbandry, and the software industry while also promoting scientific and technological research.
Fields Attracting
Investment Trade in services: To encourage investment and the development of commercial centers, supermarkets, and
traditional markets mixed with modern ones; to develop and improve the quality and competitiveness of service
industries with potential, advantages, and high added value, such as ecotourism, finance, banking, insurance,
transportation, logistics, education, health care, science, and so on; to develop the banking system to meet the
economy#39;s capital and service needs.

Construction: Pay close attention to infrastructure investment in the province#39;s industrial zones and clusters,
particularly investment in building a standard- compliant centralized wastewater treatment system.
Investment
attraction Dak Lak has 25 FDI projects with a total investment capital of about 635 million US dollars.
situation

310
Map

Department Of Planning And Investment Dak Lak


Address: No 08 Tran Hung Dao, Tan Loi Ward, Buon Ma Thuot city
Tel: (84-262) 3 852187
Fax: (84-262) 3 852187
Contact E-mail: ttxtdt@khdt.daklak.gov.vn

▪ Contact person:
- Mr. Dinh Xuan Ha
Tel: 0903585068
Email: hadx@khdt.daklak.gov.vn

311
[- This Page is intentionally left blank -]

312
DAK NONG

313
INVESTMENT ENVIRONMENT IN DAK NONG

USD/VND 23.510

GENERAL INFORMATION
Area 6515,6 km2
Population 0,658 million people (2022)
▪ Dak Nong is located in Central Highlands region.
▪ Dak Nong was established in 2004, further to the splitting of Dak Lak province. It covers 651,000
Geographical Location
ha located in mountainous region with an average elevation of 600 – 700 meter and with some
places up to 1,970 meter high from the sea level.
▪ The province is surrounded by Dak Lak Province in the north, Lam Dong Province on the east and
Adjacent provinces south-east, Binh Phuoc Province. It shares a borderline of 130km with Cambodia with two border
gates
2022 statistic:
▪ Real GRDP (billion VND): 22.400 (0,96 billion USD)
▪ GRDP growth: 7,59%
▪ GRDP per capita (million VND/year): 59,61 (2542 USD)
GRDP
▪ Economic structure:
- Industry - Construction: 19,61%
- Agriculture. forestry and fishery: 37,64%
- Service: 38,55%
▪ Industry - Construction growth: 7,87%
Industry growth ▪ Agriculture, forestry and fishery growth: 5,21%
▪ Service growth: 10,40%
Import turnover (billion USD): 0,30 (Growth rate: -0,36)
Import - Export
Export turnover (billion USD): 1,10 (Growth rate: 0,15)
▪ Agriculture still represents a very important part of Dak Nong economy. The main agricultural
Key Industry crops practiced in Dak Nong province are tea, coffee, pepper, cashew nut, rubber tree and sugar
cane.
PCI 64.87
Ranking 38
SOCIAL INFRASTRUCTURE
▪ Roadway: There are national highways No.14, 14C and 28 to Ho Chi Minh city, Đăk Lăk, Lâm
Đồng and to other provinces in the south. The province has national border gate in Bu Prăng, Đắk
Transportation
Pơ making it convenient for cross border trading and attracting tourists from Cambodia to Central
highland by roadway
▪ Dak ND'rung 1 wind power plant; Dak ND'rung 2; Dak ND'rung 3 has a total capacity of 300MW
Electricity
with a total capital of up to VND 10,000 billion;
Water ▪ Currently, within the province, there are 12 underground water resources monitoring works.
▪ The whole province of Dak Nong had about 387 schools with 5,324 classes and more than
Education & Training
172,000 students.
INVESTMENT CONDITION
Human resource 59.82% of population are in the working age (2020)
Education level Trained labor rate: 45% (2020)
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): N/A
Salary
- Area II (4,160,000 VND/month): N/A
- Area III (3,640,000 VND/month): N/A

314
- Area IV (3,250,000 VND/month): Gia Nghia City; the districts of Cu Jut, Dak Glong, Dak Mil,
Dak R'lap, Dak Song, Krong No, Tuy Duc
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum
wages paid to employees working under employment contracts)
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
Investment incentives
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
Fields Attracting High-tech agriculture, agricultural processing, infrastructure development, high-technology, tourism
Investment & services, industrial plants (coffee, rubber, cashew), mining
▪ Investment capital in the province is mainly focused on the purpose of electricity production and
distribution and agriculture, forestry, forestry and fishery. With a number of key projects such as
Dak ND'rung 1 wind power plant; Dak ND'rung 2; Dak ND'rung 3 has a total capacity of 300MW
with a total capital of up to VND 10,000 billion; Factory producing and processing high-quality
Investment attraction
agricultural products with a capacity of 5,000 tons of agricultural products with a total investment
situation
of more than 100 billion VND; 03 large-scale pig farms spread across the province with a total
investment of 400 billion VND; and some small and medium hydropower plants, etc. Investment
capital for social development at current prices in 2022 was estimated at nearly VND 18,473
billion, up 22.42% over the same period last year.
▪ The province has put into operation two industrial parks on a combined area of 327.5 ha and it is
Industrial zones making a planning scheme for Nhan Co 2 industrial park on over 800 hectares to facilitate
investment in mining and aluminium processing projects.

Map

Department of Planning and Investment Dak Nong


▪ Address: 23/3 Street, Gia Nghia town, Dak Nong

▪ Tel: 0261.3544333
Contact
▪ Email: skhdt@daknong.gov.vn
▪ Contact person:
- Mr. Tran Xuan Hai - Director
- Tel: 84-91343642
315
LIST OF INDUSTRIAL ZONES IN DAK NONG PROVINCE

No Industrial zone Name Total Area Occupancy Rate Status


stt (ha)
1 Tam Thang Industrial zone 179,19 77,26% In Operation
2 Nhan Co Industrial zone 148 86,49% Under construction
3 Nhan Co 2 Industrial zone 400 0 Not built yet

316
TAM THANG INDUSTRIAL PARK

GENERAL INFORMATION
Address Tam Thang Commune, Cu Jut District, Dak Nong Province
Investor ▪ Tam Thang Industrial Park Infrastructure Development Company
- Tel: 02613.683.579; fax: 2613,683.580.
- Investment capital: 319,876 billion VND.
Location
- The altitude is about 400 - 500m above sea level.
- Soil: Mainly red basalt soil.
- Located on National Highway 14, north of the city. Buon Ma Thuot, Dak Lak province is 18 km,
the South is 100 km from Gia Nghia Town, Dak Nong province and 330 km from Ho Chi Minh
City. Buon Ma Thuot Airport is about 30km.
- Convenience in exchange with Ho Chi Minh City and Ho Chi Minh City. Buon Ma Thuot, Dak
Lak province.
- The terrain in the industrial park is flat, convenient for the construction of factories and
enterprises. Technical infrastructure in the industrial park has basically been completed

Priority Sectors for ▪ Processing agricultural and forestry products; production of


Investment fertilizers, animal feed, building materials, household appliances.
Investment Area
Apply regional minimum wages as prescribed by the Government (average actual salary is 5.5
Minimum wage
million VND/person/month)
Lease term - Time to put into operation: 5/2005.
- Operation time: Until October 28, 2052

Planned area ▪ Total area: 179,5 ha


▪ Total leasable area: 128.4 ha
▪ Already used area: 117,6 ha.
Operation Status In Operation
Occupancy Rate and ▪ Occupancy Rate: 77,26%
Number of Projects
Number of Korean N/A
Projects
Lease fee - Land rent and infrastructure use fee: service area: 7 million VND/m2/year; industrial production
zone: 6 million VND/m2/year.
- Factory rental price: According to current price.
- Payment method: Annual payment (cash, bank transfer).
- Standard factory: According to current price.
- Office: According to current price.

INFRASTRUCTURE AND FACILITY


- Power supply system: Dak Nong Power Company supplies electricity to enterprise fences; power supply from 110KV
Transformer Station - Cu Jut.
- Water supply system: Dak Nong Urban Development and Water Supply Joint Stock Company supplies clean water to
enterprise fences.
- Waste water and waste treatment system: There is an operating wastewater treatment station with a capacity of 4,600 m3/day.
- Telecommunications system, internet: Provide to the foot of the enterprise fence.
- Internal traffic: Completed, the main road system is 36m wide, with 2 lanes; The internal road system is 11m wide, with 1 lane.

317
Layout Plan

318
NHAN CO INDUSTRIAL ZONE

GENERAL INFORMATION
Address 4, Nghia Duc ward, Gia Nghia town, Dak Nong province.
Investor ▪ Management Board of civil and industrial projects investment project in Dak Nong
province
- Tel: 02612216460
- Investment capital: 993 billion VND.
Location
- The altitude is about 600 - 700m above sea level.
- Soil: Mainly Basalt red soil
- Located far from National Highway 14: 02km; City. Buon Ma Thuot, Dak Lak province 140 km;
Gia Nghia town, Dak Nong province 10km and far from the city. Ho Chi Minh is about 240 km.
Convenience in trade with the city. Ho Chi Minh and the southern provinces.

Priority Sectors for Aluminum electrolysis; manufacturing industry using raw materials
Investment from aluminum.
Investment Area
Apply regional minimum wages as prescribed by the Government (average actual salary is 5.5
Minimum wage
million VND/person/month)
Lease term - 70 years, since August 11, 2014

Planned area A total area of 148 ha, but has leased 128 ha; the remaining 20 ha has been leveled but has not
yet been invested in the construction of industrial park infrastructure.
Operation Status Under construction
Occupancy Rate and ▪ Occupancy Rate: 86,49%
Number of Projects
Number of Korean N/A
Projects
Lease fee Currently, Dak Nong province is building a land rental unit price

INFRASTRUCTURE AND FACILITY

- Power supply system: Using a newly built 22KV power line (dual highway) from station 110/35/22KV-2x16MVA Gia Nghia -
Dak Nong to supply electricity to Nhan Co Industrial Park.

- Water supply system: Dak Nong Urban Development and Water Supply Joint Stock Company supplies clean water to
enterprise fences.

- Waste water and waste treatment system: Currently, the total area of Nhan Co Industrial Park is 148 ha, 128 ha has been leased
to Tran Hong Quan Metallurgical Company Limited to invest in the project "Dak Nong Aluminum Electrolysis Plant" Therefore,
the treatment system invested by Tran Hong Quan Metallurgy Co., Ltd meets the prescribed standards.

319
[- This Page is intentionally left blank -]

320
DIEN BIEN

321
INVESTMENT ENVIRONMENT IN DIEN BIEN
USD/VND 23.510

GENERAL INFORMATION

▪ Area: 9.541,25 km2


Area, Population
▪ Population: 635 million people (Statistics 2022)
▪ Dien Bien is a mountainous border province in the Northwest region of Vietnam.
Geographical Location
▪ 475 km west from Hanoi
▪ The East and Northeast borders Son La Province, the North borders Lai Chau
Adjacent provinces Province, the Northwest borders Yunnan Province (China), the West and Southwest
borders Lao PDR.
Statistic 2022:
▪ GRDP: 13,963.91 billion VND
▪ GRDP growth: 10,19%
▪ GRDP per capita: 39,68 million VND/year
GRDP ▪ Economic structures:
- Industry - Construction: 21,25%;
- Agriculture, forestry and fishery: 16,93%;
- Dịch vụ: 57,41%;
- Services: 4,41%
Statistic 2022:
Industry growth ▪ Industry – Construction growth: 16.11%
▪ Agriculture growth: 5.79%
▪ Service growth: 9.49%

PCI ▪ PCI score: 59.85 – Ranked 62nd out of 63 provinces in Vietnam. (2022)

SOCIAL INFRASTRUCTURE

▪ Roadway: National Highway 12 connects the two provinces of Dien Bien - Lai
Chau, National Highway 279 connects the northern mountainous provinces of Quang
Ninh, Bac Giang, Lang Son, Bac Kan, Tuyen Quang, Ha Giang, and Laos. Cai, Lai
Transportation
Chau, Son La and Dien Bien. National Highway 6 connects the provinces of Dien
Bien, Son La, Hoa Binh, and Hanoi.
▪ Airway: Dien Bien Phu Airport

Electricity
Supplied from the national power network

▪ There are 6 water plants (Dien Bien Phu city, Muong Cha, Muong Lay, Dien Bien
Dong, Tuan Giao, Tua Chua) and 1 Muong Ang water treatment station.
Water
Consumption volume reached more than 7 million m3, commercial water output
reached more than 4.9 million m3.

Education ▪ 168 preschools, 295 high schools, 17 centers, 04 colleges.

Medicare ▪ 02 provincial hospitals, 03 city hospitals, 07 district hospitals

INVESTMENT CONDITION

Human resource ▪ 58% of the population in working age (2022)

Education level ▪ Rate of trained workers: 60% (2022)

▪ The minimum salary for the province is applied as follows:


Salary
- Area III: Dien Bien Phu city

322
- Area IV: Muong Lay town, Dien Bien, Dien Bien Dong, Muong Ang, Muong Cha,
Muong Nhe, Tua Chua, Tuan Giao, and Nam Po districts
▪The lowest salary of trained workers (including employees trained by enterprises)
must be at least 7% higher than the above-mentioned base salary.
▪ Exemption and reduction of land rent
▪ Preferential tax rates and duration of corporate income tax exemption and
reduction.
Dien Bien province (including all districts and Dien Bien Phu city) is located in an
Investment incentives
area with extremely difficult socio-economic conditions. Therefore, when investing
in Dien Bien province, investors are fully entitled to preferential policies and
investment support at the highest level in accordance with the provisions of the
Investment Law 2020 and related legal documents.

Fields Attracting Investment

Map

Department of Planning and Investment of Dien Bien province


▪ Address: SN 900, group 3, Vo Nguyen Giap street, ward. Muong Thanh, City. Dien
Bien Phu - Dien Bien province
Contact
Tel: 0215 825409
▪ Fax: 02063853335
▪ Email: skhdt@dienbien.gov.vn

323
[- This Page is intentionally left blank -]

324
DONG NAI

325
INVESTMENT ENVIRONMENT IN DONG NAI

USD/VND 23.510

GENERAL INFORMATION
Area 5903,4 km2
Population 3,255 million people (2022)
Geographical ▪ Dong Nai is located in Southeast region.
Location ▪ Located in the southern key economic development region
▪ The East borders Binh Thuan province, the Northeast borders Lam Dong province, the Northwest borders
Adjacent
Binh Duong and Binh Phuoc provinces, the South borders Ba Ria - Vung Tau province, West borders Ho
provinces
Chi Minh City. South
2022 statistic:
▪ Nominal GRDP (billion VND):
▪ Real GRDP (billion VND): 233.979 (9.98 billion USD)
▪ GRDP growth: 9,22%
GRDP ▪ GRDP per capita (million VND/year): 13.404,00 ( USD)
▪ Economic structure:
- Industry - Construction:
- Agriculture. forestry and fishery:
- Service:
▪ Industry - Construction growth: 9,06%
Industry growth ▪ Agriculture, forestry and fishery growth: 3,89%;
▪ Service growth: 13,08%
Import turnover (billion USD): 1,89 (Growth rate: 0,0115)
Import - Export
Export turnover (billion USD): 2,45 (Growth rate: 0,1302)
▪ The mining industry, the processing and manufacturing industry, production and distribution of electricity,
Key Industry
gas, hot water, steam
PCI 65,67
Ranking 29
SOCIAL INFRASTRUCTURE
▪ Roadway: As a province with convenient transportation system with many national arterial roads passing
through such as National Highway 1A, National Highway 20, National Highway 51; North - South railway
Transportation line; Near Saigon port, Tan Son Nhat international airport has created favorable conditions for economic
activities in the region as well as trade with the whole country and plays a role in linking the Southeast
region with the Central Highlands.
▪ Nhon Trach 3 and 4 Thermal Power Plant Project has a scale of nearly 54 hectares with a total investment
of about 1.4 billion USD. The plant's capacity is expected to reach 1.5 thousand MW. Tri An hydropower
Electricity
plant was approved by the Prime Minister in the decision to adjust the national electricity development
planning for the period 2011-2020 with a vision to 2030.
▪ Dong Nai river system is one of the three largest river systems of Vietnam (after the Mekong and Red
Water rivers), including: the main Dong Nai river and four major tributaries, the La Nga river on the left bank and
the Be river. , Saigon River and Vam Co River on the right bank.
Education &
▪ 5 multidisciplinary training universities in Dong Nai province
Training
▪ The grassroots health system in Dong Nai currently has 11 health centers in districts and cities and 170
Medicare health stations in communes, wards, towns, hamlets and neighborhoods. Out of 170 medical stations, there
are more than 50 medical stations that are seriously degraded and need to be repaired urgently this year.
INVESTMENT CONDITION
Human resource 55,4% of population are in the working age (2022)
Education level Trained labor rate: ()
Salary ▪ The minimum salary for the province is applied as follows:
326
- Area I (4,680,000 VND/month): Bien Hoa City, Long Khanh City and Nhon Trach, Long Thanh, Vinh
Cuu, Trang Bom and Xuan Loc Districts
- Area II (4,160,000 VND/month): Dinh Quan, Thong Nhat Districts
- Area III (3,640,000 VND/month): Cam My, Tan Phu Districts
- Area IV (3,250,000 VND/month): N/A
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid
to employees working under employment contracts)
▪ Incentives according to government regulations:
Investment - Exemption and reduction for land and water rent fee
incentives - Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
Fields Attracting ▪ The mining industry, the processing and manufacturing industry, production and distribution of electricity,
Investment gas, hot water, steam
Total newly registered capital and projects to increase foreign direct investment (FDI) as of December 20,
2022 reached about US$1,141.47 million, equaling 93.6% over the same period (same period in 2021)
reached 1,219.9 million USD).In which: 48 new projects with total registered capital of 491.54 million USD,
equal to 90.6% in number of projects and 27.9% increase in registered capital over the same period last
Investment year. . There were 92 projects to increase capital with a total additional capital of 649.93 million USD, equal
attraction situation to 84.4% of the number of projects and 77.8% of the additional capital compared to the same period last
year. Thus, both the number of projects and the registered capital decreased over the same period. The
reason is due to the impact of the world economy's decline, which has affected the wave of investment in
other countries.
In 2022, there were 4,066 newly registered enterprises

Map

Department of Planning and Investment Dong Nai


Contact
▪ Address: No. 2, Nguyen Van Tri, Thanh Binh. Bien Hoa, Dong Nai

327
▪ Tel: 2513822505

▪ Email: skhdt@dongnai.gov.vn
▪ Contact person:
- Nguyen Huu Nguyen - Director of the Department of Planning and Investment of Dong Nai province.

328
AMATA INDUSTRIAL ZONE

GENERAL INFORMATION
Address Long Binh Ward - Bien Hoa City - Dong Nai
Investor Joint venture between SONADEZI Company and Amata Corp.Public Company- Thailand
- Điện thoại : 84-61-991007/893596
- Fax : 84-61-891251
- Website : http://www.amata.com
- Email : amatavn@hcm.vnn.vn
Location The distance by road from Amata Industrial Park to major cities, railway stations, ports and
international airports is as follows:
+ 32 km from the center of Ho Chi Minh City
+ 32 km from Saigon station
+ 4 km from Dong Nai port, 26 km from Tan Cang, 32 km from Saigon port, 40 km from Phu My
port.
+ 32 km from Tan Son Nhat International Airport.
Priority Sectors for Computers and accessories; food, food processing; manufacturing and
Investment assembling electricity, mechanics and electronics; leather products,
Investment Area textiles, apparel, wool, footwear; jewelry and fine arts products; sports
equipment, toys; plastic products, all kinds of packaging; industrial
products from rubber, ceramics, glass; metal texture; building
materials; auto parts, automobile manufacturing; pharmaceuticals,
agrochemicals, insecticides; Chemicals, PE fibers, plastic beads,
industrial pigments, etc.

Minimum wage Apply regional minimum wages as prescribed by the Government

Lease term - 50 year

Planned area 410 ha, of which 129 ha is developed in phase 1, 100 ha for lease, has been fully developed with
quality infrastructure facilities. The rate of leased land accounts for over 90%. Phase 2 develops
261 ha and service area, which is being developed in phases.
Operation Status Active
Occupancy Rate and ▪ Occupancy Rate: 90%
Number of Projects * Total number of projects/investing country: 48/12
Number of Korean N/A
Projects
Lease fee 40 USD/m2/50 year

INFRASTRUCTURE AND FACILITY

* Electricity price: 0.073 USD/KWh


* Water price: 4,600 VND/m3.
* Waste water treatment price: $0.28/m3
* Management fee: 0.08 USD/m2/month

329
BAU XEO INDUSTRIAL ZONE

GENERAL INFORMATION
Address Street 2A, Bau Xeo Industrial Park, Trang Bom District, Dong Nai
Investor Thong Nhat Joint Stock Company
Phone: 0251. 3924377
Fax: 0251. 3924692
Email: info@bauxeo.com.vn
Website: www.bauxeo.com.vn
Location
Distance to nearest big city:: 57 km from Ho Chi Minh City
Distance to Provincial Center: 24 km from Bien Hoa City
Distance to nearest airport: 22 km from Long Thanh airport
Distance to the nearest railway station: 2 km from Trang Bom station
Distance to the nearest river port: 40 km from Go Dau port
Distance to the nearest seaport: 45km . from Cai Mep port

Priority Sectors for Agricultural product processing industry, food processing, food,
Investment animal feed; Wood and plastic industry; textile industry, production of
Investment Area shoes, toys, jewelry; furniture manufacturing industry, interior
decoration, office; packaging industry; sports equipment
manufacturing industry; electronics and microelectronics industry;
mechanical industry (frame stamping, machine building and spare
parts); pharmaceutical and stationery manufacturing industry;
packaging production, prepress, design and printing industry; industry
producing handicrafts, glass, building materials.

Minimum wage Apply regional minimum wages as prescribed by the Government

Minimum lease area 10000 (m2)

Lease term - 50 year

Planned area 499.8 (ha)


Available for leasing: 15ha
Operation Status Active
Occupancy Rate and ▪ Occupancy Rate: 98.1%
Number of Projects
Number of Korean N/A
Projects
Lease fee 40 USD/m2/50 year

INFRASTRUCTURE AND FACILITY


Transport infrastructure: Internal roads and complete water supply and drainage system.
Power supply infrastructure: Powered from the national grid, with a voltage of 110/22KV (126 MVA).
Water supply infrastructure: Meeting the needs of businesses (currently 8,000 m3/day - night)
Communication infrastructure: Convenient at home and abroad.
Wastewater treatment infrastructure: Centralized wastewater treatment plant with current capacity of 4,000 m3/day.night

Layout plan:

330
331
HO NAI INDUSTRIAL ZONE

GENERAL INFORMATION
Address Long Tho Commune, Nhon Trach District, Dong Nai Province.
Investor Nhon Trach Industrial Park Construction Investment One Member Limited Liability Company 6A
Location Distance to nearest big city:: Distance from city center. Ho Chi Minh City 40 km along National
Highway 1A and Hanoi Highway,
Distance to Provincial Center: Distance from city center. Bien Hoa 12 km, Vung Tau city about 90
km.
Distance to the nearest airport: 45 km from Tan Son Nhat airport, about 25 km from Long Thanh
International Airport (with planning).
Distance to the nearest railway station: About 3 km from the nearest railway station, City station.
Ho Chi Minh 40 km.
Distance to nearest river port: 15km from nearest river port, 40 km from Cat Lai port
Distance to the nearest seaport: Distance from the city center. Ho Chi Minh City 40 km along
National Highway 1A and Hanoi Highway,
Priority Sectors for Agricultural product processing industry, food processing, food,
Investment animal feed; Wood and plastic industry; textile industry, production of
Investment Area shoes, toys, jewelry; furniture manufacturing industry, interior
decoration, office; packaging industry; sports equipment
manufacturing industry; electronics and microelectronics industry;
mechanical industry (frame stamping, machine building and spare
parts); pharmaceutical and stationery manufacturing industry;
packaging production, prepress, design and printing industry; industry
producing handicrafts, glass, building materials.

Minimum wage Apply regional minimum wages as prescribed by the Government (4,420,000 VND – Region I)

Minimum lease area 20.000 m2

Lease term - N/A

Planned area 496.65 ha, of which phase I is 225.71 ha has been leased, reaching 85%, phase II is 270.94 ha - has
been and is in the phase of acquisition, site clearance, ready for lease.
Operation Status Active
Occupancy Rate and ▪ Occupancy Rate: 66%
Number of Projects
Number of Korean N/A
Projects
Lease fee 160 USD/m2

INFRASTRUCTURE AND FACILITY


- Electricity: Using the national power source through the 220/22KV station with a capacity of 40MVA invested by Dong Nai
Power Company Limited and in the future will invest to upgrade to 80MVA.
- Water: Using water from Long Binh water plant (Bien Hoa city) of Dong Nai Water Supply Construction One Member
Limited Liability Company with current capacity of 200,000m3/day.
- Wastewater treatment: Acceptance limit of wastewater treatment plant - TT: Equivalent to column B of Regulation QCVN 40:
2011/BTNMT. Maximum processing capacity: 4,000m3/day. Current wastewater treatment capacity: 4,000m3/day and night
- Process rubbish: Contracting company with a unit with the function of collecting and treating waste
- System of fire: Fire hydrants are installed according to regulations on approved roads for fire prevention and fighting in Ho Nai
Industrial Park.
- Communications: The system connects the cradle to the network of the Dong Nai Post Office through the Ho Nai Industrial
Park Post Office. Switchboard capacity of Ho Nai Industrial Park 3,600 numbers, construction and installation of a 1.5 km
underground cable line with a total capacity of 3,600 pairs from Ho Nai Industrial Park post office.
Layout plan:

332
333
[- This Page is intentionally left blank -]

334
DONG THAP

335
INVESTMENT ENVIRONMENT IN DONG THAP

USD/VND 23.510

GENERAL INFORMATION
Area 3383,8 km2
Population 1,6 million people (2022)
▪ Dong Thap is located in Mekong Delta River region.
Geographical
It is located between the Southern Key Economic Zone and the Economic Zone of Can Tho-An Giang-Kien
Location
Giang-Ca Mau, influence on both sides by two big cities, Can Tho City and Ho Chi Minh City.
Adjacent The province borders Prey Veng province of Cambodia to the North, Vinh Long province and Can Tho City to
provinces the South, An Giang province to the West, Long An and Tien Giang provinces to the East.
2022 statistic:
▪ Nominal GRDP (billion VND):
▪ Real GRDP (billion VND): 99.376 (4.24 billion USD)
▪ GRDP growth: 8,62%
GRDP ▪ GRDP per capita (million VND/year): 62,10 (2648 USD)
▪ Economic structure:
- Industry - Construction: 22,27%
- Agriculture. forestry and fishery: 35,17%
- Service: 36,14%
▪ Industry - Construction growth: 12,95%
Industry
▪ Agriculture, forestry and fishery growth: 3,52%
growth
▪ Service growth: 10,92%

Import - Import turnover (billion USD): 0,80


Export Export turnover (billion USD): 1,72 (Growth rate: 0,3515)
Key Industry Agricultural sector
PCI 69.68
Ranking 5
SOCIAL INFRASTRUCTURE
▪ Roadway:
- National Highways 30, 80, 54, Ho Chi Minh road
- 2 international border gates Thuong Phuoc & Dinh Ba.
Transportation
▪ Railway & Airway: None
▪ Waterway: Cao Lanh and Sa Dec ports, located on the banks of the Tien River, are capable of receiving ships
with a tonnage of up to 5000 DWT.
Power supply to the province comes from the national network through the 110 KV transmission line system.
Electricity
Consists of 2 main sources: 220 Kv Cai Lay substation and Tra Noc thermal power plant
Currently, there are 20 urban water plants, 305 centralized water supply stations, and 8.000 drilled wells with
hand pumps.
Groundwater: Dong Thap has many underground water reservoirs at different depths, this source is very
Water
abundant, has only been exploited and used for urban and rural living, not yet put into industrial use.
The rate of urban households using clean water in 2022 is estimated at 99.4%; The rate of rural households
using clean water in 2022 is 88.97%.
The province has 01 university; 22 vocational establishments, classified by type, including: 01 Vocational
Education & College, 01 Community College, 01 Medical College; 03 Intermediate Schools under the Department of Labour,
Training Invalids and Social Affairs, 01 Vocational School - Transport, 07 vocational education centers and 08 other
establishments participating in vocational education activities.
The province has 168 medical facilities, including: 21 Hospitals; 01 Nursing and rehabilitation hospital; 02
Medicare
regional polyclinics; 143 Commune health stations, wards.
INVESTMENT CONDITION
Human
58.87% of population are in the working age (2022)
resource
336
Education level Trained labor rate: 73,6% (2022)
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): N/A
- Area II (4,160,000 VND/month): N/A
Salary - Area III (3,640,000 VND/month): Cao Lanh city, Sa Dec city
- Area IV (3,250,000 VND/month): Hong Ngu City; Districts of Cao Lanh, Chau Thanh, Hong Ngu, Lai Vung,
Lap Vo, Tam Nong, Tan Hong, Thanh Binh, Thap Muoi.
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to
employees working under employment contracts)
- Investment incentive policies are prescribed in the Law on Investment in 2020 and relevant laws.
+ Forms of incentives: Corporate income tax incentives, tax exemptions, tax reductions and other incentives
according to the provisions of the law on corporate income tax; Exemption from import tax on goods imported
to create fixed assets; raw materials, supplies and components imported for production in accordance with the
law on import and export tax; Exemption or reduction of land use levy, land rent and land use tax; Depreciation
is fast, increasing the amount of expenses deductible when calculating taxable income.
+ Objects of incentives: investment projects in sectors eligible for investment incentives, or investment projects
in areas eligible for investment incentives.
Investment - Investment promotion policy issued by the province:
incentives + Resolution No. 27/2022/NQ-HDND dated December 9, 2022 of the People's Council of Dong Thap province
amending and supplementing a number of policies to encourage socialization in the fields of education and
training, vocational training, healthcare, culture, physical training and sports, environment, judicial expertise in
Dong Thap province.
+ Resolution No. 231/2019/NQ-HDND dated April 2, 2019 of the Provincial People's Council on the program to
support investment in building technical infrastructure of industrial clusters in Dong Thap province.
+ Decision No. 23/2016/QD-UBND dated April 8, 2016 of the Provincial People's Committee promulgating the
Regulation on a number of preferential policies, encouraging investment, management and exploitation of
agricultural clean water supply works. village in Dong Thap province.
Fields
High-tech agriculture, infrastructure development, agricultural processing, retails, supporting industry,
Attracting
development of local raw materials, processing industry, auxiliary technology,...
Investment
Investment Up to now, Dong Thap has approved the investment policy of 22 projects, with a total registered capital of 4,079
attraction billion VND, an increase of 37.5% in the number of projects and an increase of 95.2% in capital compared to
situation 2021.
Currently, there are 03 Industrial Parks in operation with a total planning area of more than 251.56 ha,
Land lease fee: ~30 - 45 USD/m2 for the project life.
1. Tran Quoc Toan Industrial Park
Industrial
2. Song Hau Industrial Park
zones
3. Sa Dec Industrial Park (132 ha)
4. Dinh Ba International Border Gate Area
5. Thuong Phuoc International Border Gate Area

337
Map

Dong Thap Economic Zones Management Authority


▪ Address: 10 Le Van Chanh Street, Ward 1, Cao Lanh City, Dongthap Province

▪ Tel: 84-277 3 878471


Contact
▪ Email: bqlkkt@dongthap.gov.vn
▪ Contact person:
- Mr. Nguyen Duy Thanh
- Deputy Head of Investment & Construction Management Department
- Tel: 84-973785792

338
TAN KIEU INDUSTRIAL ZONE

GENERAL INFORMATION

Tan Kieu commune and My An commune, Thap Muoi district, Dong Thap province
Address
+ Company name: Dong Thap Construction Materials and Construction Joint Stock Company
Investor + Address: No. 03 Ton Duc Thang, Ward 1, Cao Lanh city, Dong Thap province.
+ Phone number: 02773 858 959 – 0
Mr: Nguyen Lam Thai Thinh
Position: Director of Industrial Park Management Board
Contact Person
Address: No. 03 Ton Duc Thang, Ward 1, Cao Lanh city, Dong Thap province.
Phone number: 0942.252.566
Altitude above sea level (MSL): +3.2 above National altitude
Adjacent to DT.846 and Nguyen Van Tiep Canal; 04 km from the center of My An town, 28 km
Location
from Cao Lanh city; 30 km from Tien River and 80 km from Ho Chi Minh City.
Distance to Tra Noc airport in Can Tho city: 53 km

Lease term Start date: 4/2024

Lease fee There is no specific land rental price (estimated price is about 70 USD/m2/50 years).

The total area is 148.7 hectares.


Planning area
Rental area: 101.8 hectares
Occupancy Rate and
▪ 50%
Number of Projects

Lease fee 30 USD/m2

Number of Korean
▪ 0 projects
Projects

Layout plan

339
[- This Page is intentionally left blank -]

340
GIA LAI

341
INVESTMENT ENVIRONMENT IN GIA LAI

GENERAL INFORMATION

▪ Area: 15,494.9 Km2 (second-largest province of Vietnam)


Area, Population
▪ Population: 1, 590 Million people (2019)
▪ Gia Lai is located in the northern part of the Central Highlands (“Tay Nguyen” in Vietnamese), and
Geographical Location
has a strategic position in the Vietnam-Laos-Cambodia Development Triangle.
▪ The Province shares the border with Kon Tum Province on the north, Dak Lak Province on the
Adjacent provinces
south, Cambodia on the west, Quang Ngai, Binh Dinh, Phu Yen provinces on the east.
2021 statistic:
▪ GRDP growth: 9.27%
▪ GRDP per capita: 60,45 million VND
GRDP ▪ Economic structure:
- Agriculture, forestry and fishery: 28,39%;
- Industry - Construction: 28,43 %;
- Service: 39,15%
2022 statistic:
▪ Agriculture, forestry and fishery growth: 4,61%
▪ Industry – Construction growth: 22,56 %
Industry growth
▪ Service growth: 6,70%
▪ Export turnover: 660 million USD
▪ Import turnover: 140 million USD

PCI ▪ Score: 64.00– ranked 45th out of 63 cities and provinces in Vietnam (2022)

SOCIAL INFRASTRUCTURE

▪ Roadway: Gia Lai is connected to key cities and economic hubs in the country and neighboring
countries via national roads and highways. National Highway 14 goes from Da Nang–Quang Nam to
Kon Tum–Gia Lai–Dak Lak–Ho Chi Minh City. National Highway 19, which is 160km long, connects
Quy Nhon port in Binh Dinh province to Gia Lai’s capital city Pleiku and Le Thanh International
Transportation Border Gate in Gia Lai. National Highway 78 connects the Cambodian city of Ratanakiri and
northeastern provinces of Cambodia with southern provinces of Laos and Thailand. National Highway
25 connects Gia Lai to Tuy Hoa, Phu Yen province’s capital. Truong Son Dong Road runs from Quang
Nam to Gia Lai Province and onto Da Lat.
▪ Airway: Pleiku airport has 6 flights to Ho Chi Minh city, Đà Nẵng and Hanoi everyday
▪ Gia Lai province has many large rivers that flow through it, which means great potential in
hydropower. There are currently 43 hydropower plants with a capacity of 2,194MW, including six large
plants with a capacity of 1,907MW; and 37 small- and medium-sized plants with a capacity of
Electricity
286.95MW. In addition, there are many other small hydropower plants with total installed capacity of
nearly 300MW under operation. Some enterprises in the province are also drawing up surveys to
develop wind power and solar power projects with a capacity of 300-500 MW/project.
▪ There are currently 337 irrigation works (reservoirs, dams, pumping stations) with the irrigation
capacity of about 54,239 ha in the Province. Until now, the percentage of households that have access
Water
to clean water is about 94%. Every Urban centers, industrial parks and economic zones has been
equipped with the drainage system.

INVESTMENT CONDITION

Human resource ▪ 936.477 people in working age (2022)

Education level ▪ Trained labor rate: 59,09% (2022)

▪ The minimum salary for the province is applied as follows:


- Area III (3,430,000 VND/month): Pleiku city
- Area IV (3,70,000 VND/month): An Khe town, Ayun Pa town; Chu Pah, Chu Prong, Chu Se, Dak
Salary Doa, Chu Puh, Phu Thien, Mang Yang, Krong Pa, Kong Chro, K'Bang, Ia Pa, Ia Grai, Duc Co, Dak Po
districts
▪ The lowest wage for trained labor(including those trained by the enterprises) must be at least 7%
higher than the above referenced basic salary

Investment incentives ▪ Incentives according to government regulations:

342
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
▪ Province-specific investment support:
- Support for development of investment projects and preparation of environmental impact assessment
reporting
- Support for trade promotion (exhibitions, technology fairs)

▪ Prioritized projects:
- Producing rubber products;
- Producing unburnt building materials, autoclaved concrete bricks, foam concrete bricks;
- Processing instant coffee and coffee powder (input materials are produced according to UTZ, 4C
and VietGAP processes);
Fields Attracting - Processing pepper products: peppercorns and pepper powder (input materials are produced
Investment according to VietGAP process);
- Producing and refining animal, poultry and aquatic feed;
- Investing in building 5-star hotels, investing in luxury resorts;
- Invest in building and exploiting eco-tourism areas with a scale of 20 hectares or more, cultural and
historical tourist attractions;
- Investment in construction and business of infrastructure of the zone.
▪ Apart from Le Thanh international border gate economic zone, Gia Lai has 7 industrial zones,
including Tra Da in Pleiku city (Occupancy rate: 100%), North Bien Ho, Ham Rong, Tra Ba, Play
Investment Attraction Ku, Chu Se, and An Khe.
▪ As of February 2022, Gia Lai has attracted 7 FDI projects with the total investment capital of 21.09
million USD.

343
Map

Planning and Investment Department


Address: 02 Hoang Hoa Tham, Pleiku City, Gia Lai
Contact Tel: +84 269 3824414
Email: skhdt@.gialai.gov.vn
Web: www.skhdt.gialai.gov.vn

344
LIST OF NOTABLE COMPANIES IN GIA LAI

Enterprise Sector Business size1


HAGL Group Agriculture, real estate Charter capital: 351 million USD
15 Truong Chinh, Pleiku, Gia Lai +84 269 Employees: 50
2225888 contact@hagl.com.vn hagl.com.vn
Duc Long Group Agriculture, energy, infrastructure, Charter capital: 126.7 million USD
02 Dang Tran Con, Tra Ba Ward, Pleiku, Gia manufacturing – services Employees: 106
Lai +84 269 3748367
duclong@duclonggroup.com
www.duclonggroup.com
Quang Duc Export Sales Limited Manufacturing sector, business Charter capital: 31.1 million USD
29A Truong Chinh, Pleiku, Gia Lai services, merchandising Employees: 50
+84 269 2225566 info@quangducgialai.com.vn
quangducgialai.com.vn
Vinh Hiep Company Limited Business, agricultural exports, freight Charter capital: 4 million USD
404 Le Duan, Pleiku, Gia Lai +84 269 3759699 Employees: 100
vinhhiepgl@yahoo.com www.vinhhiepgl.com
An Khe Sugar Plant - Branch of Quang Ngai Manufacturing and trading of sugar Charter capital: 83.3 million USD
Sugar Joint Stock Company Employees: 577
Thanh An Commune, An Khe Town, Gia Lai
+84 269 3532084 ankhesugar@gmail.com
www.qns.com.vn
Duong Van Phat Agricultural and Forest Wholesale of agricultural and forestry Charter capital: 6.7 million USD
Products Processing Company Limited products, refined sugar production, Employees: 10
Chu Ngoc Commune, Krong Pa District, Gia sales of beverages
Lai Mobile :+84 983 409791
vanphatphuyen@gmail.com
Mien Nui Gia Lai Corporation Business Wholesale agricultural products, Charter capital: 8.9 million USD
Development rubber, sell cattle, poultry and
18 Le Hong Phong, Dien Hong Ward, Pleiku, livestock, animal feed
Gia Lai +84 269 3897118
miennuigl@gmail.com
Gia Lai Electricity Joint Stock Company Production and trading of electricity, Charter capital: 82.2 million USD
114 Truong Chinh, Pleiku, Gia Lai electrical network construction, Employees: 430
+84 269 3823604 advisory services, production of
info@geccom.vn centrifugal concrete pillars
www.geccom.vn
Truong Sinh International Scientific Veterinary and aquatic medicine Charter capital: 3.1 million USD
Development Co. production Employees: 20
1335 Pham Van Dong, Pleiku, Gia Lai +84 269
3865295 truongsinh.gli@gmail.com
www.truongsinhgialai.com
Classic Coffee Corporation Processing and trade of coffee, sugar, Charter capital: 231,000 USD
740 Truong Chinh, Pleiku, Gia Lai tea Employees: 07
+84 269 3746279 lamnguyen.clsc@gmail.com

1
Note: Charter Capital/Revenue estimates in USD based on conversion rate of 22.500 VND = 1USD
345
LIST OF INDUSTRIAL ZONES IN GIA LAI

Industrial zone Name Total Area (ha) Occupancy Rate Status

Tra Da Industrial zone 213 ha 100% In operation

The IP will be filled Investing in infrastructure construction is


South Pleiku Industrial Park 191,55 ha
in 2025 underway

346
TRA DA INDUSTRIAL ZONE

GENERAL INFORMATION

ADDRESS Tra Da commune and Bien Ho commune, Pleiku city

INVESTOR Gia Lai Paper Joint Stock Company, Hung Nguyen Coffee Factory, Nutifood Hoang Anh

- 7 km from Pleiku city center


- 5 km from Pleiku airport by detour, 01 km from the crow flies.
LOCATION
- About 2 km from National Highway 19, about 4km from National Highway 14
- 166 km from Quy Nhon Seaport

- Processing industry of agricultural and forestry products, biofuel production.


- Food processing industry, consumer industry.
INVESTMENT Priority Sectors
- Animal feed processing industry, chemical industry, agro-forestry product
AREA for Investment
processing.
- Mechanical, electrical, electronic and low-pollution industries.
MINIMUM WAGE The average income of employees is 6.3 million VND/person/month.

 Start date: 2003


LEASE TERM
 End date: 2053
MINIMUM LEASE
Not available
AREA

PLANNED AREA  Total area: 213ha

Factory for rent:


FACTORY
- 1000 m2
AVAILABLE FOR
- Minimum land plot: 10,000 m2
RENT
- Built up area: 500m2

OPERATION
In operation
STATUS
OCCUPANCY
RATE AND Occupancy rate: 100%
NUMBER OF Attracting nearly 50 domestic and foreign investors
PROJECTS
NUMBER OF
KOREAN N/A
PROJECTS

LEASE FEE 20-30 USD/m2 (50 Years)

OPERATING FEE
(NOT INCLUDING Management fee: 0.4USD/m2
VAT)

INFRASTRUCTURE AND FACILITY

TRANSPORTATION Main road: Width: 15m, Number of lane: 4-6 lanes -

ELECTRICITY Power line: 110KV and 500/220KV - 0.05 USD

347
WATER SOURCE 2.678m3/day (TCCN: 40m3/ha/days) - 0.4 USD/m3

LAYOUT PLAN

ACTUAL VIEW

348
SOUTH PLEIKU INDUSTRIAL ZONE

GENERAL INFORMATION

ADDRESS Pleiku city

INVESTOR Nam Pleiku-IP-GL

CONTACT Mobile: (+84) 948 859 999


PERSON Email: info@saigonvrg.com.vn

Nam Pleiku Industrial Park is 18km from Pleiku city center, 23km from Pleiku airport, 65km from Kon
LOCATION
Tum city, about 160km from Buon Me Thuot city, 170km from Quy Nhon port

Mechanical assembly, production of spare parts, electronic


components
INVESTMENT Consumer production, handicrafts
Priority Sectors for Investment
AREA Textile industry
Food processing and agricultural products and some other
industries
MINIMUM WAGE N/A

 Start date: 2020


LEASE TERM
 End date: N/A
MINIMUM LEASE
Not available
AREA

PLANNED AREA  Total area: 199.55ha

OPERATION
In operation
STATUS
OCCUPANCY
RATE AND
Within a year, businesses have deposited 60ha of land, reaching a rental rate of 40% of the project.
NUMBER OF
PROJECTS
NUMBER OF
KOREAN N/A
PROJECTS

LEASE FEE 25 USD/m2/46 years (excluding VAT)

OPERATING FEE
(NOT INCLUDING Management fee: 0.4USD/m2
VAT)

INFRASTRUCTURE AND FACILITY

The main roads in the industrial park are 32 m wide - 4 lanes

TRANSPORTATIO + Branch roads in the industrial park are 23 m wide - 2 lanes


N
All internal roads are designed and constructed in strict compliance with national regulations, and
finished with Asphalt. The internal roads are also equipped with a complete, aesthetic high-pressure
lighting system

349
ELECTRICITY The power supply to the industrial park is taken from the 110/35/22KV substation

WATER SOURCE 30.000 m3/day

LAYOUT PLAN

ACTUAL VIEW

350
[- This Page is intentionally left blank -]

351
HA GIANG

352
INVESTMENT ENVIRONMENT IN HA GIANG

USD/VND 23.510

GENERAL INFORMATION
Area 7930 km2
Population 0,892723 million people (2022)
▪ Ha Giang is located in Northeast region.
Geographical
▪ Located in the North pole of Viet Nam
Location
▪ 318 km to Hanoi
▪ The Province has Van Nam Province - China to the North, Cao Bang Province to the East, Tuyen Quang
Adjacent provinces
and Yen Bai Province to the South and Lao Cai Province to the West
2022 statistic:
▪ Nominal GRDP (billion VND): 30.571 (1,3 billion USD)
▪ Real GRDP (billion VND): 16.286 (0,69 billion USD)
▪ GRDP growth: 7,62%
GRDP ▪ GRDP per capita (million VND/year): 18,24 (776,01 USD)
▪ Economic structure:
- Industry - Construction: 25,53%
- Agriculture. forestry and fishery: 29,37%
- Service: 39,80%
▪ Industry - Construction growth: 15,42%
Industry growth ▪ Agriculture, forestry and fishery growth: 4,80%
▪ Service growth: 6,09%
Import turnover (billion USD):
Import - Export
Export turnover (billion USD): (Growth rate: -0,37)
Key Industry Mining industry, processing industry, hydropower
PCI 64.39
Ranking 41
SOCIAL INFRASTRUCTURE
▪ Roadway: National highway 279, 4C, 34,... National highway 2 is upgraded synchronously; the province
also build a bypass of Yen Minh town on national highway 4C;
▪ Waterway: Lo River is a large river in Ha Giang, originating from Luu Lung, Yunnan (China), flowing
Transportation through the Vietnam - China border (Thanh Thuy area), through Ha Giang and Bac Quang cities to Tuyen
Quang. This is the main source of water supply for the central region of the province. Chay River originates
from the southwest slope of Tay Con Linh peak and the northeast slope of Kieu Lien Ti peak, the density of
tributaries is high (1.1km/km2), the water concentration coefficient reaches 2.0km/km2.
▪ Ha Giang province has approved 77 hydropower projects with a total installed capacity of 1,061 MW. Of
Electricity which, 36 hydropower plants are generating electricity into the national grid, with a total installed capacity
of 725 MW.
Water Lo River is the main source of water supply for the central region of the province.
Education &
615 schools at all levels, 98 kindergarten; 80 primary schools; 67 secondary school and 10 high schools
Training
Medicare N/A
INVESTMENT CONDITION
Human resource 42.71% of population are in the working age (2022)
Education level Trained labor rate: 56.6% (2022)
▪ The minimum salary for the province is applied as follows:
Salary
- Area I (4,680,000 VND/month): N/A

353
- Area II (4,160,000 VND/month): N/A
- Area III (3,640,000 VND/month): Ha Giang City
- Area IV (3,250,000 VND/month): Bac Me, Bac Quang, Dong Van, Hoang Su Phi, Meo Vac, Quan Ba,
Quang Binh, Vi Xuyen, Xin Man, Yen Minh districts
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages
paid to employees working under employment contracts)
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
Investment
▪ Incentives from the province:
incentives
Incentives according to government regulations:
▪ Exemption and reduction for land and water rent fee
▪ Preferential tax rates and exemption period, reduction for corporate income tax.
▪ Import tax exemption
Fields Attracting Agriculture and Forestry; tourism, services, logistics; agricultural and forestry product processing industry;
Investment urban infrastructure and science and technology.
In 2022, the whole province has 7 programs and projects using ODA capital to be implemented, including:
Class II urban development program (green cities) - Ha Giang province sub-project; Drainage and
wastewater treatment city. Ha Giang; Multi-purpose development for ethnic minorities in poor communes of
Investment
Xin Man district; Repair and improve dam safety (WB8); Construction of residential bridges and local road
attraction situation
asset management (LRAMP); Basic infrastructure for comprehensive development of Northeast provinces -
Sub-project of Ha Giang province; Developing grassroots health service delivery system - Ha Giang
province subproject.

Map

354
Ha Giang Department Of Planning And Investment
▪ Address: No 188, Tran Hung Đao street, Nguyen Trai District, Ha Giang
Contact ▪ Tel: 2193866256

▪ Email: skhdt@hagiang.gov.vn

355
LIST OF INDUSTRIAL ZONES IN HA GIANG

No Industrial zone Name Total Area (ha) Occupancy Rate Status


1 Binh Vang Industrial Zone 254.77 ha 100% In Operation

HA GIANG’S LOCATION MAP OF INDUSTRIAL ZONES

356
BINH VANG INDUSTRIAL ZONE

GENERAL INFORMATION

Address ▪ Dao Duc Commune, Vi Xuyen District, Ha Giang Province

Management Board of Ha Giang Economic Zone


▪ Address: No. 222, Nguyen Trai street, Ha Giang city, Ha Giang province
Investor
▪ Tel: (84-219) 3 860 109
▪ Email: bqlkkt@hagiang.gov.vn

Contact Person Mr. Pham Hong Thang- Head of Investment Department-

▪ 1 km to National Road 2, 17 km to the North of Ha Giang City, 2 km to Vi Xuyen


Town center to the South
Location
▪ 440 km to Hai Phong Sea Port
▪ 300 km to Noi Bai International Airport
▪ Processing of agro-forest products
Priority Sectors for
▪ Mineral processing and metallurgy
Investment
Investment Area ▪ Plywood manufacture
Restricted Sectors
N/A
for Investment

Minimum wage [Area 4] According to Decree 157/2018/ND-CP dated 23rd December

Lease term 50 years

Minimum Lease Area N/A

Limit for Construction Height N/A

Permitted Construction Rate N/A

▪ Total area: 254.77ha


- Phase I: 136.86 ha
Planned area
- Phase II: 115.905 ha
▪ Total vacant leasable area: phase II (Phase II has not yet been acquired and cleared)

Factory Available for Rent ▪ Total factory land for lease: 100.8 ha

Operation Status In Operation

Occupancy Rate and Number of ▪ Occupancy rate: 100%


Projects ▪ Number of projects: 25

Number of Korean Projects None

Lease fee ▪ Land lease fee: 7,104 VND (~0.3 USD) /m2/year

▪ Infrastructure maintenance fee: Currently the fee is not yet decided by management
board, and not yet collected
▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee
▪ Water fee: as regulated by the Government
▪ Wastewater treatment fee: N/A
▪ Waste treatment fee: N/A

INFRASTRUCTURE AND FACILITY

Financial institution 16 km to bank branches of Agribank, BIDV, VDB

▪ 15 km to Ha Giang Tax Department


Tax service, State finance office
▪ 16 km to Ha Giang State Treasury

Customs Service 14 km to Ha Giang Customs Office

Logistics 34,8 km to Thanh Thuy Border Gate

357
Post office 7 km to Vi Xuyen Post Office

▪ 9 km to Vi Xuyen General Hospital


Medicare
▪ 16 km to Ha Giang General Hospital
2 km to Police Station of Dao Duc commune
Police, public security
7 km to Police Station of Vi Xuyen district
Universities, training facilities,
▪ 17 km to Ha Giang Economic and Technical School
etc.
▪ 8 km to Ha Giang Job Introduction Center
Recruitment
▪ 15 km to Ha Giang Job Service Center

Worker dormitory None

▪ 5 km to Dao Duc kindergarten


Worker's child education facility
▪ About 16-20 km to about 10 kindergarten located in Ha Giang city

One-stop service N/A

Road Width N/A

IT & Tele-communication
Facilities Available

Emergency Power generator N/A

Fire-fighting facility Available. All factories when built have to comply fire-fighting standard to be approved.

Layout Plan

358
Location Map

Actual View

359
[- This Page is intentionally left blank -]

360
HA NAM

361
INVESTMENT ENVIRONMENT IN HA NAM

GENERAL INFORMATION

▪ Area: 900 km2


Area, Population
▪ Population: 0.9 million (2022 statistic)
▪ Ha Nam is a province located in the Red River Delta
Geographical Location
▪ 50km from Hanoi capital.

Adjacent provinces ▪ To the north, to the west, to the east, and to the south.

2022 statistic:
▪ Real GRDP: 46.065,7 billion VND (2 billion USD)
▪ GRDP growth: 10,82%
GRDP ▪ GRDP per capita: 3.783 USD/year
▪ Economic structure:
- Industry - Construction: 67,3%;
- Agriculture. forestry and fishery: 8,0%;
- Service: 24,7%;
2022 statistic:
Industry growth ▪ Industry - Construction growth: 12,96%
▪ Agriculture, forestry and fishery growth: 1,95%
▪ Service growth: 8,42%

PCI ▪ Score: 64 – ranked 46 out of 63 cities and provinces in Vietnam. (2022)

SOCIAL INFRASTRUCTURE

▪ Roadway: National Highway 1A, Hanoi - Ninh Binh Expressway, National


Highway 38, National Highway 21A, National Highway 21B, the road connecting
Transportation two highways Hanoi - Hai Phong and Hanoi - Ninh Binh.
▪ Railway: North-South Railway.
▪ Waterway: Inland waterways.

▪ The province has a waste-to-energy plant. The province is also constructing the
Electricity
Quang Trach I Thermal Power Plant

▪ Ha Nam currently has 41 concentrated clean water plants with a total capacity of
Water 175,000m3/day. The factories use water from the Red River, Day River, Sat River,
and Chau River.
▪ The province has about 29 high schools with 1 specialized high school, 24 public
Education schools and 4 private schools. In addition, there are 6 Centers of Continuing
Education - Vocational Education.
▪ In addition to the network of medical examination and treatment facilities from the
province to the grassroots, the Government has planned a high-quality regional
Medicare
medical center in Phu Ly city with an area of 940ha and more than 7,000 beds. Viet
Duc Hospitals 2, Bach Mai 2, Geriatric Hospital 2, Yuzankai Elderly Care Center.

INVESTMENT CONDITION

Human resource ▪ 55% of population are in the working age (2022)

▪ The minimum salary for the province is applied as follows:


Salary - Area III: Phu Ly city, Duy Tien town, Kim Bang district.
- Area IV: Ly Nhan, Binh Luc and Thanh Liem districts.
▪ Regarding infrastructure rental incentives: In agricultural production zones with
high technology application: Cash support (after investment) for part of the costs of
Investment incentives infrastructure construction in project fences, human resource training, market
development according to Decree 57 /2018/ND-CP dated April 17, 2018 of the
Government.
362
▪ Regarding tax incentives: For hi-tech application projects, hi-tech product
production projects, supporting industry projects, hi-tech agricultural production
projects: The preferential tax rate of 10% for 15 years shall be applied. Tax
exemption for 4 years, 50% reduction of payable tax for the next 9 years. Other
projects investing in industrial parks, investment projects in Thanh Liem, Ly Nhan
and Binh Luc districts: Tax exemption for 2 years, 50% reduction of payable tax for
the next 4 years.
▪ Policies to support training and recruiting workers: Support in training and
recruiting skilled workers for investment enterprises in the province. Direct support
for vocational training institutions and according to the provincial vocational training
project.
▪ Mechanical engineering, assembling, automobiles, motorcycles; electricity,
electronics, telecommunications, information technology; auxiliary industry, new
materials, high-tech industry; processing and preserving agricultural products, food,
beverages, milk.
Fields Attracting Investment ▪ Agriculture applying high technology: Growing and processing clean vegetable,
tuber and fruit products with high added value to serve large supermarkets and
export; invest in building concentrated breeding areas such as raising clean pigs,
dairy cows, beef cattle, breeding cows, poultry and processing products from pork
and cows...; agricultural research and development.

Map

Department of Planning and Investment


▪ Address: No. 15 Tran Phu Street, Phu Ly City, Ha Nam Province.
▪ Tel: 0351.852701
Contact ▪ Fax: 0351.852701
▪ Email: skhdt@hanam.gov.vn
▪ Contact person: Mr. Dinh Ngoc Duy - Deputy Head of Investment Cooperation
Department. Tel: 0913660525. Email: ngocduydinh20@gmail.com.

363
LIST OF INDUSTRIAL ZONES IN HA NAM

No Industrial zone Name Total Occupancy Rate Status


Area (ha)
1 Dong Van I Industrial Zone – Phase I 221.2 100% In operation
Dong Van I Industrial Zone – Phase II 150 0% Under land clearance
process – to be completed in
Q1/2023
2 Dong Van II Industrial Zone 321 94.6% In operation
3 Dong Van III Industrial Zone – Phase I 300 75% In operation
Dong Van III Industrial Zone – Phase II 223 Under legal process
4 Dong Van IV Industrial Zone – Phase I 300 100% In operation
Dong Van IV Industrial Zone – Phase II 250 Under planning
5 Dong Van V Industrial Zone 250 Under planning
6 Hoa Mac Industrial Zone 131 100% In operation
7 Chau Son Industrial Zone 377 92% In operation
8 Thanh Liem Industrial Zone – Phase I 150 100% In operation
Thanh Liem Industrial Zone – Phase II 143 50% In operation
9 Thai Ha Industrial Zone – Phase I 100 50% In operation
Thai Ha Industrial Zone – Phase II 100 Under construction
10 Chau Giang I Industrial Zone 210 Under planning
11 Chau Giang II Industrial Zone 100 Under planning
12 Kim Bang I Industrial Zone 230 Under planning

HA NAM’S LOCATION MAP OF INDUSTRIAL ZONES

364
DONG VAN I INDUSTRIAL ZONE

GENERAL INFORMATION
Address ▪ Dong Van Commune, Duy Tien District, Ha Nam
Investor Ha Nam Industrial Zone Management Board
▪ Address: No. 209 Le Hoan Road, Phu Ly City, Ha Nam Province
▪ Tel: (84-226) 3 85 0569
▪ Email: bqlkcn@hanam.gov.vn
Contact Person ▪ Mr. Tran Van Kien - Deputy Director of Ha Nam Industrial Zone Management
Board - (84) 912 220 129 - kienkcnhanam@gmail.com
Location - Land: near National Road 1 A and Cau Gie – Ninh Binh highway
- Seaport: 110 km from Hai Phong port
- Airport: 70 km from Noi Bai Airport
Investment Area Priority Sectors Investment on high-tech industry, clean industry, light industry,
for Investment and supporting industry.
Restricted Sectors Restrict heavy industry, industries affecting the environment.
for Investment
Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum
salaries
Lease term ▪ Start date: 2007
▪ End date: 2057
Minimum Lease Area 10,000 m2
Limit for Construction Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Permitted Construction Rate Residential Planning regulation (QCXDVN 01: 2008/BXD)

Planned area ▪ Total area:


- Phase 1: 221.2 ha
- Phase 2: 150 ha
Factory Available for Rent None
Operation Status ▪ Phase 1: In operation
▪ Phase 2: Under land clearance process – to be completed in Q1/2023
Occupancy Rate and Number ▪ Phase 1:
of Projects - Occupancy Rate: 100%
- Number of Projects: 98
Number of Korean Projects 32 companies
Lease fee ▪ Land lease fee: From 75-100 USD/m2/over project life
Operating fee ▪ Management fee: 0.3 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 11,500 VND (~0.5 USD)/m3
▪ Wastewater treatment fee:
From C Level: 0.6 USD/m3; From B Level: 0.42 USD/m3
( Excluding VAT)
INFRASTRUCTURE AND FACILITY
Financial institution Vietcombank, Vietinbank, Sacombank, BIDV.
Tax service, State finance office 12 km from Ha Nam Tax Office and Hanam Treasury office
Customs Service Inside the zone
Logistics 5 km from nearest Logistic compnay
Post office 12 km from Hanam Post office
Medicare 12 km from Hanam General Hospital
Police, public security 24/7 service inside the zone
Universities, training facilities, 4 km from Ha Hoa Tien University
etc.
Recruitment Supported by the IZ developer
Worker dormitory NA
Worker's child education NA
facility
One-stop service Inside the zone
Road Width NA

365
IT & Tele-communication Telecommunication: broadband ADSL service, telecommunication with IDD, fiber
Facilities optic capabilities, leased line
Emergency Power generator Available
Fire-fighting facility Available
Layout Plan

Location map

LIST OF TENANTS

No Company Name Nationality


1 Nam Son Company Ltd. Vietnam
2 Tam Kim Joint Stock Company Vietnam
3 Tri Huong Company Limited Vietnam
4 VT Industrial Park Station Vietnam
5 Trung Thanh Company Limited Vietnam
6 Ocean private enterprise Vietnam
7 Phuong Nam VN Company Limited Vietnam
8 Vietnam Geotextile Joint Stock Company Vietnam
9 Nguyen Khoa Company Limited Vietnam
10 May 19 Textile One Member Company Limited Vietnam
11 Ha Nam Setfil Water Supply Joint Stock Company Vietnam
12 Nam Duong Company Limited Vietnam
13 NN 1 TV Shoes Thuong Dinh Shoes Company Vietnam
14 Thanh Xuan Company Limited Vietnam
15 Ha Nam Hoan Duong Manufacturing & Trading JSC Vietnam
16 Hong Ha Nutrition Joint Stock Company Vietnam

366
17 Ba An Manufacturing & Trading Joint Stock Company Vietnam
18 Sao Thai Duong Joint Stock Company Branch in Ha Nam Vietnam
19 Viet Phuong Ha Nam Company Limited Vietnam
20 Ha Thanh Company Limited Vietnam
21 Dai Uy Company Limited Vietnam
22 International DDNN International Joint Stock Company Vietnam
(Anco)
23 Giang Hong Company Ltd. Vietnam
24 Ltd. Leo jins Korea
25 Korea VN Engineering Co., Ltd. Korea
26 Shin Myung Vina Co., Ltd. Korea
27 China Fenghua Iron and Steel Co., Ltd China
28 European Plastic Joint Stock Company Vietnam
29 Research and manufacture industry JSC Vietnam
30 Norfolk Hatexco Joint Stock Company Singapore
31 Yen Ha Company Ltd. Vietnam
32 Lucky Sun Electric Wire and Cable Co., Ltd. Vietnam
33 Nishu Paint Joint Stock Company Vietnam
34 CP Thien Phuc Company Vietnam
35 Quang Quan Company Limited Vietnam
36 Lee Vietnam Fine Arts Jewelry Co., Ltd. Korea
37 Yoohan Traditional Fine Arts Co., Ltd Korea
38 KAS Fashion Company Limited Korea
39 Yeedo Hanoi Trading Co., Ltd Korea
40 Vietnam Fashion Co., Ltd. China
41 C-one Packaging Co. Ltd. Korea
42 Youme VN Company Limited Korea
43 Vietnam Jewelry Co., Ltd. - Sunny Korea
44 U&I Hanoi Co. Ltd. Korea
45 Naria Vina Co., Ltd Korea
46 Nhat Ha Joint Stock Company Vietnam
47 Dayeon Bi Jou VN Co., Ltd Korea
48 Shine Fine Arts Co.Ltd Korea
49 VIP New Materials and Investment JSC Vietnam
50 Duc Viet Industry Co., Ltd Vietnam
51 Quynh Hang Company Limited Vietnam
52 Juna Company Limited Japan
53 Jasung Vina Co., Ltd. Korea
54 Northern Power Construction Consulting Joint Stock Vietnam
Company
55 Vietnam Bank for Agriculture and Rural Development - Ha Vietnam
Nam branch
56 Hiroshima Energy Supply Co., Ltd. Japan
57 Liaan Vietnam Company Limited Korea
58 Central Seed Joint Stock Company Vietnam
59 Hoa Linh Ha Nam Pharmaceutical Joint Stock Company Vietnam
60 Hankook Al Tec Vina Co., Ltd Korea
61 Lan Chi Ha Nam Investment and Services Co., Ltd. Vietnam
62 Co., Ltd. Senyang Electronics China

367
63 KMW Vietnam Co., Ltd. Korea
64 Global Ai Tec Co., Ltd. (Dong Van DS) Korea
65 Jungang Industry Vietnam Co., Ltd. Korea
66 Mico Tech Vietnam Co., Ltd. Korea
67 Jinyoung G&T Vietnam Co., Ltd Korea
68 Harim Vina Co., Ltd Korea
69 Fuji Engineering Vietnam Co., Ltd. Japan
70 Daejin Vina Co., Ltd. Korea
71 Co., Ltd. HTCTECH Korea
72 Ha Nam Manufacturing and Environment Equipment Co., Ltd America
73 Seoul Semiconductor Vina Co., Ltd. Korea
74 Co., Ltd. Yu Won NRT Korea
75 Telcon Vina Co., Ltd Korea
76 OM Chemical Co., Ltd. Japan
77 Thanh Dat Investment and Development Joint Stock Company Vietnam
78 Tuan Bach Company Limited Vietnam
79 Abbey Vietnam Joint Stock Company English - Vietnamese
80 JMI H Vietnam Co., Ltd. Korea
81 Young BK Company Limited Korea
82 LMS Vina Co., Ltd branch in Ha Nam Korea
83 CNC Star Sun Limited Company Vietnam
84 Linh Giang Precision Machining Auxiliary Industry Co., Ltd Vietnam
85 Ha Nam Urban Environment Company Limited Vietnam
86 Hai Phong Messer Industrial Gas Co., Ltd - Ha Nam Branch Germany
87 Hanyoung Worldwrap Vina Co., Ltd Korea

368
DONG VAN II INDUSTRIAL ZONE

GENERAL INFORMATION
Address Dong Van Commune, Duy Tien District, Ha Nam
Investor Vietnnam Investment Development Group
▪ Address: Chau Son Commune, Phu Ly, Ha Nam
▪ Tel: (84-226) 625 2137 Fax: (84-226) 625 2138
▪ Website: http://daianvietnam.com/
Contact Person ▪ Mr. Huan – Sales Department – Mobile: (84) 989 768 586 – Email: huannm2@tniholdings.vn
/huan792003@gmail.com
Location – Distance to Hanoi city center: 45km
– Distance to Noi Bai international airport: 70 km
– Distance to Hai Phong port: 100 km
– Distance to Cai Lan – Quang Ninh port: 105 km
– Distance to China border checkpoint: 120 km
– Distance to Phu Ly City: 11km
Investment Area Priority Sectors for Investment on high-tech industry, clean industry, light industry, and
Investment supporting industry.
Restricted Sectors for Restrict heavy industry, industries affecting the environment.
Investment
Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term ▪ Start date: 2006
▪ End date: 2056
Minimum Lease Area 10,000 m2
Limit for Construction In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Height Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction
Rate
Planned area ▪ Total area: 321 ha
Factory Available for Rent ▪ NA
Operation Status In Operation
Occupancy Rate and ▪ Occupancy Rate: 94.6% (leasable industrial land left: 5ha)
Number of Projects ▪ Number of Projects: 103
Number of Korean Projects 16 companies
Lease fee ▪ Land lease fee: 75 - 85 USD/m2/over project life (until 2056-2063) (Excluding VAT)
Operating fee ▪ Management fee: 0.35 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 11,500 VND (~0.5 USD)/m3
▪ Wastewater treatment fee:
0.6 USD/m3 for C level, 0.45 USD/m3 for B level, 0.18 USD/ m3 for A level ▪ Waste treatment
fee: 9,000 VND/m3 (~0.4 USD/m3) (Excluding VAT)
INFRASTRUCTURE AND FACILITY
Financial institution Maritime Bank
Tax service, State finance 13 km from Tax department of Hai Duong province
office 14 km from State Treasury in Hai Duong
Customs Service 13 km from Hai Duong Customs
Logistics 14 km from the industrial zone
Nippon Express、Nippon Konpo、MOL Logistics、Sankyu
Post office VNPT and Viettel Post Office inside the zone
Medicare 14 km to Hanam General Hospital
Police, public security Dong Van II Industrial Park has established a police station near the IP to ensure order and
security.
Universities, training 3km to Thanh Dong University.
facilities, etc.
Recruitment The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen,
Hai Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity.
Worker dormitory Housing, villa for experts/ employees are working in Dai An IZ.

369
Worker's child education 5 km from nearest University
facility
One-stop service NA
Road Width Main road: 40 m in width
Branch road: 22.5 m in width
IT & Tele-communication Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic
Facilities capabilities, leased line
Telephone: number of line depend on investor’s demand.
Emergency Power Available
generator
Fire-fighting facility Available
Layout Plan

Location map

Actual View

370
LIST OF TENANTS

No Company Name Nationality


1 Ata Paint Company Limited Vietnam
2 Sumi Vietnam wiring system Co., Ltd Japan
3 Kalbas Vietnam Company Limited Japan
4 SRE Vietnam Co., Ltd. Japan
5 Pomme International Company Limited Japan
6 Honda Lock VN Co., Ltd Japan
7 Vietnam Electronics Co., Ltd. TACHIBANA Japan
8 Branch of Hanoi Textile and Garment Corporation Vietnam
9 Cargill VN Co., Ltd in Ha Nam America
10 Thong Nhat Electrical Mechanical Joint Stock Company - Ha Nam Branch Vietnam
11 Ha Nam Binh Duong Mechanical Company Limited Vietnam
12 Eidai Vietnam Co., Ltd. Japan
13 Honda Vietnam Branch in Ha Nam Japan
14 Dong Van Clean Water Joint Stock Company Vietnam
15 Ha Dong Hanosimex Textile Joint Stock Company Vietnam
16 Shikoku Cable Vietnam Co., Ltd. Japan
17 Yokowo Vietnam Co., Ltd. Japan
18 Arai Vietnam Company Limited Japan
19 M.O.TEC Vietnam Company Limited Japan
20 Osawa Vietnam Co., Ltd. Japan
21 Ueda Vietnam Company Limited Japan
22 Fujigen Vietnam Co., Ltd. Japan
23 Technomeiji Rubber Vietnam Co., Ltd. Japan
24 Nippon Konpo Vietnam Real Estate Company Limited Japan
25 Ishigaki Vietnam Co., Ltd. Japan
26 Sumiriko Hose Vietnam Co., Ltd. Japan
27 T.Rad Vietnam Company Limited Japan
28 Mavin Foods Joint Venture Company Limited Australia
29 Drilube Vietnam Co., Ltd. Japan
30 Kuwayama Vietnam Co., Ltd. Japan
31 Essa Hi-Tech Co., Ltd. Korea
32 Nissho Vietnam Co., Ltd, Japan

371
33 Nippon Thermostat Vietnam Co., Ltd. Japan
34 Makuroh Paper Vietnam Co., Ltd. Japan
35 Minato Rubber Vietnam Co., Ltd. Japan
36 JCU Vietnam Co., Ltd. Japan
37 Hashima Vietnam Co., Ltd. Japan
38 Afix Vietnam Co., Ltd. Japan
39 Vina Kailo Company Limited Korea
40 Gentherm Vietnam Company Limited Germany
41 Sam Kyoung Vina Co., Ltd. Korea
42 Greenfeed Vietnam Joint Stock Company - Ha Nam Branch Hong Kong
43 Marujyu Vietnam Company Limited Japan
44 Dai Nguyen Textile Co., Ltd. (Vietnam) Taiwan
45 Dai Nguyen Clean Water Co., Ltd. (Vietnam) Taiwan
46 Hanoi Maruito Company Limited Japan
47 NBK Vina Company Limited Korea
48 Kanayama Kasei Vietnam Co., Ltd. Japan
49 Ace Antenna Co. Ltd. Korea
50 Meitoku Engineering Vietnam Co., Ltd. Japan
51 Sinfonia Microtec (Vietnam) Ltd. Japan
52 Kuwana Company Limited Japan
53 Vietnam Textile Garment Import Export Co., Ltd - Ha Nam Branch Japan
54 Green energy Co., Ltd - Ha Nam Vietnam
55 Chien Bian Vietnam Company Limited Hong Kong
56 CS Plastic Vietnam Co., Ltd. Japan
57 Jaehyun Vietnam Co., Ltd. Korea
58 NMS Vietnam Co., Ltd. Japan
59 Gunze Hanoi Company Limited Japan
60 Hachi Vietnam Cosmetics Co., Ltd. Vietnam
61 CJ VINA AGRI COMPANY LIMITED - Ha Nam branch Korea
62 Wooyoung Hi-Tech Vina Co., Ltd Korea
63 TDS Vietnam Co., Ltd. Japan
64 Wing Kwong Industrial Vietnam Co., Ltd Hong Kong
65 Kos Hanoi Company Limited Korea
66 Pacific Company of Vietnam Pacific Vietnam
67 Osung Advanced Materials Vietnam Co., Ltd. Korea
68 Ha Nam Safe Paint Company Limited Vietnam
69 Quang Quan Company Limited Vietnam
70 Ukai Vietnam Company Limited Japan
71 Diamond French Pharmaceutical Pharmaceutical Joint Stock Company Vietnam
72 Origin Vietnam Co., Ltd. Japan
73 Tonghe Vina Science and Technology Co., Ltd. China
74 Branch of Thuan Nhat Automation Electric Co., Ltd in Ha Nam Vietnam
75 Ha Nam YFY Packaging Co., Ltd. Taiwan
76 Aiwado Joint Stock Company Vietnam
77 Wetop Pharmaceutical Joint Stock Company's branch in Ha Nam Vietnam
78 Ishigaki Gomu Kougyo Vietnam Co., Ltd. Japan
79 Kent Warm Vietnam Co., Ltd Japan

372
80 PLK Chemical Co., Ltd Korea
81 Sung Nam Electron Vina Co., Ltd Korea
82 Sam Sung Climate Control Vietnam Co., Ltd. Korea
83 I.J Tech Vina Manufacturing Co., Ltd Korea
84 Gia Phuc Dong Van Company Limited Vietnam
85 Gemtek Vietnam Company Limited Taiwan

373
DONG VAN III INDUSTRIAL ZONE

GENERAL INFORMATION
Address Dong Van Commune, Duy Tien District, Ha Nam
Investor ▪ Dong Van III Industrial Zone Infrastructure Development Investment JSC
․ Address: No. 209 Le Hoan Road, Phu Ly City, Ha Nam Province
Contact Person ▪ Mr. Nguyen Van Luong – Chairman – (84) 913 320 349 - luongqhxd@gmail.com
▪ Ms. Hien – (84) 904333910-
Location ▪ Land: 45 km from Hanoi, 1 km from Dong Van Railway Station. Near Cau Gie – Ninh Binh Highway,
National Road 38, North-South Railway
▪ Seaport: 125 km from Hai Phong port; 145 km from Cai Lan seaport
▪ Airport: 65 km from Noi Bai Aiprort
Investment Area Priority Sectors for Clean industry, light industry, and supporting industry.
Investment
Restricted Sectors Restrict heavy industry, industries affecting the enviroment
for Investment
Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term ▪ Start date: 2017
▪ End date: 2067
Minimum Lease 10,000 m2
Area
Limit for In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning
Construction regulation (QCXDVN 01: 2008/BXD)
Height
Permitted
Construction Rate
Planned area ▪ Total area: 523 ha
- Phase I: 300 ha; Vacant leasable area: 60ha
- Phase II: 223 ha
Factory Available ▪ NA
for Rent
Operation Status ▪ Phase I: In operation
▪ Phase II: Under legal process
Occupancy Rate ▪ Phase I
and Number of - Occupancy Rate: 75%
Projects - Number of Projects: 56
Number of None
Korean Projects
Lease fee ▪ Land lease fee: N/A
Operating fee ▪ Management fee: 0.3 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 11,500 VND (~0.5 USD)/m3
▪ Wastewater treatment fee: 9,000 VND - 12,000 VND (~0.4-0.53 USD)/m3
▪ Waste treatment fee: 9,000 VND/m3 (~0.4 USD/m3)
(Excluding VAT)
INFRASTRUCTURE AND FACILITY
Financial Maritime Bank
institution
Tax service, State 12 km from Ha Nam Tax Office and Hanam Treasury office
finance office
Customs Service 16 km from Ha Nam Customs Service
Logistics 5 km from nearest Logistic compnay
Post office 12 km from Hanam Post office
Medicare 12 km from Hanam General Hospital
Police, public 24/7 service inside the zone
security
Universities, 7km from Ha Hoa Tien University
training facilities,
etc.
Recruitment Supported by the IZ developer

374
Worker dormitory NA
Worker's child NA
education facility
One-stop service Inside the zone
Road Width NA
IT & Tele- Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic capabilities,
communication leased line
Facilities
Emergency Power Available
generator
Fire-fighting Available
facility
Layout Plan

Location Map

Actual View

375
LIST OF SOME NOTABLE TENANTS

No Company Name Nationality


1 Northern Power Construction Consulting Joint Stock Company Vietnam
2 Ducan Environment Technology Joint Stock Company Vietnam
3 Ohtsuka Sangyo Vietnam Co., Ltd. Japan
4 Osawa Vietnam Trading Co., Ltd. Japan
5 Chubutsu Vietnam Co., Ltd. Japan
6 Pronics Hanoi Company Limited Japan
7 TDI Electronics Co., Ltd. Vietnam Japan
8 Seiko Precision Parts Vietnam Co., Ltd. Japan
9 Hojitsu Vietnam Limited Japan
10 Vietnam Plastic Taniguchi Company Limited Japan
11 YKK Vietnam Co., Ltd. - Ha Nam Branch Japan
12 Fuji Electric Industry Vietnam Co., Ltd. Japan
13 Fuji Star Roof Co., Ltd. Japan
14 Ojitex Hai Phong Co., Ltd branch in Ha Nam Japan
15 Tan Cang - Dong Van Ha Nam Joint Stock Company Vietnam
16 Vina Ito Co., Ltd. Japan
17 Hashimoto Cloth Vietnam Co., Ltd. Japan
18 Kajitech Company Limited Japan
19 Vietnam Japan Sawada precision Co., Ltd. Japan
20 Shikoku Cable Vietnam Co., Ltd. - Dong Van III Branch Japan
21 Kuwana Company Limited Japan
22 Branch of Sugiko Vietnam Co., Ltd. in Ha Nam Japan
23 Katolec Global Logistics Vietnam Co., Ltd. Japan
24 Kyosha Vietnam Co., Ltd. Japan

376
DONG VAN IV INDUSTRIAL ZONE

GENERAL INFORMATION
Address Dai Cuong Commune, Kim bang District, Ha Nam Province
Investor Viglacera Corporation
(Glass and Ceramics for Construction Corporation)
▪ Address: Tien Son Industrial Park, Hoan Son Commune, Tien Du District, Bac Ninh Province.
Head Office: The 2nd Floor, Viglacera Tower, No.1 Thang Long Boulevard, Ha Noi, Vietnam.
▪ Tel: +84 24 35536688 Fax: +84 24 35537666
▪ Website: www.viglaceraip.com
Contact Person ▪ Mr. Dang The Nam - Deputy Manager of Business Department –
(84) 903 405 099 - namdt.vir@viglaceraland.vn
▪ Ms. Nguyen Ha Phuong – Senior Marketing Executive – (84) 97 344 8994 -
phuongnh.vir@viglaceraland.vn
Location ▪ Land: 50 km from Hanoi, 1 km from Dong Van Railway Station. 7 km from Cau Gie – Ninh Binh
Highway, on National Road 38, 5 km from National Road 1A, 5km from North-South Railway
▪ Seaport: 114 km from Hai Phong port; 150 km from Cai Lan seaport
▪ Airport: 80 km from Noi Bai Aiprort
Investment Area Priority Sectors for Electronics, power industry, high techs, material for construction and
Investment mechanics, pharmaceuticals, foodstuffs, light industry, consumer goods
Restricted Sectors for Polluted sectors
Investment
Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term ▪ Start date: 2016
▪ End date: 2066
Minimum Lease Area 10,000 m2
Limit for Construction In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Height Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction
Rate
Planned area Total area: 550 ha
▪ Phase 1: 300 ha
▪ Phase 2: 250 ha
Factory Available for N/A
Rent
Operation Status ▪ Phase I: In operation
▪ Phase II: Under construction
Occupancy Rate and ▪ Phase I
Number of Projects - Occupancy Rate: 100%
- Number of Projects: 48
Number of Korean 16 projects
Projects
Lease fee N/A
Operating fee ▪ Management fee: 0.7 USD/m2/year (excluded 10% VAT)
▪ Electricity fee:
(1) - Normal hours: 1,555 VND/Kwh (equivalent to 0.067 USD/Kwh)
(From Monday to Saturday: 4h - 9h30’, 11h30’ - 17h and 20h - 22h; Sunday: 4h - 22h)
(2) - Night hours: 1,007 VND/Kwh (equivalent to 0.04 USD/Kwh)
(Everyday: 22h - 4h)
(3) - Rush hours: 2,871 VND/Kwh (equivalent to 0.123 USD/Kwh)
(From Monday to Saturday: 9h30’ - 11h30’ and 17h - 20h/Not Sunday)
▪ Water fee: 11,500 VND/m3 (equivalent 0.506 USD/m3) excluded VAT - monthly payment.
▪ Wastewater treatment fee: 9,600 VND/m3 excluded VAT (equivalent 0.45 USD/m3) - monthly
payment. The quantity is defined by 80% the amount of water supply.
INFRASTRUCTURE AND FACILITY
Financial institution Vietin Bank, Vietcombank, BIDV
Tax service, State 15 km from Hanam Tax Office.
finance office 16 km from Hanam Treasury Office
Customs Service A customs office is planned to locate at the Administration Center of the Industrial Park in order to
deal with customs formalities promptly and properly for enterprises
Logistics Logistics services, including warehouse solution, shipping and custom clearance are provided
inside the industrial park
377
Post office Ha Nam Post Office with modern informatics technology system for serving multi-service
communication such as data transfer, internet, IP telephone and video conference,
Medicare Bach Mai General Hospital (18 km), Viet Duc General Hospital (17 km), General Hospital of Ha
Nam (14.8 km)
Police, public security Security Guard ensures security inside industrial park.
Universities, training 4 Universities (Hanoi pedagogical university – Ha Nam branch, Trade university – Ha Nam branch,
facilities, etc. Hanoi industrial university – Ha Nam branch, Construction university – Ha Nam branch), 4
colleges, 7 secondary schools.
Recruitment Viglacera will support in recruitment
Worker dormitory Urban area with around 16.8ha always ensure houses, dormitory, apartment for workers in the IP
Worker's child Many kindergartens near the industrial park
education facility
One-stop service Land and factory lease, fast-track procedures and convenient services such as catering, security
service, accommodation, IT system, water-electrical system implemented and/or supported by our
industrial park
Road Width NA
IT & Tele- The telecommunication system complies with international standards and is always available for
communication commnunication demand with high data transmission speed
Facilities
Emergency Power Yes
generator
Fire-fighting facility Available. Water supply system for firefighting is located along each road.
Layout Plan

Location Map

378
Actual View

LIST OF SOME NOTABLE TENANTS

No Company Name Nationality


1 Park Electronics Vina Co., Ltd Korea
2 JT Sensor Vina Co., Ltd Korea

379
3 Sunjin F&F Co., Ltd. Korea
4 Eco wiring system co.ltd Vietnam
5 Henan MNS Meat Co., Ltd Vietnam
6 Ha Hien Thanh Hien Co., Ltd Vietnam
7 Saki Ha Nam Company Limited Vietnam
8 Jeio Vina Co., Ltd. Korea
9 Anam Electronics Vietnam Co., Ltd. Korea
10 Vikohasan Joint Stock Company Vietnam
11 Vu Gia International Co. Ltd. Vietnam
12 S-Tec Vina Co., Ltd Korea
13 Hico Vietnam Company Limited Korea
14 Nanofrance High-tech Manufacturing DP Co., Ltd Ha Nam branch Vietnam
15 Lisal Vina Co., Ltd. Korea
16 Myungsung Hanoi Co., Ltd. Korea
17 Partner Eng Vina Co. Ltd. Korea
18 Dinh Huong Construction and Trading Co., Ltd Vietnam
19 Dong Shin Hanoi Vina Joint Stock Company Vietnam
20 Binh Thuan Development Co., Ltd Vietnam

380
HOA MAC INDUSTRIAL ZONE

GENERAL INFORMATION
Address Highway 38, Hoa Mac town, Duy Tien district, Ha Nam province, Vietnam
Investor Hoa Mac Industrial Park Development Management Co., Ltd (directly under Hoa Phat Urban
Development & Construction JSC. - HOA PHAT Group)
▪ Address: No. 39 Nguyen Dinh Chieu – Hai Ba Trung – Ha Noi – Viet Nam
▪ Tel: (84) 243 976 3889
▪ Fax: (84) 243 976 3890
▪ Website: www.yenmy2-ip.vn
Contact Person ▪ Ms. Hien - Marketing Manager - (84) 989 383 531
▪ Ms. Huyen - Marketing Dept - (84) 904 200 035
Location - 45 kilometers far from Ha Noi (40 minutes driving). There are public buses going from the Industrial
Park to Ha Noi every 20 minutes and vice versa.
- Located adherent to Highway 38, close to Highways 1A, 1B; and Highway 39 connected with Highway
5, Hanoi - Hai Phong Expressway (Highway 5B) and Highway 18
- Nearby Yen Lenh Red River port
- 100 kilometers far from Hai Phong Seaport
- 75 kilometers far from Noi Bai International Airport
- 8 kilometers far from Dong Van railway station (on North - South Railway) which is a transshipment
station inside the region.
Investment Area Priority Sectors - Mechanical assembly and Electronic Industry;
for Investment - Food and Agricultural Product Processing;
- Garment and Footwear Industry;
- High-grade Consumer Goods Manufacturing;
- Environmental -friendly Building materials Manufacturing.
Restricted Sectors Garment, textile dyeing
for Investment
Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term ▪ Start date: 2008
▪ End date: 2058
Minimum Lease 16,784 m2
Area
Limit for In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning
Construction regulation (QCXDVN 01: 2008/BXD)
Height
Permitted
Construction Rate
Planned area ▪ Total area: 131 ha
Factory Available ▪ Total area: 3,712 m2
for Rent
Operation Status ▪ In operation
Occupancy Rate ▪ 100%
and Number of ▪ 42 Projects
Projects
Number of 16 projects
Korean Projects
Lease fee ▪ Land lease fee: N/A
▪ Factory lease fee: 4 USD/m2/month
▪ Payment:
- Make a deposit of 20% of the infrastructure rental within 07 days as from the signing date of the MOU
- Pay 50% of the infrastructure rental within 07 days as from the signing date of the contract
- Pay 30% of the infrastructure rental within 07 days as from the land handover date
Operating fee ▪ Management fee: 0.5 USD/m2/year (Exclude VAT)
▪ Electricity fee:
(1) - Normal hour: VND 1,611 /Kwh (equivalent to USD 0.073 /Kwh)
Time period applied:
- From Monday to Saturday: 4:00 am - 9:30 am; 11:30 am - 5:00 pm; 8:00 pm -10:00 pm
- Sunday: 4:00 am - 10:00 pm
(2) - Night hour: VND 1,044 /Kwh (equivalent to USD 0.047 /Kwh)
Time period applied: Everyday from 10:00 pm to 4:00 am
(3) - Peak hour: VND 2,964 /Kwh (equivalent to USD 0.135 /Kwh)

381
Time period applied:
- From Mondays to Saturdays: 9:30 am - 11:30 am; 5:00 pm - 8:00 pm
- Sundays: no peak hour
▪ Water fee: VND 11,500/m3 (equivalent to USD 0.5/m3) - Monthly payment.
▪ Wastewater treatment fee: VND 11,000/m3 (equivalent to USD 0.48/m3) - Monthly payment. The
volume is defined as 80% of supply water volume.
INFRASTRUCTURE AND FACILITY
Financial Vietin Bank, BIDV, Agribank, Techcombank
institution
Tax service, State 20 km to Tax department of Ha Nam province
finance office 21 km to State Treasury in Ha Nam
Customs Service Inside Industrial Park
Logistics NA
Post office From an office of Ha Nam Post Office to the Industrial Park: about 700 meters to serve the demand of
enterprises on post and telecommunications services.
Medicare Duy Tien Health Care Center and Hung Yen General Hospital (4 kilometers far from the Industrial Park)
shall meet labor's demand for medical examination and treatment.
Police, public 24/7 security service.
security
Universities, There is a system of colleges and professional vocational schools in Ha Nam province including 2
training facilities, Universities, 6 Colleges, 1 Vocational School, 3 Provincial Voactional Centers and some other Vocational
etc. Centers, which could satisfy the demand of enterprises in the province for technical workmen. Outstanding
Training centers involve as follows:
- Ha Hoa Tien University;
- Hanoi University of Industry - Hanam branch;
- Ha Nam Vocational College;
- Ly Nhan Vocational Training and Job Introducing Centers. - National
University of Civil Engineering - Hanam branch - Vietnam University of
Commerce - Hanam branch
Recruitment IZ developer will support recruitement
Worker dormitory NA
Worker's child NA
education facility
One-stop service NA
Road Width 37.5m /2 lanes
IT & Tele- International-standard telecommunication system is available to satisfy demand for communication, high-
communication ranking data transmission and international and domestic post service. An optical fiber system is installed
Facilities underground to every factory.
Emergency Power No
generator
Fire-fighting Available
facility

382
Layout Plan

Location Map

Actual View

383
384
LIST OF TENANTS

No Company Name Nationality


1 Novaref Refractories Company Ltd. Vietnam
2 PVC-ME1 Mechanical Co., Ltd Vietnam
3 Vinaglaze Joint Stock Company Vietnam
4 Advanced Material Vietnam Co., Ltd. Japan
5 GP Battery Company Limited (Vietnam) Singapore
6 Vina - Ha Nam Animal Feed Joint Stock Company Vietnam
7 Branch of OSG Vietnam Co., Ltd in Ha Nam Japan
8 Finetek Vietnam Joint Stock Company Korea
9 Keyrin Electronics Vietnam Co., Ltd. Korea
10 Hanoi Elite Group Company Limited Korea
11 Vietnam Byron Holdings Ltd. Japan
12 Sebang Chain Vina Co., Ltd Korea
13 DK Vietnam Company Limited Korea
14 NPI Vietnam Co., Ltd. Korea
15 Guymarc'h - VCN Limited Company in Ha Nam France - VN
16 Dorco Vina Co., Ltd- Ha Nam Branch Korea
17 Dynaox Vietnam Company Limited Japan
18 Ha Nam Nasaco Animal Feed Co., Ltd. Vietnam
19 Cu Tech Vietnam Co., Ltd. Korea
20 Naxis Vietnam Company Limited - Ha Nam Branch Japan
21 Noda Kogyo (Vietnam) Co., Ltd. Japan
22 Dorco Living Vina Co., Ltd Korea
23 Wish Tree Vina Co., Ltd Korea
24 Vietnam Kyodo Seihan Printing Co., Ltd Japan
25 Pretty Vina Co., Ltd America
26 Minami Aso Nouen International Co., Ltd. Japan
27 Ha Nam Kurosu Company Limited Japan
28 Taesung Hitech Vina Co., Ltd Korea
29 Komos Vina Co., Ltd Korea
30 DMR Vina Co., Ltd Korea

385
CHAU SON INDUSTRIAL ZONE

GENERAL INFORMATION
Address ▪ Chau Son ward, Phu Ly city, Ha Nam province
Investor Ha Nam VPID One Member Company Limited (Branch of Vinh Phuc Infrastructure
Development Joint Stock Company)
▪ Address: Chau Son Industrial Park, Chau Son Ward, Phu Ly, Ha Nam
▪ Tel: (84-226) 6252 137/ (84-226) 6545556
▪ Email: kcnchauson@vpid.vn
Contact Person ▪ Nguyen Anh De - (84) 983 282 399
▪ Ms. Vy Lan - (84) 931 661 999
▪ Ms. Vu Bich Lien - (84) 976 821 877
Location ▪ Land: 58 km from Hanoi, 3 km from Dong Van Railway Station, 1 km from National Road
1A
▪ Seaport: 100 km from Hai Phong port; 150 km from Cai Lan seaport, 500m far from Thinh
Chau port
▪ Airport: 80 km from Noi Bai Aiprort
▪ Railway: 3km far from Phu Ly station of the Vietnam railway from North to South
Investment Area Priority Sectors Light and high tech industries
for Investment
Restricted Polluted industries
Sectors for
Investment
Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term ▪ Chau Son Industrial Park: Until July 2056
▪ Expanded Chau Son Industrial Park: Until October 2068
Minimum Lease Area 1 ha
Limit for Construction Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Permitted Construction Rate Residential Planning regulation (QCXDVN 01: 2008/BXD)

Planned area ▪ Total planned area: 377ha


▪ Vacant leasable area: 30ha
Factory Available for Rent Total workshop area: 22,891.0 m2 (05 workshops)
Operation Status In operation
Occupancy Rate and Number ▪ Occupancy Rate: 92%
of Projects ▪ Number of Projects: 133
Number of Korean Projects 31 projects
Lease fee ▪ Land lease fee (including infrastructure): from 75 USD/m2
▪ Rental price for raw land: 9,000 VND/m2/year (equivalent to 0.39USD/m2/year). Unit price
is decided under the Ha Nam Province People’s Committee.
Investors in the expanded IP are now enjoying free land rental up to November 2029.
▪ Factory lease fee: 3.3 USD/m2/month
- Minimum rent: 05 years
- Deposit: 06 month’s rent at minimum
Operating fee ▪ Management fee: 0,35 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 11,500 VND (~0.5 USD)/m3
▪ Wastewater treatment fee: From B level: 9,600 VND (~0.43 USD) /m3
▪ Waste treatment fee: 9,000 VND/m3 (~0.4 USD/m3)(Excluding VAT)
INFRASTRUCTURE AND FACILITY
Financial institution Vietinbank, Vietcombank, BIDV
Tax service, State finance 5.4 km from Hanam Tax Department
office 3.6 km from Hanam State Treasury
Customs Service 4 km from Hanam Customs Office
Logistics NA
Post office 3 km from Ha Nam Post Office
Medicare 3.2 km from Hanam Hospital
Police, public security 1.4 km from Hanam Public Security

386
Universities, training 10.6 km from Ha Hoa Tien University
facilities, etc.
Recruitment Supported by the Management Board
Worker dormitory Under Construction
Worker's child education NA
facility
One-stop service Supported by Industrial Zone developer
Road Width Mai Road width: 32 m, number of lanes: 4)
Internal Road (width: 23 m, number of lanes: 2)
IT & Tele-communication Viettel telecommunication corporation (Viettel Telecom) is ready to meet demands of 9 - 10
Facilities lines/ ha
Underground cable is set up to fence of the manufactories.
Emergency Power generator Available
Fire-fighting facility Water supply system and extinguishing valves are also installed along all of roads
Layout Plan

387
Location Map

Actual View

LIST OF TENANTS

No Company name Business line Nationality


1 KangYin Electronic Technology Co., Ltd electronic components producing Australia
2 Espoir Vietnam Co., Ltd garment producing Japan
3 ARTPRESTO VIETNAM CO., LTD Manufacture bag producing Japan
4 Enex Vina Company Limited Interior and constructive material producing Korea
5 Dream Plastic Company Limited Production of Child toy and plactic products Korea
6 SET Vietnam Co., LTD Electronic components producing Korea
7 DongJun Art Craft Co., Ltd Jewelry producing Korea
8 Sunlin Vietnam Electronics Co., LTD electronic components producing Korea
9 Daedong Vina Co., LTD Bag hold vegetables and fruits producing Korea
10 JY Plasteel Vina Co., LTD Children's bicycles producing Korea
11 SDS Vina Co., LTD electronic components producing Korea
12 Dream Printing & Package Co., Ltd Manufacture of paper products Korea
13 Samsin Vina Co., Ltd Electronic components producing Korea
14 KAVA Vina Co., Ltd electronic components producing Korea
15 ILLJIN COM VINA Co., Ltd Manufacture of wires and cables for automobiles Korea
16 NUAS VINA CO., LTD producing of paper packaging Korea
17 IPN VINA CO.,LTD manufacturing plastic products auto parts Korea

388
18 VIET NAM SPECIAL FASTENERS Manufacture of screws Korea
CO.,LTD
19 SONETECK TJ CO.,LTD electronic components producing Korea
20 YURA HARNESS VIET NAM manufacturing automobile accessorios Korea
CO.,LTD
21 HANSHIN VINA CO., LTD manufacturing antenna cables in car Korea
22 Long Prosper International Co., Ltd electronic components producing Taiwan/ HongKong/
China
23 FAVOR UNION VINA CO., LTD electronic components producing Taiwan/ HongKong/
China
24 V POWER INDUSTRIAL CO., LTD Led production Taiwan
25 SIYOTO VINA ELECTRONIC CO., electronic components producing HongKong
LTD
26 SI YUAN TECH CO., LTD Production of paper packaging plastic packaging, Taiwan/ HongKong/
assembly charger preventive China
27 BEST FOUR VIET NAM CO.,LTD stationery production Taiwan/ HongKong/
China
28 Saovang Rubber JSC rubber products producing Vietnam
29 MTV Vinh Son Ha Nam Co., Ltd Construction and workshop rental Vietnam
30 Nam Vang Ha Nam JSC Manufacture of plastic products Vietnam
31 Hoa Viet Pharmacy JSC Traditional medicines producing Vietnam
32 Chau Son Manufacture Co., Ltd Manufacture of plywood panels Vietnam
33 Thien Loc Lighting Co., Ltd Led production Vietnam

389
THANH LIEM INDUSTRIAL ZONE

GENERAL INFORMATION
Address ▪ Thanh Liem Industrial Park, Thanh Phong Commune, Thanh Liem District, Ha Nam Province,
Viet Nam
Investor CAPELLA LAND JOINT STOCK COMPANY
▪ Address: F26, Vinaconex 9 Tower, Pham Hung Street, Hanoi, Vietnam
▪ Tel: (84-220) 3 562718 Fax: (84-220) 3 727886
▪ Website: cpliz.com.vn
Contact Person ▪ Ms. Nguyen Thi Hong Chuyen– Sales Director – (84) 964 420 028 - chuyen.cpl@gmail.com
▪ Ms. Ha - Sales Deputy Director - (84) 983 670 928 - hadtt.cpl@gmail.com
▪ Ms Tue – Sales Officer – (84) 35 323 9989 –tueanh.cpl@gmail.com
Location - Located on National Road No 1A, 8km from Ha Noi – Ninh Binh Freeway
- 55 Km from Hanoi Capital Center
- 4 Km from Phu Ly City, Ha Nam Province
- 75 Km from Noi Bai International Airport
- 100 Km from Hai Phong International Seaport
- 25 Km from Huyndai – Ninh Binh Province
- 250 km from China Border Gate, Lang Son Province
Investment Area Priority Sectors for Multi-Industry
Investment
Restricted Sectors for Restrict heavy industry, industries affecting the environment
Investment
Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term ▪ Start date: April 2019
▪ End date: April 2069
Minimum Lease Area 10,000 m2
Limit for Construction In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Height Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction Factory area: 60%
Rate Operation area: 60%
Planned area ▪ Total area: 293 ha
- Phase I: 150 ha (fully occupied)
- Phase II: 143 ha
▪ Vacant leasable area (Phase II): 70 ha
Factory Available for No
Rent
Operation Status In operation
Occupancy Rate and ▪ Phase I: 100%
Number of Projects ▪ Phase II
- Occupancy Rate: 50%
- Number of Projects: 9
Number of Korean 01
Projects
Lease fee ▪ Land lease fee: From 75USD/m2/whole leasing term (50 years from 2019 to 2069)
▪ Payment:
- Method: One-time payment, divided into three installments
- Period: Deposit: 30%; Second payment: 30% after IRC/ERC; Third payment: 40% after
handover leveled land.
Operating fee ▪ Management fee: 10.000VND/m2/year, equivalent to 0.43 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: about 0.47USD/m3 - Monthly payment
▪ Wastewater treatment fee: about 10.500VND/m3, equivalent to 0.45USD/m3. Customers will sign
contract with a Service Environment Company.
INFRASTRUCTURE AND FACILITY
Financial institution Viet A Bank, BIDV, Vietcombank, Agribank…
Tax service, State - 7km to Ha Nam to Ha Nam state treasury
finance office - 6km to Ha Nam Tax Department
Customs Service 7 km to Ha Nam Customs Agency
Logistics 5.5 km from SME Logistic (Le Cong Thanh Street, Phu Ly City)
Post office 6 km to Ha Nam Post Office

390
Medicare - 8 km to Viet Duc Hospital (Thanh Liem District)
- 7 km to Ha Nam Hospital (Truong Trinh Street)
- 8 km to Bach Mai Hospital (Thanh Liem District)
Police, public security 6 km to Ha Nam Police (Ly Thuong Kiet Street, Phu Ly City)
Universities, training - 13km to Ha Hoa Tien university
facilities, etc. - 8km to Industrial University (Phu Van Street, Phu Ly City)
- 8km to Ha Nam vocational college (Le Hoan Street, Phu Ly City)
Recruitment 6.5km to Job Introduction Center of Ha Nam Province (Tran Quang Khai Street, Phu Ly City)
Worker dormitory Near the residential area. No dormitory
Worker's child A lot of Nursery school arround Thanh Liem district and Phu Ly City
education facility
One-stop service 10km (Quang Trung Street, Phu Ly City)
Road Width Main Road: 46m; Branch Road: 28m and 20.5m
IT & Tele- International-standard telecommunication system is available to satisfy demand for communication,
communication high-ranking data transmission and international and domestic post service. An optical fiber system
Facilities is installed underground to every factory.
Emergency Power No
generator
Fire-fighting facility Set up along the roads of Industrial Park
Layout Plan

Location Map

Actual View NA

391
THAI HA INDUSTRIAL ZONE

GENERAL INFORMATION
Address ▪ Thanh Liem Industrial Park, Thanh Phong Commune, Thanh Liem District, Ha Nam Province, Viet
Nam
Investor Thai Ha Urban and Industrial Park Investment Joint Stock Company
▪ Address: PG1 – 01 Vincom, Bien Hoa, Phu Ly City, Ha Nam
▪ Tel: 0834188 189
▪ Website: khucongnghiepthaiha.com.vn
Contact Person ▪ Ms. Nguyen Van Quyen – Sales Executive– Mobile: (84) 834188189 -
Email: cpdtthaiha@gmail.com
Location ▪ About 28 km from National Highway 1A and the North-South railway; 28km from Hanoi-Ninh Binh
expressway; adjacent to the planning road of 5 Belt Road - Hanoi capital; adjacent to Thai Ha bridge,
Hung Ha bridge (way to Hung Yen, Hai Duong, Thai Binh, Hai Phong); adjacent to the highway linking
axis: Hanoi - Ninh Binh and Hanoi - Hai Phong.
▪ 20km from Phu Ly City, 77 km from Hanoi center, 85 km from Noi Bai airport and 90 km from Hai
Phong port
Investment Area Priority Sectors for ▪ Mechanical engineering, assembly, cars and motorcycles.
Investment ▪ Electricity, electronics, telecommunications, information technology.
▪ New auxiliary industries and materials.
▪ Processing and preserving agricultural products, food, beverages and
milk.
▪ Warehousing and transportation support activities
Restricted Sectors for Polluted
Investment
Minimum wage [Area 4] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term Until 2069
Minimum Lease 1ha
Area
Limit for 1 – 3 floors
Construction
Height
Permitted 60%
Construction Rate
Planned area ▪ Total planned area: 200ha
- Phase I: 100ha; total vacant leasable area: 50 ha
- Phase II: 100ha
Factory Available N/A
for Rent
Operation Status ▪ Phase I: in operation
Occupancy Rate ▪ Phase I:
and Number of - Occupancy Rate: 50%
Projects - Number of projects: 5
Number of Korean N/A
Projects
Lease fee ▪ Land lease fee: 70 -75 USD/m2/50 years, depending on location, contract signing date
▪ Payment:
- Sign contract in principle: 30% deposit
- After obtaining investment certificate, business registration in Thai Ha Industrial Park / 60 days from
the date of payment deposit: 30%
- Receive handover of payment premises: 30%
- Sign official contract, notice of issuance of payment certificate: remaining 10%
Operating fee ▪ Management fee: 0.5 USD/m2/year
▪ Electricity fee: as regulated by the Government
▪ Water fee: as regulated by the Government
▪ Wastewater treatment fee: 0.5 USD/m3/month
▪ Waste treatment fee: Negotiable
INFRASTRUCTURE AND FACILITY
Financial ArigBank, BIDV
institution
Tax service, State Tax Department of Ly Nhan district, State treasury of Ly Nhan district
finance office

392
Customs Service 15km from the nearest Customs Agency
30km from the nearest Inland Container Depot
Logistics
Post office 3km
Medicare 15km from Bach Mai Hospital and Viet Duc Hospital (Ha Nam branch)
Police, public 1km from the nearest Police Station
security
Universities, Within a radius of 10 km, there are 4 high schools and vocational training centers.
training facilities,
etc.
Recruitment Support recruiment
Worker dormitory 9.63 ha – next to the IZ
Worker's child
education facility
One-stop service Available
Road Width 68m, 54m, 36m, 12m
IT & Tele- Available
communication
Facilities
Emergency Power Not available
generator
Fire-fighting Fire Police: 1km
facility
Layout Plan

393
Location Map

Actual View N/A

394
[- This Page is intentionally left blank -]

395
HA TINH

396
INVESTMENT ENVIRONMENT IN HA TINH

USD/VND 23.510

GENERAL INFORMATION
Area 6026 km2
Population 1,3 million people (2022)
▪ Ha Tinh is located in North Central region.
▪ Located in the North Central area
Geographical Location
▪ 340 km (211 miles) to Hanoi Center. The topography is diverse, with mountainous, midland,
plain and sea areas. Ha Tinh has 14 large and small rivers and many lakes.
▪ The province has Nghe An to the North, Quang Binh to the South, Laos to the West, the East
Adjacent provinces
Sea to the east with a coastline of 137km.

2022 statistic:
▪ Real GRDP (billion VND): 92.960 (3.96 billion USD)
▪ GRDP growth: 3,98%
▪ GRDP per capita (million VND/year): 70,50 (3.00 USD)
GRDP
▪ Economic structure:
- Industry - Construction: 40,50%
- Agriculture. forestry and fishery: 31,50%
- Service: 15,00%
▪ Industry - Construction growth: -3,23%
Industry growth ▪ Agriculture, forestry and fishery growth: 0,83%
▪ Service growth: 13,08%
Import turnover (billion USD): 3,40 (Growth rate: 0,03)
Import - Export
Export turnover (billion USD): 1,80 (Growth rate: -0,1)
▪ Steel and electricity manufacturing
Key Industry ▪ Besides steel and electricity production, the province also produces a number of other key
industrial products such as beer and commercial electricity
PCI 67.18
Ranking 18
SOCIAL INFRASTRUCTURE
▪ Roadway: Ha Tinh has 130 km (82 miles) of Highway 1A stretching from Ben Thuy Bridge
(Vinh City) to Deo Ngang Pass linking Hà TInh and Quang Binh. The Ho Chi Minh Route is the
second most important route of the province. Ha Tinh also contains Road 8 which runs from
Hong Linh town to Laos and the Viet-Lao highway from Vung Ang Harbour (Ky Anh District) to
Transportation Laos.
▪ Railway: a railway link to Laos was proposed from Ha Tinh province in 2007
▪ Waterway: 167.5 km of national inland waterways and 87 km of local provincial waterways. In
particular, the national inland waterway route includes: Song La route (13 km), Ngan Sau river
(27 km), Song Nghen (38.5 km), Le canal (26 km).
▪ The province's electricity is supplied by Vung Anh thermal power plant
Electricity ▪ Besides, Ngan Troi hydropower plant with a capacity of 25.5 MW after 5 years of construction
has been completed and connected to the national power grid.
▪ In Ha Tinh province, there are 43 facilities licensed to exploit surface water with a total capacity
Water
of approximately 161,000 m3/day.
Education & Training ▪ 01 University, 238 primary schools, 157 junior high schools and 44 high schools
Medicare ▪ 18 public hospitals
INVESTMENT CONDITION
Human resource 68,9% of population are in the working age (2022)
Education level Trained labor rate: 74% (2022)

397
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): N/A
- Area II (4,160,000 VND/month): N/A
Salary - Area III (3,640,000 VND/month): Ha Tinh City anh Ky Anh Town
- Area IV (3,250,000 VND/month): Hong Linh Town and Cam Xuyen, Can Loc, Duc Tho,
Huong Khe, Huong Son, Ky Anh, Nghi Xuan, Thach Ha, Vu Quang, Loc Ha Districts
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum
wages paid to employees working under employment contracts)
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
Investment incentives - Import tax exemption
▪ Incentives from the province:
- Preferential credit policies
- Interest rate support
Fields Attracting ▪ Prioritized projects: steel manufacture, assembly, electronic products, agricultural products,
Investment manufacturing electronic and other industrial fields.
Investment attraction Revenue of the FDI sector as of 9/2022 in Ha Tinh province reached 3 billion USD, equivalent to
situation 70,270 billion VND, down 80% compared to the same period in 2021.
Ha Vang Industrial Park
Vung Ang Industrial Park
Dai Kim Industrial Park
Industrial zones
Gia Lach Industrial Park
Phu Vinh Industrial Park
Formosa Industrial Park

Map

Ha Tinh Department of Planning and Investment


▪ Address: No 16, Xo Viet Nghe Tinh, Tran Phu, Ha Tinh

▪ Tel: 0239 3856 750


Contact
▪ Email: sokehoach@hatinh.gov.vn
▪ Contact person:
- Tran Viet Ha (Head of the Department).
Tel: 0906868468

LIST OF INDUSTRIAL ZONES IN HA TINH

398
No Industrial zone Name Total Area (ha) Occupancy Rate Status
1 Gia Lach Industrial Zone 350 22.7% In Operation
2 Vung Ang Economic Zone 22,781 N/A In Operation
3 Phu Vinh Industrial Zone 200 30% In Operation
4 Vung Ang 1 Industrial Zone 200 92% In Operation
5 Cau Treo International Border Gate 56,685 N/A In Operation
Economic Zone (Cau Treo IBEZ)
4 Ha Vang Industrial Zone 250 0% Under Construction
7 Hoanh Son Industrial Zone 41.76 0% Under Construction

HA TINH’S LOCATION MAP OF INDUSTRIAL ZONES

399
GIA LACH INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

Address Xuan An town, Nghi Xuan district, Ha Tinh

Ha Tinh Economic Zone Service Infrastructure Center


Investor ▪ Address: Vung Ang Industrial Zone, Ky Thinh Ward, Ky Anh Commune, Ha Tinh
▪ Tel: (84-239) 3 713 999 Fax : (84-239) 3 713 999
Contact person:
▪ Mr. Pham Anh Tu- Director of Center for Investment Promotion and Human Resource Supply
Contact Person of Ha Tinh Economic Zones- Mail: ipc.hatinhez@gmail.com
▪ Mr. Le Nguyen Kien Cuong - Director - (84) 985 346 168 - lenguyenkiencuong@gmail.com
▪ Mr. Dang Ba Giap - Head of Department - (84) 974 220 090 - dangbagiap@gmail.com
▪ 50 m to National Road 1A, 5 km to Vinh City, 45 km to Ha Tinh City
Location ▪ 25 km to Cua Lo Port
▪ 15km to Vinh Airport, 06 km to Xuan Hai Port
Production of household appliances, mechanical processing,
Investment priorities Sectors spare parts manufacturing, agro-forestry-fishery processing
Investment Area industry
Investment Restricted Sectors Heavy industries

Minimum wage [Area 4] According to Decree 90/2019/NĐ-CP dated 15th November 2019

Lease term 50 years

Minimum Lease Area 1.5 ha

Limit for Construction


1 - 5 floors
Height
Permitted Construction
N/A
Rate
▪ Total area: 100ha
Planned area ▪ Total vacant space for rent: 67.56 ha
▪ Total area with full infrastructure ready to build factories: 43.55 ha

Factory Available for Rent ▪ Currently, the IZ does not have factory available for rent

Operation Status In Operation

Occupancy Rate and ▪ Rate of Occupancy: 25.7%


Number of Projects ▪ Number of project: 05 projects

Number of Korean Projects None

Lease fee 0.3 USD/m 2 /year


▪ Management fee: None
▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee
▪ Water fee: 9,000 VND (~0.4 USD)/m3 for production activities
▪ Wastewater treatment fee: to be defined

INFORMATION OF INFRASTRUCTURE AND FACILITY

5 km to Agribank branch of Nghi Xuan district


Financial institution
1 km to Vietcombank branch of Xuan An Town
Tax service, State finance
office 5 km to Tax Department and State Treasury of Nghi Xuan district

Customs Service 42 km to Customs Department of Ha Tinh province

Logistics N/A

400
Post office 5 km to Post Office of Nghi Xuan district

Medicare 6 km to Nghi Xuan General Hospital

Police, public security 5 km to Police station of Nghi Xuan district

Universities, training
42 km to Ha Tinh city, where has many universities and technical school located.
facilities, etc.

Recruitment 42 km to Ha Tinh Job Introduction center

Worker dormitory N/A

Worker's child education


N/A
facility

One-stop service 44 km to Ha Tinh Public Administration Center

Road Width N/A

Communication
Infrastructure of Industrial Available
Zone

Emergency Power generator N/A

Fire-fighting Facility N/A

Layout Plan

Location map

401
Actual View

List of enterprises in the Industrial Park

No. Name Nationality Business sector

1 Chau Tuan Export and Import Ltd. Vietnamese Manufacture of paper and packages
for export

2 Vinh Plastic & Bag JSC. Vietnamese Manufacture of packages

3 Nghe An LPG Ltd. Vietnamese Processing gas extraction, painting,


repairing and verifying gas tank shells

4 Hai Phong Gas Petrolimex Ltd. - Ha Tinh Vietnamese Extraction of LPG


Branch

402
VUNG ANG ECONOMIC ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

Ky Anh Town, Ha Tinh province


Address
Ha Tinh Economic Zone Management Board
▪ Office 1:
- Address: Ky Loi, Ky Anh Town, Ha Tinh Province
Investor - Tel: (84-239) 3 891 962 Fax : (84-239) 3 868 699
▪ Office 2: No. 86 Phan Dinh Phung, Ha Tinh City, Ha Tinh Province
- Address: Ky Loi, Ky Anh Town, Ha Tinh Province
- Tel: (84-239) 3 881 237 Fax: (84-239) 3 882 992
Mr Nguyen Van Khoa- Deputy Head of Management Board-
Contact Person
Mobile: (84) 98 387 6559- Email: nguyenvankhoa.kkt@hatinh.gov.vn
▪ 100 km to Vinh City, 50 km to Ha Tinh City
Location ▪ 9 km to Vung Ang port
▪ 65 km to Dong Hoi Airport, 115 km to Vinh Airport
▪ High-tech; processing technology, supporting industries; Post-steel
manufacturing industries.
Investment
▪ Eco- tourism - trade.
priorities Sectors
Investment Area ▪ Seaport; port services, loading, logistics, sea transport.
▪ Social Infrastructure Projects.
Investment
N/A
Restricted Sectors

Minimum wage [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019

Lease term No more than 50 years

Minimum Lease Area 0.58 ha

Limit for Construction 1 - 5 floors


Height

Permitted Construction Rate 55 - 70%

▪ Total area: 113.8 ha


Planned area ▪ Total vacant space for rent: 87.06 ha
▪ Total area with full infrastructure ready to build factories: 15.15 ha

Factory Available for Rent Currently, the EZ does not have any factory for rent

Operation Status ▪ In Operation

Occupancy Rate and ▪ Occupancy rate: 82%


Number of Projects ▪ Number of Project: 132 projects

Number of Korean Projects None

▪ Land lease rate: 0.3 USD/m 2 /year


▪ Electricity fee: as regulated by the Government (see appendix)
Lease fee
▪ Water fee: 9,000 VND (~0.4 USD)/m3 for production
▪ Wastewater treatment fee: to be updated
▪ Management fee: None
▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee
▪ Water fee: 9,000 VND (~0.4 USD)/m3 for production
▪ Wastewater treatment fee: to be updated

INFORMATION OF INFRASTRUCTURE AND FACILITY

▪ Agribank and Vietinbank branches are located in the EZ


Financial institution
▪ 12 km to Techcombank, Vietcombank, BIDV bank branches of Ky Anh town

403
Tax service, State finance
About 10 km to Tax Department and State Treasury of Ky Anh town
office

Customs Service 6 km to Customs Office of Vung Ang Port Border Gate

Vung Ang Economic Zone has a wide logistical system: from Vung Ang deep seaport and its
Logistics
supporting logistical providers,…

Post office 12 km to Ky Anh Post office

Medicare 10 km to Ky Anh General Hospital

Police, public security 10 km to Ky Anh police station

Universities, training
60-70 km to universities and technical colleges located in Ha Tinh city (of Ha Tinh province)
facilities, etc.

Recruitment There is an on-site Employment transaction floor of Vung Ang - Ky Anh EZ

Worker dormitory There are dormitories for individuals and family dormitories

Worker's child education


N/A
facility

One-stop service N/A

Road Width N/A

Communication
Infrastructure of Industrial N/A
Zone

Emergency Power generator N/A

Vung Ang Firefighting and Prevention Police Department is located in the EZ; firefighting
Fire-fighting facility
devices are equipped.

Layout Plan

404
Location Map

Actual View

List of enterprises in the Industrial Park

No. Name Nationality Business sector

1 Rong Mei JSC. Taiwanese Paint production: 5,000 tons/year;


Mechanical processing, metal
processing and coating with a
capacity of 10,000 tons of
products/year.

405
2 Shian Yun JSC. Taiwanese Industrial gas production and
extraction
3 Juan Yen Ltd. Taiwanese General processing, including
mechanical processing, chemical
preparation used in wastewater
treatment; factories for rent.

4 Morfortune JSC. Taiwanese Construction of factories for rent

5 Goodean Ltd. Taiwanese Processing, coating and handling all


kinds of steel with a capacity of
36,000 tons of products/year.
6 Huu Sinh Control and Mechanical Taiwanese Production of metal structures
Construction Ltd.

406
PHU VINH INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

▪ Vung Ang Economic Zone, Ky Anh town, Ha Tinh province


Address
Phu Vinh Infrastructure Construction Investment Co., Ltd.
▪ Address: Lien Phu Group, Ky Lien Ward, Ky Anh Commune, Ha Tinh
Investor
▪ Tel: (84-239) 3 722 578 Fax : (84-239) 3 722 378
▪ Email: pv@pvip.com.vn
▪ Ms. Tran Ngoc Linh – Assistant - Mobile: (84) 932 315 368-
Email: tran0568@gmail.com
▪ Mr. Chang Wei Lin – Sales Deputy Director – Mobile: (84) 932 315 028 –
Contact Person
Email: pvwilliam8899@gmail.com
▪ Ms. To Thi Kim Dung – Sales Executive – Mobile: (84) 932 315 848 – Email:
tothikimdung.ht@gmail.com
▪ 200 m to National road 1B
Location ▪ 15 km to Vung Ang port
▪ 70 km to Dong Hoi Airport, 120 km to Vinh Airport
▪ Production and processing of iron and steel products: Hot rolled steel coils,
stainless steel, steel bars, round steel, steel pipes, special metals.
▪ Mechanical and electrical industry: Electronics, electronics, industrial and
household electricity, information technology, communications and
Investment telecommunications.
priorities ▪ Manufacture of mechanical industry: components, accessories for assembling
Sectors vehicles, motors, manufacturing and repairing agricultural mechanics, and
Investment Area equipment used in mining exploitation.
▪ Building materials industry: Producing concrete, cement, fire-proof, heat-
resistant and ceiling materials.
▪ Other industries
Investment
Restricted N/A
Sectors

Minimum wage [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019

▪ Start date: 2010


Lease term
▪ End date: 2060

Minimum Lease Area 5,000 m2

Limit for Construction


N/A
Height
Permitted Construction
N/A
Rate

Planned area 200 ha

Factory Available for Rent Currently, the IZ does not have factory available for rent

Operation Status In Operation

Occupancy Rate and ▪ Rate of Occupancy: 30%


Number of Projects ▪ Number of Project: 06 projects

Number of Korean Projects None

▪ Land lease fee (including:


Lease fee - 65 USD/m2/until 2060 for lease area from 0.5 ha – 2 ha
- 55 USD/m2/until 2060 for lease area from above 2 ha
▪ Management fee: 1,350 VND (~0.061 USD) /m2/month
Operating fee ▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 11,000 VND (~0.4 USD)/m3 for production

407
▪ Wastewater treatment fee: 2,500 VND (~0.27 USD) /m3

INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Agribank, Techcombank, BIDV bank branches of Ky Anh town are located nearby

Tax service, State finance


office 17 km to Tax Department and State Trasury of Ky Anh town

Customs Service 17 km to Vung Ang Customs Office

Vung Ang Economic Zone has a wide logistical system: Vung Ang deep seaport and its
Logistics
supporting logistical providers

Post office 17 km to Post Office of Ky Anh province

Medicare 14 km to Ky Anh General Hospital

Police, public security 15 km to Ky Anh Police

Universities, training
60-70 km to universities and technical colleges located in Ha Tinh city (of Ha Tinh province)
facilities, etc.

Recruitment There is an on-site Employment transaction floor of Vung Ang - Ky Anh EZ

Worker dormitory There are dormitories for individuals and family dormitories

Worker's child education


N/A
facility

One-stop service Phu Vinh gives support to projects in proceeding one-stop service

▪ Main road: 45.5 m wide


Road Width
▪ Branch road: 11.25 m wide
Communication
Infrastructure of Industrial Available, installed to the fence of each factory
Zone
Emergency Power
Self- equipped
generator

Fire-fighting Facility Available

Layout Plan

408
Location map

Actual View

409
VUNG ANG I INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

Vung Ang Economic Zone, Ky Anh town, Ha Tinh province


Address
Ha Tinh Economic Zone Service Infrastructure Center
Investor ▪ Address: Vung Ang Industrial Zone, Ky Thinh Ward, Ky Anh Commune, Ha Tinh
▪ Tel: (84-239) 3 713 999 Fax : (84-239) 3 713 999
▪ Mr Pham Anh Tu- Director of Center for Investment Promotion and Human Resource Supply
of Ha Tinh Economic Zones-
Mail: ipc.hatinhez@gmail.com
Contact Person ▪ Mr. Le Nguyen Kien Cuong - Director – (84) 985 346 168
Mail: lenguyenkiencuong@gmail.com
▪ Mr. Dang Ba Giap - Head of Department - (84) 974 220 090 –
Mail: dangbagiap@gmail.com
▪ 50 m to National Road 1A, 100 km to Vinh City, 50 km to Ha Tinh City
Location ▪ 9 km to Vung Ang Port
▪ 70 km to Dong Hoi Airport, 115 km to Vinh Airport

Prioritized Area: N/A


Investment Area
Restricted Area N/A

Minimum wage [Area 3] According to Decree 157/2018/ND-CP dated 23rd December

Lease term 50 years

Minimum Lease Area N/A

Limit for Construction


N/A
Height
Permitted Construction
N/A
Rate

Planned area ▪ Total Area: 200 ha

Factory Available for Rent N/A

Operation Status In Operation

Occupancy Rate and ▪ Rate of Occupancy: 92%


Number of Projects ▪ Number of Project: 26

Number of Korean Projects ▪ None

Lease fee ▪ Land lease fee: 0.3 USD/m2/year

▪ Management fee: None


▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee
▪ Water fee: 9,000 VND (~0.4 USD)/m3 for production
▪ Wastewater treatment fee: to be defined

INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Agribank, Techcombank, BIDV bank branches of Ky Anh town are located nearby

Tax service, State finance


Ky Anh Town State Treasury and Tax Department is located nearby the ID (~2 km )
office

Customs Service 15-20 km to Vung Ang Customs Office, located in Vung Ang EZ

Vung Ang Economic Zone has a wide logistical system: from Vung Ang deep seaport and its
Logistics
supporting logistical providers.

410
Post office Ky Anh Post Office is located in the ID

Medicare 600 m to Ky Anh General Hospital

Police, public security 500 m to Ky Anh Police station

Universities, training
50-60 km to Ha Tinh city, where has universities and technical schools located
facilities, etc.

Recruitment There is an on-site Employment transaction floor of Vung Ang - Ky Anh EZ

Worker dormitory There are dormitories for individuals and family dormitories

Worker's child education


N/A
facility

One-stop service N/A

Road Width N/A

Communication
Vung Ang Firefighting and Prevention Police Department is located in the EZ; firefighting
Infrastructure of Industrial
devices are equipped
Zone
Emergency Power
N/A
generator

Fire-fighting facility N/A

Layout Plan

Location Map

Actual View N/A

411
CAU TREO INTERNATIONAL BORDER GATE ECONOMIC ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

▪ Son Kim 1-2 Town, Tay Son Town, Huong Son District, Ha Tinh Province
Address
Ha Tinh Economic Zone Management Board
▪ Office 1:
- Address: Ky Loi, Ky Anh Town, Ha Tinh Province
Investor - Tel: (84-239) 3 891 962 Fax : (84-239) 3 868 699
▪ Office 2: No. 86 Phan Dinh Phung, Ha Tinh City, Ha Tinh Province
- Address: Ky Loi, Ky Anh Town, Ha Tinh Province
- Tel: (84-239) 3 881 237 Fax : (84-239) 3 882 992
Mr. Pham Anh Tu- Director of Center for Investment Promotion and Human Resource Supply
Contact Person of Ha Tinh Economic Zone-
Mobile: (84) 393 868 939/ (84) 989 353 968
▪ 65 km to Vinh City, 75 km to Ha Tinh City
Location ▪ 80 km to Vung Ang port
▪ 75 km to Vinh Airport
▪ Production and processing of agro-forest products, fine art product,
cosmetics and pharmaceutical products, animal food
▪ Processing and assembling of electronic device, automobile and
Investment priorities
motor accessories, packaging, mechanicals
Sectors
Investment Area ▪ Trading and service: supermarkets, hotels, restaurants, eco – tourism
▪ Investment in infrastructural construction (urban infrastructure, water
supply and treatment, telecommunication,..)
Investment
Polluted industries
Restricted Sectors

Minimum wage [Area 4] According to Decree 90/2019/NĐ-CP dated 15th November 2019

Lease term 50 years

Minimum Lease Area N/A

Limit for Construction


N/A
Height

Permitted Construction Rate N/A

Planned area 56,685 ha

Factory Available for Rent N/A

Operation Status In operation

Occupancy Rate and ▪ Occupancy Rate: N/A


Number of Projects ▪ Rate of Occupancy: 26 projects

Number of Korean Projects None

Lease fee ▪ Land lease fee: Depending on location and projects

▪ Management fee: None


▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee
▪ Water fee: 9,000 VND (~0.4 USD)/m3 for production
▪ Wastewater treatment fee: to be defined

INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Few bank branches located nearby

Tax service, State finance


About 30 km to Huong Son Tax Department and State Treasury
office

412
Vung Ang Customs Service is located far (more than 100 km) from the EZ. Previously, Cau
Customs Service
Treo International Border Gate Customs Office was closed.

Logistics N/A

Post office Over 30 km to Huong Son Post Office

Medicare Over 40 km to km to Huong Son General Hospital

Police, public security Located in the EZ

Universities, training
Located in Ha Tinh city, over 110 km to the EZ
facilities, etc.

Recruitment 110 km to Job Introduction Center of Ha Tinh

Worker dormitory N/A

Worker's child education


N/A
facility

One-stop service About 110 km to Ha Tinh Public Administration Center

Road Width N/A

Communication
Infrastructure of Industrial N/A
Zone

Emergency Power generator N/A

Fire-fighting facility N/A

Layout Plan N/A

Location Map

Actual View

413
414
[- This Page is intentionally left blank -]

415
HAI DUONG

416
INVESTMENT ENVIRONMENT IN HAI DUONG

GENERAL INFORMATION

▪ Area: 1,662 km2


Area, Population
▪ Population: about 1.9 million (2022 statistic)
▪ One of Hanoi’s satellite cities, located in the Northern focal economic area and in regional planning
Geographical Location of Hanoi Capital City
▪ 57 km from Hanoi, 45 km from Hai Phong, 100 km from Quang Ninh.
▪ The Province has Bac Giang Province to the north, Bac Ninh Province to the North West and Quang
Adjacent provinces Ninh Province to the North East, Hai Phong Province to the east, Hung Yen to the west, Thai Binh
Province to the south.
2022 statistic:
▪ Real GRDP (billion VND): 169.179 (7,275 billion USD)
▪ GRDP growth: 9,0%
GRDP ▪ GRDP per capita (million VND/year): 86,9 (3.746 USD)
▪ Economic structure:
- Industry - Construction: 60,2%
- Agriculture. forestry and fishery: 9,5%
- Service: 30,3%
2022 statistic:
Industry growth ▪ Industry - Construction growth: 11,8%
▪ Service growth: 6.8%
▪ Agriculture, forestry and fishery: 3,4%

PCI ▪ Score: 65,22– ranked 32th out of 63 cities and provinces in Vietnam (2022)

SOCIAL INFRASTRUCTURE

▪ Roadway: National Road 5 from Hanoi to Hai Phong runs through the Province with total length of
44.8 km, National Road 18 from Bac Ninh, Huong Duong to Cai Lan Port - Quang Ninh runs through
the Province with total length of 20 km. Another national roads through the Province are National Road
37, 38, 38B, 10 and Hanoi – Hai Phong Expressway (new Highway 5).
▪ Railway: on the route of Hai Phong – Hai Duong – Hung Yen – Ha Noi – Lang Son – Lao Cai
Transportation railway, the route Kep – Bai Chay, the route Yen Vien- Cai Lan.
▪ Waterway: Hai Duong domestic port is in the centre of the key economic zone in the Northern delta
area. The port is 55 km away from Ha Noi, 90 km away from Noi Bai airport, 55 km away from Hai
Phong port, and 120 km away from Cai Lan port – Quang Ninh.
▪ Airway: 75 km to Noi Bai airport (1.5 h car travel); 70 km to Cat Bi Airport (1.5 hour car travel),
both through the new Highway 5.

Electricity ▪ The capacity satisfies the demands of manufacturing and people living.

Water ▪ The capacity satisfies the demands of manufacturing and people living.

Education ▪ 06 universities, 06 junior colleges, 02 technical colleges.

Medicare ▪ 22 provinical hospital, 5 local polyclinics and 265 clinics in towns.

INVESTMENT CONDITION

Human resource ▪ About 60% of population in working age (2022)

▪ The minimum salary for the province is applied as follows (see appendix for detail amount):
- Area II: Hai Duong City
- Area III: Chi LinhTown and Cam Giang, Nam Sach, Kim Thanh, Kim Mon, Gia Loc, Binh Giang,
Salary Tu Ky District in Hai Duong Province
- Area IV: Thanh Ha, Thanh Mien and Ninh Giang districts
▪ The lowest wage for trained labor (including those trained by the enterprises) must be at least 7%
higher than the above referenced basic salary
▪ Incentives according to government regulations:
Investment incentives - Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.

417
- Import tax exemption

▪ Prioritized projects:
Fields Attracting
- Building infrastructure in industrial zones, developing traditional villages, developing non-state
Investment
owned industries, rural industries and traditional villages

17 newly licensed projects with a total registered capital of 59.5 million USD (7 projects outside
industrial zones - IZs, total capital 13.7 million USD and 10 projects in industrial zones, total capital
Investment attraction
45.7 million USD); 31 projects adjusted to increase capital with a total capital increase of 299.5 million
situation
USD (7 projects outside the industrial zone, up 23.4 million USD; 24 projects in the industrial zone, up
276.1 million USD).

Map

Hai Duong Center for Investment Promotion and Development Consultancy


Address: 58 Quang Trung - Quang Trung Ward- Hai Duong City
Contact
Tel: (84-220) 3 852 344
Fax: (84-220) 3 850 814

418
LIST OF INDUSTRIAL ZONES IN HAI DUONG

No Industrial zone Name Total Area Occupancy Rate Status


(ha)
1 Dai An Industrial Zone 135.96 95% In Operation
Dai An Extended Industrial Zone – Stage I 189.02 85% In Operation
Dai An Extended Industrial Zone – Stage II 278.02 0% To Be
Implemented In
2022
2 Lai Cach Industrial Zone 135.42 16.7% In Operation
3 An Phat Hi-Tech Industrial Zone 46.42 89% In Operation
4 An Phat 1 Industrial Zone 180 3% In Land
Clearance Process
5 Cong Hoa Industrial Zone 201.23 58% In Operation
6 Cam Dien - Luong Dien (VSIP) Industrial Zone 149.31 100% In Operation
7 Lai Vu Industrial Zone 212.89 90% In Operation
8 Phu Thai Industrial Zone 56.7 100% In Operation
9 Tan Truong Industrial Zone 198.06 100% In Operation
Expanded Tan Truong Industrial Zone 112.6 0% Licensed
10 Nam Sach Industrial Zone 62.42 100% In Operation
11 Phuc Dien Industrial Zone 82.88 100% In Operation
Expanded Phuc Dien Industrial Zone 214.57 0% In Legal Process
12 Binh Giang Industrial Zone 450 0% In Legal Process
13 Kim Thanh Industrial Zone 164.98 0% In Legal Process
14 Gia Loc Industrial Zone 198 0% In Legal Process

419
HAI DUONG’S LOCATION MAP OF INDUSTRIAL ZONES

420
DAI AN INDUSTRIAL ZONE

GENERAL INFORMATION

Km 51, Highway No.5, Tu Minh Ward, Hai Duong City, Hai Duong Province, Vietnam
Address
DAI AN JOINT STOCK COMPANY
▪ Address: Dai An Industrial Zone, Km 51, Highway No.5, Tu Minh Ward, Hai Duong City, Hai
Duong Province, Vietnam
Investor
▪ Tel: 02203.555.888
▪ Fax: 02203.786.703
▪ Website: http://daianvietnam.com/
▪ Mrs. Tuong Quynh Huong - Deputy General Director –
(84) 936 388 477 - huong.tuong@daianvietnam.com
▪ Mrs. Tran Huyen Thanh - Sales and Marketing Department –
Contact Person
(84) 906 856 899 - thanh.tran@daianvietnam.com
▪ Mr. Vuong Quoc Trung - Sales and Marketing Department –
(84) 945469358 - trung.vuong@daianvietnam.com
- 5 km to Hai Duong city center
- 50km far from Hanoi Central
- 50km far from Hai Phong domestic airport
- 80km far from Noi Bai International Airport
Location
- 50km far from Hai Phong Sea Port
- 80km to Quang Ninh deep water sea port
- 7km far from the new Freeway No. 5A Hanoi – Hai Phong
- 2km far from Cao Xa Railway Station
Priority Sectors for Investment on high-tech industry, clean industry, light industry, and
Investment supporting industry.
Investment Area
Restricted Sectors for
Restrict heavy industry, industries affecting the environment.
Investment

Minimum wage [Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019

▪ Start date: 2002


Lease term
▪ End date: 2052

Minimum Lease Area 10,000 m2

Limit for Construction


Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental
Permitted Construction Planning regulation (QCXDVN 01: 2008/BXD)
Rate

Planned area Total area:135.96 ha

Factory Available for


Total area: 18,538 m2
Rent

Operation Status In operation

Occupancy Rate and ▪ Occupancy Rate: 95%


Number of Projects ▪ Number of Projects: 42
Number of Korean
11 companies
Projects
▪ Land lease fee: 100USD/m2
▪ Factory lease fee: 25,000 USD/month to 60,000 USD/month
▪ Payment: pay into 3 installments:
Lease fee
- 1st installment: 30% of total leasing fee within 5 days after signing MOU.
- 2nd installment: 65% of total leasing fee not over 30 days from the 1st installment.
- 3rd installment: 5% of total leasing fee before receiving the land use rights.

Operating fee ▪ Management fee: 0.3 USD/m2/year

421
▪ Infrastructure maintenance fee: 0.4 USD/m2/year
▪ Electricity fee: According to the price of the government EVN (see Appendix)
▪ Water fee: According to the price of Hai Duong clean water supply Co., Ltd
▪ Wastewater treatment fee:
FOR ENTERPRISE LEASING THE WORKSHOP
Waste water standard fee (VND/m3)
*Enterprise leases the workshop: 18,500 (~0.79 USD)
*For enterprise with metal index not over B 40%,
Fee will be plus 39,000 VND Over 40% not accept
*For enterprise with chloride index, mecury index
Fee will be plus 39,000 VND over B
FOR ENTERPRISE LEASING LAND
Waste water standard fee (VND/m3)
*QCVN40:2011 Level A: 12,500 (~0.54 USD)
*QCVN40:2011 Level B: 14,500 (~0.62 USD)
*QCVN40:2011 Over level B
- Having <=03 indexes over level B: 17,500 (~0.75 USD)
- Having 04 indexes over level B: 19,000 (~0.81 USD)
- Having 05 indexes over level B: 20,500 (~0.88 USD)
- Having 06 indexes over level B: 22,000 (~0.94 USD)
- Having 07 indexes over level B: 23,500 (~1 USD)
*QCVN40:2011: For enterprise with metal index
Fee will be plus 39,000 VND not over B 40%, over 40% not accept
*QCVN40:2011: For enterprise with chloride index, Fee will be plus 39,000 VND mecury index
over B
▪ Waste treatment fee: According to the price of the service supplier

INFRASTRUCTURE AND FACILITY

Oceanbank, Vietcombank, BIDV, PG bank, Seabank, Vietinbank, Techcombank,…in the Hai


Financial institution
Duong city.

Tax service, State finance 6km to Tax department of Hai Duong province
office 7km to State Treasury in Hai Duong

There is an On- site Customs Office insides Dai An IZ


Customs Service
Dai An IZ has Inland Container Depot

4km to Trancy Logistics (Vietnam) in Hai Duong Co., Ltd


Logistics
4km to BSL Networks Co., Ltd

Post office TDT express, VNPT, DHL, FedEx, TNT...door-to-door delivery service

Medicare 5km to Hai Duong General Hospital

24/7 security service. The guards of Dai An IZ cooperate with the local polices supports to ensure
Police, public security
the security for the whole industrial zone.
Universities, training
3km to Thanh Dong University.
facilities, etc.
The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen, Hai
Recruitment
Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity.

Worker dormitory Housing, villa for experts/ employees are working in Dai An IZ.

Worker's child education


3km to Tu Minh preschool.
facility

One-stop service Dai An IZ has One-stop service.

Road Width The internal roads system has the sections: 55m; 39m; 37m; 35.5m; 33m, 17.5m; 15.5m

Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic


IT & Tele-
capabilities, leased line
communication Facilities
Telephone: number of line depend on investor’s demand.

422
Emergency Power
Available
generator

Fire-fighting facility Available

Layout Plan

Location map

Actual View

423
LIST OF TENANTS

No Company name Nationality Business line


1 Orisel Vietnam Co., Ltd Korea Manufactures and markets electrics application
2 Princeton Biomeditech Vietnam Co., Ltd Korea Medical equipment
3 Daeho Special Steel Vina Co., Ltd Korea Trade and manufactures st ainless steel
4 Silkroad Hanoi Joint Stock Company Korea Manufactures industrial admixtures
5 Shinheung Vina Electrics Co., Ltd Korea Specializes in electronic fields
6 Chemilens Vietnam Joint Stock Company Korea Manufactures chemicallens
7 Hana Motors Joint Stock Company Korea Produces Electric motorcycle
8 Prettl Viet Nam Co., Ltd Korea Manufacturing of electronic sensor parts
9 GD Technology Vina Co., Ltd Korea Manufactures electronic components
10 Eduen Vina Co., Ltd Korea Manufactures electronic components
11 Jinyong HNS Co., Ltd Korea Produces electronic appliances
12 Sumidenso Vietnam Co., Ltd Japan Manufactures and markets electric wire
13 Sumiden Automative Wire Co., Ltd Japan Manufactures electrical wires
14 Aureole Mitani Chemical & Environment Inc Japan Storing, diluting and distributing chemical
products
15 Taishodo Vietnam Co., Ltd Japan Produces electronic appliances
16 Tomoken Fire Viet Nam Co., Ltd Japan Manufacturing of fire fighting equipments and
other relating services.
17 Trancy Logistic Co., Ltd Japan Logistic distribution
18 PHI Co., Ltd Taiwan Trade and manufactures garment
19 Hulane Electronic Co., Ltd Taiwan Manufactures automotive connectors
20 Wonderful Vietnam Co.,Ltd Taiwan Manufactures electrical connectors
21 Vi Son Yarn Spining JSC Vietnam Manufactures and markets yarns
22 Masan One member Company Limited Vietnam Manufactures food (instant noodle)
23 Petrol Viet Nam Branch Vietnam Trade the services relating the petrol
24 Linh Anh School Equipment JSC Vietnam Produces school equipments
25 Minh Thai Co., LTd Vietnam Agency of wine, beer, beverage …
26 EDV Co., Ltd Vietnam workshop subleasing
27 Ngu Phuc Co., Ltd Vietnam workshop subleasing
28 Laurelton Diamonds Viet Nam Co.,Ltd U.S. Trades and manufactures rough diamonds
29 GCP Vietnam Co.,Ltd U.S. Produces admixtures

424
30 Ge-shen Co., Ltd Malaysia Designs and manufactures all kinds of plastic
molded products
31 Hinsitsu Screen Vietnam Co., Ltd Malaysia Specializes in producing and printing the label
sticker for electrical and electric products, home
appliances…
32 Seiko Vietnam Co., Ltd Malaysia Printing and other related services
33 Vietnam Luen Tai Electrical Equipment Co., HongKong Manufactures household el ectrical Equipment
Ltd Co., Ltd equipments
34 Taishodo Electronics Vietnam Co., Ltd HongKong Manufacturing and processing, assembling
electronic board
35 Bonsen Co., Ltd HongKong Manufacturing paper shredder
36 DONG QUN ENTERPRISES (HK) HongKong Printing and embroidering on fabric
LIMITED
37 CHANG JIN CHENG ELECTRICAL (HK) HongKong Produces electronic appliances
LIMITED
38 Tiens Vietnam Co., Ltd China Manufactures functional food
39 Yuantai Vietnam Co., Ltd China Printing and embroidering on fabric
40 Falcon Vietnam Co., Ltd Singapore Manufactures wooden furniture
41 Memtech Co., Ltd Singapore Producing plastic and metal molds
42 Jemmtec Vietnam Co., Ltd UK Refractory ceramic

425
DAI AN EXPANSION INDUSTRIAL ZONE

GENERAL INFORMATION

Km 51, Highway No.5, Tu Minh Ward, Hai Duong City, Hai Duong Province, Vietnam
Address
DAI AN JOINT STOCK COMPANY
▪ Address: Dai An Industrial Zone, Km 51, Highway No.5, Tu Minh Ward, Hai Duong City, Hai
Duong Province, Vietnam
Investor
▪ Tel: 02203.555.888
▪ Fax: 02203.786.703
▪ Website: http://daianvietnam.com/
▪ Mrs. Tuong Quynh Huong - Deputy General Director – (84) 936 388 477 -
huong.tuong@daianvietnam.com
Contact Person
▪ Mrs. Tran Huyen Thanh - Sales and Marketing Department – (84) 906 856 899 -
thanh.tran@daianvietnam.com
- 5 km to Hai Duong city center
- 50km far from Hanoi Central
- 50km far from Hai Phong domestic airport
- 80km far from Noi Bai International Airport
Location
- 50km far from Hai Phong Sea Port
- 80km to Quang Ninh deep water sea port
- 7km far from the new Freeway No. 5A Hanoi – Hai Phong
- 2km far from Cao Xa Railway Station
Priority Sectors for Investment on high-tech industry, clean industry, light industry, and
Investment supporting industry.
Investment Area
Restricted Sectors for
Restrict heavy industry, industries affecting the environment.
Investment

Minimum wage [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019

▪ Start date: 2006


Lease term
▪ End date: 2056

Minimum Lease Area 10,000 m2

Limit for Construction


Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental
Permitted Construction Planning regulation (QCXDVN 01: 2008/BXD)
Rate
▪ Total area: 467.04 ha
- Stage 1: 189.02 ha
Planned area - Stage 2: 278.02 ha (Expected 2021)
▪ Vacant leasable area: 11.751 ha
▪ Total area with full infrastructure ready to build factory: 189.02 ha
Factory Available for
Total area: 1.537 m2
Rent

Operation Status In Operation

Occupancy Rate and ▪ Occupancy Rate of Stage 1: 85%


Number of Projects ▪ Number of Projects: 41
Number of Korean
26 companies
Projects
▪ Land lease fee: 100 USD/m2
▪ Factory lease fee: 90.000 VND/m2/month
▪ Payment: pay into 3 installments:
Lease fee
- 1st installment: 30% of total leasing fee within 5 days after signing contract.
- 2nd installment: 65% of total leasing fee not over 30 days from the 1st installment.
- 3rd installment: 5% of total leasing fee before receiving the land use rights.

426
▪ Management fee: 0.3 USD/m2/year
▪ Infrastructure maintenance fee: 0.4 USD/m2/year
▪ Electricity fee: According to the price of the government EVN (see Appendix)
▪ Water fee: According to the price of Hai Duong clean water supply Co., Ltd
▪ Wastewater treatment fee:
FOR ENTERPRISE LEASING THE WORKSHOP
Waste water standard fee (VND/m3)
*Enterprise leases the workshop: 18,500 (~0.79 USD)
*For enterprise with metal index not over B 40%,
Fee will be plus 39,000 VND Over 40% not accept
*For enterprise with chloride index, mecury index
Fee will be plus 39,000 VND over B
FOR ENTERPRISE LEASING LAND
Operating fee Waste water standard fee (VND/m3)
*QCVN40:2011 Level A: 12,500 (~0.54 USD)
*QCVN40:2011 Level B: 14,500 (~0.62 USD)
*QCVN40:2011 Over level B
- Having <=03 indexes over level B: 17,500 (~0.75 USD)
- Having 04 indexes over level B: 19,000 (~0.81 USD)
- Having 05 indexes over level B: 20,500 (~0.88 USD)
- Having 06 indexes over level B: 22,000 (~0.94 USD)
- Having 07 indexes over level B: 23,500 (~1 USD)
*QCVN40:2011: For enterprise with metal index
Fee will be plus 39,000 VND not over B 40%, over 40% not accept
*QCVN40:2011: For enterprise with chloride index, Fee will be plus 39,000 VND mecury index
over B
▪ Waste treatment fee: According to the price of the service supplier

INFRASTRUCTURE AND FACILITY

Oceanbank, Vietcombank, BIDV, PG bank, Seabank, Vietinbank, Techcombank, in the Hai


Financial institution
Duong city.

Tax service, State finance 6km to Tax department of Hai Duong province
office 7km to State Treasury in Hai Duong

There is an On- site Customs Office insides Dai An Expansion IZ


Customs Service
Dai An Expansion IZ has Inland Container Depot

4km to Trancy Logistics (Vietnam) in Hai Duong Co., Ltd


Logistics
4km to BSL Networks Co., Ltd

Post office TDT express, VNPT, DHL, FedEx, TNT...door-to-door delivery service

Medicare 5km to Hai Duong General Hospital

24/7 security service. The guards of Dai An IZ cooperate with the local polices supports to ensure
Police, public security
the security for the whole industrial zone.
Universities, training
3km to Thanh Dong University.
facilities, etc.
The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen, Hai
Recruitment
Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity.

Worker dormitory Housing, villa for experts/ employees are working in Dai An IZ.

Worker's child education


3km to Tu Minh preschool.
facility

One-stop service Dai An IZ has One-stop service.

Road Width The internal roads system has the sections: 55m; 39m; 37m; 35.5m; 33m, 17.5m; 15.5m

Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic


IT & Tele-communication
capabilities, leased line
Facilities
Telephone: number of line depend on investor’s demand.

427
Emergency Power
Available
generator

Fire-fighting facility Available

Layout Plan

Location map

Actual View

428
429
LIST OF TENANTS

No Company name Nationality Business line


1 Kefico Vietnam Co., Ltd Korea Produces automobile components and automatic control system
2 During Vietnam Co., Ltd Korea Produces automobile components and automatic control system
3 Namyang Delta Co., Ltd Korea Manufactures garment
4 KPF Vietnam Co., Ltd Korea Manufactures screws
5 SD Global Viet Nam Co., Ltd Korea The production and inspection of cell phone cover glass
6 DS INV Co., Ltd Korea manufacturing waste water treatment equipements
7 LB Label Tracing Co., Ltd Korea Production, processing and export of woven labels and printed labels
for clothing, hats, shoes. Processing and trading of garment materials
and accessories. Manufacturing carton, all types of paper boxes
8 ShinYang Metal Viet Nam Korea Manufacturing and processing of metal components, aluminum
Co., Ltd products
9 Yuhan Precision Vina Co., Korea Manufactures electronic components
Ltd
10 Orgel VietNam Co., ltd Korea Music box manufacturing
11 Fashion Pin Up Vina Co., Ltd Korea Processing plastic and manufacturing garment accessories
12 Myong Shin Tech Vina Co., Korea Manufactures transmission parts and engine parts
Ltd
13 Suntel Vina Co., Ltd Korea Manufactures electronic components
14 DS Global Vina Korea Assembly and processing electronic products
15 Sangshin Vina Co., Ltd Korea Manufactures electronic components
16 Sepyung ENC Co., Ltd Korea Assembly and processing electronic products
17 Doosan Electro - Material Korea Manufactures electronic components
Vietnam Co., LTd
18 Vina Ilshin Tech Vina Co., Korea Manufactures electronic components
Ltd
19 LMS Vina Co., Ltd Korea Manufacturing and processing of metal components, aluminum
products
20 SY Global Co., Ltd Korea Manufactures electronic components (tape)
21 DY Elecen Vina Co., Ltd Korea Manufactures electronic components
22 Poongsan system Co., Ltd Korea Manufactures part for automotive (ETC)
23 Samsong Industry Co., Ltd Korea Manufactures automatic components for engine equipment
24 HST Networks Vina Co., Ltd Korea Manufactures belt bucker
25 GIC Vina Co., Ltd Korea Manufactures part for automotive components
26 Vina Solar CO., LTD Korea Manufactures Solar Aluminum Structure and Parts
27 Fuluhashi Viet Nam Co., Ltd Japan Wood Palet
28 Fujikura Kasei Co., Ltd Japan Coating materials for interior and exterior of two-wheel, four-wheel
vehicle.
29 Koyo Viet Nam Co., Ltd Japan Precision mechanical
30 NISSEI ECO VIETNAM Japan Manufacturing plastic products
CO., LTD
31 Pan-Continental Metal Taiwan Manufactures the copper oxide powder, copper cacbonate powder
Materials Viet Nam
Company Limited
32 Jin Shan Hardware Vietnam Taiwan Manufactures screwdrives
Co., Ltd
33 SK FACADE (VN) Co., Ltd Taiwan Manufactures curtain wall
34 Dolexphar International Vietnam Manufacturing functional food
Pharmaceutical Joint Stock
Company
35 Burwitz Joint Stock Company Vietnam Manufacturing fireproof concrete
36 Vescom Co., Ltd Vietnam workshop subleasing
37 Thien An An Co., Ltd Vietnam workshop subleasing
38 CTKF Co., Ltd Vietnam
39 Taiwoo Technology VN Co., HongKong The Production of Mobil-Phone parts & Precise Electric Goods
Ltd
40 Hai Duong HaiD Co., Ltd Singapore Manufactures animal feed
41 Twins Hai Duong Vietnam Singapore Manufactures animal feed
Co., Ltd

430
LAI CACH INDUSTRIAL ZONE

GENERAL INFORMATION

Km 49, Highway No.5, Lai Cach Town, Cam Giang District, Hai Duong City, Hai Duong Province,
Address Vietnam
Dai Duong Co., Ltd
▪ Address: Lai Cach IZ Km 49, Highway No.5, Lai Cach Town, Cam Giang District, Hai Duong
Investor City, Hai Duong Province, Vietnam
▪ Tel: (84-220) 3 555 868
▪ Fax: (84-220) 3 555 916
▪ Mrs. Tuong Quynh Huong - Deputy General Director – (84) 936 388 477 -
Contact Person
huong.tuong@daianvietnam.com

- 5 km to Hai Duong city center


- 50km far from Hanoi Central
- 50km far from Hai Phong domestic airport
Location - 80km far from Noi Bai International Airport
- 50km far from Hai Phong Sea Port
- 82km to Quang Ninh deep water sea port
- 7km far from the new Freeway No. 5A Hanoi – Hai Phong
- 2km far from Cao Xa Railway Station

Priority Sectors for


High-tech industry, clean industry, light industry, and supporting industry.
Investment
Investment Area
Restricted Sectors for
Restrict heavy industry, industries affecting the enviroment
Investment

Minimum wage [Area 2] According to Decree 90/2019/NĐ-CP dated 15th November 2019

Lease term End date: January 1st, 2057

Minimum Lease Area 15,000 m2

Limit for Construction


Factory height may not exceed two floors and may not exceed 14m.
Height
Permitted Construction In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental
Rate Planning regulation (QCXDVN 01: 2008/BXD)
▪ Total area: 135.42 ha
Planned area ▪ Vacant leasable area: 75.17ha
▪ Total area with full infrastructure ready to build factory: 75.17ha
Factory Available for
Total area: 1.500 m2
Rent

Operation Status In operation

Occupancy Rate and ▪ Occupancy Rate: 16.7%


Number of Projects ▪ Number of Projects: 9
Number of Korean
03 projects
Projects
▪ Land lease fee: 72 USD/m2 to 90 USD/m2
▪ Payment: pay into 3 installments:
Lease fee - 1st installment: 30% of total leasing fee within 5 days after signing contract.
- 2nd installment: 65% of total leasing fee not over 30 days from the 1st installment.
- 3rd installment: 5% of total leasing fee before receiving the land use rights.
▪ Management & infrastructure maintenance fee: 20,000 VND/m2/year
From 2022: Prices will change according to the Board of Director’s decision, but not more than 15%
compared to the previous year.
Operating fee
▪ Electricity fee: According to the price of the government EVN (see Appendix)
▪ Water fee: According to the price of Hai Duong clean water supply Co., Ltd
▪ Wastewater treatment fee:

431
FOR ENTERPRISE LEASING THE WORKSHOP
Waste water standard fee (VND/m3)
*Enterprise leases the workshop: 18,500 (~0.79 USD)
*For enterprise with metal index not over B 40%,
Fee will be plus 39,000 VND Over 40% not accept
*For enterprise with chloride index, mecury index
Fee will be plus 39,000 VND over B
FOR ENTERPRISE LEASING LAND
Waste water standard fee (VND/m3)
*QCVN40:2011 Level A: 12,500 (~0.54 USD)
*QCVN40:2011 Level B: 14,500 (~0.62 USD)
*QCVN40:2011 Over level B
- Having <=03 indexes over level B: 17,500 (~0.75 USD)
- Having 04 indexes over level B: 19,000 (~0.81 USD)
- Having 05 indexes over level B: 20,500 (~0.88 USD)
- Having 06 indexes over level B: 22,000 (~0.94 USD)
- Having 07 indexes over level B: 23,500 (~1 USD)
*QCVN40:2011: For enterprise with metal index
Fee will be plus 39,000 VND not over B 40%, over 40% not accept
*QCVN40:2011: For enterprise with chloride index, Fee will be plus 39,000 VND mecury index over
B
▪ Waste treatment fee: According to the price of the service supplier

INFRASTRUCTURE AND FACILITY

Oceanbank, Vietcombank, BIDV, PG bank, Seabank, Vietinbank, Techcombank,…in the Hai


Financial institution
Duong city.

Tax service, State 6km to Tax department of Hai Duong province


finance office 7km to State Treasury in Hai Duong

There is an On- site Customs Office insides Lai Cach IZ


Customs Service
Lai Cach IZ has Inland Container Depot

4km to Trancy Logistics (Vietnam) in Hai Duong Co., Ltd


Logistics
4km to BSL Networks Co., Ltd

Post office TDT express, VNPT, DHL, FedEx, TNT...door-to-door delivery service

Medicare 5km to Hai Duong General Hospital

24/7 security service. The guards of Lai Cach IZ cooperate with the local polices supports to ensure
Police, public security
the security for the whole industrial zone.
Universities, training
4km to Thanh Dong University.
facilities, etc.
The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen, Hai
Recruitment
Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity.

Worker dormitory Housing, villa for experts/ employees are working in Lai Cach IZ

Worker's child
4km to Tu Minh preschool.
education facility

One-stop service Lai Cach IZ has One-stop service

Road Width The main internal roads system has the sections: 30m - 33m

Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic


IT & Tele-
capabilities, leased line
communication Facilities
Telephone: number of line depend on investor’s demand.
Emergency Power
Available
generator

Fire-fighting facility Available

432
Layout Plan

Location Map

Actual View

433
434
AN PHAT HIGH-TECHNOLOGY INDUSTRIAL PARK

GENERAL INFORMATION

Km 47, Highway 5, Viet Hoa and Tu Minh ward, Hai Duong city, Hai Duong province
Address
An Phat High-Technology Industrial Park Company Limited
▪ Address: Km 47, Highway 5, Viet Hoa and Tu Minh ward, Hai Duong city, Hai Duong province
Investor
▪ Tel: (84) 986 888 868
▪ Website: anphatcomplex.com
▪ Pham Van Tuan - General Director - Mobile: (84) 986 888 868 - Email:
tuanpv@anphatcomplex.com
Contact Person
▪ Mr. Duc Kien Vuong/Kevin - Deputy Business Development Manager - Mobile: (84) 965666899
– Email: kienvd@anphatholdings.com
- 2.7 km from Hai Duong City Center, 60 km from Hanoi Center
- 85 km from Noi Bai International Airport and 55 km from Cat Bi Airport (Hai Phong city)
Location
- 50 km from Hai Phong Port and 55 km from Dinh Vu Port
- 0.1 km from Highway 5
- Producing plastic bag, industrial packaging, high-tech building material
- Producing plastic products, accessories and household appliances
- Electronic components - Precision engineering, molding manufacturing
- Plastic parts for cars and motorbikes
Priority
- Manufacturing industries of new and high-tech materials
Sectors for
- High-end garment, shoes and textile (not including dyeing and tanning)
Investment
Investment Area - Processing wood and high-end furniture - Producing products from paper, carton
- Producing building materials
- Mechanical processing, steel components
- Assembling bicycles, motorbike, cars, specialized transport vehicles
Restricted - Producing basic chemicals (accruing industrial wastewater)
Sectors for - Steel refining from iron and steel scrap using non-continuous furnace
Investment - Non-attracting/restricted-attracting-investment industries in Hai Duong province

Minimum wage [Area 2] According to Decree 90/2019/NĐ-CP dated 15th November 2019

Lease term End date: November 30, 2056

Minimum Lease Area Negotiation

Limit for Construction


Height Factory area: up to 21m
Permitted Construction Factory area: 60 percent of land area
Rate
▪ Total area: 46 ha
Planned area ▪ Total vacant leasable area: 2.9 ha for commercial/ service land
▪ Total area with full infrastructure ready to build factory: around 2 ha
Factory Available for
Total area: about 40,000 m2
Rent
In operation
Operation Status

Occupancy Rate and ▪ Occupancy Rate: 89%


Number of Projects ▪ Number of Projects:10
Number of Korean
None
Projects
▪ Land lease fee: 85 USD/m2 plus factory unit construction cost of $200 - $250/m2
▪ Factory lease fee: 3.2 USD/ m2 (VAT excluded)
Lease fee ▪ Payment:
- Method: Bank transfer
- Period: Factory lease: on quarterly basis, on the 10th day of the first month of the next period.

435
- Land lease: Payment due is 30 days after the date of contracting at the latest.

▪ Management fee: 0.6 USD/m2/year


Operating fee
▪ Electricity fee: According to Government Regulation (See Appendix)

INFRASTRUCTURE AND FACILITY

3.1 km from BIDV - Thanh Dong Branch


4.0 km from Vietcombank – Hai Duong Branch
Financial institution
3.3 km from Vietinbank – Industrial Park Branch
3.0 km from VPBank – Nguyen Luong Bang Transaction Office
Tax service, State finance 3.9 km from Hai Duong Tax Department
office 4.4 km from Hai Duong State Treasury

500m from Hai Duong Custom Department


Customs Service
5.9 km from Hai Duong Inland Container Depot

Logistics services, including warehouse solution, shipping and custom clearance are provided
Logistics
inside the industrial park

Post office 5.0 km from Hai Duong Post Office

Medicare 2.8 km from Hai Duong General Hospital

Police, public security 1.6 km from Viet Hoa ward Police Station

Universities, training 2.0 km from Hai Duong University


facilities, etc. 28.0 km from Sao Do University

Recruitment Yes

Worker dormitory 2.0 km from the dormitory in Hai Duong University

Worker's child education


Many kindergartens near the industrial park
facility
Land and factory lease, fast-track procedures and convenient services such as catering, security
service, accommodation, IT system, water-electrical system implemented and/or supported by our
One-stop service
industrial park

Main road: 50m, 4 lanes


Road Width
Loops: 34m, 2 lanes
IT & Tele-
High-speed internet, international telecommunication, on-demand telephone installation
communication Facilities
Emergency Power
Yes
generator

Fire-fighting facility Yes

436
Layout Plan

437
Actual View

438
AN PHAT 1 INDUSTRIAL ZONE
(Previously: Quoc Tuan – An Binh Industrial Zone)

GENERAL INFORMATION

Quoc Tuan, An Binh, An Lam Commune, Nam Sach District, Hai Duong Province
Address
An Phat High-Technology Industrial Park Company Limited
▪ Address: Km 47, Highway 5, Viet Hoa and Tu Minh ward, Hai Duong city, Hai Duong province
Investor
▪ Tel: (84) 986 888 868
▪ Website: anphatcomplex.com
▪ Pham Van Tuan - General Director - Mobile: (84) 986 888 868 - Email:
tuanpv@anphatcomplex.com
Contact Person
▪ Mr. Duc Kien Vuong/Kevin - Deputy Business Development Manager - Mobile: (84) 965666899
– Email: kienvd@anphatholdings.com
▪ 12 km from Hai Duong City Center, 70 km from Hanoi Center
▪ 79 km from Noi Bai International Airport and 54 km from Cat Bi Airport (Hai Phong city)
Location
▪ 50 km from Hai Phong Port and 55 km from Dinh Vu Port
▪ 0 km to Highway 37 - 10 km from Highway 5
▪ Producing plastic bag, industrial packaging, high-tech building
material
▪ Producing plastic products, accessories and household appliances
▪ Electronic components - Precision engineering, molding
manufacturing
▪ Plastic parts for cars and motorbikes
Priority Sectors for ▪ Manufacturing industries of new and high-tech materials
Investment ▪ High-end garment, shoes and textile (not including dyeing and
tanning)
Investment Area ▪ Processing wood and high-end furniture
▪ Producing products from paper, carton
▪ Producing building materials
▪ Mechanical processing, steel components
▪ Assembling bicycles, motorbike, cars, specialized transport vehicles
▪ Producing basic chemicals (accruing industrial wastewater)
Restricted Sectors for ▪ Steel refining from iron and steel scrap using non-continuous furnace
Investment ▪ Non-attracting/restricted-attracting-investment industries in Hai
Duong province

Minimum wage [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019

Lease term End date: 2070

Minimum Lease Area 1 ha

Limit for Construction


up to 21m
Height
Permitted Construction
60%
Rate
▪ Total area: 180 ha
Planned area
▪ Total vacant leasable area: 140 ha
Factory Available for
No RBF
Rent
Obtained the investment approval from prime Minister and IRC
Operation Status
Land handover in Quarter IV, 2021
Occupancy Rate and ▪ Occupancy Rate: 3%
Number of Projects ▪ Number of Projects: 1
Number of Korean
None
Projects

Lease fee ▪ Land lease fee: 75 USD/m2 plus factory unit construction cost of $200 - $250/m2

439
▪ Payment:
- Method: Bank transfer
- Period: Factory lease: on quarterly basis, on the 10th day of the first month of the next period.
- Land lease: Payment due is 30 days after the date of contracting at the latest.
▪ Management fee: 0.6 USD/m2/year
Operating fee
▪ Electricity fee: According to Government Regulation (See Appendix)

INFRASTRUCTURE AND FACILITY

Agribank Vietnam- 500 m


Financial institution
BIDV Nam Sach – 500m
Tax service, State finance
State Treasury- Nam Sach District- 500m
office

Customs Service

Logistics services, including warehouse solution, shipping and custom clearance are provided
Logistics
inside the industrial park

Post office Nam Sach Post office – 1km

Quoc Tuan Mediacal Centre – 200m


Medicare
Nam Sach Hospital – 2km

Police, public security Nam Sach District Police station – 2 km

Universities, training Nam Sach High School: 2 km


facilities, etc. Hai Duong University: 12 km

Recruitment Available

Worker dormitory

Worker's child education


Many kindergartens near the industrial park
facility
Land and factory lease, fast-track procedures and convenient services such as catering, security
One-stop service service, accommodation, IT system, water-electrical system implemented and/or supported by our
industrial park
Main road: 50m, 4 lanes
Road Width
Loops: 34m, 2 lanes
IT & Tele-
High-speed internet, international telecommunication, on-demand telephone installation
communication Facilities
Emergency Power
Available
generator

Fire-fighting facility Available

Layout Plan

440
Location Map

Actual View

441
CONG HOA INDUSTRIAL ZONE

GENERAL INFORMATION

Cong Hoa Ward, Chi Linh Commune, Hai Duong city


Address
Cao Su Viet Nam Industrial Zone & Urban Development JSC
▪ Address: No. 12, Nguyen An Street, Hai Tan Ward, Hai Duong City
Investor
▪ Tel: (84-220) 3 838 025 Fax: (84-220) 3 838 024
▪ Email: info@vinaruco.com.vn
▪ Mr. Nguyen Dinh Dang - Head of Planning and Investment Department - (84-220) 3 838 029
Contact Person
▪ Mr. Phuong – (84) 913215420 - ntphuong2002@gmail.com

- Land: Located on National Road 5, No.18 and No.37


Location - Seaport: 50 km Hai Phong Sea Port and 80 km from Quang Ninh Deep Water sea port
- Airport: 80 km from Noi Bai International Airport

Priority Sectors for Manufacturing and assembling electric, electronic product,


Investment mechanical, automobile and motorbike; textile
Investment Area
Restricted Sectors for
Polluted Sector
Investment

Minimum wage [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019

▪ Start date: 2008


Lease term
▪ End date: 2058

Minimum Lease Area 10,000 m2

Limit for Construction


Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental
Permitted Construction Planning regulation (QCXDVN 01: 2008/BXD)
Rate
▪ Total area: 201.23 ha
Planned area
▪ Total Industrial Land area: 145.54 ha
Factory Available for
▪ Total area: NA
Rent

Operation Status ▪ In operation

Occupancy Rate and


58%
Number of Projects
Number of Korean
None
Projects

Lease fee Land lease fee: 65 -75 USD/m2

▪ Maintainance fee: 0.35 USD/m2/year


▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee
▪ Water fee: 0.65 USD/m3
▪ Wastewater treatment fee: 0.7 USD/m3

INFRASTRUCTURE AND FACILITY

Financial institution Agribank, Vietin Bank, BIDV

Tax service, State finance 30 km to Tax department of Hai Duong province


office 29 km to State Treasury in Hai Duong

Customs Service 31 km from Hai Duong Customs Department

442
Logistics N/A

Post office TDT express, VNPT, DHL, FedEx, TNT...door-to-door delivery service

Medicare 29 km to Hai Duong General Hospital

24/7 security service. The guards of Lai Cach IZ cooperate with the local polices supports to ensure
Police, public security
the security for the whole industrial zone.
Universities, training
32.4 km to Thanh Dong University.
facilities, etc.
The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen, Hai
Recruitment
Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity.

Worker dormitory N/A

Worker's child education


N/A
facility

One-stop service N/A

Road Width The main internal roads system has the sections: 30m - 33m

Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic


IT & Tele-
capabilities, leased line
communication Facilities
Telephone: number of line depend on investor’s demand.
Emergency Power
Available
generator

Fire-fighting facility Available

Layout Plan

443
Location Map

Actual View

444
LIST OF SOME NOTABLE TENANTS

No. Company name Nationality Business line


1 Vietnam Rubber Industry and Urban Vietnam Investing in construction and trading of technical
Development Joint Stock Company infrastructure system of Republic Industrial Zone,
Chi Linh district, province HD in accordance with
detailed planning of Cong Hoa Industrial Zone
approved by People's Committee of HD
2 Nice Ceramic Company Limited Vietnam Producing and trading in import and export of tiles
and other sizes
3 Kim Duong Vietnam Consumer Goods China Manufacturing, processing and trading high
Company Limited quality plastic products
4 Poyun Electronics (HD) Vietnam Seychelles Manufacturing, processing, trading in speaker
Company Limited components and components and devices related
to speakers and sound
5 Dainty & Gemmy Technology Co., Ltd Hong Kong Manufacturing and processing components of
Vietnam speakers, Amplifier and Amplifier components
6 Dong A Vietnam Science and Hong Kong Manufacturing and processing speaker tubers and
Technology Co., Ltd components related to speaker roots; speakers and
headphones
7 Sun Acoustis Company Limited Virgin Islands Manufacturing and processing tubers of speakers,
frequency, finished products

445
CAM DIEN – LUONG DIEN INDUSTRIAL ZONE (VSIP HAI DUONG)

GENERAL INFORMATION

▪ Cam Dien Commune, Cam Giang District, Hai Duong, Vietnam


Address
VSIP Hai Duong Co., Ltd
▪ Address: Cam Dien Commune, Cam Giang District, Hai Duong, Vietnam
Investor ▪ Tel: +84 220 378 9668
▪ Fax: +84 220 378 6868
▪ Website: vsip.com.vn

Contact Person ▪ Le Quoc Han (Robin) - (84) 943 836 839 - han.lq@vsip.com.vn

- 40 Km from Hanoi Capital


- 60 Km from Hanoi International Airport
Location - 65 Km from Hai Phong Seaport
- 25 Km from Highway 5B
- Face to National Highway 5A

Priority Sectors for Investment Light and high tech industries


Investment Area
Restricted Sectors for
Polluted industries
Investment

Minimum wage [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019

▪ Start date: When tenants are ready


Lease term
▪ End date: 5th August 2058

Minimum Lease Area 1 ha

Limit for Construction


Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental
Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction
Rate
▪ Total area: 149.31 ha
Planned area
▪ Total vacant leasable area: 110 ha (Phase 1)
Factory Available for
▪ Total area: NA
Rent

Operation Status ▪ In operation

Occupancy Rate and


100%
Number of Projects
Number of Korean
N/A
Projects

Lease fee ▪ Land lease fee: 85 USD/m2/over project life

▪ Management fee: 1,577 VND (~0.07 USD)/m2/year


▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee
▪ Water fee: 13,700 VND (~0.5 USD)/m3
▪ Wastewater treatment fee: 5,633 VND (~0.25 USD)/m3

INFRASTRUCTURE AND FACILITY

Financial institution Vietcombank, VietinBank

Tax service, State finance


15km from the nearest State Tax and Finance Agency
office

15km from the nearest Customs Agency


Customs Service
15km from the nearest Inland Container Depot

446
Logistics 5km from the nearest Logistic Center

Post office 3km from the nearest Mailing Post Office

Medicare 3km from the nearest local clinic

Police, public security 2km from the nearest Police Station

Universities, training 15km from the nearest Universites and Training Center + University of Economic and Technology,
facilities, etc. University of Medical/ Hai Duong vocational School

Recruitment Recruitment support service available

Worker dormitory Worker dormitory available within IP

Worker's child education


2km from the nearest Facility
facility

One-stop service 15km from the nearest Hai Duong provincial Facility

Main Road: 56-meter-wide, four lanes


Road Width
Branch Road: 26-Meter-wide, two lanes
Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic
IT & Tele-
capabilities, leased line
communication Facilities
Telephone: number of line depend on investor’s demand.
Emergency Power
NA
generator

Fire-fighting facility Available

Layout Plan

Location Map

447
Actual View

448
LIST OF SOME NOTABLE TENANTS

No. Company name Nationality Business line


1 Best Pacific Company Limited Hong Kong Producing and trading in knitted fabric, knitting fabric,
(Vietnam) woven fabric and other non-woven fabrics belonging to
industry code 1321
2 Long Star Engineering Co., Ltd. Seychelles Manufacturing and trading raw materials used for
(Vietnam) manufacturing shoe soles, shoes from rubber plastic and
Eva plastic; Producing and trading catalysts, flocculants
and additives
3 Ehwa Global Company Limited South Korea Producing and processing grinding stone products with
diamonds; manufacturing and processing all kinds of saw
blades and drills with diamonds used in industrial
production; Performing commercial rights
4 BW Hai Duong Industrial Netherlands - Warehousing and storage services, business and real
Construction Company Limited Vietnam estate consulting; building offices and workshops for rent
5 Ta Ting Plastic Co., Ltd. (Hai Duong) Samoa Production and trading of l
PE and PP plastic bags
6 Jointak Labels (VN) Company Hong Kong Manufacturing and trading textile labels, labels, paper
Limited hangers, labels, hand-locking silicon
7 BW Hai Duong Industry PT Netherlands - Warehousing and storage services, business and real
Company Limited - Project 02 Vietnam estate consulting; building offices and workshops for rent
8 Leo (Vietnam) Paper Products Co., Hong Kong Producing paper bags, paper cards
Ltd
9 Vietnam Union Materials Company South Korea Producing Ferrite magnets
Limited
10 BW Hai Duong Industrial Netherlands - Warehousing and storage services, business and real
Construction Company Limited - HD Vietnam estate consulting; building offices and workshops for rent
03
11 Superior EMS Limited (Vietnam) Hong Kong Producing postcards; making machines
Cotton candy; animal music player
12 Tran Phu Electrical Mechanical Joint Vietnam Production of electric wires and cables of all kinds
Stock Company
13 Vina Foam Vietnam Co., Ltd. Vietnam Producing fire foam products
14 The Long Airtech Joint Stock Vietnam Production of air blowing chamber; production and
Company assembly of equipment and machines used for laboratories
and medical; Production of air filter accessories

449
LAI VU INDUSTRIAL ZONE

GENERAL INFORMATION

▪ Lai Vu commune, Kim Thanh district, Hai Duong province


Address
Lai Vu industry Park Company limited
Investor ▪ Address: Lai Vu commune, Kim Thanh district, Hai Duong province, Viet Nam
▪ Tel: (84-220) 3 562718 Fax: (84-220) 3 727886
▪ Mrs. Tuong Quynh Huong - Deputy General Director – (84) 936 388 477 -
huong.tuong@daianvietnam.com
Contact Person
▪ Mrs. Tran Huyen Thanh - Sales and Marketing Department – (84) 906 856 899 -
thanh.tran@daianvietnam.com

- Land: Next to National Road 5A, 1 km from Tien Trung


Location - Seaport: 40 km from Hai Phong Port
- Airport: 40 km from Cat Bi (Hai Phong) airport

Priority Sectors for High-tech industry, clean industry, light industry, and supporting
Investment industry.
Investment Area
Restricted Sectors for
Restrict heavy industry, industries affecting the enviroment
Investment

Minimum wage [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019

▪ Start date: 2007


Lease term
▪ End date: 2057

Minimum Lease Area 10,000 m2

Limit for Construction


Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental
Permitted Construction Planning regulation (QCXDVN 01: 2008/BXD)
Rate
▪ Total area: 212.89 ha
Planned area
▪ Vacant leasable area: 152.5ha
Factory Available for
▪ Currently, Lai Vu IZ does not have factory available for rent
Rent
▪ In operation
Operation Status

Occupancy Rate and ▪ Occupancy Rate: 90%


Number of Projects ▪ Number of Projects: 11 project
Number of Korean
None
Projects

Lease fee ▪ Land lease fee: 60 USD/m2

▪ Management fee: 0.5 USD/m2/year - Annual payment from 5th to 15th January
▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee
▪ Water fee: 0.61 USD/m3 - Monthly payment
▪ Wastewater treatment fee: Sewage treatment system is Under contruction

INFRASTRUCTURE AND FACILITY

Financial institution 5 km from nearest ATM of BIDV, VietinBank

Tax service, State 12 km to Tax department of Hai Duong province


finance office 11 km to State Treasury in Hai Duong

Customs Service 13 km to Hai Duong Customs Office

450
Logistics Trancy Logistics (Vietnam) in Hai Duong Co., Ltd, BSL Networks Co., Ltd

Post office TDT express, VNPT, DHL, FedEx, TNT...door-to-door delivery service

Medicare 7 km from Nam Sach District Medical Center

Police, public security 24/7 security service.

Universities, training
10 km to Hai Duong University.
facilities, etc.
The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen, Hai
Recruitment
Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity.

Worker dormitory NA

Worker's child
3 km to Lai Vu preschool.
education facility

One-stop service NA

Road Width The main internal roads system has the sections: 30m - 33m

Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic


IT & Tele-
capabilities, leased line
communication Facilities
Telephone: number of line depend on investor’s demand.
Emergency Power
Available
generator

Fire-fighting facility Available

Layout Plan

Location Map

451
Actual View

LIST OF TENANTS

No. Company name Nationality Business line


1 Vinashin Precision Mechanical Joint Vietnam Manufacturing
Stock Company
non-standard mechanical equipment and hydraulic
equipment, hydraulic units; production and
manufacture of steel structures; production of grinding
nuts
2 Lai Vu Industrial Park Company Vietnam Constructing and trading technical infrastructure
Limited system of Lai Vu Industrial Park
3 Shipbuilding Electric-Electronic Joint Vietnam Manufacturing measuring modules and protecting
Stock Company diesel parameters; transmitter protection devices;
universal
4 Vinashin Industrial Development Vietnam Fabrication of wind pipe systems and accessories
Company Limited
5 Thinh Hung Transport and Construction Vietnam Installing transmission lines for commercial concrete
Material Trading Joint Stock Company stations, supplying commercial concrete for
construction projects (mainly supplied to Pacific
Textile Project and expanding Tinh Loi Garment
Project in Lai Vu Industrial Park)
6 Enbest Joint Stock Company Vietnam Trading in petrol, oil, liquefied petroleum gas;
warehouse business; restaurants, mini supermarkets
7 Binh Duong Mechanical and Trading Vietnam Manufacturing metal components; producing,
Company Limited processing and trading mechanical products; excess
factory rental as prescribed
8 CAS International Container Joint Stock United States- Manufacturing all kinds of international standard
Company British Virgin container products, manufacturing and assembling
Islands-Vietnam mechanical products; Manufacturing and assembling all
kinds of components for container production;
Manufacturing specialized machinery, equipment and
tools for the container industry
9 Tinh Loi Garment Company Limited Hong Kong Manufacturing and trading garment products; Washing,
printing, embroidery and performing other processing
steps
10 Pacific Crystal Textile Co., Ltd. Hong Kong Manufacturing and trading knitted products and raw
materials
11 Misawa Engineering Co., Ltd. Japan Manufacturing, manufacturing, processing

and assembling parts, components, components of


angle and motor measuring sensors

452
PHU THAI (NAM TAI) INDUSTRIAL ZONE

GENERAL INFORMATION

▪ Phu Thai Town, Kim Thanh Distric, Hai Duong Province


Address
Nam Tai International Co., Ltd. (Phu Thai IZ West area)
▪ Address: Phu Thai Industrial Park, Phu Thai Town, Kim Thanh District, Hai Duong Province
Investor ▪ Tel: (84-220) 3 722 990/1
▪ Fax: (84-220) 3 722 960
▪ Email: sales@namtai.vn

Contact Person ▪ Mr. Hoang Vinh Tuan - Sales & Service Manager – (84) 982 594 866 (leaved)

- Land: Next to National Road 5A, 1 km from Tien Trung


Location - Seaport: 40 km from Hai Phong Port
- Airport: 40 km from Cat Bi (Hai Phong) airport

Priority Sectors for High-tech industry, clean industry, light industry, and supporting
Investment industry.
Investment Area
Restricted Sectors for
Restrict heavy industry, industries affecting the enviroment
Investment

Minimum wage [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019

▪ Phu Thai Industrial Park – West area 2003-2050.


Lease term
▪ Phu Thai Industrial Park – East area 2015-2065.

Minimum Lease Area 10,000 m2

Limit for Construction


Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental
Permitted Construction Planning regulation (QCXDVN 01: 2008/BXD)
Rate

Planned area ▪ Total area: 56.7 ha

Factory Available for


▪ Ready built factory for lease with the area ranging from 2,520 to 20,000 m2
Rent

Operation Status In operation

Occupancy Rate and ▪ Occupancy Rate: 100%


Number of Projects ▪ Number of Projects: 42
Number of Korean
09 projects
Projects

Lease fee ▪ Land lease fee: Depending on location

▪ Management fee: 0.35 USD/m2/month (Pay at the 1st day of the 1st month of each quarter)
▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee ▪ Water fee: 14,385 VND (~0.65 USD)/m3 (Monthly Payment)
▪ Wastewater treatment fee: 7,350 VND (~0.33 USD)/m3 - Monthly payment with chargeable
volume is counted at 70% of supplied water volume

INFRASTRUCTURE AND FACILITY

Financial institution BIDV, VietinBank, Vietcombank, Sacombank ATM within 5 km

Tax service, State finance 25 km to Tax department of Hai Duong province


office 24 km to State Treasury in Hai Duong

Customs Service 25 km to Hai Duong Customs Office

Logistics Trancy Logistics (Vietnam) in Hai Duong Co., Ltd, BSL Networks Co., Ltd

453
Post office 4 km to Kim Luong Post Office

Medicare 1.6 km from Phuc Thanh District Medical Center

Police, public security 24/7 security service.

Universities, training
24 km to Hai Duong University.
facilities, etc.
The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen, Hai
Recruitment
Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity.

Worker dormitory NA

Worker's child education


6.5 km to Kinh Mon preschool.
facility

One-stop service NA

Road Width The main internal roads system has the sections: 30m - 33m

Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic


IT & Tele-
capabilities, leased line
communication Facilities
Telephone: number of line depend on investor’s demand.
Emergency Power
Available
generator

Fire-fighting facility Available

Layout Plan

Location Map

454
Actual View

455
LIST OF TENANTS

No. Company name Nationality Business line


1 Poyun Electronic Co., Ltd. Brunei Production and trading of speaker coils;
production and trading of parts related to speakers;
audio equipment
2 Vietnam Ripe Lawn Japan Production of plastic materials for export
Company Limited
3 Hakken Technology Co., Ltd. British Virgin Islands Processing, assembling, manufacturing and selling
speaker components and related accessories;
hardware, equipment and speakers
4 Vietnam Shop Vac Company Hong Kong Production of vacuum cleaners, engines, filter
Limited bags and vacuum cleaner parts and accessories
5 Nam Lee International Co., Vietnam Manufacturing and processing all kinds of
Ltd. garments
6 Cixing VN Company Limited Hong Kong Sublease machinery
7 Nam Ninh Company Limited Vietnam Manufacturing motor boats; export sports
clothing; business motels, food, drink,
refreshments, karaoke services
8 Merrimack River Precision Taiwan Manufacture all kinds of plastic support frames
Industry Co., Ltd. (HD) inside and outside of speaker components; detailed
plastic accessories of travel products such as
suitcases, bags, backpacks;
9 Injae Vina Company Limited China Producing garments made of exported wool;
manufacturing and processing toys, paper,
notebooks and cards; execute commercial rights
10 Dong Tai VN International British Virgin Islands Producing garment machinery and equipment;
Company Limited production and trading of garment accessories;
delivery, transportation of garments and consumer
goods
11 Believe Zone Company Korea - Vietnam Producing and trading Polyethelene membranes,
Limited bags and plastic beads; Trade promotion between
Vietnam and foreign countries
12 Global Resources Group China Manufacturing industrial protective clothing (worn
Company Limited Vietnam once)
13 Nam & Co Co., Ltd. Vietnam Making clothes (except for fur); producing
knitting and knitting clothes; trading fabrics,
ready-made garments, footwear and other related
goods
14 Blue Tec Vina Company South Korea Manufacturing and processing plastic molds for
Limited mobile phones and other electronic devices
15 Nam Tai International Vietnam Building factories for rent
Company Limited
16 Global Wrapper Industrial Hong Kong Production of plastic products
Co., Ltd Vietnam
17 Nam Tai International Vietnam Building factories for rent
Company Limited
18 Fantastic International Ltd. Hong Kong Producing all kinds of children's toys
19 Nam Tai International Building factories for rent
Company Limited
20 Daeil Tech Vietnam Co., Ltd. South Korea Storage and Inspection of electronic component
products (Phms for mobile phones)
21 Em Vina Company Limited South Korea Manufacturing and processing film and adhesive
tapes for mobile phones and other electronic
devices; Performing import and export rights and
distribution rights of wholesale and retail
distribution (No wholesale or retail establishment
is established)
22 May Mayfair Company Hong Kong Making garments (except for fur)
Limited
23 Hai Duong Branch - KTC South Korea Store, check and assemble all kinds of rubber,
Electronics VN Co., Ltd. silicone mobile phone components (mobile phone
keyboard, back plate to protect the phone, stand,
456
pads, mobile keyboard pad, mobile phone key
adjustment)
24 HMT Vina Company Limited South Korea Store, check and assemble all kinds of rubber,
silicone mobile phone components (mobile phone
keyboard, back plate to protect the phone, stand,
pads, mobile keyboard pad, mobile phone key
adjustment); Commercial rights
25 LLP Company Limited United Kingdom - Russia Trade
26 Eno Interlining Vietnam Singapore Manufacturing and processing fabric fabrication;
Company Limited Performing commercial rights
27 Hyon Jin Vietnam Co., Ltd. South Korea Producing plastic products;

Producing other products from rubber;


Manufacturing electronic components;
Management consulting activities; Implementation
of export rights, import rights and distribution
rights
28 TianYe Outdoor Company China Manufacturing and processing products
Limited (Vietnam)
Outdoor travel, including: canvas tents, sleeping
bags, sack bags, suitcases.
29 Yura Vietnam Company South Korea Manufacturing and processing: wire
Limited
connection, set of electrical conductors,
containers, terminals for electrical and electronic
devices
30 Pamson Industry Vietnam Hong Kong Producing toy clothes
Co., Ltd.
and accessories of toys; Production of toys and
dolls made of cotton and polyester; Production of
backpacks, children's bags, school bags
31 Kintex Elastic Company Seychelles Republic Producing woven wire
Limited
32 Nam Tai International Vietnam Factory Project - Warehouse G3, G4, G5 belong to
Company Limited batch CN11, CN12 - Eastern subdivision
33 Binh Thanh Production and Vietnam Producing and processing garments
Trading Company Limited
34 Akiflex Vina Company South Korea Manufacturing Panel construction
Limited
35 Nam Tai International Vietnam Construction of factories - warehouses and
Company Limited auxiliary works for lease
36 Nam Tai International Vietnam Construction of factories - warehouses and
Company Limited auxiliary works for lease
37 Innovation Group Company Thailand Production of rubber products
Limited (Vietnam)
38 Hae Sung Chemical Vina Co., South Korea Manufacturing, processing, pressing plastic
Ltd. products for electronic products from pure silicone
resins
39 Wanda Textile Co., Ltd. India - China Production of pillowcases and bed sheets
40 Vietnam Bigfun Leisure China Production of plastic products; Commercial rights
Company Limited
41 Nam Tai International Vietnam Building warehouses - factories and auxiliary
Company Limited works for rent
42 Ducar Company Limited China Production of water pumps,

Pressure washers, generators, portable generators.

457
TAN TRUONG INDUSTRIAL ZONE

GENERAL INFORMATION

Address ▪ Tan Truong Town, Cam Giang District, Hai Duong city

Nam Quang Invesment and Development JSC


▪ Address: Nam Sach IZ, Ai Quoc Ward, Hai Duong
Investor
▪ Tel: (84-220) 3 570 666
▪ Email: namquanghd@gmail.com/ namquang@vidgroup.com.vn
▪ Mr. Huan – Sales Department – (84) 989 768 586 – huannm2@tniholdings.vn
Contact Person
/huan792003@gmail.com

- Land: 45 km from Hanoi, 55 km from Hai Phong


Location - Seaport: 55 km Hai Phong Sea Port, 60 km from Cai Lan – Quang Ninh port
- Airport: 70 km from Noi Bai International Airport; 50 km from Cat Bi – Hai Phong

Priority Sectors for High-tech industry, clean industry, light industry, and supporting
Investment industry.
Investment Area
Restricted Sectors for
Restrict heavy industry, industries affecting the enviroment
Investment

Minimum wage [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019

▪ Start date: 2008


Lease term
▪ End date: 2058

Minimum Lease Area 10,000 m2

Limit for Construction


Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental
Permitted Construction Planning regulation (QCXDVN 01: 2008/BXD)
Rate
▪ Total area: 198.06 ha
Planned area
▪ Total Industrial land: 129.45 ha

Factory Available for Rent NA

In operation
Operation Status

Occupancy Rate and ▪ Occupancy Rate: 100%


Number of Projects ▪ Number of Projects: Over 40

Number of Korean Projects 01 project

Lease fee ▪ Land lease fee: 80 USD/m2

▪ Management fee: 0.35 USD/m2/year


▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee ▪ Water fee: 11,500 VND (~0.5 USD)/m3
▪ Wastewater treatment fee: USD 0.6/m3 for C level; USD 0.45/m3 for B level; USD 0.18/m3
for A level (Excluding VAT)

INFRASTRUCTURE AND FACILITY

Financial institution Maritime Bank, Vietcombank, ACB, Agribank, Techcombank...

Tax service, State finance 13 km to Tax department of Hai Duong province


office 11 km to State Treasury in Hai Duong

Customs Service There is an On- site Customs Office insides Tan Truong IZ
Tan Truong IZ has Inland Container Depot

458
Logistics Nippon Express、Nippon Konpo、MOL Logistics、Sankyu、Konoike、Yusen

Post office TDT express, VNPT, DHL, FedEx, TNT...door-to-door delivery service

Medicare 5km to Hai Duong General Hospital

24/7 security service. The guards of Lai Cach IZ cooperate with the local polices supports to
Police, public security
ensure the security for the whole industrial zone.
Universities, training
4km to Thanh Dong University.
facilities, etc.
The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen,
Recruitment
Hai Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity.

Worker dormitory Housing, villa for experts/ employees are working in the IZ

Worker's child education


8km to Tu Minh preschool.
facility

One-stop service Tan Truong IZ has One-stop service

Road system of centre is 36m wide. Branch road syste, is 24m wide. Street lighting system was
Road Width
installed along the route.
Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic
IT & Tele-communication
capabilities, leased line
Facilities
Telephone: number of line depend on investor’s demand.
Emergency Power
Available
generator

Fire-fighting facility Available

Layout Plan

Location Map

459
Actual View

LIST OF TENANTS

No. Company name Nationality Business line


1 UMC VN Electronic Company Limited Japan Manufacturing, manufacturing and assembling all
kinds of electronic machinery, equipment, parts and
components
2 Iriso VN Electronic Co., Ltd Japan Manufacturing connected parts; connecting parts
with needle tip; connecting parts for cars; Accurate
mechanical and electrical equipment parts
3 Jaguar International Co., Ltd Hanoi Japan Manufacturing and trading in designing,
manufacturing and assembling sewing machines and
spare parts; execute commercial rights
4 Evergreen Vietnam Screw Industry Co., Ltd Taiwan Producing iron shells; stainless steel snail
production; copper snail production; mechanical
5 Japan VSM Production Co., Ltd. Japan Producing garment products
6 Uniden VN Company Limited Japan Producing all kinds of cordless phones and
accessories; types of radio transceivers and parts
7 Hong Tri Precision Company Limited Taiwan Manufacture of connecting machines; Coaxial Cable;
antenna; sublease office
8 Branch of Sankyu VN Co., Ltd. Japan Service of leasing and managing factories,
warehouses, rental machines and equipment
9 Pegasus sewing machine company limited Japan Production of nose overlock industrial sewing
machines; 5-stitch stitch machine; type of sewing
table; sewing table shaft; Commercial rights
10 YAS Real Estate Company Limited Hong Kong Investing in creating offices, factories, warehouses
and other facilities; providing machinery rental and
supporting equipment for offices, factories and
warehouses
11 Hitachi Cable VN Company Limited Japan Manufacturing, processing and assembling all kinds
of wires and related semi-finished products; plastic
beads for wire sheath; sub-lease of offices and
factories; antennas for PC computers
12 Valqua VN Company Limited Japan Producing twisted pads; synthetic plastic pads
13 Chi Hua VN Company Limited Samoa Manufacturing motors; generator; total clock;
automobile motors, chucks; automotive generator;
flywheel sports machine; sports machines;

460
manufacturing, processing and assembling plastic
parts
14 Nishoku Technology VN Company Limited Taiwan Manufacturing plastic components of mobile phones;
plastic components of computers; consumer plastic
products; other plastic products
15 IKKA VN Technology Co., Ltd Japan Manufacturing and processing plastic components
for cars and motorcycles; Plastic components for
office equipment
16 C.P VN Livestock Joint Stock Company - Thailand Production of feed for cattle and poultry
(02 Branches in Hai Duong)
17 Japan Toko Mimtech Co., Ltd. Japan Production and manufacture of precision metal parts
for automatic, automotive, orthodontic systems,
medical and dental instruments, hardware and key
parts, computers
18 Sankyu Logistics (Vietnam) Co., Ltd. - in Japan Transport agency services, freight forwarding,
Hai Duong customs clearance, warehouse management,
warehousing and storage services
19 Mascot VN Co., Ltd. Denmark Producing and processing clothes; building
warehouses and yards; commercial rights
20 Ajinomoto Vietnam Company Japan Building Ajinomoto's products storage and
distribution center manufactured and traded in
Vietnam
21 ICS VN Company Limited Japan Manufacture, process and process metal parts for
cars and electronic devices
22 Brother Vietnam machine limited company Japan Processing, assembling, manufacturing and selling
sewing machines, accessories; repair and resell used
sewing machines; carry out business activities
according to the above areas
23 Sansei VN Co., Ltd. Hong Kong Manufacturing and assembling all kinds of parts and
details; types of molds; restore, repair and maintain
molds; factory lease
24 Showa Valve Vietnam Co., Ltd. Japan Manufacturing, processing and assembling valves,
sieves and other pipeline materials
25 ChangHong Vietnam Engineering Co., Ltd. Seychelles Processing, mold making, plastic and metal
Republic component assemblies; manufacturing and
assembling components or finished products; Printed
and processed plastic product surface
26 Leong Hup Vietnam Company Limited Malayasia Producing food, poultry and aquatic products;
production of raw materials used to produce animal
feed, poultry and aquatic products; Production of
vitamin and mineral mixtures to supplement feed
ingredients
27 Vietnam Zunow Engineering Co., Ltd. Hong Kong Manufacturing, processing and assembling plastic
components, parts and products
28 Nam Quang Investment and Construction Vietnam Embellish the ground for construction of traffic
Joint Stock Company infrastructure system, power supply, water supply,
communication, wastewater treatment ... to attract
investors to build and trade in industrial zones.
29 SBC Vietnam Steel House Joint Stock Vietnam Production of steel structures; corrugated iron
Company
30 Vifon Joint Stock Company Poland - Producing products from rice, starch and starch
Vietnam products; processing food, meat, vegetables;
Production of seasoning powder
31 Minh Phu Steel Joint Stock Company - HD Vietnam Production of rolled steel coils (P / O steel coils),
cold rolled steel coils, galvanized steel coils and steel
box tubes (input materials are produced and
processed from hot rolled coils).
32 USFEED CO., LTD America Production of animal feed, poultry and aquatic
products: 330,000 tons / year
33 ManGo Vietnam Company Limited Japan Manufacturing, processing and assembling molds for
plastic products and plastic products
34 Fuji Seiko Innovation Vietnam Company Japan Manufacturing, processing, manufacturing all kinds
Limited of metal parts and products for automatic office
equipment, automobile industry and other industries
35 ABSFIL Vina Company Limited South Korea Manufacturing filter parts; environmental materials;
consulting and installing waste water treatment

461
systems; research and market development of filters,
waste water treatment materials, waste water
treatment systems; Commercial rights
36 Sansei Vina Company Limited Japan Manufacturing, processing and assembling plastic
components and products; types of molds and seals,
accessories; print letters and pictures on plastic
products; restore, maintain and repair molds; Support
businesses to find customers
37 Jupiter Vietnam Supply Chain Joint Stock Vietnam Warehousing and storage of goods; other support
Company in Hai Duong services related to transport; freight transport by
road; goods support, packaging, loading and
unloading services
38 Super Foam Enterprise INC Anguilla Manufacturing and processing plastic products from
plastic particles
39 Sambound Vietnam Company Limited Hong Kong Production and processing of plastic packaging
products for cosmetic industry (makeup powder,
lotion, eyelash, lipstick, ...); Manufacturing and
processing toys for children (models of plastic toys,
robots, animals, ...).
40 Three-Color Stone Stationery (Vietnam) Co., China Manufacturing and processing: notebooks,
Ltd. envelopes, stationery from paper; file clamps, file
folders and school supplies; pen, pencil of all kinds,
pencil core

462
NAM SACH INDUSTRIAL ZONE

GENERAL INFORMATION

▪ Nam Sach District, Hai Duong Province


Address
Nam Quang Invesment and Development JSC
▪ Address: Nam Sach IZ, Ai Quoc Ward, Hai Duong
Investor
▪ Tel: (84-220) 3 570 666
▪ Email: namquanghd@gmail.com/ namquang@vidgroup.com.vn
▪ Mr. Huan – Sales Department – (84) 989 768 586 – huannm2@tniholdings.vn
Contact Person
/huan792003@gmail.com

- Land: 57 km from Hanoi,


Location - Seaport:56 km Hai Phong Sea Port, 67 km from Cai Lan – Quang Ninh port
- Airport: 65 km from Noi Bai International Airport

Priority Sectors for High-tech industry, clean industry, light industry, and supporting
Investment industry.
Investment Area
Restricted Sectors for
Restricted heavy industry, industries affecting the enviroment
Investment

Minimum wage [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019

▪ Start date: 2003


Lease term
▪ End date: 2053

Minimum Lease Area 10,000 m2

Limit for Construction


In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Height
Residental Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction Rate

▪ Total area: 62.42 ha


Planned area
▪ Total Industrial land: 48.08 ha

Factory Available for Rent ▪ NA

▪ In operation
Operation Status

Occupancy Rate and ▪ Occupancy Rate: 100%


Number of Projects ▪ Number of Projects: 18

Number of Korean Projects 02 projects

Lease fee ▪ Land lease fee: 45 - 66 USD/m2

▪ Management fee: 0.35 USD/m2/year


▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee ▪ Water fee: 11,500 VND (~0.5 USD)/m3
▪ Wastewater treatment fee: USD 0.6/m3 for C level; USD 0.45/m3 for B level; USD 0.18/m3
for A level (Excluding VAT)

INFRASTRUCTURE AND FACILITY

Financial institution Maritime Bank, Vietcombank, ACB, Agribank, Techcombank...

Tax service, State finance


office 6 km to Tax department of Hai Duong province andState Treasury in Hai Duong

Customs Service 13km from Hai Duong Customs Department

Logistics Nippon Express、Nippon Konpo、MOL Logistics、Sankyu、Konoike、Yusen

463
Post office TDT express, VNPT, DHL, FedEx, TNT...door-to-door delivery service

Medicare 10 km to Hai Duong General Hospital

24/7 security service. The guards of Lai Cach IZ cooperate with the local polices supports to
Police, public security
ensure the security for the whole industrial zone.
Universities, training
8 km to Hai Duong University.
facilities, etc.
The labor forces from local and from neighboring provinces (Bac Ninh, Thai Binh, Hung Yen,
Recruitment
Hai Phong, Quang Ninh...). It is easy to find the workers whom you need in the vicinity.

Worker dormitory Housing, villa for experts/ employees are working in the IZ

Worker's child education


8 km to preschool.
facility

One-stop service Nam Sach IZ has One-stop service

Road Width Main road: 16.5 m, other road: 13.5 m

Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic


IT & Tele-communication
capabilities, leased line
Facilities
Telephone: number of line depend on investor’s demand.

Emergency Power generator Available

Fire-fighting facility Available

Layout Plan

Location Map

464
Actual View

LIST OF TENANTS

No. Company name Nationality Business line


1 Co., Ltd. Chyun Jaan Taiwan Producing and trading in products made of
plastic and rubber
2 Haivina Company Limited South Korea Production of sports gloves, industrial
gloves, sports clothes, all kinds of shirts and
sports apparel
3 Baifar Hai Duong Wood Co., Ltd Vietnam China Manufacturing and processing plywood
products. Performing the right to export,
import, and wholesale distribution of goods.
4 AP Packaging Co., Ltd (Hanoi) Thailand Manufacture, print all kinds of cartons,
corrugated carton sheets and hard forms
5 Tinh Loi Garment Company Limited Hong Kong Manufacturing and trading all kinds of
garment products from textile, knitted, wool
and raw materials for textile industry
6 May Ever-Glory Company Limited China Production of scale clothing
7 VN Toyodenso Company Limited Japan Manufacture parts for cars; multi-purpose
parts; Production of ignition coils
8 Viet Tuong Company Limited Samoa Producing carpet type 4m / m; Flame
retardant preparations
9 Aiden VN Company Limited Japan-Hong Manufacturing circuit boards in PCB,
Kong electrical and electronic products; electrical
and electronic components; design, drawing
drawings and CAD and CAM data for molds
of plastic and metal products;
10 Vina Okamoto Company Limited Hong Kong Producing all kinds of shoes, boots and
gloves; raincoats and wind jackets;
Performing commercial rights
11 LFV Metal VN Company Limited Taiwan Producing all kinds of glass products;
aluminum door; aluminum windows; door
push; aluminum tiles
12 First Company - Hai Duong Plastic Chemical Taiwan Production of plastic pipes and PVC, HDPE,
Company Limited PPR connectors
13 Dusco vina steel yarn processing company South Korea Producing steel fibers
14 Nam Quang Infrastructure Development and Vietnam Embellish the ground for construction of
Investment Joint Stock Company traffic infrastructure system, power supply,
water supply, communication, wastewater
465
treatment ... to attract investors to build and
trade in industrial zones.
15 Green Environment Trading Service Co., Ltd Vietnam Industrial waste treatment plant
16 Hong Gia Joint Stock Company Vietnam Fabrication of weaving, dyeing, stretching,
sewing into tulle curtain products
17 Vina Feed Joint Stock Company Vietnam Producing and processing animal feed pellets
18 An Phat Plastic and Green Environment Joint Vietnam Investing production lines according to
Stock Company modern Japanese technology and equipment
to produce high quality plastic packaging

466
PHUC DIEN INDUSTRIAL ZONE

GENERAL INFORMATION

▪ Cam Phuc Town, Cam Giang District, Hai Duong city


Address
Nam Quang Invesment and Development JSC
▪ Address: Nam Sach IZ, Ai Quoc Ward, Hai Duong
Investor
▪ Tel: (84-220) 3 570 666
▪ Email: namquanghd@gmail.com/ namquang@vidgroup.com.vn
▪ Mr. Huan – Sales Department – (84) 989 768 586 – huannm2@tniholdings.vn
Contact Person
/huan792003@gmail.com
- 40 Km from Hanoi Capital
Location - 75 Km from Noi Bai International Airport
- 68 Km from Hai Phong Seaport, 127 km from Cai Lan Quang Ninh Sea Port
Priority Sectors for High-tech industry, clean industry, light industry, and supporting
Investment industry.
Investment Area
Restricted Sectors
Restricted heavy industry, industries affecting the enviroment
for Investment

Minimum wage [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019

▪ Start date: 2003


Lease term
▪ End date: 2053

Minimum Lease Area 1 ha

Limit for Construction


Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residental
Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction
Rate

Planned area ▪ Total area: 82.88 ha

Factory Available for Rent ▪ Total area: NA

Operation Status ▪ In operation

Occupancy Rate and ▪ 100%


Number of Projects ▪ 28 projects

Number of Korean Projects None

Lease fee ▪ Land lease fee: Depending on location

▪ Management fee: 0.35/m2/year


▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee
▪ Water fee: 15,000 VND (~0.64 USD)/m3
▪ Wastewater treatment fee: 5,633 VND (~0.25 USD)/m3

INFRASTRUCTURE AND FACILITY

Financial institution Vietcombank, VietinBank

Tax service, State finance


15km from the nearest State Tax and Finance Agency
office

15km from the nearest Customs Agency


Customs Service
15km from the nearest Inland Container Depot

Logistics 5km from the nearest Logistic Center

Post office 3km from the nearest Mailing Post Office

467
Medicare 3km from the nearest local clinic

Police, public security 2km from the nearest Police Station

Universities, training 15km from the nearest Universites and Training Center + University of Economic and
facilities, etc. Technology, University of Medical/ Hai Duong vocational School

Recruitment Recruitment support service available

Worker dormitory Worker dormitory available within IP

Worker's child education


2km from the nearest Facility
facility

One-stop service 15km from the nearest Hai Duong provincial Facility

Widths of main road system of the IZ are 30m and 23.25m. Branch road’s width is 17.5m. The
Road Width road system in the industrial park is completely asphalted with concrete and is illuminated by
modern high pressure lamps.
The internal telecommunication network is connected from the industrial zone’s switchboard to
IT & Tele-communication factories through the underground cable system to ensure high-speed, uninterrupted transmission
Facilities of information. Other services such as the Internet, mail, newspapers are provided by the postal
service network of Hai Duong province.
The water supply network for firefighting is designed in conjunction with the potable water
Emergency Power
supply network, which is located along the roads. The distance among fire hydrants is 120m -
generator
150m with a diameter of D125mm.

Fire-fighting facility Available

Layout Plan None

Location Map

Actual View

468
469
LIST OF TENANTS

No. Company name Nationality Business line


1 Towada VN Electronic Co., Ltd Hong Kong Manufacturing and trading in manufacturing and
assembling electric and electronic components and
equipment; high-tech digital equipment and
products; machinery, equipment, tools and fixtures
for production, business, manufacture and assembly;
outsource processing of materials, components and
products for the above business activities
2 Brother Vietnam Industrial Company Japan Manufacture all kinds of printers, fax machines,
Limited electronic devices and multi-functions; types of
accessories and spare parts; research and
development activities; repairing and re-exporting
these products to foreign markets
3 Nissei VN Technology Company Singapore Manufacturing plastic lenses; metal parts; molds;
Limited Machining components and mold details
4 Taisei Hanoi Electronic Company Japan-Hong Kong Producing electric wires, sheathed wires and electric
Limited wire sheaths; electric and electronic machinery,
equipment, components; producing all kinds of raw
materials for production of the above-mentioned
products; Commercial rights
5 Matex VN Company Limited Hong Kong Production and assembly of springs, stroke switches
and technical axes
6 Kim Thuy Phuc Company Limited China Production of textile products
7 Atarih Precision Vietnam Co., Ltd. Japan Manufacture precision mechanical stamping parts;
production of molds and mold details; exercise the
right to import and export, wholesale distribution and
retail of registered goods
8 Mizuho Precision Vietnam Co., Ltd. Japan-Hong Kong Manufacturing, trading and assembling all kinds of
injection molds and molds, metal springs, precision
shaft springs for automatic office equipment and
other machinery and electronic equipment; stamping
parts, spare parts and components for other types of
automatic office equipment.
9 Siam Steel VN Company Limited Thailand-Japan Producing, manufacturing and assembling products
from rolled steel; perform stamping, punching,
shaping, bending, cutting, and cutting products of
steel products
10 Kuroda Kagaku VN Company Japan Manufacturing, processing, assembling and selling
Limited parts, details, plastic components for automatic
office equipment and other electrical and electronic
equipment; plastic components used for transport
vehicles; Precision molds and parts for molds.
11 Vinh Han Precision Technology Taiwan Mold manufacturing; mold machining and repair;
Vietnam Co., Ltd. manufacturing, processing and repairing plastic
components; mold parts
12 Viet Nhat Transport Company Japan - Vietnam Building warehouses with a scale of 4,370m2;
Limited - Hai Duong Branch import and export goods delivery and transport
services, and goods loading and unloading charges
13 Posco Vietnam Holdings Company Japan-Korea Producing and processing steel products; Sublease
Limited excess factory built; Carrying out activities of buying
and selling goods
14 Branch of Aureole BCD Company Japan Manufacturing plastic components used in cars and
Limited in electronic components
15 Leo VN Electronics Company Hong Kong Manufacture of high-tech metal parts, parts and
Limited components; pressed metal parts; molds; mechanical
and electronic products
16 Meijitsu Tongda VN Company Japan Manufacturing and processing all kinds of labels and
Limited decals; perform import and export rights and
distribution

470
17 SSK VN Company Limited Japan Manufacture electrostatic brushes; producing decals,
adhesive tapes of all kinds; sponge production;
factory lease
18 Sanyu Seimitsu Vietnam Company Japan-Taiwan Production of electrical and electronic components,
Limited plastic parts and products
19 Fuji Seiko Vietnam Company Hong Kong Manufacture all kinds of shaft, shaft, spring and
Limited screw parts; Other parts, details, components
20 Teikoku VN Company Limited Japan Manufacturing all kinds of components in
photocopiers, fax machines; machining of office
machine parts; Other surface treatment
21 Honwu VN Co., Ltd. Taiwan Manufacturing, processing and processing shoe
boxes; packing box; cans; packing paper, paper
sacks, paper plates, hangers, shoe covers, cartons,
paperboard, lining, foil, gift wrap, paper tray;
products made of paper pulp or paperboard,
sandpaper, paper bags, lock bags and paper.
Producing and trading in plastic products. Produce
and trade user manuals for the above products.
22 Jupiter VN Logistics Joint Stock Japan - Vietnam Trading and providing warehousing and storage
Company services; providing and trading transportation
services
23 Arion Electric Company Limited Japan Production of control equipment, components and
parts
24 Fit VN Company Limited Hong Kong Manufacturing and trading plastic parts and
components for electronic products, office machines,
household appliances and others. Excessive office
and factory leasing. Implementing the right to export
and import and distribute components according to
HS code registered
25 Fuji Chemi Vietnam Company Japan Execute import and export rights and distribution
Limited rights for new chemical and materials products and
synthetic plastics for industrial use
26 Nam Quang Investment and Vietnam Embellish the ground for construction of traffic
Construction Joint Stock Company infrastructure system, power supply, water supply,
communication, wastewater treatment ... to attract
investors to build and trade in industrial zones.
27 Vietnam Lifting Equipment Joint Vietnam Constructing workshops to manufacture, sell, install
Stock Company lifting and lowering equipment, conveying
machinery and equipment for industrial, agricultural,
transportation, mechanical and automation industries
to meet domestic market
28 Truong Phu Joint Stock Company Vietnam Production of telecommunication cables of all kinds

[- This Page is intentionally left blank -]

471
HAI PHONG

472
INVESTMENT ENVIRONMENT IN HAI PHONG

GENERAL INFORMATION

▪ Area: 1,526 km2


Area, Population
▪ Population: 2.09million (2022 statistic)
▪ Located in the Northeastern region of Vietnam.
Geographical Location
▪ Located105 km from Ha Noi.
▪ To the north: Quang Ninh province
▪ To the west: Hai Duong province
Adjacent provinces
▪ To the east: Bac Bo bay
▪ To the south: Thai Binh province
2022 statistic:
▪ GRDP: 365,000 billion VND (14.6 billion USD)
▪ GRDP growth: 12.32%
▪ GRDP per capita: 7,517 USD/year
GRDP
▪ Economic structure:
- Industry - Construction: 53.68%;
- Agriculture. forestry and fishery: 3.61%;
- Service: 36.98%;
- Tax on Goods: 5.73%
2022 statistic:
Industry growth ▪ Industry - Construction growth: 15.56%
▪ Agriculture, forestry and fishery growth: 1.21%
▪ Service growth: 9.06%
▪ Score: 70.76 – ranked 03 out of 63 cities and provinces in Vietnam. (2022)
PCI
▪ Score: 70.61 – ranked 02 out of 63 cities and provinces in Vietnam. (2021)

SOCIAL INFRASTRUCTURE

▪ Roadway:
 National way: QL5, QL10, QL37
 Highway: Ha Noi – Hai Phong, Ha Noi – Quang Ninh
 Highway at the seaside: Quang Ninh – Hai Phong – Ninh Binh
▪ Railway: Ha Noi – Hai Phong
▪ Inland waterway:2,700 km, account for 40% national inland waterway; connect to
almost provinces in the North of Vietnam
▪ Seaway:
 125km long coastline
Transportation  Port city with 35 seaports
 Lach Huyen international deep-water port; have sea freights direct routes
to Europe (33 days), Eastern US (45 days), Western US (25 days), India
(18 days)...
▪ Airway:
 Cat Bi international airport
 Domestic flights to: Da Nang, Pleiku, Buon Ma Thuot, Nha Trang, Phu
Quoc, Ho Chi Minh City.
 International flights to: Incheon (Korea), Osaka (Japan), Bangkok
(Thailand), Singapore.
Hai Phong 1 & 2 Thermal Power Plant located in Tam Hung commune, Thuy
Nguyen district, Hai Phong city:

 Capacity of 4x300MW
Electricity  Total investment of more than 1.2 billion USD equivalent to about
24,000MW
 Producing 7.2 billion kWh electricity each year, providing a large amount
of electricity for the national grid.

473
 The power production cycle of the plant includes 2 main equipments:
boiler and turbine, generator with power transmission system including 2
distribution 220kv and 110kv.

8 water treatment plants in Hai Phong with a total capacity of 380,000 m3/day can
Water serve all kinds of needs with water quality up to WHO standards. Furthermore, in
each rural district, there are small water treatment plants that meet all local needs.
▪ 05 universities and academies, 02 research institutes, 16 colleges, 26 junior colleges
Education
and nearly 60 vocational schools in the city

Medicare ▪12 hospitals and 04 institutes

INVESTMENT CONDITION

Human resource ▪ 50.2% of population are in the working age (2022)

Education level ▪ Trained labor rate: 35% (2022)

▪ The minimum salary for the city is applied as follows:


- Area I: 4.680.000 VND
Salary
▪ The lowest wage for trained labor (including those trained by the enterprises) must
be at least 7% higher than the above referenced basic salary
a. Offers in Economic Zones
- 10% corporate income tax rate for 15 years; Tax exemption for 4 years, 50%
reduction of payable tax for the next 9 years;
- Exemption from land rental to serve investment projects during capital construction
under projects approved by competent authorities, but not exceeding 03 years from
the date of issuance of land lease decisions.
- Tax exemption for goods imported to create fixed assets, raw materials, supplies
and components imported for production of the project.
b. Incentives in industrial zones outside economic zones
- Corporate income tax rate of 17% for 10 years; Tax exemption for 2 years, 50%
Investment incentives reduction of tax payable for the next 4 years;
- Exemption from land rent in accordance with current law
- Tax exemption for goods imported to create fixed assets, raw materials, supplies
and components imported for production of the project.
c. Incentives for Export Processing Enterprise (EPE)
Apply incentives to goods of export processing enterprises, exempt from export tax,
import tax and value added.
- Conditions of preferential treatment:
+ Production projects specialized for export;
+ Register for operation as an export processing enterprise according to the
provisions of law.
Hi-tech industry, seaport - logistics, tourism - trade; focusing on attracting large and
Fields Attracting Investment
high-tech projects that play a leading role and make great contributions to the city.
Hai Phong Economic Zone Authority
▪ Address: 24 Cu Chinh Lan street, Hong Bang district, Hai Phong city.
▪Tel:(+84) 02253.569.170
Contact
▪ Fax :
▪ Email: banquanlykkt@haiphong.gov.vn
▪ Contact person: Mr. Le Trung Kien – Chairman

LIST OF INDUSTRIAL ZONES

No Industrial zone Name Total Area (ha) Occupancy Rate Status


1 Trang Due industrial zone 394.27 97.97% In operation
2 Japan – Hai Phong industrial zone 153 100% In operation
3 MP Dinh Vu industrial zone 234.1 96.97% In operation

474
4 Dinh Vu industrial zone 541.46 96.73% In operation
5 Do Son Hai Phong industrial zone 155.2 96.91% In operation
6 An Duong industrial zone 196.1 83.26% In operation
7 VSIP urban, industrial and trading zone 507.6 76.07% In operation
8 Industrial zone and marine services 132.7 92.6% In operation
9 Nam Cau Kien industrial zone 263.47 54.4% In operation
10 Nam Dinh Vu non-tariff and industrial 1,329.11 29.27% In operation
zone (zone 1)
11 Nam Dinh Vu industrial zone (zone 2) 513.4 20.57% In operation
12 Hai Phong international gateway port 526.81 2.44% In operation
industrial zone
13 Xuan Cau non-tariff and industrial zone 751.95 0% Under legal
14 Tien Thanh industrial zone 410.46 0% Under legal

475
LIST OF PLANNING INDUSTRIAL ZONE TO 2030
No Industrial zone Name No Industrial zone Name
1 Trang Due 3 industrial zone 7 Tien Lang 1 & 2 industrial zone
2 Cau Cuu industrial zone 8 Nam Trang Cat industrial zone
3 Giang Bien industrial zone 9 Cai Trap Island industrial zone
4 An Hoa industrial zone 10 Thuy Nguyen industrial zone
5 Vinh Quang industrial zone 11 An Hung – Dai Ban industrial zone
6 Kien Thuy industrial zone 12 Nam Cau Kien 2 industrial zone

LOCATION MAP OF INDUSTRIAL ZONES AND ECONOMIC ZONE

476
DEEP C INDUSTRIAL ZONES

GENERAL INFORMATION
Address Dong Hai 2 Ward, Hai An District, Hai Phong city
Name of Investor: DEEP C Industrial Zones
Investor ▪ Address: Harbourview Office Tower, 12 Tran Phu, Hai Phong city, Vietnam
▪ Tel: +84 2253836169
▪ Email: info@deepc.vn
▪ Website:www.deepc.vn

Contact Person Koo Hyeji – Head of Korea Desk - +82 10 9792 3302 – hyeji.koo@deepc.vn

Location Adjacent location


- 07 km from city center;
- 05 km from Cat Bi internationalairport;
- Directly connected to Hai Phong Port; 15km to Lach Huyen Deep Sea Port (100,000 DWT
vessel)
- Directly connected to Hanoi – Hai Phong – Quang Ninh – China Border expressway
Investment Sectors Priority Sectors for Renewable Energy, Electronic, Mechanical, Petrochemical.
Investment
Investment Restricted Follow restricted industry list of Hai Phong city
Sectors
Minimum wage Area 01According to Decree 38/2022/ND-CP
Lease term ▪ Start date: 06/05/2009
▪ End date: 06/05/2059
Minimum Lease Area 10,000 m2
Limit for Construction Following regulation of Airport Height Safety Limit
Height

Permitted Construction 60%


Rate
Planned area ▪ Total area: 1,500
▪ Total vacant leasable area: 750
▪ Total area with full infrastructure ready to build factory:400

Factory Available for Rent ▪ 200,000 m2 Ready built Factory from Sub-Developers (BW, KCN, Core5)

Operation Status Ready for lease


Occupancy Rate and 140+ Projects
Number of Projects 50% occupancy

Number of Korean projects 21

Lease fee ▪ Land lease fee: Depend on location, size


▪ Factory lease fee: Depend on location, size

Operating fee ▪ Management fee: to be discussed


▪ Electricity fee: follow EVN rate
▪ Water fee: 20,200 VND/m3
▪ Wastewater treatment fee: to be discussed
▪ Waste treatment fee: to be discussed

477
Layout plan

INFRASTRUCTURE AND FACILITY


Banking service inside Industrial Zone
2km to Custom Agency
Logistic Center within Industrial Zone
Petrochemical Zone within Industrial Zone
Strong cooperation with Local Universities& Vocational school

List of Korean Projects in DEEP C Industrial Zones

No. Name of Company Business line

1 Daesun Vina Co., Ltd Portable Butane gas

2 Dong Nam Petrovina Co., Ltd Insulating oil

3 YTG Vina Co.,Ltd Bobbin Manufacturing

4 INNOREX Vina Co., Ltd Automotive parts

5 Pantra Vina Co., Ltd Rubber parts for automotive

6 Suhil Vina Co., Ltd Optical cable components

7 KFS Vina Co., Ltd Casting & Molding facilities

8 Haewon Vina Co., Ltd Automotive parts

9 PHA VIETNAM Co., Ltd Automotive parts

10 YMP PLUS COMPANY LIMITED Automotive parts

11 Dong Yang Vina Industry Co., Ltd Automotive parts

12 Mi Chang Vietnam Company Limited Automotive parts

13 SEM DIAMOND CO., LTD Diamond precision Tools

14 SEM MICRO CO., LTD Precison tool for semiconductor

15 Ecoluxveko Co., Ltd Lighting Assembly

478
16 G Food Co., Ltd Sesame Oil

17 LS Metal VINA Copper Pipe

479
TRANG DUE INDUSTRIAL PARK

GENERAL INFORMATION
Address Le Loi Commune, An Duong District, Hai Phong City

Sai Gon – Hai Phong Industrial Park Corporation


Investor ▪ Address:Le Loi Commune, An Duong District, Hai Phong City
▪ Tel: (+84.225) 324-2668
▪ Email: info@trangdue-ip.com.vn
▪ Website:trangdue-ip.com.vn

Contact Person Contact Name: Nguyen Thi Hong Hanh


Position: Sales and Marketing Director
Mobile: (+84) 982-990-505
Email: hanh.nguyen@trangdue-ip.com.vn
Location + Distance to Ha Noi Capital: 102km
+ Distance to Hai Phong City Center: 15km
+ Distance to Cat Bi International Airport: 15km
+ Distance to the Ha Noi – Hai Phong Railway station: 15km
+ Distance to Thuong Ly river port: 15km
+ Distance to the Hai Phong seaport: 15km
Investment Sectors Priority Sectors for High-tech fields, Supporting industries, Industries producing
Investment environmentally friendly products, etc.

Investment Restricted Textile Dyeing


Sectors

Minimum wage The minimum wageapplying toRegion 1in accordance with Decree No. 38/2022/ND-CP
issued on 01/07/2022 is VND 4,680,000/person/month
Lease term 50 years:
- Trang Due IP phase I: 2006-2056
- Trang Due IP phase II: 2014-2064
- Trang Due 3 IP: Expected 2023-2073
Minimum Lease Area - Minimum rental area (m2):
+ Land lease: 20,000m2
+ Warehouse for rent: 6,000m2
Limit for Construction + 4.0m +/- 0,1m
Height
Permitted Construction 70% total subleased land area
Rate

Planned area - The total area (m2 or hectare): 1,088ha in which:


- Trang Due Industrial Park Phase 1: 187ha
- Trang Due Industrial Park Phase 2: 214ha
- Trang Due 3 Industrial Park: 687ha
Factory Available for Rent - The area available for rent (m2 or hectare): 687ha
+ Trang Due Industrial Park Phase 1&2: 100% occupied.
+ Trang Due Industrial Park 3: 687ha
+ Warehouse: 12,000m2
Operation Status - Operation status (as of end of 2020):
+ Trang Due Industrial Park Phase 1&2: 401ha (100% active)
+ Trang Due Industrial Park 3: 687ha (Under legal procedures)
Occupancy Rate and - The rate of occupancy % (as of end of 2020):
Number of Projects + Trang Due Industrial Park Phase 1&2: 100% occupied.
+ Trang Due Industrial Park 3: 0% (under legal procedures)
-Number of projects: 112 projects

480
Number of Korean ▪ ~70 projects
projects

Lease fee ▪ Land lease fee:


▪ Factory lease fee: 5 USD/m2/month (not including VAT)

Operating fee ▪ Management fee: 0.5 USD/m2/year


▪ Electricity fee:
+ Peak hours: 2,871 VND/Kwh
+ Normal hours: 1,555 VND/Kwh
+ Idle hours: 1,007 VND/Kwh
▪ Water fee: 21,500 VND/m3 (not including VAT)
▪ Wastewater treatment fee: 13.000 VND/m3
▪ Waste treatment fee:
Layout plan

INFRASTRUCTURE AND FACILITY


Financial institution Distance from the nearest Banking: SHINHAN BANK, WORRIBANK inside the IP (0.5km)
Tax service, State finance Distance from the nearast State Tax and Finance Agency: 5km
office

Customs Service Distance from the nearest Customs Agency: 18km


Distance from the nearest Inland Container Depot: 27km
Logistics Distance from the nearest Logistic Center: 35km
Post office Distance from the nearest Mailing Post Office: 5km
Medicare Distance from the nearest Hospital: 4km
Police, public security Distance from the nearest Police Station: 1.5km
Universities, training 6km
facilities, etc.

Recruitment Support recruitment


Worker dormitory Distance from the nearest Facility: inside the IP (0.5km)
Worker's child education Distance from the nearest Facility: 4km
facility
One-stop service Distance from the nearest Facility: 3km

481
Road Width + Main road: 40m (6 car lanes)
+ Branch road: 23m
Communication Available
Infrastructure of
industrial park

Emergency Power Available


generator

Fire-fighting facility Available

List of enterprises in Trang Due Industrial Zone

No. Name of Company Business line Nationality

1 Tan Huy Hoang Manufactory of foam, foam helmet liner Viet Nam

2 HP 2 Painting Co.,Ltd Producing powder coating, water paint Viet Nam

3 VLC packaging JSC Producing PP woven fertilizer Viet Nam

4 SIVICO JSC Manufactory of high-end packaging and reflective Viet Nam


road marking paint
5 Asia plastic JSC Producing plastic pipe Viet Nam

6 Hai Phong International Fashion Manufactory of shoes and leather products Japan
company
7 EH Hai Phong Viet Nam Co.,Ltd Manufactory of animal feed UK

8 Hoang Nam Co.,Ltd Manufactory of wood chipboard Viet Nam

9 Bucheon Viet Nam Co.,Ltd Manufactory of electrical cable Korea

10 Dongjin Techwin Vina Co,Ltd Manufactory of plastic components, electronic Korea


components, household electronic products and pre-
processed plastic beads
11 Crystal Sweater Viet Nam Co.,Ltd Project on manufacturing shirt products Hong Kong

12 LG Electronic Viet nam Hai Phong Project of high-tech electronic products, automotive Korea
Co.,Ltd electronic components, energy-saving household
goods production…
13 Kansai Felt VN Co.,Ltd Manufactory of components for automotive & Japan
computer drives and other devices, components in
electrical devices
14 Steelflex Co.,Ltd Manufacture and assembly of combined frames, Italia
transmission equipment and electrical components for
interior products
15 Dong Yang Hai Phong Electronics Project on manufacturing electronic products' details, Korea
Co.,Ltd spare parts and plastic components
16 Bluecom Vina Co.,Ltd Manufactory of TV speakers, vibration motor (for Korea
phone), bluetooth headsets
17 Dong Do Electronics Hai Phong Co.,Ltd Project of electronic factory DongDo produces Korea
printed circuit boards for mobile phone, battery
charger for mobile phone and other products
18 Samnec International JSC Manufacture and assembly of electric fans, steam fans Viet Nam

19 Meiko Viet Nam Co.,Ltd Manufactory of plastic components, assembly plastic Japan
sheet and plastic molding for office machinery
equipments
20 Aichi Tokei Denki Viet Nam Co.,Ltd Factory of processing and assembling components, Japan
semi-finished products and finished products of gas
meters, electronic water meters, mechanical water
meters.

482
21 Trang Due transportation JSC Construction and business operation of factories and Viet Nam
warehouses
22 Baoshen Viet Nam Printing Co.Ltd Producing labels and packages, antibacterial and anti- Hong Kong
mildew agents.
23 Insung Hivina Co.,Ltd

24 Kyowa Plastic Industry VN Co.,Ltd Manufactory of plastic products, molds, plastic- Japan
mechanical jigs for electronics, automobiles and other
industrial products.
25 Steel Flower HP Electronics & Project for steel product production Korea
Machinery Co.,Ltd
26 Heang sung Electronics Co.,Ltd Factory of manufacturing and assembling electronic Korea
circuit boards, electronic boards for electronic
products, telephones, IVI and home appliances
27 Heesung Electronics Viet Nam Co.,Ltd Factory manufacturing and assembling components Korea
for automatic positioning liquid crystal modules,
manufacturing induction plates, and automatic
positioning light guide plates
28 Halla Electronics Vina Co.,Ltd Manufacturing components for cell phones and Korea
accessories for cars
29 Comet Viet Nam Co.,Ltd Projects on manufacturing electrical, electronic Korea
components, mechanical and mold
30 Hoang Hai Viet Nam packaging JSC Manufactory of carton packaging Viet Nam

31 Sungwoo Tech Vina Co.,Ltd Manufacturing electronic components Korea

32 Ohsung vina Co.,Ltd Manufacturing accessories for LED screens and Korea
OLED TVs
33 Công Ty TNHH Hansung PTC Vina Korea

34 LG Display Vietnam Haiphong Co.,Ltd Manufacturing and processing plastic OLED screens Korea
for mobile devices, smart watches, tablets, OLED TV
screens
35 HT solar Viet Nam Co.,Ltd Projects on manufacturing batteries and solar panels China

36 WooSung Electronics VN Co.,Ltd Manufacturing electronic components for mobile Korea


phones and motor vehicles
37 HKT Electronics Viet Nam Co.,Ltd Manufacturing components for mobile phones, Korea
components for infotainment systems on vehicles.
38 HKTM Vina Company Manufacturing conveyor belts and factory automatic Korea
machines and providing maintenance services by
conveyors and automatic machines used in factories.
Manufacturing safety fence, automation system, ...
39 Thien Bao Hai Phong Co.,Ltd Construction and business operation of factories Viet Nam

40 HS Color Co.,Ltd Manufacturing components for mobile phones, Korea


components for infotainment systems on vehicles.
41 Ilshintech Việt Nam Co.,Ltd Manufacturing accessories for mobile phones, Korea
printing on adhesive tape products, nylon, board used
for phone screens, printing on electronic components
42 SL Electronics Co.,Ltd Projects on manufacturing washing machine Korea
accessories, refrigerators, motor vehicles
43 DongA-Hwasung Co.,Ltd Project on manufacturing plastic products, processing Korea
plastic molds, processing rubber products, processing
metal molds
44 LG Innotek VNHP Co.,Lyd Manufactory of camera module Korea

45 Seongho Tech vina Co.,Ltd Assembling and processing heat presses used in the Korea
manufacture of electronic products. Assembling and
processing automatic assembly machines for
telephone components and other products
46 EST Vina Co.,Ltd Manufacturing, processing racks, legs, shells ... used Korea
in television and other electronic devices,
manufacturing nail, screws, metal sheet presses
products
47 Products plastics Jingguang Co.,Ltd Manufacturing and processing plastic components for China
electronic products
483
48 Serveone (Viet Nam) Co.,Ltd Warehousing Korea

49 0Kr Ems Viet Nam Co.,Ltd Electronic production Korea

50 LG Chem Engineering Plastics Co.,Ltd Plastic beads production Korea

51 K&P Electronics Việt Nam Co.,ltd Circuit boards for camera modules production Korea

52 Chin Hung Việt Nam Co.,Ltd Manufacturing products from silicon China

53 Seiyo Hai phong Co.,Ltd Plastic components production China

54 Re-tech Hai Phong Co.,Ltd Recycling, processing electronic components US

55 Bao Nam investment development Renting office Viet Nam


services JSC
56 YoungHo Eng Vina Co.,Ltd Renting office Korea

57 Thuan Thien Service International Renting office Viet Nam


Co.,Ltd
58 J2 Engineering Co,Ltd Renting office Viet Nam

59 Bach Thao Duoc Co.,Ltd Pharmaceutical production Viet Nam

60 Groll Plywood Viet Nam Co.<ltd Plywood production China

61 Công ty TNHH SM Tech Việt Nam High technology, metal components Korea

62 Taesung Engineering vina Co.,Ltd Camera components Korea

63 JCV Corp co.,Ltd Fake nails production Korea

64 Tuong Vien Grandpark Co.,Ltd Construction and business operation of factories Viet Nam

65 Central pharmaceuticals No.3 company Pharmaceutical Viet Nam

66 AP-Tech Viet Nam Co.,Ltd Electronic components Korea

67 Yesun Tech Viet Nam Co.,Ltd Gaskets and adhesives production Korea

68 Primzen electronics Co.,Ltd Manufacturing connecting equipment in electronic China


components
69 Power seven Tech JSC Electronic components production China

70 Van Long Co.,Ltd Technical plastic production Viet Nam

71 Dunam Chemistry Vina Co.,Ltd Plastic beads production Korea

72 Goda Intenational Co.,Ltd Electronic components production Taiwan

73 Ourhome Co.,Ltd Food production Korea

484
485
NAM DINH VU INDUSTRIAL ZONE

GENERAL INFORMATION
Address Dinh Vu-Cat Hai Economic Zone, Dong Hai 2 Ward, Hai An District, Hai Phong City,
Vietnam
Sao Do Investment Group JSC
Investor ▪ Address: No. 768B Ngo GiaTu Street, Thanh To Ward, Hai An District, Hai Phong City,
Vietnam
▪ Tel: (+84) 965 469 469
▪ Email: sales@saodogroup.com
▪ Website: Namdinhvu.com/saodogroup.com
Contact Person Name - Position - Mobile: - Email:
[Mrs. Tran Thi To Loan–Deputy Director–(+84) 945226868 – loantt@saodogroup.com]

Location Adjacent location [Cáckhuvựcxungquanh]


- 10 km from Hai Phong city/ 100km from Hanoi the capital;
- 15 km from Cat Bi International airport;
- 0 km from Nam Dinh Vu port which is located inside the industrial park;
- 7km km from Hanoi – Hai Phonghighway/..
Investment Sectors Priority Sectors for - Logistics, warehousing
Investment - Car parts
- Electronics, electrical parts, high technology products,
industrial products supporting high-tech industry
- Mechanism
- Plastic& packaging products
- Oil & gas
- Light industry
Investment Restricted Follow the list of restricted project of Hai Phong city
Sectors
Minimum wage Region 1: VND 4,680,000/monthAccording to Decree 38/2022/ND-CP
Lease term ▪ Start date: 06 May 2009
▪ End date: 06 May 2059
Minimum Lease Area 10,000sqm
Limit for Construction - Factory: 2-3 floors
Height - Office, Commercial & service area: up to 9 floors

Permitted Construction 70%


Rate
Planned area ▪ Total area: 1329ha
▪ Total vacant leasable area: 300ha
▪ Total area with full infrastructure ready to build factory:50ha++

Factory Available for Rent ▪ Totalarea 10,600sqm.


Many tenants inside the industrial park providing a large number of factory for rent
Operation Status ▪ Active/Under Construction/Under Construction and to be completed by {year}/In Land
Clearance Process
Active
Occupancy Rate and ▪ Phase 1 (370ha): 100% occupied
Number of Projects  Phase 2 (960ha): Phase 2.1 (220ha) 80% occupied. Phase 2.2 (280ha) under infrastructure
construction. Remaining one develop in the future
Number of Korean projects ▪6

Lease fee ▪ Land lease fee: USD105/sqm


▪ Factory lease fee: USD4.5-5/sqm/month

486
Operating fee ▪ Management fee: VND 1,400/sqm/month
▪ Electricity fee: Follow EVN price + 1-3% operation fee
▪ Water fee: VND 16,300/m3 + 3% operation fee (~VND 500/m3)
▪ Wastewater treatment fee: VND 12,000/m3
▪ Waste treatment fee: Collected and calculated by Urban Environment Company

Layout plan

INFRASTRUCTURE AND FACILITY [CƠ SỞ HẠ TẦNG]


Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities,
training facilities, etc., Road Width,…
Distance from the nearest banking: 4km
Nearest State Tax & Finance Agency: 15km
Logistics Center: There are many companies doing different kind of logistics inside the Industrial Park such as warehouse for
lease, cold storage, depot, CFS warehouse, parking area, etc.
Distance to nearest Universities: 15km
Road Width: 23 – 34 – 46m
Nam Dinh Vu International Seaport & Liquid Jetties located inside the industrial park saving logistics cost

List of Projects in Industrial Zone

No. Name of Company Nationality Business line

1 Nam Dinh Vu Port Vietnam Seaport Operation


2 Hai Phong Port Services Vietnam Cold Storage & Container yard
3 Pan Hai An Vietnam & Korea Container yard
4 Polyfill Vietnam Plastic Bead (PE, PP)
5 Bac Viet Vietnam Metal processing
6 GLC Taiwan Air purifier system
7 VICO Vietnam Homecare, Bodycare
8 SIVICO Vietnam Traffic Paint
9 Wiseland Hong Kong Packaging
10 Tapetco Vietnam Jet Fuel storage
11 Iteco Vietnam LNG storage
12 Tam Cang Vietnam Container yard
13 PVOil Vietnam Petrol station
14 Thien Luong Vietnam Car parking
15 Hisun China Terrain vehicle assembling
16 Yunjia China PVC film
17 PolyStyrene Taiwan Plastic Bead (EPS, PP, PS)

487
18 Arnova Korea Paint for construction
19 Yoshino Japan Gypsum board
20 JTS Korea Electronics parts
21 BW Industrial Vietnam RBF
22 An Phat Vietnam Plastic Bead (PBAT)
23 TuongVien Group (TVG) Vietnam RBF & BTS Factory
24 Sea Logistics (SLP) Singapore Warehouse for lease
25 Build Up Hong Kong Clothes hanger
26 Greenworks China Gardening tools
27 Allan Logistics Vietnam Warehouse for lease
28 TTC Vietnam Warehouse for sugar
29 Gaw NP Hong Kong RBF
30 JD Property China Warehouse for lease
31 Dong Li China Packaging
32 Viet Phap Steel Vietnam Steel sheet, pipe
33 ESR Singapore RBF
34 Jeil Korea Cold Warehouse, Container Yard
35 Samsung Engineering AMECC Vietnam & Korea Steel Structure
36 Doosan Korea Steel Structure
37 GFA Vietnam Warehouse, Container Yard
38 Fengmang China Sandpaper
39 Hai Phong Paint Vietnam Paint
40 Mitsubishi Estate Japan Warehouse for lease
41 Fine Tech China Metal hand tools
42 Magnetec Germany Magnetic metal coil in automobile
43 RRC Germany High tech battery
44 Robot Grand Pro China Vacuum Cleaner robot
45 Growatt China Electric car charger
46 Vietwood Russia Wood processing

488
TIEN THANH INDUSTRIAL ZONE

GENERAL INFORMATION
Address Tien Thanh and Cap Tien Commune, Tien Lang District, Hai Phong City
Tien Thanh Investment Industrial Zone JSC
Investor ▪ Address: Tien Lang District, Hai Phong City
▪ Tel: +84(225)3588819
▪ Email: info@tienthanhiz.com
▪ Website: tienthanhiz.com.vn

Contact Person Dang Thai Son–Chief Of Industrial Zone Management Board- Mobile Number: 0982388831 –
tienthanhiz.com.vn

Location Adjacent location


- 25 km from Hai Phong center city;95 km from Ha Noi city/ the capital;
- 25 km from Cat Bi airport;
- 45 km from LachHuyendeepwater port;
- 2 km from No.10 Highway; 11km from Ha Noi – Hai Phong Expressway
Investment Sectors Priority Sectors for [Mechanicals; Consume Production; Light Industry; Electronic;
Investment Agricultural Processing;Production of construction materials]
Investment Restricted [Chemical, Battery and Accumulator, Metallurgical, Plating,
Sectors Dying, Paper Production etc. compliance with Decision
No.1338/QD-UBND issued by Hai Phong People Committee]
Minimum wage [4,680,000 VND] According to Decree 38/2022/ND-CP
Lease term ▪ Start date: 27/5/2022
▪ End date:27/5/2072
Minimum Lease Area 1.5 ha
Limit for Construction Please refer to QVCVN 01:2021/BXD based on land plot area, we only regulate the maximum
Height of floor number as follows:
- Industry area: max. of 5 floors
- Administrator area: max.of 5 floors
Permitted Construction Total Industry and administrator area: max. of 70% land plot area
Rate

Planned area ▪ Total area: 410.46 ha


▪ Total vacant leasable area: 289.11 ha
▪ Total area with full infrastructure ready to build factory: 0

Factory Available for Rent ▪ Totalarea: 0

Operation Status ▪ Active/Under Construction/Under Construction and to be completed by {year}/In Land


Clearance Process
[In Land Clearance Process, to be commenced in Q4/2023 ]
Occupancy Rate and
Number of Projects

Number of Korean projects

Lease fee ▪ Land lease fee:


▪ Factory lease fee:

489
Operating fee ▪ Management fee:
▪ Electricity fee:
▪ Water fee:
▪ Wastewater treatment fee:
▪ Waste treatment fee:

INFRASTRUCTURE AND FACILITY


Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities, training
facilities, etc., Road Width,…
Bank List:
Agribank- 3.7km
Lienviet Post Bank: 4.1km
VIETNAM PROSPERITY BANK: 4.3 km
Tien Lang State Tax Agency:3.7km
Logistic Center: 28km
Education Facilities:
Viet Nam Maritime University25.7 km
Hai Phong University16km
Vocational College≈12km

490
[- This Page is intentionally left blank -]

491
HA NOI

492
INVESTMENT ENVIRONMENT IN HANOI

USD/VND 23.510

GENERAL INFORMATION
Area 3360 km2
Population 8,435 million people (2022)
▪ Hanoi is located in Red River Delta region.
Geographical
▪ Bac Giang, Bac Ninh Province to the East; Hung Yen Province to the South East; Vinh Phuc Province to
Location
the North, Ha Nam Province to the South; Phu Tho and Hoa Binh Province to the West.
Adjacent provinces
2022 statistic:
▪ Nominal GRDP (billion VND): 1.196.000 (50,93 billion USD)
▪ Real GRDP (billion VND):
▪ GRDP growth: 8,89%
GRDP ▪ GRDP per capita (million VND/year): 141,80 ( USD)
▪ Economic structure:
- Industry - Construction: 24,04%
- Agriculture. forestry and fishery: 2,08%
- Service: 63,22%
▪ Industry - Construction growth: 7,74%
Industry growth ▪ Agriculture, forestry and fishery growth: 2,58%
▪ Service growth: 10,06%
Import turnover (billion USD): 40,93
Import - Export
Export turnover (billion USD): 17,10 (Growth rate: 0,103)
PCI 66.74
Ranking 20
SOCIAL INFRASTRUCTURE
▪ Roadway: National Road 1A from North To South, National Road 2 to Ha Giang, National Road 3 to Bac
Kan, Cao Bang, National Road 5 to Hai Phong, the new Hanoi-Hai Phong Expressway; National Road 18 to
Quang Ninh, National Road 6 and 32 to Southwest run through the City; Highway Hoa Lac- Hoa Binh
(newly completed); Highway Phap Van- Cau Gie (Ha Nam)
▪ Railway: Hanoi is the arrival and departure point for many Vietnam Railways and one trans-national
Transportation
railway to Beijing, China and to Kunming, China. It also has Cat Linh- Ha Dong elevated railway
constructed and under testament.
▪ Waterway: A large system of river passes through the City, including Hong, Day, Duong To Lich, Kim
Nguu, Lu, Ca Lo, Nhue River. 2 hours from Hai Phong Seaport and Cai Lan – Quang Ninh Seaport by car
▪ Airway: Noi Bai International Airport 45 km to the North
▪ 7 transformer stations and power lines of 200kW and 500kW, 32 transformer stations of 110kV and other
Electricity
lower-voltage wires…
Water ▪ 18 water supply plants with capacity of 4,000 to 98,000 m3 per day
Education &
▪ 80 universities, colleges; 182 high schools; 320 vocational centers; 113 scientific research departments
Training
▪ 94 hospitals and medical centers; 577 clinics in villages, districts; 18 Health & Medicine research
Medicare
Institutions.
INVESTMENT CONDITION
Human resource 68,5% of population are in the working age (2022)
Education level Trained labor rate: 72,23% (2022)
Salary ▪ The minimum salary for the province is applied as follows:

493
- Area I (4,680,000 VND/month): Ba Dinh, Bac Tu Liem, Cau Giay, Dong Da, Ha Dong, Hai Ba Trung,
Hoan Kiem, Hoang Mai, Long Bien, Nam Tu Liem, Tay Ho, Thanh Xuan, Gia Lam, Dong Anh, Soc Son,
Thanh Tri, Thuong Tin, Hoai Duc, Thach That, Quoc Oai, Thanh Oai, Me Linh, Chuong My Districts and
Son Tay Town
- Area II (4,160,000 VND/month): Ba Vi,, Dan Phuong, Phu Xuyen, Phuc Tho, Ung Hoa and My Duc
Districts
- Area III (3,640,000 VND/month): N/A
- Area IV (3,250,000 VND/month): N/A
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages
paid to employees working under employment contracts)
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
Investment
▪ Incentives from the province:
incentives
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
▪ Prioritized projects:
- Developing selectively some industries, which are highly beneficial and use high-technologies; eco-civic
Fields Attracting agriculture and new villages; high quality human resources and science-technology strength for the needs of
Investment Hanoi and nation’s development
- Developing Hanoi to become high quality center of services of the Northern Vietnam, national and
international area
Hanoi attracts 1,692 million USD of FDI in 2022.
Investment Of which, 365 new projects were registered with a capital of 233 million USD; there were 202 additional
attraction situation projects to increase investment capital with an increase of 834 million USD; Foreign investors contributed
capital and bought shares 388 times with a capital of 625 million USD, up 83.8%.

Map

494
Hanoi Investment Promotion Center

Contact ▪ Address: No. 16, Cat Linh Street, Hanoi, Viet Nam

▪ Tel: (84-24) 926 3455/926 3479

495
LIST OF INDUSTRIAL ZONES IN HANOI

No Industrial zone Name Total Area (ha) Occupancy Rate Status


1 Hoa Lac Hi-Tech Park 1,586 40% In Operation
2 Quang Minh I Industrial Zone 407 100% In Operation
3 Quang Minh II Industrial Zone 344 40% In Operation
4 Hanoi Southern Supporting Industrial 76.92 30% In Operation
Park
5 Phu Nghia Industrial Zone 170 100% In Operation
6 Thach That- Quoc Oai Industrial Zone 155 100% In Operation
7 Nam Thang Long Industrial Zone 260.87 80% In Operation
8 Thang Long Industrial Zone 302 100% In Operation
9 Sai Dong B Industrial Zone 47.3 100% In Operation
10 Noi Bai Industrial Zone 114.1 100% In Operation
11 Hanoi- Dai Tu Industrial Zone 40 N/A Transferred into Urban
Zone
12 Cong vien cong nghe industrial park 36 37% Clearing Ground
13 Sach Soc Son Industrial Zone 203,8 1% Clearing Ground

HANOI’S LOCATION MAP OF INDUSTRIAL ZONES

496
HOA LAC HI- TECH PARK

GENERAL INFORMATION OF INDUSTRIAL ZONE

Address 29Km, Thang Long Highway, Thach That District, Hanoi

Hoa Lac Hi-tech Park Management Board, Ministry of Science and Technology (MOST
▪ Address: Km29, Thang Long Highway, Thach That, Hanoi, Viet Nam
▪ Tel: (84-246) 3 269 295
Investor
▪ Fax: (84-246) 3 269 290
▪ Website: www.hhtp.gov.vn
▪ Email: info@hhtp.gov.vn
Mr. Nguyen Hieu - Vice Director, International Relations and Investment Promotion Department
Contact Person Mobile: (84) 912 682 766
Email: hieunt@hhtp.gov.vn; hieuhhtp@gmail.com
▪ 30 km to Hanoi
▪ 47 km to Noi Bai International Airport
Location
▪ 156 km to Hai Phong Port; 193 km to Cai Lan Port
▪ Km29, Thang Long Highway, Thach That, Hanoi, Viet Nam
Investment Biotechnology, Information technology, New material technology and Automation
prioritized technology, regulated in Decision 66/QĐ-TTg dated November 25, 2014 and
Sectors Decision 13/2017/QĐ-TTg dated April 28, 2017
Investment Area
Investment
Restricted N/A
Sectors

Minimum wage [Area 2] According to Decree 90/2019/NĐ-CP dated 15th November 2019

Lease term ▪ 70 years for projects on prioritized sectors; 50 years for other projects

Minimum Lease
3000m2
Area
Limit for
1-7 Floor (s)
Construction Height
Permitted
40%-60%
Construction Rate
▪ Total area: 1586 ha
Planned area
▪ Total vacant leasable area: 673 ha [1065 ha, trong đó đã cho thuê 392 ha (chiếm 36,8% diện tích)]
Factory Available Currently, the Park has no factory available for rent. The Management Board has plan to build factory
for Rent for rent soon

Operation Status In Operation

Occupancy Rate
Occupancy Rate: 40%
and Number of
Number of project: about 94
Projects
Number of Korean
04 companies
Projects
▪ Land lease fee: 70-90USD depending on location
Lease fee ▪ Infrastructure lease: 50-60 USD/m2/up to 2060 (not including 10% VAT)
▪ Factory lease fee: N/A
▪ Management and Infrastructural Maintenance fee: 0.8 USD/m2//year
▪ Electricity fee: as regulated by the Government (see Appendix)
Operating fee ▪ Water fee: 11,615VND/m3 (~0.5 USD/m3)
▪ Wastewater treatment: Water treatment factory is already constructed recently, and the fee is issued
in 2020.

INFORMATION OF INFRASTRUCTURE AND FACILITY

497
Financial institution 7-8 km to local bank branch of Agribank, BIDV...

Tax service, State 11 km to Tax Department and State Treasury of Thach That district
finance office The Management Board is working with

Customs Service Hoa Lac Customs Office is located in the High Tech Park

There are some logistics serivce provider operating inside the High Tech Park such as Yusen Logistics,
Logistics
Nippon Express,...

Post office 11 km to Thach That Post office

9 km to Thach That General Hospital; a new hospital will be built in the General Service Area for
Medicare
workers, experts,..
Police, public
Hoa Lac High-tech Police Station is located within the High Tech Park
security
Universities, Many new universities and technology institute are built/relocated in the Park, such as FPT University,
training facilities, Vietnam-Japan University (of Vietnam National University), University of Science and Technology
etc. of Hanoi,… in order to supply high-quality human resource on Science/Technology
Available and plentiful, as Hanoi is the education hub of Northern Vietnam and many top institutes of
Recruitment
technology are located nearby the Park.

Worker dormitory There is a general service area for workers, experts and administrative staffs of the Park

Worker's child
Available in the General Service Area
education facility
According to Decree No. 74/2017 / ND-CP, The Management Board is allowed to apply the one-stop
mechanism in handling administrative procedures under the authority of the Management Board. The
"one-stop-shop" mechanism is applied in handling administrative procedures under the authority of
other state management agencies and other specialized agencies in the fields of investment and
One-stop service
registration of business, land use, construction, labor use and other fields.
The Management Board is the leading and coordinating agency with state management agencies and
relevant professional agencies in handling administrative procedures under the "one-stop" and "one-
stop shop" mechanism. information

Road Width Lang- Hoa Lac Highway: 6 lanes, 140m wide

Communication
Communication system (telecommunication, internet,..) is provided by VNPT Group with a capacity
Infrastructure of
of 300,000 head numbers.
Industrial Zone
Emergency Power
Available
generator

Fire-fighting facility Available

498
Layout Plan

Location Map

Actual View

499
LIST OF PROJECTS IN HOA LAC HI-TECH PARK

No. Company Name Functional Nationality Business line


Area
1. Vietnam Joint Stock Commercial Bank R&D Vietnam Bank information technology
For Industry And Trade (Vietinbank) development training center
2. National Institute Of Information And R&D Vietnam High-tech information and
Communications Strategy- Ministry Of communication center.
Information And Communications.
3. Directorate For Standard, Metrology R&D Vietnam Center of measurement
And Quality
4. Hti- Science Union Of High Tech R&D Vietnam Research, development and testing of
Telecommunications new space equipment, materials and
satellite image processing.
5. Nissan Techno Vietnam Co., Ltd. R&D Japan Research on automotive engine
6. National Satellite Center R&D Vietnam Building material facilities for the
development of space satellite
technology
7. Hanoi Department Of Science And R&D Vietnam Technology transfer and research center
Technology
8. Institute Of Functional Foods R&D Vietnam Research on the application and
implementation of advanced science and
technology in biotechnology, food,
functional foods, biomedical, cosmetics
and medicinal materials.
9. Vietnam Institute Of Science And R&D Vietnam
Technology
10. Government Cipher Committee R&D Vietnam Building CNC infrastructure for
National Network Monitoring Center,
National CA Center and CHIP
Technology Development Research
11. Institute Of Technology Application, R&D Vietnam - Providing a system of core transfer
Ministry Of Science And Technology centers and open-transfer research
centers in a number of potential
technological fields such as electronics,
automation, new materials,
biomedical, ...
- Supporting commercialization of
products after research;
12. Dt&C Vina Jsc. R&D South Korea - Studying electromagnetic
compatibility and electrical safety for
products, electrical and electronic
equipment and other testing methods.
- Providing testing services on
electromagnetic field compatibility and
electrical safety for electrical and
electron

500
13. Vietnam - Korea Institute Of Science R&D Vietnam,
And Technology Korea
14. Viettel Military Telecommunications Center Area Vietnam Viettel Hi-tech center
Group
15. Vietnam Diamond Media Jsc. Center Area Vietnam Data center and customer service
(project leasing area at the General
Service Center)
16. Viettel - Cht Co., Ltd Center Area Vietnam Data storage
17. Vietnam Internet Center Center Area Vietnam Internet center
18. Vietnam Post And Telecommunications Center Area Vietnam Supporting the needs of
Group telecommunications - information
technology services at Hoa Lac Hi-Tech
Park
Controlling the entire
telecommunication-information
technology network in the west of
Hanoi capital
19. Viettel Military Telecommunications Center Area Vietnam Office
Group
20. Hoa Lac Nasia Jsc. Center Area Vietnam Production of intelligent warning and
monitoring devices
21. Vietcombank Center Area Vietnam Banking services
22. Southeast Asia Commercial Joint Stock Center Area Vietnam CNC center
Bank
23. Financial And Enterprise Development Center Area Vietnam Hotel services
Jsc.
24. Ministry Of Finance Center Area Vietnam Office
25. Fpt Software Hanoi Co., Ltd. Software Park Vietnam Manufacturing and trading in software
26. C.E.O Investment Jsc. Software Park Vietnam Building offices for software
enterprises.
27. Tinh Van Technology Jsc. Software Park Vietnam Manufacturing and trading software
28. Vietnam Diamond Media Jsc. Software Park Vietnam Outsourcing and customer service
29. Bkav Jsc. Software Park Vietnam Manufacturing network security
software
30. Hoa Lac High-Tech Park Development Software Park Vietnam Investment and trading in technical
Co., Ltd infrastructure
31. Misa Jsc. Mixed Zone N/A Researching and developing computer
software and manufacturing
information-telecommunications
products.
32. Togi Real Estate Financial Investment Mixed Zone Vietnam Educations
Jsc.
33. Financial And Enterprise Development Mixed Zone Vietnam Establishment of trade and service
Jsc. center area
34. Hoa Lac Xanh Jsc. Mixed Zone Vietnam Restaurant
35. International Education Investment Mixed Zone Vietnam Education Department
Management Jsc.
36. Embedded System Development Jsc. Mixed Zone Vietnam Embedded system
37. Twitter Beans Coffee Jsc. Mixed Zone Vietnam Restaurants, convenience stores, fast
food and coffee shops
38. Hoa Lac High-Tech Park Development Mixed Zone Vietnam Introducing and trading furniture with
Co., Ltd high applicability.
39. Fpt University Education Vietnam University
40. C.E.O Investment Jsc. Education Vietnam Training center
41. Vietnam Institute Of Science And Education Vietnam University
Technology
42. Hanoi Department Of Industry And Education Vietnam Training center
Trade
43. Van Lang University Education Vietnam University
44. H.P.T Foam Crete Joint Stock Company Hi-Tech Vietnam Researching new materials technology,
Industrial Park producing HPT-2001 chemicals,

501
installing lightweight concrete
aggregate gas production line,..
45. Noble Vietnam Electronic Co., Ltd. Hi-Tech Japan Electronic components and devices,
Industrial Park integrated control circuits, industrial
robots.
46. Vietnam Oe Tek Group Co., Ltd Hi-Tech Taiwan Manufacturing and assembling optical
Industrial Park cable connector.
47. Vietnam Export And Construction Hi-Tech Vietnam Infrastructure construction and trading
Corporation Industrial Park (34.5ha)
48. Thuan Phat Imoso Jsc. Hi-Tech Manufacture phones and electronic
Industrial Park boards.
49. Viet Nam - Korea Medical Hi-Tech Vietnam, South Manufacturing medical equipment;
Corporation (Vikomed) Industrial Park Korea research and development center for
technology transfer
50. Fc Hoa Lac Technology Co., Ltd Hi-Tech Vietnam Manufacturing precision mechanical
Industrial Park products and high-class heat treatment.
51. Medlac Pharma Pharmaceutical Hi-Tech Italy Producing antibiotics
Manufacturing Co., Ltd Italy Industrial Park
52. Thanh Ha Jsc. Hi-Tech Vietnam Producing probiotics
Industrial Park
53. Fpt Hoa Lac High-Tech Park Hi-Tech Vietnam Infrastructure business investment
Development Co., Ltd Industrial Park (225.5ha)
54. Mobile Telecom Infrastructure And Hi-Tech N/A
Technical Services Corpartion Industrial Park
55. Vnpt Technology Hi-Tech Vietnam Manufacture of telecommunication
Industrial Park equipment
56. Eco Energy Jsc. (Vietnam Green Energy Hi-Tech N/A Producing telecommunication products,
Co., Ltd) Industrial Park field cables; Producing solar batteries
57. Viettel Military Telecom Group Hi-Tech Vietnam Produce smart card
Industrial Park
58. Vinalines Logistics Vietnam Jsc. Hi-Tech Vietnam Bonded
Industrial Park
59. Felix Vietnam Jsc. Hi-Tech Vietnam Manufacturing precision mechanical
Industrial Park products and high-class heat treatment.
(Phase 2 of the FC Company Project)
60. Viettel Military Telecom Group Hi-Tech Vietnam Manufacturing telecom equipment, IT
Industrial Park and Viettel CNC products
61. Biospring Hoa Lac.,Jsc Hi-Tech Vietnam Building Probiotics Biotechnology
Industrial Park Research Functional Area for
applications in animal husbandry,
agriculture, food and pharmaceuticals
62. Evn Hanoi Hi-Tech Vietnam Electrical engineering services, manage
Industrial Park and grid operation
63. Sao Viet Jsc. Hi-Tech Vietnam Producing solar panels
Industrial Park
64. Sds Industrial Co., Ltd Hi-Tech South Korea Manufacture piezoelectric pump and
Industrial Park graphite sheet for electronic products
65. Viet Chuan Jsc. Hi-Tech Vietnam Researching and applying CAD / CAM
Industrial Park / CNC technology to produce high-
precision mold products
66. Htmp Vietnam Mechanical Co., Ltd Hi-Tech Vietnam Mold manufacturing factory with
Industrial Park advanced technology and high accuracy
67. Hanoi Customs Department Hi-Tech Vietnam Headquarters of Ha Tay Customs
Industrial Park Department
68. Cvi Cosmetic Pharmaceutical Jsc. Hi-Tech Vietnam -Technology transfer; development and
Industrial Park production of nano-technological
products, extraction and transformation
technologies to enhance traditional
herbal values
- Producing medicinal products and
functional foods and cosmetics of high
economic value
69. Hanwha Techwin Co., Ltd Hi-Tech South Korea Manufacturing parts and components of
Industrial Park aircraft engines and industrial turbine
gas engines

502
70. Kannametal Singapore Pte Ltd And Hi-Tech Singapore Development and production of cutting
Shinki Special Tool Co., Ltd Industrial Park tools
71. Nidec Corporation Hi-Tech Japan Developing, manufacturing and trading
Industrial Park brushless DC motors
72. Nidec Corporation Hi-Tech Japan Developing, manufacturing and trading
Industrial Park small-sized reducers with high accuracy
73. Kova Paint Co., Ltd Hi-Tech Vietnam Research and produce high-class,
Industrial Park environmentally friendly nano paint
74. Asia Industrial Technology Jsc. Hi-Tech Vietnam Producing high-quality electrical
Industrial Park equipment
75. Vinsmart Research And Manufacture Hi-Tech Vietnam Constructing a smart electronics factory
Jsc. Industrial Park
76. Vinaconex Advanced Compound Stone Hi-Tech Vietnam Producing high-class paving stone.
Jsc. (Vicostone) Industrial Park
77. Style Stone Jsc. Hi-Tech Vietnam Production of artificial high quality
Industrial Park paving stones
78. Vietnam Stone Processing Jsc. Hi-Tech Vietnam Producing interior stone
Industrial Park
79. Vinaconex Glass Fiber Reinforced Pipe Hi-Tech Vietnam Producing glass fiber reinforced pipe
Jsc. Industrial Park
80. Hit High Technology Development Jsc. Hi-Tech Vietnam Software technology, electronics and
Industrial Park telecommunications, information
technology.
81. Hti High-Tech Production Science And Hi-Tech Vietnam Software technology, electronics and
Technology Union Industrial Park telecommunications, information
technology.
82. Vina-Sanwa Co., Ltd (Joint Venture Hi-Tech Vietnam, Manufacture of fireproof doors
Between Vinaconex And Sannwa- Industrial Park Japan
Holdings Corp Japan)
83. State Bank Of Vietnam Hi-Tech Vietnam Office
Industrial Park
84. Vietnam Construction And Import - Hi-Tech Vietnam Infrastructure business (277ha)
Export Joint Stock Corporation Industrial Park
(Vinaconex)
85. A&A Green Phoenix Jsc. Hi-Tech N/A Manufacturing large-scale quartz slabs
Industrial Park using polymer-squeezed organic
adhesive in vacuum environment, with
thermal phase with the most advanced
technology today producing CNC
products
86. Smart Energy Management Jsc. Hi-Tech N/A Producing and trading smart electronics,
Industrial Park capable of transmitting data with
UART, RS232 / 485 interfaces
87. Gia Phat Hoa Lac Entertainment Service Recreation Vietnam
Jsc. And Sport
Zone

503
QUANG MINH I INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

Address ▪ Me Linh district, Hanoi

Nam Duc Investment and Development Infrastructure Co.,Ltd


Investor ▪ Address: Quang Minh Industrial Zone, Quang Minh Town, Me Linh Dist., Hanoi City
▪ Tel: (84-24) 3 248 4282 Fax: (84-24) 3 813 4514

Contact Person N/A

▪ 18km to Hanoi Center


▪ 10 km to Phuc Yen Station
Location ▪ 110 km to Hai Phong port
▪ 4 km from Noi Bai Airport

Investment priorities ▪ Electronics, high technology industry


Sectors ▪ Eco-friendly industry
Investment Area
Investment Restricted
Polluted Industries
Sectors

Minimum wage [Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019

Lease term N/A

Minimum Lease Area N/A

Limit for Construction


N/A
Height
Permitted Construction
N/A
Rate
▪Total area: 407 ha
Planned area
▪ Total vacant leasable area: 20 ha

Factory Available for Rent ▪ Currently, the IZ does not have factory available for rent

Operation Status ▪ In operation

Occupancy Rate and ▪ Occupancy Rate: 100%


Number of Projects ▪ Number of Projects: 98

Number of Korean Projects 32 companies

▪ Land lease fee: 120 USD/m2


Lease fee
▪ Building lease fee: 2.0 – 2.5 USD/m2/month
▪ Management fee: 0.3 USD/m2/year
Operating fee ▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: ~ 0.6 USD/m3

INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Vietcombank, Maritime Bank, ACB, Agribank, Techcombank have their branches near the ID

Tax service, State finance


10 km to Tax Department and State Treasury of Me Linh District
office

Customs Service 9 km to Bac Thang Long Industrial Zone Customs Office

Various fast and convenient means:


▪ Road (many national roads across for domestic transportation);
Logistics ▪ Sea (Haiphong Seaport (via Hai Phong- Hanoi Expressway), Cai Lan Port, Cua Ong Seaport of
Quang Ninh (via Hanoi- Ha Long High Express way);
▪ Air: Noi Bai Airport

504
Post office 8.5 km to Me Linh Post Office

17 km to Me Linh General Hospital, also, there are many central, national hospitals in Hanoi
Medicare
Urban Area.

Police, public security 10 km to Me Linh Police Station

Universities, training
There are many universities, colleges and intermediate vocational training in various fields.
facilities, etc.
Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational
Recruitment
schools of all sectors.

Worker dormitory Available dorms for workers and administrative staffs.

Worker's child education


Available
facility

One-stop service 10 km to Me Linh People’s Committee, which provides one-stop service

▪ Central/main road: 36 m wide


Road Width
▪ Local/ branch road: 24 m wide
Communication
Reach international standards, adapt well with communication needs. Underground optical cable
Infrastructure of Industrial
system is directly connected to the fence of each enterprise.
Zone
Emergency Power
Available
generator

Fire-fighting facility The system reaches national standard, as one fire hydrant is installed every 120m

Layout Plan

Location Map

505
Actual View

506
QUANG MINH II INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

Address ▪ Me Linh district, Hanoi

Hop Quan Investment Company-Taiwan


▪ Address: Quang Minh II Industrial Zone, Me Linh District, Hanoi
Investor
▪ Tel: (84-24) 6260 5786/(84-24) 6260 5788
▪ Fax: (84-24) 6260 5788

Contact Person N/A

▪ 18 km to Hanoi Center; 10 km to Phuc Yen Station


▪ 110 km to Hai Phong Port; 120 km to Cai Lan Dêp Port
▪ 03 km to Noi Bai Airport
Location
▪ To the North of North Thang Long- Noi Bai Expressway and Hanoi- Lao Cai Railway, at the
head of National Road 18 to Hai Phong Port and Quang Ninh- Cai Lan Deep Port, which creates
favorable condition for transportation

Investment Area N/A

Minimum wage [Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019

Lease term N/A

Minimum Lease Area N/A

Limit for Construction


Height
N/A
Permitted Construction
Rate

Planned area ▪ Total area: 344ha

Factory Available for Rent Currently, the IZ does not have factory available for rent

▪ Management fee: 0.4 USD/m2/year


Operation Status ▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: ~0.6 USD/m3
Occupancy Rate and ▪ Rate of Occupancy: 40%
Number of Projects ▪ Number of projects: 35

Number of Korean Projects 01

▪ Land lease fee: 120 USD/m2


Lease fee
▪ Buidling lease: 2.0 – 2.5 USD/m2/month
▪ Management fee: 0.4 USD/m2/year
Operating fee ▪ Electricity fee: as regulated by the Government
▪ Water fee: ~0.6 USD/m3

INFORMATION OF INFRASTRUCTURE AND FACILITY

Local bank branches of Vietcombank, Maritime Bank, ACB, Agribank, Techcombank are located
Financial institution
nearby the IZ
Tax service, State finance
10 km to Tax Office and State Treasury of Me Linh District
office

Customs Service 9 km to Bac Thang Long Industrial Zone Customs Office

Various fast and convenient means:


▪ Road (many national roads across for domestic transportation);
Logistics ▪ Sea (Haiphong Seaport (via Hai Phong- Hanoi Expressway), Cai Lan Port, Cua Ong Seaport of
Quang Ninh (via Hanoi- Ha Long High Express way);
▪ Air: Noi Bai Airport

507
Post office 5km to Me Linh District Post Office, 2 km to Quang Minh Post Office

Medicare 13 km to North Thang Long Hospital, Dong Anh District, 15 km to Hanoi E Hospital

Police, public security 10 km to Me Linh Police Station

Universities, training
There are many universities, colleges and intermediate vocational training in various fields.
facilities, etc.
Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational
Recruitment
schools of all sectors.

Worker dormitory A dorm of 27.8 ha for over 10,000 workers and specialists with park and social services.

Worker's child education


Available
facility

One-stop service Provided by Me Linh People’s Committee.

Main road: 36 m wide


Road Width
Branch road: 24 m wide
Communication
Infrastructure of Industrial Modern and standardized telecommunication system to meet the needs of investors
Zone
Emergency Power
N/A
generator

Fire-fighting facility The system reaches national standard, fire hydrants are installed in domestic road of the IZ

Layout Plan

Location map

Actual View

508
509
HANOI SOUTHERN SUPPORTING INDUSTRIAL PARK

GENERAL INFORMATION OF INDUSTRIAL ZONE

Address ▪ Phu Xuyen district, Hanoi

N&G Development and Investment Corporation


▪ Address: No. 20, Mai Anh Tuan St., Dong Da Dist., Hanoi City
Investor
▪ Tel: (84-24) 3 784 6045 Fax: (84-24) 3 784 6043
▪ Email: sales@ngcorp.com.vn

Contact Person Contact person: Mr. Tran Phuong Lam – Sales Department – (84) 90 456 8688

▪ Land: 30 km to Hanoi Center; 04 km to Phuc Yen Station


Location ▪ Seaport: 85 km to Hai Phong Port
▪ Airport: 60 km to Noi Bai Airporrt
Electronic supporting industry; mechanical precision industry;
Investment prioritized
Automobile supporting industry; high tech industry, leather
Sectors
Investment Area shoe supporting industry, textile supporting industry

Investment Restricted Sectors N/A

Minimum wage [Area 2] According to Decree 90/2019/NĐ-CP dated 15th November 2019

Lease term ▪ 70 years for projects on prioritized sector; 50 years for other projects

Minimum Lease Area N/A

Limit for Construction


N/A
Height
Permitted Construction
N/A
Rate
▪ Total area: 76.92 ha
Planned area ▪ Total industrial land area: 52 ha
▪ Total vacant leasable area: 50 ha

Factory Available for Rent Currently, the IZ has no factory available for rent

Operation Status In Operation

Occupancy Rate and Occupancy Rate: 30%


Number of Projects 2 projects
Number of Korean
None
Projects
▪ Land lease fee: 140 – 180 USD/m2/50 years to 70 years
Lease fee
▪ Factory lease fee: 2 – 3 USD/m2/month
▪ Management fee: 0.3 – 0.7 USD/m2/year
Operating fee ▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: ~0.6 USD/m3

INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Bank branches of VDB, AgriBank are located nearby.

Tax service, State finance


3.5 km to Phu Xuyen Tax department; 5 km to Phu Xuyen State Treasury
office

Customs Service 42 km to Ha Tay Customs Office

Strategically located at the gateway to the south of Hanoi capital, between two arterial road: Phap
Logistics
Van - Cau Gie highway and National Highway 1A.

Post office 4 km to Phu Xuyen Post Office

510
Medicare 4 km to Phu Xuyen Hospital.

Police, public security 4.5 km to Phu Xuyen Police station

Universities, training
There are many universities, colleges and intermediate vocational training of various fields.
facilities, etc.
Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational
Recruitment
schools of all sectors.

Worker dormitory A population neighborhood is located near the ID.

Worker's child education


Available
facility

One-stop service Provided by Phu Xuyen People’s Committee

Road Width N/A

Reach international standards, adapt well with communication needs. Underground optical cable
Communication
system is directly connected to the fence of each enterprise. Fiber optic cable systems can be
Infrastructure of Industrial
connected to telecommunication applications and leased line systems. There are IDD, VoIP,
Zone
ADSL telephone switchboard.
Emergency Power
Available
generator

Fire-fighting facility Available

Layout Plan

Location Map

511
List of Tenant

No. Name of project Nationality Business field

1 Investment project on production and Japan Manufacturing mechanical


trading of high-tech supporting components
industrial products
2 Project of investment in building a Vietnam Producing mechanical components,….
factory to produce supporting industry
products

512
PHU NGHIA INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

Address ▪ Km25, National Road 6, Phu Nghia, Chuong My District, Hanoi

Phu My Group JSC.


▪ Address: No 24, Ngo Quyen, Van Phuc Ha Dong, Hanoi.
Investor ▪ Tel: 0919 18 18 18
▪ Fax: (+8424) 3311 9807
▪ Website: http://phumygroup.com.vn/
Nguyen Thi Thanh Xuan, Director – (84) 9 1918 1818 - Email: sales@phumygroup.com.vn/
Contact Person
thanhxuan@phumygroup.com.vn
▪ 23 km from Hanoi City.
▪ 40 km from Noi Bai Airport.
Location
▪ 120 km from Hai Phong Port.
▪ 10km from National Road 21A.
Investment
Technology, industrial manufacturing, supporting industries
priorities Sectors
Investment Area Investment
Restricted Polluted industries
Sectors

Minimum wage [Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019

Lease term : 50 years


Lease term ▪ Start date : 2008
▪ End date : 2057

Minimum Lease Area 700m2

Limit for Construction


▪ Unlimited
Height

Permitted Construction Rate ▪ 60%

▪ Total area : 170 ha


Planned area ▪ Total vacant leasable area : N/A
▪ Total area with full infrastructure ready to build factory: 145 Ha

Factory Available for Rent ▪ Currently, the IZ does not have factory available for rent

Operation Status ▪ In operation

Occupancy Rate and


▪ Occupancy rate: 100%
Number of Projects

Number of Korean Projects N/A

▪ Land lease fee: 100 USD/m2


Lease fee
▪ Factory lease fee: to be negotiated
▪ Management fee: 0.5 USD/m2/year
▪ Electricity fee: as regulated by the Government
Operating fee ▪ Water fee: 0.4USD/m3
▪ Wastewater treatment fee: 0.4USD/m3
▪ Waste treatment fee: to be negotiated

INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Internal Sevice

Tax service, State finance


Internal Service
office

513
Internal Service
Customs Service
Internal Service

Logistics Internal Service

Post office Internal Sevice

Medicare 7km to Chuong My Hospital

Police, public security 6km to the nearest police station

Universities, training
There are many universities, colleges and intermediate vocational training in various fields.
facilities, etc.
Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational
Recruitment
schools of all sectors.

Worker dormitory Available dorms for workers and administrative staffs.

Worker's child education


Available
facility

One-stop service 4 km to Chuong My People’s Committee, which provides one-stop service

▪ Main road : 30m and 25m width


Road Width
▪ Internal transport system accounted for 15% of the total area of the industrial zone
Communication
Infrastructure of Industrial Good
Zone

Emergency Power generator Available

Fire-fighting facility Internal Service (general system for the IZ and each factory’s installation)

Layout Plan

Location Map

514
Actual View

515
THACH THAT- QUOC OAI INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

Address ▪ Thach That District, Hanoi

Ha Tay Investment Development JSC


Investor ▪ Address: Thach That – Quoc Oai Industrial Zone, Thach That Dist., Hanoi
▪ Tel: (84-24) 2324 4881 Fax: (84-24) 3394 3204

Contact Person ▪ N/A

▪ 20 km to Hanoi Center; 20 km to Hanoi Gas Station


Location ▪ 130 km to Hai Phong port; 150 km to Quang Ninh- Cai Lan Deep Port
▪ 30 km to Noi Bai Airport

Mechanical industry, electronic industry, processing food, consumers


Investment priorities
goods, jewelry, parts of motorbike, automobiles and electrical
Sectors
Investment Area appliances
Investment Restricted
Polluted Industry
Sectors

Minimum wage [Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019

▪ Starting date: 2007


Lease term
▪ End date: 2057

Minimum Lease Area 1 ha

Limit for Construction


N/A
Height
Permitted Construction
N/A
Rate
▪ Total area: 155 ha
Planned area
▪ Vacant leasable area: N/A

Factory Available for Rent ▪ Currently, the IZ does not have factory available for rent

Operation Status ▪ In operation

Occupancy Rate and ▪ Occupancy Rate: 100%


Number of Projects ▪ Number of Projects: N/A

Number of Korean Projects 06

Lease fee ▪ Land lease fee: 100 USD/m2

▪ Management fee: 0.5 USD/m2/year


▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee
▪ Water fee: ~0.6 USD/m3
▪ Waste treatment fee: N/A

INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution There are many bank branches near the IZ

Tax service, State finance


office 8.5 km to Thach That Tax Department and State Treasury

Customs Service 10 km to Ha Tay Customs Office

Various fast and convenient means:


▪ Road (many national roads across for domestic transportation);
Logistics
▪ Sea (Haiphong Seaport (via Hai Phong- Hanoi Expressway), Cai Lan Port, Cua Ong Seaport of
Quang Ninh (via Hanoi- Ha Long High Express way)

516
▪ Air: Noi Bai Airport

Post office 8.5 km to Thach That post office

Medicare 4.6 km to Quoc Oai Hospital

Police, public security 7.5 km from Thach That Police Station

Some civil national universities (such as Posts and Telecommunications Institute of Technology,
Universities, training
Hanoi Architecture University,..) and vocational schools are located in Ha Dong city, 20 km from
facilities, etc.
the ID.
Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational
Recruitment
schools of all sectors.

Worker dormitory Available dorms for workers and administrative staffs.

Worker's child education


N/A
facility

One-stop service 8.5 km to Thach That People’s Committee, which provides one-stop service

Main road: 36 m wide


Road Width
Branch road: 24m wide
Communication
Reach international standards, adapt well with communication needs. Underground optical cable
Infrastructure of Industrial
system is directly connected to the fence of each enterprise.
Zone
Emergency Power
Available
generator

Fire-fighting facility Available

Layout Plan

Location Map

Actual View

517
518
THANG LONG INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

Address ▪ Dong Anh district, Hanoi capital

Thang Long Industrial Park Corporation


Investor ▪ Address: Thang Long Industrial park, Dong Anh District, Hanoi, Vietnam
▪ Tel: (84-24) 3 881 0620 Fax: (84-24) 3 881 0624

Contact Person ▪ N/A

▪ Land: 11 km to Hanoi Center; 10 km to Phu Dien Station, 15 km to Hanoi Railway Station


Location ▪ Seaport: 100 km to Hai Phong port, 115 km to Cai Lan Port
▪ Airport: 11 km to Noi Bai Airporrt

Investment priorities Mechanical Industry, Electronic industry, Precision industry,


Sectors Light industry, IT, High-tech industry
Investment Area
Investment Restricted
Restrict Industries affecting the environment.
Sectors

Minimum wage [Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019

Lease term ▪ 50 years

Minimum Lease Area 1 ha

Limit for Construction


N/A
Height

Permitted Construction
N/A
Rate
▪ Total area: 302ha
Planned area
▪ Total leasable area:

Factory Available for Rent ▪ Currently, the IZ does not have factory available for rent

Operation Status ▪ In operation

Occupancy Rate and ▪ Occupancy Rate: 100%


Number of Projects ▪ Number of Projects: 106 projects

Number of Korean Projects None

▪ Land lease fee: from 100 USD/m2


Lease fee
▪ Building lease fee: 7.0 USD/m2/month
▪ Management fee: 1.0 USD/m2/year
Operating fee ▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: ~0.6 USD/m3

INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Many bank branches are near the ID

Tax service, State finance


office 11 km to Tax department and State Treasury of Dong Anh District.

There is an On- site Customs Office in the IZ


Customs Service
Located in the Customs Office

Various fast and convenient means:


▪ Road (many national roads across for domestic transportation);
Logistics ▪ Sea (Haiphong Seaport (via Hai Phong- Hanoi Expressway), Cai Lan Port, Cua Ong Seaport of
Quang Ninh (via Hanoi- Ha Long High Express way);
▪ Air: Noi Bai Airport

Post office 11 km to Dong Anh post office

519
Medicare 12 km to Dong Anh General Hospital, >20 km to many national hospital in Hanoi urban area.

Police, public security 12 km to Police station of Dong Anh District

Universities, training
Many universities, colleges and vocational schools are located in Hanoi
facilities, etc.
Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational
Recruitment
schools of all sectors.

Worker dormitory Available dorms for workers, specialists and administrative staffs.

Worker's child education


There are 3 public preschools, 5 private preschools and 10 baby-sitting homes around the ID
facility

One-stop service 13 km to Dong Anh People’s Committee, which provides one-stop service.

Main road: 40m wide, 6-lane


Road Width
Local/branch road: 26m, 2-lane
Communication
Be able to support domestic and international communication via telecommunication, Fax,
Infrastructure of Industrial
Internet.
Zone
Emergency Power
Available
generator

Firefighting Facility Available and well-equipped

Layout Plan

Location map

520
Actual View

521
NAM THANG LONG INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

Address ▪ Thuy Phuong Town, Bac Tu Liem district, Hanoi

Hanoi Huaic Industrial Park Development Corporation


Investor ▪ Address: Nam Thang Long Industrial Zone, Thuy Phuong, Tu Liem Dist., Hanoi
▪ Tel: (84-24) 3 7523 444/ 3 7523 453 Fax: (84-24) 3 7521 896

Contact Person ▪ N/A

▪ 15 km to Hanoi Urban area


▪ 6 km to Hanoi Center; 10 km to Phu Dien Station
Location ▪ 115 km to Hai Phong port
▪ 15 km to Noi Bai Airport

Developed towards a green industrial Zone with High tech industry,


Investment priorities Sectors
light industry and civil mechanical industry
Investment Area
Investment Restricted
Polluted Industries
Sectors

Minimum wage [Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019

Lease term N/A

Minimum Lease Area 1 ha

Limit for Construction


Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction Rate

▪ Total area: 260.87 ha


Planned area
▪ Vacant leasable area: 10 ha

Factory Available for Rent ▪ Currently, the IZ does not have factory available for rent

Operation Status In Operation

Occupancy Rate and ▪ Occupancy Rate: 80%


Number of Projects ▪ Number of Projects: 87

Number of Korean Projects N/A

▪ Land lease fee: 120 - 130 USD/m2


Lease fee
▪ Building lease fee: 3.0 – 4.0 USD/m2/month
▪ Management fee: 1.0 USD/m2/year
Operating fee ▪ Electricity fee: as regulated by the Government
▪ Water fee: ~0.6 USD/m3
INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution There are many bank branches near IZ.

Tax service, State finance


9 km to Bac Tu Liem Tax Department; 8 km to Bac Tu Liem State Treasury
office

Customs Service ▪ 10 km to North Hanoi Customs Office


▪ ICD My Dinh is located in North Hanoi Customs Department
Various fast and convenient means:
▪ Road (many national roads across for domestic transportation);
Logistics ▪ Sea (Haiphong Seaport (via Hai Phong- Hanoi Expressway), Cai Lan Port, Cua Ong Seaport
of Quang Ninh (via Hanoi- Ha Long High Express way);
▪ Air: Noi Bai Airport

522
Post office 4 km to Tan Xuan VnPost of Tu Liem District.
Medicare 7 km to Nguyen Xa Hospital; many national Hospital in Hanoi Urban area.

Police, public security 10 km to Bac Tu Liem Police station

Universities, training
There are many universities, colleges and intermediate vocational training in various fields.
facilities, etc.

Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational
Recruitment
schools of all sectors.
Worker dormitory Available dorms for workers, specialists and administrative staffs.

Worker's child education


N/A
facility

One-stop service 10 km to Bac Tu Liem People’s Committee, where provides one-stop service

▪ External transport system: 40- 60m


Road Width
▪ Internal transport system: ranging from 18, 21, 30 m
Communication
Full communication system ensures national and international contact easily, include telephone,
Infrastructure of Industrial
mobile phone, Fax, Internet.
Zone

Emergency Power generator Available

Fire-fighting facility Available

Layout Plan

Location map

523
Actual View

524
SAI DONG B INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

Address ▪ Long Bien district, Hanoi

Hanoi Electronic Corp. (HANEL)


▪ Address: No. 2, Chua Boc St., Dong Da Dist., Hanoi City
Investor
▪ Tel: (84-24) 3 852 2102 / 3 852 4555 Fax: (84-24) 3 852 5770
▪ Email: info@hanel.com.vn

Contact Person ▪ N/A

▪ 8 km to Hanoi Center; 03 km to Gia Lam Station


Location ▪ 87 km to Hai Phong Port; 100 km to Cai Lan Port
▪ 33 km to Noi Bai Airport

Investment priorities
Production of food, animal feed; Electronic industry
Sectors
Investment Area
Investment Restricted
Restrict industries affecting the environment
Sectors

Minimum wage [Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019

Lease term 50-70 years

Minimum Lease Area N/A

Limit for Construction


N/A
Height

Permitted Construction Rate N/A

Planned area ▪ Total area: 47.3 ha

Factory Available for Rent ▪ Currently, the IZ does not have factory available for rent

Operation Status ▪ In operation

Occupancy Rate and ▪ Occupancy Rate: 100%


Number of Projects ▪ Number of Projects: 24

Number of Korean Projects 8 companies

Lease fee ▪ Land lease fee: 150 –200 USD/m2/50 years

▪ Management fee: 0.6 USD/m2/year


▪ Infrastructure maintenance fee: 1.5 USD/m2/year
Operating fee
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: About 0.6 USD/m3

INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution There are many bank branches near IZ.

Tax service, State finance


office Long Bien Tax department and State Treasury is located in the ID

▪ 3 km to Gia Thuy Customs Office


Customs Service
▪ ICD Gia Thuy í located in Gia Thuy Customs Office
Various fast and convenient means: road (many national roads across for domestic
transportation); Haiphong Seaport (via Hai Phong- Hanoi Expressway), Cai Lan Seaport, Cua
Logistics
Ong Seaport of Quang Ninh (via Hanoi- Ha Long High Express way); Noi Bai Airport (27 km
away from the ID)

Post office 5 km to Long Bien Post office

525
10 km to Bach Mai Hospital and Hanoi Medical University Hospital, and many central,
Medicare
national hospitals in Hanoi

Police, public security 4 km to Long Bien Post office

Universities, training
There are many universities, colleges and intermediate vocational training in various fields.
facilities, etc.
Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational
Recruitment
schools of all sectors.

Worker dormitory Available dorms for workers, specialists and administrative staffs.

Worker's child education


Available
facility

One-stop service 5 km to Long Bien People’s Committee, where provides one-stop service

Main road: 26 m wide


Road Width
Local/ Branch Road: 20.5 m wide
Communication
Infrastructure of Industrial Full service
Zone

Emergency Power generator Available

Fire-fighting facility Available

Layout Plan

Location Map

526
Actual View

527
NOI BAI INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

Address ▪ Mai Dinh Town, Quang Tien Commune, Soc Son district, Hanoi

Noi Bai Development Co., Ltd


Investor ▪ Address: Quang Tien Commune, Soc Son District, Hanoi
▪ Tel: (84-24) 3 582 0332 Fax: (84-24) 3 582 0330

Contact Person Ms. Tuyen – Client Relationship Manager - (84) 963 741 780 - tuyen.nguyen@nbiz.com.vn

▪ 25 km to Hanoi Center; 10 km to Phuc Yen Station


Location ▪ 120 km to Hai Phong port; 125 km to Cai Lan Airport.
▪ 3 km to Noi Bai Airport

Mechanical Industry, Electronic Industry, Precision Industry,


Investment priorities Sectors
Light Industry, IT,..
Investment Area
Investment Restricted
Polluted Sector
Sectors

Minimum wage [Area 1] According to Decree 90/2019/NĐ-CP dated 15th November 2019

Lease term N/A

Minimum Lease Area N/A

Limit for Construction


N/A
Height

Permitted Construction Rate N/A

Planned area ▪ Total area: 114.1 ha. (Phase I: 100 ha ; Phase II: 14.1 ha )

Factory Available for Rent ▪ Currently, the IZ does not have factory available for rent

Operation Status ▪ In operation

Occupancy Rate and ▪ Occupancy rate: 100%


Number of Projects ▪ Number of project: N/A

Number of Korean Projects None

Lease fee 135 USD/m2

▪ Management fee: 1 USD/m2/year


Operating fee ▪ Electricity fee: as regulated by the Government
▪ Water fee: ~0.75 USD/m3

INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Vietcombank, Agribank near the ID

Tax service, State finance


6.5 km to Soc Son’s State Treasury and Tax Department
office

Customs Service 10km to Express Delivery Customs Office (Soc Son, Hanoi)

Various fast and convenient means:


▪ Road (many national roads across for domestic transportation);
Logistics ▪ Sea (Haiphong Seaport (via Hai Phong- Hanoi Expressway), Cai Lan Port, Cua Ong Seaport of
Quang Ninh (via Hanoi- Ha Long High Express way);
▪ Air: Noi Bai Airport

Post office 6.5 km to Soc Son Post Office

Medicare 7 km to Soc Son Hospital. There are many national, central hospitals in Hanoi

528
Police, public security 6km to Soc Son Police Station

Universities, training
There are many universities, colleges and intermediate vocational training in various fields.
facilities, etc.
Hanoi has a redundant source of well-trained labor with many universities, colleges, vocational
Recruitment
schools of all sectors.

Worker dormitory Available dorms for workers and administrative staffs.

Worker's child education


Available
facility

One-stop service 6.5 km to Soc Son People’s Committee, which provides one-stop service

Road Width N/A

Communication
Be able to support domestic and international communication via telecommunication, Fax,
Infrastructure of Industrial
Internet.
Zone

Emergency Power generator Available

Fire-fighting facility Available

Layout Plan

Location Map

Actual View

529
530
CONG VIEN CONG NGHE THONG TIN INDUSTRIAL PARK

GENERAL INFORMATION
Address Tan Dan and Minh Tri communes, Soc Son district, Hanoi city
Investors

HIM LAM JOINT STOCK COMPANY


▪ Address: 234 Ngo Tat To Street, Ward 22, Binh Thanh, Ho Chi Minh City, Vietnam
Tel: 02835144348

Geographical features - The East is adjacent to Sai Dong Be Industrial Park


- The West is adjacent to Dam Quang Trung Street
- The South borders Aeon Long Bien
- The North borders on National Highway 5.
- 15 minutes from Hanoi city center by car, easy to move to neighboring districts as well as to the
northern provinces.
Investment sector Technology

Minimum wage [Minimum regional salary according to 38/2022/ND-CP]


Lease term 50 years
Minimum rental area N/A
Building height limit N/A

Permissible building rate N/A

Planned area Total planned area: 36 (ha)


Area available for rent: 25.9 (ha)

Status Clearing ground


Occupancy rate and 37 %
number of projects in the
area
Number of Korean projects N/A
in the area
Lease fee N,/A

Management fee N/A

INFRASTRUCTURE
Transportation System: The traffic route N1 has a cross section of 18m wide and a total length of 95.95m. The N2 traffic route
has a cross section of 25m wide, the total length of the route is 391.55m. Traffic route N3 has a cross section of 17.5m wide, total
length of route 302.50m. The traffic route N4 has a cross section of 15m wide, the total length of the route is 84.94m. Traffic
route N5 has a cross section of 15m wide, total length of route 137.56(m) Traffic route D1 has a cross section of 25m wide, total
length of route 756.54m. Traffic route D2 has a cross section
Electricity: National power system (110KV, 220KV...): Underground 22KV power line along industrial road 3, belonging to Sai
Dong B Industrial Park. 22/0.4KV transformer station: 6 stations, total capacity: 11100KVA
Water: Volume of water (m3/day) from Sai Dong B water supply station to supply water to the area with a flow rate of 3500
m3/day
Wastewater treatment: Maximum treatment capacity (m3/day): 3,200 m3/day Factory standard: The centralized wastewater
treatment station is built in accordance with the general planning of the Park, with an isolated green space to meet comply with
QCVN 01/2008.

531
SACH SOC SON INDUSTRIAL ZONE

GENERAL INFORMATION
Address Tan Dan and Minh Tri communes, Soc Son district, Hanoi city
Investors
DDK Construction Investment Group Joint Stock Company
▪ Address: No. 5, alley 629/15 - Kim Ma Street - Ngoc Khanh Ward - Ba Dinh
District - Hanoi City
▪ Tel: 0243.7830464 - 0243.7830465

Geographical features Distance from Noi Bai International Airport: 3.7km


Distance from Hanoi city center: 20km
Distance from National Highway 5 to Hai Phong: 24.5km
Distance from Hai Phong port: 120km, Cai Lan port: 125km

Investment sector Information technology, communication, computer software technology,


biotechnology, microelectronics technology, precision mechanics,
mechatronics, optoelectronics, automation, new materials technology ,
nanotechnology, environmental technology, clean energy technology.

Minimum wage [Minimum regional salary according to 38/2022/ND-CP]


Lease term 50 years
Minimum rental area 01 ha
Building height limit N/A

Permissible building N/A


rate

Planned area ▪ Total area: 302.8ha

Status Clearing Ground


Occupancy rate and 1%
number of projects in
the area
Number of Korean None
projects in the area
Lease cost Land fee: 260 USD/m2

Fee for using infrastructure: 220 USD - 260 USD/m2/50 years for the
manufacturing sector; 250 USD/m2/50 years for logistic projects

Management and maintenance fee for industrial park infrastructure: 0.8


USD/m2/year

Annual land rent: Applied according to regulations of Hanoi People's


Committee

Waste water treatment fee: 4,500 VND/m3

Electricity supply price: Applied according to the electricity supply tariff of


EVN

532
Water supply price: 8,000 VND/m3

Note: The above prices do not include VAT and are subject to change without
prior notice

533
[- This Page is intentionally left blank -]

534
HAU GIANG

535
INVESTMENT ENVIRONMENT IN HAU GIANG

USD/VND 23.510

GENERAL INFORMATION
Area 1621 km2
Population 0,729 million people (2022)
Geographical ▪ Hau Giang is located in Mekong Delta River region.
Location ▪ Belongs to Mekong Delta
It borders with Can Tho City, Vinh Long Province on the north, Bac Lieu Province on the south, Soc
Adjacent provinces
Trang Province on the east, and Kien Giang Province on the west.
2022 statistic:
▪ Real GRDP (billion VND): 48.062 (2,03 billion USD)
▪ GRDP growth: 13,94%
▪ GRDP per capita (million VND/year): 65,89 (2657 USD)
GRDP
▪ Economic structure:
- Industry - Construction: 29,95%
- Agriculture. forestry and fishery: 24,06%,
- Service: 36,86%
▪ Industry - Construction growth: 6,63%
Industry growth ▪ Agriculture, forestry and fishery growth: -3,00%
▪ Service growth: -2,97%
Import turnover (billion USD): 0,35 (Growth rate: -0,02)
Import - Export
Export turnover (billion USD): 0,77 (Growth rate: 0,257)
Processing, manufacturing, electricity generation and distribution, water supply, waste management and
Key Industry treatment activities, seafood and aquatic product processing, livestock and livestock feed production
poultry and aquatic products, manufacturing products from prefabricated metal
PCI 68.12
Ranking 12
SOCIAL INFRASTRUCTURE
▪ Roadway: The province has 6 national highways with a total length of more than 158 km
▪ Railway: Hau Giang will focus on directing the completion of the project DT926B connecting Can Tho -
Ca Mau expressway and Soc Trang province, DT925B connecting Vi Thanh city with Can Tho city and
connecting to the Can Tho - Ca Mau expressway intersection with Chau Doc - Soc Trang; DT931 to
Transportation
connect with Hong Dan district, Bac Lieu province... to create motivation for local socio-economic
development.
▪ Waterway: some main canal routes such as Xa No canal, Quan Lo - Phung Hiep canal, dredging KH9
canal, Lai Hieu canal, 8,000 canal
Solar and wind power projects are being approached by investors, the Provincial People's Committee is
asking the Ministry of Industry and Trade to submit to the Prime Minister to supplement solar power
Electricity
projects with a total capacity of 900MW and power projects. wind with a total capacity of 350MW in Hau
Giang province in the Power Plan VIII in the period of 2021 - 2025.
The rate of urban population using clean water 97%, the rate of rural population using clean water
Water 88.95%. This group of targets exceeded the plan.
(16) Rate of domestic waste in urban and rural areas is collected and treated 90%, reaching the plan.
Education &
N/A
Training
Medicare N/A
INVESTMENT CONDITION
Human resource of population are in the working age (2022)
Education level Trained labor rate: 65,37% (2022)
Salary ▪ The minimum salary for the province is applied as follows:
536
- Area I (4,680,000 VND/month): N/A
- Area II (4,160,000 VND/month): N/A
- Area III (3,640,000 VND/month): Vi Thanh, Nga Bay City and Chau Thanh, Chau Thanh A Districts
- Area IV (3,250,000 VND/month): Long My Town, Vi Thuy, Long My, Phung Hiep Districts
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages
paid to employees working under employment contracts)
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
Investment incentives
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
▪ Prioritized projects:
- For Industrial manufacturing: mechanical manufacture, assembly,
Fields Attracting - For the investment projects in infrastructures in economic zones, rural area; commerce and services:
Investment infrastructures in industrial zones, rural areas, commercial and services centers.
- For the environmental fields: Water supply for the industrial zones, rural areas; Solid waste treatment,
water waste centralized treatment.
Investment attraction No new FDI projects are granted in the year; Accumulated so far, there are 24 FDI projects, with a total
situation registered capital of nearly 607.4 million USD
Industrial zones 2 industrial zones (Song Hau, Tan Phu Thanh), 8 industrial clusters (CCNs) with a total area of 744 ha.

Map

Hau Giang Department Of Planning And Investment


▪ Address: No 7, Xo Viet Nghe Tinh Street, Ward 5, Vi Thanh City, Hau Giang Province

▪ Tel: 2933870214
Contact
▪ Email: maunt.skhdt@haugiang.gov.vn
▪ Contact person:
- Ms. Nguyen Thi Mau- Deputy Director of Department of Planning and Investment of Hau Giang
province

LIST OF INDUSTRIAL ZONE

537
No. Name of industrial zone Total area Occupancy Rate

Song Hau Industrial Park - Phase 1


1 290,79 ha 83%

Central area for operating IT zones


3 12,75 ha

Tan Phu Thanh Industrial Park


4 201 ha

538
SONG HAU INDUSTRIAL PARK

GENERAL INFORMATION
Address Dong Phu Commune, Chau Thanh District, Hau Giang Province
Investors

HIM LAM JOINT STOCK COMPANY


▪ Address: 234 Ngo Tat To Street, Ward 22, Binh Thanh, Ho Chi Minh City, Vietnam
Tel: 02835144348

Geographical features - The East is adjacent to Sai Dong Be Industrial Park


- The West is adjacent to Dam Quang Trung Street
- The South borders Aeon Long Bien
- The North borders on National Highway 5.
- 15 minutes from Hanoi city center by car, easy to move to neighboring districts as well as to the
northern provinces.
Investment sector Agro-fishery processing, production.
Machine manufacturing.
Production of consumer goods.
Producing food, foodstuffs, spare parts for production, daily life,....
Minimum wage [Minimum regional salary according to 38/2022/ND-CP]
Lease term Since 2009
Minimum rental area N/A
Building height limit N/A

Permissible building rate N/A

Planned area Total planned area: 290.79ha

Status In operation
Occupancy rate and 83%
number of projects in the
area
Number of Korean projects N/A
in the area
Lease fee 68 USD/m2

Management fee 0,5USD/m2/year

539
[- This Page is intentionally left blank -]

540
HO CHI MINH

541
INVESTMENT ENVIRONMENT IN HO CHI MINH

GENERAL INFORMATION

▪ Area: 2,095 km2


Area, Population
▪ Population: 9,3 million (2022 statistics)
▪ Located in the South region of Vietnam.
Geographical Location
▪ Located 1760 km from Hanoi capital
The city is adjacent to Binh Duong province to the north, with Tay Ninh province to
the northwest, with Dong Nai province to the east and northeast, with Ba Ria - Vung
Adjacent provinces
Tau province to the southeast, and with Long An and Tien Giang to the west and
southwest.
2022 statistics:
▪ GRDP: 1.479.227 billion VND (# 64 billion USD)
▪ GRDP growth: 9,03%
▪ GRDP per capita: 6.770 USD/year
GRDP
▪ Economic structure:
- Industry - Construction: 22,1%;
- Agriculture. forestry and fishery: 0,6%;
- Service: 64%;
- Tax on Goods: 13,3%
2022 statistics:
Industry growth ▪ Industry - Construction growth: 11,95%
▪ Agriculture, forestry and fishery growth: 3,74%
▪ Service growth: 8,37%

PCI ▪ Score: 65.86 – ranked 27 out of 63 cities and provinces in Vietnam. (2022)

SOCIAL INFRASTRUCTURE

▪ Roadway: Ho Chi Minh City is 1,760km from Hanoi, 99km from Tay Ninh, 30km
from Bien Hoa (Dong Nai), 70km from My Tho, 125km from Vung Tau, 168km
from Can Tho, 308km from Dalat, and 375km from Buon Ma Thuot. The City has
National Highway 13 which connects Vietnam with the rest of Indochina.
▪ Railway: Thong Nhat express train connects Ho Chi Minh City to Hanoi, through
many provinces in Vietnam
▪ Waterway:
- Having 110 river & canal routes with the total length of nearly 1,000 km, along
with a system of seaports and inland waterways;
- Saigon Port as the largest seaport system in Vietnam, having an important
strategic position in economic development, acting as an international gateway for
foreign trade activities of the whole country
Transportation ▪ Airway: Tan Son Nhat International Airport, 7km from the city hub to the north,
being one of the biggest international airports in Vietnam with the current designed
handling capacity of 28 million passengers per year, actual capacity of over 30
million passengers per year & future expansion to 50 million (T3 terminal under
construction); operating over 250,000 domestic and international flights yearly with
domestic flights to & fro Hanoi, Da Nang City and numerous cities and provinces in
all regions across Vietnam as well as international flights to over 30 foreign countries
and territories across the world
▪ Other: The ongoing Hochiminh City Metro project – a combination of metro,
tramway and monorail with a total length of 225.5km, consisting of 8 urban
railway lines with the total length of 169km, 1 tram line of 12.8km and 2 monorail
lines of 43.7 km, 175 stations; Line 1 Ben Thanh-Suoi Tien (19.7km long, 14
stations), construction start in 2007 & operation expected in 2024

Power from the national grid of 500/220/110KV power stations supplies power to Ho
Electricity
Chi Minh City with a capacity of 12,454.2 MW.

542
Currently, raw water sources are mainly exploited (up to 94%) from surface water
including The Dong Nai river basin and Saigon river basin, and a small part (6%)
from groundwater. The total design water supply capacity of current water plants is
2,400,000 m3/day, and the average actual water generation capacity of 2019: is
1,928,000 m3/day. Some of the main parameters of the City's current water supply
system are as follows:
- Percentage of population with water supply: 100%.
Water - Average consumption of clean water through the city's water supply system: 1.93
million m3/day.
- Total design capacity of water plants: 2.40 million m3/day.
- Average total capacity of water generation from water plants: 1.53 million
m3/day.
- Total number of customer connections: 2.14 million.
- Total length of clean water transmission and distribution network: 8,200 km.
- Rate of loss of clean water loss: 20.85%.
Ho Chi Minh City has abundant human resources with high technical
Education skills,advanced education system with 75 universities and colleges and 700,000
students

Medicare ▪ 128 hospitals and some hundreds of medical examination & treatment facilities

INVESTMENT CONDITION

▪ 8,8% of population (50.557.000 people) are in the working age, about 4.3 million
Human resource
workers (2022)

Education level ▪ Trained labor rate: 87,56% (2022)

▪ The minimum salary for the province is applied as follows:


- Area I: In Ho Chi Minh City, all districts, Thu Duc city and 4 districts (Nha Be,
Binh Chanh, Hoc Mon, Cu Chi) apply the region I minimum wage (minimum wage
is 4.68 million VND/month) and 22,500 VND/hour).
Salary
- Area II: Can Gio district applies the minimum wage in Region II (minimum is
4.16 million VND/month and 20,000 VND/hour).
▪ The lowest wage for trained labor (including those trained by the enterprises)
must be at least 7% higher than the above referenced basic salary
▪ Incentives according to government regulations:
Investment incentives Corporate Income tax incentives, Exemption of Import Duty and Export Tax, Land
rent incentives, Incentives on accelerated depreciation
▪ Prioritized projects:
Prior to attracting the leading technology corporations that are at the top of
production chains, have high technology usage, and have strengths in the field of
R&D.
Prior to investors who are financially strong, have new technologies with high
Fields Attracting Investment
intellectual properties, and are environmentally friendly.
Prior to attracting of service industries with high added value and high scientific and
technological content; digital economy and application of artificial.
Prioritize the information technology industries towards automation, using clean
energy, renewable energy

543
Map

Department of Planning and Investment


▪ Address: 32 Le Thanh Ton Street, Ben Nghe Ward, Distric 1, Ho Chi Minh City,
Viet Nam
Contact ▪ Tel: (028).38.293.179 - (028).38.227.495 - (028).38.293.174
▪ Fax : (84.8) 38295008 – 38290817
▪ Email: skhdt@tphcm.gov.vn
▪ Website: http://www.dpi.hochiminhcity.gov.vn/

LIST OF INDUSTRIAL ZONES

Industrial zone Name Total Area (ha) Occupancy Rate Status

Dong Nam Industrial Park 342 ha 95% In operation

Hiep Phuoc Industrial Park 597 ha 30% In operation

Le Minh Xuan 3 Industrial


311 ha 60% In operation
Park

Le Minh Xuan Industrial


100 ha 100% In operation
Park

544
Tan Phu Trung Industrial
542.64 ha 80% In operation
Park

Tan Thuan Export


300 ha 83% In operation
Processing Park

Tay Bac Cu Chi Economic


381,24 ha 98% In operation
Zone

Vinh Loc Industrial Park 207 ha 94% In operation

545
DONG NAM INDUSTRIAL ZONE

GENERAL INFORMATION
Provincial Road No.8, Binh My – Hoa Phu Commune, Cu Chi District, Ho Chi Minh City,
ADDRESS
Vietnam
INVESTOR Sai Gon VRG Investmet Corporation
Mobile: (+84) 948 859 999
CONTACT PERSON
Email: info@saigonvrg.com.vn

 Distance to Ho Chi Minh City Center: 24 km


 Distance to Thu Dau Mot, Binh Duong: 05 km
LOCATION  Distance to Cat Lai Port: 44 km
 Distance to Cai Mep – Thi Vai deep seaport: 90 km
 Distance to Tan Son Nhat Airport: 24 km

Priority Sectors Electronics industry, high-tech industry and supporting industries,


for Investment medical equipment and medicine, food processing, mechanics.
INVESTMENT AREA
Restricted Sectors Production of iron, steel, construction materials, paper, chemicals,
for Investment textiles and garment products, v.v

MINIMUM WAGE [Area 1] According to Decree 38/2022/ND-CP dated June 12th, 2022

 Start date: 2008


LEASE TERM
 End date: 2058

MINIMUM LEASE AREA Not available

LIMIT FOR CONSTRUCTION


HEIGHT
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residential Planning Regulation (QCXDVN 01:2008/BXD)
PERMITTED CONSTRUCTION
RATE

 Total area: 342 ha


PLANNED AREA
 Total vacant leasable area: 95% occupied

 Factory for rent:


- Minimum area for rent: 1,000 m2
FACTORY AVAILABLE FOR - Rent contract term: minimum 3 years.
RENT
- Deposit: 3-6 months
 Land for lease: 2 ha (minimum area)

OPERATION STATUS In operation


OCCUPANCY RATE AND
Occupancy rate: 95%
NUMBER OF PROJECTS
NUMBER OF KOREAN
03
PROJECTS
For information of land and factory for lease, contact:
LEASE FEE  Mobile: (+84) 948 859 999 (Ms. Janice)
 Email: info@saigonvrg.com.vn
 Management fee:
OPERATING FEE (NOT - Land: 0.63 USD/m2/year;
INCLUDING VAT) - Factory for rent: 0.8 USD/m2/year;
 Electricity fee: as regulated by the Government

546
 Water fee: 0.59 USD/m3/month
 Wastewater treatment fee: 0.405 USD/m3/month
INFRASTRUCTURE AND FACILITY
FINANCIAL INSTITUTION Vietcombank
TAX SERVICE, STATE FINANCE
15 km to Cu Chi Tax Department
OFFICE
CUSTOMS SERVICE 27 km to Linh Trung Export Processing Zone Customs Department
LOGISTICS Not Available
POST OFFICE 15 km to Cu Chi Post Office
MEDICARE 20 km to Cu Chi General Hospital
POLICE, PUBLIC SECURITY 24/7 security service

 15 km to Ho Chi Minh City University of Foreign Languages – Information


UNIVERSITIES, TRAINING Technology
FACILITIES, ETC.  21 km to Industrial University of Ho Chi Minh City
 8 km to Thu Dau Mot University of Binh Duong Province

RECRUITMENT Supported by Industrial zone developer

WORKER DORMITORY Worker Dormitory project available and demanding from tenants
WORKER’S CHILD EDUCATION
Not available
FACILITY
ONE-STOP SERVICE Inside the zone
ROAD WIDTH Main road: 29 m – 40 m; Branch road: 15 m – 22 m
IT & TELE-COMMUNICATION
Telecommunication systems are ready to meet the communication needs.
FACILITIES
EMERGENCY POWER
Available in the zone
GENERATOR

The water supply network for firefighting is designed in conjunction with the potable
FIRE-FIGHTING FACILITY
water supply network, which is located along the roads.

LAYOUT PLAN

547
LOCATION MAP

ACTUAL VIEW

548
LIST OF TENANTS IN DONG NAM IP
No. Company name Nationality Business line
1 FIRST SOLAR VIETNAM MANUFACTURING COMPANY USA Solar panels
LTD
2 ALPLA PACKAGING (VIETNAM) COMPANY LIMITED Austria Package
3 AM VI PHARMACEUTICAL JOINT STOCK COMPANY Pakistan Medicine
4 WESTERN FLAVORS FRAGRANCES PRODUCTION Vietnam Food Flavor
JOINT STOCK COMPANY
5 JAPAN PLUS VIETNAM CO.,LTD Japan Package
6 NAM DO PRODUCTION TRADING JOINT STOCK Vietnam Sanitary equipment
COMPANY
7 INDUSTRIAL GAS T.H.T CO., LTD Vietnam Gas
8 WORLDON (VIET NAM) COMPANY LIMITED British Virgin Isl. Garment
9 SHEICO (VIET NAM) CO., LTD Taiwan Garment
10 MINH NGAN VETERINARY MEDICINE CO., LTD Vietnam Veterinary medicine
11 VIETNAM DAIRY PRODUCTS JOINT STOCK COMPANY Vietnam Dairy products
12 TRUONG GIANG ELECTRICAL TRADING - Vietnam Electrical equipment
PRODUCTION CO., LTD
13 ZHONG SHENG CANDLE COMPANY LIMITED Vietnam Candle
14 HOANG NAM PRODUCTION COMPANY LIMITED Vietnam Package
15 IVC JOINT STOCK COMPANY Vietnam Medicine
16 BANSUK VIETNAM CO.,LTD South Korea Rubber spare parts
17 NHAN HOANG FURNITURE CORPORATION Vietnam Furniture
18 NGOC HOANG GIA MANUFACTURING TRADING CO., Vietnam Furniture
LTD
19 SAGOPHAR CO., LTD Vietnam Veterinary medicine
20 ANPHACHEM COMPANY LIMITED Vietnam Food Flavor
21 GCP VIETNAM COMPANY LIMITED Singapore Construction
additives
22 SHEICO WATERSPORTS (VIETNAM) CO., LTD. Taiwan Garment
23 TAN HOANG GIA TRADING COMPANY LIMITED Vietnam Furniture
24 MODO LIVING COMPANY LIMITED Vietnam Furniture
25 CJ VINA AGRI CO., LTD. South Korea Meat processing
26 AT&N COMPANY LIMITED Vietnam Cosmetics
27 HAZEL COSMETIC JOINT STOCK COMPANY Vietnam Cosmetics
28 BMO INT CO., LTD Korea Machinery
29 VINA MOLYMER COMPANY LIMITED Japan Sanitary equipment
30 GOTIME ECO SCIENCE JOINT STOCK COMPANY Vietnam Cosmetics
31 GLOBAL SAFEWEAR VIETNAM CO., LTD. New Zealand Safe wear

549
HIEP PHUOC INDUSTRIAL PARK

GENERAL INFORMATION
Name of industrial
park (IP) HIEP PHUOC INDUSTRIAL PARK (Phase 2)

Location of IP (city,
province and district) Nha Be District

Period of operation
UP TO SEPTEMBER 23, 2058

Type of IP
light, clean and un-polluted industry, non labor intensive, logistics.
Total land size of IP
597 ha
(ha)
Size of industrial lot/
factory outlet inside
the IP) (m2) Total area of Hiep Phuoc Industrial Park Phase 2 is at 597 ha of land with 64 current enterprises

Total leasable area


350 Ha
(ha)
Rate of occupancy of
30%
IP
Nearest ring road
Nguyen Van Linh street

Distance (km) 13km


The nearest national
railway Sai Gon station

Distance (km) 20
The nearest airport Tan Son Nhat Airport
Distance (km) 25km
The nearest port Hiep Phuoc Port: 1km
Cat Lai Port : 23 km
INFRASTRUCTURE
Main road system -
width and number of Road 60m wide
lanes
Internal road system
- width and number Road 25m, 35m wide
of lanes
Power supply National grid
Water supply 45,000 (m3/day)
Sewage treament
18,000
system
INVESTMENT COST
Land 597ha
Leasing term - year
Up to September 23, 2058

Rental price
Not available

Electricity Price (USD/Kwh)

550
Peak time VND 2,871
Regular time VND 1,555
Peak off time VND 1,007
Price of water supply
VND 10.800/m3
(USD/m3)
Average income per
~ 6.000.000 VND -~ 8.000.000 VND/ tháng
worker (USD/month)

INVESTOR INFORMATION

Other
competitiveness: ideal location closed to the downtown, convenient for labor recruitment, inside ports, comprehensive
infrastructure.
Focused type of
industry/ investment
light, clean and un-polluted industry, non-labor intensive, logistics.
:

Name of IP
developer Hiep Phuoc Industrial Park Joint Stock Company.

Address:
Headquarter: Division B, Road No. 1, Hiep Phuoc Industrial Park, Hiep Phuoc Commune, Nha Be
District, HCMC

Contact person
Mr Tan - Sale & Marketing Deputy Director: (+84) 984865516 email: tan.huong@hiepphuoc.com
Sale & Marketing Department: (+84) 964 11 88 33 email: marketing@hiepphuoc.com

Location map

551
Layout plan

552
LE MINH XUAN 3 INDUSTRIAL ZONE

GENERAL INFORMATION

ADDRESS Provincial Road No.10, Le Minh Xuan Commune, Binh Chanh District, Ho Chi Minh
City, Vietnam

INVESTOR Sai Gon VRG Investmet Corporation

CONTACT PERSON Mobile: (+84) 948 859 999 (Ms. Janice)


Email: info@saigonvrg.com.vn

LOCATION  Distance to Outer Ring Road No.3: Directly connected


 Distance to Ho Chi Minh – Trung Luong Highway: 11 km
 Distance to Tan Tao Industrial Park: 04 km
 Distance to Cat Lai Port: 35 km
 Distance to Cai Mep – Thi Vai deep seaport: 85 km
 Distance to Tan Son Nhat Airport: 18 km

INVESTMENT AREA Priority Sectors Electronics industry, high-tech industry and supporting industries,
for Investment medical equipment and medicine, food processing, mechanics.

Restricted Production of iron, steel, construction materials, paper, chemicals,


Sectors for textiles and garment products, v.v
Investment

MINIMUM WAGE [Area 1] According to Decree 38/2022/ND-CP dated June 12th, 2022

LEASE TERM  Start date: 2014


 End date: 2064

MINIMUM LEASE AREA Not available

LIMIT FOR CONSTRUCTION In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
HEIGHT Residential Planning Regulation (QCXDVN 01:2008/BXD)

PERMITTED CONSTRUCTION
RATE
PLANNED AREA  Total area: 311 ha
 Total vacant leasable area: not available for lease

FACTORY AVAILABLE FOR  Factory for rent:


RENT - Minimum area for rent: 680 m2
- Rent contract term: minimum 3 years.
- Deposit: 3-6 months
 Land for lease: 1.2 ha (minimum area)

OPERATION STATUS In operation

OCCUPANCY RATE AND Occupancy rate: 60%


NUMBER OF PROJECTS

NUMBER OF KOREAN Not available


PROJECTS

LEASE FEE For further information of land and factory for lease, contact:
 Mobile: (+84) 948 859 999 (Ms. Janice)
 Email: info@saigonvrg.com.vn

553
OPERATING FEE (NOT  Management fee:
INCLUDING VAT) - Land: 0.65 USD/m2/year;
- Factory for rent: 0.8 USD/m2/year;
 Electricity fee: as regulated by the Government
 Water fee: 0.54 USD/m3/month
 Wastewater treatment fee: 0.4 USD/m3/month

INFRASTRUCTURE AND FACILITY


FINANCIAL INSTITUTION Vietcombank, Agribank
TAX SERVICE, STATE FINANCE 13 km to Binh Chanh Tax Department
OFFICE
CUSTOMS SERVICE 34 km to Linh Trung Export Processing Zone Customs Department
LOGISTICS Not Available
POST OFFICE  06 km to Ba Hom Post Office (Binh Tan, Ho Chi Minh)
 15 km to Tan Kien Post Office (Binh Tan, Ho Chi Minh)
 12 km to Binh Chanh Post Office (Binh Chanh, Ho Chi Minh)

MEDICARE  14 km to Binh Chanh General Hospital


 07 km to Quoc Anh General Hospital
 09 km to Trieu An General Hospital

POLICE, PUBLIC SECURITY 24/7 security service


UNIVERSITIES, TRAINING  08 km to Ho Chi Minh International College
FACILITIES, ETC.  09 km to South Vietnam Agriculture and Forestry College

RECRUITMENT Supported by Industrial zone management board

WORKER DORMITORY Not available

WORKER’S CHILD EDUCATION Not available


FACILITY
ONE-STOP SERVICE Not available

ROAD WIDTH - Zone B: Main road: 18m – 22m; Branch road: 16,5 m
- Zone A: Main road: 25m – 30m; Branch road: 18 m
IT & TELE-COMMUNICATION Telecommunication systems meet the communication needs.
FACILITIES
EMERGENCY POWER Available in the zone
GENERATOR
FIRE-FIGHTING FACILITY The water supply network for firefighting is designed in conjunction with the potable
water supply network, which is located along the roads.
LAYOUT PLAN

554
LOCATION MAP

ACTUAL VIEW

LIST OF TENANTS IN LE MINH XUAN 3 IP

No. Company name Nationality Business line


1 VOLGA VN CORPORATION Vietnam Package
2 SIEU THANH MANUFACTURING TRADING INVESTMENT CO., Vietnam Plastic equipment
LTD.
3 VI GIA SHOES COMPANY LIMITED Vietnam Shoes
4 BLUE SKY PACKAGING JOINT STOCK COMPANY Vietnam Package
5 TAN TIEN SENKO MANUFACTURING COMPANY LIMITED Vietnam Machinery
6 VINH NAM IMPORT EXPORT MANUFACTURING TRADING Vietnam Package
CO., LTD.
7 CDT PRODUCTION CO., LTD Vietnam Machinery
8 CP PAPER CORPORATION Vietnam Package
9 ROEDERS VIETNAM COMPANY LIMITED Germany Mechanical equipment
10 VIETNAM PAIHO., LTD Taiwan Garment
11 BEN THANH - HIEU UYEN COMPANY LIMITED Vietnam Machinery
12 ANHNGA MOTOR MANUFACTURING COMPANY LIMITED Vietnam Machinery
13 SONG THANH TEXTILE DYEING COMPANY LIMITED Vietnam Textile & Dyeing
14 KIEN DANG TEXTILE DYEING COMPANY LIMITED Vietnam Textile & Dyeing
15 DANG THANH SERVICE TRADING MANUFACTURING CO., Vietnam Textile & Dyeing
LTD.
16 DUC PHU MINH COMPANY LIMITED Vietnam Textile & Dyeing
17 TAN GIA ANH TEXTILE AND DYEING CO., LTD. Vietnam Textile & Dyeing
18 THANH PHAT TEXTILE DYEING COMPANY LIMITED Vietnam Textile & Dyeing
19 TRANG KIEM PRODUCTION TRADING COMPANY LIMITED Vietnam Textile & Dyeing
20 DUC PHUC TEXTILE DYEING COMPANY LIMITED Vietnam Textile & Dyeing
21 HOANG LONG TEXTILE DYEING FABRIC YARN CO., LTD Vietnam Textile & Dyeing
22 THAI BINH DUONG TEXTILE SERVICE TRADING Vietnam Textile & Dyeing
MANUFACTURING CO., LTD.
23 THIEN PHU THINH TRADING MANUFACTURING CO., LTD. Vietnam Textile & Dyeing
24 VIET PHAT TEXTILE AND DYEING CO., LTD. Vietnam Textile & Dyeing
25 PHUOC THINH DYEING COMPANY LIMITED Vietnam Textile & Dyeing
26 DUNG TAM TEXTILE SERVICE TRADING MANUFACTURING Vietnam Textile & Dyeing
CO., LTD.
27 MINH DUC TEXTILE DYEING COMPANY LIMITED Vietnam Textile & Dyeing
28 ECPVN SAIGON 1 LIMITED LIABILITY COMPANY Canada Cold storage
29 CHANG YUAN MATERIAL CO., LTD Taiwan Molding
555
30 VINH KIEN THINH MACHINERY - CONSTRUCTION - TRADE - Vietnam Chemicals
SERVICE CO., LTD.
31 KONOHANA VIET NAM PACKAGING PAPER CO., LTD Japan Package
32 THIEN LONG GLOBAL TRADING AND SERVICE CO., LTD. Vietnam Stationery
33 TAM MINH FOOD COMPANY LIMITED Vietnam Food
34 ANAMET VIETNAM COMPANY LIMITED Netherland Mechanical equipment
35 LAM AN PACKAGING SX CO.,LTD Vietnam Package
36 SOCIAL BELLA RETAIL VIETNAM COMPANY LIMITED Indonesia Cosmetics

556
LE MINH XUAN INDUSTRIAL ZONE

GENERAL INFORMATION

ADDRESS Lot B, Street No. 04, Central Park B, Le Minh Xuan Industrial Zone, Le Minh Xuan
ward, Binh Chanh district, Ho Chi Minh city, Vietnam
INVESTOR Khang Phuc House Trading Investment Company Limited
Address: 550 Kinh Duong Vuong Street, An Lac A ward, Binh Tan district, Ho Chi
Minh city, Vietnam.
Tel: (84-28) 3875 3021 – 3876 6172
Website: https://www.khangphuchouse.com.vn/
CONTACT PERSON Mr. Trieu - Sales & Marketing Deputy Manager - Mobile: (84) 919490224 - Email:
trieu.truong@khangphuchouse.com.vn
LOCATION 18 Km from Ho Chi Minh City Center
18 Km from Tan Son Nhat International Airport
18 Km from Sai Gon Seaport
06 Km from National Highway No. 01A and 06 Km from Provincial Highway No. 10
INVESTMENT AREA Priority sectors for investment: Multi – Industry
Restricted sectors for investment: Industries that are polluting.
MINIMUM WAGE [Region 1] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum
salaries
LEASE TERM 1997 – 2047
MINIMUM LEASE AREA 2.000 m2
LIMIT FOR CONSTRUCTION In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
HEIGHT/ PERMITTED Residential Planning regulation (QCXDVN 01: 2008/BXD)
CONSTRUCTION RATE
PLANNED AREA Total area: 100 ha
Total vacant leasable area: Unavailable
FACTORY Unavailable
AVAILABLE FOR
RENT
OPERATION In operation
STATUS
OCCUPANCY RATE AND Occupancy Rate: 100%
NUMBER OF PROJECTS Number Of Projects: 169 projects
NUMBER OF KOREAN 0 project
PROJECTS
LEASE FEE Land and factory lease fee: Unavailable
OPERATING FEE Management fee: 1,400 VND/m2/month (excluded VAT)
Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from
March 16th, 2015 (excluded VAT) for voltage from 22KV-110KV
Water fee: 13,000 VND/m3 (excluded VAT)
Wastewater treatment fee: From 9.829 VND and more depending on the level pollution
of the waste water (excluded VAT)

INFRASTRUCTURE AND FACILITY

FINANCIAL INSTITUTION
TAX SERVICE, STATE FINANCE 18 km from Ho Chi Minh Tax Office
OFFICE
CUSTOMS SERVICE Inside Le Minh Xuan Industrial Zone
LOGISTICS Inside Le Minh Xuan Industrial Zone
POST OFFICE 1 km from Vietnam Post Office
MEDICARE Inside Le Minh Xuan Industrial Zone
POLICE, PUBLIC SECURITY 24/7 security service
UNIVERSITIES, TRAINING No planning of universities near Le Minh Xuan Industrial Zone
FACILITIES, ETC.
RECRUITMENT Khang Phuc House Trading Investment Company Limited will support in recruitment
WORKER DORMITORY Many rental houses and hotels within a radius of 2km
WORKER'S CHILD EDUCATION 2 Km from the zone
FACILITY
ONE-STOP SERVICE Hepza – 35 Nguyen Binh Khiem Street, District 1, HCM City
ROAD WIDTH Main roads: road limit: 8 m, 2 lanes
By roads: road limit: 5 - 8 m, 2 lanes
IT&TELECOMUNICATION Inside Le Minh Xuan Industrial Zone
FFACILITIES
EMERGENCY POWER 5km from Le Minh Xuan Industrial Zone

557
GENERATOR
FIRE- FIGHTING FACILITY Inside Le Minh Xuan Industrial Zone
LAYOUT PLAN

LOCATION MAP

https://goo.gl/maps/kScT5BRBAdbMxGmo8

558
ACTUAL VIEW

559
TAN PHU TRUNG INDUSTRIAL ZONE

GENERRAL INFORMATION

ADDRESS Northwest Saigon City Development Corporation (SCD)


Headquarter: National Highway No.22 (Asian Highway 1), Tram Bom Hamlet, Tan Phu Trung
Commune, Cu Chi District, Ho Chi Minh City, VN
Tel: (+84.28) 3796 5862 – 37963379
Hotline: (+84) 0934910919
Email: scd@tanphutrung-iz.com
Website: www.tanphutrung-iz.com

INVESTOR
Key shareholders:
 Kinh Bac City Development Holding Corporation (KBC) under Saigon Invest Group (SGI)
 Ho Chi Minh City Finance and Investment State-owned company (HFIC)

CONTACT PERSON  Ms. Lan - Sale & Marketing Deputy Director: (+84) 934910919 – (+84) 903370302
lantanphutrung.iz@gmail.com
 Sale & Marketing Department: (+84.28) 37965862 ttkd.scd.iz@gmail.com

Located in the northwest of Ho Chi Minh City, Tan Phu Trung Industrial Zone is on the facade of
National Highway No.22, Tan Phu Trung Commune, Cu Chi District. Bordering Tay Ninh
Province to the North, Binh Duong Province to the East, Long An Province to the West and Hoc
Mon District, Ho Chi Minh City to the South, it belongs to the Northwest City’s urban planning
with an area of 6,000 hectares.
LOCATION Details about Tan Phu Trung Industrial Park (IP)’s position (in favor of land transport)
Road:
 25 km away from Ho Chi Minh City center
 55 km away from Moc Bai International Border Gate
 National Highway No.22: Spanning HCMC center, Tan Binh District, District 12, Hoc Mon
District and Cu Chi District (HCMC). This is the route that connects Cu Chi (HCMC) and
Moc Bai and Xa Mat international border gates (Tay Ninh province) that border Cambodia.
It is one of the roads under the Asian Highway project implemented between HCM City and
Cambodia.
 National Highway No.1A: It is a route running throughout Vietnam which starts from Huu
Nghi (Friendship) border gate on the border with China and ends in Nam Can Town, Ca Mau
province. Considered as the most important route in Vietnam, Highway No.1A passes through
centers of half of the provinces in Vietnam and connects four big cities in Vietnam: Ha Noi,
Da Nang, Ho Chi Minh City and Can Tho.
 Provincial Road No. 8: It connects the key economic triangle area of Long An, Binh Duong
provinces and HCMC.

 Ring Road 3: Starting at Ben Luc - Long Thanh expressway ending at Ho Chi Minh City -
Trung Luong expressway, will pass through 6 important intersections, including the Ho Chi
Minh City - Moc Bai Expressway Interchange belt 3 Cu Chi (HCMC). Ring road 3 intersects
National Highway 22 (Hoc Mon) at the route Km 8 + 800 along the route of National Highway
22, parallel to An Ha canal.

 Ring Road 4: Starting at the intersection with Bien Hoa - Vung Tau Expressway at Km 40 +
000 (Phu My area), towards Long Thanh international airport, intersecting with HCMC -
Long expressway Thanh - Dau Giay, intersects with National Highway 1A, intersects with
National Highway 22 in Cu Chi, crosses Ben Luc town, intersects with Ho Chi Minh City -
Trung Luong highway, the end point connects to the North-South trunk road in the urban area.
Hiep Phuoc port town, HCMC.
 Ho Chi Minh City-Moc Bai Expressway: the expressway will run side-by-side with
National Highway No. 22, starting from an intersection with Ring Road No. 3 and cross the
Ring Road 4 in Ho Chi Minh City and ending at the Moc Bai border gate economic zone in
Tay Ninh.

Ports:
 27 km from Saigon Port
 35 km from Cat Lai Port

560
 30 km away from VICT Port
 37 km from Lotus Port

Dock load:
Saigon Port:
* Container depot: 570,000m2
* Wharves: 2,300m
* Being able to handle vessels with a maximum load of 50,000 DWT (approximately 50,000 tons)
Cat Lai Port:
* Container depot: 62,000m2
* Wharves: 296m
* Being able to handle vessels with a maximum load of 30,000 DWT (approximately 30,000 tons)
VICT Port
* Container depot: 99,840m2
* Wharves: 678m
* Being able to handle vessels with a maximum load of 40,000 DWT (approximately 40,000 tons)
Lotus Port
* Container depot: 150,000m2
* Wharves: 300m
* Being able to handle vessels of up to 45,000 DWT (equivalent to 45,000 tons)

The route from Tan Phu Trung Industrial Zone to Ports:


Highway 22 (the Asian Highway)  An Suong Flyover  Ha Noi Highway or Vo Van Kiet
Avenue  Cat Lai Port (under Saigon Port) or VICT Port  60 minutes

Airports:
 60 km away from Long Thanh International Airport (Long Thanh Airport is expected to be a
major air transshipment point in Vietnam and the world and is planned to be put into operation
in 2023)
 Capacity: 100 million passengers/year
 The terminal and cargo capacity is 5 million tons/year
 15 km from Tan Son Nhat Domestic & International Airport
 Capacity: 25 million passengers per year and 400 flights per day

The route from Tan Phu Trung Industrial Zone to Tan Son Nhat Airport:
Highway 22 (the Asian Highway)  An Suong Intersection  Truong Chinh Street  Hoang
Van Thu Street  Phan Dinh Giot Street  Truong Son Street  Tan Son Nhat International
Airport  30 minutes

INVESTMENT AREA Priority sectors for investment: Multi – Industry


Restricted sectors for investment: Industries that are polluting and labor intensive
MINIMUM WAGE [Region I] According to Decree 38/2022/ND-CP date 12th June 2022 on minimum salaries
LEASE TERM  Start date: 16/12/2004
 End date: 16/12/2054
MINIMUM LEASE 15,000 m2
AREA
LIMIT FOR In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
CONSTRUCTION Planning regulation QCXDVN 01:2008/BXD
HEIGHT
PLANNED AREA Total area: 542.64 ha
FACTORY 2,600 m2
AVAILABLE FOR
RENT
OPERATION STATUS In operation
OCCUPANCY RATE  Occupancy Rate: 80%
AND NUMBER OF  Number Of Projects: 112
PROJECTS
NUMBER OF KOREAN 1
PROJECTS
LEASE FEE  Land lease: The unit price applicable from January 01st, 2015 to December 31, 2019 is
2,310VND/ m2/year (According to the Circular No 3214/TB-CT dated March 25, 2016).
 Infrastructure lease fee: Please contact sales for details (Hotline: 0934.910.919)

OPERATING FEE  Unit price: 12,500 VND/ m2/year


 Water price: 9,600 VND/m3

561
 Wastewater treatment fee: 7,820 VND/m3
 Power price: (from 6 KV): according to the price set by the HCMC Power Company,
excluding VAT.
Normal hours: 1,685 VND/Kwh
Off-peak hours: 1,100 VND/Kwh
Peak hours: 3,076 VND/Kwh

INFRASTRUCTURE AND FACILITY


FINACIAL Vietcombank, MB bank, Vietinbank, Agibank
INSTITUTION
TAX SERVICE, STATE 10 km from Tan Phu Trung Zone
FINANCE OFFICE
CUSTOMS SERVICE 25 km from Tan Phu Trung Zone
LOGISTICS Inside Tan Phu Trung zone
POST OFFICE 1km from Tan Phu Trung Zone
MEDICARE In front of Tan Phu Trung Zone
POLICE, PUBLIC 24/7 security service
SECURITY
UNIVERSITIES, Universities center planning nearby Tan Phu Trung Zone
TRAINING
FACILITIES, ETC
RECRUITMENT Support from
WORKER Near by Tan Phu Trung Zone
DORMITORY
WORKER’S CHILD 1km from Tan Phu Trung Zone
EDUCATION
FACILITY
ONE- STOP SERVICE Hepza – 35 Nguyen Binh Khiem St, Dist 1, HCM City
ROAD WIDTH Roads are synchronously planned under the national standard No. 22 TCVN 276-01 with a load
capacity of H.30
Main roads: road limit: 35 - 40m
Byroads: road limit: 20 - 25 m

IT&TELECOMUNICAT Inside Tan Phu Trung Zone


ION FFACILITIES
EMERGENCY POWER 5km from Tan Phu Trung Zone
GENERATOR
FIRE- FIGHTING Inside Tan Phu Trung Zone
FACILITY

LAYOUT PLAN

562
LOCATION MAP

ACTUAL VIEW

563
TAN THUAN EXPORT PROCESSING ZONE

GENERAL INFORMATION

Tan Thuan Export Processing Zone, Tan Thuan Dong Ward, District 7, Ho Chi Minh City, Viet
Nam
ADDRESS Tel: 84-28-3770 1777 / 1888 ; 0901 821 669
Mail: marketing@tanthuan.com.vn
Web: www.tanthuan.com.vn
Key shareholders:
INVESTOR  Industrial Promotion Company (IPC)
 Phu My Hung Holdings Group (CT&D)

CONTACT PERSON Sale & Marketing Department: 0901 821 669 marketing@tanthuan.com.vn

Ideal location closed to the downtown, convenient for labor recruitment, right next to the biggest
container port of Vietnam, completed infrastructure, best services, EPZ management experience
of foreign experts.

Details about Tan Thuan Export Processing Zone (TTZ)’s position (in favor of land
transport)
Roads:
 4 km from Ho Chi Minh City center.
 2 km from Phu My Hung New City Center.
 The nearest national highway (about 0.5 km) - Nguyen Van Linh: has a total length of
17.8 km, connecting from Huynh Tan Phat Street, District 7 to National Highway 1 (the
section passing through Binh Chanh), connecting with the highway Ho Chi Minh City -
Trung Luong; It is considered a significant lifeline for economic development for the
southern region of Ho Chi Minh City, connecting with key projects such as Tan Thuan
Export Processing Zone, Phu My Hung Urban Area, Hiep Phuoc Power Plant, Hiep Phuoc
Industrial Park, Hiep Phuoc Port Urban Area, Hiep Phuoc Port, Phu My Bridge and Thu
Thiem New Urban Area.
 National Highway No.1A: It is a route running throughout Vietnam which starts from Huu
Nghi (Friendship) border gate on the border with China and ends in Nam Can Town, Ca Mau
province. Considered as the most important route in Vietnam, Highway No.1A passes
through centers of half of the provinces in Vietnam and connects four big cities in Vietnam:
Ha Noi, Da Nang, Ho Chi Minh City and Can Tho.
Ports:
 8 km from Cat Lai Port
 Next to VICT Port

Dock load:
Cat Lai Port:
* Container depot: 62,000m2
* Wharves: 296m
* Being able to handle 7 container ships at once with a load from 30,000 – 40,000 DWT (over
2.000TEUs).
LOCATION * Loading and unloading capacity: 60 moves/h/vessel

VICT Port
* Container depot: 99,840m2
* Wharves: 678m
* Being able to handle vessels with a maximum load of 25,000 DWT (approximately 25,000
tons).

The route from TTZ to Ports:


From Huynh Tan Phat St.  Vo Chi Cong St.  Eastern Ring Road  Nguyen Thi Dinh 
Cat Lai Port (under Saigon Port) (around 30 minutes) or From Huynh Tan Phat St.  Ben
Nghe St.  VICT Port (5-10 minutes).

Airports:
48 km away from Long Thanh International Airport (Long Thanh Airport is expected to be a
major air transshipment point in Vietnam and the world and is planned to be put into operation
in 2023). Capacity: 100 million passengers/year. The terminal and cargo capacity is 5 million
tons/year

564
13 km from Tan Son Nhat Domestic & International Airport. Capacity: 25 million passengers
per year and 400 flights per day

The route from Tan Thuan Export Processing Zone to Tan Son Nhat Airport:
Huynh Tan Phat St.  Nguyen Tat Thanh St.  Ton Duc Thang St.  Vo Thi Sau St. 
Nguyen Van Troi St.  Truong Son St.  Tan Son Nhat International Airport (30 minutes).

National railway – Sai Gon station:


10 km away from the station.

Priority sectors for investment: light, clean and un-polluted industry, high value added
INVESTMENT AREA industries, bio-tech industry, trading and services.
Restricted sectors for investment: Industries that are polluting and labor intensive
MINIMUM WAGE [Region I] According to Decree 38/2022/ND-CP date 12th June 2022 on minimum salaries
 Start date: 23/09/1991
LEASE TERM
 End date: 23/09/2041
MINIMUM LEASE 1000 m2 for factory leasing
AREA 100 m2 for office leasing
LIMIT FOR
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
CONSTRUCTION
Planning regulation QCXDVN 01:2008/BXD
HEIGHT
PLANNED AREA Total area: 300 ha
FACTORY
AVAILABLE FOR
Area: ~ 30,000 sqm
RENT & OCCUPANCY
Rate: ~ 10%
RATE
OPERATION STATUS In operation
OCCUPANCY RATE
AND NUMBER OF 250
PROJECTS
NUMBER OF KOREAN
11
PROJECTS
 Please contact sales for details (Hotline: 0901 821 669)
LEASE FEE
 Management fee: 0.5 USD/m2/month
 Water price: 12,100VND/m3
 Power price: according to the price set by the HCMC Power Company, excluding VAT.
Normal hours: 2,666 VND/Kwh (4:00~9:30; 11:30~17:00; 20:00~22:00)
OPERATING FEE
Off-peak hours: 1,622 VND/Kwh (22:00 ~ 04:00)
Peak hours: 4,587 VND/Kwh (9:30 ~ 11:30; 17:00 ~ 20:00)

INFRASTRUCTURE AND FACILITY


FINANCIAL
Vietcombank
INSTITUTION
TAX SERVICE, STATE
Please search District 7 Tax Department
FINANCE OFFICE
CUSTOMS SERVICE Inside Tan Thuan zone
LOGISTICS Inside Tan Thuan zone
POST OFFICE Inside Tan Thuan zone
MEDICAL FACILITIES Inside Tan Thuan zone
POLICE, PUBLIC
24/7 security service
SECURITY
UNIVERSITIES,
TRAINING Universities center planning nearby Tan Thuan Zone
FACILITIES, ETC
RECRUITMENT Support from HEPZA
WORKER
Inside Tan Thuan Zone
DORMITORY
WORKERS’ CHILD
EDUCATION Inside Tan Thuan Zone
FACILITY

565
ONE- STOP SERVICE Hepza – 35 Nguyen Binh Khiem St, Dist 1, HCM City
Main roads: 30 m
ROAD WIDTH Byroads: 12 – 20 m

IT&TELECOMUNICAT
Inside Tan Thuan Zone
ION FACILITIES
EMERGENCY POWER
Inside Tan Thuan Zone
GENERATOR
FIRE- FIGHTING
FACILITY Inside Tan Thuan Zone

LAYOUT PLAN

566
LOCATION MAP

ACTUAL VIEW

567
TAY BAC CU CHI INDUSTRIAL ZONE

GENERAL INFORMATION

ADDRESS CU CHI COMMERICAL AND INDUSTRIAL DEVELOPING INVESTMENT -


JOINT STOCK COMPANY (CIDICO)
HO: Road D3, Cu Chi Tay Bac Cu Chi Industrial Zone, Tan An Hoi, Cu Chi District, Ho
Chi Minh City, VN.
Tel: (84.8) 38920587 – 38921737
Fax: (84.8) 38921008
Email: cuchiiz@cidico.com.vn
Website: www.cidico.com.vn
INVESTOR Key shareholders:
 Cuchi Commercial and Industrial Developing Investment - Joint Stock Company
(Cidico)
 Ho Chi Minh City Finance and Investment State-Owned Company (HFIC)
CONTACT PERSON  Planning and Investment Department:
 Mr. Loi +(84) 0989.048.335
 Gmail: doanducloi139@gmail.com
Tay Bac Cu Chi Industrial Zone is located on Highway 22 in Ho Chi Minh City, so it is
convenient to carry out all procedures quickly. The city's traffic routes have been expanded
and built to create favorable conditions for the best transportation of goods to the port, airport
and neighboring provinces.
Details about Tay Bac Industrial Park (IP)’s position (in favor of land transport)
Road:
LOCATION  National Highway No.22: Spanning HCMC center, Tan Binh District, District 12, Hoc
Mon District and Cu Chi District (HCMC). This is the route that connects Cu Chi (HCMC)
and Moc Bai and Xa Mat international border gates (Tay Ninh province) that border
Cambodia. It is one of the roads under the Asian Highway project implemented between
HCM City and Cambodia.
 National Highway No.1A: It is a route running throughout Vietnam which starts from
Huu Nghi (Friendship) border gate on the border with China and ends in Nam Can Town,
Ca Mau province. Considered as the most important route in Vietnam, Highway No.1A
passes through centers of half of the provinces in Vietnam and connects four big cities in
Vietnam: Ha Noi, Da Nang, Ho Chi Minh City and Can Tho.
 Provincial Road No. 8: It connects the key economic triangle area of Long An, Binh
Duong provinces and HCMC.
 Ring Road 3: Starting at Ben Luc - Long Thanh expressway ending at Ho Chi Minh City
- Trung Luong expressway, will pass through 6 important intersections, including the Ho
Chi Minh City - Moc Bai Expressway Interchange belt 3 Cu Chi (HCMC). Ring road 3
intersects National Highway 22 (Hoc Mon) at the route Km 8 + 800 along the route of
National Highway 22, parallel to An Ha canal.
 Ring Road 4: Starting at the intersection with Bien Hoa - Vung Tau Expressway at Km
40 + 000 (Phu My area), towards Long Thanh international airport, intersecting with
HCMC - Long expressway Thanh - Dau Giay, intersects with National Highway 1A,
intersects with National Highway 22 in Cu Chi, crosses Ben Luc town, intersects with Ho
Chi Minh City - Trung Luong highway, the end point connects to the North-South trunk
road in the urban area. Hiep Phuoc port town, HCMC.
 Ho Chi Minh City-Moc Bai Expressway: the expressway will run side-by-side with
National Highway No. 22, starting from an intersection with Ring Road No. 3 and cross
the Ring Road 4 in Ho Chi Minh City and ending at the Moc Bai border gate economic
zone in Tay Ninh.
Ports:
 35 km from the center of Ho Chi Minh City
 40 km from Saigon port, 57 km from Cat Lai port
 35 km from Saigon Station
 29 km from Tan Son Nhat airport

Dock load:
Saigon Port:
* Container depot: 570,000m2
* Wharves: 2,300m
* Being able to handle vessels with a maximum load of 50,000 DWT (approximately 50,000
tons)
Cat Lai Port:
* Container depot: 62,000m2
568
* Wharves: 296m
* Being able to handle vessels with a maximum load of 30,000 DWT (approximately 30,000
tons)
VICT Port
* Container depot: 99,840m2
* Wharves: 678m
* Being able to handle vessels with a maximum load of 40,000 DWT (approximately 40,000
tons)
Lotus Port
* Container depot: 150,000m2
* Wharves: 300m
* Being able to handle vessels of up to 45,000 DWT (equivalent to 45,000 tons)

The route from Tay Bac Industrial Zone to Ports:


Highway 22 (the Asian Highway)  An Suong Flyover  Ha Noi Highway or Vo Van Kiet
Avenue  Cat Lai Port (under Saigon Port) or VICT Port  90 minutes.

Airports:
82 km away from Long Thanh International Airport (Long Thanh Airport is expected to be
a major air transshipment point in Vietnam and the world and is planned to be put into
operation in 2023). Capacity: 100 million passengers/year. The terminal and cargo capacity
is 5 million tons/year

29 km from Tan Son Nhat Domestic & International Airport . Capacity: 25 million
passengers per year and 400 flights per day

The route from Tay Bac Industrial Zone to Tan Son Nhat Airport:
Highway 22 (the Asian Highway)  An Suong Intersection  Truong Chinh Street 
Hoang Van Thu Street  Phan Dinh Giot Street  Truong Son Street  Tan Son Nhat
International Airport  50 minutes

INVESTMENT AREA Priority sectors for investment: Multi – Industry


Restricted sectors for investment: Industries that are polluting and labor intensive
MINIMUM WAGE [Region I] According to Decree 38/2022/ND-CP date 12th June 2022 on minimum salaries
LEASE TERM  Start date: 30/12/1998
 End date: 30/12/2048
LIMIT FOR In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
CONSTRUCTION Residential Planning regulation QCXDVN 01:2008/BXD
HEIGHT
PERMITTED
CONSTRUCTION RATE
PLANNED AREA Total area: 381,24 ha
Step 1- Existing project: 208 ha
Step 2- wide grease project: 173,24 ha (not active yet)
OPERATION STATUS In operation
OCCUPANCY RATE  Occupancy Rate: 98%
AND NUMBER OF  Number Of Projects: 43
PROJECTS
NUMBER OF KOREAN 05
PROJECTS
LEASE FEE  Land lease:
 Infrastructure lease fee:
Please contact sales for details (Hotline: (84.8) 38920587)
OPERATING FEE  Unit price: 0,5 USD/ m2/year
 Water price: according to the price set by the water supply service units such as: Saigon
Water Corporation (Sawaco), Ho Chi Minh City Irrigation Service Exploit Management
Company Limited (Hcm.Imc Co., Ltd) excluding VAT.
 Wastewater treatment fee: 8.500 VND/m3
 Power price: (from 22 KV): according to the price set by the HCMC Power Company,
569
excluding VAT.

Normal hours: 1,685 VND/Kwh


Off-peak hours: 1,100 VND/Kwh
Peak hours: 3,076 VND/Kwh

INFRASTRUCTURE AND FACILITY


FINACIAL Vietcombank, ACB Bank, Agibank, BIDV Bank, ...
INSTITUTION
TAX SERVICE, STATE <2 km from Tay Bac Zone
FINANCE OFFICE
CUSTOMS SERVICE < 40 km from Tay Bac Zone
LOGISTICS Inside Tay Bac zone
POST OFFICE Inside Tay Bac Zone
Such as: VN post, J&T express, Viettel post, DHL,...
MEDICARE Beside of Cu Chi Hopital
POLICE, PUBLIC 24/7 security service
SECURITY
UNIVERSITIES, < 1km from Tay Bac Zone - Sai Gon Polytechnic College
TRAINING FACILITIES,
ETC
RECRUITMENT Support from Tay Bac Zone
WORKER DORMITORY Near by Tay Bac Zone
WORKER’S CHILD < 1km from Tay Bac Zone
EDUCATION FACILITY
ONE- STOP SERVICE Hepza – 35 Nguyen Binh Khiem St, Dist 1, HCM City
ROAD WIDTH Roads are synchronously planned under the national standard No. 22 TCVN 276-01 with a
load capacity of H.30
Main roads: road limit: 35 - 40m
Byroads: road limit: 20 - 25 m
TELECOMMUNICATIO < 2km from Tay Bac zone
N FACILITIES
EMERGENCY POWER < 2km from Tay Bac Zone
GENERATOR
FIRE- FIGHTING Inside Tay Bac Zone
FACILITY
LAYOUT PLAN

570
LOCATION MAP

ACTUAL VIEW

571
VINH LOC INDUSTRIAL PARK

GENERAL INFORMATION
ADDRESS Lot A59/I, Street No. 07, Vinh Loc industrial Park, Binh Hung Hoa B ward, Binh Tan district,
Ho Chi Minh city, Vietnam
INVESTOR Vinh Loc Industrial Park Limited Company
Address: Lot A59/I, Street No. 07, Vinh Loc industrial Park, Binh Hung Hoa B ward, Binh
Tan district, Ho Chi Minh city, Vietnam
Tel: (84-28) 3765 0946
Website: https://www.kcnvinhloc.vn/
CONTACT PERSON Ms. Lan Anh - Sales & Service Manager - Mobile: (84) 0902997690 - Email:
ntlananh211@yahoo.com
LOCATION 15 Km from Ho Chi Minh City Center
8 Km from Tan Son Nhat International Airport
17 km away from Sai Gon Port
Close to the National Highway 1A
INVESTMENT AREA Priority sectors for investment: Multi – Industry
Restricted sectors for investment: Industries that are polluting.
MINIMUM WAGE [Region 1] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
LEASE TERM 1997 – 2053
MINIMUM LEASE AREA 878 m2
LIMIT FOR According to Decision 226/QD-SQHKT dated 11/12/2018 of the Department of Planning and
CONSTRUCTION Architecture of Ho Chi Minh City
HEIGHT/ PERMITTED
CONSTRUCTION RATE
PLANNED AREA Total area: 207 ha
Total vacant leasable area: 10.000m2
FACTORY AVAILABLE 3.000m2
FOR RENT
OPERATION In operation
STATUS
OCCUPANCY RATE AND Occupancy Rate: 94%
NUMBER OF PROJECTS Number Of Projects: 147 projects
NUMBER OF KOREAN 0 project
PROJECTS
LEASE FEE Land and factory lease fee: Unavailable
OPERATING FEE Infrastructure maintenance and reconstruction costs: 0,6 USD/m2/year (excluded VAT)
Electricity fee: 4.200VND/khw (excluded VAT)
Water fee: 12,100 VND/m3 (excluded VAT)
Wastewater treatment fee: From 5.766 VND and more depending on the level pollution of the
waste water (excluded VAT)
INFRASTRUCTURE AND FACILITY

FINANCIAL INSTITUTION Joint Stock Commercial Bank for Foreign Trade of Vietnam – Saigon North Branch
TAX SERVICE, STATE 16 km from Ho Chi Minh Tax Office
FINANCE OFFICE
POST OFFICE 1 km from Viettel Post
MEDICARE Tan Binh General Clinic
POLICE, PUBLIC 24/7 security service
SECURITY
UNIVERSITIES, TRAINING 4,5 km from Ho Chi Minh City University of Food Industry. Ho Chi Minh City
FACILITIES, ETC.
RECRUITMENT Inside Vinh Loc Industrial Park
WORKER DORMITORY Workers' accommodation Industrial Park
WORKER'S CHILD Inside Vinh Loc Industrial Park
EDUCATION FACILITY
ONE-STOP SERVICE Hepza – 35 Nguyen Binh Khiem Street, District 1, HCM City
ROAD WIDTH Main roads: road limit: 8 m, 2 lanes
By roads: road limit: 5 - 8 m, 2 lanes
IT&TELECOMUNICATION Inside Vinh Loc Industrial Park
FFACILITIES
EMERGENCY POWER Inside Vinh Loc Industrial Park
GENERATOR
FIRE- FIGHTING Inside Vinh Loc Industrial Park
FACILITY

572
LAYOUT PLAN

LOCATION MAP

573
ACTUAL VIEW

574
[- This Page is intentionally left blank -]

575
HOA BINH

576
INVESTMENT ENVIRONMENT IN HOA BINH

GENERAL INFORMATION

▪ Area: 4.596,4 km2


Area, Population
▪ Population: 875.379 with 30 ethnics (2022 statistic)
▪ Hoa Binh province is located at the gateway to the Northwest region of Vietnam. It is
Geographical Location about 74 km far from the center of Hanoi Capital in the direction of National Highway
6 and is a counterbalance area to the West of Hanoi Capital.
▪ Adjacent Hanoi Capital to the East, borders Phu Tho province to the North, borders
Adjacent provinces Son La province and Thanh Hoa province to the West and borders Ha Nam province and
Ninh Binh province to the Southeast..
2022 statistic:
▪ GRDP: 32,680 billion VND (1,39 billion USD)
▪ GRDP growth: 9.03%
▪ GRDP per capita: 2.799,83 USD/year
GRDP
▪ Economic structure:
- Industry - Construction: 38, 97%;
- Agriculture, forestry and fishery: 22,71%;
- Service: 33,18%;
- Tax on Goods: 5,14%
2022 statistic:
Industry growth ▪ Industry - Construction growth: 11,44%
▪ Agriculture, forestry and fishery growth: 4,57%
▪ Service growth: 11,08%

PCI ▪ Score: 62,81 – ranked 53 out of 63 cities and provinces in Vietnam. (2022)

SOCIAL INFRASTRUCTURE
▪ Roadway: There are important national highways running through the area such as:
Ho Chi Minh Road, National Highway 6, National Highwayh 12B, National Highway
21, especially Hoa Lac – Hoa Binh city road has been invested and operated which
shortens the traveling time from Hoa Binh city to Hanoi Capital’s center from 120
minutes to less than 60 minutes on average. In addition, the route from Hoa Binh City
to Moc Chau district (Son La province) is currently approved by the Prime Minister,
Transportation when completed, it will reduce the traveling time from Hanoi Capital to Son La province
by about 2-3 hours.
▪ Railway: None.
▪ Waterway: None.
▪ Airway: None.

Electricity ▪ Supplied from the national power network

Water ▪ Supplied by Hoa Binh Clear Water JSC

▪ 05 colleges, 03 technical schools, 10 district-level centers of vocational education and


training, 02 vocational education centers and 02 other institutions participating in
Education vocational training at elementary level. Among those, there are 16 public establishments,
06 private establishments in which 03 establishments are managed by the central
government and 19 others are managed by the local authority.

Medicare ▪ 02 provincial hospitals; 9 district hospitals

INVESTMENT CONDITION

577
Human resource ▪ 68,5% of population are in the working age (2022)

Education level ▪ Trained labor rate: 26,2% (2022)

▪ The minimum salary for the province is applied as follows:


- Area III: including: Hoa Binh city, Luong Son, Tan Lac, Kim Boi, Mai Chau, Cao
Salary Phong, Yen Thuy, Lac Thuy, Lac Son, Da Bac district.
▪ The lowest wage for trained labor (including those trained by the enterprises) must be
at least 7% higher than the above referenced basic salary
▪ Incentives according to government regulations:
The project is entitled to incentives in accordance with the Investment Law of Vietnam
and other relevant regulations, including:

(1) Corporate income tax incentives;

(2) Exemption from import tax on goods imported to create fixed assets; raw materials,
Investment incentives supplies and components imported for production in accordance with the law on
import and export tax;

(3) Exemption or reduction of land use levy, land rent, and land use tax;

(4) Rapid depreciation, increasing the amount of expenses deductible when calculating
taxable income.

And other available incentives are regulated by Vietnam Government.


▪ Prioritized projects:
- High technology, industrial electronics, mechanical engineering products;
Fields Attracting Investment - Supporting industry;
- Development of trade, service and tourism;
- Construction and development of infrastructure and key projects.

Map

Hoa Binh Department of Planning and Investment


▪ Address: No 672 Tran Hung Dao, Hoa Binh city
Contact ▪ Tel: (84-218) 3 852 111
▪ Fax: (84-218) 3 853 152
▪ Email: sokehoach@hoabinh.gov.vn

LIST OF INDUSTRIAL PARKS

578
NO. INDUSTRIAL ZONE NAME TOTAL AREA OCCUPANCY STATUS
(HA) RATE
1 Luong Son Industrial Park 83.08 Fully occupied Active

2 Da River Left-bank Industrial Park 68.37 89.78 Active, the cleared land area left is
for auction

3 Yen Quang Industrial Park 200.11 0 Under construction, with available


land for rent

4 Binh Phu Industrial Park 214.29 31 In Land clearance process

5 Nhuan Trach Industrial Park 213.68 0 In Land clearance process

6 Lac Thinh Industrial Park 220 0 Currently applying for Investment


Policy Decision

7 South Luong Son Industrial Park 204.2 55.69 Currently unavailable

8 Thanh Ha Industrial Park (for DDI 282.14 0.54 Currently unavailable


projects only)

579
LUONG SON INDUSTRIAL PARK

GENERAL INFORMATION

Address Hoa Son commune, Luong Son district, Hoa Binh province, next to Ha Noi

An Thinh Hoa Binh Real Estate JSC


- Address: Luong Son Industrial Park, Km 36 Highway 6, Hoa Son commune, Luong Son district, Hoa
Investor Binh province
- Tel: 0218 38 23488
- Email: luongsonpark@yahoo.com

Mr. Nguyen Tue Vinh


- Position: Chief Executive Officer
Contact person
- Tel: 0932.262.789
- Email: luongsonpark@yahoo.com

36 km from Ha Noi center


65 km from Noi Bai International Airport
Location
120 km from Hai Phong deep-water port
22 km from Hoa Lac-Hoa Binh highway

- Priority Sectors: Electronic components, garment


Investment sectors
- Restricted Sectors: Dyeing; billet, aluminum cast iron… production
Mininum Wage
According to Decree 4.160.000 VND/month
38/2022/NĐ-CP
- Start date: 02/02/2007
Lease term
- End date: 02/02/2057

Minimum Lease Area 1.600 m2

Limit for Construction - Factory construction area: 2 to 3 floors


Height - Operating area: 3 to 5 floors
Permitted - Factory construction area: 60%
Construction Rate - Operating area: 35% - 60%

- Total area: 83,082 ha


Planned area - Total vacant leasable area: 60,46 ha
- Total area with full infrastructure ready to build factory: 60,46 ha

Factory available for


- Total area: About 3,09ha with 70% already occupied
Rent

Operation Status Well-established

Occupancy rate and fully occupied


number of projects 44 projects

Number of Korean
9
projects
Lease fee - Land lease fee: 60 USD/m2 - 85 USD/m2
- Management fee: 0,3 USD/m2 (7.000VND/m2)
- Electricity fee: as regulated by EVN
Operating fee - Water fee: 9.298 VND/m3
- Wastewater treament fee: 9.000 VND/m3

580
LIST OF SOME NOTABLE TENANTS

No. Company name Countries Business fields


1 Garment Export manufacturing factory Korea Manufacturing garment for export

2 Investment in building factory of India Processing incenses, bamboo, joss powder


manufacturing and processing incenses,
bamboo, joss powder and related products to
export at Luong Son industrial park
3 Dongah Elecom Co.,LTD establishment Korea Manufacturing and assembling battery power equipment
project

4 Almine Viet Nam Co.,LTD establishment Japan Aluminum alloy product manufacturing and processing
project

5 Construction of Tessellation Viet Nam - Hoa Korea - Finishing of textile products


Binh exporting garment products factory Details: Finishing (printing, washing, embroidering,…)
garment; Finishing of textile products;
- Remaining other business support activities
Details: Import and export of raw materials, equipment
and finished products for garment processing.
Exercising the right to import and export goods.
- Manufacturing ready-made textiles
- Manufacturing carpets, blankets and cushions.
- Manufacturing knitted and crocheted garments.
- Manufacturing other textiles etc.
Details: Producing garment products and garment
accessories

6 Manufacture personal working uniform Japan Manufacturing personal working uniform


factory

7 Project of establishment Transon Vietnam Korea Production of electronic components:


Co.,Ltd Producing, processing, assembling transformers,
resistance rolls and other electronic components,
manufacturing, processing, assembling PCB circuit
board
8 Nissin Manufacturing Viet Nam Japan Manufacturing parts and accessories for automobiles
and other motor vehicles
9 Doosung Tech Viet Nam Factory Korea Manufacturing and assembling Mobile Phone
Components
10 Investment project to produce Led, camera Korea - Manufacturing electronic components
for mobile phones, finger print recognition Production of cameras for mobile phones (Camera
module and CCTV camera Coasia CM Vina module), LED, fingerprint identification module.
Production of components and accessories to produce
camera modules;
Production of observation cameras;
- Repair electronic and optical equipment
Details: Repair Camera of mobile phones (camera
module)
11 Tongwei Hoa Binh animal feed factory Taiwan Animal and poultry feed production

12 The project of manufacturing connector Korea Manufacturing precision connectors for high-definition
equipment associated with the establishment displays, network equipment and solar power converters
of CN PLUS VINA Co., Ltd
13 The project of manufacturing electronic Korea Manufacturing electronic components
components

14 Cap Global Manufacturing Company Korea Manufacture parts and accessories for motor vehicles
and other motor vehicles

581
Detail: Manufacturing, processing, assembling wipers
for automobile

15 Melamine paper and furniture factory China Manufacturing melamine paper

16 Viet Nam Etch Home Technology Taiwan - Manufacture of electronic components such as:
Conductive frame, ultra-thin thermocouple module,
rotary encoder, ultra-thin VCM voice coil drive;
- Manufacture of other metal products ;
- Manufacture of peripherals.

582
DA RIVER LEFT-BANK INDUSTRIAL PARK

GENERAL INFORMATION

Address Huu Nghi ward, Hoa Binh city

Da Hop Trade JSC


- Address: 1st floor, DH12 social housing building, Le Thanh Tong street, group 5, Tan Thinh
ward, Hoa Binh city, Hoa Binh province
Investor
- Tel: 02183 854 926
- Email: dahop@dahop.vn
- Website: www.dahop.vn

- Name: Vu Thi Hop


- Position: Chairman of Directors, General Director
Contact person
- Tel: 036 6477777
- Email: dahop@dahop.vn
Adjencent location
64km from Hanoi Capital city, in the center of Hoa Binh city
Location 93 km from Noi Bai Aiprort
150 km from Hai Phong Port
22 km from Hoa Lac-Hoa Binh highway

- Priority Sectors: high-tech, low pollution, large-capital industries


Investment sectors - Investment: Electronic components, garment, food processing, pharmacy, medical
- Restricted Sector: High risk of pollution

Mininum Wage According to


4.160.000 VND/month
Decree 38/2022/NĐ-CP

- Start date: 30/6/2014


Lease term
- End date: 30/6/2064

Minimum Lease Area 0,5 ha

- Factory construction area: not exceeding 3 floors


Limit for Construction Height
- Operating area: 1 to 2 floors

- Factory construction area: not exceeding 55%


Permitted Construction Rate
- Operating area: not exceed 60%

- Total area: 68,37 ha


Planned area
- Total vacant leasable area: 66,39 ha (6ha for auction)

Factory available for Rent - Total area: Approximately 50%

Operation Status Infrastructure completed (110KV substation next to IP; clean water treatment plant,
wastewater treatment plant and social housing)
Occupancy rate and number 89,78%
of projects 32 projects

Number of Korean projects 2

Lease fee - Land lease fee: 65-100 USD/m2 (based on the land lot)

- Management fee: 0.3 USD/m2/year


- Electricity fee: As regulated by EVN
Operating fee
- Water fee: 10,950 VND/m3
- Wastewater treament fee: 0,3 USD/m3

583
LIST OF SOME NOTABLE TENANTS

No Project Countries Business Fields


1 Trading, Export and Import of Japan Manufacture of temperature measurement components.
Materials; Manufacture of temperature Manufacture of Machinery Instrument and Tools. Assembly of
measurement components, including Machinery Instrument and Tools. Products for export and
Finished Thermistor and Lead Wire; domestic consumption. Trading, Export and Import of
Manufacture of Machinery Instrument Materials for Thermistor and Wire Sensors.
and Tools. Assembly of Machinery
Instrument and Tools.

2 High-quality Optical lens factory Japan Manufacturing high quality lenses


3 Garment Export manufacturing factory Korea Manufacturing garment for export
4 Manufacturing of electronic circuits Japan - Manufacturing of electronic circuits used for creating
equipment: Peripheral equipment,
computers, electronic appliances, audiovisual equipment, solar
cells; microprocessors; controllers (programmable logic
controllers PLC , CNC, ... (Prioritized supporting products, hi-
tech industry);
- Collection, treatment of wastewater, exhaust, solid wastes;
recycling or wastes;
- Leasing unused factory premises.
5 Hoa Binh Koyuseni Knitting Factory Korea - Manufacture of knitted and crocheted garments;
- Finishing of textile products;
- Yarn making;
- Production of woven fabrics;
- Manufacturing other textiles.
- Wholesale of other machinery, equipment and spare parts;
- Wholesale of fabrics, ready-made goods, shoes.
6 Long Binh Electronics Co., LTD Korea Manufacturing and processing electromagnetic interference
filters, Emi filters and auxiliary accessories
7 Bandai Viet Nam Co.,LTD Japan Processing and assembling electrical and electronic conductor
for export

584
BINH PHU INDUSTRIAL PARK

GENERAL INFORMATION

No CC01 Binh Phu Industrial Park, Mong Hoa commune, Hoa Binh city, Hoa Binh province
Address
Name of investor: Binh Phu Invest
- Address: No CC01 Binh Phu Industrial Park, Mong Hoa commune, Hoa Binh city, Hoa
Binh province
Investor
- Tel: 091 918 1818
- Email: hoaphu.hb@phumygroup.com.vn
- Website: binhphuip.com

- Name: Chu Duc Phuong

- Position: General Manager


Contact person
- Tel: 091 918 1818
- Email: hoaphu.hb@phumygroup.com.vn
Adjencent location

18km from Hoa Binh City; 55km from Ha Noi city


Location 80km from Noi Bai airport
160km from Hai Phong port
13 km from Hoa Lac - Hoa Binh highway

- Priority Sectors: Enviromentally friendly projects


Investment sectors
- Restricted Sectors (Lĩnh vực hạn chế đầu tư)

Mininum Wage 4.160.000 VND/ month

50 years
Lease term

Minimum Lease Area Not applicable

- Khu xây dựng nhà máy: 5 (projected)


Limit for Construction Height
- Khu điều hành: 5 (projected)

- Khu xây dựng nhà máy: 70%


Permitted Construction Rate
- Khu điều hành: 40%

- Total area: 214,29 ha


Planned area
- Total vacant leasable area: 80 ha (projected)

Operation Status In Land clearance process


Occupancy rate and number of
50%
projects

585
LIST OF FDI PROJECTS

No Project Countries Business Fields


1 Forestry manufacturing China Manufacture of plywood, veneers and thin boards
factory

NHUAN TRACH INDUSTRIAL PARK

GENERAL INFORMATION

Address Nhuan Trach and Cu Yen communes, Luong Son district, Hoa Binh province

Name of investor: Hoa Phu - Hoa Binh Co.,LTD

- Address: Nhuan Trach Industrial park, Luong Son Town, Luong Son district, Hoa Binh
province
Investor
- Tel: 091 918 1818
- Email: hoaphu.hb@phumygroup.com.vn
- Website: Nhuantrachip.com
- Name: Chu Duc Phuong
- Position: General Manager
Contact person
- Tel: 091 918 1818
- Email: hoaphu.hb@phumygroup.com.vn
Adjencent location

35km from Hoa Binh City; 40km from Ha Noi centre

Location 60km from Noi Bai airport

150km from Hai Phong port

20km from Hoa Lac-Hoa Binh expressway

- Priority Sectors: Enviromentally friendly projects


Investment sectors
- Restricted Sectors: sectors with high risk of pollution

Mininum Wage 4.160.000 VND/month

Minimum Lease Area 2010 (m2)


- Khu xây dựng nhà máy: 5
Limit for Construction Height
- Khu điều hành: 5
- Khu xây dựng nhà máy: 70%
Permitted Construction Rate
- Khu điều hành: 40%
- Total area: 213,68%
Planned area
- Total vacant leasable area: 149 ha

586
- Total area with full infrastructure ready to build factory: 0%

Factory available for Rent - Total area (tổng diện tích nhà xưởng có thể cho thuê):

Operation Status In Land Clearance Process


Occupancy rate and number of
0%
projects

Lease fee 50-60 USD/m2 not include VAT

Layout map

587
LAC THINH INDUSTRIAL PARK

GENERAL INFORMATION

Address Lac Thinh Commune, Hang Tram town, Yen Thuy district

Investor Name of investor: GREENTEX VINA

Contact Tel: 02183 897052


Adjencent location

To Hanoi City: 90km, To Hoa Binh city: 70km


Location
To Noi Bai International airport: 90km; To Cat Bi - Hai Phong: 190km

Hai Phong port: 190km

Manufactures electrical and electronic equipment, information technology, technology


Investment sectors
incubator. High-tech industry, software technology, electricity, electronics

Mininum Wage 3.250.000 VND/month


Minimum Lease Area 1ha
Lease term 50 years
- Total area: 220ha
Planned area
- Total area with full infrastructure ready to build factory: 60%

Operation Status Completed land clearance of 113 ha


Occupancy rate and number of
N/A
projects
- Land lease fee: 15-35 USD
Lease fee
- Factory lease fee: $3
- Management fee: 0,3 USD/m2
- Electricity fee: 0.05 USD
Operating fee
- Water fee: 0.4 USD/m3
- Wastewater treament fee: 0.22 USD/m3

Layout map

588
YEN QUANG INDUSTRIA1:E41AL PARK

GENERAL INFORMATION
Address Yen Quang Village, Ky Son District, Hoa Binh Province
Name of investor: An Viet Hoa Binh JSC.

- Address: Yen Quang Industrial Park, Quang Tien District, Hoa Binh city, Hoa Binh Province

Investor
- Tel: 088 988 6068
- Email: info@amberasset.vn
- Website: https://yenquangip.com.vn/
- Name: Tran Phuong Lan
- Position: Head of Sales & Marketing Department
Contact person
- Tel: 090 428 1006
- Email:
Adjencent location [Các môi trường xung quanh]
43 km from Hanoi City
66 km from Noi Bai International Airport
Location
30 km from Son Tay Port (Hanoi)
174 km from Hai Phong deep-water port
200 km from Cai Lan deep-water port (Quang Ninh)

50 km from Hanoi Station

- Priority Sectors :
Food production & processing;
Garment & Leather Footwear;
Manufacture of drugs, pharmaceutical chemicals and medicinal herbs;
Other processing and manufacturing industries;
Investment sectors Telecommunication;
Producing products from wood, bamboo, products from straws and plaiting materials;
Manufacture of metals and other non-metalic mineral products;
Manufacture of automobiles and motor vehicles, means of transport;
Production and distributio of steam, hot water, air conditioning and ice production

- Restricted Sectors: Environmental polluted industries

Mininum Wage 4.160.000 VND


- Start date: 2015
Lease term
- End date: 2065
Minimum Lease Area 1 ha

Limit for Construction - Khu xây dựng nhà máy: 5 floors


Height - Khu điều hành:

Permitted Construction - Khu xây dựng nhà máy: 70%


Rate - Khu điều hành:
- Total area: 200.11 ha
Planned area
- Total vacant leasable area: 130.9 ha

589
Operation Status Infrastructure under construction and to be completed by the first quarter of 2024

Occupancy rate and


3 projects (occupancy rate: 5%)
number of projects
Number of Korean projects
Lease fee - Land lease fee: 90-95 USD
- Management fee: 0,3 USD/m2/year

- Electricity fee:
As regulated by EVN
Peak hours: 2,759 VND/kW (voltage level 110 kV or more)
Normal hours: 970 VND/kW (with voltage level 110 kV or more)
Off-peak hours: 1,536 VND/kW (with voltage level 110 KV or more)
Operating fee
- Water fee: 9.298 VND/m3 for Manufacturing enterprises; 12.387 VND/m3 for services
activities

- Wastewater treament fee: 9.000 VND/m3/month

- Waste treament fee: According to the prescribed price of the unit responsible for handling
domestic and hazardous waste

590
[- This Page is intentionally left blank -]

591
HUNG YEN

592
INVESTMENT ENVIRONMENT IN HUNG YEN

GENERAL INFORMATION

▪ Area: 930,2 km2


Area, Population
▪ Population: 1.284 million (2022 statistic)
▪ Hung Yen province is located in the Red River Delta, in the Northern Key Economic
Geographical Location Zone.

 The Northwest borders with Hanoi city.


 The East borders with Hai Duong province.
Adjacent provinces
 The South borders with Thai Binh province.
 The Southwest borders with Ha Nam province.
2022 statistic:
▪ Real GRDP: 5.570 billion USD
▪ GRDP growth: 13,41%.
▪ GRDP per capita: 4771 USD/year
GRDP
▪ Economic structure:
- Industry - Construction: 63,91%;
- Agriculture. forestry and fishery: 7,49%;
- Service: 28,60 %;
- Tax on Goods: 6,28%
2022 statistic:
Industry growth ▪ Industry - Construction growth: 12,71 %
▪ Agriculture, forestry and fishery growth: 2,48%
▪ Service growth: 21,91%

Import turnover (billion USD):


Import - Export
Export turnover (billion USD): 0.63 billion USD

PCI ▪ Score: 67.91– ranked 14 out of 63 cities and provinces in Vietnam. (2021)

SOCIAL INFRASTRUCTURE

▪ Roadway: Hanoi - Hai Phong Expressway


(3 km/5 minute drive); Huu Nghi Border Gate
(200 km/3h45 minute drive). The province adjacent National Highway 5, adjacent to
road 39A, 73km from Hai Phong port, 90km from Cai Lan port...
▪ Railway: Hanoi - Hai Phong railway, connecting the provinces including Hanoi,
Hung Yen, Hai Duong, Hai Phong and the northern and southern border provinces, to
Transportation international border gates.
▪ Waterway: The inland waterway transport route on the Red River and Luoc River is
capable of connecting the Northwest provinces to international seaports in Hai Phong
and Quang Ninh
▪ Airway: Easy access to Noi Bai international airport by highway with a time of about
45 minutes.

Electricity Hung Yen has Waste-to-energy plant, electromechanical power plants

▪ The total reserve of underground water (groundwater) that can be exploited in the
Water province is currently over 1.1 million m3/day, of which over 81% of the groundwater
reserve is located in the deep aquifer (the aquifer) pleistocene water).

Education ▪ Hung Yen has over 400 schools meeting national standards

Medicare ▪ About 16 hospitals

593
INVESTMENT CONDITION

Human resource ▪ 46,3% of population are in the working age (2022)

Education level ▪ Trained labor rate: 65% (2022)

▪ The minimum salary for the province is applied as follows:


- Area I, II, III, IV:
Salary
▪ The lowest wage for trained labor (including those trained by the enterprises) must be
at least 7% higher than the above referenced basic salary

Investment incentives ▪ Tax incentives, subsidies, low rent.

▪ Producing components, electrical and electronic


products; Energy; Garment
▪ Prioritizing in industries with high added value,
high science and technology content,
Fields Attracting Investment environmentally friendly, energy, logistics,
production and business projects that can participate
in the global value chain, especially electronics
industry, telecommunications industry, mechanical
industry

Investment Attraction Situation ▪ 516 projects with total investment capital of 6.313.000.000 USD

Map

Department of Planning and Investment


 Address: 8 Chua Chuong Street, Hung Yen City, Hung
 Yen Province
Contact
 Tel: +84 (221).3.863.456
 Email: sokhdt@hungyen.gov.vn
 Website: https://sokhdt.hungyen.gov.vn/

594
LIST OF INDUSTRIAL ZONES IN HUNG YEN PROVINCE

NO INDUSTRIAL ZONE NAME TOTAL AREA OCCUPANCY STATUS


(HA) RATE (%)
1 Pho Noi A Industrial Zone 688.94 84% In operation
2 Thang Long II Industrial Zone 525.7 64.6% In operation
3 Minh Duc Industrial Zone 198 34.2% In operation
4 Minh Quang Industrial Zone 150 40.4% In operation
5 Yen My Industrial Zone 280 53% In operation
6 Yen My II Industrial Zone 313.5 28.1% In operation
7 Clean Industrial Zone 143.08 13% In operation
8 No.3 Industrial Zone 159.71 0% In operation
9 No.5 Industrial Zone 192.64 0% In operation
10 Kim Dong Industrial Zone 100 Expand
in the period 2021-2030 by 100 ha
11 Tan Dan Industrial Zone 200 Under construction
12 Ly Thuong Kiet – 300 Under construction
VIDIFI Industrial Zone
13 No. 4 Industrial Zone 390 New planned industrial parks by
2030
14 No. 6 Industrial Zone 308.2 New planned industrial parks by
2030
15 No. 7 Industrial Zone 198.56 New planned industrial parks by
2030

595
LOCATION MAP OF INDUSTRIAL ZONES

596
PHO NOI A INDUSTRIAL PARK

GENERAL INFORMATION
Address Located in Yen My district, Van Lam district and My Hao town, Hung Yen province

Hoa Phat Hung Yen Industrial Park Infrastructure Development Company Limited.

- Address: 39 Nguyen Dinh Chieu, Le Dai Hanh Ward, Hai Ba Trung District, Hanoi City.
Industrial investor
- Tel: 024.39763889

- Fax: 024.39763890

- Contact person: Mr. Cuong- 0918.507.886

Km19, National Highway 5, Hung Yen:

- 24 km from Hanoi center,


Geographical location
- 43 km from Noi Bai airport,
- 101 km from Dinh Vu port (Hai Phong),
- 130 km from Quang Ninh deep sea port.

▪ Manufacturing and assembling components and equipment of electricity, electronics,


refrigeration, optics, telecommunications, products from new technologies and high techniques;
▪ Mechanical engineering; manufacturing and assembling automobiles, motorcycles, medical
devices, and other machinery and motor equipment; production of products from prefabricated
metal, jewelry; production of corrugated iron, aluminum, steel;
▪ Food production and processing (excluding production of tapioca, vermicelli, MSG, sugar from
sugarcane; aquatic and seafood processing; slaughter of cattle and poultry), beverages;
▪ Production of products from paper, wood (excluding wood processing, wood chips from
Fields of investment
natural wood), plastic (excluding recycling of plastic scrap), rubber, plastics, leather;
attraction
▪ Production of pharmaceuticals, cosmetics, packaging, labels; production of building materials
(excluding cement, clinker, brick, tile), composite materials, artificial flooring, flexible, super-
durable, ultra-light materials; production of industrial gases;
▪ Logistics services, factories for rent.

The reception of investment projects in industrial parks must ensure compliance with the
investment attraction orientation of Hung Yen province from time to time.

Minimum regional wage Area II, minimum wage 4,160,000 VND (USD 177.22)

Minimum rental area According to the agreement with the Industrial Park Infrastructure Investor.

Limit for Construction


According to the planning approved by the competent authority.
Height

Permitted Construction
Rate According to the planning approved by the competent authority.

▪ Scale: 688.94 ha. In which, the area of industrial land for lease is 492.1 ha.

▪ Area of industrial land leased: 412 ha, occupancy rate reached 84%.
Planning Area
▪ The remaining industrial land area not leased: About 80 ha.

597
Operation Status Active

The industrial park has received 211 investment projects (92 FDI projects and 119 DDI projects),

Number of Projects with a total registered investment capital of about 1,169 million USD and 23,387 billion VND. In

which, there are 30 projects of Korean investors with registered investment capital of about 468

million USD.

▪ Land sublease price associated with industrial park infrastructure: 125 - 140 USD/m2

▪ Management cost: USD 0.7/m2/year

Lease fee & Operating ▪ Electricity costs: According to the general regulations of the Government
fee
▪ Water cost: 13,500 VND/m3

▪ Wastewater treatment fee: 12,000 VND/m3

INFRASTRUCTURE

▪ Construction site: The land plots have been processed, ready for the construction of the
Factory.

▪ Power supply: Power is supplied continuously and stably through 3 110/22KV substations.

▪ Water supply: Industrial park water plant was built with a capacity of 15,000 m3/day.

▪ Waste water and waste treatment: The wastewater treatment plant was built with a total
capacity of 6,000 m3/day.

Infrastructure
▪ Telephone & Internet: The telecommunications system meets international standards and is
always available to meet the needs of communication, high-speed data transmission and
domestic and international postal services. The underground fiber optic cable system is directly
connected to the fence of each enterprise.

▪ Internal traffic: The system of internal roads is built with a reasonable cross-section, ensuring
easy and convenient means of transportation to each factory. Lighting systems are installed
along the roads.

▪ Fire prevention: Water supply system with fire hydrants is arranged along the roads of the
Industrial Park.

▪ Customs: Hung Yen Customs is currently headquartered about 4 km from the Industrial Park.
All sealing and lead clamping procedures are carried out right at the factories in the Industrial
Park.

Social infrastructure ▪ Banking: The system of banks (Vietcombank, Techcombank, ACB, Sacombank, Agribank,
and services Bank for Investment and Development of Vietnam...) has a branch in Pho Noi, 1-2 km from the
Industrial Park. . Currently, some banks have set up ATM stations in the Industrial Park, quickly
serving all requirements of businesses and employees in the Industrial Park.

▪ Housing for workers: The area near the industrial park has been planned to invest in the
construction and development of urban areas and housing areas, ensuring housing needs for

598
industrial park workers.

▪ Hospital: Pho Noi General Hospital (2km away from the Industrial Park) is modernly planned
and built to meet the needs of treatment and medical examination and treatment for workers in the
Industrial Park.

Location/ Map

LIST OF TENANTS

No Name of Projects Nation Business line

1 Factory producing stainless steel KOREA Producing stainless steel knives, spoons, forks and
cutlery and fork tableware; production of core products, metal
polishing wax; and build factories for rent
2 KIDO Garment Factory KOREA Producing fabric pants and shirts; pants, swimwear;
pants, leather jacket; Manufacturing sports shoes
and sandals; Producing all kinds of labels for
products of pants, shirts, shoes and sandals.
3 ALPEC Elevator FACTORY Japan Manufacturing and assembling elevators; escalators
and hydraulic ladders; Manufacture of electrical
panels, medium and low voltage electrical

599
equipment; mechanical products; Manufacturing
and assembling elevators, escalators and hydraulic
ladders;
4 Factory for the production of workwear KOREA Producing workwear and protective clothing such
and protective clothing as: Clothes, gloves, socks... used for cleaning in
clean rooms, laboratories
5 Factory manufacturing and assembling KOREA Manufacture and assemble children's toys;
toys and electrical and electronic Manufacture of molds; Manufacture and assemble
mechanical products electrical and electronic equipment accessories;
manufacturing Urethame Foam products,
manufacturing and assembling products on stamping
machine lines, paint spraying machines such as cold
storage tanks, auto parts, etc.
6 Factory manufacturing bearings, Japan Manufacture of bearings and mechanical products;
mechanical products Manufacturing and assembling other electrical
products
7 Factory for processing livestock, KOREA Producing animal, poultry and aquatic feed
poultry and aquatic food
8 Animal and poultry feed processing KOREA Producing and processing feed for livestock, poultry
factory and other livestock.
9 PALFINGER MARINE VIETNAM NETHERLANDS Manufacture of life-saving systems and equipment
FACTORY - DAVIT mounted on rigs and ships for the shipbuilding and
offshore industries
10 The factory produces PE cover material KOREA Producing PE cover materials and other plastic
and other plastic products. products.
11 Mold and spare parts factory KOREA Manufacture of molds and mold spare parts. Factory
for rent.
12 Aluminum factory Hyundai Aluminum KOREA Producing aluminum ingots and aluminum products,
Vina decorating the surface with heat press technology
for aluminum profile products, renting a part of the
factory on the premises
13 tissue paper factory Japan Producing high-grade tissue paper products from
wood pulp and recycled paper to supply domestic
and export markets
14 Relocating the factory producing KOREA Manufacturing plastic products and printing plastic
plastic products and printing plastic packaging labels of all kinds
packaging labels of all kinds
15 Moving ViKom auto parts KOREA Manufacture and assemble motors, motor spare
manufacturing factory parts, control cables, door moving equipment used
in automobiles and industry; Producing and
assembling blowers and accessories of blowers;
Manufacture of plastic components for automotive
equipment. Manufacturing and assembling molds
for product production
16 General Industrial Project IDE Japan Building factories for rent; provides services related
to construction and finishing of factories,
installation of industrial production equipment lines
17 Shinjo Pho Noi mechanical factory Japan Manufacture of steel molds and steel mold details.
manufactures and manufactures black
long screws.
18 Wassenburg Medical Vietnam Factory NETHERLANDS Manufacture of bolts, screws and tools for the
production of bolts and screws
19 Vinax Porcelain Factory Japan Manufacture of WD 440 sterilizer assembly parts,
WD 440 sterilizer electronic box and WD 440
sterilizer lift bar;
20 The factory produces labels and export Japan Producing high-grade sanitary ware,
labels.
21 Tatsumi Seiko Vietnam Factory Japan Producing image caption labels (Head set label),
language annotation labels (Panel sticker) and
product labels (Fine label.
22 Dorco Hung Yen razor factory KOREA Producing metal punching products and other
mechanical products
23 Factory producing transmission China (HK) Manufacture of razor blades, manufacture of razors,
components using inductors eyebrows, manufacture of razor handles,
manufacture of molds for the manufacture of
cutlery, hand tools, and common metal utensils.

600
24 DSM Vietnam Factory KOREA Manufacture of components for optical game
players (PSPs), DVD-RW players; transmission
components for car doors.
25 Factory that manufactures and Japan Manufacture of plastic phone cases.
assembles all kinds of image
processing machines and related parts,
components and electrical equipment
by high technology
26 Daido DMS Vietnam Factory Japan Manufacture and assemble document scanners and
related parts, components and equipment;
manufacturing and assembling printer parts,
components and equipment; manufactures and
assembles camera parts, components and equipment.
27 DSM Vietnam factory expansion KOREA Producing and processing steel products of all kinds,
project by production processes: stamping, cutting, bending,
coiling, rolling, riveting, machining, grinding, heat
treatment, surface treatment.
28 Branch of CARGIll Vietnam Co., Ltd America Manufacturing and assembling components, spare
in Hung Yen parts and accessories for phones and plastic
products.
29 INOX PRODUCTS FACTORY KOREA Producing and processing feed for livestock, poultry
and aquatic products.
30 Project to produce Korean products Japan Producing stainless steel products
31 Project of manufacturing plastic Japan Producing welding materials such as: welding rod,
products welding wire, solder paste, solder powder, solder
pellets; Producing products from turpentine as
welding materials and serving other manufacturing
industries
32 Drossapharm Asia Factory (Vietnam) China (HK) Producing plastic products such as household
plastic, auto parts, office machinery
33 Project of manufacturing precision Japan Processing pig's small intestine; separation of
mechanical products extracts and chemical essences from the mucous
membrane of the small intestine of pigs;
classification and processing of sausage casings
34 Icam Vietnam factory project. Japan Design, manufacture and assemble precision plastic
components and products such as: electrical wiring
harnesses, covers, etc. used for cameras,
automobiles, electronics, electrical and other
industrial products; Design capacity of 950 tons of
products/year
35 Vietnam Factory MIE Japan Invest in building a factory to produce metal molds;
manufacturing plastic parts and metal parts used for
cars and motorcycles; manufactures water meters
and components in water meters. Include:
36 Paint and putty factory Japan Move Vietnam MIE factory project from land lot
No. D-9, Thang Long II Industrial Park, Hung Yen
province to Zone A Pho Noi A Industrial Park;
37 Greenfeed Vietnam Factory- Hung Yen THAILAND Invest in additional machinery and equipment to
Branch increase the capacity of the old project and
supplement the production of water meters and
details in water meters.
38 The project of establishing Watanabe Japan Vietnam MIE One Member Limited Liability
Pipe Vietnam Co., Ltd. in Vietnam Company is allowed to apply regulations on export
processing enterprises.
39 PALFINGER MARINE VIETNAM NETHERLANDS Production of water-based paints, oil-based paints
FACTORY - BOAT and putty;
40 DORCO VINA II FACTORY KOREA Producing high quality animal, poultry and seafood
feed
41 Expanded export label and plate Japan Manufacturing, assembling, installing and finishing
factory greenhouses for agricultural cultivation
42 Vietnam yamato rubber products Japan Manufacture of boats, lifeboats, life rafts and rescue
factory boats for the marine and offshore market. Design
capacity scale:
43 Factory producing loose parts related Japan Invest in building factories and offices for lease.
to sanitary ware products

601
44 Ming Hao Vietnam Electronic CHINA Invest in machinery and equipment to produce razor
Components Factory blades.
45 Factory producing all kinds of cutlery KOREA Invest in additional machinery and equipment to
increase the capacity of the project "Factory
manufacturing labels and export labels
46 PLASTIC BENE PRODUCTION KOREA Producing rubber products used for electronic
devices and motor engines
47 FANCY VIETNAM INDUSTRIAL China (HK) Invest in equipment and production lines for plastic
FACTORY parts related to sanitary ware products
48 VIETNAM HAPAM CAPACITOR Netherlands Manufacturing and assembling transformers and
MANUFACTURING FACTORY circuits for phone chargers
49 MANUFACTURING ALUMINUM Korea Manufacturing aluminum LCD/OLED TV frames
LCD/OLED TV FRAME
50 ANNEX VIETNAM ELECTRONIC Manufacture of electronic switches for phones,
FACTORY computers, home appliances and other electronic
products
51 MINGHUI VIETNAM FACTORY Singapore Manufacture and processing of earphone shells,
molds and other parts of headphones for mobile
phones and tablets; Producing electronic devices
and components for earphones, mobile phones,
tablets
52 Sanitary ware factory China (HK) Producing high-grade sanitary ware; manufacturing
water heaters, aluminum profiles and related loose
parts for export and domestic consumption; Import
of related products for the production of the above
mentioned products
53 PHAM NGUYEN CAKE FACTORY Japan Production of soft chocolate covered cakes
54 SUN KANG VIETNAM FACTORY Singapore Production of printing ink, silkscreen printing of
clothing
55 KOPAC CONCERT FACTORY KOREA Producing all kinds of cardboard packaging from
roll paper; Factory and warehouse for rent
56 PROJECT MANUFACTURING KOREA Invest in more machines to produce aluminum
ALUMINUM PHONE CASE - CNC phone cases from CNC technology
MOBILE
57 PROJECT MANUFACTURING Korea Production of concrete admixtures
CONCRETE ADDITIVES
58 EXPANDING INOX PRODUCTS China (HK) Producing stainless steel products
FACTORY
59 IDEAL INDUSTRIAL PROJECT 2 KOREA Invest in building factories for lease; and provide
services related to construction and finishing of
factories, offices, installation of industrial
production equipment lines, investment
consulting....
60 FACTORY MANUFACTURING, Japan Invest in building a factory to produce laminated
PROCESSING WOODEN FLOORS, laminate flooring
MULTIPLE PLANTS
61 FACTORY MANUFACTURING China Producing all kinds of product labels
TEMPERATURE LABEL
PRODUCTS
62 MOLITEC MANUFACTURING Japan Forging, pressing and rolling metal; mechanical
FACTORY PROJECT IN HUNG YEN processing and metal coating (excluding plating);
PROVINCE manufacturing and manufacturing auto parts,
motorcycle parts, agricultural machinery parts and
metal household electronic components
63 PLASTIC PRODUCTS FACTORY Japan Invest in building a factory to produce PE film,
packaging, shrink film, PE-PET . protective film
64 FACTORY MANUFACTURING KOREA Producing electronic price list products, laptop
ELECTRONIC PRICE LIST AND battery chargers, plastic TVs
BATTERY CHARGER.
65 DSM VIETNAM FACTORY KOREA Invest in additional machinery and equipment from
EXPANDING PROJECT for the 2nd undistributed profits to expand the production of
time. plastic products
66 TSUKUBA VIETNAM'S MOLD KOREA Invest in building factories to manufacture, produce
MANUFACTURING FACTORY IN casting molds, and process all kinds of cast products
PHONOI A INDUSTRIAL PARK made of aluminum, zinc, magnesium and other

602
metals; painting and plating of aluminum, zinc,
magnesium, other metals and plastic products
67 SG PRECISION FACTORY Japan Research, development, production and processing
ESTABLISHMENT PROJECT of precision mechanical components
68 HARNESS CABLE PRODUCTION Japan Production of wire harnesses and application
PROJECT AND APPLICATION equipment
DEVICES
69 PROJECT FACTORY PRODUCING, Japan Producing and processing hanging baskets, metal
PROCESSING HANDLING HAND, hangers covered with plastic.
HANDLING MATERIAL WITH
PLASTIC
70 CONSTRUCTION LIXIL VIETNAM China Invest in building a warehouse to store
WAREHOUSE manufactured products of Lixil Vietnam Co., Ltd
71 PROJECT OF PRODUCTION OF Japan Production of plastic solution tanks, frames, racks,
USEFUL PRODUCTS metal hangers
72 FOR PRINTING CIRCUIT Japan Producing cables and signal transmission lines for
PRODUCTION EQUIPMENT machines
73 JINXIANDA VIETNAM FACTORY China (HK) Manufacturing and assembling paper shredders of
all kinds, plastic laminators
74 YOULL ELECTRONIC FACTORY China (HK) Invest in building factories for lease; and provide
VIETNAM services related to construction and finishing of
factories, offices, installation of industrial
production equipment lines, investment
consulting....
75 IDEAL INDUSTRIAL PROJECT 3 Japan Invest in building a factory to manufacture molds
and plastic products for the electrical, electronic,
and household appliances industries
76 MINGHUI TECHNOLOGY China (HK)
Producing phone battery charging case, electronic
VIETNAM FACTORY
price list cover, laptop battery charging case, TV
case, desk phone case, phone earphone case.
Producing pins, steel contacts of all kinds.
77 DSM VINA FACTORY Korea Producing and assembling rolling door opening and
closing motors, flanges and accessories, rolling door
equipment
78 BX SHINSEI VIETNAM COMPANY Japan Producing all kinds of PVC flooring
LIMITED PROJECT
79 HAI HAN NEW MATERIAL CO., China Producing, processing spare parts and auxiliary parts
LTD for cars
80 MARUSHIN SEISAKUSHO Japan Invest in building and providing cold and dry
VIETNAM PROJECT storage services; storage of frozen and dry goods
(CPC 742).
81 AJ TOTAL CONNECTOR KOREA
- Manufacture of automobile water pumps: 450
tons/year;
- Producing flywheel moving parts for motor
vehicles: 50 tons/year;
- Manufacture of equipment for changing disc
brakes and brake pads for motor vehicles: 15
tons/year
82 HZL GROUP VIETNAM PROJECT China
Producing and processing vending machines: 300
products/year (equivalent to 150 tons/year).
Provide consulting services on operation and
management of vending machines.
Provide vending machine repair and maintenance
service.
83 FACTORY ESTABLISHMENT GRN Japan Factory lease
VIETNAM CO., LTD HANOI
BRANCH
84 FACTORY, OFFICE FOR LEASE China (HK) Producing, processing and assembling parts and
accessories for printers, copiers, fax machines,
scanners, multi-function office equipment (walkie-
talkies), automatic teller machines (ATMs) , money
603
counters, household electrical appliances, medical
equipment, vehicles, industrial machinery
equipment
85 FANCY VIETNAM INDUSTRIAL China (HK) Factory producing plastic flooring products
FACTORY 2
86 PLASTIC FLOORING FACTORY China Invest in building a factory producing all kinds of
PVC flooring
87 HAIXIN FACTORY NO. 2 China Invest in building and providing cold and dry
storage services;
88 Aj total Hanoi – cold storage project KOREA storage of frozen and dry goods (CPC 742)
89 PLASTIC PRODUCTS AND MOLD Japan Invest in building a factory producing plastic trays
FACTORY and plastic films; Manufacture of metal molds and
metal jigs; Factory lease
90 SG PRECISION 2 FACTORY Japan Manufacturing and processing precision mechanical
ESTABLISHMENT PROJECT components
91 FACTORY PRODUCING FILM China Producing film from PVC and film from paper
FROM PVC AND FILM FROM
PAPER

604
THANG LONG II INDUSTRIAL ZONE

GENERAL INFORMATION
Address Located in Yen My district and My Hao town, Hung Yen province.
Industrial investor
Thang Long II Industrial Park Company Limited
- Address: Thang Long II Industrial Park, Yen My district, Hung Yen province.
- Tel: (+84-321) 3974620; Fax: (+84-321) 3974624;
- Contact person: Mr. Nguyen Duc Thang – 0912.173.518; Position: Director.
Geographical Adjacent to National Highway 5; 30km from Hanoi, about 70km from Hai Phong port, 115km from Quang
location Ninh deep sea port; adjacent to Pho Noi Textile and Garment Industrial Park
Fields of investment
Manufacturing precision electronic and mechanical products; mechanical and electronic industries, traffic
attraction
machinery, production of rubber products for the automobile industry; light industry, industrial gas;
manufacture of drugs, vaccines and biological products; optical glass production and high-tech
manufacturing industries are encouraged to develop according to the provisions of law; packaging
production (excluding paper and board recycling, pulp and paper production).
Minimum regional
wage Area II, minimum wage 4,160,000 VND (USD 177.22).
Minimum rental
area According to the agreement with the Industrial Park Infrastructure Investor.
Limit for
Construction Height According to the planning approved by the competent authority.
Permitted
Construction Rate According to the planning approved by the competent authority.

Planning Area ▪ Scale: 525.7 ha. In which, the area of industrial land for lease is 401.42 ha.

▪ Industrial land area for lease: 259 ha, occupancy rate is 64.6%.

▪ The remaining industrial land area not yet leased: Approximately 142 ha.

Operation Status
Active

Number of Projects
In the industrial park, there are 104 foreign investment projects, with a total registered investment capital of
about 3,130 million USD. Foreign investors investing in industrial zones are mainly Japanese investors,

including a number of large economic groups such as Kyocera, Hoya, Nippon, Daikin, Toto, Panasonic, ..

Lease fee & ▪ Land lease fee associated with industrial park infrastructure: 130 - 150 USD/m2
Operating fee ▪ Factory rent: From 126,940 VND/m2 to 163,800 VND/m2
▪ Management cost: 23,400 VND/m2/month
▪ Electricity cost: According to the general regulations of the Government
▪ Water cost: 13,104 VND/m3
▪ Waste water treatment fee: 5,850 VND/m3

INFRASTRUCTURE
Infrastructure
▪ Construction site: The land plots have been processed, ready for the construction of the Factory.
▪ Power supply: The power supply is stable with a capacity of 216 MVA.
▪ Water supply: The Industrial Park water plant was built with a capacity of 24,000 m3/day.
▪ Waste water and waste treatment: The wastewater treatment plant was built with a total capacity of
15,000 m3/day.
▪ Telephone & Internet: The telecommunications system meets international standards and is always
available to meet the needs of communication, high-speed data transmission and domestic and international

605
postal services. The underground fiber optic cable system is directly connected to the fence of each
enterprise.
▪ Internal traffic: The system of internal roads is built with a reasonable cross-section, ensuring easy and
convenient means of transportation to each factory. Lighting systems are installed along the roads.
▪ Fire prevention: Water supply system with fire hydrants is arranged along the roads of the Industrial
Park. In the industrial park, a team of fire prevention and fighting police of Hung Yen Provincial Police has
been arranged.
Social infrastructure
▪ Customs: Hung Yen Customs is currently headquartered about 1 km from the Industrial Park. All sealing
and services
and lead clamping procedures are carried out right at the factories in the Industrial Park.
▪ Banking: The system of banks (Vietcombank, Techcombank, ACB, Sacombank, Agribank, Bank for
Investment and Development of Vietnam...) has a branch in Pho Noi, 1-2 km from the Industrial Park. .
Currently, some banks have set up ATM stations in the Industrial Park, quickly serving all requirements of
businesses and employees in the Industrial Park.
▪ Housing for workers: The area near the industrial park has been planned to invest in the construction and
development of urban areas and housing areas, ensuring housing needs for industrial park workers.
▪ Hospital: Pho Noi General Hospital (2km away from the Industrial Park) is modernly planned and built
to meet the needs of treatment and medical examination and treatment for workers in the Industrial Park.
Location/ Map

606
607
LIST OF TENANTS

No Name of Projects Nationality Business line


1 Hamaden Vietnam Factory Japan Manufacture of components for cars and motorcycles;
Processing, assembling and packing components and spare parts
of cars and motorcycles.
2 Corona Vietnam Factory Japan Manufacture of plastic and metal accessories and product details
(brake pedals, accelerator pedals, steps up and down, logos,
logos, etc.) for motor vehicles: Scale: 800,000 units/year
(equivalent to 800,000 units/year) equivalent to 8 tons/year);
Mechanical processing, surface treatment and surface coating of
metal and plastic products for the Company's manufactured
products. Scale: 5 tons/year; Precision mold making. Scale: 120
tons/year
3 Takagi Vietnam Factory Japan Manufacture of parts for water purifiers; Producing molds, water
fountains, tap products 60 tons of products/year; Expansion
project of manufacturing water purifiers; machine parts and
sprinklers; Manufacture of molds and faucets. Design capacity
scale: 90 tons of products.
4 Akiyama cold-drawn bar Japan Producing cold drawn steel bars;
production project -
SC(Vietnam)
5 BUNKA Factory- Vietnam Japan Producing all kinds of rolling doors, storm-proof doors, doors;
partitions, sliding glass frames; awnings, tents, screens; interior
and exterior products; disaster prevention equipment, security
equipment, fire prevention equipment.
6 Factory NIKKISO Vietnam Japan Producing accessories for blowback parts for commercial
aircraft, such as: Blocker Door, Bullnose.
7 Hoya Glass Disk Vietnam II Japan 2.1. Manufacturing, assembling and processing computers,
internet and telecommunications equipment and products,
information, spare parts and components for products, such as
magnetic disks, computer hard drives and used glass substrates
for magnetic memory disk (for hard drive production).
2.2. Research, explore and create solutions for application in the
field of computer technology and information technology; and
develop technology to create and perfect new technology or new
products in computers, internet/telecommunications/information
equipment and spare parts and components related to the above-
mentioned fields and trade in products generated from research
and development
2.3. Manufacture of plastic trays to store glass discs in the
polishing process.
Hoya Glass Disk Vietnam II Co., Ltd. is allowed to apply
regulations on export processing enterprises.
8 HUNG YEN INDUSTRIAL Japan Producing and filling high quality industrial and medical gas
GAS AND MEDICAL GAS products
PRODUCTION FACTORY
9 DENYO Vietnam Factory Japan Manufacture of generators and generator spare parts
10 Shindengen Vietnam Factory Japan Manufacture of electronic products for cars, motorcycles and
others
11 Ochai Vietnam Factory Japan Manufacture of industrial mechanical accessories such as locks,
hooks, rings, latches, clamps, corrugated washers, leaf springs,
washers
12 Mikasa Vietnam Factory Japan * Producing, researching and developing light construction
equipment such as table compactor, vibrating roller compactor,
compactor hammer, concrete mixer, reverse roller, submersible
pump and power supply
* Producing components and spare parts for the above-
mentioned machinery and equipment
13 Sews-Components Vietnam Japan Manufacture of electrical and electronic components for cars
Factory and motorcycles
14 Musashi Auto Parts Vietnam Japan Producing parts such as camshaft, manual shift lever, automatic
Factory control lever, pedal shift lever
15 Mizuno Precision Parts Japan Manufacturing and processing electronic components and auto
Vietnam Factory parts

608
16 Factory for the production of Japan Manufacture of electrical cables used in the automotive industry
electrical cables used in the
automotive industry
17 Factory Vietnam Japan Manufacture of rubber parts for automobiles, motorcycles,
office equipment and other products such as: wire rings,
protective devices, covers, seals and washers, rubber gaskets
18 Toyota Vietnam Industrial Japan Manufacture of electrical equipment and spare parts for motor
Equipment Factory vehicles such as: Engines for material handling equipment,
axles.
Manufacture of transport equipment such as: Motorized
forklifts, stackers, trailers.
19 HITACHI ATEMO HUNG THAILAND Manufacture of carburetors, throttle valves, air ducts, fuel pump
YEN FACTORY modules, electronic controls for motorcycles, cars and multi-
purpose engines
20 Established Kyoto Biken Japan Production and distribution of veterinary drugs, biological
Hanoi Laboratories Co., Ltd. - products, microorganisms, chemicals used in veterinary
Building a factory to produce medicine.
veterinary drugs
21 SMM VIETNAM FACTORY Japan Manufacture of Lithium iron phosphate used as electrodes for
lithium batteries; Crushing Lithium iron phosphate products
produced by the Company
22 Construction project of Japan Construction of high-standard factories, warehouses,
Kyocera high-tech product infrastructure, offices and other ancillary works for lease by
production complex Kyocera's affiliates; provide management consulting services;
provides general office administrative management services for
investment projects to rent factories and offices in the Complex.
23 Panasonic Vietnam – Hung Japan Support financial activities for subsidiaries in Vietnam of
Yen Branch. Panasonic corporation to carry out projects of manufacturing
electrical appliances, components, and household electrical
products, through activities including but not limited to: the
provision of factories, warehouses, operators, technical
infrastructure...
24 Topy Fasteners Vietnam Japan Producing steel accessories for cars and motorcycles, including:
factory project washers, clamps, nut clamps, clamps, counterweights, VTC
versions... and other similar products.
25 Akebono Brake Astra Vietnam Japan Manufacture of master cylinders, brake controllers
Factory
26 Shin-Etsu Vietnam Factory Japan Production of adhesive materials; Manufacture of reflectors for
LED light emitting diodes and other semiconductor applications
27 Bando factory (Vietnam) Japan Manufacture of plastic parts for motorcycles such as: Fuel tank
cap; water barrier; Fenders; handbrake and throttle protection
device; turn signal lights….
Manufacture of conveyor belts. (belt) for motorcycles.
28 Kawakin Core-tech Vietnam Japan Manufactures parts and equipment made of metal and rubber,
Factory Project including anti-seismic equipment, vibration control and
reinforcement equipment for bridges and buildings.
29 Panasonic Appliances Japan 2.1. Invest in machinery and equipment for manufacturing,
Vietnam factory in Hung Yen assembling and installing household electrical appliances and
household products, including: washing machines of all kinds,
refrigerators of all kinds, dryers of all kinds, microwave ovens,
etc. types, vacuum cleaners of all kinds, rice cookers of all
kinds, presses and grinders of all kinds, irons of all kinds and
details, components, semi-finished products used for the above
equipment and products. Design capacity: 1,000,000
products/year.
2.2. Design, research and develop household electrical
appliances, household products, details, components, semi-
finished products, materials for equipment and products
specified in Section 2.1 of this Article .
2.3. Provide market research services (CPC 86401).
2.4. Provide management consulting services (CPC 865).
2.5. Providing customer care services such as: surveying
opinions, recording customer feedback, offering solutions to
improve products, quality and services ... for household
electrical appliances; household products.
30 Kosaka Vietnam Factory Japan Manufacture of motor shafts for industrial trucks

609
31 INVESTMENT PROJECT Japan Manufacture of SMD surface-glued components for crystal
PRODUCING SMD oscillators; Manufacture, repair and maintenance of molds and
SURFACE COMPONENTS. accessories for molds
32 Azuma Safety Factory Japan Manufacture of lights (reflective) and related parts, reflective
signs and related steel poles, reflective nails, rubber traffic poles
used in road traffic safety.
33 Sanwa vietnam industrial Japan 2.1. Manufacture of interior parts, plastic seats for automobiles;
factory project. Design capacity scale: 51.2 tons of products/year.
2.2. Manufacture of molds used for molding plastic products;
Design capacity scale: 05 sets/year (equivalent to 5.5 tons of
products/year).
2.3. Manufacture of inspection jigs used to inspect plastic
interior parts for automobiles; capacity scale 20 sets/year
(equivalent to 1.2 tons/year).
Sanwa Vietnam Industry Co., Ltd. is allowed to apply
regulations on export processing enterprises.
34 Seiko Vietnam Industrial Japan Producing stainless steel, aluminum, iron, plastic parts for
Factory machinery and equipment such as stepper motors, Ion implants,
automatic testing equipment, etc. in semiconductor production
lines
35 Electronic connector Japan Producing all kinds of connectors for laptops, printers, copiers,
manufacturing project mobile phones. Scale of design capacity; 300 tons of
products/year. Producing plastic connectors for laptops, printers,
copiers, mobile phones. Design capacity: 200 tons of
products/year
36 Hamatetsu Vietnam Factory Japan Manufacture of metal washers, clutches, levers and gearboxes
Project for motorcycles and cars
37 Tanaka Precision Vietnam Japan Manufacture of pins, bearings, discs, metal clamps for
Factory motorcycles.
38 Fuji Bakelite Vietnam Factory Japan * Manufacturing and assembling electrical equipment, control
equipment for power distribution such as: Circuit breakers,
leakage current circuit breakers, circuit breakers parts, cable
terminals of electric meters.
* Design and manufacture stamping dies used in heat casting
and stamping technology.
39 Project to expand the factory Japan Manufacture of electrical cables used in the automotive industry
to produce electric cables used
in the automotive industry
40 Musashi Auto Parts Vietnam Japan Invest in additional machinery and equipment to increase the
factory expansion project capacity of the production project Camshaft, manual shift lever,
automatic control gear lever, gear lever for cars, motorcycles,
ships from 3,214,000 products/year (equivalent to 1,240 tons of
products/year) to 10,230,000 products/year (equivalent to 3,580
tons of products/year)
41 Research and develop NETHERLANDS Research, explore and create solutions for application in the
technology Hoya Memory field of computer technology and information technology; and
Disk develop technology to create and perfect new technologies or
new products in computers,
internet/telecommunications/information equipment and spare
parts and components related to the above fields to provide the
Company Hoya Glass Disk Vietnam II
42 Tokyo Keiso Vietnam Factory Japan Manufacture of flow meters; Manufacture of water level
Project measuring equipment
43 Denka Vietnam New Singapore Manufacture of PVC adhesive tapes for automotive electronics
Materials Factory and others
44 Generator production project Japan Manufacture of generators
45 Factory Ochiai II Japan Manufacture of washers
46 Project for the production of Japan Manufacture of commercial aircraft wing parts such as the
parts for commercial aircraft Sharklet and the product that joins the gap between the J Panel
wings (Gap cover) and the J Panel (J Panel).
47 Matsuda Sangyo Scrap Japan Recycling scrap from electrical, electronic, mechanical and
Recycling Factory (Vietnam) semiconductor components
48 Project of Yotsugi Vietnam Japan Producing products from insulating materials such as jackets,
factory pants, insulating plastic sheets
49 Rotor and Stator production Japan Manufacture of stators and rotor cores for lifting equipment
project engines and motor vehicles

610
50 MICROTECHNO VIETNAM Japan Manufacture of spare parts and accessories for automobiles,
FACTORY including: oil damper, oil booster valve, stopper and core coil
51 JEWELRY PROJECT WITH Japan Products from gold, silver and platinum (Platinum): 393,600
PREMIUM METAL, GEM products/year (equivalent to 1,200 kg of products/year);
Products from Cobarion (Co-Cr alloy): 24,000 products/year
(equivalent to 72 kg of products/year);
Products from brass (Cu-zn alloy): 24,000 products/year
(equivalent to 72 kg of products/year).
52 TOEI VIETNAM FACTORY Producing components for office equipment and
PROJECT telecommunications equipment such as: roller brush, cotton
coated roller brush, metal frame and others
53 SECOND TOTO VIETNAM Japan Manufacture of sanitary ware and sanitary ware-related
FACTORY PROJECT accessories
54 EIKODO VIETNAM Japan Candy production
FACTORY PROJECT
55 Tamagawa Electronics Japan Manufacture of electrical components for mobile
Vietnam Factory telecommunications of base stations, broadcasting,
telecommunications satellites and public broadcasting, such as:
coaxial attenuators, dividers, coaxial splitters, circuit breakers,
coaxial filters, duplexers and other components
56 MITSUBA VIETNAM Japan Manufacture of starter motors, generators, horns, electrical
FACTORY PROJECT IN relays, electrical conductors, pulse generators and some other
THANG LONG II electronic products of motorcycles; Manufacture of electrical
INDUSTRIAL PARK relays and electrical conductors for automobiles; Manufacture of
windshield wipers for cars. Producing all kinds of horns
(trumpets) for cars. Manufacture of fuel pumps and auto power
generation integrators. Producing cooling fan motors for
automobiles; Producing all kinds of motors for motorcycles and
cars
57 ELECTRONIC Japan Provide technical testing and electromagnetic compatibility
COMPATIBILITY LAB certification services for electrical and electronic products.
PROJECT
58 RODAX VIETNAM Virtue Manufacture of components for transmission of industrial
FACTORY PROJECT machines such as housings, shafts, rims and manufacture of
metal precision machinery products.
59 Project to expand investment Japan Invest in additional investment in machinery and equipment at
in manufacturing SMD the stages of gluing, punching, glazing and printing circuits,
surface-glued components cutting edges and cleaning products under the investment
project of manufacturing SMD surface-glued components,
increasing the production process. Project capacity scale from
2.4 billion products/year (equivalent to 300 tons) to 3.6 billion
products/year (305 tons)
60 PROJECT Japan Manufacture of luggage compartment doors and manufacture of
MANUFACTURING THE rear flaps and blades in commercial aircraft
DOORS OF BAGGAGE
BOXES, BACKWARDS
AND COMMERCIAL
AIRLINES
61 SUZURAN VIETNAM Japan Invest in building a cotton factory for medical, sanitary and
PRODUCTION FACTORY cosmetic use
PROJECT
62 FLOWER FACTORY Japan Invest in building a factory to produce, process and pack
nutritional drinks.
63 TOPY FASTENERS Switzerland Invest in additional machinery and equipment to increase the
VIETNAM FACTORY capacity of the Topy Fasteners Vietnam Factory project
EXPANDING PROJECT
64 NIPPON MEKTRON Japan Invest in building a factory to produce printed circuit boards for
FACTORY PROJECT electronic devices.
65 FOOD MANUFACTURING, Japan Invest in building a food production, processing and processing
PROCESSING AND factory.
PROCESSING FACTORY.
66 NITTAN VIETNAM Japan Manufacture of fire alarm system equipment
FACTORY PROJECT
67 PRODUCTION OF SMD Japan Additional investment in machinery and equipment, increasing
SURFACE SURFACED the capacity of investment projects to produce SMD surface-
COMPONENTS glued components from 6.84 billion products/year (equivalent to

611
PRODUCTION EXPANSION 652 tons of products/year) to 7.44 billion products/year
PROJECT (2nd time). (equivalent to 727 tons of products/year)
68 DAIKIN VIETNAM Japan Manufacturing, processing and assembling air conditioners and
FACTORY related spare parts and components of air conditioners
69 DAINICHI VIETNAM Japan Manufacturing and assembling electronic components and
FACTORY PROJECT products
70 KOYO VIETNAM Japan Invest in building a factory to manufacture metal equipment for
FACTORY PROJECT furniture such as sofa hinges, turntables of all kinds
71 AMAGASAKI PIPE Japan Invest in building a factory for the production of copper fittings
VIETNAM FACTORY for connecting pipes for air conditioners
PROJECT
72 MARUESU VIETNAM Japan Manufacture of metal equipment.
FACTORY PROJECT
73 ITO VIETNAM FACTORY Japan Medical device manufacturing
PROJECT
74 CERAMIC PACKAGE Japan Processing and assembling technical ceramic products (Ceramic
PRODUCTION PROJECT Package) and connectors for fiber optic networks
FOR OPTICAL CABLE
NETWORK
75 HONEYCOMB J-PANEL Japan Manufacture of honeycomb core (Honeycomb J-panel) for the
PRODUCTION PROJECT production of J-panel products for commercial aircraft
FOR COMMERCIAL
AIRLINES
76 NIKKISO VIETNAM Japan Manufacture of products, parts and equipment from composite
FACTORY II materials for commercial aircraft
77 CHAIN Japan Chain production, processing and assembly
MANUFACTURING,
PROCESSING AND
Assembling FACTORY
78 KAGA ELECTRONICS Japan Manufacturing, processing and assembling electrical and
VIETNAM FACTORY electronic equipment for air conditioners and automobiles
PROJECT
79 ORGANO FACTORY THAILAND Manufacturing and assembling wastewater treatment systems;
(VIETNAM) IN HUNG YEN providing maintenance services, maintenance of wastewater
PROVINCE treatment systems; chemical preparation Polytetsu used in
wastewater treatment system
80 JEWELRY KHANH Japan Invest in building a factory to manufacture and process jewelry,
MANUFACTURING AND imitation jewelry and related details
PROCESSING FACTORY
PROJECT
81 VIETINAK FACTORY 2 Japan Manufacture of rubber parts for automobiles, motorcycles,
office equipment and other products
82 THE SECOND TOTO Japan Lease more land, invest in building factories and add machinery
VIETNAM FACTORY and equipment to increase the capacity of the second Toto
EXPANDING PROJECT. Vietnam factory project.
83 THANG LONG SERVICE Japan Invest in building distribution and trading stores for petroleum
STATION II and petrochemical products
84 SANWA FELT VIETNAM Japan Manufacture of components used for copiers and laser printers.
PROJECT
85 SWCC SHOWA VIETNAM Japan Producing connecting wires used for electrical, electronic,
household, industrial equipment and means of transport
86 IPTVN FACTORY PROJECT Japan Manufacture of components and spare parts for molds
87 NFK VIETNAM PROJECT Singapore Invest in building a factory producing all kinds of flexible pipes
88 FUJI BAKELITE VIETNAM Japan Invest in building factories and supplementing machinery and
FACTORY EXPAND equipment to increase the capacity of the project of Fuji Bakelite
Vietnam Factory
89 PROCESS LAB PROJECT. Japan Producing metal molds for circuit board production
MICRON VIETNAM
90 SEWS-COMPONENTS Japan Invest in building a factory to produce electronic components
VIETNAM FACTORY for cars and motorcycles; manufactures electrical wiring for cars
PROJECT II and motorcycles
91 PRODUCTION PROJECT Japan Producing industrial cutting tools
OF INDUSTRIAL CUTTING
TOOLS
92 ASAHI KASEI ADVANCE Japan Manufacture of airbags for cars
VIETNAM PROJECT
612
93 Zipper STEEL FACTORY Japan Producing and processing cold drawn wire (rolled steel) from
high-grade alloy steel and stainless steel
94 COLD AKIYAMA-SC Japan Manufacture of cables and conductors
(VIETNAM)
95 FUKOKU BUSSAN Japan Investment and installation of lead glass printing line (lead glass
VIETNAM PROJECT frit) for SMD surface-glued components
96 GLASS PRINTING LINE Japan Invest in building a factory for the production of protective
INVESTMENT PROJECT equipment
97 LEAD FOR SURFACE Japan Invest in building a factory to produce wire mesh pipes to
PARTS SMD collect water
98 THIRD TOTO VIETNAM Japan Invest in building a factory to manufacture sanitary ware and
FACTORY PROJECT related accessories
99 NAGAOKA VIETNAM Japan Invest, build factories and technical infrastructure works for
PROJECT lease
100 THE FOURTH TOTO Japan Producing glass for smartphone cameras and smart watches.
VIETNAM FACTORY
PROJECT
101 FACTORY FOR LEASE Japan Producing ceramic packages of components used for CMOS
INVESTMENT PROJECT IN sensors
LOT G3-G6
102 CRYSTAL-OPTECH Japan Manufacture of crystal oscillators for the automotive industry
FACTORY
103 CMOS COMPONENTS Japan Manufacture of contactors (probes) for testing electrical
PRODUCTION contacts.
INVESTMENT PROJECT

613
MINH DUC INDUSTRIAL ZONE

GENERAL INFORMATION
Address Located in My Hao town, Hung Yen province.
Industrial investor
VNT Infrastructure Investment and Development Joint Stock Company
- Address: Minh Duc Industrial Park, My Hao Town, Hung Yen Province.
- Contact person: Ms. Tuong Quynh Huong – Deputy Director; Phone: 0936.388.477.
Geographical Km32 National Highway 5 (Hanoi - Hai Phong); 35 km from Hanoi center, 58 km from Noi Bai airport,
location 65 km from Hai Phong port, 105 km from Quang Ninh deep sea port.
Fields of investment
▪ Producing and assembling electrical and electronic components and equipment, refrigeration,
attraction
telecommunications, products from new and high-tech technologies;
▪ Mechanical engineering; manufacturing and assembling machinery, equipment, automobiles,
motorcycles, prefabricated metal products; jewelry;
▪ Producing and processing agricultural and forestry products, food, beverages, animal feed (excluding
cattle and poultry slaughter);
▪ Producing products from paper, wood, plastic, rubber, plastic;
▪ Manufacture of pharmaceuticals, cosmetics, paints, packaging, printing, embroidery, labels, building
materials, ceramics, glass, textiles (excluding dyeing), leather and footwear (excluding tanning) , furniture,
kitchen equipment, concrete admixtures, environmental chemicals, coating materials, detergents;
▪ Logistics services, petrol shops
Minimum regional
wage Region 2, minimum salary 4,160,000 VND.

Minimum rental area


According to the agreement with the investor of the industrial park infrastructure.

Limit for
Construction Height According to the planning approved by the competent authority.

Permitted
Construction Rate According to the planning approved by the competent authority.

Planning Area ▪ Scale: 198 hectares. In which, the area of industrial land for lease is 155 hectares.

▪ Industrial land area for lease: 53 ha, occupancy rate is 34.2%.

▪ The remaining industrial land area not yet leased: Approximately 102 ha.

Operation Status
Active

Number of Projects
In the industrial park, there are 31 investment projects (7 FDI projects and 24 DDI projects), with a total

registered investment capital of about 1,087 billion VND and 43 million USD. In which, there are 03

projects with Korean investment capital with a total registered investment capital of about 7.9 million

USD.

Lease fee & ▪ Sublease fee of land associated with industrial park infrastructure: 145 - 150 USD/m2
Operating fee ▪ Management cost: 17,000 VND/m2/year
▪ Electricity cost: According to the general regulations of the Government
▪ Water cost: 15,500 VND/m3
▪ Waste water treatment fee: 14,500 VND/m3

INFRASTRUCTURE

614
Infrastructure
▪ Construction site: The land plots have been processed, ready for the construction of the Factory.
▪ Power supply: The power supply is stable.
▪ Water supply: The water source is taken from the clean water supply station of Hai Duong Clean Water
Trading Joint Stock Company.
▪ Waste water and waste treatment: The wastewater treatment plant was built with a total capacity of
2,500 m3/day.
▪ Telephone & Internet: The telecommunications system meets international standards and is always
available to meet the needs of communication, high-speed data transmission and domestic and international
postal services. The underground fiber optic cable system is directly connected to the fence of each
enterprise.
▪ Internal traffic: The system of internal roads is built with a reasonable cross-section, ensuring easy and
convenient means of transportation to each factory. Lighting systems are installed along the roads.
▪ Fire prevention: Water supply system with fire hydrants is arranged along the roads of the Industrial
Park.
Social infrastructure
▪ Customs: Hung Yen Customs is currently headquartered about 6 km from the Industrial Park. All sealing
and services
and lead clamping procedures are carried out right at the factories in the Industrial Park.
▪ Banking: The system of banks (Vietcombank, Techcombank, ACB, Sacombank, Agribank, Bank for
Investment and Development of Vietnam ...) is located near the industrial park.
▪ Hospital: Pho Noi General Hospital (10 km away from the Industrial Park) is modernly planned and built
to meet the needs of treatment and medical examination and treatment for workers in the Industrial Park.
Location/ Map

615
616
LIST OF TENANTS

No Name of projects Nationality Business line


1 Vegetable and seafood processing factory Vietnam Processing vegetables, fruits and seafood by vacuum
by vacuum drying technology drying technology
2 Factory manufacturing steel structure and Vietnam Manufacture of steel structures and lifting equipment
lifting equipment
3 Tam Hoang Son Industrial Service Vietnam Factory lease
Complex
4 Factory Manufacturing mechanical and Vietnam Producing gasoline engine water pumps, steel billets
plastic foam and EPS foam products.
5 Factory producing composite film, Vietnam Production of composite films used to package
printing on film material and producing products, print on films and manufacture wooden
artificial wood board boards.
6 Steel structure factory Vietnam Manufacturing all kinds of steel structures, non-
standard goods with steel structures
7 Phu Du Garment Factory Vietnam Manufacture of garments for export
8 SPRAY MANUFACTURING Vietnam Producing all kinds of foam
FACTORY
9 Factory producing high-class bedding Vietnam
10 Hiep Hoa specialized car mechanic Vietnam Producing auxiliary equipment for the automotive
factory mechanical industry, products for environmental
sanitation, labor protection equipment, including: Thin
shell products, frame structures, non-standard
components , specialized accessories, workwear.
11 Factory manufacturing steel structure and Vietnam Manufacture of steel structures and lifting equipment
lifting equipment
12 Specialized vehicle assembly plant Vietnam Manufacturing and assembling special-use vehicles.
13 Packaging factory and factory for rent Vietnam Production of plastic packaging;
14 Mechanical factory and factory for rent Vietnam 1. Mechanical processing, production of steel products
2. Invest in building factories for rent
15 FACTORY MANUFACTURING, Vietnam Manufacturing and assembling electric bicycles. Scale
ASSEMBLY ELECTRIC BIKE AND of design capacity: 24,000 units/year. Construction of
CONSTRUCTION FACTORY FOR factory for rent. Scale of area: 22,400m2.
LEASE
16 TOTAL SERVICES MESA Vietnam Invest in building a service center for warehouse
leasing and storing goods.
17 FACTORY, OFFICE FOR LEASE Vietnam Factory and office for rent
18 PLASTIC ADDITIONAL Vietnam Production of plastic additives
PRODUCTION PROJECT
19 HUNG YEN VQB TIN Vietnam Producing, electrolysing and refining tin with 99.95%
MANUFACTURING FACTORY. content from tin ingots with 99.75% content; and
produce tin wire, tin bar, tin range from 99.75% to
99.95%.
20 FACTORY MANUFACTURING, Vietnam Invest in building factories for manufacturing,
MANUFACTURING GARMENTS, processing garments, accessories for the garment
GARMENT ACCESSORIES AND industry, and leasing factories
FACTORY FOR LEASE
21 PRODUCTION OF WOMEN Vietnam PRODUCTION OF WOMEN SURFACES
SURFACES
22 TIEN GIA CUTTING TOOLS Vietnam Invest in building a scissor factory of all kinds
FACTORY
23 ASIA STAR BUILDING MATERIALS Vietnam Invest in building a factory to produce all kinds of
FACTORY materials for the construction industry
24 EXPAND STEEL Structural FACTORY Vietnam Producing steel frame structure and non-standard steel
structure
25 Kerry Integrated Logistics(Hung Yen) CANADA Warehousing, transportation, delivery and distribution
services; Import-Export freight forwarding services
and Logistics services: Store and preserve records.
Capacity 1,500,000 tons of goods/year
26 Garment factory for export KOREA Producing and processing garments for export and
domestic consumption

617
27 Investment project to expand garment KOREA Additional investment, replacement of machinery and
factory for export equipment to improve the production capacity of the
project of garment factory for export
28 Project to manufacture walls, partitions, KOREA Manufacture of walls, partitions, and roofing sheets
and roofing sheets used in Sypanel Vina used in construction; Production of plastic windows
construction and doors with panels
29 KIM THANH VIETNAM CLEAN China Manufacture of metal equipment for clean rooms.
ROOM EQUIPMENT FACTORY - Producing soundproof, heat-insulating,
soundproofing and fire-resistant roofing sheets,
partitions and walls with color coated corrugated iron
and non-metallic minerals.
- Manufacture of metal doors, windows and frames,
shutters, gates, room dividers.
30 GIA HUNG RUBBER SHOOT China Producing labor protection boots from synthetic resin
FACTORY Invest in building ready-built factories and auxiliary
offices for lease
31 BUILDING PROJECT FACTORY FOR UK Producing labor protection boots from synthetic resin
LEASE - CORE5 HUNG YEN I CO., Invest in building ready-built factories and auxiliary
LTD offices for lease

618
MINH QUANH INDUSTRIAL ZONE

GENERAL INFORMATION

Address Located in My Hao town, Hung Yen province.


Industrial investor VID Hung Yen Joint Stock Company.
- Address: Minh Duc Industrial Park, My Hao Town, Hung Yen Province.
- Contact person: Mr. Nguyen Minh Huan; Phone: 0989.768.586.
Geographical Km32 National Highway 5 (Hanoi - Hai Phong); 35 km from Hanoi center, 58 km from Noi Bai airport,
location 65 km from Hai Phong port, 105 km from Quang Ninh deep sea port.
Fields of investment
attraction Electrical, electronic, refrigeration, mechanical, agro-forestry product processing industry, food, high-
grade building materials, packaging industry, consumer goods production, light industry and other
industries. other clean industry.

Minimum regional
wage Region 2, minimum salary 4,160,000 VND.

Minimum rental area


According to the agreement with the investor of the industrial park infrastructure.

Limit for
Construction Height According to the planning approved by the competent authority.

Permitted
Construction Rate According to the planning approved by the competent authority.

Planning Area ▪ Scale: 150 ha. In which, the area of industrial land for lease is 111.35 ha.

▪ Industrial land area for lease: 46.5 ha, occupancy rate is 40.4%.

▪ The remaining industrial land area not yet leased: Approximately 64 ha.

Operation Status
Active

Number of Projects
The IP has received 27 investment projects (10 FDI projects and 17 DDI projects), with a total registered

investment capital of about 2,225 billion VND and 98 million USD. Including 01 project of Korean investor

with registered investment capital of 280.00 USD.

Lease fee & ▪ Land sublease price associated with industrial park infrastructure: 125 - 140 USD/m2
Operating fee ▪ Management cost: 14,000 VND/m2/year
▪ Electricity cost: According to the general regulations of the Government

▪ Water cost: Ngoc Tuan Nagaoka Clean Water Co., Ltd provides directly to investors.

INFRASTRUCTURE

Infrastructure ▪ Construction site: The land plots have been processed, ready for the construction of the Factory.
▪ Power supply: The power supply is stable.
▪ Water supply: The clean water supply plant was built with a total capacity of 5,500 m3/day.
▪ Waste water and waste treatment: The wastewater treatment plant was built with a capacity of 2,000
m3/day.
▪ Telephone & Internet: The telecommunications system meets international standards and is always
available to meet the needs of communication, high-speed data transmission and domestic and international
postal services. The underground fiber optic cable system is directly connected to the fence of each
enterprise.
▪ Internal traffic: The system of internal roads is built with a reasonable cross-section, ensuring easy and
convenient means of transportation to each factory. Lighting systems are installed along the roads.
▪ Fire prevention: Water supply system with fire hydrants is arranged along the roads of the Industrial

619
Park.
Social infrastructure ▪ Customs: Hung Yen Customs is currently headquartered about 6 km from the Industrial Park. All sealing
and services and lead clamping procedures are carried out right at the factories in the Industrial Park.
▪ Banking: The system of banks (Vietcombank, Techcombank, ACB, Sacombank, Agribank, Bank for
Investment and Development of Vietnam ...) is located near the industrial park.
▪ Hospital: Pho Noi General Hospital (10 km away from the Industrial Park) is modernly planned and built
to meet the needs of treatment and medical examination and treatment for workers in the Industrial Park.
Location/ Map

620
LIST OF TENANTS

No Name of Projects Nationality Business line


1 NEW BEST WIRE VIETNAM Taiwan Producing high-grade carbon steel wire, alloy steel
INDUSTRIAL FACTORY PROJECT wire, stainless steel wire by steel wire tensioning
technology
2 PROJECT BY JAPANESE SAFETY Japan Invest in building warehouses to store goods
STANDARDS
3 NAKANO INDUSTRIES VIETNAM Japan 2.1. Producing drums from metal.
2.2. Exercising the right to export, import, and
distribute wholesale (without establishing a
wholesale establishment) of goods with HS codes:
4016, 7326, 8309.
2.3. Services related to production (CPC 884, 885).
Details: Repairing drums
4 PROJECT OF FACTORY, Singapore 2.1. Invest in building factories, warehouses,
WAREHOUSE, OFFICE FOR LEASE offices and some ancillary works for lease.
VIETLOG 2.2. Management consulting and investment
consulting services for businesses (CPC 865).
5 FACTORY AND WAREHOUSE FOR Singapore Invest in building factories and offices for rent
LEASE DH LOGISTICS PROPERTY
MINH QUANG VIETNAM
6 GENERATOR MANUFACTURING China Manufacture of generating sets and generator
FACTORY - ELECTRIC ENGINE SENCI engines; High pressure car washing machine, water
VIETNAM pump of all kinds; 4 stroke gasoline engine
7 PRODUCTION OF CONCRETE KOREA Producing raw materials for concrete admixtures,
ADDITIONAL MATERIALS concrete admixtures
8 SUPERLON HUNG YEN FACTORY Singapore Manufacture of rubber-based products, such as:
Insulation rolls, sheet insulation, exercise mats,
foam insulation tapes, insulating tapes,
soundproofing materials, foam pads for use in the
car
9 HIGHEND KITCHEN PRODUCTION China Production and processing of kitchen cabinets,
PROJECT kitchen drawers, edge braces and wooden kitchen
cabinet partitions
10 BURMAY VIETNAM INVESTMENT China (HK) Producing hand tools and electric machinery
PROJECT
11 MECHANICAL MANUFACTURING Vietnam Invest in the construction of a factory to
FACTORY, THANG LONG HUNG YEN manufacture and process mechanical products for
MECHANICAL JOINT STOCK the automotive, motorcycle, household appliances,
COMPANY and furniture industries.
12 INVESTMENT IN CONSTRUCTION Vietnam Invest in building factories and offices for rent
FACTORY, OFFICE FOR LEASE
13 CONTAINER FACTORY Vietnam Producing container houses and containers
14 MANUFACTURING FACTORY Vietnam Invest in the construction of a factory to
manufacture and construct prefab houses with
industrial wood and metal
15 INVESTMENT IN CONSTRUCTION Vietnam Invest in building factories and offices for rent
FACTORY, OFFICE FOR LEASE
16 PRODUCTION OF PLASTIC Vietnam Investing in building a factory to produce
HOUSEHOLDS AND FACTORY LEASE household plastic products and leasing factories and
3A offices
17 PLASTIC ADDITIONAL FACTORY Vietnam Invest in building a factory to produce plastic
additives.
18 STORAGE AND MATERIALS Vietnam 2.1. Warehouse and trading of production materials
TRADING OF KIEN VUONG for the food, pharmaceutical, food and industrial
COMPANY IN HUNG YEN additives, animal feed, veterinary medicine, aquatic
medicine, aquaculture medicine.
2.2. Dispensing Dextrose from powder to liquid
form
19 PROJECT FACTORY, OFFICE FOR Vietnam Invest in building factories and offices for rent
LEASE TTC

621
20 DULICO MECHANICAL Vietnam Invest in building a factory for the production of
MANUFACTURING FACTORY AND lock details and components; mold production;
FACTORY LEASE production of copper trees, copper sheet rolls; and
for rent factories and offices
21 VAN HO LOGISTICS Vietnam Investing in construction, providing dry and cold
storage services
22 MINH THU LOGISTICS CENTER Vietnam LOGISTICSMINH THU CENTER
23 AN HUNG THINH PACKAGING Vietnam Invest in building a factory to produce plastic and
FACTORY paper packaging
24 PROJECT HUNG YEN Vietnam Building factories and offices for rent
25 FACTORY, OFFICE FOR LEASE Vietnam Invest in building factories, offices and ancillary
works for lease.
26 JASTAR FURNITURE AND EXTERIOR Vietnam Invest in building a factory to manufacture interior
PRODUCTION FACTORY and exterior products made of wood and plastic and
lease factories and offices
27 CARTON PACKAGING FACTORY IN Vietnam Producing carton packaging from paper
HUNG YEN

622
YEN MY INDUSTRIAL ZONE

GENERAL INFORMATION

Address Located in Yen My district, Hung Yen province.


Industrial investor
Viglacera Industrial Park Development Joint Stock Company Yen My - Hung Yen.
- Address: Km 33, new road 39A, Lieu Xa commune, Yen My district, Hung Yen province.
- Contact person: Mr. Nguyen Anh Tuan – Director; Phone: 0932.309.8888.
Geographical location Adjacent to the new National Highway 39 A; 32 km from Hanoi, about 75 km from Hai Phong port,
118 km from Quang Ninh deep sea port
Fields of investment High-tech application; Manufacture of electrical equipment, electronics, computers and optical
attraction products; Manufacture of automobiles, motorcycles, machinery, equipment and products from
prefabricated metal; Processing and preserving meat, vegetable and fruit products; Beverage
production; manufacture of wood products; pharmaceuticals, cosmetics, paints, packaging; Services
of Logistics.
Minimum regional wage
Region 2, minimum salary 4,160,000 VND

Minimum rental area


According to the agreement with the investor of the industrial park infrastructure

Limit for Construction


Height According to the planning approved by the competent authority

Permitted Construction
Rate According to the planning approved by the competent authority

Planning Area ▪ Scale: 280 hectares. In which, the area of industrial land for lease is 204 ha.

▪ Industrial land area for lease: 108.3 ha, occupancy rate is 53%.

▪ The remaining industrial land area not yet leased: Approximately 95 ha.

Operation Status
Active

Number of Projects
The IP has received 30 investment projects (16 FDI projects and 14 DDI projects), with a total

registered investment capital of about 2,020 billion VND and 298 million USD. In which, there are

03 projects of Korean investors with registered investment capital of 36 million USD.

Lease fee & Operating fee


▪ Land sub-lease price associated with industrial park infrastructure: 120 - 135 USD/m2
▪ Management cost: 0.7 USD/m2/year
▪ Electricity cost: According to the general regulations of the Government
▪ Water cost: 13,000 VND/m3
▪ Waste water treatment fee: 12,000 VND/m3

INFRASTRUCTURE

Infrastructure ▪ Construction site: The land plots have been processed, ready for the construction of the Factory.
▪ Power supply: The power supply is stable.
▪ Water supply: Provided by a clean water supply plant outside the IP.
▪ Waste water and waste treatment: The wastewater treatment plant was built with a capacity of
2,000 m3/day.
▪ Telephone & Internet: The telecommunications system meets international standards and is
always available to meet the needs of communication, high-speed data transmission and domestic
and international postal services. The underground fiber optic cable system is directly connected to

623
the fence of each enterprise.
▪ Internal traffic: The system of internal roads is built with a reasonable cross-section, ensuring
easy and convenient means of transportation to each factory. Lighting systems are installed along
the roads.
▪ Fire prevention: Water supply system with fire hydrants is arranged along the roads of the
Industrial Park.
Social infrastructure and ▪ Customs: Hung Yen Customs is currently headquartered about 3 km from the Industrial Park. All
services sealing and lead clamping procedures are carried out right at the factories in the Industrial Park.
▪ Banking: The system of banks (Vietcombank, Techcombank, ACB, Sacombank, Agribank, Bank
for Investment and Development of Vietnam ...) is located near the industrial park.
▪ Hospital: Pho Noi General Hospital (4 km from the Industrial Park) is modernly planned and built
to meet the needs of treatment and medical examination and treatment for workers in the Industrial
Park.
Location/ Map

624
LIST OF TENANTS

No Name of Projects Nationality Business line


1 HUNG YEN LOGISTICS PARK Singapore Invest in the construction of a logistics center to develop,
I operate and lease the completed logistics facilities and
related technical infrastructures and works; real estate
business; providing management services (CPC 742);
provides real estate management services (CPC 82202).
2 HUNG YEN LOGISTICS PARK Singapore Invest in the construction of a logistics center to develop,
II operate and lease the completed logistics facilities and
related technical infrastructures and works; real estate
business; providing management services (CPC 742);
provides real estate management services (CPC 82202).
3 HUNG YEN LOGISTICS PARK Singapore Invest in the construction of a logistics center to develop,
III operate and lease the completed logistics facilities and
related technical infrastructures and works; real estate
business; providing management services (CPC 742);
provides real estate management services (CPC 82202).
4 YUSUNG ELECTRONICS Korea Manufacture of engine control devices, sensors and LEDs
VINA
5 JIA YANG PACKAGING Samoa Paper packaging production
FACTORY
6 SANG-A VINA PROJECT KOREA - Producing all kinds of pneumatic accessories such as:
wiper valves, safety valves, connectors, connecting pipes,
steam valves, couplings...: 2,000,000 products/year
(equivalent to 480 tons/year);
- Producing all kinds of plastic pipes, plastic pneumatic
pipes (for industrial robots and pneumatic pipes): 1,000,000
meters/year (equivalent to 360 tons/year)
7 POLYMERIC PRODUCTS VGH China (DL) Producing synthetic rubber of all kinds and products from
CO., LTD (VIETNAM) synthetic rubber; Producing products from synthetic plastic
8 FACTORY FUSION GROUP KOREA 2.1. Production, processing and packaging of animal feed.
2.2. Exercising the right to export, import, and distribute
wholesale (without establishing a wholesale establishment)
of goods with the following file codes: 1902, 1905,
2309.10, 2309.90.20, 3920, 3926, 4201.00.00 , 4203, 4415,
6115, 7323, 7326.20, 8214, 8424.10, 8531, 8703, 9603.
2.3. Providing warehousing and storage services (CPC 742)
(only operating since April 2025).
9 YEE WOO VIETNAM WATER China (HK) Invest in building a factory to produce packaging from
FACTORY YEE WOO cardboard, corrugated paper from cardboard
VIETNAM
10 FACTORY MANUFACTURING Germany Invest in building a factory to produce additives for the
CONSTRUCTION SURFACES construction industry.
AND ADDITIONS
11 HUNG YEN TITAN Singapore 2.1 Invest in building factories, warehouses and ancillary
INDUSTRIAL PROJECT works for lease.
2.2. Warehousing and storage of goods (CPC 742).
2.3. Brokerage services, real estate consulting, real estate
management.
2.4. Technical consulting service (CPC 8672).
2.5. Management consulting services (CPC 865).
12 GOODS STORAGE AND AIG China (HK) - Centers, warehouses for storing goods and leasing
MANUFACTURING FACTORY warehouses: 50,000 tons of products;
IN HUNG YEN - Production and mixing of food ingredients and food
additives: 1,200 tons of products/year
13 PAPER PRODUCTION China (HK) Producing paper bags, paper boxes from paper
FACTORY
14 FACTORY MANUFACTURING China 2.1. Manufacturing and assembling components,
COMPONENTS FOR accessories and spare parts: automobiles, motorcycles,
ELECTRIC VEHICLES, mopeds, electric bicycles, electric motorcycles, electric
MOTORCYCLES, GARDEN vehicles, generators; agricultural machinery, forestry,
MACHINERY AND gardening machines, mechanical processing.
MECHANICAL PRODUCTION 2.2. Manufacture of metal furniture accessories.

625
2.3. Office and factory for rent
15 ACEWELL FACTORY Samoa Manufacture of mechanical components for the automotive
(VIETNAM) and petroleum industry
16 ECHO PLASTIC FLOOR America Producing plastic floor panels and PVC films of all kinds.
FACTORY

626
YEN MY II INDUSTRIAL ZONE

GENERAL INFORMATION

Address Located in Yen My district, Hung Yen province


Industrial investor
Hoa Phat Hung Yen Industrial Park Infrastructure Development Company Limited.
- Address: 39 Nguyen Dinh Chieu, Le Dai Hanh ward, Hai Ba Trung district, City. Hanoi.
- Tel: 024.39763889 Fax: 024.39763890 ;
- Contact person: Mr. Cuong- 0918.507.886.
Geographical Adjacent to Highway 39; about 5km from National Highway 5A, about 3km from Hanoi-Hai Phong
location highway intersection, about 30km from Hanoi center, 55km from Noi Bai airport, 75km from Hai Phong
port, 120km from Quang Ninh deep sea port.
Fields of investment
Manufacturing and assembling data transmission equipment and components, mobile phones, computers
attraction
and peripheral devices; software and digital content production; manufacturing and assembling electrical,
electronic, refrigeration, optical, telecommunications, automobile, motorbike, and other motorized vehicles,
machines and equipment; manufacturing mechanical products, machinery and equipment, manufacturing
molds, jewelry, jewelry; metal production (excluding the production of cast iron and steel billets);
production of sports equipment, toys, production of building materials (excluding production of cement,
clinker, bricks and tiles); manufacturing composite materials, flexible, super-durable, ultra-lightweight
materials; industrial gas production; production and processing of agricultural products, food (excluding
production of cassava flour, vermicelli, monosodium glutamate, sugar from sugar cane; processing aquatic
products, seafood; slaughtering livestock and poultry), beverages, food breed; manufacture of paper
products (excluding pulp and paper production), wood (excluding wood processing, wood chips from
natural wood), plastic (excluding recycling of plastic scraps), high rubber, plastics, non-metallic minerals
and from steel, aluminum and alloys; manufacturing pharmaceuticals, cosmetics, packaging and labels;
manufacture of medical equipment; manufacture of chemical products (excluding basic chemicals,
detergents, additives, chemical fertilizers, plant protection chemicals); logistics services, warehouses,
factories for rent, petrol stations; manufacture of supporting industry products (excluding textiles, garments,
leather and shoes) on the list of priority development as prescribed by law and other industries producing
products from new and high-tech technologies.
Minimum regional Region 2, minimum salary 4,160,000 VND
wage
Minimum rental area According to the agreement with the investor of the industrial park infrastructure
Limit for According to the planning approved by the competent authority
Construction Height
Permitted According to the planning approved by the competent authority
Construction Rate

Planning Area ▪ Scale: 313.5 ha. In which, the area of industrial land for lease is 221.83 ha.

▪ Industrial land area for lease: 62.4 hectares, occupancy rate is 28.1%.
▪ The remaining industrial land area not yet leased: Approximately 159 ha.

Operation Status
Active

Number of Projects
The IP has received 43 projects (26 DDI projects and 17 FDI projects), with a total registered investment capital

of about 2,736 billion VND and 200 million USD. In which, there are 02 projects with investment capital of

foreign investors with a registered investment capital of about 15 million USD.

627
Lease fee & ▪ Land sub-lease price associated with industrial park infrastructure: 120 - 135 USD/m2
Operating fee ▪ Management cost: 0.7 USD/m2/year
▪ Electricity cost: According to the general regulations of the Government
▪ Water cost: 13,500 VND/m3
▪ Waste water treatment fee: 12,000 VND/m3

INFRASTRUCTURE

Infrastructure
▪ Construction site: The land plots have been processed, ready for the construction of the Factory.
▪ Power supply: Power is supplied stably with a 110/22KV transformer station with a capacity of 63 MVA.
▪ Water supply: The clean water supply plant was built with a total capacity of 6,000 m3/day.
▪ Waste water and waste treatment: The wastewater treatment plant was built with a total capacity of
3,000 m3/day.
▪ Telephone & Internet: The telecommunications system meets international standards and is always
available to meet the needs of communication, high-speed data transmission and domestic and international
postal services. The underground fiber optic cable system is directly connected to the fence of each
enterprise.
▪ Internal traffic: The system of internal roads is built with a reasonable cross-section, ensuring easy and
convenient means of transportation to each factory. Lighting systems are installed along the roads.
▪ Fire prevention: Water supply system with fire hydrants is arranged along the roads of the Industrial
Park.
Social infrastructure
▪ Customs: Hung Yen Customs is currently headquartered about 6 km from the Industrial Park. All sealing
and services
and lead clamping procedures are carried out right at the factories in the Industrial Park.
▪ Banking: The system of banks (Vietcombank, Techcombank, ACB, Sacombank, Agribank, Bank for
Investment and Development of Vietnam ...) is located near the industrial park.
▪ Hospital: Pho Noi General Hospital (7 km from the Industrial Park) is modernly planned and built to meet
the needs of treatment and medical examination and treatment for workers in the Industrial Park.
Location/ Map

628
629
LIST OF TENANTS

No Name of Projects Nationality Business line


1 Tri-Wall Vina Packaging China (HK) * Producing packaging from cardboard materials
Factory * Producing wooden pallets
2 YAMCO PRECISION Japan Manufacturing and processing precision mechanical products, auto
VIETNAM FACTORY parts and components used for electronic equipment.
Economic organizations established to implement this investment
project may apply regulations on export processing enterprises.
3 MING SHIN VIETNAM China (HK) Production of paper packaging, production of plastic packaging and
FACTORY printing
4 PROJECT Japan Producing food containers with aluminum foil, paper, plastic film
MANUFACTURING FOOD
CONTAINERS SHINMEI
VIETNAM
5 YOUNGMIN HI-TECH KOREA Producing and processing car steering wheel heating pads, electric
VINA car seat pads and related accessories
6 INTECH COLOR VIETNAM China Producing all kinds of colored plastic beads
FACTORY
7 PROJECT KIV Korea Invest in building a factory to produce auto components
8 BEVERAGE ENGLISH Invest in building a factory to produce soy milk, pure drinking
MANUFACTURING (Cayman) water, fruit juice, and carbonated soft drinks
FACTORY
9 THE NORTH TRIBECO. Japan Invest in building a factory to manufacture and process mechanical
products for washing machines, electric trains, ships, and machine
shelves.
10 LAYMAC VIETNAM China Invest in building factories, offices and warehouses for rent.
FACTORY
11 PROJECT OF FACTORY, China Assembling pressure pumps, 4-stroke gasoline engines, gasoline
OFFICE, HOUSE FOR generators
LEASE
12 ENGINE PRODUCTS China Generator assembly
ASSEMBLY FACTORY
13 VIETNAM RAIDON China Manufacturing and assembling gasoline-powered generators: 27,000
MECHANICAL tons/year
Manufacturing and assembling gasoline generator components such
as: cylinder shield, electric motor, control screen, mounting frame,
fuel tank: 110 tons/year
14 GENERATOR ASSEMBLY Indonesia Production of veterinary drugs
FACTORY
15 JIANGHUAI GENERATOR Spain Invest in the construction of a mold factory; manufacturing and
ASSEMBLY FACTORY processing plastic products, civil and industrial plastic
specifications; assembling civil and industrial electrical equipment
16 VAKSINDO VIETNAM China Assembling snow removal machines, cultivators, washers, lawn
VETERINARY PROJECT mowers, engines
17 SIMON ELECTRICAL China Assembling pressure pumps, generators, 4-stroke gasoline engines,
EQUIPMENT FACTORY snow removal machines, cultivators, washing machines, lawn
mowers

630
CLEAN INDUSTRIAL PARK

GENERAL INFORMATION

Address Located in Khoai Chau and An Thi districts, Hung Yen province.
Industrial investor
VTK Hung Yen Industrial Park Investment and Development Company Limited.
- Address: Executive office building, Ecopark urban area, Xuan Quan commune, Van Giang district,
Hung Yen province, Vietnam.
- Contact person: Mr. Sun Byung Soo; Position: General Director.
Geographical location Adjacent to the road connecting Hanoi - Hai Phong Expressway and Cau Gie - Ninh Binh Expressway;
about 2 km from the intersection to Hanoi - Hai Phong highway, about 35 km from Hanoi center, 50
km from Noi Bai airport, 75 km from Hai Phong port, 120 km from Quang Ninh deep sea port.
Fields of investment
attraction Manufacture of data transmission equipment and components, mobile phones, computers and
peripheral devices; software production, digital content; manufacturing and assembling electrical and
electronic equipment and components; manufacturing and assembling automobiles, motorcycles and
auto and motorcycle parts; manufacturing machinery and equipment for industry, agriculture and
energy; manufacturing precision mechanical products, molds, high-grade steel and components and
spare parts for mechanical processing machines; manufacturing composite materials, flexible, super-
durable, ultra-lightweight materials; manufacturing supporting technology products according to the
Government's regulations; manufacturing in the field of cosmetics and pharmaceuticals with
intelligent and automated production processes; produce energy-saving products; warehousing, goods
storage, logistics operations
Minimum regional wage
Region 2, minimum salary 4,160,000 VND

Minimum rental area According to the agreement with the Investor


Limit for Construction According to the planning approved by the competent authority
Height
Permitted Construction According to the planning approved by the competent authority
Rate

Planning Area ▪ Scale: 143.08 ha. In which, the area of industrial land for lease is 100 ha.

▪ Industrial land area for lease: 13 hectares, occupancy rate is 13%.

▪ The remaining industrial land area not yet leased: About 87 ha.

Operation Status
In operation, the investor is building the infrastructure of the industrial park

Number of Projects
The IP has received 7 FDI projects of Korean investors, with a total registered investment capital of
about 36 million USD.

Lease fee & Operating fee ▪ Sub-lease fee of land associated with industrial park infrastructure: 96 - 130 USD/m2
▪ Management cost: 13,800 VND/m2/year
▪ Electricity cost: According to the general regulations of the Government
▪ Water cost: IP infrastructure investor has not decided yet
▪ Waste water treatment fee: IP infrastructure investor has not decided yet

INFRASTRUCTURE

Infrastructure
The investor is building the infrastructure of the industrial park

631
Social infrastructure and
▪ Banking: The system of banks is located near the IP.
services
▪ Hospitals: Some provincial hospitals are near the industrial park, meeting the needs of treatment and
medical examination and treatment for industrial park workers.
Location/ Map

632
INDUSTRIAL PARK NO.3

GENERAL INFORMATION

Address Located in Yen My, Khoai Chau and An Thi districts, Hung Yen province
Industrial investor
Ecoland Industrial Park Management Joint Stock Company.
- Address: C78 Pho Truc, Ecopark Urban Area, Xuan Quan Commune, Van Giang District, Hung Yen Province,
Vietnam.
- Contact person: Mr. Ho Nam – 0987.803.699; Position: Deputy General Director
Geographical
location Adjacent to the road connecting Hanoi - Hai Phong Expressway and Cau Gie - Ninh Binh Expressway; about 1

km from the intersection to Hanoi - Hai Phong highway, about 35 km from Hanoi center, 50 km from Noi Bai

airport, 75 km from Hai Phong port, 120 km from Quang Ninh deep sea port.
Fields of
Manufacturing electrical equipment, data transmission accessories, mobile phones, computers and peripheral
investment
attraction devices; production of communication equipment; manufacture of civil electrical products, manufacture of civil
electrical appliances, manufacture of hand tools powered by motor or compressed air; producing shoes;
manufacture of electric motors, generators, transformers, electrical distribution and control equipment;
production of plastics and synthetic rubber in primary form; manufacture of office machinery and equipment
(except for computers and computer peripherals); manufacture beds, cabinets, tables and chairs; manufacture of
gymnastics and sports equipment; manufacture toys and games; manufacture of refractory products; manufacture
of electric lighting equipment; manufacture of electric lighting equipment; manufacture of metal tanks, tanks
and containers; software production, digital content; manufacturing and assembling electrical and electronic
equipment and components; manufacturing and assembling automobiles, motorcycles and auto and motorcycle
parts; manufacturing machinery and equipment for industry, agriculture and energy; manufacturing precision
mechanical products, molds, high-grade steel and components and spare parts for mechanical processing
machines; manufacturing composite materials, super-plastic, super-durable, ultra-lightweight materials;
manufacturing supporting industry products according to the Government's regulations; manufacturing in the
field of cosmetics and pharmaceuticals with intelligent and automated production processes; produce energy-
saving products; production, business and distribution of clean energy, renewable energy; warehouse, storage of
goods; logistics activities and other industries encouraging investment
Minimum regional Region 2, minimum salary 4,160,000 VND
wage
Minimum rental According to the agreement with the Investor who is building the infrastructure of the Industrial Park
area
Limit for According to the planning approved by the competent authority
Construction
Height
Permitted
According to the planning approved by the competent authority
Construction Rate

Planning Area ▪ Scale: 159.71 ha. In which, the area of industrial land for lease is 115 hectares.

▪ Industrial land area for lease: 0 ha, occupancy rate is 0%.

▪ The remaining industrial land area not yet leased: 115 ha.

Operation Status The investor is compensating for site clearance and applying for land lease
Number of Projects Calling for investment attraction and in the industrial park
Lease fee & Calling for investment attraction and in the industrial park
Operating fee

633
INFRASTRUCTURE

Infrastructure
The investor is building the infrastructure of the industrial park

Social
▪ Banking: The system of banks is located near the IP.
infrastructure and
services ▪ Hospitals: Some provincial hospitals are near the industrial park, meeting the needs of treatment and medical
examination and treatment for industrial park workers.
Location/ Map

634
INDUSTRIAL PARK NO.4

GENERAL INFORMATION

Address Located in An Thi and Kim Dong districts, Hung Yen province
Industrial investor
Yen My Industrial Park Investment Joint Stock Company.
- Address: No. 63 Tran Duy Hung, Trung Hoa, Cau Giay, Hanoi, Vietnam.
- Contact person: Mr. Nguyen Tuan – 0977.865.455; Position: Director.
Geographical location Adjacent to the road connecting Hanoi - Hai Phong Expressway and Cau Gie - Ninh Binh Expressway;
about 3 km from the intersection to Hanoi - Hai Phong highway, about 35 km from Hanoi center, 50 km
from Noi Bai airport, 75 km from Hai Phong port, 120 km from Quang Ninh deep sea port
Fields of investment
Electronics, precision mechanics; light industry, other production and business industries in accordance with
attraction
the industrial development planning of Hung Yen province
Minimum regional wage
Region 2, minimum salary 4,160,000 VND

Minimum rental area According to the agreement with the investor


Limit for Construction According to the planning approved by the competent authority
Height
Permitted Construction According to the planning approved by the competent authority
Rate

Planning Area ▪ Scale: 192.64 ha, industrial land for lease is 143 ha..

▪ Industrial land area for lease: 0 ha, occupancy rate is 0%.

▪ The remaining industrial land area not yet leased: Approximately 143 ha.

Operation Status The investor is building the infrastructure of the industrial park.
Number of Projects Calling for investment attraction and in the industrial park
Lease fee & Operating
▪ Land sub-lease price associated with industrial park infrastructure: 115 - 120 USD/m2
fee
▪ Management cost: 13,800 VND/m2/year
▪ Electricity cost: According to the general regulations of the Government
▪ Water cost: IP infrastructure investor has not decided yet
▪ Waste water treatment fee: IP infrastructure investor has not decided yet

INFRASTRUCTURE

Infrastructure
The investor is building the infrastructure of the industrial park

Social infrastructure and


▪ Banking: The system of banks is located near the IP.
services
▪ Hospitals: Some provincial hospitals are near the industrial park, meeting the needs of treatment and
medical examination and treatment for industrial park workers.
Location/ Map

635
636
[- This Page is intentionally left blank -]

637
KHANH HOA

638
INVESTMENT ENVIRONMENT IN KHANH HOA

GENERAL INFORMATION

▪ Area: 5,199.5 km2


Area, Population
▪ Population: 1.254 million (2022 statistic)
▪ Located in the South-Central Coast region of Vietnam.
Geographical Location ▪ Located 450 km from Ho Chi Minh city and 1.270 km from Hanoi city

▪ Phu Yen province to the north, DakLak and Lam Dong to the west, the sea to the
Adjacent provinces
east, and Ninh Thuan province to the south.
2022 statistic:
▪ GRDP: 54,505.2 billion VND (2,32 billion USD)
▪ GRDP growth: 20,7%
▪ GRDP per capita: 3,257 USD/year
GRDP
▪ Economic structure:
- Industry - Construction: 32.39 %;
- Agriculture. forestry and fishery: 11.2 %;
- Service: 46.54 %;
- Tax on Goods: 9.88 %
2022 statistic compared to 2021:
Growth ▪ Industry - Construction growth: 24.61 %
▪ Agriculture, forestry and fishery growth: 2.49 %
▪ Service growth: 25.46 %

PCI ▪ Score: 67.74 – ranked 16 out of 63 cities and provinces in Vietnam. (2022)

SOCIAL INFRASTRUCTURE

▪ Roadway: Road traffic is smooth to the neighboring provinces and the Central -
Central Highlands through National Highways 1A, 26, 27C and Deo Ca Tunnel. T
▪ Railway: The North-South railway runs along Khanh Hoa province, with Nha Trang
Station as one of the major stations to ensure the transit of passengers and goods to
localities in the country.
▪ Waterway: Khanh Hoa province has the orientation to plan 04 inland waterway
wharf areas: Van Phong Bay, Nha Phu lagoon, Nha Trang Bay and Cam Ranh Bay to
meet the demand of freight and passengers serving the socio - economic development
of the province with ship sizes: Container vessels up to 24,000 TEU (Northern Van
Phong); General and bulk cargo vessels from 100,000 to 300,000 tons (North/- South
Van Phong, Cam Ranh) and passenger ships up to 225,000 GT in all 04 areas.
Transportation ▪ Airway: Cam Ranh International Airport is the port with the 4th largest passenger
transport port in Viet Nam and with the 3rd international passenger traffic ranked in
the country. Cam Ranh International Airport is capable in receiving Airbus 320, 321,
300-600, Boeing 767, 777, 747 and equivalent aircraſt
* Capacity: 85 flights/day
* International flights to: Russia, China, Hong Kong, Korea, Malaysia, Singapore,
Uzbekistan
* Distance: 35 km south of Nha Trang city center and 10 km north of Cam Ranh.
▪ Marina: to serve tourism. The bay areas of Nha Trang, Cam Ranh, Van Phong are
oriented to study the berth, anchor buoys serving cruise ships, yachts to use the above
tourism services and study the construction of airports for seaplanes in service of
tourism associated with the tourist port.

639
Khanh Hoa province's electricity grid system is located in the national power grid
system with a fairly strong power grid. The province's commercial electricity reached
2,136 billion kWh in 2021, reaching 95.16% compared to 2020, Pmax = 395MW. The
Electricity main power is supplied by 2 hydroelectric power plants and 01 transformer station
220/110/22KV- 250MVA Nha Trang with capacity (125+250)MVA, Pmax = 278MW
that meets the power demand for operation, production and business of investors.

Khanh Hoa province has 9 factories with a total capacity of 173,500m3/day and night.
There are 05 water supply plants outside the Van Phong Economic Zone with a
Water capacity of 91,000m3/day-night. Van Phong economic zone has 04 reservoirs
including Dong Dien Lake (100 million m3), Da Ban Lake (75 million m3), Hoa Son
Lake (19 million m3), and Tien Du Lake (09 million m3).
▪ 06 Special research institution, 09 universities and institutes, 04 junior colleges and
Education over 30 vocational schools in the province and Singapore Vietnam International
School.
▪ Hospital system: Khanh Hoa Provincial General Hospital, Vinmec International
Hospital, Saigon - Nha Trang Eye Hospital, 22/12 Hospital, 87 Hospital, Tam Tri
Hospital, Saigon General Hospital – Nha Trang, Khanh Hoa Provincial Cancer
Medicare
Hospital, Yersin Nha Trang General Hospital.
▪ Private polyclinics: Tin Duc, Phuc Sinh, Medic, Olympia Polyclinic and family
doctor...

INVESTMENT CONDITION

Human resource ▪ 63,8% of population are in the working age (2022)

Education level ▪ Trained labor rate: 83% (2022)

▪ The minimum salary for the province is applied as follows:


- Area I: 4,680 million/month
- Area II: 4,160 million/month
Salary
- Area III: 3,640 million/month
- Area IV: 3,250 million/month

▪ Incentives according to government regulations:


According to the rules of law.
▪ Incentives from the province:
Investment incentives
Resolution No. 55/2022/QH15 dated June 16, 2022 of the National Assembly on piloting
some preferential mechanisms, policies and peculiarities of Khanh Hoa
provincedevelopment includes 05 groups of policies with 11 specific policies
▪ Prioritized projects:
On April 13, 2022, the Prime Minister issued Decision 451/QD-TTg approving the
task of adjusting the master planning on Van Phong economic zone, Khanh Hoa
province until 2040, vision to 2050 with the following important points: * As a multi-
sector integrated economic zone, it plays a leading role in attracting investment. It is an
economic development’s main force for the regions and the whole country. The green
economy is the foundation with an international container transshipment port and
Fields Attracting Investment
logistics, the urban, services, tourism and industry. All play an important role
combining with the development of other economic sectors
* As a center of high-class general tourism and entertainment services, which is
unique, distinct and modern tourism products and services with high quality, branded
and international competitiveness
* As an area for sustainable smart urban development with a modern and
synchronously developed social infrastructure system full stop

640
Map

Department of Planning and Investment


▪ Address: 01 Tran Phu street, Nha Trang city, Khanh Hoa Province
▪ Tel: 0258.3822.906
Contact
▪ Fax : 0258.3822.906
▪ Email:
▪ Contact person: 0913839438

LIST OF INDUSTRIAL ZONES

Industrial Park Location Scale Occupancy rate Status

Suoi Dau Industrial Park Suoi Tan commune 136,73 ha 97% occupancy rate In operation
www.sudazi.com.vn Cam Lam district

Ninh Thuy Industrial Park Ninh Thuy ward Ninh 207,9 ha 35% occupancy rate In operation
www.ninhthuyip.com Hoa Town

641
Khatoco Ninh Ich industrial Ninh Ich commune 35,58 ha Completed In operation
and livestock cluster infrastructure,
Ninh Hoa town
occupancy rate
reaches 69%

Ninh Xuan Cluster Ninh Xuan commune 50 ha The first construction Under contruction
procedures are
Ninh Hoa town
underway

Dac Loc Cluster Vinh Phuong commune 34,52 ha 100% occupancy rate In operation

Nha Trang city

Dien Phu Cluster Dien Phu commune 49,77 ha 100% occupancy rate In operation

Dien Khanh district

Dien Phu VCN Cluster Dien Phu commune 25,23 ha Completed In operation
infrastructure, phase 3
Dien Khanh district
expansion investment
is underway

Dien Phu VCN Cluster Dien Tho commune 50 ha The first construction Under contruction
procedures are
Dien Khanh district
underway

Trang E 1 Cluster Suoi Tan commune and 35,2 ha Completed In opertation


Suoi Cat commune infrastructure, calling
for secondary
Cam Lam district
investors; occupancy
rate reaches 91%

Trang E 2 Cluster Suoi Tan commune and 44,68 ha Infrastructure is being Under contruction
Suoi Cat commune completed

Cam Lam district

642
Song Cau Cluster Song Cau commune 40 ha Completed In operation
infrastructure, calling
Khanh Vinh district
for investors

643
LOCATION MAP OF INDUSTRIAL ZONES

644
SUOI DAU INDUSTRIAL ZONE

GENERAL INFORMATION
Address Suoi Dau Industrial Zone, Suoi Tan Commune, Cam Lam District, Khanh Hoa Provine

Name of Investor:
Investor Suoi Dau Industrial Zone Join Stock Comany
▪ Address: Suoi Dau Industrial Zone, Suoi Tan Commune, Cam Lam District, Khanh Hoa
Provine
▪ Tel: 0583743249
▪ Email: info@sudazi.com.vn
▪ Website:www.sudazi.com.vn
Contact Person Mr Tran Dinh Tan
Position: General Director
Tel: 0944192130
Location - Located on National Highway 1A
- 20km to Nha Trang City
- 35km to Cam Ranh Port, Cam Ranh Internation Airport.

Investment Sectors Priority Sectors for Seafood processing; vegetables, caned food processing;
Investment garment; electronics, mechanical engineering…

Investment Restricted Acording to Investment Restricted Sectors


Sectors
Minimum wage 3,640,000 VND/month
Lease term ▪ Start date:
▪ End date: 21/8/2048
Minimum Lease Area 5,000 m2
Limit for Construction 5 floors
Height

Permitted Construction 70% for 1 floor construction, 60% for 2 floors construction, 50% for 3-5 floors construction
Rate

Planned area ▪ Total area: 136.73 ha


▪ Total vacant leasable area: 92.05 ha
▪ Total area with full infrastructure ready to build factory: 92.05 ha

Factory Available for Rent ▪ Total area: None

Operation Status ▪ Active

Occupancy Rate and ▪ 97%


Number of Projects

Number of Korean projects ▪ 04 projects

Lease fee ▪ Land lease fee: 8.5 USD/m2/ 5 years

▪ Factory lease fee: None

645
Operating fee ▪ Management fee: None
▪ Electricity fee: Acording to electricity fee of Khanh Hoa Power Company
▪ Water fee: 8,500 VND/m3
▪ Wastewater treatment fee: 3,000 – 38,300 VND/m3

Layout plan

INFRASTRUCTURE AND FACILITY


Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities,
training facilities, etc., Road Width,…

List of Projects in Industrial Zone

No. Name of Company Nationality Business line

1 Seafood processing factory Japan Production of aquatic products


2 Seafood frozen factory for British Virgin Islands Processing, preserving and trading
export aquatic products and aquatic
products
3 Marine and petroleum precision Norway Manufacture of marine and
mechanical equipment factory; petroleum precision mechanical
shipbuilding and composite equipment (excluding goods and
components services when exercising border
rights)
4 Sports gloves factory Korea Producing, trading, processing
sports gloves, garment products
and exporting all kinds of skating
shoes
5 Animal feed factory Taiwan Producing animal feeds,
veterinary drugs, probiotics,
aquatic veterinary drugs, pond
improvers, fertilizers, processing

646
agricultural products and
functional foods.
6 Factory producing aquaculture British Virgin Islands Producing and trading all kinds of
feed and veterinary medicine feed, additives, feed ingredients,
equipment and supplies for
aquaculture; Processing aquatic
products for export; Production of
veterinary drugs
7 Factory for manufacturing, Korea Production, processing and
processing and installing installation of engine
complete assemblies, pipes and compartments, modules,
steel structures complete assemblies, pipes and
steel structures of ships for new
construction
8 Seafood processing plants Hong Kong- China Processing and preserving
seafood and aquatic products
9 Production of furniture, rattan America Producing products from wood,
exports Rapexco - Dai Nam Suoi bamboo (except furniture);
Dau Branch manufactures products from
bamboo, sedge, straw, twine and
furniture
10 Sewing swimwear Hong Kong- China Producing and trading in
swimwear, beachwear,
sportswear and other apparel
products, auxiliary materials for
the garment industry; Perform
machining, re-machining
11 Processing flower paste, packing Taiwan Processing flower paste and
finished products of household packing household ceramic
ceramics (excluding sanitary products
ceramics), fine art ceramics
12 Factory manufacturing Norway Invest in building a factory
mechanical equipment and specializing in the production of
electrical and electronic electrical, electronic and
equipment mechanical equipment for the
marine, aquaculture, oil and gas
industries and shipbuilding.
13 Seafood processing and Malaysia Processing and preserving
preservation factory seafood and aquatic products
14 Sodex Toseco Co., Ltd France -Manufacture, export and
domestic sales of sports products
for professional training and
competition; Supply and install
professional sports equipment
and tools; Construction of civil
sports works.
An Phuoc Sunpo Co., Ltd Vietnam - Hong Kong Producing bra cup products
15

647
16 Project of processing seafood Japan Processing and packaging
products and freezing packaging seafood, agricultural products and
of foods and agricultural fruits; produce solar power for
products for export the project's production activities.
17 Shin Woo Tech Mechanical Korea Producing and manufacturing
Factory details and components for
mechanical products of all kinds.
18 Il Shin . Food Processing Factory Korea Processing and preserving aquatic
products and aquatic products.

648
NINH THUY INDUSTRIAL ZONE

GENERAL INFORMATION
Address Ninh Thuy Industrial Zone, Ninh Thuy ward, Ninh Hoa town, Khanh Hoa province
Name of Investor:
Investor Hoan Cau Van Phong Co,Ltd
▪ Address: 20 Tran Phu, Nha Trang ciy, Khanh Hoa Provine
▪ Tel: (84.58) 6260 222
▪ Email: marketingip@thanhyen.com
▪ Website:www.ninhthuyip.com
Location This coastal industrial zone is in the south of Van Phong EZ, in Ninh Thuy Ward, Ninh Hoa town. It
is 8 km away from National Highway 1A; 18 km to Hoa Huynh station; 10 km to Hon Khoi port;
adjacent to South Van Phong general port; and 75 km to Cam Ranh international airport

Investment Sectors Priority Sectors for Mechanical manufacturing and assembly, refrigeration – electronic,
Investment producing home appliances, handicrafts, packing, processing of
agriculture and forestry products, producing building materials
Investment Restricted Acording to Investment Restricted Sectors
Sectors
Minimum wage 3,640,000 VND/month
Lease term ▪ Start date:
▪ End date: 06/2063
Minimum Lease Area 5,000 m2
Limit for Construction
Height 5 floors

Permitted Construction 70% for 1 floor construction, 60% for 2 floors construction, 50% for 3-5 floors construction
Rate

Planned area ▪ Total area: 207.9 ha


▪ Total vacant leasable area: 152.82 ha
▪ Total area with full infrastructure ready to build factory: 152.82 ha

Factory Available for Rent ▪ Total area None

Operation Status ▪ Active phase 1


▪ Under construction phase 2

Occupancy Rate and ▪ 35%


Number of Projects

Number of Korean projects ▪ 05 projects

Lease fee ▪ Land lease fee:


▪ Factory lease fee: None
Operating fee ▪ Management fee: 0.1 USD/m2/year
▪ Electricity fee: acording to electricity fee of Khanh Hoa Power Company
▪ Water fee: 4,750 – 11,700 VND/m3
▪ Wastewater treatment fee: 0.3 USD/m3

649
Layout plan

INFRASTRUCTURE AND FACILITY


Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities, training
facilities, etc., Road Width,…

List of Projects in Ninh Thuy Industrial Zone

No. Name of Company Nationality Business line


1 Ninh Thuy Cement Distribution Japan Cement distribution station
Station
2 Seyoung Factory - Hoa Hiep Korea Production, processing and
installation of machine
compartment assemblies,
modules, tool parts, pipes and
steel structures
3 Gyeongnam Insu Warehouse Korea warehouse (capacity: 12,700 m3)
containing materials and
insulation for repair of machinery
and equipment
4 Daeehyup Vietnam Factory Korea Mechanical processing,
construction of insulation by
spray method, construction of
deck finishing, interior
construction of houses on ships
for new construction
5 Jeil VinaNT . Factory Korea Producing, processing and
assembling steel structures for
shipbuilding
6 Ninh Hoa export wood chip Singapore Purchasing and processing paper
processing factory materials into wood chips for
export
7 Hankook Factory Korea Producing, processing and
assembling steel structures for
shipbuilding

650
8 Seafood processing plants Australia Processing and preserving
seafood and aquatic products

651
[- This Page is intentionally left blank -]

652
KIEN GIANG

653
INVESTMENT ENVIRONMENT IN KIEN GIANG

USD/VND 23.510

GENERAL INFORMATION
Area 6348 km2
Population 1,81 million people (2022)
Geographical ▪ Kien Giang is located in Mekong Delta River region.
Location Located in the Mekong Delta.
Adjacent It is bounded by An Giang, Hau Giang provinces, Can Tho City in the east and the south - east, Ca Mau
provinces Province in the south, and Cambodia in the north.
2022 statistic:
▪ Nominal GRDP (billion VND):
▪ Real GRDP (billion VND): 68.436 (2,92 billion USD)
▪ GRDP growth: 7,70%
GRDP ▪ GRDP per capita (million VND/year): 66,24 (2822 USD)
▪ Economic structure:
- Industry - Construction: 26,26%
- Agriculture. forestry and fishery: 41,09%
- Service: 30,06%
Import turnover (billion USD): 0,16 (Growth rate: 0,24)
Import - Export
Export turnover (billion USD): 0,80 (Growth rate: 0,0971)
Key Industry Food processing, supporting industries
PCI 62.24
Ranking 56
SOCIAL INFRASTRUCTURE
▪ Roadway: National highway system through Kien Giang province, including: 04 national highways 61, 63, 80,
road N1 with a length of 292km
Transportation ▪ Waterway: 2,700 km of rivers, canals and canals being exploited for water transport with 123 routes. In which,
the longest route has a distance of 160 km from Rach Gia city to Ca Mau city and the shortest route has a
distance of 9.3 km from An Thoi port to Hon Thom commune (Phu Quoc).
Electricity ▪ Power supply from the National Power station network
The inter-district intra-provincial water source belongs to 02 rivers and canals (Cai Be River, Rach Gia - Ha
Tien Canal); Independent provincial water source belongs to 2,927 rivers. In addition, Kien Giang waters cover
Water
an area of more than 63,000 square kilometers, with a coastline of nearly 200 kilometers and 143 islands, of
which 41 are inhabited.
INVESTMENT CONDITION
Labor in economic sectors, including agriculture - forestry - fishery accounted for the largest proportion, over
Human resource 45%, followed by labor in the service sector accounting for more than 39%, labor in industry - construction
accounting for more than 39%. of population are in the working age (2022)
Education level Trained labor rate: 50% (2022)
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): N/A

Salary - Area II (4,160,000 VND/month): Rach Gia, Ha Tien, Phu Quoc City
- Area III (3,640,000 VND/month): Kien Luong, Kien Hai, Chau Thanh Districts
- Area IV (3,250,000 VND/month): An Bien, An Minh, Rong Rieng, Go Quao, Hon Dat, U Minh Thuong, Tan
Hiep, Vinh Thuan, Giang Thanh Districts

654
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to
employees working under employment contracts)
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
▪ Incentives from the province:
-Land rental exemption: The 1-year land rental unit price is calculated at 0.5% of the land price according to the
purpose of using the leased land and the unit price is stable for 5 years. Exemption from paying land rent for 3-
Investment 15 years, depending on the investment location and investment industry.
incentives
Some policies allowed by the Prime Minister to be applied in Phu Quoc island are as follows:
- Investment projects in tourism business in Phu Quoc are investment projects in the list A.
- All investment projects of domestic and foreign organizations and individuals are entitled to the corporate
income tax rate of 10% for 15 years.
- 50% income tax reduction for high-income earners.
- Policies on entry and exit in Phu Quoc.
- Policies on residence in Phu Quoc.
Fields Attracting Eco-tourism and luxury resort; well-qualified workforce training; infrastructure development for IPs, tourism
Investment sites and urban areas;
Investment
attraction By the end of 2022, the province has withdrawn 294 projects, with a total area of more than 11,866 hectares.
situation
Total 5 industrial zones. Currently, Thuan Yen Industrial Park (134 ha) is basically full, Thanh Loc Industrial
Industrial zones Park (250 ha) is 46% full. Xeo Ro Industrial Park, Tac Cau Industrial Park, Kien Luong Industrial Park are
calling for investment in infrastructure.

Map

Kien Giang Department of Planning & Investment


▪ Address: No 29, Bach Dang street, Vinh Thanh Van ward, Rach Gia city, Kien Giang province

Contact ▪ Tel: 2973862037

▪ Email: skhdt@kiengiang.gov.vn
▪ Contact person:
- Mr. Giang Thanh Khoa - Director of the Department of Planning and Investment of Kien Giang province

655
XEO RO INDUSTRIAL ZONE

GENERAL INFORMATION
Address Hung Yen commune, An Bien district, Kien Giang province
Economic Zone Management Board of Kien Giang Province
Investor

Location 7km from An Bien district center, 15km from Rach Gia airport and 22km from Rach Gia city. This
industrial park complex is located on National Highway 63 and the river is adjacent to Cai Lon river,
convenient for transporting goods by road and waterway.

Investment Sectors Priority Sectors for + Investment and business in technical infrastructure of Xeo Ro
Investment Industrial Park Complex (including: Industrial Park, Service -
Commercial Zone, Residential - Resettlement Area).
+ Investment in industrial production with such industries as: Processing
seafood; food and food processing; mechanical industry; shipbuilding
industry; production of building materials and some other industries.
Minimum wage 3,640,000 VND/month
Lease term ▪ 50 years
Minimum Lease Area 10000 (m2)
Limit for Construction
Height N/A

Planned area ▪ Total area: 210.5 (ha)


The planning associated with the IZ is the residential - resettlement area with an area of 30.03 ha
and the service - commercial area with an area of 71.28 ha.

Operation Status ▪ Active


Occupancy Rate and ▪ 90%
Number of Projects

Lease fee ▪ Land lease fee: 15 USD


▪ Factory lease fee: 2 USD
Operating fee ▪ Management fee: 0,5USD/m2/years

656
Layout plan

INFRASTRUCTURE AND FACILITY


Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities, training
facilities, etc., Road Width,…

657
TAC CAU INDUSTRIAL ZONE

GENERAL INFORMATION
Address Hoa Phu commune, Chau Thanh district, Kien Giang province

Investor N/A

Location About 17 km from Rach Gia city center; It is about 5 km from the center of Chau Thanh district
Distance to the nearest airport: About 12 km from Rach Gia Airport
Distance to the nearest seaport: About 17 km from Rach Gia city center; It is about 5 km from the
center of Chau Thanh district
Investment Sectors Processing agricultural products, aquatic products, food, manufacturing
Priority Sectors for
consumer goods and garments, leather shoes, plastic products, animal
Investment
feed, livestock and poultry, mechanical and electronic assembly....
Minimum wage 3,640,000 VND/month
Lease term ▪ 50 years
Minimum Lease Area 10000 (m2)
Limit for Construction
Height
N/A

Planned area
▪ Total area: 68ha

Operation Status ▪ Active


Occupancy Rate and
Number of Projects 50%

Lease fee ▪ Land lease fee: 30 USD/m2


▪ Factory lease fee: 2 USD
Operating fee ▪ Management fee: 0,5USD/m2/years
Electricity price: - Normal hours: 1,452 VND/kWh. - Off-peak hours: 918 VND/kWh. - Peak hours:
2,673 VND/kWh. (Note: Price does not include value added tax)
Water price: 8,500 VND/m3.

658
Layout plan

INFRASTRUCTURE AND FACILITY


Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities, training
facilities, etc., Road Width,…

659
[- This Page is intentionally left blank -]

660
KON TUM

661
INVESTMENT ENVIRONMENT IN KON TUM

USD/VND 23.510

GENERAL INFORMATION
Area 9676 km2
Population 0,569 million people (2022)
▪ Kon Tum is located in Central Highlands region.
Geographical Location Kon Tum is located on the East-West Economic Corridor (sea and continent) and the Central
Coast economic arc;
Kon Tum has a particularly important geographical position, belonging to the Vietnam - Laos -
Adjacent provinces Cambodia Development Triangle area, where there is "the three-border landmark of Vietnam -
Laos - Cambodia".
2022 statistic:
▪ Real GRDP (billion VND): 17.626 (0,757918 billion USD)
▪ GRDP growth: 9,50%
▪ GRDP per capita (million VND/year): 52,44 (2234 USD)
GRDP
▪ Economic structure:
- Industry - Construction: 26,83%
- Agriculture. forestry and fishery: 19,75%
- Service: 44,80%
▪ Industry - Construction growth: 14,88%
Industry growth ▪ Agriculture, forestry and fishery growth: 6,19%
▪ Service growth: 8,03%
Import turnover (billion USD): 0,01
Import - Export
Export turnover (billion USD): 0,32 (Growth rate: 0,1)
Producing coffee, rubber, macadamia, sugar cane, cold vegetables - flowers, red ginseng and other
rare and precious materials; afforestation associated with forestry economic development; develop
Key Industry
beef cattle, dairy cows, goats, freshwater aquatic products and cold sturgeon...; production of
renewable energy such as wind power, solar power,...
PCI 64.89
Ranking 37
SOCIAL INFRASTRUCTURE
▪ Roadway: National Highway 14, National Highway 40, National Highway 24 ... convenient
Transportation
connection to Central provinces, Central Highlands and the whole country.
▪ Power sources based on renewable energy sources besides hydroelectricity that Kon Tum
Electricity
province has potential, especially wind power, solar power....
The water source of 80 irrigation reservoirs in Kon Tum province has a storage capacity of 86%
Water or more of the design capacity, basically ensuring irrigation for the Winter-Spring crop in 2022-
2023.
Education & Training N/A
Medicare N/A
INVESTMENT CONDITION
Human resource 49,32% of population are in the working age (2022)
Education level Trained labor rate: ()
Salary ▪ The minimum salary for the province is applied as follows:

662
- Area I (4,680,000 VND/month): N/A
- Area II (4,160,000 VND/month): N/A
- Area III (3,640,000 VND/month): Kon Tum City, Dak Ha District
- Area IV (3,250,000 VND/month): Dak To, Dak Glei, Ia H'Drai, Kon Long, Kon Ray, Ngoc Hoi,
Sa Thay, Tu Mo Rong Districts
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum
wages paid to employees working under employment contracts)
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
Investment incentives
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
Fields Attracting Investment Production of renewable energy such as wind power, solar power,...
Total registered capital of nearly 172.6 billion VND, 9 projects outside industrial parks and
economic zones with total registered capital of 1,483 billion VND; In addition, a number of
Investment attraction situation potential investors and corporations such as: Sun Group, Hung Nhon, Him Lam Joint Stock
Company, Nutifood, ... have come to survey and look for investment opportunities in the
province.

Map

Kon Tum Department of Planning & Investment


Contact
▪ Address: 12 - Nguyen Viet Xuan - Kon Tum City, Kon Tum Province.

663
▪ Tel: 2603862710
▪ Email: skhdt@kontum.gov.vnsokehoachdautu
kontum@chinhphu.vn
▪ Contact person:
- Mr. Ngo Viet Thanh - Director of Department of Planning and Investment of Kon Tum province

664
[- This Page is intentionally left blank -]

665
LAI CHAU

666
INVESTMENT ENVIRONMENT IN LAI CHAU

USD/VND 23.510

GENERAL INFORMATION
Area 9059 km2
Population 0,484146 million people (2022)
Geographical ▪ Lai Chau is located in Northwest region.
Location It is located 450 km from Hanoi.
Lai Chau is located in the northwest of Vietnam. The province shares its borders with Yunnan province (China) to
Adjacent
the North, with other provinces of Lao Cai, Yen Bai, and Son La to the East and with Dien Bien to the West and
provinces
Southwest. The province has a common border with China of 273 km in length.
2022 statistic:
▪ Nominal GRDP (billion VND): 23.943 (1,029555364 billion USD)
▪ Real GRDP (billion VND): 14.146 (0,608297221 billion USD)
▪ GRDP growth: 9,00%
▪ GRDP per capita (million
GRDP 29,22 (1256,43343330318 USD)
VND/year):
▪ Economic structure:
- Industry - Construction: 39,57%
- Agriculture. forestry and fishery: 14,49%
- Service: 39,41%
▪ Industry - Construction growth: 14,78%
▪ Agriculture, forestry and fishery
Industry growth 4,77%
growth:
▪ Service growth: 5,05%
Import turnover (billion USD): 0,03 (Growth rate: 0,057)
Import - Export
Export turnover (billion USD): 0,01 (Growth rate: -0,537)
Key Industry Hydropower industry, processing industry
PCI 62. 05
Ranking 57
SOCIAL INFRASTRUCTURE
Transportation is Lai Chau is rather challenging due to its difficult topography. Roadway is the major means in the
province. There are 5 national highways running through the province (National highways No. 12, 32, 4D, 279,
Transportation
100 with the total length of 216 km). National highway no. 12 connects Dien Bien Phu city with China (through
Ma Lu Thang border gate). National 4D connects to Sapa town of Lao Cai province.
Electricity grid was combined of different lines including 110, 35, 22, 10 and 0.4 KV and transformer systems. The
110KV line is 87 km long; the 35KV line: 688 km; the 22KV line: 0.16km; the 10KV line: 5.9km; the 0.4KV line:
Electricity 408 km. There are two 110 KV substations with the total capacity of 16,000KV; a 35/6KV substation with
capacity of 48.429 KVA; a 22/0.4 KV substation with capacity of 10KVA; 6 10/0.4 KV substations with the total
capacity of 920KVA; a 04/10 KV substation with capacity of 1,120K
Water Water supply works mainly meet a water demand in urban areas.
Education &
There are 390 schools, reaching 64.78% (increasing 14 schools, increasing 2.28% compared to 2021).
Training
Medicare N/A
INVESTMENT CONDITION
Human resource 52% of population are in the working age (2022)
Education level Trained labor rate: 58.28% (2022)
667
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): N/A
- Area II (4,160,000 VND/month): N/A
Salary - Area III (3,640,000 VND/month): Lai Chau City
- Area IV (3,250,000 VND/month): The districts of Muong Te, Phong Tho, Sin Ho, Tam Duong, Than Uyen, Tan
Uyen, Nam Nhun
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to
employees working under employment contracts)
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
▪ Incentives from the province:
Investment
- The preferential tax rate of 10% for a period of 15 years applies to: Newly established enterprises from
incentives
investment projects in the province.
- Tax exemption for 4 years, 50% reduction of tax payable in the next 9 years for newly established enterprises
from investment projects in the province.
- For employees with household registration in Lai Chau province: The level of support for labor training is from
02 to 03 million VND/person/course.
Agricultural production to develop local specialties; application of high technology in agriculture, connectivity
Fields Attracting
between businesses and farmers, sustainable forestry development, renewable energy, mining, building materials
Investment
production, agricultural and forestry product processing, economic activities at border gates, and tourism.
Investment
attraction Up to now, Lai Chau has 1 FDI projects with the total investment capital is about 1.5 million US dollars.
situation
There are 2 industrial zones which are Muong So IZ (Phong Tho district) covering 200 hectares and Tam Duong IZ
Industrial zones
(Tam Duong district) covering 200 hectares.

Map

Department of Planning and Investment Lai Chau


▪ Address: The 7th Floor B Zone administrative center - Lai Chau politics
Contact
▪ Tel: (84-213) 3876 501

▪ Email: so.kh&dt-laichau@chinhphu.vn

668
▪ Contact person:
- Mr. Dang Tran Thang - Director
- Tel: 84-913 253 23

669
[- This Page is intentionally left blank -]

670
LAM DONG

671
INVESTMENT ENVIRONMENT IN LAM DONG

GENERAL INFORMATION

▪ Area: 9.773 km2


Area, Population
▪ Population: 1,322 million

▪ Located in the subtropical mosoon area with average annual temperature ranging from 18-25o
Geographical Location Celcius, at the altitude of 800-1500m above sea level.

▪ Located near Liên Khương International Airport, 30km from Đà Lạt city to the south

▪ Lâm Đồng borders Bình Thuận province to the south east, Khánh Hòa anh Ninh Thuậ provinces to
Adjacent provinces the east, Đăk Lăk – Đăk Nông provinces to the north, Đồng Nai – Bình Phước provinces to the west,
south west.

2021 statistic:

▪ Nominal GRDP: 81,157 billion VND (3.53 billion USD)

▪ GRDP growth: 2.58%

▪ Nominal GRDP per capita: 65.93 million VND/year


GRDP
▪ Economic Structure:

- Industry and Construction: 20.03%

- Service: 38.88%

- Agriculture, Forestry and Fishery: 41.09%

2021 statistic:

▪ Industry - Construction growth: 6.28%


Industry growth
▪ Agriculture, forestry and fishery growth: 4.8%

▪ Service growth: -1.84%

PCI ▪ Score: 67.26 – ranked 17th out of 63 cities and provinces in Vietnam (2022)

SOCIAL INFRASTRUCTURE

▪ Roadway: National Roads: 20, 27, 28, 55; Provincial roads: 722, 723, 724, 725 connecting south
Transportation central, southeast anh central highland provineces.

▪ Airway: Liên Khương International Airport, 30km from Đà Lạt city to the south.

Electricity ▪ Supplied from the national power network

▪ Quality underground water is mainly used in water supply system


Water
▪ In area: 08 water stations in operation with total capacity of 61,000 m3/day

672
▪ In industrial zones, industrial clusters: 04 water stations in operation with total capacity of 24,400
m3/day

Education ▪ 02 universities, 04 colleges, 01 technical schools and 53 vocational training schools in the province.

Medicare ▪ 06 provincial hospitals, 12 district hospitals and 01 private hospitals

INVESTMENT CONDITION

Human resource ▪ Around 60% of population in working age (2021)

Education level ▪ Trained labor rate: 18.8% (2021)

▪ The minimum salary for the province is applied as follows (see appendix for detail amount):

Salary - Area II: including: Bảo Lộc City

- Area III: including: Đức Trọng district

▪ Incentives according to government regulations:

Exemption and reduction for land and water rent fee


Investment incentives
- Preferential tax rates and exemption period, reduction for corporate income tax.

Import tax exemption

▪ Prioritized Projects:

- High technology, industrial electronics, information technology; mechanical engineering products;

- Supporting industry;

Fields Attracting - Projects using high technology, modern techniques; ecological environment preservation; research,
Investment development and high-technology incubators;

- Development of trade, service and tourism;

- Construction and development of infrastructure and key projects;

- Development of education, training, health, fitness and sports.

Map

673
Office of Lam Dong Industrial Zones Authority

Address: No 36 Tran Phu, 4 Ward, Dalat City, Lam Dong Province

Contact Tel: (84-263) 3 549 106

Fax: (84-263) 3 549 104

E-mail: bqlkcn@lam dong.gov.vn

LIST OF INDUSTRIAL ZONES IN LAM DONG

No Industrial zone Name Total Area (ha) Occupancy Rate Status


1 Phú Hội Industrial Zone 109 97,9% In operation
2 Lộc Sơn Industrial Zone 183 85,8% In operation
3 Phú Bình Industrial Zone 246 Planning

LÂM ĐỒNG’S LOCATION MAP OF INDUSTRIAL ZONES

674
PHU HOI INDUSTRIAL ZONE

GENERAL INFORMATION
Phú Hội commune, Đức Trọng district, Lâm Đồng Province, Vietnam
Address
Investor Lộc Sơn – Phú Hội Infrastructure Development Company
▪ Address: No 371, Thống Nhất Street, Đức Trọng district, Lâm Đồng province, Vietnam.
▪ Tel: (84-263) 3678 515
▪ Website: http://liza.lamdong.gov.vn
Contact Person ▪ Võ Văn Hậu - Director - Mobile: +84 - 989-200 272 - Email: hauvv@lamdong.gov.vn
Location - From HCMC: 270 km
- From Da Lat: 30 km
- From Lien Khuong airport: 03 km
- Close to major communications network
- Advantages of geographical location: Ho Chi Minh City seaport, Dong Nai, Binh Thuan, Khanh
Hoa, main industrial parks in the south.
- The labor abundant, stable from local and neighboring provinces.
Investment Area Priority Sectors for processing of manufacturing products for tourism, processing vegetables,
Investment seafood, wine, jams, sweets, industrial production of building materials,
high quality bricks, processing forestry, wood products, agricultural
products, electronics and other industrial sectors
Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term 2005 - 2055
Limit for Construction In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Height Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction Rate Construction area is 50%-70% of the total leased land lot
Planned area ▪ Total area: 109 ha
Operation Status ▪ In operation
Occupancy Rate and ▪ 97.9%
Number of Projects ▪ 33 Projects
Number of Korean Projects ▪ 03 projects
Lease fee ▪ Land lease fee: 5.200VND/m2 /year
▪ Payment:
- Method: Bank Transfer in VND
- Annual payment
Operating fee ▪ Management fee: 0.16 USD/m2/year
▪ Electricity fee: According to the Circular by Ministry of Industry and Trade,

675
Layout Plan

676
LOC SON INDUSTRIAL ZONE

GENERAL INFORMATION
Lộc Sơn ward, Bảo Lộc City, Lâm Đồng Province, Vietnam
Address
Investor Lộc Sơn – Phú Hội Infrastructure Development Company
▪ Address: No 371, Thống Nhất Street, Đức Trọng district, Lâm Đồng province, Vietnam.
▪ Tel: (84-263) 3678 515
▪ Website: http://liza.lamdong.gov.vn
Contact Person ▪ Võ Văn Hậu - Director - Mobile: +84 - 989-200 272 - Email: hauvv@lamdong.gov.vn
Location Close to major communications network
From HCMC : 190km
From Da Lat : 110km
Advantages of geographical location: Ho Chi Minh City seaport, Dong Nai, Binh Thuan, main
industrial parks in the south, Lien Khuong airport 80 km from the north.
The labor abundant, stable from local and neighboring provinces
Investment Area Priority Sectors processing of coffee, tea, silk, building materials, aluminum production,
for Investment paving stones, electronic assembly, processing woods, shoes, clothing
industry ...
Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term ▪ Start date: 2004
▪ End date: 2054
Limit for Construction In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Height Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction
Rate
Planned area ▪ 183 ha
Factory Available for Rent None
Operation Status In operation
Occupancy Rate and ▪ 85.8%
Number of Projects ▪ 51 projects
Number of Korean Projects 02 projects
Lease fee ▪ Land lease fee: 10.800VND/m2 /year
Operating fee ▪ Management fee: 0.16 USD/m2/year
▪ Electricity fee: According to the Circular by Ministry of Industry and Trade
▪ Waste treatment fee: According to contract
INFRASTRUCTURE AND FACILITY

677
Layout Plan

678
[- This Page is intentionally left blank -]

679
LANG SON

680
INVESTMENT ENVIRONMENT IN LANG SON

GENERAL INFORMATION

Area and population ▪ Area: 8,310 km2


▪ Population: 802,090 Million (Data 2022)
Geographical location ▪ Lang Son is a mountainous province, located in the Northeast of Vietnam
▪ Lang Son is 154 km from Hanoi by road and 165 km by railway.
▪ Having a border line over 231 km long, there are 02 international border gates, 01
main border gate and 09 auxiliary border gates, openings.
Adjacent provinces ▪ The North borders Cao Bang province
▪ The East borders Quang Ninh province and Sung Ta city (Guangxi, China).
▪ The South borders Bac Giang province
▪ The West borders Bac Kan province and Thai Nguyen province.
GRDP Figures for 2022:
▪ GRDP Index: 22,683 Billion VND
▪ GRDP Growth: 7.22%
▪ GRDP per capita: 51.72 million VND/person
▪ Economic structure:
- Industry - Construction: 24.40%;
- Agriculture: 21.10%;
- Service: 49.98%;
- Product tax: 4.53%
Industry growth Figures for 2022:
▪ Processing and manufacturing industry: 10.25%
▪ Total turnover of import and export goods through Lang Son province reached
23,849 million USD
▪ Service increase: 12.49%
PCI ▪ According to the announcement of VCCI, with a composite score of 67.88 points,
Lang Son province ranked 15th out of 63 provinces and cities in the country, up 21
places compared to 2021; ranked 5th out of 14 provinces in the Northern mountainous
region (2022).

SOCIAL INFRASTRUCTURE

▪ Main roads: The arterial traffic routes running through the province such as National
Highway 1A (Huu Nghi - Hanoi: 150km), National Highway 4A (Dong Dang - Cao
Bang: 118km), National Highway 4B (Lang Son - Mui Port: 118km), National
Highway 4B (Lang Son - Mui Port) Pagoda, Quang Ninh: 114km), National Highway
Transportation 1B (Lang Son - Thai Nguyen: 160km).
▪ Railway: Intermodal railway Hanoi - Lang Son - China.
▪ Waterway: 114km from Mui Chua port - Quang Ninh, 220km from Dinh Vu port -
Hai Phong.
▪ By air: 152km from Noi Bai International Airport, 135.2km from Van Don Airport.
The whole province has 4 110kV transformer stations, a relatively complete power
Electricity transmission line system that can supply enough for consumption and production.
Currently, 100% of communes are using electricity from the national grid.
The whole province has a clean water supply system with a total capacity of
50,020m3/day, which can basically fully meet the clean water source for residential
Water
areas and a part of the clean water demand for production and business of enterprises.
located in the city and surrounding areas.
▪ Kindergarten: 232
Education & Training
▪ Elementary School: 180

681
▪ Middle School: 141
▪ Elementary and Middle School: 72
▪ High School: 26
▪ Vocational Education Center - GDTX: 09
▪ Education Center: 01
▪ Center for Informatics and Foreign Language Education: 01
▪ Professional school: 01
▪ College: 04

INVESTMENT CONDITION

Human resource ▪ 515,324 people of working age (2022)

Education level ▪ Proportion of people with professional training: 50% (2022)

▪ Region III: Minimum monthly salary is 3,640,000 VND, minimum hourly wage is
17,500 VND. Apply to: Lang Son City.
▪ Region IV: Minimum monthly salary is 3,250,000 VND, minimum hourly wage is
Salary 15,600 VND. Apply to: Bac Son, Binh Gia, Cao Loc, Chi Lang, Dinh Lap, Huu Lung,
Loc Binh, Trang Dinh, Van Lang, Van Quan districts.
▪ The salary paid to employees who have undergone vocational training or vocational
training is at least 7% higher than the corresponding regional minimum wage.
▪ Incentives decided by the government
- Exemption and reduction of land and water surface rents
- Incentives on tax rates and duration of corporate income tax exemption and reduction.
Investment incentives - Import duty free
▪ Incentives according to the decision of the province
Investment support policy in Lang Son province according to Resolution No.
16/2022/NQ-HDND dated 07/07/2022 (Attached file).
- Agriculture and Forestry
- Industry Development
Fields Attracting Investment
- Development of tourism - services
- Developing border economy

Map

Investment Promotion Center - Department of Planning and Investment


▪ Address: No. 2 Hoang Van Thu - Chi Lang Ward, Lang Son City
Contact
Tel: 025.3816.815
▪ Email: ttxtdtls@gmail.com

682
683
LIST OF INDUSTRIAL PARKS

NO. INDUSTRIAL ZONE NAME TOTAL AREA OCCUPANCY RATE STATUS


(HA)
1 Dong Banh Industrial Park 162,13 90% In operation

2 Huu Lung Industrial Park 599,76 ha - In operation

DONG BANH INDUSTRIAL PARK MAP

684
DONG BANH INDUSTRIAL PARK

GENERAL INFORMATION
Address Hoa Lac commune, Huu Lung district and Chi Lang town, Chi Lang district, Lang Son province
Investor Management Board of Dong Dang - Lang Son Border Gate Economic Zone
▪ Address: Ly Thai To Street, Dong Kinh, Lang Son City, Lang Son
▪ Tel: 0205 3875 708
▪ Email: banqlktck@langson.gov.vn
▪ Website: https://banqlktck.langson.gov.vn/

Location - Distance from province: 180 km from Hanoi city, 34 km from Lang Son city
- Distance from airport: Noi Bai airport 186 km
- Distance from port: Cai Lan port 142 km

Investment sectors Areas of investment + Group of industries of mechanical assembly, manufacturing of spare
promotion: parts;
+ The industry group produces high-quality plastic parts;
+ Group of industries producing and assembling electronic components
and electronic circuits;
+ Group of industries producing and processing molds with high
technical standards;
+ Other industrial service industries.
Areas of investment none
restriction:
Mininum Wage Region IV: Minimum regional salary according to Decree No. 38/2022/ND-CP

Lease term 50 years

Minimum Lease Area not required


Limit for Construction In accordance with the National Technical Regulation on construction planning
Height (QCVN 01:2021/BXD)

Permitted Construction
Rate

Planned area ▪ Total area: 162.13 ha


▪ Area for building factories and warehouses: 110.97 ha

Factory available for Rent Not available yet

Operation Status Infrastructure is being built


Occupancy rate and ▪ Occupancy rate: 33.61 ha (equivalent to 20.73%)
number of projects ▪ Number of projects in the area: 2 projects

Number of Korean projects None

Lease fee ▪ Land rental cost: 20-30 USD

▪ Factory rental cost: 2 USD

685
Operating fee ▪ Management cost: 0.2USD/m2
▪ Electricity cost:
Rush hour: 0.1 USD
Normal: 0.05 USD
Off-peak hours: 0.03 USD
▪ Water cost: 0.4 USD/m3
▪ Waste water treatment fee: 0.3 USD/m3
INFRASTRUCTURE
- Industrial production land includes:
+ Construction of factories and production enterprises;
+ Building warehouses and yards;
- Industrial zone administrative and service land area includes:
+ Operators and managers of industrial parks;
+ Banking and financial transaction office;
+ Product introduction center;
+ Police station;
+ Specialized fire prevention and fighting teams in industrial parks;
- Technical infrastructure works include:
+ Water supply station;
+ Waste water treatment station;
+ 110KV power station;
+ Parking lot;
- Green land and water surface area, including:
+ Landscape land;
+ Isolate green land;
+ Water surface in the industrial park;

LIST OF SOME NOTABLE TENANTS

No. Company name Countries Business fields

1 DONG BANH Cement Factory Vietnam Cement production

2 LANG SON CONSTRUCTION JOINT Vietnam Producing concrete and products from
STOCK COMPANY cement - cement and gypsum

686
HUU LUNG INDUSTRIAL PARK

GENERAL INFORMATION
Address Ho Son commune and Hoa Thang commune, Huu Lung district
Location The North borders Na Vi village and Dong Gia village, Ho Son commune; The South borders on
Suoi Ngang 1 village, Hoa Thang commune; The East borders Hanoi - Lang Son railway; West
borders Bac Giang - Lang Son highway.

Investment sectors Areas of investment + Group of industries of mechanical assembly, manufacturing of spare
promotion: parts;
+ The industry group produces high-quality plastic parts;
+ Group of industries producing and assembling electronic components
and electronic circuits;
+ Group of industries producing and processing molds with high
technical standards;
+ Other industrial service industries.
Areas of investment none
restriction:
Mininum Wage Region IV: Minimum regional salary according to Decree No. 38/2022/ND-CP

Lease term 50 years

Minimum Lease Area not required


Limit for Construction In accordance with the National Technical Regulation on construction planning
Height (QCVN 01:2021/BXD)

Permitted Construction
Rate

Planned area ▪ Total area: 599,76 ha

Factory available for Rent Not available yet

Operation Status Infrastructure is being built


Occupancy rate and N/A
number of projects

Number of Korean projects None

Lease fee ▪ N/A

Operating fee Management fee: 0.2 USD/m2


Electricity price: 0.03 - 0.1 USD / KWh
Water price: 0.4 USD/m3
Wastewater treatment: $0.28/m3

INFRASTRUCTURE

687
- Industrial production land includes:
+ Construction of factories and production enterprises;
+ Building warehouses and yards;
- Industrial zone administrative and service land area includes:
+ Operators and managers of industrial parks;
+ Banking and financial transaction office;
+ Product introduction center;
+ Police station;
+ Specialized fire prevention and fighting teams in industrial parks;
- Technical infrastructure works include:
+ Water supply station;
+ Waste water treatment station;
+ 110KV power station;
+ Parking lot;
- Green land and water surface area, including:
+ Landscape land;
+ Isolate green land;
+ Water surface in the industrial park;

[- This Page is intentionally left blank -]

688
LAO CAI

689
INVESTMENT ENVIRONMENT IN LAO CAI

GENERAL INFORMATION

 Area: 6,364.03 km2


Area, Population
 Population: 770.60 thousand people (2022)
 Lao Cai is a highland province, located in the North of Vietnam
Geographical Location
245km from Hanoi by road, 296km by railway
It borders Ha Giang province to the East, Yen Bai province to the South, Lai Chau
Adjacent provinces
province to the West, and Yunnan province (China) to the North.
2022 statistic:

 GRDP scale: 68,000 billion VND (2.89 billion USD)


 GRDP growth rate: 9.02%
GRDP  GRDP per capita: 90 million VND/year
 Economic structure:
- Industry - Construction: 44.85%
- Agriculture, Forestry and Fishery: 13.97%
- Tourism and Services: 41.18%
Goods taxes: 10.16 %
2022 statistic:
Industry growth  Industry – Construction growth: 8.62 %
 Agriculture, Forestry and Fishery growth: 4.47 %
 Services growth: 10.76 %

PCI ranked 11th out of 63 cities and provinces in Vietnam (2022)

SOCIAL INFRASTRUCTURE

 Roadway: Five national highways with a total length of 456km and Noi Bai -
Lao Cai highway with a length of 72km through the province; 16 provincial
roads with a length of 969km and more than 9,500km of rural roads
 Waterway: The inland waterway system through Lao Cai province has great
potential for transportation with 2 major river routes flowing through are the
Red River and Chay River with a total length of about 230km.
Transportation
 Railway: The province has about 120 km of railways, of which the 62 km section
through Lao Cai territory belongs to the railway line maintaining international
transport operations Hai Phong - Hanoi - Lao Cai (Vietnam) - Kunming (China).
 Airway: Sa Pa airport – airport standards of grade 4C, capacity of 1.5 million
passengers/year is being invested to soon put into operation.

 231 km of 220KV lines (two 220KV substations) and 450km of 110KV lines (five
Electricity 110KV substations)

Water  Water supply system with a total capacity of 109.6 thousand m3/day and night

 Lao Cai province has 01 branch of Thai Nguyen University - Lao Cai campus, 15
vocational education centers (01 college, 01 secondary school, 12 vocational education
Education
centers and 01 enterprise with vocational education activities). On average, every year,
vocational training institutions recruit and train more than 13,359 people

Medicare  5 provincial hospitals, 9 district hospitals and 01 private hospitals

690
INVESTMENT CONDITION

Human resource 60% of population in working age (2022)

Education level Trained labor rate: 66.7% (2022)

 The regional minimum wages are applied as follows:


 Region II: Lao Cai city (minimum salary 4,160,000 VND/month)
 Region III: Sa Pa town, Bao Thang district (minimum salary 3,640,000 VND/month)
Salary  Region IV: Districts: Bao Yen, Bat Xat, Muong Khuong, Si Ma Cai, Van Ban
(minimum salary 3,250,000 VND/month)
 Average salary of workers in industrial zones: Foreign-owned enterprises: 6,000,000
VND/person/month; Domestic capital enterprises: 9,500,000 VND/person/month

 Lao Cai province is always committed to improving the investment and business
environment in the direction of transparency and openness, creating the most favorable
Investment incentives conditions for investors and businesses. Apply the regulations on preferential policies
of the Central Government in relevant legal documents such as land, corporate income
tax, import and export tax, investment incentive industries and professions.

 Large scale commodity agriculture, application of modern science and technology in the
chain of production, processing and consumption of products.
 Develop processing, manufacturing, mineral processing, agricultural products,
processing and assembly in the direction of high technology, clean technology, deep
processing, raising the localization rate, quality product quality, environmentally
friendly, low energy consumption, creating jobs for many workers. Attract investment
Fields Attracting Investment in the construction of logistics zones, inland ports, commercial infrastructure, technical
infrastructure serving the border gate economy, industrial parks and industrial clusters.
The fields of digital economy, digital technology.
 Strongly attract and develop high-quality and modern tourist service, cultural-spiritual
tourism and entertainment service areas, especially advantageous services, green, smart
and attractive tourism products, highly competitive lead.

Map

691
Lao Cai Department of Planning and Investment

Address: Block 2, Nam Cuong ward, Lao Cai citry, Lao Cai province

Contact Phone: 02143.840 810 or 02143.840 034

Fax: 02143.823466

Email: skhdt@laocai.gov.vn

692
LIST OF INDUSTRIAL ZONES

Industrial zone Name Total Area (ha) Occupancy Rate Status

Bac Duyen Hai Industrial Currently filled, operating stably, so there is no


85ha 98.2%
zone need to call for investment attraction

Dong Pho Moi Industrial


100h 86,58% In operation
zone

Tang Loong Industrial zone 1,100ha 81,69%; In operation

693
DONG PHO MOI INDUSTRIAL ZONE

GENERAL INFORMATION

Stay in economic zone of Lao Cai border, belonging to Pho Moi Ward, Lao Cai City, closely to Lao Cai
Address international railway station

Investor Invest with state budget capital

Mechanical assembly workshop; electronic production and assembly; processing agricultural and forestry
Location products; storages

Minimum wage 4.16 million VND/person/month

Lease term N/A


Minimum Lease
100ha
Area
Limit for
Construction The average building height of each land lot is 1-2 floors.
Height
Permitted
The average construction density for each specific land lot is 50-55%
Construction Rate

Total area: 100h


Planned area
Area available for rent: 65ha

+ Electricity cost: According to the price set by the Ministry of Industry and Trade
Operating fee + Cost of production water: Average 12,000VND/m3
+ Cost of wastewater treatment: Average 12,000VND/m3

Operation Status In operation


Occupancy Rate
86,58%; 42 projects (The remaining land fund to expand the Hoa Truong station to serve the development
and Number of
of railway infrastructure when upgrading to 1,435m gauge)
Projects

Lease fee Land rental cost: 4,000,000VND/m2

694
Map

695
TANG LOONG INDUSTRIAL ZONE
GENERAL INFORMATION

Phu Nhuan commune and Tang Loong town, Bao Thang district, Lao Cai province.
Address

Investor Invest with state budget capital

Metallurgy, chemical, mineral extraction and other supporting industries.


Location

Minimum wage 3.64 million VND/person/month

Lease term N/A


Minimum Lease
587.8ha
Area
Limit for
Construction The average building height of each land lot is 1.5-3 floors.
Height
Permitted
The average construction density for each specific land lot is 40-60%.
Construction Rate

Total area: 1,100ha


Planned area
Area available for rent: 587.8ha

+ Electricity cost: According to the price set by the Ministry of Industry and Trade
+ Cost of production water: 9,000VND/m3
Operating fee
+ Cost of household water: 11,000VND/m3
+ Cost of wastewater treatment: 16,238.2VND/m3

Operation Status In operation

81,69%;
Occupancy Rate 29 projects
and Number of (The remaining land fund is limited, mainly high hills and no clear ground, still inhabited interspersed. The
Projects purpose of attracting investment projects to produce the following products is Gold, Silver, Copper,
Phosphorus….)

Lease fee 2,000,000VND/m2

696
Map

697
[- This Page is intentionally left blank -]

698
LONG AN

699
INVESTMENT ENVIRONMENT IN LONG AN

GENERAL INFORMATION

 Area: 4,494.93 km2


Area, Population  Population: 1,738,000 people.
 Long An has 15 administrative units, including 1 city, 01 town, 13 districts; The
administrative center is Tan An city.

 Long An is a province in the Mekong Delta region - has a special position as the
gateway between two regions: the Mekong Delta and the Southeast region, bordering
the Kingdom of Cambodia and Ho Chi Minh City. Ho Chi Minh City - enjoy the
Geographical Location
spread of industrial and urban development of the city. Ho Chi Minh.
 From Ho Chi Minh City, it is easy to move to Long An in about 40-50 minutes, and
in Long An there is almost no traffic jam.

 Long An is adjacent to Ho Chi Minh City and Tay Ninh province to the east, to
Adjacent provinces Cambodia to the north, to Dong Thap province to the west and Tien Giang province
to the south.

2022 statistic:
 GRDP growth: 8.46%
 GRDP per capita: 90.2 million VND/year (3846 USD/year)
GRDP  Economic structure:
- Industry - Construction: 52.33%;
- Agriculture, forestry and fishery: 14.72%;
- Services: 26.66%;
2022 statistic:
 Industry – Construction increased: 11.15%
 Agriculture increased: 0.71%
Industry growth  Service increase: 21%
 Import and export:
-Export turnover: 6.7 billion USD
- Import turnover: 5.1 billion USD

PCI ▪ Điểm PCI: 68,45 – Xếp thứ 10 trên 63 tỉnh Việt Nam. (2022)

SOCIAL INFRASTRUCTURE

 Roadway: Expressways passing through the province include: Ho Chi Minh City -
Trung Luong road: connecting Ho Chi Minh City with provinces in the Mekong Delta,
Ben Luc - Long Thanh Expressway connecting to Dong Nai and Eastern provinces
Transportation Southern. National Highway System: 1A, 50, 62, N1, N2 (Ho Chi Minh Road).
 Waterway: The waterway system managed by the province includes the HCMC
route. Ho Chi Minh - Kien Luong, City. Ho Chi Minh City-Moc Hoa, Moc Hoa-Ha
Tien, City. Ho Chi Minh - Ha Tien.

 The whole province has more than 5,261 km of medium voltage lines, 4,929 km of
low voltage lines; 20,480 substations with a total capacity of 5,096,023 kVA;
310,108km of 110KV transmission line, 20 110 kV stations with a capacity of 2,032
Electricity MVA; 02 220 kV stations with a capacity of 928 MVA. 100% of communes, wards
and townships have electricity from the national grid.
 In addition, in 2021, Long An has granted investment certificates for 2 projects of
Long An LNG 1 & 2 thermal power plants, with an expected capacity of 3,000 MW,

700
total investment capital of over 3 billion USD, which will meet the demand for use.
electricity for daily life and production and business activities in the province.

 Number of factories/clean water treatment stations at present: there are 36 factories,


1413 rural water supply stations (> 30 households).
 Total capacity of existing factories and water supply stations: 345,700 m³/day
(updated in 2021 is 445,112 m³/day and night, 2022 is 515,112 m³/day). In which:
urban wells is 205,700m³/day (updated in 2021 is 220,700m³/day, in 2022 it
Water
increases by 290,700 m/day), wells in rural areas are 140,000m³/day (updated in
2021 is 224,412 m³/day).
 Demand for water according to the approved planning: by 2025 is 511,989m³/day;
by 2030 is 627,457 m³/day and night.

 Long An currently has 2 universities, 1 Pedagogical College, and 39 vocational


training institutions. (25 public institutions, accounting for 64%; 14 non-public
Education establishments, accounting for 36%), of which: 3 Vocational Colleges, 6 Vocational
Intermediate Schools, 7 Vocational Training Centers, 18 units public institutions, 4
enterprises and 1 cooperative engaged in vocational training...

 Public health centers including: 29 affiliated units; 15 medical centers at district, town
Medicare and city level; 5 regional polyclinics and private medical facilities.

INVESTMENT CONDITION

 According to the statistical yearbook, in 2021, the labor force aged 15 and over
Human resource
will reach 992.7 thousand people.
 Rate of trained workers: 73.35 (2022)
Education level
 Including degrees and certificates: 32.07%
 Long An currently has: Area II, III and IV:
 Area II: VND 4,160,000/month and VND 20,000/hour, applicable to enterprises
operating in the area of Region II, including: Tan An city and districts of Ben Luc,
Can Duoc, Can Giuoc, Germany Hoa and Thu Thua.
 Area III: 3,640,000 VND/month and 17,500 VND/hour, applicable to enterprises
Salary
operating in the area of Region III, including: Kien Tuong town and Chau Thanh,
Duc Hue, Tan Tru and Thanh districts. Chemistry.
 Area IV: 3,250,000 VND/month and 15,600 VND/hour, applicable to enterprises
operating in the area of Region IV, including: the remaining districts of the
province: Moc Hoa, Tan Hung, Tan Thanh and Vinh Hung.
 Incentives according to the Government's regulations: Exemption and reduction of
Investment incentives land and water rents; Preferential tax rates and duration of corporate income tax
exemption and reduction. Import duty free

 Agriculture: high quality organic agriculture associated with key products such as
rice, vegetables, dragon fruit, lemon, beef,...; high-tech agricultural model
combining eco-tourism…
 Industry: Supporting industry, processing and manufacturing, automation,
Fields Attracting Investment manufacturing components - electronic equipment and software, microchips,
semiconductor industry, artificial intelligence; recycled energy.
 Developing urban complexes, commerce, entertainment services, combining resort
villas and world-class golf courses, etc.
 Marine economy, maritime services, logistics, finance, import and export.

701
Map

Tên cơ quan liên hệ: Sở Kế hoạch và Đầu tư tỉnh Long An


▪ Address / địa chỉ: No. 61, Truong Dinh, Tan An city, tỉnh Long An
▪ Tel: 0272.3886009
▪ Fax :
Contact
▪ Email: skhdt@longan.gov.vn
▪ Contact person: Mr. Nguyen Vu Dat, : Investment Promotion Specialist - Tel:
0394039659 – Email: nguyenvudat@longan.gov.vn

702
LIST OF INDUSTRIAL ZONES

No Industrial zone Name Total Area (ha) Occupancy Rate Status


1 KCN Đức Hòa 1 257.49 70.64% In operation
(Duc Hoa 1 Industrial Park)
2 KCN Xuyên Á 302.45 89.80% In operation
(Xuyen A Industrial Park)
3 KCN Tân Đức 545.69 79.06% In operation
(Tan Duc Industrial Park)
4 KCN Đức Hòa III 330.46 82.01% In operation
(Duc Hoa III Industrial Park)
5 KCN Tân Đô 209.10 100% In operation
(Tan Do Industrial Park)
6 KCN Hải Sơn 443.29 100% In operation
(Hai Son Industrial Park)
7 KCN Vĩnh Lộc 2 223.22 93.5% In operation
(Vinh Loc 2 Industrial Park)
8. KCN Nhựt Chánh 122.75 97.7% In operation
(Nhut Chanh Industrial Park)
9. KCN Phúc Long 78.96 100% In operation
(Phuc Long Industrial Park)
10. KCN Phú An Thạnh 352.75 76.07% In operation
11. KCN Thịnh Phát 73.47 100% In operation
(Thinh Phat Industrial Park)
12. KCN Thuận Đạo 303.16 100% In operation
(Thuan Dao Industrial Park)
13. KCN Cầu Tràm 61.09 100% In operation
(Cau Tram Industrial Park)
14. KCN Cầu Cảng Phước Đông 128.88 34.15% In operation
(Cau Cang Phuoc Dong IP)
15. KCN Long Hậu 245.50 100% In operation
(Long Hau Industrial Park)
16. KCN Long Hậu 3 123.98 56.71% In operation
(Long Hau 3 Industrial Park)
17. KCN Tân Kim 156.31 94.69% In operation
(Tan Kim Industrial Park)
18. KCN Hoa Binh 117.67 85.83% In operation
(Hoa Binh Industrial Park)
SUB-TOTAL: 18 IPs 4,076.23 86.79%
19. KCN Trần Anh – Tân Phú 105.48 34.09% In operation
(Tran Anh – Tan Phu IP)
20. KCN Nam Thuận 308.39 9.79% In operation
(Nam Thuan Industrial Park)
21. KCN Hựu Thạnh 524.14 23.02% In operation
(Huu Thanh Industrial Park)
22. KCN Đông Nam Á 396.00 19.64% In operation
(Dong Nam A IP)
23. KCN An Nhựt Tân 119.20 0.00% In operation
(An Nhut Tan IP)
24. KCN Suntec 295.43 17.41% In operation
(Suntec Industrial Park)
SUB-TOTAL: 06 IPs 1,748.64 18.07%
TOTAL: 24 IPs in operation 5,982.14 65.19% In operation

25. KCN Thế Kỷ 119.19 - Land clearance


(The Ky Industrial Park)
26. KCN Lộc Giang 466.00 - Land clearance
(Loc Giang Industrial Park)

703
27. KCN Prodezi 400.00 - Land clearance
(Prodezi Industrial Park)
28. KCN Tandoland 250.00 - Land clearance
(Tandoland Industrial Park)
29. KCN Nam Tân Tập 244.74 - Land clearance
(Nam Tan Tap Industrial Park)
30. KCN Tân Tập 654.00 - Land clearance
(Tan Tap Industrial Park)
31. KCN Quốc Tế Trường Hải 162.19 - Land auction
32. KCN Thủ Thừa 188.88 - Land clearance
(Thu Thua Industrial Park)
SUB-TOTAL: 08 IPs 2,485 - Land clearance
33. KCN Hoàng Lộc 152.21 - Waiting for Prime
(Hoang Loc Industrial Park) Minister’s approval
34. KCN Anh Hồng 2 131.19 - Waiting for Prime
(Anh Hong 2 Industrial Park) Minister’s approval
35. KCN Saigon-Mekong 200.00 - Waiting for Prime
(Saigon-Mekong IP) Minister’s approval
36. KCN Cửa khẩu Bình Hiệp – Giai đoạn 1 168.50 - - Waiting for Prime
37. KCN Đông Sông Rồ 172.00 - Minister’s approval
- Inside Long An Border-
gate Economic Zone
SUB-TOTAL: 05 IPs 823.9 - Waiting for Prime
Minister’s approval
TOTAL: 13 IPs 3,308.9 Waiting for Prime
Minister’s approval

704
DUC HO III-HONG DAT IZ INDUSTRIAL PARK

GENERAL INFORMATION
Hong Dat – Long An Company
Investor ▪ Address: Duc Lap Ha Commune, Duc Hoa District, Long An Province.
▪ Tel: 093 153 9292 – press 4
▪ Email: congtycophanhongdatlongan@gmail.com

Contact Person Duong Huyen- Admin KCN – 093 153 9292

Location Adjacent location


Distance from Ho Chi Minh City: 05km;
Distance from Tan Son Nhat airport: 20 km
Distance from Hiep Phuoc port: 40 km
Distance from Long An international port: 60 km
From Ben Luc - Long Thanh port: 40 km
Distance from station/national road/1A: 20 km
Investment Sectors Priority Sectors for - Group of agricultural product processing projects;
Investment
- Group of textile and garment projects (not tanning);
- Group of electrical, electronic and telecommunications projects;
- Group of stationery projects;
- Group of projects for processing livestock, poultry and aqua feed (not
processing fishmeal, aquatic by-products from fresh aquatic by-
products);
- Group of other projects:
+ Manufacture of children's toys;
+ Producing technological products;
+ Support services for the operation of the industrial zone such as office
leasing, banking, postal and telecommunications; warehousing services
(including cold storage); transportation, delivery, food supply; industrial
hygiene; services of collecting and transporting solid waste and
hazardous waste to a place for thorough treatment outside the industrial
park.

Investment Restricted Producing iron, steel, cast iron, metallurgy; production (mixing of raw
Sectors materials), processing, bottling and packaging of plant protection drugs;
fertilizer production.
Minimum wage
4.160.000 VND

Lease term ▪ Phase 1: From October 1, 2009 onward


▪ Stage 2: not done yet
Minimum Lease Area 5.000m2
Limit for Construction 2 floors
Height

705
Permitted Construction
Rate - Factory construction area: 77.39%
- Operating area] 1.20%

Land area ▪ Total area: 27,3989 ha


▪ Total leasable area: 27,3989 ha
▪ Total vacant leasable area: 0 ha
▪ Total area with full infrastructure ready to build factory: 27,3989 ha
Factory Available for Rent ▪ Total area: 0 ha

Operation Status ▪ Active

Occupancy Rate and ▪ 100%


Number of Projects ▪ 15 projects

No. of Korean projects None

Lease fee N/A

Operating fee ▪ Management fee: None


[Chi phí vận hành] ▪ Electricity fee: According to the tariff of Duc Hoa Electricity
▪ Water fee: 10,046 VND/m3
▪ Wastewater treatment fee: VND 10,454/m3
▪ Waste treatment fee: VND 6,600,000/wide area

LIST OF PROJECTS IN INDUSTRIAL ZONE

No. Name of Company Nationality

1 Duc Thi Technology Manufacturing Trading Service Co., Ltd Vietnam

2 Vietnam Lien Nong Joint Stock Company Vietnam

3 World Vision (VN) Co., Ltd. China

4 Omega Plant Protection Products Joint Stock Company Vietnam

5 A Chau Hoa Sinh Co., Ltd Vietnam

6 Futai . Joint Stock Company China

7 Dat Viet Research - Production Co., Ltd Vietnam

8 Hoang Chau Long An Plastic Trading Co., Ltd Vietnam

9 To Nam Biotech One Member Company Limited Vietnam

10 Golden Lion Fertilizer Co., Ltd Vietnam

11 Golden Agro-Chemical Fertilizer Co., Ltd Vietnam

12 Asia Agros Co., Ltd Vietnam

13 Gap Agro . Co., Ltd Vietnam

14 Global Farm Joint Stock Company Vietnam

706
15 C.N.D Aluminum Glass Door Manufacturing and Assembling Co., Ltd Vietnam

707
HUU THANH IDICO INDUSTRIAL ZONE

GENERAL INFORMATION / THÔNG TIN TỔNG QUÁT


Address Huu Thanh ward, Duc Hoa district, Long An province, Vietnam
IDICO Corporation - JSC/ Tổng công ty IDICO-CTCP
Developer ▪ Tel: +84 39312660
▪ Email: dautu@idico.com.vn
▪ Website: https://idico.com.vn

Contact Person Vu Anh Luan - Deputy Sales Manager - Mobile: +84 985 614 678 - Email:
luan.va@idico.com.vn

Location Adjacent location


- Adjacent to border Ho Chi Minh city;
- 40km far from center of Ho Chi Minh city
- 35 km far from Tan An city of Long An province
- 15km far from HCM - Trung Luong expressway
- 20km far from National highway No.1A
- 52km far from Long An international port
- 32km far from Tan Son Nhat international airport
- 55km far from Cat Lai port
Investment Sectors Priority Sectors for Investment:
Industrial zone is arranged with the following production types:
- Industrial electric machinery, industrial electricity and household electricity; Producing
electrical, electronic equipment and electronic components (including production stages in
the closed production technology of the Project such as painting, spraying, plating,
cleaning metal surfaces with chemicals, etc.);
-Manufacturing furniture, interior decoration; wood processing, wood chips from natural
wood; construction materials (no cement production, no clinker production, no lime
production); construction painting;
-Ceramic, Glass, Crystal;
-Producing and distributing gas, industrial gas, medical gas; hot water, steam,

Minimum wage
Vùng II: 4.160.000VND/month

Lease term 06/8/2069


Minimum Lease Area 10.000m2
Limit for Construction Height According to the regulations of the Ministry of Construction not in QCVN 01: 2021/BXD

Permitted Construction Rate According to the regulations of the Ministry of Construction not in QCVN 01: 2021/BXD
[Tỷ lệ xây dựng]

Land area ▪ Total area: 524,14ha


▪ Total leasable area: 395,41ha
▪ Total vacant leasable area: 300ha
▪ Total area with full infrastructure ready to build factory: 200ha
Factory Available for Rent ▪ Total area of planning land: 28ha
▪ Total vacant leasable area: 10.000m2
Operation Status ▪ Active
Đang hoạt động

708
Occupancy Rate and Number of ▪ 23%
Projects ▪ 35

No. of Korean projects ▪0


▪0

Lease fee ▪ Land lease fee: 150$/m2/duration

▪ Factory lease fee: 4.5$/m2/month

Operating fee ▪ Management fee: 0.15$/m2/month


▪ Factory Roof rental price: 30,000VND/m2/year
▪ Electricity fee: accordance with regulation of government
▪ Water fee: 12.100VND/m3
▪ Wastewater treatment fee: ~0,5$/m3
▪ Waste treatment fee: accordance with regulation of suppliers

INFRASTRUCTURE AND FACILITY


Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities, Training
facilities, etc., Road width, …

Layout plan

709
TAN DUC INDUSTRIAL ZONE

GENERAL INFORMATION
Address Lot 8, Duc Hoa Ha Road, Tan Duc Industrial Park, Duc Hoa District, Long An Province, Vietnam
Name of Investor:
Investor TAN DUC INVESTMENT CORPORATION
▪ Address / Địa chỉ: Lot 8, Duc Hoa Ha Road, Tan Duc Industrial Park, Duc Hoa District, Long An
Province, Vietnam
▪ Tel: (+84.272)3761821
▪ Email: nhtduong@itagroup-vn.com
▪ Website: www.kcntanduc.vn
Contact Person Name - Position - Mobile: - Email: Duong Nguyen Hoang Thuy – Deputy Sales Director- (+84)
899318986- nhtduong@itagroup-vn.com

Location Adjacent location


- 28 km from Hochiminh city/ the capital
- 23 km from Tan Son Nhat airport
- 20 km from Bourbon port
- 22 km from Trung Luong highway
Investment Sectors Priority Sectors for
Các lĩnh vực đầu tư Investment
 Electrical industry, industrial electricity and household electricity.
 Electronic industry, informatics, media, telecommunications.
 Motorcycle, automobile, tractor manufacturing industry.
 Mechanical industry, precision mechanics, medical instruments.
 Industry serving oil and gas exploitation and processing.
 Manufacturing industry of construction steel, steel pipe, plating.
 Furniture manufacturing industry, interior decoration, building
materials.
 Industry of ceramics, glass, crystal.
 Plastic and rubber technology (no latex processing).
 Packaging, prepress, printing, paper industry (no pulp processing).
 Garment and footwear industry.
 Food and victuals processing industry.
 Pharmaceutical and cosmetic manufacturing industry.

Minimum wage
4,160,000 VND/month

Lease term ▪ Stage 1: From…. Until October 28, 2055


▪ Stage 2: From…. Until 03/06/2058
Minimum Lease Area 3,000 m2
Limit for Construction No limit
Height

Permitted Construction 60-70% land size


Rate

Land area ▪ Total area: 545ha


▪ Total leasable area: 388.5262 ha
▪ Total vacant leasable area: 82ha
▪ Total vacent area with full infrastructure ready to build factory: 70ha
Factory Available for Rent ▪ Total area: 199.093,22 m2
▪ Total vacant leasable area: 46.857m2
710
Operation Status ▪ In operation
Occupancy Rate and ▪ Stage 1: 94%, Stage 2: 63.15%
Number of Projects ▪ 220 projects

No. of Korean projects ▪ 10

Lease fee ▪ Land lease fee: 185-200 USD/m2 (VAT not included)
▪ Factory lease fee: 2.6-2.8 USD/m2/month

Operating fee ▪ Management fee: 10,018 VND/m2/year


▪ Electricity fee: according to the price of Vienam Electricity Company
3
▪ Water fee: 14,277 VND/m
▪ Wastewater treatment fee:
3
“Class A” Standard according to “Letter: 394/CV-TADICO 22”: 4,968 VND/m
3
“Class B” Standard according to “Letter: 393/CV-TADICO 22”: 12,790 VND/m
▪ Waste treatment fee: tenants will sign the contract directly with the service suppliers
INFRASTRUCTURE AND FACILITY

Tan Duc E-city is planned and designed on an area of 387 hectares, which includes homes, villas, apartments and flats. It features lovely
green landscaping and it guarantees to satisfy the strictest criterion of a green urban and an ideal living environment. The contemporary
urban and residential infrastructure system offers tree-lined roads; street lights; a central park with a beautiful 10ha lake surrounded by
green trees; an underground electricity system; a modern information technology infrastructure to supply cable TV and high speed
internet; and a water supply and treatment facility.
Additionally, there is a modern public service infrastructure, which includes schools, a sports complex, a commercial center,
supermarkets, an entertainment area, and medical clinics and hospitals.
Regarding safety and security, TTG employs a Security Team of 100 trained and well-equipped individuals who are
dedicated, responsible, polite and enthusiastic.

711
Layout plan

712
LONG HAU INDUSTRIAL PARK

GENERAL INFORMATION
Address Ấp 3, xã Long Hậu, huyện Cần Giuộc, tỉnh Long An
Name of Investor: Long Hau Company
Investor ▪ Address: Long Hau Commune, Can Giuoc District, Long An Province
▪ Tel: (+84) 906 938 599
▪ Email : sales@longhau.com.vn
▪ Website: https://longhau.com.vn/

Contact Person Name - Position - Mobile: - Email:


Ms Phuong Anh – Korea Desk : (+84) 989 098 288 ;
Email: anh.tp@longhau.com.vn
Location Adjacent location
- Distance from the center of District 1, HCMC: 19 km
- Distance from Tan Son Nhat airport: 25 km
- Distance from Saigon Hiep Phuoc port: 03 km
- Long An International Port: 22 km
- Distance from Ben Luc - Long Thanh Expressway: 05 km
Investment Sectors Priority Sectors for Group of industries that cause less environmental pollution:
Investment Mechanical engineering, metallurgy, food processing, beverage,
supporting industries; Projects on garment production, chemical,
pharmaceutical and cosmetic manufacturing industries; Instruments
manufacturing, medical equipment, packaging, electrical-electronic
assembly...
Investment Restricted Group of industries causing environmental pollution.
Sectors
Minimum wage 4.160.000 VND/ month

Lease term ▪ June 17, 2057


Thời hạn cho thuê ▪ Extended Long Hau Industrial Park: Land use term until December 21, 2059
▪ Long Hau 3 Industrial Park: Land use term until June 21, 2066
Minimum Lease Area - Ready-built factory: From 160 m2
- Industrial land: From 5,000 m2
Limit for Construction Long Hau Industrial Park:
Height - Factory and warehouse area: Average number of floors: From 02-05 floors.
- Area of administrative and service works: Average number of floors: From 02-05 floors.
Extended Long Hau Industrial Park:
- Factory and warehouse area: Building height: From 02-05 floors.
- Area of administrative and service works: Building height: From 09 to 12 floors.
Long Hau Industrial Park 3-phase 1:
- Factory and warehouse area: Maximum building height: 05 floors.
- Area of administrative and service works: Maximum building height: 09 floors.
Permitted Construction - Factory and warehouse area: ≤70%
Rate - Area of administrative and service works: ≤45%
- Percentage of trees in the factory premises: ≥20%
- Percentage of trees in the premises of administrative and service works: ≥30%
Land area ▪ Total area: 411,31 ha.
[Diện tích đất] ▪ Total leasable area: 36,4 ha
▪ Total vacant leasable area: 36,4 ha
▪ Total area with full infrastructure ready to build factory: 36,4 ha
Factory Available for Rent ▪ Total area:
Ready-built factory: 73,700 m2
High-rise factory: 40,000 m2
▪ Total vacant leasable area:
Ready-built factory: 21,000 m2
713
High-rise factory: Phase1: 6,900 m2, Phase 2: 20,000 m2

Operation Status In operation: Long Hau Industrial Park + Long Hau Industrial Park expansion: 249.33 ha; Long Hau
3 Industrial Park: 26.5 ha. KCN Long Hậu 3: đã giải phóng mặt bằng 117,7836,8 ha/ 123,9825 ha,
đạt 95%.
Occupancy Rate and - Long Hau Industrial Park: 100%.
Number of Projects - Expanded Long Hau Industrial Park: 100%.
- Long Hau 3 Industrial Park: 55%.
▪ Total 192 projects include:
143 Enterprises lease land, 49 Enterprises rent factories.
No. of Korean projects ▪ 23 projects

Lease fee ▪ Land lease fee : 260 USD/ m2


▪ Factory lease fee: 5 USD/ m2

Operating fee ▪ Management fee: Infrastructure fee: 0.042 USD/m2/month


▪ Electricity fee: According to the price of EVN Can Giuoc
▪ Water fee: 9,020 VND/m3
▪ Wastewater treatment fee: 8,040 VND/m3
▪ Waste treatment fee: N/A

INFRASTRUCTURE AND FACILITY


- In Long Hau Industrial Park, there are HD Bank, Vietin Bank, BIDV, Shinhan Bank...; Ben Luc Customs Branch –
Customs Department of Long Hau Industrial Park; Large logistics units such as SLP, Logos, Cobi; The accommodation
area is 6.1ha wide with full facilities; supermarket; child school; clinic; gridiron; Police; Fire and Rescue Team; Post and
telecommunications infrastructure; power supply; adequate water supply to the enterprise's land plot and factory.
- Near Long Hau Industrial Park, there are schools from primary to high school in Can Giuoc district, Nha Be district,
Hiep Phuoc vocational training school...

714
AN THANH INDUSTRIAL ZONE

GENERAL INFORMATION
Phu An Thanh - Long An Company Limited
Investor ▪ Address / Address: Phu An Thanh Industrial Park, TL 830, An Thanh Commune, Ben Luc District,
Long An Province.
Tel: 02723655747
▪ Email: businessanhpat@pat-ip.com
▪ Website: pat-ip.com
Contact Person Nguyen Thanh Quang – Deputy Director - 0903808385 – quan.nguyen@pat-ip.com

Location Adjacent location


- Distance from the city. Ho Chi Minh City: 35 km
- 40 km from the airport
- 40 km from the sand port
- Distance from station/national road/ 06 km

Investment Sectors Priority Sectors for Clean industry, Advanced technology


Investment
Investment Restricted Pollution industry.
Sectors
Minimum wage
Area II: 4.160.000 VND/Month

Lease term ▪ Giai đoạn 1: From 2007 to 2057


Minimum Lease Area 2500m2
Permitted Construction 70%
Rate

Land area ▪ Total area: 307ha


▪ Total leasable area: 211,74ha
▪ Total vacant leasable area: 22,47ha
▪ Total area with full infrastructure ready to build factory: 211.74 ha
Factory Available for Rent ▪ Total area: None
▪ Total vacant leasable area: None
Operation Status ▪ Active

Occupancy Rate and ▪ 85,46%


Number of Projects ▪ 57 Projects

No. of Korean projects ▪ 7 Projects

Lease fee ▪ Land lease fee: 185 USD – 198 USD.

Operating fee ▪ Management fee: 1300VND/m2/month


▪ Electricity fee: According EVN
▪ Water fee: 13.210VND/m3
▪ Wastewater treatment fee: 11.300 – 17.535 VND/m3

715
Layout plan

716
TAN KIM INDUSTRIAL PARK

GENERAL INFORMATION / THÔNG TIN TỔNG QUÁT


Address JMP5+8RX, QL50, Tan Kim, Can Giuoc, Long An
TAN KIM INDUSTRIAL AND RESIDENTIAL AREA INFRASTRUCTURE
Investor DEVELOPMENT CO., LTD
▪ Address / Address: Tan Phuoc KP, Can Giuoc TT, Can Giuoc District, Long An Province
Tel: 0272 3875814
▪ Email: bql.kcn@tankim.com.vn
▪ Website: https://www.tankim.com.vn/
Contact Person Vo Thi Kim Chi - Assistant Director- 0909801518-Chi.vo@haithanh.com.

Location Adjacent location


- 15 km from Ho Chi Minh city
- 20 km from Tan Son Nht airport
- 15 km from Long An International port
- 12 km from Hiep Phuoc port
- 16 km from Sai Gon port
Investment Sectors Priority Sectors for Industry causes less environmental pollution
Investment
Investment Restricted Industry pollutes the environment
Sectors
Minimum wage [Mức lưong tối thiểu vùng] Area II: VND 4,160,000/month

Lease term To 25/7/2058


Thời hạn cho thuê
Minimum Lease Area It has been filled, there is no more land for rent
Limit for Construction - Factory construction area: Max 19m
Height - Operating area: Up to 19m

Permitted Construction Allowed Building Rate


Rate - Factory construction area: 60%
- Operating area: 40%

Land area ▪ Total area: 104.1 ha


▪ Total leasable area: 69,87 ha
▪ Total vacant leasable area: full
▪ Total area with full infrastructure ready to build factory:full
Factory Available for Rent ▪ Total area 11.577m2
▪ Total vacant leasable area: full
Operation Status ▪ Active

Occupancy Rate and ▪ 96.1 %


Number of Projects ▪ 27 projects

No. of Korean projects None

Lease fee ▪ Land lease fee: Currently, the Industrial Park has no industrial land for lease

▪ Factory lease fee: 66,000 VND - 92,000 VND depending on the rental location

717
Operating fee ▪ Management fee: 10,000 VND/m2 excluding VAT [Management fee]
▪ Electricity fee: [Electricity fee]
+ Normal price bracket: 1,555 (VND/ Kwh)
+ Peak price bracket: 2,871 (VND/Kwh)
+ Low price bracket: 1,007 (VND/ Kwh
▪ Water fee: [Water fee]: 13,500 VND/m3
▪ Wastewater treatment fee: [Wastewater treatment fee] without VAT
+ Standard treatment: 9,000 VND/m3
+ Direct waste connection (< 5m3/day.night): 11,000 VND/m3
+ Wastewater exceeding standard (Cod < 200mg/l): 17,000 VND/m3
+ Wastewater exceeding standard (Cod > 200mg/l): 50,000 VND/m3
▪ Waste treatment fee:[Waste treatment fee] according to the contract with the supplier

718
[- This Page is intentionally left blank -]

719
NAM DINH

720
INVESTMENT ENVIRONMENT IN NAM DINH

GENERAL INFORMATION

▪ Area: 1,668 km2


Area, Population
▪ Population: 1.877 million (2022 statistic)
▪ Nam Dinh is located in the southern center of the Red River Delta at coordinates 19 054’ to
20040’ North latitude and from 105055’ to 106045 East latitude.
Geographical Location
▪ Distance from Hanoi: 90km, from Hai Phong: 75km, from Minh City: 1,058km, from Da
Nang: 515km.
▪ The North is adjacent to Thai Binh province, the South is Ninh Binh province, the
Adjacent provinces northwest is adjacent to Ha Nam province, The East is adjacent to the sea (the Gulf of
Tonkin).
2022 statistic:
▪ Real GRDP: 91,966 billion VND (3.96 billion USD)
▪ GRDP growth: 9.07%
▪ GRDP per capita: 2,150 USD/year
GRDP
▪ Economic structure:
- Industry - Construction: 42,56%;
- Agriculture. forestry and fishery: 19,39%
- Service: 34.78%;
- Tax on Goods: 3.8%
2022 statistic:
Industry growth ▪ Industry - Construction growth: 13.11%
▪ Agriculture, forestry and fishery growth: 3.9%
▪ Service growth: 7.47%

PCI ▪ Score: 64.99 – ranked 24 out of 63 cities and provinces in Vietnam. (2021)

SOCIAL INFRASTRUCTURE

▪ Roadway:
- Main highways: Cau Gie-Ninh Binh Expressway through Nam Dinh province is about 35
minutes by car from Nam Dinh city.
- National highway routes such as: National Highway 10, National Highway 37B, National
Highway 38B, National Highway 21, National Highway 21B have been built to ensure traffic
connection with the Northern Delta provinces and the center of Hanoi City.
- The trunk road connects the marine economic zone with the Cau Gie - Ninh Binh expressway
(Provincial road 490B); coastal road through Nam Dinh province are under construction, when
completed, have greatly contributed to promoting socio-economic development, ensuring
national security, international integration of the province.
Transportation ▪ Railway:
- The North-South railway through Nam Dinh province is 41.2km long, single track, 1,000mm
wide, mainly serving passengers going to/from Nam Dinh station from central and southern
provinces.
- The North-South high-speed railway route has been planned to pass through the area of
Nam Dinh province about 36km.
▪ Waterway:
- The central river system passes through the province with a total length of 257km including:
Red river, Dao river, Ninh Co river, Day river, Quan Lieu canal with many national important
inland waterway transport routes passing through the province such as Ba Lat - Hanoi route
(through Red River system); Lach Giang - Hanoi route (through the Red river and Ninh Co

721
river system); Quang Ninh - Ninh Binh route (through the Red River, Dao River and Day river
system) and Cua Day - Ninh Binh route (through the Day river system);
- The local river system is 278km long: Most of the rivers managed by the locality pass through
the saltwater sluices under the dike so limit static, only allowing ships <100T to pass through,
these rivers are mainly for transportation with short distances in each district, the main routes
are of low technical grade IV and grade V. The system of transport routes mainly serves the
demand of transporting agricultural products, construction materials between the inner
districts, connecting with the waterway system managed by the central government to form a
smooth and continuous waterway system.
▪ Other:
- Main airport: None.
- Routes to the airport:
+ National Highway 10 to Cat Bi airport;
+ National Highway 21, National Highway 21B to Noi Bai airport.

Electricity Supplied from the national power network

- Water price: According to general regulations.


Water + Water price for production activities: 13,500 VND/m3
+ Domestic water for residential households: 8,200 VND/m3.
- In Nam Dinh province, there are 16 vocational intermediate schools, colleges and
universities, in the school year 2021-2022 there are 34,331 pupils and students, accounting for
Education 9.62% of the total number of students.
- Nam Dinh city has a vocational training and job introduction center.

Medicare ▪ 08 provincial hospitals, 10 district hospitals and 01 private hospitals

INVESTMENT CONDITION

Human resource ▪ 57.9% of population are in the working age (2022)

Education level ▪ Trained labor rate: 75,5% (2022)

▪ The minimum salary for the province is applied as follows:


- Area II: including: Nam Dinh city;
- Area III: including: Giao Thuy; Hai Hau, Nghia Hung, Xuan Truong, Nghia Hung, Nam
Salary
Truc, Truc Ninh, Vu Ban, Y Yen, My Loc District
▪ The lowest wage for trained labor (including those trained by the enterprises) must be at
least 7% higher than the above referenced basic salary
▪ Investment procedures shall be settled at a focal agency; the time is greatly shortened
compared to general regulations; Investors do not have to pay any service fees except for the
prescribed fees.
Investment incentives ▪ Investment incentives as prescribed by the Vietnamese Government apply.
▪ In addition to the general regulations, large-scale and important projects are researched by
the provincial government in collaboration with investors and submitted to the Government
for specific policies to be applied.
▪ Prioritized projects: Infrastructure of industrial zones and clusters; high-tech industries;
spare part manufacturing industry, automobile assembly, electrical and electronic;
Fields Attracting Investment pharmaceutical production; other industries; High-tech agriculture; trade, service, high-class
entertainment; logistics services; education and training services; health care and medical
services...

722
Map

Department of Planning and Investment


▪ Address No. 172, Han Thuyen Street, Nam Dinh City, Nam Dinh Province City
Contact ▪ Tel: (84) 228.3.645.227
Website:http://sokhdt.namdinh.gov.vn
▪ Email: sokhdt@namdinh.chinhphu.vn

723
LIST OF INDUSTRIAL ZONES IN NAM DINH

No Industrial zone Name Total Area (ha) Occupancy Rate Status


1 My Trung Industrial Zone 150 30% In operation
2 Hoa Xa Industrial Zone 300 100% In operation
3 Bao Minh Industrial Zone 215 100% In operation
4 Rang Dong Textile Industrial Zone Phase I: 520 11.5% Under Land Clearance
(Aurora IP) Process
5 Hong Tien Industrial Zone 198.03 Finding Developers
6 My Thuan Industrial Zone 113.72 Finding Developers
7 Trung Thanh Industrial Zone Finding Developers
8 Xuan Kien Industrial Zone Finding Developers
9 Viet Hai Industrial Zone Finding Developers

NAM DINH’S LOCATION MAP OF INDUSTRIAL ZONES

724
MY TRUNG INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE


Nam Dinh City, Nam Dinh Province
Address
Investor Bac Giang FuJi Development JSC
▪ Add: Song Khe-Noi Hoang Industrial Park (the Northern area), Bac Giang
▪ Tel: (84-204) 652 9 010/ (84) 918 273 656
▪ Website: http://fujiip.com/ko/
Contact Person Mr. Giang – (84) 913 275 656 - giangnguyen@fujiip.com
Location - Land: 90 km from Ha Noi City Center to the South East, 90 km from Hai phong to the Southwest
- Seaport: 90 km from Hai Phong Sea Port to the North East
- Airport: 130 km from Noi Bai Airport and 100 km from Cat Bi Airport
Investment Area Investment priorities Sectors Manufacturing and assembling electric, electronic
product, mechanical, automobile and motorbike; textile
Investment Restricted Sectors Polluted Sector
Minimum wage [Area 2] According to Decree 90/2019/NĐ-CP dated 15th November 2019
Lease term ▪ Start date: 2006
▪ End date: 2056
Minimum Lease Area 10,000 m2
Limit for Construction In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Height Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction Rate
Planned area ▪ Total area: 150 ha
▪ Total Industrial land area: 103 ha
Factory Available for Rent ▪ Total area: NA
Operation Status ▪ In operation
Occupancy Rate and ▪ 30%
Number of Projects ▪ 14 projects
Number of Korean Projects 01 project
Lease fee ▪ Land lease fee: 60 USD/m2
Operating fee ▪ Management fee: 6,000 VND (~0.26 USD)/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: About 11,000 VND (~0.5 USD)/m3
▪ Wastewater treatment fee: Not constructed
▪ Waste Collection: 350,000 - 400,000 VND (~15- 18 USD)/m3
INFORMATION OF INFRASTRUCTURE AND FACILITY
Financial institution Agribank, Vietin Bank, BIDV
Tax service, State finance 5 km from Nam Dinh Tax Office
office
Customs Service Nam Dinh Customs Office within 4 km
108 km from Hai Phong Bonded Warehouse
Logistics NA
Post office 4.3 km from Nam Dinh Post Office
Medicare Nam Dinh General Hospital within 4 km
Police, public security Inside Industrial Zones
Universities, training Luong The Vinh University
facilities, etc. Nam Dinh Technical Pedagogy University
Recruitment Supported by Nam Dinh Management Board Industrial Zone
Worker dormitory NA
Worker's child education NA
facility
725
One-stop service NA
Road Width NA
Communication Telephone network and high speed internet by VNPT
Infrastructure of Industrial
Zone
Emergency Power generator None
Fire-fighting facility Set up across industrial zones. The distance between fire hydrants is 150m.
Layout Plan

726
LIST OF PROJECTS IN INDUSTRIAL ZONE

No Company Name Nationality Business line


1 Vietnam Headwork Co., Ltd JAPAN Manufacture motor vehicles
2 YSS Garment Company Limited HONGKONG Manufacture of costumes
3 Nam Phuong Hong Joint Stock Company Vietnam Food Service
4 Hoang Anh Steel Structure and Lifting Vietnam Producing products from prefabricated metal (except
Equipment Joint Stock Company machinery and equipment)
5 Cuu Long Investment Joint Stock Company
6 Trung Duc Trading and Trading Co., Ltd Vietnam Producing and distributing electricity, gas, hot water,
steam and air-conditioning
7 Phu My Hai private enterprise Vietnam Manufacture motor vehicles
8 Dai Doan Ket Import Export Joint Stock Vietnam Processing wood and producing products from wood,
Company bamboo of various species (except beds, wardrobes,
tables, chairs); Producing products from straw,
plaiting materials and plaiting materials
9 Phat Cuong Joint Stock Company Vietnam Producing products from prefabricated metal (except
machinery and equipment)
10 Tan Dan Phu Steel Joint Stock Company Vietnam Producing products from prefabricated metal (except
machinery and equipment)
11 Song Hong Garment Joint Stock Company Vietnam Weaving
12 An Khanh Limited Company Vietnam Warehousing and support activities for transportation
13 Nam Lien Joint Stock Company Vietnam Producing packaging and anti-counterfeit stamps
14 PIM Vina Co., Ltd. Korea Instrumentation and control; engines and turbines;
pressure equipment and accessories; spare parts for
motor vehicles and vehicle engines, including

727
HOA XA INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE


My Xa and Loc Hoa Commune, Nam Dinh City, Nam Dinh province
Address
Investor ▪ Nam Dinh IZ Development and Exploitation Infrastructure Company
․ Address: Pham Ngu Lao Road - Hoa Xa Industrial Zone - Nam Dinh province
․ Tel: (84-228) 3 682 539
Contact Person Ms. Do Thi Huong - (84-228) 3682 539 - huongdt81.bql@gmail.com
Location - National Road 10 connecting provinces from Quang Ninh to Ninh Binh links with national road 1
- the main traffic line at the border of Nam Dinh and Ninh Binh
- 90 km from Hai Phong Sea Port to the North East
- 130 km from Noi Bai Airport and 100 km from Cat Bi Airport
Investment Area Investment priorities Manufacturing and assembling electric, electronic product, mechanical,
Sectors automobile and motorbike; textile
Investment Restricted Polluted Sector
Sectors
Minimum wage [Area 2] According to Decree 90/2019/NĐ-CP dated 15th November 2019
Lease term ▪ Start date: 2003
▪ End date: 2053
Minimum Lease Area 10,000 m2
Limit for Construction In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Height Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction Rate
Planned area ▪ Total area:
- Total Industrial land area: 285.27 ha
- Total leasable area: 204.34 ha - currently 100% industrial land is leased. Instead, factory lease and
transfer is available.
Factory Available for Rent ▪ Total area: 300 ha
Operation Status ▪ In operation

Occupancy Rate and ▪ 100%


Number of Projects ▪ 126 projects
Number of Korean Projects 09 companies
Lease fee ▪ Land lease fee: 65 USD/m2▪ Factory lease fee: 4 USD/m2/month
▪ Payment:
- Make a deposit of 20% of the infrastructure rental within 07 days as from the signing date of
the MOU
- Pay 50% of the infrastructure rental within 07 days as from the signing date of the contract
- Pay 30% of the infrastructure rental within 07 days as from the land handover date
Operating fee ▪ Management fee: 2,500 VND (~0.11 USD)/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 11,500 VND (~0.5 USD)/m3
▪ Wastewater treatment fee: 6,500 VND (~0.29 USD)/m3 (Excluding environment protection fee)
▪ Waste treatment fee: 200,000 VND (~9 USD)/m3 with regular solid waste
INFORMATION OF INFRASTRUCTURE AND FACILITY
Financial institution Agribank, Vietin Bank, BIDV
Tax service, State 5 km from Nam Dinh Tax Office
finance office
Customs Service Nam Dinh Customs Office within 4 km
108 km from Hai Phong Bonded Warehouse
Logistics NA
Post office 4.3 km from Nam Dinh Post Office
Medicare Nam Dinh General Hospital within 4 km

728
Police, public security Inside Industrial Zones
Universities, training Luong The Vinh University
facilities, etc. Nam Dinh Technical Pedagogy University
Recruitment Supported by Nam Dinh Management Board Industrial Zone
Worker dormitory NA
Worker's child NA
education facility
One-stop service NA
Road Width NA
Communication Telephone network and high speed internet by VNPT
Infrastructure of
Industrial Zone
Emergency Power None
generator
Fire-fighting facility Set up across industrial zones. The distance between fire hydrants is 150m.
Layout Plan

729
Location Map

Actual View

730
LIST OF PROJECTS IN INDUSTRIAL ZONE

No Company Name Nationality Business line


1 Nam Dinh Industrial Zone Infrastructure Vietnam Real estate business, infrastructure construction
Development and Development Company
2 Mai Van Dang Company Limited Vietnam Manufacture motor vehicles
3 Phu Hai Company Ltd. Vietnam Manufacture of electrical equipment
4 Phu Thinh private enterprise Vietnam Producing machines and equipment not classified in
any category
5 Dong Thanh partnership Vietnam Manufacture motor vehicles
6 Thai Quan Company Ltd. Vietnam Manufacture motor vehicles
7 Quang Toan Company Limited Vietnam Producing products from rubber and plastic
8 Thanh Nguyen Company Limited Vietnam Producing products from rubber and plastic
9 Minh Hong Company Limited Vietnam Producing products from rubber and plastic
10 Najimex Joint Stock Company Vietnam Processing wood and producing products from wood,
bamboo of various species (except beds, wardrobes,
tables, chairs); Producing products from straw,
plaiting materials and plaiting materials
11 Nam Dinh Water Trading Co., Ltd Vietnam Exploiting, treating and supplying water
12 Nam Dinh Industrial Goods Trading Joint Vietnam Manufacture motor vehicles
Stock Company
13 Hainan Company Limited Vietnam Manufacture motor vehicles
14 Doan Ket Company Limited Vietnam Producing beds, wardrobes, tables, chairs
15 Nam Dinh Electrical Construction Company Vietnam Manufacture of electrical equipment
Ltd.
16 Vinh Ky Company Ltd. Vietnam Producing products from rubber and plastic
17 Xuan Tung Company Limited Vietnam Producing products from rubber and plastic
18 Duy Khanh Transport Joint Stock Company Vietnam Producing products from prefabricated metal (except
machinery and equipment)
19 CP Thuy Dat Vietnam Manufacturing and processing food; textile
20 Thong Thong Company Limited Vietnam Manufacture of electrical equipment
21 Garnet Nam Dinh Garment Company Korea Manufacture of costumes
Limited
22 Nam Dinh Forest Products Joint Stock Vietnam Producing beds, wardrobes, tables, chairs
Company
23 Truong Phat Company Limited Vietnam Manufacture motor vehicles
24 Viet Han Electrical Technology Co., Ltd Vietnam Manufacture of electrical equipment
25 Phu Duc Company Limited Vietnam Producing machines and equipment not classified in
any category
26 Dai Tan Company Limited Vietnam Producing products from prefabricated metal (except
machinery and equipment)
27 Nam Dinh Food Industry Joint Stock Vietnam Producing beverages
Company (NADA Beer Joint Stock
Company)
28 CP Tasco Company Vietnam Producing products from other non-metallic minerals
29 Nam Dinh Investment and Development Vietnam Financial service activities (excluding insurance and
Bank Branch social insurance)
30 Tan Truong Phat Company Limited Vietnam Manufacture of electrical equipment
31 Nam Tan Plastic Joint Stock Company Vietnam Producing products from rubber and plastic
32 Mai Huong Commercial Joint Stock Vietnam
Company

731
33 Son Nam Textile and Garment Joint Stock Vietnam Weaving
Company
34 ARKSUN - Phu Thanh Limited Company Vietnam Manufacture of costumes
35 Truong Tho Pharmaceutical Joint Stock Vietnam Producing medicine, pharmaceutical chemicals and
Company pharmaceutical materials
36 Vinh Truong Joint Stock Company Vietnam Producing paper and paper products
37 Thanh Hai Company Limited Vietnam Manufacturing and processing food
38 CP Hung Vuong Company Vietnam Producing products from prefabricated metal (except
machinery and equipment)
39 Hang Quyen Company Limited Vietnam Producing products from prefabricated metal (except
machinery and equipment)
40 Nam Dinh Garment Joint Stock Company Vietnam Manufacture of costumes
41 Hai Hoa Company Limited Vietnam Manufacturing and processing food
42 Duc Phuong Company Limited Vietnam Manufacture motor vehicles
43 Minh Dan Pharmaceutical Joint Stock Vietnam Producing medicine, pharmaceutical chemicals and
Company pharmaceutical materials
44 Viet Anh Company Limited Vietnam Producing beds, wardrobes, tables, chairs
45 UNIVERSAL CANDLE VIETNAM CO., China Other manufacturing and processing industries
LTD
46 Nam Duoc Company Limited Vietnam Producing medicine, pharmaceutical chemicals and
pharmaceutical materials
47 Hoang Dung Textile and Garment Company Vietnam Weaving
Limited
48 Hong Phat Company Limited Vietnam Producing products from prefabricated metal (except
machinery and equipment)
Vietnam Producing medicine, pharmaceutical chemicals and
pharmaceutical materials
49 Nam Dinh Silk Weaving Joint Stock Vietnam Weaving
Company
50 Nam Dinh Textile and Garment Corporation Vietnam Weaving
51 Dinh Cong Company Limited Vietnam Weaving
52 Bank for Agriculture and Rural Vietnam Financial service activities (excluding insurance and
Development of Nam Dinh, North of Nam social insurance)
Dinh Branch
53 Tran Hong Quan Trade Co., Ltd Vietnam Producing and distributing electricity, gas, hot water,
steam and air-conditioning
54 Chau Thanh private enterprise Vietnam Producing products from rubber and plastic
55 DHTEX textile and garment co.ltd Italy Weaving
56 ARKSUN Vietnam Joint Stock Company China Manufacture of costumes
57 CP Thuy Binh Company Vietnam Weaving
58 Viet Trieu Construction Mechanical Joint Vietnam Producing machines and equipment not classified in
Stock Company any category
59 Minh Quang Company Limited Vietnam Manufacture electronic products, computers and
optical products
60 CP Duc Thang Vietnam Producing products from prefabricated metal (except
machinery and equipment)
61 X20 Nam Dinh Company Limited Vietnam Weaving
62 Tuyet Thanh Production and Trading Vietnam Producing beverages
Service Co., Ltd
63 TCE VINA DENIM Joint Stock Company Korea Weaving
64 DongYang ST Vina Co., Ltd Korea
65 Northern Gas Trading Joint Stock Company
- Duyen Hai Branch
66 Bao Minh Company Limited Vietnam Metal production

732
67 Dan Phu commercial private enterprise Vietnam Producing products from prefabricated metal (except
machinery and equipment)
68 Nam Ninh Packaging Joint Stock Company Vietnam Packaging manufacturer
69 D.F Zin Company Limited Korea Manufacture of costumes
70 Thanh Binh Company Limited Vietnam Producing products from rubber and plastic
71 Vietnam Industrial Gas Co., Ltd Vietnam Other manufacturing and processing industries
72 Nam Dinh Granite Joint Stock Company Vietnam Producing products from other non-metallic minerals
73 Nam Dinh YoungOne Company Limited Korea Textile
74 Thuy Binh Wool Joint Stock Company Vietnam Lodging
75 TRITON LTD Korea Manufacture of costumes
76 Anh Phat Company Limited Vietnam Weaving
77 Thanh Thuy Green Energy Joint Stock Vietnam Producing solar cells, products using solar energy
Company
78 Huong Giang Commercial Joint Stock Vietnam Manufacturing and processing food
Company
79 Nam Dinh Enterprise Development Support Vietnam Wholesale (excluding automobiles, motors,
Joint Stock Company motorcycles and other motor vehicles)
80 Private enterprise Tam Huy Hoang Vietnam Producing products from prefabricated metal (except
machinery and equipment)
81 Honlei Duc Ha Joint Stock Company Vietnam Manufacture motor vehicles
82 Nam Dinh Steel Wire Rope Joint Stock Vietnam Producing products from prefabricated metal (except
Company machinery and equipment
83 Dong Nam Woolen Textile Co., Ltd China Weaving
84 Nam Dinh KATOH Company Limited JAPAN Producing products from rubber and plastic
85 Vietnam Joint Stock Commercial Bank for Vietnam Financial service activities (excluding insurance and
Industry and Trade - ND Branch social insurance)
86 Cheonghak Gloves Vina Co., Ltd Korea Manufacture of costumes
87 DNA Investment Joint Stock Company Vietnam Manufacture of costumes
88 Designer Textile Vietnam Co., Ltd. NEW Weaving
ZEALAND
89 Nam Ha Pharmaceutical Joint Stock Vietnam Producing medicine, pharmaceutical chemicals and
Company pharmaceutical materials
90 Hoang Long Company Limited Vietnam Producing products from prefabricated metal (except
machinery and equipment)
91 Unburnt Brick Material Joint Stock Vietnam Producing products from other non-metallic minerals
Company 567
92 Hoang Lien Pharmaceutical Co., Ltd Vietnam Producing medicine, pharmaceutical chemicals and
pharmaceutical materials
93 Phuong Thuy Import Export Trading Joint Vietnam Weaving
Stock Company
94 International Auto Parts Co., Ltd Vietnam Sale and repair of automobiles, motors, motorbikes
and other motor vehicles
95 Anh Duc Commercial Wood Joint Stock Vietnam
Company
96 Dai Loc Nam Dinh steel wire mesh Co., Ltd Vietnam Producing products from prefabricated metal (except
machinery and equipment)
97 Luc Bao Fiber and Synthetic Plastic Joint China Producing chemicals and chemical products
Stock Company
98 Tan Phu prestressed concrete one member Vietnam Producing products from other non-metallic minerals
limited company
99 Vietnam Textile Corporation Vietnam Weaving
100 Phong Linh Transportation and Trading Co., Vietnam
Ltd
101 ETC Investment and Technology JSC Vietnam Environmental technology
102 Tran Tin Production and Trading Co., Ltd Vietnam Mechanical

733
103 Aelim Vina Co., Ltd Korea
104 Thuan Phat Production and Trading Service Vietnam
Co., Ltd
105 Viet Thuan Joint Stock Company China-Vietnam Manufacture of costumes
106 Hong Phu Gia Textile Co., Ltd Vietnam Textile
107 Phuc Vinh Transportation Co., Ltd Vietnam Producing products from other non-metallic minerals
108 Duc Chuong Company Limited Vietnam Laundry, cleaning textile and fur products
109 Specter Vietnam Garment Technology Co., Denmark Manufacture of costumes
Ltd
110 Santerlon Travel Goods Co., Ltd China Producing suitcases, bags
111 Thanh Bach Shoes Co., Ltd Vietnam China Producing shoes
112 Nam Dinh Fertilizer Joint Stock Company Vietnam Fertilizer
113 Won Young Vina Co., Ltd Korea
114 Hoa Son Company Ltd. Vietnam
115 Viet Nam Nam Dinh Company Limited
116 Viet Thai Joint Stock Company Vietnam Manufacture motor vehicles
117 Tan Long Steel Pipe Limited Company Vietnam
118 Bao Loc Trade and Production Joint Stock Vietnam
Company
119 Giang Nam Cat Joint Stock Company Vietnam
120 Hanh Thuy Trade & Production Co., Ltd. Vietnam
124 Nox Vina Co., Ltd
125 Forelink Limited
126 Sing Yick One Member Company Limited

734
BAO MINH INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE


Vu Ban district, Nam Dinh province
Address
Investor ▪ Nam Dinh IZ Development and Exploitation Infrastructure Company
․ Address: Pham Ngu Lao Road - Hoa Xa Industrial Zone - Nam Dinh province
․ Tel: (84-228) 3 682 539
Contact Person Ms. Do Thi Huong - (84-228) 3682 539 - huongdt81.bql@gmail.com
Location - National Road 10 connecting provinces from Quang Ninh to Ninh Binh links with national road 1
- the main traffic line at the border of Nam Dinh and Ninh Binh
- 90 km from Hai Phong Sea Port to the North East
- 130 km from Noi Bai Airport and 100 km from Cat Bi Airport
Investment Area Investment priorities Manufacturing and assembling electric, electronic product, mechanical,
Sectors automobile and motorbike; textile
Investment Restricted Polluted Sector
Sectors
Minimum wage [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019
Lease term ▪ Start date: 2007
▪ End date: 2057
Minimum Lease Area 10,000 m2
Limit for Construction In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Height Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction Rate
Planned area ▪ Total area: 215ha
▪ Total Industrial Land area: 104.37 ha
Factory Available for Rent ▪ Total area: NA
Operation Status ▪ In operation
Occupancy Rate and ▪ 100%
Number of Projects
Number of Korean Projects None
Lease fee Land lease fee: 90 USD/m2
Operating fee ▪ Management fee: 0.3 USD/m2/year (fixed for 5 years)
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 11,400 VND (~0.5 USD)/m3 (household); 8,800 VND (~0.39 USD)/m3 (production)
▪ Wastewater treatment fee: Approximately 0.45 - 0.6 USD/m3 (excluding textile wastewater)
▪ Waste treatment fee: Approximately 0.36 USD/m3 (excluding textile wastewater)
▪ Waste Collection: 30 USD/ton
INFORMATION OF INFRASTRUCTURE AND FACILITY
Financial institution Agribank, Vietin Bank, BIDV
Tax service, State finance 14 km from Nam Dinh Tax Office
office
Customs Service Nam Dinh Customs Office within 14 km
Logistics NA
Post office 11 km from Nam Dinh Post Office
Medicare Nam Dinh General Hospital within 10 km
Police, public security Inside Industrial Zones
Universities, training Luong The Vinh University
facilities, etc. Nam Dinh Technical Pedagogy University
Recruitment Supported by Nam Dinh Management Board Industrial Zone
Worker dormitory NA

735
Worker's child education NA
facility
One-stop service NA
Road Width NA
Communication Telephone network and high speed internet by VNPT
Infrastructure of Industrial
Zone
Emergency Power generator None
Fire-fighting facility Set up across industrial zones. The distance between fire hydrants is 150m.
Layout Plan

Location Map

Actual View

736
737
LIST OF PROJECTS IN INDUSTRIAL ZONE

No Company Name Nationality Business line


1 Bao Minh Industrial Zone Infrastructure Vietnam Construction and trading of infrastructure, waste water
Investment JSC treatment
2 Nam Dinh Forest Products Joint Stock Vietnam Producing beds, wardrobes, tables, chairs
Company
3 Sunrise spinning (Vietnam) Co., Ltd. HONGKONG Weaving
4 Branch of Sumi Vietnam wiring system Co., Japan Manufacture of electrical equipment
Ltd. in Nam Dinh province
5 Sunrise Luen Thai Textile and Dyeing Joint China Weaving
Stock Company
6 Smart Shirts Vietnam Co., Ltd. HONGKONG Manufacture of costumes
7 Yulun Textile Weaving Co., Ltd (Vietnam) China Weaving
8 Padmac Vietnam Co., Ltd. Manufacture of costumes
9 Smart Shirts Co., Ltd Bao Minh USA Manufacture of costumes
10 Junzhen Garment Co.Ltd China Manufacture of costumes
11 Sunrise Fabric (Vietnam) Co., Ltd. China Textile fibers
12 KAM HING PIECE WORKS CO., LTD HONGKONG Textile
13 Bao Minh Textile Joint Stock Company Vietnam Textile
14 Chentai Weaving Company Limited of Seychelles Apparel manufacturers
Northern Vietnam
15 Herberton private limited company Textile

738
RANG DONG TEXTILE INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE


▪ Rang Dong Town, Nghia Hung, Nam Dinh Province, Vietnam
Address
Investor Rang Dong Infrastructure Investment and Development JSC.,
HEAD OFFICE
▪ Address: Lot HC3, Rang Dong Textile Industrial Park, Rang Dong Town, Nghia Hung, Nam Dinh
Province, Vietnam
▪ Tel: 02288856886
▪ Website: www.auroraip.vn

NORTHERN REGIONAL OFFICE


▪ Address: HCO Building 5th Floor, 44B Ly Thuong Kiet, Hoan Kiem, Hanoi, Vietnam
▪ Tel: 0247305468

SOUTHERN REGIONAL OFFICE


▪ Address: VTP Building, 2nd Floor, 8 Nguyen Hue Blv., Ben Nghe Ward, District 1, HCMC,
Vietnam
▪ Tel: 02839110981
Contact Person ▪ Ms. Nguyen Thi Quynh Trang – Sale Director cum. CEO’s assistant –
Mobile: (84) 8 3989 9988 - Email: trang.nguyenthiquynh@auroraip.vn
Location - Located within Ninh Co Economic Zone
- 50km from Nam Dinh City Center; 40 km from Ninh Binh City Center, 75 km from Thai Binh
City Center, 130 km from Hanoi City Center;
- 150km from Noi Bai International Airport (Hanoi); 145km from Cat Bi Airport (Hai Phong);
- 200km from Cai Lan Deep Seaport, 140km from Hai Phong Port, 10Km from Hai Thinh
Intermediary Port;
- 30km from Cao Bo intersector connecting to the Highway.
Investment Area Investment priorities Fabric manufacturing, Dying, Supporting industry
Sectors
Investment Restricted No restriction
Sectors
Minimum wage [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019
Lease term ▪ Start date: 2015
▪ End date: 30 June 2065
Minimum Lease Area 5 ha
(Lease area below this threshold is subject to approval on case by case basis)
Limit for Construction For administrative and service area: 3 – 5 floors
Height For factory area: below 5 floors
Permitted Construction Rate For administrative and service area: 30% - 40% (various among area)
For factory area: 45% (at max of 5 floors and adjusted with construction height in compliance with
national standard)
Planned area ▪ Total area: 2,100 ha
- Phase I: 520 ha (2017 -2020: to make 1 billion meters of fabric in the area)
- Phase II: 850 ha (2023-2030: increase fabric production to 1.5 billion meters and complete full
supply chain in the area)
- Phase III: 657 ha (2031-2035: build modern city of trading and service for textile and fashion)
▪ Total vacant leasable area: 350 ha (Phase 1)
▪ Total area with full infrastructure ready to build factory: 520ha (Phase 1)
Factory Available for Rent ▪ Total area: Na
Operation Status ▪ In operation
Occupancy Rate and 1 project ~ Occupancy rate of 11.5%
Number of Projects
Number of Korean Projects None
Lease fee ▪ Land lease fee: 70 USD/m2/over project life
▪ Factory lease fee: Not applicable
▪ Payment:
739
- Method: One-time payment for full leasing term
- Period:
Deposit: 20% of full amount at the time of principle contract
1st period: 20% of full amount at the time of official contract
2nd period: 50% of full amount upon investment certificate
4th period: 10% of full amount upon land use right certificate
Operating fee ▪ Management fee: 0.3 USD/m2/year
▪ Electricity fee: At EVN’s list price
▪ Water fee: 0.4 USD/m3 for industrial purpose, 0.5 USD/m3 for living purpose
▪ Wastewater treatment fee: Upon feature of wastewater (average 1 USD/m3)
▪ Waste treatment fee: Upon feature of waste
INFORMATION OF INFRASTRUCTURE AND FACILITY
Financial institution JSC Bank for Foreign Trade of Vietnam (Vietcombank)
Vietnam Technological and Commercial JSC Bank (Techcombank)
Vietnam Bank for Agriculture and Rural Development(Agribank)
Vietnam Bank for Industry and Trade (VietinBank)
Bank for Investment and Development of Vietnam (BIDV)
Tax service, State finance 30Km from District Tax Authorities and Treasury office
office 55Km from Province Tax Authorities and Treasury office
Customs Service 60Km from nearest Customs Agency
ICD is available within Logistic Area of IP
Logistics Available within IP
Post office Available within IP
Medicare 2Km from Rang Dong Town Medicare Center
14Km from Nghia Binh Town General Hospital
35Km from Nghia Hung District General Hospital
Police, public security 34Km from Nghia Hung District Police Station
A public security unit will be available within IP.
Universities, training Training center is available within IP
facilities, etc.
Recruitment Recruitment support service available
Worker dormitory Worker dormitory available within IP
Worker's child education 2Km from Rang Dong Kindergarten
facility
One-stop service Available
Road Width 24m with six lanes
Communication Optical cable, IDD network available
Infrastructure of Industrial
Zone
Emergency Power generator Not available
Fire-fighting facility Available
Layout Plan

740
Location Map

Actual View

[- This Page is intentionally left blank -]

741
NGHE AN

742
INVESTMENT ENVIRONMENT IN NGHE AN

GENERAL INFORMATION

▪ Area: 16.486,49 km2


Area, Population
▪ Population: 3,4 million (2022 statistic)
Nghe An is a located at latitude 18033' to 20001' North latitude, longitude 103052' to
105048' East longitude, in the center of North Central region of Vietnam; The East borders
Geographical Location the sea, the South borders Ha Tinh province, the North borders Thanh Hoa province, the
West borders the Lao People's Democratic Republic with 468 km of land border, the east
coast is 82 km long.
▪ The East borders the sea, the South borders Ha Tinh province, the North borders Thanh
Adjacent provinces
Hoa province, the West borders the Lao People's Democratic Republic.
2022 statistic:
▪ GRDP: 176.000 billion VND (7.5 billion USD)
▪ GRDP growth: 9,08%
GRDP ▪ GRDP per capita: 51,34 million VND (2.1 thousand USD)
▪ Economic structure:
- Industry - Construction: 33,8%;
- Agriculture. forestry and fishery: 22,7%;
- Service: 43,5 %.
2022 statistic:
Industry growth ▪ Industry - Construction growth: 10,96% %;
▪ Agriculture, forestry and fishery growth: 4,78%;
▪ Service growth: 10,77%;
▪ Score in 2022:
PCI
Ranked 23 out of 63 cities and provinces in Vietnam (Up 7 steps compared to 2021).

SOCIAL INFRASTRUCTURE

▪ Roadway:
There are 8 national highways passing through the province. In which, there are 3 routes
along the North-South direction, 5 transverse routes in the East-West direction connecting
with Laos; There is a trans-Asia route from Laos through Thanh Thuy border gate to Cua
Lo and Dong Hoi ports. The North-South Expressway passing through the territory of
Nghe An province is 134 km long, with a scale of 6 lanes, expected to be completed and
put into use in mid-2024.
▪ Railway:
With 94 km, stretching from North to South. In which, Vinh Railway Station is rated as the
first class station, the third largest passenger and transportation station in the country.
▪ Waterway:
Transportation
The existing Cua Lo port is a large-scale commercial port, with 06 main berths, 3 cargo
yards with an area of 9ha, loading and unloading capacity of over 10 million tons/year,
receiving ships of 30,000 DWT.
Cua Lo deep-water port is planned with 12 berths (ship size 30, 50, 100 thousand DWT),
of which 1 berth for ships of 30,000 DWT and 1 berth for ships of 50,000 DWT put into
operation by the end of 2025.
▪ Airlineway:
Vinh International Airport is less than 15 minutes drive from the city center. The airport
has the fastest growth rate in the country and is the main airport of the North Central
region; currently investing in more cargo terminals and establishing more domestic and
international routes.

743
The national electricity grid has covered all 21 districts, cities and towns in the province.
Many hydropower projects have been completed and will be put into operation such as:
Electricity Ban Ve, Khe Bo, Hua Na, Ban Coc, Nhan Hac and dozens of other small and medium
hydropower plants to ensure stable power supply for production and living.

The water supply can meet the production, service and daily activities of Nghe An
Water province. Particularly, Vinh city and surrounding areas have a water supply capacity of
90,000m3/day and is expected to increase to 100,000m3/day in the future.
Nghe An is a province with a multi-disciplinary and multi-field vocational training system
with 06 universities, 11 colleges and nearly 70 professional and vocational training schools
Education in the fields of economics, engineering, vocational training, pedagogy, health, culture and
art ... fully meet the human resource needs of investors with the rate of trained workers
reaching over 65%.
▪ Nghe An has a synchronous hospital network with modern equipment from the provincial
and district levels, regional general clinics and a relatively good commune and ward health
network. In which, there are 12 provincial hospitals to fully meet the medical examination
Medicare
and treatment needs of the people and investors such as Nghe An General Hospital with a
scale of 1000 beds. High-tech hospitals as satellites for the North Central region such as:
Oncology, Cardiology, Obstetrics and Gynecology, Eye, Vinh International,...

INVESTMENT CONDITION

▪ In 2022, the province's labor force aged 15 and over is 1,556 million people, of which
those being employed in the economy accounted for 98.7% of the provincial population.
The labor structure of Nghe An has shifted in the right direction, increasing the proportion
Human resource
of employees in the industries - construction and services (accounting for 63.4%); The
number of employees working in the formal economic sector is increasing rapidly. Every
year, new jobs are created for 40-45 thousand people.
▪ In the period of 2021-2022, 129,028 people will be recruited and trained, including 9,581
people at college degrees; intermediate level 18,265 people; primary education, training for
less than 3 months 101,182 people; The average employment rate after graduation is over
Education level
80.7%; The rate of trained workers in 2022 will reach 67.7%, of which diplomas and
certificates will reach 27.4%; The rate of students graduating from middle and high
schools entering vocational training is 57 percent.
The minimum salary for the province is applied as follows:
- Areas in regions where the region II minimum wage is applied: VND 4,160,000/month,
including: Vinh city, Cua Lo town and Nghi Loc and Hung Nguyen districts.
- Areas in regions where the region III minimum wage is applied: 3,640,000 VND/month,
Salary including: Quynh Luu District, Yen Thanh, Dien Chau, Do Luong, Nam Dan, Nghia Dan
and Thai Hoa towns , Hoang Mai.
- The rest of Nghe An province applies the region IV minimum wage: 3,250,000
VND/month.

▪ Incentives according to government regulations:


The project is entitled to investment incentives according to the regulations of the
Government of Vietnam for industrial zones in the Southeast Economic Zone (applicable
to areas with extremely difficult socio-economic conditions), including:
- Corporate income tax: The tax rate of 10% is applied for the first 15 years; in which, tax
exemption for 04 years and 50% tax reduction for the next 9 years.
Investment incentives - Import and export tax: Exemption from import tax on goods to create fixed assets; Tax
exemption for 5 years for raw materials, supplies and components that cannot be produced
domestically.
▪ Incentives from the province:
Resolution No. 05/2021/NQ-HDND dated August 13, 2021 of the People's Council of
Nghe An province promulgates a number of policies to support investment in Nghe An
province, period 2021-2025, including:

744
- Support training costs 01 (one) time with the level of 2 million VND / 1 employee for the
project with a total investment of 2,300 billion VND and employing more than 2,000
employees;
- The provincial budget will support 50% of the cost of implementing investment
procedures in the investment preparation step, but not exceeding VND 200 million per
project since the project comes into operation.

Map

South-East Nghe An Economic zone Management Auhtority


▪ Address: No 362- Le Nin street, Hung Phuc Ward, Vinh City, Nghe An Province.
▪ Tel: (0238) 3 835 146
Contact
▪ Fax :
▪ Email: dongnameza@gmail.com
▪ Contact person:

745
LIST OF INDUSTRIAL ZONES IN NGHE AN PROVINCE

No Industrial zone Name Total Area (ha) Occupancy Rate Status


1 WHA Industrial Zone 1 3,200 ▪ Phase 1: 75% In Operation
(Phase 1: 498) ▪ Phase 2: 22%
2 Hoang Mai Industrial Park 264.77 N/A In Operation
3 VSIP Industrial Zone 200 ha (Phase 1) 89% (Phase 1) Phase 1: In Operation
Phase 2: Under Construction
4 Nam Cam Industrial Zone Zone A: 416.3 A: 97.91% In Operation
Zone B: 122.7 B: 87.58%
Zone C: 154.7 C:100%
Zone D: 1,220.9 D: 1%

NGHE AN’S LOCATION MAP OF INDUSTRIAL ZONES

746
WHA INDUSTRIAL ZONE 1 - NGHE AN

GENERAL INFORMATION
WHA Industrial Zone 1 - Nghe An, Nghi Long Commune, Nghi Loc District, Nghe An Province,
Address Vietnam
Investor WHA Industrial Zone Nghe An JSC
▪ Address: Lot AC1-1, WHA Industrial Zone 1 - Nghe An, Nghi Long Commune, Nghi Loc
District, Nghe An Province, Vietnam.
▪ Tel: (84-222) 3634 034
▪ Website: https://www.whavietnam.com/
Contact Person ▪ Ms. Anchalee Prasertchand - Vice President - Mobile: +66 81 8432253 - Email: anchaleep@wha-
industrialestate.com
▪ Ms. Nguyen Thi Ngoc – Senior Manager-Customer Development _ Mobile: +84975457459 _
Email: ngoc.thi.nguyen@whavietnam.com
Location  16km from Cua Lo International Seaport Cluster
 17km from Vinh Railway Station
 18km from Vinh City / Airport
 80km from Nghi Son Deep Sea Port
 288km from Hanoi city
 306km from Noi Bai airport
 360 km from Hai Phong Sea port
 1,318km Ho Chi Minh city/ Tan Son Nhat International Airport
Investment Area Priority Sectors for - Industrial: Automotive, Plastics, Light Metals, Textiles/Garments
Investment (exclude dyeing), Building Materials
- Consumer Goods: Food Processing, Beverages, Value-added
Agriculture, Fast Moving Consumer Goods (FMCG), Electrical
Appliances
- Technology: Electronics, Medical Assembly, Software, Smart Phones,
Communications
- Logistics: Cold Storage, Inland Container Depot, Modern, Warehouse
Logistics, Shipping and Freight
Restricted Sectors for Dyeing, tanning
Investment
Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term ▪ Phase 1: 2017 - 2067
▪ Phase 2: 2017 - 2067
Minimum Lease Area 5,000 m2
Limit for Construction In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Height Planning regulation (QCVN 01:2021/BXD), The construction area is not more than 70% of the
Permitted Construction Rate total leased land lot
Planned area ▪ Total reserved area: 2,100 ha
▪ Total leasable area: 498 ha
Factory Available for Rent ▪ Total area: Available upon further Discussion
Operation Status ▪ In operation
Occupancy Rate and ▪ Phase 1: 75%
Number of Projects ▪ Phase 2: 22%
▪ 22 Projects
Number of Korean Projects ▪ 1 project
Lease fee ▪ Development Fee: 65 USD/m2 (This Rate is valid until December 2023)
▪ Factory lease fee: Available upon further Discussion
▪ Payment:
- Method: Bank Transfer in VND
- Payment structure:
 10% of Total Lease Fee, payable upon signing of MOU
 40% of Total Lease Fee, payable upon signing of Land Sublease Agreement (within 2
months from MOU Date)
747

50% of Total Lease Fee, payable before Land Hand-over date (within 1 months from
LSA date)
Operating fee ▪ Management fee: VND1,506/m2/month (excluded VAT)
▪ Electricity fee: According to the Circular by Ministry of Industry and Trade, valid from March
16th, 2015 (excluded VAT) for voltage from 22KV-110KV.
▪ Treated Water Supply: 11,800 VND/ m3 (excluded VAT)
▪ Wastewater treatment fee: 6,300 VND/ m3 (excluded VAT)
Note: Wastewater Test Fee, Wastewater Surcharge Fee (in case of inorganic/heavy metal
parameters discharged) : To be provided upon discussion
INFRASTRUCTURE AND FACILITY
Financial institution BIDV, Vietin Bank, Vietcombank, Agribank, etc
Tax service, State finance 17 km from Tax Department of Nghe An province
office 16 km from Nghe An State Treasury
Customs Service 17.5 Km from Nghe An Provincial Customs Department
Post office 2.7 km from Quan Hanh Post Office
Medicare 6 Km from Nghi Loc District Hospital
14 Km Nghe An General Hospital
Police, public security 5 km from Nghi Loc District Police Station

Universities, training 19 Km from Vinh University


facilities, etc.
Recruitment Nghi Loc District, Nghe An Province, Labor-Invalids & Social Affairs Department, etc will support
in recruitment
Worker dormitory Opposite the zone (300m)
Worker's child education 2 Km from the zone
facility
One-stop service 18 Km from the nearest Facility
Road Width Main road: 67m, 4 lanes; By Road: 30m, 2 lanes
IT & Tele-communication The telecommunication system complies with international standards and is always available for
Facilities communication demand with high data transmissions
Emergency Power generator Available
Fire-fighting facility Available.
- Fire Fighting Station: 24/7 operation with Emergency Team stand by, locating inside Industrial
Zone
- firefighting hydrant is located along internal roads.
Layout Plan

748
Location Map

Actual View

749
LIST OF SOME NOTABLE TENANTS

No. Company Name Nationality Location


1 GOERTEK Precision Industry Vietnam Co., Ltd Hong Kong Plot A1-1; A1-2; A1-3; A1-4;
A2-1; A2-2; A2-3

2 NAKANO Apparel Co., Ltd Japan Plot A5-7


3 KYUNGSHIN Nghe An Co., Ltd Korea Plot A5-8
4 VINA SUN Energy Investment JSC Vietnam Plot A3-1A

5 TALI International Transport and Trade JSC Vietnam Plot A3-1A

750
HOANG MAI I INDUSTRIAL PARK

GENERAL INFORMATION
Address Quynh Thien Ward, Hoang Mai Town, Nghe An Province, Vietnam

Investor ▪ Address:.9th floor, VEAM Tay Ho Building, Lot D, Zone D1, Phu Thuong Ward, Tay Ho District,
Ha Noi
▪ Tel: 024.6269.3838
▪ Website: htdcorp.vn
Contact Person ▪ Hoang Minh Duc – PR Manager; Tel: 0868003789
Location ▪ 12km from Nghi Son deep water Port – Thanh Hoa
▪ 8km from Dong Hoi Port-Nghe An
▪ Adjacent to National Highway No 1A
▪ Near Hanoi – Vinh Highway
▪ 200km from Hanoi
▪ 60km from Vinh International Airport

Investment Area Priority Sectors for Manufacture and assembly of electrical, electronic and
Investment telecommunication equipment; Manufacture of chemicals and chemical
products; Fine engineering Industry; Footwear manufacturing Industry;
Steel manufacturing Industry; Manufacture and assembly of automobile
and aircraft components; Agricultural goods and mineral processing –
forestry Industry; Construction materials, producing semi-finished
building products; Industrial service equipment manufacturing Industry

Restricted Sectors for All occupations are unprohibited by Vietnamese law


Investment
Minimum wage [Area III] 3.640.000 VND
Lease term ▪ Start date: from the date of signing the contract
▪ End date: February 26th 2071
Minimum Lease Area 30,000 m2
Limit for Construction Building height limit
Height - Factory construction area: 8-40m
Permitted Construction Rate - Operating area: 8-20m
Permissible building rate
- Factory construction area: 70%
- Operating area: 60%
Planned area ▪ Total area: 264.77 ha
▪ Total vacant leasable area: 174 ha
▪ Total area with full infrastructure ready to build factory: 174ha
Factory Available for Rent ▪ Total area: N/A
Operation Status ▪ In operation
Occupancy Rate and
Number of Projects ▪ 07 Projects
Number of Korean Projects N/A
Lease fee ▪ Land lease fee: 0.06 USD/m2
▪ Industrial infrastructure fee: 55 USD/m2
▪ Factory lease fee: N/A
▪ Payment:
- After signing Land Sublease Agreement : 10%
- After signing Land Sublease Contract: 50%
- After handing over land: 30%

751
- After handing over the Certificate of Land Use Rights and the value-added invoice: 10%

Operating fee ▪ Management fee: 0.05USD/m2/month


▪ Electricity fee: Peak hour: 0.13 USD/KWh
Normal hour: 0.08 USD/KWh
Off-peak hour: 0.05 USD/KWh
▪ Water fee: 0.45USD/m3 (According to regulations of the Provincial People’s Committee on clean
water price)
▪ Wastewater treatment fee: 0.25 – 0.85 USD/m3
▪ Waste treatment fee: According to the regulations of the service provider
INFRASTRUCTURE AND FACILITY
Financial institution BIDV, Vietin Bank, Vietcombank, Agribank
Tax service, State finance 7.8 km from Nghe An Tax Office
office 30 km from Nghe An State Treasury Office
Logistics 20 Km from Logistic Center: Nghi Son Logistics
Post office 6.3 km from Vietnam Post Office
Medicare 6 Km from Quang Khoi General Hospital
Universities, training 4 Universities, 9 colleges, 14 vocational schools
facilities, etc.
Road Width The central road’s axis is of 36 meters in width
The main road’s axis is of 22,25 meters in width

IT & Tele-communication The telecommunication system complies with international standards and is always available for
Facilities communication demand with high data transmission s
Emergency Power generator Available
Fire-fighting facility Available. Water supply system for firefighting is located along each road.
Layout Plan
Location Map
Actual View .

LIST OF SOME NOTABLE TENANTS

No. Company Name Nationality Location


1 JUTENG ELECTRONIC TECHNOLOGY Taiwan B1, B2, CN01 Hoang Mai I Industrial
(VIETNAM) LIMITED Park

2 DUC TIN HANOI PRODUCTION TRADING Viet Nam DVHC02, Hoang Mai I Industrial
SERVICES BUILDING LIMITED COMPANY Park
3 NHUA HOANG MAI CORPORATION Viet Nam KHA02, Hoang Mai I Industrial Park
4 ENVROY VIETNAM JOINT STOCK Japan A01, Hoang Mai I Industrial Park
COMPANY

5 DONGXU JUTENG ELECTRONIC MATERIAL Taiwan A08, Hoang Mai I Industrial Park
(VIETNAM) LIMITED

6 GOOD MAY PAINT INDUSTRY CO., LTD Taiwan A09, Hoang Mai I Industrial Park

7 RUNERGY PV TECHNOLOGY (THAILAND) Thailand A10, Hoang Mai I Industrial Park


CO.,LTD

752
VSIP NGHE AN I INDUSTRIAL PARK

GENERAL INFORMATION
No.8 Dai Lo Huu Nghi, Hung Tay Commune, Hung Nguyen District, Nghe An Province, Viet
Address Nam.
Investor VSIP NGHE AN Ltd., Co.
▪ Address: No.8 Dai Lo Huu Nghi, Hung Tay Commune, Hung Nguyen District, Nghe An
Province, Viet Nam.
▪ Tel: (84.238) 3763 555
Website: https://www.vsip.com.vn
Contact Person ▪ Ms Hong Anh - Marketing Assistant Manager
- Mobile: ++ 84 93 2345 188
- Email: anh.nth@vsip.com.vn
Location - 2 Km from Vinh Center
- 4 Km from Vinh Airport
- 15 Km from Cua Lo Seaport
- 90 Km from Nghi Son Seaport
- 290 Km from Ha Noi
- 330 Km from Hai Phong Seaport
Investment Area Priority Sectors for Light, Clean & High-tech Industries such as: E&E, F&B, FMCG,
Investment Packaging, Pharmaceutical, Automotive components, etc.
Restricted Sectors for Heavy Industries which produce high pollution to environment such as:
Investment dyeing, rubber, concrete, etc.
Minimum wage Region 2 (Pursuant to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries)
Lease term ▪ 50 years: 2015 - 2065
Minimum Lease Area 10,000 m2
Limit for Construction
Pursuant to Master Plan Amendment Approval of VSIP Nghe An dated 06 Nov
Height
Permitted Construction Rate 2020:

 For Industrial Land, the maximum building coverage is 70%. The


maximum of 03 – 05 storeys is allowed.

 For Mixed Use Land, e.g. dormitory land, the maximum building coverage
is 50%. The maximum of 10 storeys is allowed.

Planned area ▪ Total IP area: 370 ha


▪ Total vacant leasable area: ~20 ha
Factory Available for Rent ▪ Available & supplied by BWID, SIS Nghe An
Operation Status ▪ In operation
Occupancy Rate and ▪ 89 %
Number of Projects ▪ 40 Projects
Number of Korean Projects ▪ 03 projects
Lease fee ▪ Land lease fee: Upon Request
▪ Payment: 10% after signing Letter of Offer + 30 % after having Investment Registration
Certificate, Enterprise Registration Certificate + 30% after signing Land Sublease Agreement +
30% after Land Hand-over
- Method: Bank Transfer in VND.
Operating fee ▪ Management fee: 1,595 VND/m2/month (excluding VAT)
▪ Electricity fee: By EVN
▪ Water fee: 11,958 VND/m3 (excluding VAT)
▪ Wastewater treatment fee: 5,707 VND/m3/ (based on 80% of water consumption) (excluding
VAT)
INFRASTRUCTURE AND FACILITY
Financial institution Vietcombank, BIDV, Seabank, Maritimebank, Agribank, etc
Tax service, State finance 9 km from Nghe An Tax Office
office 8 km from Nghe An State Treasury Office
Customs Service 3 Km from Vinh Customs Agency

753
Logistics VN Post, Vietsun, SME, Avina, etc.
Post office 1 km from Vietnam Post Office
Medicare 6 Km from Nghe An General Hospital
Police, public security 2 Km from Hung Nguyen Police Station
Universities, training 8 Km from Vinh University
facilities, etc.
Recruitment VSIP Nghe An support investors in recruitment
(job fairs, advertisement, connect universities & investors, etc.)
Worker dormitory Available for building on VSIP NA’s service land
Worker's child education Available from surrounding residential areas.
facility
One-stop service VSIP NA Customer Service coordinates with Dong Nam SEZ to support investors in doing
application for licenses.
Road Width Carriageway with reserve width of 27, 31 & 38m (02 lanes)
IT & Tele-communication Supplied by Vietnam Technology & Telecommunication JSC (VNTT)
Facilities
Emergency Power generator Available & supplied by EVN
Fire-fighting facility 24/7 VSIP Nghe An Fire Fighting Station, Nghe An Fire Fighting Station
Layout Plan

Location Map

Actual View

754
Sangwoo’s factory (Korean Garment maker)

Luxshare’s dormitory (Hong Kong E&E maker)

755
LIST OF SOME NOTABLE TENANTS

No. Company Name Nationality Location

1 Biomass Fuel Vietnam Co., Ltd Japan 18,19

2 An Nam Matsuoka Garment Co., Ltd. Japan C1-01

3 Innovative Manufacturing Solutions Vietnam Co., South Korea 24,25


Ltd.

4 SangWoo Vietnam Co., Ltd South Korea 30

5 UMW Equipment Systems (VietNam) Ltd., Co. Malaysia 28B

6 Gift Story Industrial Ltd., Co. Hong Kong 17

7 Luxshare – ICT Nghe An Ltd., Co. Hong Kong 20,21,22,23,27

8 Construction Material of Centre Region JSC Vietnam 28

9 Dat Tien Ltd., Co. Vietnam 26B

10 Hoang Gia Viet Service & Trading Ltd., Co. Vietnam 29

11 Hoang Gia Warehouse Ltd., Co. Vietnam 81

12 ICEM Material & Construction JSC Vietnam 05B

13 Kien Moc Design JSC Vietnam 26

14 Nanoco Vinh Ltd., Co. Vietnam 36

15 Nghe An Industrial Gas JSC Vietnam 12

16 TDV Vietnam Manufacturing & Trading Vietnam 11


Corporation Ltd.

17 Viet Duc Glass Commercial JSC Vietnam 05C

18 Vietnam Post Vietnam 13,14,15

19 Vietnam Technology & Telecommunication JSC Vietnam H-05-3,1

20 Great LongView Industrial Co., Ltd. Taiwan 06,16

21 Beckers Nghe An Branch Sweden 07,08

756
22 BCI JSC Vietnam E2-02

23 INDICO Industrial Development Co., Ltd Vietnam E2-02, 82,83

24 Phuong Truc Investment JSC Vietnam 04B

25 Haohui Technology Vietnam Ltd. Co. Vietnam 04A

26 Everwin Precision Vietnam Technology Ltd., Co. Hong Kong D1-1, D1-2

27 Merry- Luxshare (Vietnam) Co., Ltd. Hong Kong 01

28 Woosin Vina Co., Ltd. Korea 32,33

29 SIS Infrastructure Service Co.,ltd Singapore 96,97,98

30 Food 1.6 JSC Vietnam 05A

31 Ngoc Ha Co.,ltd Vietnam 04D

32 Taihing Plastic Metal (Vietnam) Hong Kong 85

33 TOA Electric Japan 92

34 TCS Industrial JSC Vietnam


C2

35 Telstar Viet Nam Co.,ltd Vietnam 86

36 Paper Works Printing Ltd Hong Kong 31

37 Gaiwatch Hong Kong E2-02

38 Current Power Hong Kong 05E

757
VSIP NGHE AN II INDUSTRIAL PARK

GENERAL INFORMATION
Tho Loc commune, Dien Chau District, Nghe An Province, Vietnam
Address
Investor VSIP Nghe An Co., Ltd
▪ Address: No. 8 Dai lo Huu Nghi, VSIP Nghe An, Hung Tay Town, Hung Nguyen Dist., Nghe
An, Vietnam
▪ Tel: (84) 917 31 1818
▪ Website: www.vsip.com.vn
Contact Person ▪ Ms Hong Anh - Marketing Assistant Manager
- Mobile: ++ 84 93 2345 188
- Email: anh.nth@vsip.com.vn
Location - 35 km from VSIP Nghe An I
- 37 km from Vinh City Center
- 30 km from Vinh International Airport
- 23 km from Cua Lo Seaport
- 310 km from Hai Phong Seaport
- 2.5 km from Highway No.01
Investment Priority Sectors for Light, Clean & High-tech Industries such as: E&E, F&B, FMCG,
Area Investment Packaging, Pharmaceutical, Automotive components, etc.
Restricted Sectors Heavy Industries which produce high pollution to environment such as:
for Investment rubber, concrete, etc.
Minimum wage Region 3 (Pursuant to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries)
Lease term 2023-2073 (50 years)
Minimum Lease Area 10,000 m2
Limit for Construction Height For Industrial Land, the maximum building coverage permitted is 70% of total area. The
maximum number of storey allowed is 05 storeys.
Permitted Construction Rate
Planned area ▪ Total area: 500ha (Phase 1)
▪ Total vacant leasable area: 350ha (Phase 1)
Factory Available for Rent ▪ N/A
Operation Status ▪ Under development
Occupancy Rate and Number ▪ Under construction
of Projects

Number of Korean Projects


Lease fee ▪ Land lease fee: Upon Request
▪ Payment: 10% after signing Letter of Offer + 30 % after having Investment Registration
Certificate, Enterprise Registration Certificate + 30% after signing Land Sublease Agreement +
30% after Land Hand-over
- Method: Bank Transfer in VND.
Operating fee ▪ Management fee: 1,595 VND/m2/month (excluding VAT)
▪ Electricity fee: By EVN
▪ Water fee: 11,958 VND/m3 (excluding VAT)
▪ Wastewater treatment fee: 5,707 VND/m3/ (based on 80% of water consumption) (excluding
VAT)
INFRASTRUCTURE AND FACILITY
Financial institution Vietcombank, BIDV, Seabank, Maritimebank, Agribank, etc.
Tax service, State finance 34 km from Nghe An Tax Office
office 33 km from Nghe An State Treasury Office
Customs Service 34 km from Nghe An Custom Office
Logistics 9 km from the nearest Logistic Center: Nhat Tin Logistics
Post office 9 km from Dien Chau Post Office
Medicare 12 km from Dien Chau District Medical Center

758
Police, public security 11km from Dien Chau Police Station
Universities, training facilities, Vinh University, Vinh Industrial University, Vietnam – Korea Vocational College, Vinh
etc. Technical University, Vietnam – Germany Vocational College, etc.
Recruitment VSIP Nghe An support investors in recruitment
(job fairs, advertisement, connect universities & investors, etc.)
Worker dormitory Available for building on VSIP NA’s service land
Worker's child education 3.4 km from the zone
facility
One-stop service VSIP NA Customer Service coordinates with Dong Nam SEZ to support investors in doing
application for licenses
Road Width Width 7.5m, 11.25m, 22.5m
IT & Tele-communication The telecommunication system complies with international standards and is always available for
Facilities communication demand with high data transmission
Emergency Power generator Available & supplied by EVN
Fire-fighting facility 24/7 VSIP Nghe An Fire Fighting Station, Nghe An Fire Fighting Station.
Layout Plan

Location Map

Actual View
Under Development
Land is available for handover in Q2/2024

759
760
NAM CAM INDUSTRIAL ZONE

GENERAL INFORMATION

▪ Area A: On the border of Nghi Long, Nghi Thuan ward, Nghi Loc district, Nghe An
▪ Area B: On the border of Nghi Xa and Nghi Long ward, Nghi Loc district, Nghe An
Address ▪ Area C: On the border of Nghi Xa and Nghi Quang ward, Nghi Loc district, Nghe An
▪ Area D: On the border of Nghi Thuan and Nghi Long ward, Nghi Loc district, Nghe An
Area A, B, C
Nghe An Industrial Zone Development Company
▪ Address: No. 16, Le Hoan Street, Hung Phuc Ward, Vinh City, Nghe An province
▪ Tel: (84-238) 860 0299 Fax: (84-238) 3597 985
Investor
Area D
Tuan Loc Construction Investment JSC.
▪ Address: 362/14 Ung Van Khiem, Ward 25, Binh Thanh District, Ho Chi Minh City
▪ Tel: (84-28) 6258 5039
▪ Area A,B,C: Mr Sy – Dong Nam Economic Zone Management Board - (84) 913 357 897 -
Contact Person tvsykktdn@gmail.com
▪ Area D: Mr Son - (84) 966 66837 - info@xaydungtuanloc.com
▪ 18 km to Vinh cỉty
▪ 8 km to Cua Lo Port
Location
▪ 12 km to Vinh airport
▪ 17 km to Vinh station and 2 km to Quan Hanh station
▪ Zone A: Steel rolling, metallurgy; Mechanical manufacture; Automobile
assembly; Processing of Agricultural and Forrest Product; Processing
consumer goods and products for export.
Priority Sectors for ▪ Zone B: Brewery Manufacture
Investment ▪ Zone C: heavy industry with high pollutant level such as: Fertilizer
Investment Area processing and chemical industry; Processing products to wood, leather;
Mechanical manufacture ; Mineral processing; Building material
manufacture,..
Restricted Sectors for
N/A
Investment

Minimum wage [Area 4] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

Lease term 50 years

Minimum Lease Area N/A

Limit for Construction


N/A
Height

Permitted Construction Rate N/A

▪ Area A: 416.3 ha (industrial land area: 288 ha, vacant leasable area: 6 ha)
▪ Area B: 122.7 ha (industrial land area: 101.6 ha, vacant leasable area: 0 ha)
Planned area
▪ Area C: 154.7 ha (industrial land area: 110.37 ha, vacant leasable area: 0 ha)
▪ Area D: 1220.9 ha (industrial land area: 932.1 ha, vacant leasable area: 928.34 ha)

Factory Available for Rent ▪ Total area: N/A

Operation Status ▪ In operation

▪ Rate of Occupancy:
- Area A: 97.91% (15 projects)
Occupancy Rate and
- Area B: 87.58% (15 projects)
Number of Projects
- Area C: 100% (38 projects)
- Area D: 1% (1 project)

761
Number of Korean Projects 02 projects

▪ Land lease fee with infrastructure: 0.45USD/m2/year (for all area)


▪ Land lease fee without infrastructure:
- For 1,667 VND /m2/year (for A, C,D area); 3,996 VND (~0.176 USD)/m2/year (for B area)
Lease fee
▪ Factory lease fee:
- For Area A, B, C: 41,000 VND /m2/year (~ 1.82 USD/ m2/year)
(All statistics of 2017)
▪ Infrastructure maintenance fee: 2,071 VND (~ 0.09 USD) /m2/year (for Area C)
▪ Electricity fee: as regulated by the Government
Operating fee
▪ Water fee: 11,400 VND (~0.51 USD)/m3 (for all area)
▪ Wastewater treatment fee: 9,568 VND (~0.45 USD)/m3 (for all area)

INFRASTRUCTURE AND FACILITY

Financial institution 8-10 km to bank branches of Vietcombank, Vietinbank, Agri Bank, LienViet Post Bank

Tax service, State finance


9 km to Tax Department and State Treasury of Nghi Loc
office

Customs Service 6 km to Cua Lo Port Customs Office

Logistics 8 km to Cua Lo Port with transport service available there.

Post office Nam Cam Post Office is next to the IZ

Medicare 7.6 km to Nghi Loc General Hospital; 9.4 km to Cua Lo Town General Hospital

Police, public security 9.4 km to Nghi Loc Post Office

Universities, training
10- 25 km to Nghe An’s universities and vocational schools
facilities, etc.

Recruitment 23 km to Nghe An Recruitment Center

Worker dormitory N/A

Worker's child education


Nghi Xa Preschool. Nghi Long Preschool, Nghi Quang Preschool are located in the area of the IZ
facility

One-stop service 23 km to Nghe An Public Administration Center

▪ The central roads system: 43m wide


Road Width
▪ The interior road systems: 22.25m – 43m wide
IT & Tele-communication
Systems of optical cable and wired lines Nam Cam Post Office is next to Industrial Park
Facilities

Emergency Power generator Available

Fire-fighting facility Available

Layout Plan

762
Location Map

Actual View

763
LIST OF TENANTS

No. Company name Nationality Business line Zone


1 Chau Tien Co., Ltd Vietnam Wall baits manufacture Zone A
2 Huong Lieu Co., Ltd Vietnam Stone manufacture Zone A
3 Hanoi Beer JSC. - Nghe An Vietnam Beer manufacture Zone A
4 Mechanical JSC. No. 9.1 Vietnam Mechanical manufacture Zone A
5 Japan-Viet Nghe An Warehouse Vietnam Sawn stone and limestone manufacture Zone A
JSC.
6 Thien Phu Co., Ltd Vietnam Krap paper manufacture Zone A
7 Masan MB Co., Ltd Vietnam Food manufacture Zone A
8 Trung Do JSC. Vietnam High quality construction materials Zone A
9 Construction Investment JSC. and Vietnam Building material Zone A
TM 379
10 Thinh Loc JSC. Vietnam Warehouse service center Zone A
11 Viet Vinh JSC. Vietnam Asbestos cement sheet Zone A
12 Tin Thanh JSC. Vietnam Car service Zone A
13 Tan An Construction JSC. Vietnam Mechanical Factory Project Zone A
14 Dong Tien JSC. Vietnam Garment manufacture Zone A
15 PetroVietnam Nghe An Mineral Vietnam Construction materials production Zone A
Corporation
16 Tan A Co., Ltd Vietnam Solar water heater manufacture Zone B
17 Hanoi Beer - Alcohol - Beverage Vietnam Alcohol - Beverage manufacture Zone B
Joint Stock Corporation
18 Son Nam JSC. Vietnam CACO3 limestone manufacture Zone B
19 1 TV Son Ha Nghe An Co., Ltd Vietnam Stainless steel products Zone B
20 Choa Viet JSC. Vietnam Food processing Zone B
21 Vietnam PJ Mercury JSC. Vietnam Animal feed Zone B
22 Dai Minh Quang Construction Co., Vietnam Industrial freight forwarding center Zone B
Ltd
23 Central Construction Consultant and Vietnam Storage and factory for rent Zone B
Investment JSC.
24 Royal Foods Nghe An Co., Ltd Thailand Seafood processing Zone B
25 FRESCOL Thailand Sea products and meat, non-alcoholic beverages Zone B
26 Royal Beverage Co., Ltd Thailand Non-alcoholic beverages, ice, processing milk Zone B
and dairy products
27 Royal can Industries Co., Ltd, Nghe Thailand Metal food boxes Zone B
An branch
28 Austfeed Nghe An Joint Venture Animal feeding production Zone B
Company
29 Royal Capital Co., Ltd Thailand Showroom and service center Zone B
30 Viet Duc Trading JSC. Vietnam Tempered glass manufacture Zone B
31 Nghe An super-fine white limestone Vietnam Ultrafine limestone manufacture Zone C
JSC.
32 Ha An Phat Co., Ltd Vietnam Stone Processing Zone C
33 An Viet Investment and Vietnam Unburnt bricks Zone C
Development JSC.
34 Vinh Mechanical JSC. Vietnam Supporting Industry Zone C
35 Cao Thang Import Export JSC. Vietnam Food processing Zone C
36 Lien Hiep- Nghe An Co., Ltd Vietnam CACO3 limestone manufacture Zone C
37 VIC Trading JSC. Vietnam Animal feed manufacture Zone C

764
38 Hai An Seafood Import Export & Vietnam Seafood Processing Zone C
Trading Co., Ltd
39 Nghe An Paper Material Co., Ltd Vietnam Paper manufacture Zone C
40 Asia Mineral JSC. Vietnam Ultrafine limestone manufacture Zone C
41 Consulting and Construction of the Vietnam White stone processing factory Zone C
Central JSC.
42 Chemical Industry JSC. Vietnam Manufacturing and processing artificial wood Zone C
43 Vietnam Tung Huong JSC. Vietnam Export wood processing enterprises for export Zone C
44 Minh Thai Son JSC. Vietnam Fishmeal manufacture Zone C
45 Tan Ky JSC. Vietnam White limestone fine art stone manufacture Zone C
46 Phihico JSC. Vietnam Wood product manufacture Zone C
47 European Plastic JSC. Vietnam Calcium carbonate resin manufacture Zone C
48 VNT Construction Commercial Vietnam Ultra fine limestone and coating enamel Zone C
Joint Stock Corporation manufacture
49 Construction Trading Joint Stock Vietnam Ultra fine limestone and porcelain enamel Zone C
Corporation. - Ministry of Transport
50 Nghe An Mineral JSC. Vietnam Ultra fine limestone processing Zone C
51 Tien Phong Plastic JSC. Vietnam Plastic products manufacture Zone C
52 Thien Phu Co., Ltd Vietnam Krap paper manufacture Zone C
53 Thien Phu JSC. Vietnam Paper manufacture Zone C
54 Hoa Sen Nam Cam Nghe An Co., Vietnam Steel sheet manufacture Zone C
Ltd
55 Tri Viet Energy Co., Ltd Vietnam Northern Massan project Zone C
56 Quy Long general service complex Vietnam Seafood processing Zone C
57 OMYA company Switzerland Ultrafine limestone Zone C
58 TAN VIET TRUNG ARTIFICIAL China Artificial plywood Zone C
PLANK JSC.
59 Hope Nghe An Animal Feed Co., China Animal feed manufacture Zone C
Ltd. Vietnam
60 BSE Vietnam Electronic Co., Ltd South Korea Components and electrical testing equipment Zone C
61 Cargill Vietnam Co., Ltd. The U.S Feed production Zone C
62 Wood World Vietnam Joint Venture India Nghe An plywood processing Zone C
Co., Ltd.
63 Agro Nutrition International JSC Malaysia Animal feeding production Zone C
64 ANT Co., Ltd (HN) - Nghe An Malaysia Factory producing animal feed for cattle, poultry Zone C
Branch and handicrafts
65 Vietnam Gia Nhat Plastic Co., Ltd China Home appliance manufacturing electronic Zone C
components
66 CP Vietnam Livestock JSC. Thailand C.P Nghe An animal feed factory Zone C
67 Nagoya Giken Industrial Co.Ltd Japan Car parts manufacturing project Zone C
68 Becker Industrial Coatings Vietnam Switzerland Becker Vietnam paint factory Zone C
Co., Ltd.
69 Tuan Loc Investment Construction Vietnam Infrastructure construction Zone D
JSC.

765
[- This Page is intentionally left blank -]

766
NINH BINH

767
INVESTMENT ENVIRONMENT IN NINH BINH
USD/VND 23.510

GENERAL INFORMATION

 Area: 1,387.1 Km2


Area, Population
 Population: 1.007,6 million (2022 statistic)
 Ninh Binh has a is the southernmost gateway province in the Northern Delta region,
located at the boundary of three geographical areas: the Northwest, the Red River Delta and
Geographical Location the North Central Region. Ninh Binh is located at the intersection of three economic
regions: the Hanoi region, the Northern Coastal region and the central coastal region.
 Distance from Hanoi: 95 Km, from Ho Chi Minh City: 1626 km, from Da Nang: 670 km
 To the north, it borders Ha Nam province
 To the east and northeast, it borders Nam Dinh province across the Day River
Adjacent provinces
 To the northwest, it borders Hoa Binh province
 To the south, it borders Thanh Hoa province and the East Sea.
2022 statistic:
 GRDP: 81.000 billion VND (3.45 billion USD)
 GRDP growth: 8,62%
 GRDP per capita: 3500 USD/year
GRDP
 Economic structure:
- Industry - Construction: 37,81%;
- Agriculture. forestry and fishery: 8,85 %;
- Service: 36,95%;
- Tax on Goods: 16,39%
2022 statistic:
Industry growth  Industry - Construction growth: 5,67%
 Agriculture, forestry and fishery growth: 3,04%
 Service growth:15,45%

PCI  Score: 64.22 - ranked 44 out of 63 cities and provinces in Vietnam. (2022)

SOCIAL INFRASTRUCTURE

 Roadway: The road system contains 01 expressway rout - 24.5 km, 08 national highway
routs - 240.79 km; 20 provincial road routs - 272.3 km; district roads - 349.5 km, urban
roads - 355.26 km, commune roads - 2,375.26 km and rural roads - 4,386 km.
 Railway: The North-South railway route is 21.6 km through the province with 4 stations
(Ninh Binh station, Cau Yen station, Ghenh station and Dong Giao station), and 10 faraway
Transportation
stations that are convenient for transporting passengers and goods.
 Waterway: The waterway traffic includes 16 routes of the inland waterway with a total
length of nearly 298.8 km. There are 24 inland waterway ports: Ninh Binh port, Ninh Phuc
port, and ICD port, 103 cargo wharves, 4 petroleum wharves, and 30 river-cross passenger
wharves distributed throughout the province.
 The electricity network is built relatively evenly throughout the province: Ninh Binh Power
Electricity Plant with a capacity of 4x25MW; 01 500kV transformer station, 03 220kV transformer
stations; 13 110kV substations…

 Water resources including surface water and underground water. In which, the surface water
is the main water resource due to high rainfall, the sea and the river system is quite dense
along with many lakes and lowland areas.
Water
 The large rivers include: Day river, Hoang Long river, Boi river and some other small rivers
such as Lang river, Vac river, An river, etc., but Day river is the largest river flowing
through Ninh Binh province from Gia Thanh and into the sea at the Cua Day (Day gate).

768
 Besides, there are 21 large reservoirs in the province such as Dap Troi, Da Lai, Yen Quang,
Yen Thang reservoirs, with a total area of 1,270ha with a storage capacity of about 30
million m3.
 Up to now, the whole province has had 1 university, 4 colleges and 4 vocational and
Education
professional intermediate schools training many professions with many types of training.

Medicare  The province had 421 medical facilities

INVESTMENT CONDITION

Human resource  48,4% of population are in the working age (2022)

Education level  Trained labor rate: 14,5% (2022)

 The minimum salary for the province is applied as follows:


- Area II: Ninh Binh city: 4.160.000 VND
- Area III: Tam Diep city, Gia Vien district, Yen Khanh district, Hoa Lu district: 3.640.000
Salary VND
- Area IV: Nho Quan district, Kim Son district, Yen Mo district: 3.250.000 VNĐ
 The lowest wage for trained labor: 5.000.000 VND (including those trained by the
enterprises) must be at least 7% higher than the above referenced basic salary
 Investment incentives in Ninh Binh province shall be implemented according to
Investment incentives
government regulations
 Prioritized projects: high technology, modern technology, clean technology, smart
manufacturing, manufacturing, assembly and supporting industries for the automobile
industry, manufacturing products for agricultural production.
 Agriculture Sector: high-tech, green, clean, organic, endemic agriculture towards serving
the tourism industry; research projects for application and transfer of technology to breed
plant and animal breeds; scientific and technological application of aquaculture; develop
key and specialty products (OCOP) in an organic direction associated with sustainable
tourism development.
 Cultivation: project of research, transfer and production of high quality plant varieties;
Fields Attracting Investment projects on research and application of science and technology in farming, preservation,
processing and organic farming;
 Livestock production: livestock breeding project; livestock project towards the organic
direction, digital transformation.
 Fishery sector: project of producing high-tech aquatic breeds; organic aquaculture project;
projects on seafood exploitation in coastal waters (clams, oysters, shrimp, crabs...) and
offshore fishing.
 Attracting projects in the field of logistics; projects to build sports training and training
centers and establishments; vocational training projects; wastewater treatment in districts,
cities and urban areas.

Map (Add Province map)

Department of Planning and Investment


 Address: 8 Le Hong Phong Street, Van Giang Ward, Ninh Binh City
 Tel: 0229.3871.156
Contact
 Fax : 0229.3873.381
 Email: skhdt@ninhbinh.gov.vn
 Contact person: Dinh Thi Thuy Ngan

LIST OF INDUSTRIAL ZONES

No Industrial zone Name Total Area (ha) Occupancy Rate Status

769
1 Gian Khau Industrial Zone 212 100% In Operation
2 Phuc Sơn Industrial Zone 142 93,47% In Operation
3 Khanh Phu Industrial Zone 351 100% In Operation
4 Tam Diep I Industrial Zone 64 100% In Operation
5 Kanh Cu Industrial Zone In Operation
6 Tam Diep II Industrial Zone planning
7 Kim Son Industrial Zone planning

770
GIAN KHAU INDUSTRIAL ZONE

GENERAL INFORMATION
Address Located on the territory of 3 communes Gia Tan, Gia Xuan and Gia Tran, Gia Vien district, Ninh
Binh province
Contact Person Mr. Thắng – Position: Head of Investment Management - Mobile: 0913055983 - Email:
hoangmanhthang0509@gmail.com

Location Adjacent location:


+ It is bordered by route ĐT477 to the South.
+ It is bordered by Gia Tan commune to the North.
+ It is bordered by Gia Lap commune to the West.
+ It is bordered by National Highway 1A to the East.
Investment Sectors Priority Sectors for Mechanical engineering, cement, light industry, food, garment…
Investment:
Minimum wage 200-500 USD/person/month.
Lease term 50 years
Minimum Lease Area [Diện tích cho thuê tối thiểu]
Limit for Construction [Giới hạn chiều cao xây dựng
Height - Khu xây dựng nhà máy
- Khu điều hành]

Permitted Construction [Tỷ lệ xây dựng cho phép


Rate - Khu xây dựng nhà máy
- Khu điều hành]

Planned area - Planning area: 262 ha


- The actual area was established: 162 ha
- The remaining area: 100 ha
- Planning area 2020: 262 ha
- The area of the project is the establishment of new and expanded 2020: 100 ha
Operation Status ▪ Active

Occupancy Rate and ▪ 100%


Number of Projects

Lease fee ▪ 40 USD/m2

Layout plan

771
INFRASTRUCTURE AND FACILITY
- Water: Water is taken from clean water supply station of Hoa Lu district with a capacity of 3,000 m3/day, Ninh Binh Clean Water
Supply Company Limited, providing enough clean water for production and daily life.

- Power: The power is taken from 110KV power station in the industrial zone. It assures to provide sufficient and stable power supply
for production.

- Traffic system: The Industrial Zone is located in Gia Vien district which is crossed by National Highway 1A and Route ĐT477.
This industrial zone is near Day and Hoang Long river crossing which is convenient for water transportation to Hai Phong, Quang
Ninh and Thanh Hoa

772
TAM DIEP I INDUSTRIAL ZONE

GENERAL INFORMATION
Address 201 Le Hong Phong, Dong Thanh ward, Ninh Binh city, Ninh Binh province
Industrial Park Infrastructure Development Company
Investor ▪ Address: 201 Le Hong Phong, Dong Thanh ward, Ninh Binh city, Ninh Binh province
▪ Tel: 0904150979
▪ Email
▪ Website:

Contact Person Mr. Thắng – Position: Head of Investment Management - Mobile: 0913055983 - Email:
hoangmanhthang0509@gmail.com
[Tên - Chức vụ - Số điện thoại – Email của người phụ trách]
Location Adjacent location: Tam Diep 1 Industrial Park is located in Quang Son commune (Tam Diep city),
about 15 km from Ninh Binh city center, about 3 km from Tam Diep city center.

Investment Sectors Priority Sectors for Cement Production; footwear and garment production; manufactures
Investment: medical equipment…
Minimum wage 200-500 USD/person/month.
Lease term 50 years

Minimum Lease Area [Diện tích cho thuê tối thiểu]


Planned area ▪ Total area: 142 ha
▪ Total vacant leasable area: 9 ha

Operation Status ▪ Active


Occupancy Rate and ▪ 93,47% - 18 projects
Number of Projects

Number of Korean projects ▪ N/A

Lease fee ▪ Land lease fee: 50 USD/m2

Layout plan

INFRASTRUCTURE AND FACILITY


Electricity supply, clean water supply, wastewater treatment system... are invested synchronously and modernly, fully meeting the
needs of investors participating in production investment in the industrial park.
In addition to building high-quality infrastructure, Tam Diep 1 Industrial Park also provides a series of other utility services
including: 24/7 security service, fire protection, logistics, maintenance, construction. building factories, banks,...

773
KHANH PHU INDUSTRIAL ZONE

GENERAL INFORMATION
Address Located on the territory of 2 communes Khanh Phu (Yen Khanh district) and Ninh Phuc (Ninh Binh
city), Ninh Binh province
Name of Investor: Industrial Park Infrastructure Development Company
Investor ▪ Address: Located on the territory of 2 communes Khanh Phu (Yen Khanh district) and Ninh Phuc
(Ninh Binh city), Ninh Binh province

Contact Person Mr. Thắng – Position: Head of Investment Management - Mobile: 0913055983 - Email:
hoangmanhthang0509@gmail.com

Location Adjacent location: The road surface is 11.25m wide surrounding the industrial park, the average height
of the top of the road is (+5.5m).
The western boundary of the industrial park is Ninh Phuc port. The port can receive ships of 3000 tons
along the Day River.
In Khanh Phu Industrial Park, there is now Tien Hung port, which has been put into operation, which
is very convenient for transporting goods.
Investment Sectors Priority Sectors for textile, garment, mechanical engineering, steel, chemicals, construction
Investment: materials, shipbuilding...
Minimum wage 200-500 USD/person/month
Lease term ▪ 50 years

Minimum Lease Area [Diện tích cho thuê tối thiểu]


Planned area ▪ Total area: 351 ha
▪ Total vacant leasable area: 4,6 ha

Operation Status ▪ Active

Occupancy Rate and ▪ 100% - 30 projects


Number of Projects

Number of Korean projects ▪ N/A

Lease fee ▪ Land lease fee: 40 USD/m2

774
Layout plan

INFRASTRUCTURE AND FACILITY


The 110KV Nam Dinh and Ninh Binh power lines cut through the West and the South of the industrial zone construction site.
The 35KV power line of Ninh Binh power plant runs along the southern part of the industrial park construction site.
Currently, there is a 110KV transformer station in the IP to serve investors in the IP.
Water supply and drainage system:
Thanh Nam clean water supply factory has a capacity of 20000m3/day to fully serve the needs of use in the industrial park.
Drainage: A completely separate drainage system consisting of a rainwater drainage system and a wastewater drainage system.
Rainwater drainage system: including a system of stormwater drainage ditches along the roads, cross-road culverts and a system of
air-conditioning ditches around the industrial park, with a trapezoidal cross-section of 5-10m wide, depth average 0.8-1m flows to the
drainage pumping station of the region in the North of Khanh Phu Industrial Park.

775
[- This Page is intentionally left blank -]

776
NINH THUAN

777
INVESTMENT ENVIRONMENT IN NINH THUAN

GENERAL INFORMATION
▪ Area: 3,358 km2
Area, Population
▪ Population: 598,683 people (Statistics 2022)
▪ Located in the South Central Coast of Vietnam.
Geographical location ▪ Distance from Ho Chi Minh City 350 km, from Cam Ranh International Airport 60
km, from Nha Trang city 105 km, and from Da Lat city 110 km.
▪ It borders Khanh Hoa province to the North, Binh Thuan province to the South, and
Neighboring provinces
Lam Dong province to the West.
Statistics 2022:
▪ GRDP: 23,486.5 billion dong
▪ GRDP growth: 7.42%
GRDP ▪ GRDP per capita: 76,8 million VND/year
▪ Economic structures:
- Industry - Construction: 37.6 %;
- Agriculture, forestry and fishery: 30 %;
- Services: 32.4 %.
In 2022 :
Industry growth ▪ Industry - Construction Growth: 5.52 %
▪ Growth in agriculture, forestry and fishery: 4.21 %
▪ Service growth: 13.9 %
PCI ▪ Score: 65.43 – ranked 30th out of 63 provinces and cities in Vietnam (2022)

SOCIAL INFRASTRUCTURE
▪ Road: National Highway 1A passes through, National Highway 27 goes to Da Lat
and the South Central Highlands, National Highway 27B passes through the territory
of Bac Ai district, Ninh Thuan province to Cam Ranh city, Khanh Hoa province.
▪ North-South Expressway: about to be put into operation
Carriage ▪ Railway: North-South Railway
▪ Waterway: Near Ba Ngoi Port (one of the largest seaports in the country); Ca Na
General Port with a capacity of 300,000 tons (phase 1 has been put into operation, with
a capacity of 100,000 tons).
▪ Other: About 55km from Cam Ranh International Airport
In 2021, Ninh Thuan province has 3,176.15 MW (onshore wind power: 573.85
MW; Small and medium hydroelectricity: 299 MW; and Solar power: 2,302.85 MW)
put into operation and generating electricity. The electricity output generated to the
grid is about 6,250 million kWh (reaching and exceeding the plan for 2021).
Electricity
The national grid system has been invested in 100% of communes, wards and
townships to meet the electricity demand for production and provide electricity to more
than 99.9% of households in the province. The province is continuing to build more
power systems to supply key economic zones of the province.
There are 04 systems of large-scale concentrated water supply works with a total scale
of over 120,000 m3/day-night, including: Phan Rang - Thap Cham Water Plant with a
scale of 52,000 m3/ day - night, Ca Na - Phuoc Nam Water Plant with a scale of 30,000
m3 /day - night, Tan Son Water Plant with a scale of 8,000 m3/day - night, Phuoc Dan
Water
Water Plant with a scale of 30,000 m3 /day - night, supplying for Phuoc Dan town,
Ninh Phuoc district. More than 60 Water Supply Systems from surface water or
underground water with a scale of 50 - 500 m3 /day - night and self-flowing water
works serving about 148,000 people.
The system of training schools includes: Branch of Nong Lam University - Ho Chi
Minh City in Ninh Thuan, School of Provincail Politics, Center for University 2 –
Thuy Loi University, Ninh Thuan Vocational College, Institute of Education and
Education
Applied Sciences Central Vietnam, Vocational and Continuing Education Center in
districts and cities have the task of improving professional qualifications and skills for
workers.

778
There are 241 medical institutions for medical examination and treatment. Total
number of doctors and nurses is 1,898 people. Ninh Thuan province newly invested
and put into operation Provincial General Hospital with 800 beds, hospitals in Thuan
Health Insurance Bac and Thuan Nam districts with 100 beds; upgraded Ninh Phuoc District Hospital,
Ninh Son Regional Hospital and Regional General Clinics; merged and established
other medical examination and treatment establishments such as Hospital of
Traditional Medicine, and Provincial Center for Disease Control and Prevention.
INVESTMENT CONDITIONS
Human Resources ▪ 56.3% of the population in working age (2022)
Academic level ▪ Rate of trained workers: 60% (2022)
▪ The minimum wage by region is 3,640,000 VND/month, applicable to employers
operating in areas in Region III including: Phan Rang - Thap Cham city, Ninh Hai
district, Thuan Bac district.
Wage
▪ The minimum wage by region is 3,250,000 VND/month, applicable to employers
operating in the area of Region IV, including the following districts: Thuan Nam, Ninh
Phuoc, Ninh Son, and Bac Ai.
- All districts of Ninh Thuan province located in areas with extremely difficult socio-
economic conditions are entitled to the highest investment incentive policy framework
according to investment areas according to the provisions of the Investment Law 2020
and Decree No. 31/2021/ND-CP dated March 26, 2021 detailing and guiding the
Investment incentives implementation of a number of articles of the Investment Law.
- Phan Rang - Thap Cham city is located in an area with difficult socio-economic
conditions. Investment incentives will be applied according to the provisions of the
Investment Law 2020 and Decree No. 31/2021/ND-CP dated March 26, 2021 detailing
and guiding the implementation of a number of articles of the Investment Law.
Prioritize industries that have little impact on environment such as assembling
electronic components, informatics, high-tech industries, projects serving renewable
energy production; assembling cars and motorbikes; mechanical technology for
Investment attraction fields
processing agricultural and industrial machines; building materials industry;
agricultural, forestry and fishery processing industry; production of consumption
goods …

Map

779
Ninh Thuan Industrial Zones Management Board
▪ Address: No. 59, April 16 Street, Phan Rang - Thap Cham city, Ninh Thuan province
Contact ▪ Phone: 0259.2212.709
▪ Fax: 0259.3922.046
▪ Email: bqlkcn.nt@gmail.com

780
LIST OF INDUSTRIAL ZONES
N0. Industrial Park Name Total area COMPLETE RATE Status
(hectare)
1 Du Long Industrial Zone 407,28 6% Put into operation
2 Thanh Hai Industrial Zone 78,0 100% Active
3 Phuoc Nam Industrial Zone 370,0 19% Put into operation
4 Ca Na Industrial Zone 827,2 // Submitting to the Prime
Minister for investment
policy decision

LOCATION MAP OF INDUSTRIAL ZONE

781
DU LONG INDUSTRIAL ZONE

GENERAL INFORMATION
Address National Highway 1A, Bac Phong commune, Thuan Bac district, Ninh Thuan province.
Investor's name: Hoang Thanh Du Long Industrial Zone Investment Joint Stock Company
Investment owner ▪ Address : Du Long Industrial Zone, Thuan Bac district, Ninh Thuan province, Vietnam
▪ Hotline: 096.230.5757
▪ Email : dulongip@hoangthanh.vn
▪ Website: www.dulongip.vn

Contact person Name - Position - Mobile: - Email of person in charge


NGUYEN VAN SANG – Deputy Director – 0905364055 sangnv@hoangthanh.vn

Location Surrounding areas:


- 20 km from Phan Rang - Thap Cham city to the North;
- 30 km from Cam Ranh Port, Khanh Hoa province;
- 25 km from Ba Ngoi Port;
- 50 km from Ca Na General Port;
- 70 km from Ho Chi Minh City by road.
Investment fields Prioritize industries that have little impact on environment such as assembling electronic components,
informatics, high-tech industries, projects serving renewable energy production; assembling cars and
motorbikes; mechanical technology for processing agricultural and industrial machines; building
materials industry; agricultural, forestry and fishery processing industry; production of consumption
goods …
Minimum wage Minimum regional salary according to Decree 38/2022/ND-CP
Lease term ▪ Start Date: 2007
▪ End Date: 2057
Minimum lease area 01 hectare
Limit for construction - Factory building area: 2 floors
hieght - Operating area: 2 floors

Permitted construction rate 70%

Planned area ▪ Total area: 407.28 ha


▪ Total industrial land area for lease: 288.5 ha
▪ Total area with full infrastructure ready to build factories: 288.5 hectares

Factory available for lease ▪ Total factory area for lease

Operation Status Active

Occupancy rate and - 6% - 2 projects


number of projects

Number of Korean projects 01 (current)

Lease fee ▪ Land rent: 35 - 40 USD/m 2 (rental period until 2057)


▪ Factory rental cost: #N/A
Operation fee ▪ Management fee: 0.44 USD/m2/year
▪ Electricity: [According to EVN electricity unit price ]
▪ Water bill: [According to provincial unit price ]
▪ Wastewater treatment fee: 0.44 USD/m3 day and night
▪ Waste treatment fee: [According to the regulations of the province]

782
Layout plan

List of Projects in Industrial Zone

No. Name of company Country Business

1 InnoFlow NT . Co., Ltd Korea Fabric children's toys

2 Hoang Thanh Do Luong Investment Vietnam Textile


and Production Joint Stock Company

783
PHUOC NAM INDUSTRIAL ZONE

GENERAL INFORMATION
Address Phuoc Nam Commune, Thuan Nam District, Ninh Thuan Province
Investor's name : Phuoc Nam Ninh Thuan Investment Joint Stock Company
Investment owner ▪ Address : Phuoc Nam Industrial Zone, Phuoc Nam commune, Thuan Nam district, Ninh Thuan
province
▪ Phone : 0375.300.000
▪ Email : lamvudt@gmail.com
▪ Website: www.kcnphuocnam.vn or www.phuocnam.vn
Contact person Name - Position - Mobile: - Email of the person in charge
VU VAN LAM: Deputy General Director
Phone number: 0375.300.000
Email : lamvudt@gmail.com
Location Surrounding areas:
- from 15km Phan Rang - Thap Cham city to the South;
- from 70km Cam Ranh International Airport;
- from 50 Ba Ngoi Port;
- from 10km Ca Na General Port;
- from 335km Ho Chi Minh city by road.
Investment fields Prioritize industries that have little impact on environment such as assembling electronic components,
informatics, high-tech industries, projects serving renewable energy production; assembling cars and
motorbikes; mechanical technology for processing agricultural and industrial machines; building
materials industry; agricultural, forestry and fishery processing industry; production of consumption
goods …
Minimum wage Minimum regional salary according to Decree 38/2022/ND-CP
Lease term ▪ Start Date: 2007
▪ End Date: 2057
Minimum rental area 01 hectare
Limit for construction - Factory construction area: 02 floors
hieght - Operating area: 02 floors

Permitted construction rate 70%

Planned area ▪ Total area: 370 ha


▪ Total area of industrial land for lease: 269.75 ha
▪ Total area with full infrastructure ready to build factories: 84 ha

Factory available for lease ▪ Total factory space for rent

Operation Status Active


Occupancy rate and - Fill rate: 19%
number of projects - Number of projects in the industrial park: 11 projects

Number of Korean projects Not available

Lease fee ▪ Land rent: 25-35 USD/m 2 (rental period until 2057)

784
Operation fee ▪ Management fee: [0.3usd/m2/year]
▪ Electricity: [According to EVN electricity unit price]
▪ Water fee: [According to provincial unit price]
▪ Wastewater treatment fee: [0.5-0.7usd/m3]
▪ Waste treatment fee: [According to regulations provincial decree]

Layout plan

INFRASTRUCTURE AND FACILITIES


Distance from nearest bank: 3km; Nearest State Tax and Finance Agency: 3km; nearest Logistics Center: At Industrial Park;
Universities, training institutions: 15km, etc., Industrial park road width: 11m

785
List of Projects in Phuoc Nam Industrial Zone

No. Name of company Country Business

1 Van Gia Construction and Interior Vietnam Producing building materials


Decoration Co., Ltd
2 Southern Central Urban Service Joint Vietnam Producing products from beer wort
Stock Company
3 Industrial Gas And Welding Electrode Vietnam Producing Oxygen
Joint Stock Company
4 Hacom Ninh Thuan Construction Joint Vietnam Concrete factory
Stock Company

5 Trung Nam Investment Development Vietnam Concrete factory


Joint Stock Company

6 Khang Thuan Ninh Co., Ltd Vietnam Producing products from tires

7 Nhu Cuong Development Investment Vietnam Producing building materials for concrete
Joint Stock Company factories

8 HDP Ninh Thuan Joint Stock Vietnam Concrete factory


Company
9 MA-SBTC Joint Stock Company Vietnam Producing building materials for concrete
factories
10 Top Solutions Joint Thailand Producing lubricating oil
Stock Company
Lubricating oil factory
11 Lam Dai Thang Ninh Thuan Joint Vietnam Producing building materials
Stock Company Sand Processing Plant

786
[- This Page is intentionally left blank -]

787
PHU THO

788
INVESTMENT ENVIRONMENT IN PHU THO

GENERAL INFORMATION

▪ Area: 3.534,56 km2


Area, Population
▪ Population:1.516.900 people

▪ Phu Tho province in the Northern midland and mountainous region


▪ It is far 50km from Noi Bai International Airport; 180km from Hai Phong seaport,
Geographical Location 180km from Lao Cai international border gate. The province has a convenient location in
terms of railway, road and river traffic, converging all types of transport and affirming
the position of the regional center.

▪ The East borders Vinh Phuc province and Hanoi capital.


▪ The West borders Son La province and Yen Bai province
Adjacent provinces
▪ It borders Hoa Binh province to the South.
▪ The North borders with Tuyen Quang province.

2022 Statistic:
▪ GRDP: 88,37 billion VND (3,76 million USD)
▪ GRDP growth: 7,7 %
GRDP ▪ GRDP per capita: 2.480,85 USD/year
▪ Economic structure:
- Industry - Construction: 40,18%
- Agriculture. Forestry and fishery: 19,81%
- Service: 40,01%

2022 Statistic:
Industry growth ▪ Industry - Construction growth: 11,92%
▪ Agriculture. Forestry and fishery growth: 3,49%
▪ Service growth: 6,04%
▪ Score: 66.30 Rank 24 out of 63 cities and provinces in Vietnam (2022)
PCI

SOCIAL INFRASTRUCTURE

▪ Roadway: The total length of roads in the province is 12,916 km, divided into 10 types
of roads; Currently, there are 54 provincial roads with a total length of 786 km, the rate
of hardening is 99.4%. There is a highway Hanoi - Lao Cai running through, connecting
Hanoi capital to the northwest through Vinh Phuc, Phu Tho, Yen Bai and Lao Cai
province. Currently, the Tuyen Quang - Phu Tho expressway, which passes through Phu
Tho province, is about 28.6 km long, is being implemented. Along with that, there are 09
national highways with 531 km passing through, including National Road.2, National
Road.2D, National Highway 32, National Highway 32B, Highway 32C, National
Highway 32C avoiding Viet Tri city, QL.70, QL.70B and Ho Chi Minh Road.
Transportation ▪ Railway: There are two lines: Yen Vien - Lao Cai railway line runs through with a
length of about 75 km, passing through 05 districts, cities and towns; The special-use
railway line from Tien Kien station to Lam Thao Superphosphate and Chemical
Company is 2.9 km long and is in operation. Currently, there are 8 stations on the main
line and 01 Tien Kien station on the branch line from Tien Kien to Lam Thao
Superphosphate and Chemical factory.
▪ Waterway: Inland waterways include 05 rivers flowing through, with a total length of
316.5 km, specifically: 03 national inland waterways (Lo river, Red river and Da river)
reaching technical level of grade II is 1km, and level III is 223.5km; local river route
includes 23km of Chay river and 69km of Bua river.

789
▪ Other: The province has Hai Linh and Thuy Van IDC (nland Container Depot)

▪ The 500kV power source from the Northern grid supplies power to the 500kV Viet Tri
station from the Son La - Viet Tri and Son La - Hiep Hoa lines (4 x ACSR 400 conductors)
with a total length of 123.96 km.
▪ The 220kV power grid of Phu Tho province is supplied from the 500kV Viet Tri station
and partly imported from the 220kV China power source via the Yen Bai - Phu Tho line
(ACSR 400 conductor). The total length of 220kV transmission line in the province is
Electricity 251,547 km, connected to 02 220 kV substations.
▪ The 110KV grid has 15 stations with 27 transformers with a total capacity of 1070
MVA and 25 transmission lines with a total length of 328,364 km. The medium-voltage
grid consists of 04 voltage levels, 35kV, 22kV, 10kV and 6kV, of which the main ones
are 35 and 22 KV, the 6kV grid only accounts for a small proportion, equivalent to 4% of
the grid's capacity. The low-voltage grid consists of 02 voltage levels, 0.4kV and
0.23kV, with a total length of lines of 4,652.44km.

▪ The province currently has 2,190 irrigation units/ construction, of which: 1,591 lakes
and dams; 263 irrigation pumping stations, 19 combined irrigation and drainage pumping
Water
stations and many temporary units/ construction
▪ There are 1,590 reservoir, dams units/construction in the province

Education ▪ 05 universities, 10 colleges, 28 vocational schools

Medicare ▪ 15 hospital, 17 Clinics

INVESTMENT CONDITION

Human resource ▪ 57 % of population are in the working age (2022)

Education level ▪ Trained labor rate: 71% (2022)

▪ The minimum salary for the province is applied as follows


- Area II: 4.160.000 VND per month
Salary
- Area III: 3.640.000 VND per month
- Area IV: 3.250.000 VND per month
▪ According to Decree No. 218/2013/NĐ-CP dated December 26, 2013 of the Prime
Investment incentives
Minister.
▪ Prioritized Projects:

- Investment in infrastructure of industrial parks and industrial clusters

-Industry: Manufacturing and assembling high-tech products; electronics, production of


application software, pharmaceuticals, cosmetics, supporting industries,…
Fields Attracting Investment
- Agriculture and forestry:Investment in raw material areas associated with processing
and exporting: tea, pomelo fruit, raising high-quality cows and pigs, processing wood for
export,...

- Trade and services:Investment in the fields of high-class resorts,tourism, commercial


centers, logistics services,…).

790
Map

Phu Tho Department of Planning and Investment

▪ Located: Tran Phu street, Tan Dan Ward, Viet Tri City, Phu Tho province

▪ Tel: (84) 0210 384 6581

Contact ▪ Fax: (84) 0210 384 0955

▪ Website: http://dpi.phutho.gov.vn

▪ Contact: Mr. Trinh The Truyen, Director

Email: truyen.gov@gmail.com

LIST OF INDUSTRIAL ZONES

NO INDUSTRIAL ZONE NAME TOTAL AREA OCCUPANCY RATE STATUS


(ha)
1 Phu Ha Industrial zone 456 33,85 % in operation

2 Trung Ha Industrial zone 200 100 % in operation

791
3 Cam Khe Industrial zone 450 32 % in operation

4 Thuy Van Industrial zone 335 100 % in operation

5 Tam Nong Industrial zone 350 N/A Attracting investment

6 Ha Hoa Industrial zone 400 N/A Attracting investment

7 Phu Ninh Industrial zone 80,3 N/A Attracting investment

792
PHU HA INDUSTRIAL PARK

GENERAL INFORMATION
Address Phu Ho, Ha Loc, Ha Thach commune, Phu Tho Town
TỔNG CÔ NG TY VIGLACERA-CTCP
Investor ▪ Address: 2nd floor, Viglacera tower, No 1 Thang Long, Me Tri, Nam Tu Liem, Hanoi
▪ Website: https://viglaceraip.com

Location Adjacent location:


- 3 km from Phu Tho Town
- 16 km from Viet Tri City
- 60 km from Noi Bai Airport
- 198 km from Hai Phong Port
- - 2 km from Noi Bai - Lao Cai highway
Investment Sectors ▪ Priority sector for investment
High technology, production of electrical equipment, electronic products, high-grade civil electrical
appliances; Mechanical industry, manufacturing common machines; assembly industry, automobile
manufacturing, construction machinery; machinery manufacturing industry for high-class textile and
garment industries; repair, maintenance and installation of machinery and equipment; high-grade
wood and plastic production industry; high-tech supporting industries, housing for workers, etc.
Minimum wage Area III: 3.640.000 VND per month (~157 USD/people/month)
Planned area ▪ Total area:
- Phase 1: 356 ha
- Phase 2: 100 ha
▪ Total vacant leasable area: 216.53 ha
▪ Total ground clearing, in construction: 115 ha
Occupancy Rate and ▪ Occupancy rate:
Number of Projects Phase 1: 33,85%
Phase 2: Under construction
▪ Number of Projects: 26
Number of Korean projects ▪ None

Lease fee ▪ Land lease fee: 0,22 USD/m2/year (current price), paid annually.
▪ Factory lease fee: 75-85 USD/m2 excluding VAT, lease until 2064

Operating fee ▪ Electricity fee:


- Regular hours: 1,555 VND/Kwh (equivalent to 0.067 USD/Kwh
- Night time: 1,007 VND/Kwh (equivalent to 0.004 USD/Kwh)
- Rush hour: 2,871 VND/Kwh (equivalent to 0.123 USD/Kwh)
▪ Water fee: 11,429 VND/m3 (equivalent to 0.49 USD/m3)
▪ Wastewater treatment fee: 9,547 VND/m3 (equivalent to 0.41 USD/m3)

793
Layout map

794
CAM KHE INDUSTRIAL PARK

GENERAL INFORMATION
Address Sai Nga, Thanh Nga, Son Nga, Xuong Thinh commune, Cam Khe district
Duc Anh Construction Joint Stock company
Investor ▪ Address: Sai Nga, Thanh Nga, Son Nga, Xuong Thinh commune, Cam Khe district
▪ Tel: 0975 686 689/ 0915 165 999
▪ Email: ducanhcorp2010@gmail.com
▪ Website:
Khucongnghiepcamkhe.com / Khucongnghiepcamkhe.vn
Location ▪ Adjacent location:
- There is a traffic system and connects from the industrial park to Noi Bai – Lao Cai highway at
IC.10 crossing point, it is 0.8km from Cam Khe Industrial Park;
- 100 km to Hanoi city; the distance to Noi Bai airport is 75 km.
- 250 km to Lao Cai border gate;
- 150 km to Hai Phong port
- Nears to Phu Tho railway station (Phu Tho township) and Chi Chu railway station (Thanh Ba
district).
Investment Sectors ▪ Priority sector for investment
The complex of textiles, mechanics, processing of agricultural and forestry products, production of
consumer goods, production of building materials, supporting industries, mineral processing and
assembly, production and assembly of electronic products, drinks,...
Minimum wage Area IV: 3.250.000 VND per month
Planned area
▪ Total area: 450ha
▪ Total vacant leasable area: 109,82ha
▪ Total ground clearing, in construction: 131ha
Occupancy Rate and ▪ Occupancy rate: 32%
Number of Projects ▪ Number of Projects: 22
Number of Korean projects ▪ None

Lease fee ▪ Land lease fee: 0,15 USD/m2/year (current price), paid annually.
▪ Factory lease fee: Depending on the time and location, payment method

Operating fee ▪ Electricity fee:


- Regular hours: 1,685 VND/Kwh
- Off-peak hours: 1,100 VND/Kwh
- Rush hour: 3,076 VND/Kwh
▪ Water fee: 12.500 VND/m3
▪ Wastewater treatment fee: 11.000 VND/m3

795
Layout map

796
[- This Page is intentionally left blank -]

797
PHU YEN

798
INVESTMENT ENVIRONMENT IN PHU YEN

USD/VND 23.510

GENERAL INFORMATION
Area 5045 km2
Population 0,961 million people (2021)
▪ Phu Yen is located in South Central Coast region.
Geographical Location Tuy Hoa City - the main city of Phu Yen is 120 km from Nha Trang, and 561 km from Ho Chi
Minh City and 1,156 km from Hanoi.
Phu Yen shares border with Binh Dinh Province in the north, Khanh Hoa Province on the south,
Adjacent provinces
Dak Lak and Gia Lai provinces on the west and East Sea on the east.
2022 statistic:
▪ Real GRDP (billion VND): 50.496 (2,13196537893181 billion USD)
▪ GRDP growth: 7,46%
▪ GRDP per capita (million
57,60 (2453 USD)
GRDP VND/year):
▪ Economic structure:
- Industry - Construction: 26,65%
- Agriculture. forestry and fishery: 25,57%
- Service: 43,16%
▪ Industry - Construction growth: 6,82%
▪ Agriculture, forestry and fishery
Industry growth 3,28%
growth:
▪ Service growth: 11,17%
Import turnover (billion USD): 0,15 (Growth rate: 0,083)
Import - Export
Export turnover (billion USD): 0,24 (Growth rate: 0,129)
Key Industry Tourism, manufacturing, food processing
PCI 64,8
Ranking 39
SOCIAL INFRASTRUCTURE
▪ Roadway: There is National Highway 1A running through the length of the province,
connecting Phu Yen with Hanoi capital and Ho Chi Minh City; national highway 25 and
Transportation provincial road 645 from Tuy Hoa to Gia Lai, Dak Lak.
▪ Railway: The railway running through the province is 120 km long.
▪ Airway: Tuy Hoa domestic airport
Phu Yen is using the national 110KV power grid system, so far 100% of communes have
electricity. The power source is guaranteed to meet the needs of production and daily life in the
Electricity region. Song Hinh hydropower plant with a capacity of 72MW connects to the national network.
In 2004, the construction of Song Ba Ha hydropower plant started with a capacity of 220 MW
and was about to start construction of Krong Nang hydropower plant with a capacity of 66 MW.
Tuy Hoa city water plant with a capacity of 28,000m3/day is under investment, phase I has
exploited 8,000m3/day and night, ensuring clean water supply for Tuy Hoa city, Tuy Hoa
Water
district and Hoa Hiep Industrial Park. All district towns have water plants with a total capacity
of 13,000m3/day.
The whole province currently has 360 preschools and high schools; 120 continuing education
Education & Training
institutions; 04 vocational education institutions and 03 higher education institutions.
Medicare N/A
INVESTMENT CONDITION

799
Human resource 54% of population are in the working age (2022)
Education level Trained labor rate: 74,3% (2022)
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): N/A
- Area II (4,160,000 VND/month): N/A
Salary - Area III (3,640,000 VND/month): Tuy Hoa City, Song Cau town and Dong Hoa district
- Area IV (3,250,000 VND/month): Phu Hoa, Tuy An, Song Hinh, Dong Xuan, Tay Hoa and
Son Hoa districts
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory
minimum wages paid to employees working under employment contracts)
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
Investment incentives
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
Supporting industry, food processing, construction material, and tourism. Infrastructure
Fields Attracting Investment
development, oil filter.
▪ During the 5-year period (2018-2022), Phu Yen province has attracted 06 foreign investment
projects, with a total investment capital of about 5.07 million USD and about 08 times of capital
Investment attraction situation
contribution and share purchase applications. acquired the capital contribution to companies that
are implementing investment projects in the province with a value of about 23.24 million USD.
Phu Yen currently has 3 industrial parks: Hoa Hiep has a total area of 707.5 ha, planned in Hoa
Hiep commune, Dong Hoa district; An Phu with a total area of 97 hectares is planned near Tuy
Industrial zones
Hoa city; Northeast of Cau River IP with a total area of 301 hectares is planned in Xuan Hai
commune, Song Cau district

800
Map

Department of Planning and Investment Phu Yen


▪ Address: No. 02A, Dien Bien Phu Street, Tuy Hoa City, Phu Yen Province

▪ Tel:
Contact
▪ Email: ktt@phuyen.gov.vn
▪ Contact person:
- Mr. Nguyen Chi Hien - Director
- Tel: 84.91344548
- Email: chien-sokhdt@phuyen.gov.vn

801
HOA HIEP 1 INDUSTRIAL ZONE

GENERAL INFORMATION
Address Dong Hoa Ward, Phu Yen Province

Phu Yen Economic Zone Management Board


▪ Address: No. 353 Tran Hung Dao St., Ward 4, Tuy Hoa City, Phu Yen Province
▪ Tel: 84-257-3828 720
Investor
▪ Email: quanlydautu2016@gmail.com
▪ Website: https://bqlkkt.phuyen.gov.vn

Contact Person Mr. Nguyen Quoc Linh – Specialist – HP: 0935 300 530 - quanlydautu2016@gmail.com

Adjacent location
- 6 km from 1A highway, near the junctions between National Highway 1A and the road to Tay
Nguyen
Location
- 3 km from Tuy Hoa airport;
- 15 km from Vung Ro port; 40km from Van Phong port
- 700 m from Phu Hiep station
Priority Sectors for
Mechanical, Electronic, Agricultural and aquatic products
Investment
Investment Sectors
Investment Restricted
[Lĩnh vực hạn chế đầu tư]
Sectors
Minimum wage According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
▪ Start date: 1999
Lease term
▪ End date: 26th November, 2049
Minimum Lease Area Unavailable

Limit for Construction 02 Floors


Height

Permitted Construction 60%


Rate

▪ Total area: 101,5 ha


Planned area ▪ Total vacant leasable area: 101,5 ha
▪ Total area with full infrastructure ready to build factory: 101,5 ha

Factory Available for Rent Unavailable

Operation Status Active


Occupancy Rate and
82,71% with 30 projects
Number of Projects

Number of Korean projects None

▪ Land lease fee: USD 0.047/m2/year


Lease fee ▪ Factory lease fee: USD 20/m2

802
▪ Electricity fee: USD 0.068 ~ 0.13/kWh
▪ Water fee: USD 0.72/m3
Operating fee
▪ Wastewater treatment fee: USD 0.26 ~ 1.79/m3 according to COD volume (mg/l)
▪ Waste treatment fee: USD 6.56/unit/month

INFRASTRUCTURE AND FACILITY


Financial institution Agribank, Vietcombank

Tax service, State


finance office Many service providers available

Customs Service 12 km from Hoa Hiep 2

Universities, training facilities 2 universities & 2 colleges

Police, public security Near the zone

Medicare 15 km from Phu Yen General Hospital

Road Width 40 m with 2 lanes

Layout Plan

803
Location Map

Actual View

List of Projects in Industrial Zone

No. Name of Company Nationality Business line

1 Saigon Pearl Co., Ltd Japan Producing pearls transplanting, gems

2 Semco Phu Yen Industrial Co., Ltd London Producing wooden door, flower glass,
metal door frame, plastic door frame
3 Foodtech Joint Stock Company Thailand Processing agricultural, aquatic and
fishmeal products
4 Taesan Food Co., Ltd Vietnam Producing Seafood

5 Phu Yen Cashew Joint Stock Company Vietnam Processing agricultural, aquatic and
fishmeal products
6 Truong Thanh Industrial Wood Joint Vietnam Producing foam board and wood
Stock Company
7 Masan Brewery Phu Yen MTV Co., Ltd Vietnam Manufacturing beer

804
8 I.D.P Joint Stock Company Vietnam Producing uPVC tube

9 Ba Hai Joint Stock Company Vietnam Producing Seafood

10 Hoang Long Vina Manufacturing and Vietnam Producing NPK fertilizer


Trading Co., Ltd
11 Hong Ngoc Seafood Co., Ltd Vietnam Producing Seafood

12 Blue Sea Canned Food Co., Ltd Vietnam Producing and processing frozen sea fish,
canned tuna, fish meal, ice cubes
13 Branch of Olam Vietnam Co., Ltd in Phu Singapore Purchasing, producing, processing
Yen agricultural products for export and
domestic consumption (cashew nuts,
macadamia nuts...)
14 Xin Bang Co., Ltd China Producing Seafood

15 Anh Phu Quy Enterprise Vietnam Packaging production

16 Phuc Nguyen Seafood Co., Ltd Vietnam Producing seafood

17 Harry & Co., Ltd Japan Producing gems

18 Tan Phat Canned Food Co., Ltd Vietnam Frozen tuna, canned tuna, fishmeal
production
19 Concept EyeWear Manufacture Vietnam Hongkong (China) – Japan Producing and trading glasses frames and
Co., Ltd eyeglasses; glass cases and other types of
packaging; processing and trading in
jewelry.
20 Hong Bang Co., Ltd Vietnam Producing seafood

21 Mosc Vietnam Co., Ltd Philippines Producing and processing seafood

22 Agricultural Development Investment Vietnam Producing and processing seafood


Joint Stock Company
23 Thanh Dung Canned Food Co., Ltd Vietnam Processing canned seafood

24 Ausabaco Construction Mechanical Co., Vietnam Producing mechanical products used in


Ltd civil and industrial construction for
export.
25 Julia Seafood Co., Ltd Vietnam Seafood processing

26 Asta Joint Stock Company Vietnam Producing pharmaceutical and health


functional food
27 Phu Yen Food Processing and Trading Vietnam Producing and processing food from
Joint Stock Company seafood, meat….
Processing fruits: Peruvian chili, passion
fruit, dragon fruit....
28 Au Sa Vi Na Phu Yen Co., Ltd Vietnam Producing mechanical equipment and
tools for the field of fitness training,
bodybuilding, physical therapy, post-
injury recovery...
29 Thuan Phat T&P Co., Ltd Vietnam Processing frozen agricultural and aquatic
products
30 Central Modun Home High Technology Vietnam Production of modular components for
Co., Ltd prefab houses, production of interior
decorations, handicrafts for prefab houses

805
HOA HIEP 2 INDUSTRIAL ZONE

GENERAL INFORMATION

Address Dong Hoa Ward, Phu Yen Province

Phu Yen Economic Zone Management Board


▪ Address: No. 353 Tran Hung Dao St., Ward 4, Tuy Hoa City, Phu Yen Province
▪ Tel: 84-257-3828 720
Investor
▪ Email: quanlydautu2016@gmail.com
▪ Website: https://bqlkkt.phuyen.gov.vn

Contact Person Mr. Nguyen Quoc Linh – Specialist – HP: 0935 300 530 - quanlydautu2016@gmail.com

Adjacent location
- 8 km from 1A highway, near the junctions between National Highway 1A and the road to Tay
Nguyen
Location - 10 km from Tuy Hoa airport
- 4 km from Phu Hiep Station
- 10 km from Vung Ro port, 35 km from Van Phong Port
Priority Sectors for
Investment Sectors Processing rattan, producing interior decoration, garment
Investment
Minimum wage According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
▪ Start date: 2003
Lease term
▪ End date: 2053
Minimum Lease Area Unavailable

Limit for Construction


02 Floors
Height

Permitted Construction
None
Rate

▪ Total area: 73,18 ha


Planned area ▪ Total vacant leasable area: 73,18 ha
▪ Total area with full infrastructure ready to build factory: 73,18 ha

Factory Available for Rent Total area: 5000 m2

Operation Status Active


Occupancy Rate and
100% with 2 projects
Number of Projects

Number of Korean projects None

▪ Management fee: USD 0.009


▪ Electricity fee: USD 0.068 ~ 0.13/kWh
▪ Water fee: USD 0.72/m3
Operating fee ▪ Wastewater treatment fee: USD 0.26 ~ 1.79/m3 according to COD volume (mg/l)
▪ Waste treatment fee: USD 6.56/unit/month

INFRASTRUCTURE AND FACILITY

806
Financial institution Agribank, Vietcombank

Tax service, State


finance office Many service providers available

Customs Service 12 km from Hoa Hiep 2

Universities, training facilities 2 universities & 2 colleges

Police, public security Near the zone

Medicare 15 km from Phu Yen General Hospital

Road Width 40 m with 2 lanes

Layout Plan

Location Map

807
Actual View

808
List of Projects in Industrial Zone

No. Name of Company Nationality Business line

1 Hoa Hiep Rattan Export Processing Hongkong (China) - Producing materials from wood, rattan,
Enterprise (RapexCo) bamboo, leaves, seaweed, leather, plastic,
paper, ceramics, metal and natural fibers to
make household products, handicrafts and
other materials. Other related products
mainly for export.
- Producing furniture (beds, cabinets, tables,
chairs from pre-processed wood planks)
2 An Hung Joint Stock Company Vietnam Textile

809
AN PHU INDUSTRIAL ZONE

GENERAL INFORMATION
Address Tuy Hoa City, Phu Yen Province

Phu Yen Economic Zone Management Board


▪ Address: No. 353 Tran Hung Dao St., Ward 4, Tuy Hoa City, Phu Yen Province
▪ Tel: 84-257-3828 720
Investor
▪ Email: quanlydautu2016@gmail.com
▪ Website: https://bqlkkt.phuyen.gov.vn

Contact Person Mr. Le Xuan Huy - Specialist - HP: 0948 443 267 - Email: quanlydautu2016@gmail.com

Adjacent location
- 100 m from 1A highway;
Location - 10 km from Tuy Hoa airport;
- 30 km from Vung Ro port;
- 4 km from Tuy Hoa station

Priority Sectors for


Light and clean industry
Investment
Investment Sectors
Investment Restricted
None
Sectors
Minimum wage According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
▪ Start date: 2007
Lease term
▪ End date: August, 2057
Minimum Lease Area Unavailable

Limit for Construction 2.2 Floors


Height

Permitted Construction 45%


Rate

▪ Total area: 68.4 ha


Planned area ▪ Total vacant leasable area: Unavailable
▪ Total area with full infrastructure ready to build factory: 68.4 ha

Factory Available for Rent Unavailable

Operation Status Active


Occupancy Rate and
92,15% with 40 projects
Number of Projects

Number of Korean projects None

▪ Land lease fee: USD 0.37/m2/year


Lease fee ▪ Factory lease fee: Unavailable

810
▪ Electricity fee: USD 0.068 ~ 0.13/kWh
▪ Water fee: USD 0.72/m3
Operating fee
▪ Wastewater treatment fee: USD 0.51 ~ 2.43/m3 according to COD volume (mg/l)
▪ Waste treatment fee: USD 6.56 /unit/month

INFRASTRUCTURE AND FACILITY


Financial institution Agribank, Vietcombank

Tax service, State


finance office Many service providers available

Customs Service 8 km from An Phu Industrial zone

Universities, training facilities 2 universities & 2 colleges

Police, public security Near the zone

Medicare 6 km from Phu Yen General Hospital

Road Width The main road is 40m wide for 2 lanes and the internal road is 16m wide

Layout Plan

Location Map

811
Actual View

List of Projects in Industrial Zone

No. Name of Company Nationality Business line

1 Hai Tinh Seafood Co., Ltd China Seafood Processing

2 Phu Yen Tree Co., Ltd Vietnam – America Essential oil processing

3 Phu Yen Construction Material Joint Vietnam Stone processing


Stock Company
4 Trang Thuy Seafood Co., Ltd Vietnam Seafood Processing

5 Tien Dat Construction Joint Stock Vietnam Investment in construction of Precast


Company Concrete Factory and Galvanized Metal
Factory.
6 Son A Co., Ltd Vietnam Processing cartons and packaging from
carton paper and packing finished products.
7 Viet Thai Manufacturing and Trading Vietnam Dried seafood processing for export
Co., Ltd
8 Asia Door Manufacturing Co., Ltd Vietnam Investment for building mechanical factory

9 Tom Vang Seafood Joint Stock Company Vietnam Seafood Processing

10 Phuong Tuan Construction and Vietnam Invest in the construction of a mechanical


Advertisement Co., Ltd factory serving the construction and
transportation industries
11 Phu Thuan Construction Co., Ltd Vietnam Manufacturing, processing pre-engineered
steel frames, steel doors, aluminum profiles
and producing all kinds of block bricks
12 Kim Linh Co., Ltd Vietnam Processing finished glass products, high-
class mirrors, and export-oriented
handicrafts and products behind glass
13 Tuy Hoa Industrial Gas Joint Stock Vietnam Oxygen production
Company
14 Bao Chau Phu Yen MTV Co., Ltd Vietnam Processing wood products for export

15 Quang Thong Manufacturing and Trading Vietnam Producing cashew kernel


Co., Ltd
16 Huy Tung Coffee Co., Ltd Vietnam Coffee processing

17 Long Son Tuy Hoa Co., Ltd Vietnam Cashew Producing

812
18 Long Son Tuy Hoa Co., Ltd Vietnam Cashew Producing

19 Khanh Viet Corporation Vietnam Bagged cigarettes production

20 Long Son Joint Stock Company – Phu Vietnam Cashew Kernel Production & Cashew Oil
Yen Branch Shell Press
21 Hiep Hoa Construction Joint Stock Vietnam Mechanical processing and precast concrete
Company products
22 Best Cashew and Macadamia Joint Stock Vietnam Cashew Kernel Production & Cashew Oil
Company Shell Press
23 Nam Viet Hung Investment Joint Stock Vietnam Cashew Producing
Company
24 Hoang Hai Trading Co., Ltd Vietnam Tempered glass and mechanical processing

25 Nguyen Thong Co., Ltd Vietnam Cashew Kernel Production & Cashew Oil
Shell Press
26 Thinh An Phu Manufacturing Trading Vietnam Cashew Producing
Joint Stock Company
27 Minh Long Service Trading Co., Ltd Vietnam Processing granite, basalt, river stone,
stream stone, etc. to serve construction; art
stone processing
28 CCIPY Vietnam Co., Ltd America Producing electronic components

29 Branch of Re Vei Vietnam Co., Ltd Vietnam Producing bottled drinking water and soft
drinks of all kinds
30 Khai Hien Agricultural Co., Ltd Vietnam Producing agricultural products

31 Uniland Packaging Import-Export Vietnam Producing packaging, foam bags, and


Trading Co., Ltd products for industry and household use
from plastic
32 Bao Khanh Construction Joint Stock Vietnam Producing drinking bottled and pure
Company drinking water
33 An Bao Khanh Transport Trading Service Vietnam Coffee processing
Co., Ltd
34 Central Industry Joint Stock Company Vietnam Assembling electrical equipment

35 Pjaca Phu Yen Joint Stock Company Vietnam Producing plastic packaging, pet bottle,
plastic products
36 Sang Jung Vina Manufacturing-Trading- Vietnam Producing shoes, bags, luggage, handbags
Import Export Co., Ltd from leather, plastic
37 Fansipan Phu Yen Joint Stock Company Vietnam Assembling and distributing electric
vehicles, electric charging stations,
batteries for electric cars and electric
vehicles
38 Yen Bien Phu Yen Co., Ltd Vietnam Producing and processing of bird's nests;
canned bird's nest water (jar).
39 Nam Viet Hung Investment Co., Ltd Vietnam Producing and processing agricultural
products
40 Phu Yen Manufacturing, Trading and Vietnam Mechanical processing workshops for civil
Energy Joint Stock Company and industrial construction

DONG BAC SONG CAU INDUSTRIAL ZONE – ZONE 1

GENERAL INFORMATION
Address Song Cau Ward, Phu Yen Province

813
Phu Yen Economic Zone Management Board
▪ Address: No. 353 Tran Hung Dao St., Ward 4, Tuy Hoa City, Phu Yen Province
▪ Tel: 84-257-3828 720
Investor
▪ Email: quanlydautu2016@gmail.com
▪ Website: https://bqlkkt.phuyen.gov.vn

Contact Person Ms. Le Thi Nhat Uyen – Specialist – HP: 0905 723 499 – Email: quanlydautu2016@gmail.com

Adjacent location
- Located on the 1D highway (From Song Cau to Quy Nhon)
Location - 80 km from Tuy Hoa airport; 50 km from Phu Cat Airport
- 20 km from Quy Nhon port
- 70 km from Tuy Hoa station; 30km Dieu Tri station, Binh Dinh province
Priority Sectors for
Wood processing
Investment
Investment Sectors
Investment Restricted
None
Sectors
Minimum wage According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
▪ Start date: 2007
Lease term
▪ End date: August, 2058
Minimum Lease Area Unavailable

Limit for Construction 8m - 10m


Height

Permitted Construction 50% ~ 60%


Rate

▪ Total area: 105,8 ha


Planned area ▪ Total vacant leasable area: Unavailable
▪ Total area with full infrastructure ready to build factory: 105,8 ha

Factory Available for Rent Unavailable

Operation Status Active


Occupancy Rate and
83,26% with 22 projects
Number of Projects

Number of Korean projects None

▪ Land lease fee: USD 0.028/m2/year


Lease fee ▪ Factory lease fee: N/A

▪ Electricity fee: USD 0.068 ~ 0.13/kWh


▪ Water fee: USD 0.72/m3
Operating fee ▪ Wastewater treatment fee: USD 0.26 ~ USD 1.79/m3 according to COD volume (mg/l)
▪ Waste treatment fee: USD 6.56 /unit/month
▪ Management Fee: USD 0,009

INFRASTRUCTURE AND FACILITY


Financial institution Agribank, Vietcombank

814
Tax service, State
finance office Many service providers available

Customs Service 70 km from Dong Bac Song Cau Area 1

Universities, training facilities 2 universities & 2 colleges

Police, public security Near the zone

Medicare 67 km from Phu Yen General Hospital; 18km from Song Cau General Hospital

Road Width 50 m with 4 lanes

Layout Plan

Location Map

815
Actual View

List of Projects in Industrial Zone

No. Name of Company Nationality Business line

1 Kenee Vietnam Mineral Joint Stock China- Vietnam Producing and processing vonfram,
Company molypden
2 Tan Binh Phu Co., Ltd Vietnam Producing interior and exterior furniture
for export
3 Phu My Co., Ltd Vietnam Producing interior and exterior furniture
for export
4 Tan Binh Co., Ltd Vietnam Producing paper of all kinds and carton
packaging
5 Hoang Khoi Co., Ltd Vietnam Producing interior and exterior furniture
for export
6 Thai Thinh Manufacturing Co., Ltd Vietnam Processing forest products

7 A Chau Paper material Co., Ltd Vietnam Wood chip and wood pellet processing

8 Thanh Phuc Joint Stock Company Vietnam Producing interior and exterior furniture
for export
9 Hao Hung Phu Yen Co., Ltd Vietnam Processing finished wood products, wood
chips, and wood pellets
10 Tan Trinh Co., Ltd Vietnam Producing wood

11 Phu Yen NPK Fertilizer Co., Ltd Vietnam Producing fertilizer of all kinds

12 Minh Toan Co., Ltd Vietnam Producing furniture for export and
domestic consumption
13 Kami Zawa Kougei Vietnam Co., Ltd Japan Forest product processing; factory lease

14 Kami Zawa Kougei Vietnam Co., Ltd Japan Wood processing

15 Bao Chau Phu Yen MTV Co., Ltd Vietnam Processing wood materials

816
16 Bao Chau Phu Yen MTV Co., Ltd Vietnam Production of energy tablets

17 Tam Dinh Phu Yen Co., Ltd Vietnam Producing and processing wood chips,
wood pellets and fresh flower solution.
18 Dong Nam Phu Yen Co., Ltd Vietnam Production of energy tablets from wood

19 Bao Long Phu Yen Co., Ltd Vietnam Producing pellets and veneers

20 Phu Yen Phat Co., Ltd Vietnam Production of energy tablets from wood,
wood finished products
21 Thang Loi Co., Ltd Vietnam Wood processing

22 Hoang Ha Phu Yen Paper Joint Stock Vietnam Paper production


Company

817
DONG BAC SONG CAU INDUSTRIAL ZONE – ZONE 2

GENERAL INFORMATION
Address Song Cau Ward, Phu Yen Province

Phu Yen Economic Zone Management Board


▪ Address: No. 353 Tran Hung Dao St., Ward 4, Tuy Hoa City, Phu Yen Province
▪ Tel: 84-257-3828 720
Investor
▪ Email: quanlydautu2016@gmail.com
▪ Website: https://bqlkkt.phuyen.gov.vn

Contact Person Ms. Le Thi Nhat Uyen – Specialist – HP: 0905 723 499 – Email: quanlydautu2016@gmail.com

Adjacent location
- Located on the 1D highway (From Song Cau to Quy Nhon)
- 80 km from Tuy Hoa airport; 50 km from Phu Cat Airport
Location
- 20 km from Quy Nhon port
- 70 km from Tuy Hoa station; 30km Dieu Tri station, Binh Dinh province
Priority Sectors for Agricultural products, aquatic products, beverage, wood, plywood,
Investment fiber, fabric
Investment Sectors
Investment Restricted
None
Sectors
Minimum wage According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
▪ Start date: 2018
Lease term
▪ End date: N/A
Minimum Lease Area Unavailable

Limit for Construction Unavailable


Height

Permitted Construction N/A


Rate

▪ Total area: 81,8 ha


Planned area ▪ Total vacant leasable area: N/A
▪ Total area with full infrastructure ready to build factory: 59,52 ha

Factory Available for Rent Unavailable

Operation Status Active


Occupancy Rate and
5,27% with 2 projects
Number of Projects

Number of Korean projects None

▪ Land lease fee: Being calculated


Lease fee ▪ Factory lease fee: Being calculated

818
▪ Electricity fee: USD 0.068 ~ 0.13/kWh
▪ Water fee: USD 0.72/m3
Operating fee ▪ Wastewater treatment fee: USD 0.26 ~ USD 1.79/m3 according to COD volume (mg/l)
▪ Waste treatment fee: USD 6.56 /unit/month
▪ Management Fee: USD 0,009

INFRASTRUCTURE AND FACILITY


Financial institution Agribank, Vietcombank

Tax service, State


finance office Many service providers available

Customs Service 70 km from Dong Bac Song Cau Area 2

Universities, training facilities 2 universities & 2 colleges

Police, public security Near the zone

Medicare 67 km from Phu Yen General Hospital; 18km from Song Cau General Hospital

Road Width 50 m with 4 lanes

Layout Plan

819
Location Map

List of Projects in Industrial Zone

No. Name of Company Nationality Business line

1 Nguyen Hung Co., Ltd Vietnam Canned Seafood Processing

2 Phu Yen Food Technology Co., Ltd Vietnam Producing fish sauce and fish of all kinds

820
[- This Page is intentionally left blank -]

821
QUANG BINH

822
INVESTMENT ENVIRONMENT IN QUANG BINH

GENERAL INFORMATION
Area 8000 km2
Population 0.914 million people (2022)
 Quang Binh is located in North Central region.
Geographical
 Located in the Middle of Vietnam.
Location
 500 km from Hanoi and 1,200 km from Ho Chi Minh City.
Adjacent  The Province has East Sea to the East, Quang Tri to the South, Laos Border to the West and Ha
provinces Tinh Province to the North.
2022 statistic:
- Nominal GRDP (billion VND): 27,720 (~1.17 billion USD)
- Real GRDP (billion VND): 50,117 (~2.13 billion USD)
- GRDP growth: 7.96%
GRDP - GRDP per capita (million VND/year): 54.83 (~2,300 USD)
Economic structure:
- Industry - Construction: 30.10%
- Agriculture. forestry and fishery: 20.09%
- Service: 49.53%
- Industry - Construction growth: 10.77%
Industry
- Agriculture, forestry and fishery growth: 2.48%
growth
- Service growth: 9.43%
Supporting industry, power generation industry, shipbuilding industry, cement industry, glass
Key Industry
production industry.
PCI Score: 63.41 – ranked 48th out of 63 cities and provinces in Vietnam (2021).
SOCIAL INFRASTRUCTURE
Quang Binh is one transportation hub that is located in the middle point of Vietnam and has the
narrowest part in Vietnam.
 Roadway: The Province has National Road 1A (122km), Ho Chi Minh Road (200km within the
Province alone), National Road 12A, 12C, 9B, 15A. Provincial Road 20, 16 towards Cha Lo
international border gate and other border gates, while national gate 12A, 12C and 9B connect
Transportation
Laos- Thailand with Cha Lo International Seaport.
 Railway: North-South Railway goes through the province with 21 Gas station (Dong Hoi is
national Gas station).
 Waterway: Nhat Le, Gianh, Hon La seaports (Hon La receives 12 million tons/year).
 Airway: Dong Hoi Airport, which is under expansion project by FLC Corp.
Electricity National power system has spread to all corners of villages and cities.
Phu Vinh and Hai Thanh Water supply factory with capacity of 18,000 m3 per day and 9,000 m3 per
Water
day, respectively.
Education &
01 university, 03 technical high schools.
Training
Vietnam – Cuba Hospital under central management is located in Dong Hoi city, and many
Medicare
polyclinic hospitals in districts and Dong Hoi city.
INVESTMENT CONDITION
Human
62.5% of population are in the working age (2022)
resource
Education level Trained labor rate: 67.7% (2022)
 The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): N/A
- Area II (4,160,000 VND/month): Dong Hoi city
- Area III (3,640,000 VND/month): Ba Don town, Le Thuy, Quang Ninh, Bo Trach, Quang Trach
Salary
district.
- Area IV (3,250,000 VND/month): Minh Hoa, Tuyen Hoa district.
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum
wages paid to employees working under employment contracts)
Investment  Incentives according to government regulations:
incentives - Exemption and reduction for land and water rent fee
823
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
Fields Prioritized projects:
Attracting ▪ Renewable energy (solar energy, wind power and even offshore wind power), tourism (exploration
Investment tourism) and fishing & seafood processing.
Investment Quang Binh province currently has 27 FDI projects granted investment certificates with a total
attraction registered investment capital of 1,122 million USD, of which 19 investment projects have been
situation completed and put into official operation.
Industrial
9 Industrial Zones
zones

Map

Quang Binh Department Of Planning And Investment


▪ Address: No. 09, Quang Trung Street, Dong Hoi city, Quang Binh Province
▪ Tel: (84-232) 3 822 270
Contact ▪ Email: skhdt@quangbinh.gov.vn
▪ Contact person:
- Mr. Trang Quang Hoa – (84) 964 704 777 – Director of Quang Binh Investment Promotion and
Advisory Center

824
LIST OF INDUSTRIAL ZONE IN QUANG BINH

No Industrial zone Name Total Occupancy Rate Status


Area (%)
(ha)
1 North West Dong Hoi Industrial Zone 67 99.8% In Operation
2 North Dong Hoi Industrial Zone 105 71.7% In Operation
3 North West Quan Hau Industrial Zone 220 9.35% Under Construction,
Licensed
4 Cam Lien Industrial Zone 450 15.09% In Operation
5 Bang Industrial Zone 450 8.81% Under Construction,
Licensed
6 Bo Trach Industrial Zone 250 - Under Construction,
Licensed
7 Hon La Port Industrial Zone 168 99.73% In Operation
8 Hon La II Industrial Zone 117.1 11.9% Under Construction,
Licensed
9 Western Gate Industrial Zone 118 1.37% Under Construction,
Licensed

825
NORTH-WEST DONG HOI INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

Address Bac Ly Ward, Dong Hoi City, Quang Binh Province

Quang Binh Economic Zone Management Board


▪ Address: 17 Ly Thuong Kiet Street -Dong Hoi City - Quang Binh Province
Investor
▪ Tel: (84-232) 3 828 513 Fax: (84-232) 3 828 516
▪ Website: https://bqlkkt.quangbinh.gov.vn/3cms/
Mr. Duong Ngoc Anh- Officer of Planning and Construction Department-
Contact Person
Tel: (84) 984 806 001- Email: anhkktqb@gmail.com

▪ 50 km to Dong Hoi City


▪ 45 km to Dong Hoi Airport
Location
▪ 5 km to Hon La Port
▪ 300 m to National Road

Investment priorities Sectors No Regulation


Investment Area
Investment Restricted Sectors No Regulation

Minimum wage [Area 2] According to Decree No. 38/2022/ND-CP dated June 12, 2022

▪ Start date: 2019


Lease term
▪ End date: 2069

Minimum Lease Area No regulation

Limit for Construction ▪ Factory area: 1-2 floors


Height ▪ Office floor: no more than 3 floors
Permitted Construction ▪ Factory area:66%
Rate ▪ Office floor: 34%
▪ Total Area: 67 ha
Planned area ▪ Total vacant leasable area: 0.1 ha
▪ Total area with full infrastructure ready to build factory: 41 ha

Factory Available for Rent N/A

Operation Status In Active, with full infrastructure

Occupancy Rate and ▪ Occupancy Rate: 99.8%


Number of Projects ▪ Number of project: 22
Number of Korean
None
Projects

Lease fee ▪ Land lease fee: 8,400 VND/m2/year (~ 0.36 USD/m2/year)

▪ Management fee: None


▪ Infrastructure maintenance fee: 3,400 VND/m2/year (~0.15 USD/m2/year)
▪ Electricity fee: as regulated by the Government
Operating fee
▪ Water fee: 12,000 VND/m3 (~0.54 USD/m2/year) for production activities; 15,000 VND/m3
(~0.67 USD/m3) for service activities; 5,000 VND/m3 (~0.22 USD/m3) for household
activities.

INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Many bank branches nearby

Tax service, State finance


5 km to the nearest Tax Department and State Treasury
office

Customs Service N/A

826
Logistics Around 5 km nearby the IZ

Post office 5 km to Post office of Dong Hoi city

Medicare 3 km to General Hospital of Dong Hoi city

Police, public security 5 km to Police station of Dong Hoi City

Universities, training ▪ 5 km to Quang Binh University


facilities, etc. ▪ 7 km to Quang Binh Vocational School.

Recruitment Available

Worker dormitory Invested by private enterprises

Worker's child education


2 km to the nearest preschool
facility

One-stop service 2 km to Quang Binh Public Administration Center

Road Width Completed construction with the width of 15-32 m

Communication
Infrastructure of Available
Industrial Zone
Emergency Power
Self-equipped
generator

Fire-fighting facility Self- equipped

Layout Plan

827
Location Map

LIST OF PROJECTS IN INDUSTRIAL ZONE

No Company Name Nationality Business line


1 VNECO12 Electricity Construction Joint Stock Vietnam Electric poles, centrifugal concrete...
Company
2 Truong Thinh Group Joint Stock Company Vietnam Wooden handicrafts
3 Viet Trung One Member Co., Ltd Vietnam Raw wood products, interior and
exterior wood
4 Quang Binh Book and School Equipment Joint Vietnam Semi-finished pine wood products,
Stock Company. sawn drying rods, school equipment
5 Tan Hoan Cau Joint Stock Company Vietnam Cables and electrical materials,
binchotan coal,…
6 Su Ly Manufacturing and Trading Co., Ltd Vietnam Gas cylinders
7 Quang Binh Petroleum Trading Joint Stock Vietnam Liquefied petroleum gas
Company
8 Ha Quang Garment Factory Joint Stock Vietnam Garment
Company.
9 Tien Phat Construction Consulting Co., Ltd Vietnam Commercial concrete
10 Quang Binh Printing Joint Stock Company Vietnam Carton box packaging
11 Dong Tam Quang Binh Industrial Joint Stock Vietnam Tunnel bricks
Company
12 Hoang Lam Co., Ltd Vietnam Wood materials
13 Su Ly Trading Co., Ltd Vietnam Liquefied petroleum gas
14 Truong Thanh Industrial and Import-Export Co., Vietnam Wood and plywood factory
Ltd
15 COSEVCO CHEMICAL AND RUBBER JOINT Vietnam Chemical and rubber
STOCK COMPANY
16 Dong Tam Joint Stock Company Vietnam Raw material warehouse
17 Nam Viet Quang Binh Co., Ltd Vietnam Plywood and formwork factory
18 Duc Dat Co., Ltd Vietnam Tempered glass
19 Minh Ha Construction Company Limited Vietnam Concrete structure
20 Duc Quan Trading and Production Co., Ltd Vietnam Export wood processing factory and
energy pellets.
21 Viet Phong No.1 Construction Joint Stock Vietnam Viet Phong commercial concrete
Company products
22 Ngoc Long Trading Service Co., Ltd Vietnam Canned agricultural products

828
NORTH DONG HOI INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

Address Bac Ly Ward, Dong Hoi city, Quang Binh province

Quang Binh Economic Zone Management Board


▪ Address: 17 Ly Thuong Kiet Street -Dong Hoi City - Quang Binh Province
Investor
▪ Tel: (84-232) 3 828 513 Fax: (84-232) 3 828 516
▪ Website: https://bqlkkt.quangbinh.gov.vn/3cms/
Mr. Duong Ngoc Anh- Officer of Planning and Construction Department-
Contact Person
Tel: (84) 984 806 001- Email: anhkktqb@gmail.com

▪ 3 km to Dong Hoi City


▪ 8 km to Dong Hoi Airport
Location
▪ 67 km to Hon La Port
▪ 3 km to Highway

Investment priorities Sectors No regulation


Investment Area
Investment Restricted Sectors No regulation

Minimum wage [Area 2] According to Decree No. 38/2022/ND-CP dated June 12, 2022

Lease term N./A

Minimum Lease Area No regulation

▪ Factory area: 2 floors


Limit for Construction
▪ Office area: 2floors
Height

Permitted Construction ▪ Factory area: >70%


Rate ▪ Office area: <70%
▪ Total area: 105 ha
Planned area ▪ Total vacant leasable area: 22 ha
▪ Total area with full infrastructure ready to build factory: 78 ha

Factory Available for Rent Currently, the IZ does not have factory available for rent

Operation Status ▪ In Active, with full infrastructure

Occupancy Rate and ▪ Occupancy Rate: 71.7%


Number of Projects ▪ Number of Project: 26
Number of Korean
None
Projects

Lease fee Land lease fee: 5,850 – 7,150 VND/m2/year (~0.25- 0.31 USD/m2/year)

▪ Management fee: None


▪ Infrastructure maintenance fee: 3,500 VND (~0.15 USD/m2/year)
▪ Electricity fee: as regulated by the Government
Operating fee
▪ Water fee: 12,000 VND/m3 (~0.54 USD/m3) for production activities; 15,000 VND /m3
(~0.67 USD/m3) for service activities; 5,000 VND/m3 (~0.22 USD/m3) for household
activities.

INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Many bank branches are located nearby the IZ

Tax service, State finance


5 km to the Tax Department and State Treasury of Dong Hoi City (Quang Binh)
office

829
3.8 km to Customs Department of Quang Binh
Customs Service
64 km to Hon La ICD

Logistics 64 km to Hon La ICD

Post office 3 km to post office of Dong Hoi city

Medicare 3 km to Dong Hoi General Hospital

Police, public security 6 km to Police station of Dong Hoi

Universities, training
4 km to No.9 Vocational School
facilities, etc.

Recruitment 4 km to Quang Binh Job Introduction Center

Worker dormitory 1 km to the Dorm

Worker's child education


1 km to nearby Preschool
facility

One-stop service 4 km to Quang Binh Public Administration

Road Width Road: 2-4 lane

Communication
Infrastructure of Available
Industrial Zone
Emergency Power
Self- equipped
generator

Fire-fighting facility N/A

Layout Plan and Location


Map

LIST OF PROJECTS IN INDUSTRIAL ZONE

No. Company Name Nationality Business line


1 Quang Binh Seed Joint Stock Company Vietnam NPK compound fertilizer plant
2 Son Hai Group Co., Ltd Vietnam Factory manufacturing building
components No. I
3 Hoa Binh Furniture Manufacturing Co., Ltd Vietnam Laminated timber and high-class
furniture
4 Tuan Viet General Trading Co., Ltd Vietnam Non-alcoholic beverages, mineral water
5 Truong Thanh Industrial Import-Export Company Vietnam Truong Thanh Industrial Wood
Limited.
6 Tan Chau Phat Transport Trading Co., Ltd Vietnam Thanh Chau agricultural products
7 Nguyen Anh II Joint Stock Company Vietnam Concrete commercial concrete
8 Dung Tin Co., Ltd Vietnam Steel Structure
9 Hoang Huy Toan Co., Ltd Vietnam concrete and hot asphalt concrete
products
10 COSEVCO Ceramics and Construction Joint Stock Vietnam Dinh river brick
Company

830
11 Kim Son Glass Joint Stock Company Vietnam Son Kim plywood
12 Thang Long Urban Development and Construction Vietnam Industrial plywood
Joint Stock Company
13 TaMiCo Agricultural Products Processing Joint Vietnam Tamico agricultural product processing
Stock Company
14 Hai Thuy Trading Company Limited. Vietnam Hai Thuy Industrial Plywood
15 Loc Dai Phat Construction and Trading Co., Ltd Vietnam Wood pellet
16 Aggregates and Concrete (Vietnam) Co., Ltd. Vietnam Commercial concrete
17 Thang Long Urban Development and Investment Vietnam Industrial plywood
Joint Stock Company
18 Hung Thinh Construction and Trading Joint Stock Vietnam Exporting veneer, peeled board
Company
19 Hung Thinh Construction and Trading Joint Stock Vietnam Film-coated plywood
Company
20 Hoang An Phat Trading Co., Ltd Vietnam Hoang An Phat Energy Tablet
21 Quang Binh General Trading and Transport Vietnam Industrial wood
Production Co., Ltd
22 Nghe An Industrial Gas Joint Stock Company Vietnam Quang Binh Oxygen
23 T&Z Development Investment Co., Ltd Vietnam Producing tablets, processing stone and
building materials
24 Tan Quang Phat Service and Trading Co., Ltd Vietnam Tan Quang Phat Forest Product
25 Duc Lam Service and Trading Co., Ltd Vietnam Handicrafts
26 Thang Giang Service Co., Ltd Vietnam Nhat Le alkaline ionized bottles

831
NORTH-WEST QUAN HAU INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

Quan Hau Town, Quang Ninh District, Quang Binh province


Address
Quang Binh Economic Zone Management Board
▪ Address: 17 Ly Thuong Kiet Street -Dong Hoi City - Quang Binh Province
Investor ▪ Tel: (84-232) 3 828 513 Fax: (84-232) 3 828 516
▪ Email: kkt@quangbinh.gov.vn
▪ Website: https://bqlkkt.quangbinh.gov.vn/3cms/
▪ Mr. Tran Thanh Chuong – Deputy Head of Investment Promotion Department, Quang Binh
Economic Zone Management Board
Mobile: (84) 913 295 494 Fax: (84-52) 3 828 516.
Contact Person
▪ Mr. Nguyen Viet Thanh – Head of Resource and Environment Department
Mobile: (84) 915 277 936 Fax: (84-52) 3 828 516.
Email: kkt@quangbinh.gov.vn

▪ 7 km to Dong Hoi City


▪ 15 km to Dong Hoi Airport
Location
▪ 79 km to Hon La Port
▪ 1 km to National Road 16

Zoned as a multi-industry industrial park with clean, advanced


and environmentally friendly technologies, including: textile,
Investment priorities garment, footwear manufacture; production of construction
Sectors materials, processing of agricultural, forestry and electrical
Investment Area products; manufacture and assembling of cars, motorcycles;
mechanicals
Investment Restricted
None
Sectors

Minimum wage [Area 3] According to Decree No. 38/2022/ND-CP dated June 12, 2022

Lease term ▪ 50 years

Minimum Lease Area No

Limit for Construction ▪ Office Area: 2 floors


Height ▪ Factory Area: 2 floors

Permitted Construction
>70%
Rate
▪ Total area: 220 ha
Planned area ▪ Total leasable area: 137 ha
▪ Total area with full infrastructure ready to build factory: 152 ha

Factory Available for Rent ▪ Currently, the IZ does not have factory available for rent

Operation Status ▪ In operation

Occupancy Rate and ▪ Occupancy rate: 9.35%


Number of Projects ▪ Number of project: 5
Number of Korean
None
Projects
▪ Land lease fee: 0.23 USD/m2/year
Lease fee
▪ Factory lease fee: N/A
▪ Infrastructure maintenance fee: 0.15/m2/year
▪ Electricity fee: as regulated by the Government
Operating fee
▪ Water fee: 12,000 VND (~0.54 USD)/m3 for production activities; 15,000 VND (~0.67
USD)/m3 for service activities.

832
INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Many bank branches nearby

Tax service, State finance


office 2 km to Tax Department and State Treasury of Quang Ninh District

7 km to the nearest Customs Office


Customs Service
ICD is located in the Customs Office

Logistics 7 km to the nearest Customs Office that have ICD

Post office 2 km to the nearest Post Office

Medicare 2 km to General Hospital of Quang Ninh district

Police, public security 2km the nearest Police station

Universities, training
9 km to No.9 Vocational School
facilities, etc.

Recruitment N/A

Worker dormitory None

Worker's child education


3 km around the IZ
facility

One-stop service 9 km to Quang Binh Public Administration Center

Road Width Road with 2-4 lanes

Communication
Infrastructure of Available
Industrial Zone
Emergency Power
Self-equipped
generator

Fire-fighting Facility Available

Layout Plan

Location map

833
Actual View

LIST OF PROJECTS IN INDUSTRIAL ZONE

No. Company Name Nationality Business line


1 Branch of Song Chanh Brick Joint Vietnam Tuynel Brick production
Stock Company
2 Truong Minh General Co., Ltd Vietnam Binchotan coal production
3 S&D Quang Binh Co., Ltd Vietnam Garment
4 S&D Quang Binh Co., Ltd Vietnam Garment Factory Expansion
5 The Hoa Co., Ltd Vietnam Wood processing factory, producing high-class
office furniture and handicraft products

834
CAM LIEN INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

Thanh Thuy and Ngu Thuy Bac Commune, Le Thuy District, Quang Binh province
Address
Quang Binh Economic Zone Management Board
▪ Address: 17 Ly Thuong Kiet Street - Dong Hoi City - Quang Binh Province
Investor
▪ Tel: (84-232) 3 828 513 Fax: (84-232) 3 828 516
▪ Website: https://bqlkkt.quangbinh.gov.vn/3cms/
Mr. Duong Ngoc Anh- Officer of Planning and Construction Department-
Contact Person
Tel: (84) 984 806 001- Email: anhkktqb@gmail.com

▪ 45 km to Dong Hoi City


▪ 50 km to Dong Hoi Airport
Location
▪ 100 km to Hon La Port
▪ 50 km to Dong Hoi Railway station

Investment priorities Sectors No regulation


Investment Area
Investment Restricted Sectors No regulation

Minimum wage [Area 3] According to Decree No. 38/2022/ND-CP dated June 12, 2022

▪ Start Date: 2019


Lease term ▪ End date: 2069
(Term: 50 years)

Minimum Lease Area No regulation

Limit for Construction ▪ Factory area: 1-2 floors


Height ▪ Office area: no more than 3 floors
Permitted Construction ▪ Factory area: 30-60%
Rate ▪ Office area: 30-60%
▪ Total area: 450 ha
Planned area ▪ Total vacant leasable area: 156 ha
▪ Total area with full infrastructure ready to build factory: 183 ha

Factory Available for Rent Currently, the IZ does not have factory available for rent

Operation Status ▪ In operation

Occupancy Rate and ▪ Occupancy Rate: 15.09%


Number of Projects ▪ Number of Projects: 10
Number of Korean
None
Projects

Lease fee ▪ Land lease fee: 4,500 VND/m2/year (~0.19 USD/m2/year)

▪ Management fee: None


▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee ▪ Water fee: 12,000 VND/m3 (~0.54 USD/m3) for production activities; 15,000 VND/m3
(~0.67 USD/m3) for service activities; 5,000/m3 VND (~0.22 USD/m3) for household
activities

INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Branches of Agribank, Vietinbank, LienvietPostbank located nearby.

Tax service, State finance


5.5 km to Tax Department and State Treasury of Le Thuy District
office

Customs Service 35 km to km to Customs Department of Quang Binh province

835
Logistics 5 km to service providers

Post office 5.5 km to Post Office of Le Thuy District

Medicare 5 km to Le Thuy General Hospital

Police, public security 5 km to Police station of Le Thuy district

Universities, training ▪ 45 km to No.9 Vocational school


facilities, etc. ▪ 50km to Quang Binh university

Recruitment 36 km to Quang Binh Job Introduction center

Worker dormitory Not available

Worker's child education


No available
facility

One-stop service 33.5 km to Quang Binh Public Administration center

Road Width Road by passing National Road 1A: 15m wide

Communication
Infrastructure of Available
Industrial Zone
Emergency Power
Self- equipped
generator

Fire-fighting facility Self- equipped

Layout Plan

Location Map

LIST OF PROJECTS IN INDUSTRIAL ZONE

No. Company name Nationality Business line


1 Vietnam National Textile and Vietnam Garment and textile products
Garment Group
2 Nguyen Anh I Construction Vietnam Building materials manufacture
Materials Trading JSC.
3 VHC Investment and Vietnam Garment
Development JSC
4 Chau Thanh Mineral Co., Ltd Vietnam Mining and processing plastic products, metal
products, trading of construction materials and
equipment,…
5 Hoan Nguyen Investment Vietnam Calcium carbide and industrial gas products
Development JSC

836
6 Tien Dat Construction And Vietnam Concrete and concrete structure
Investment Joint Stock Company
7 Branch of Hoang Van General Vietnam Building materials manufacture
Construction Trading Co., Ltd
8 Liquefied Central Company Vietnam Quang Binh LPG filling station
Limited - Quang Binh Branch
9 Song Giang General Construction Vietnam Producing unburnt bricks and oxygen
Co., Ltd
10 Bao Ninh Construction and Vietnam Concrete and concrete structure
Trading Co., Ltd

837
BANG INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

Phu Thuy Commune, Le Thuy District, Quang Binh Province


Address
Quang Binh Economic Zone Management Board
▪ Address: 17 Ly Thuong Kiet Street -Dong Hoi City - Quang Binh Province
Investor ▪ Tel: (84-232) 3 828 513 Fax: (84-232) 3 828 516
▪ Email: kkt@quangbinh.gov.vn
▪ Website: https://bqlkkt.quangbinh.gov.vn/3cms/
▪ Mr. Tran Thanh Chuong – Deputy Head of Investment Promotion Department, Quang Binh
Economic Zone Management Board
Mobile: (84) 913 295 494 Fax: (84-52) 3 828 516.
Contact Person
▪ Mr. Nguyen Viet Thanh – Head of Resource and Environment Department
Mobile: (84) 915 277 936 Fax: (84-52) 3 828 516.
Email: kkt@quangbinh.gov.vn

▪ 44 km to Dong Hoi City


▪ 49 km to Dong Hoi Airport
Location
▪ 105 km to Hon La Port
▪ 2 km to National Road 16

Zoned as a multi-industry industrial park with Forest


paper production, leather shoe production, garment,
Investment priorities mechanical assembly industry, electromechanical assembly
Sectors industry, civil industry, production of building materials,
Investment Area plastic and glass industry, pharmaceuticals, medicinal herbs,
cosmetics, food industry.
Investment Restricted
None
Sectors

Minimum wage [Area 3] According to Decree No. 38/2022/ND-CP dated June 12, 2022

Lease term ▪End year: 2071

Minimum Lease Area No

Limit for Construction


N/A
Height

Permitted Construction
<70%
Rate
▪ Total area: 450 ha
Planned area ▪ Total leasable area: 4.2 ha
▪ Total area with full infrastructure ready to build factory: 98.66 ha

Factory Available for Rent ▪ Currently, the IZ does not have factory available for rent

Operation Status ▪ Under Construction, Licensed

Occupancy Rate and ▪ Occupancy rate: 8.81%


Number of Projects ▪ Number of project: 2
Number of Korean
None
Projects
▪ Land lease fee: 0.28 USD/m2/year
Lease fee
▪ Factory lease fee: N/A
▪ Infrastructure maintenance fee: 0.15/m2/year
▪ Electricity fee: as regulated by the Government
Operating fee
▪ Water fee: 12,000 VND (~0.54 USD)/m3 for production activities; 15,000 VND (~0.67
USD)/m3 for service activities.

838
INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Branches of BIDV, Vietcombank, Techcombank, Sacombank...

Tax service, State finance


office 6 km to Tax Department of Le Thuy District

Customs Service N/A

Logistics 46.8 km to the nearest Customs Office that have ICD

Post office 7.6 km to the nearest Post Office

Medicare 7.4 km to General Hospital of Le Thuy district

Police, public security 7.9 km the nearest Police station

Universities, training
The district has a comprehensive education system.
facilities, etc.

Recruitment N/A

Worker dormitory None

Worker's child education


N/A
facility

One-stop service 42 km to Quang Binh Public Administration Center

Road Width Road with 2-4 lanes

Communication
Infrastructure of Available
Industrial Zone
Emergency Power
Self-equipped
generator

Fire-fighting Facility Self-equipped

Layout Plan

839
Location map

LIST OF PROJECTS IN INDUSTRIAL ZONE

No. Company name Nationality Business line


1 HOANG LINH CO., LTD Vietnam Paper pulp and kraft paper
2 VINAFOR GREEN ENERGY JOINT STOCK Vietnam Production of wood pellets
COMPANY

840
HON LA PORT INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

Quang Dong Commune, Quang Trach District, Quang Binh province


Address
Quang Binh Economic Zone Management Board
▪ Address: 17 Ly Thuong Kiet Street -Dong Hoi City - Quang Binh Province
Investor
▪ Tel: (84-232) 3 828 513 Fax: (84-232) 3 828 516
▪ Website: https://bqlkkt.quangbinh.gov.vn/3cms/
Mr. Duong Ngoc Anh- Officer of Planning and Construction Department-
Contact Person
Tel: (84) 984 806 001- Email: anhkktqb@gmail.com

▪ 63 km to Dong Hoi City


▪ 58 km to Dong Hoi Airport
Location
▪ 1 km to Hon La Port
▪ 1 km to National Road

Refining Fero mangan; processing of agricultural, forestry and


Investment priorities
aquatic products; mechanical industry; Production of building
Sectors
Investment Area materials; building and repairing vessels; Warehouse services
Investment Restricted
No regulation
Sectors

Minimum wage [Area 3] According to Decree No. 38/2022/ND-CP dated June 12, 2022

Lease term 50 years

Minimum Lease Area No regulation

Limit for Construction ▪ Factory area: 20 m


Height ▪ Office area: 20 m
Permitted Construction ▪ Factory area: <60%
Rate ▪ Office area:<60%
▪ Total area: 168 ha
Planned area ▪ Total vacant leasable area: 122 ha
▪ Total area with full infrastructure ready to build factory:89 ha
Factory Available for
Currently, the IZ does not have factory available for rent
Rent

Operation Status ▪ In operation

Occupancy Rate and ▪ Occupancy Rate: 99.73%


Number of Projects ▪ Number of Projects: 23
Number of Korean
1
Projects

Lease fee ▪ Land lease fee: 0.21 USD/m2/year

▪ Management fee: None


▪ Infrastructure maintenance fee: 3,500 VND (~0.15 USD)/m2/year
Operating fee ▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 12,500 VND (~0.54 USD)/m3 for production activities; 15,000 VND (~0.67
USD)/m3 for service activities.

INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Many bank branches are located nearby

Tax service, State finance


1 km to the nearest Tax Department and State Treasury
office

841
Customs Service 1 km to Customs Office of Hon La Port Border Gate

Logistics Located in the Customs Office of Hon La Port Border Gate

Post office 1 km to Post Office of Quang Dong commune

Medicare 27 km to North Quang Binh General Hospital

Police, public security 1 km to Police station of Quang Dong commune

Universities, training
63 km to No.9 Vocational School
facilities, etc.

Recruitment N/A

Worker dormitory Not available

Worker's child education


1 km to the nearest preschool
facility

One-stop service 1 km

Road Width Main road: 24 m wide

Communication
Infrastructure of Available
Industrial Zone
Emergency Power
Self- equipped
generator

Fire-fighting facility N/A

TR¹ M 535

Mò I § é C
® i H À N? I

Nó I HË U

hÇ m ® Ì o ngang 4
® i HÀ N? I

cn1
Hå § å NG M¦ ê I

cn2

Hß N Cá

S= 8.7 ha
Nó I § ¤ NG BANG Mò I ¤ NG

n1

c1

® å i hä c chï a

C¶ NG Hß N LA
XÃ QU?NG Ð Ô NG
cn3

Layout Plan c2
n2
1

Nó I Só

dl1 Mò I Rå NG

XÃ QU?NG PHÚ dl2

n3a

BI?N Ð Ô NG
I
N?

Hß N Vò NG CHï A
®i

cn4

n3b

S= 5 ha

c3

n4
cn5

842
Location Map

Actual View

843
LIST OF PROJECTS IN INDUSTRIAL ZONE

No. Company name Nationality Business line


1 Quang Dong Forest Products Production Vietnam Producing paper chips for export
and Export Joint Stock Company
2 Hao Hung Quang Binh Co., Ltd. Vietnam Processing, trading agricultural products, raw
materials, paper materials for export and
domestic consumption
3 Phan Vu Quang Binh Concrete Co., Ltd Vietnam Producing cast concrete structures, concrete
structural products
4 Tuong Hung Construction and Trading Co., Vietnam Manufacturing medium and low voltage electrical
Ltd cabinets, producing high quality hot and cold
asphalt concrete, producing epoxy-Sika paint,
mechanical production
5 Bao Dat Thanh Trading Joint Stock Vietnam Paper material processing
Company
6 Truong Hong Steel Structure One Member Vietnam Processing corrugated iron and steel purlins,
Co., Ltd manufacturing equipment for inspection of
welded metal structures, pressure tanks
7 Lam Hoan Quan Quang Binh Co., Ltd Vietnam Producing wood-based products
8 Hoang Long Mineral Joint Stock Company Vietnam Titanium concentrate, ultrafine zircon, artificial
rutile and red iron oxide powder
9 Dinh Phong Construction Co., Ltd Vietnam Processing steel and corrugated iron structures,
supplying and installing equipment for inspection
of welded metal structures
10 Hon La Water Supply and Drainage Joint Vietnam Supplying industrial and domestic water to
Stock Company factories, ports, service areas, tourist areas... and
urban areas in Hon La Economic Zone
11 CAT VINH HUNG GENERAL LIMITED Vietnam Firewood, mechanical processing, galvanized
LIABILITY COMPANY iron and steel
12 Le Minh Furniture Production Co., Ltd Vietnam Producing laminated timber and producing
wooden furniture
13 Dohwa Green Energy Co., Ltd. (Korea) Korea Producing wood pellets, capacity 50,000
tons/year
14 Kim Thach Anh Construction and Trading Vietnam Production, processing and trade of minerals and
Joint Stock Company supplies
15 DKC Hon La Investment Joint Stock Vietnam Petroleum depot has a capacity of 4,800 m3,
Company including 4 storage tanks with a capacity of 1,200
m3.
16 Phuoc Thinh Trading Co., Ltd Vietnam Buying, selling and processing all kinds of
seafood.
17 Minh Loan Trading & Development Co., Vietnam Processing, packing and cooling seafood
Ltd
Production of aquatic feed
18 Quang Dong Market Investment and Vietnam Building a second-class market according to
Development Cooperative national standards, including: 1-storey traditional
market house, 2-storey commercial kiosks, 03
floors, outdoor business area
19 New Mekong Development Investment Vietnam Producing all kinds of metal structures
Joint Stock Company
20 Anh Thu General Trading Construction Vietnam Producing and processing all kinds of steel
Co., Ltd structures with steel structure production lines
and metal processing
21 The project to build a bonded warehouse Vietnam-Lao Constructing bonded warehouse and oil pipeline
and an oil pipeline system to Laos by Lao system to Laos
Petro with a total investment of 400 million
USD

22 Hon La Fish Meal Production Co., Ltd Vietnam Building a fishmeal factory of 3,000 tons/year.
23 Le Dung Linh Co., Ltd Vietnam Growing clean, high-tech vegetables

844
HON LA II INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

Quang Phu commune, Quang Trach district, Quang Binh province


Address
Quang Binh Economic Zone Management Board
▪ Address: 17 Ly Thuong Kiet Street -Dong Hoi City - Quang Binh Province
Investor
▪ Tel: (84-232) 3 828 513 Fax: (84-232) 3 828 516
▪ Website: https://bqlkkt.quangbinh.gov.vn/3cms/
Mr. Duong Ngoc Anh- Officer of Planning and Construction Department-
Contact Person
Tel: (84) 984 806 001- Email: anhkktqb@gmail.com

▪ 64 km to Dong Hoi City


▪ 58 km to Dong Hoi Airport
Location
▪ 1 km to Hon La Port
▪ 1 km to National Road 1A

Multi-sector industrial park with major industries such as


metallurgy, electronics, mechanics, manufacturing and
Investment priorities
assembling cars and motorcycles; manufacturing building
Sectors
Investment Area materials, industry of wood and wood products, processing
agricultural products...
Investment Restricted
No regulation
Sectors

Minimum wage [Area 3] According to Decree No. 38/2022/ND-CP dated June 12, 2022

Lease term 50 years

Minimum Lease Area No regulation

Limit for Construction ▪ Factory area: 20 m


Height ▪ Office area: 20 m
Permitted Construction ▪ Factory area: <60%
Rate ▪ Office area:<60%
▪ Total area: 117.1 ha
Planned area ▪ Total vacant leasable area: 116.4 ha
▪ Total area with full infrastructure ready to build factory: 13.88 ha
Factory Available for
Currently, the IZ does not have factory available for rent
Rent

Operation Status ▪ In operation

Occupancy Rate and ▪ Occupancy Rate: 11.9%


Number of Projects ▪ Number of Projects: 2
Number of Korean
0
Projects

Lease fee ▪ Land lease fee: 0.21 USD/m2/year

▪ Management fee: None


▪ Infrastructure maintenance fee: 3,500 VND (~0.15 USD)/m2/year
Operating fee ▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 12,500 VND (~0.54 USD)/m3 for production activities; 15,000 VND (~0.67
USD)/m3 for service activities.

INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Many bank branches are located nearby

845
Tax service, State finance
1 km to the nearest Tax Department and State Treasury
office

Customs Service 1 km to Customs Office of Hon La Port Border Gate

Logistics Located in the Customs Office of Hon La Port Border Gate

Post office 1 km to Post Office of Quang Dong commune

Medicare 27 km to North Quang Binh General Hospital

Police, public security 1 km to Police station of Quang Dong commune

Universities, training
63 km to No.9 Vocational School
facilities, etc.

Recruitment N/A

Worker dormitory Not available

Worker's child education


1 km to the nearest preschool
facility

One-stop service 1 km

Road Width Main road: 24 m wide

Communication
Infrastructure of Available
Industrial Zone
Emergency Power
Self- equipped
generator

Fire-fighting facility N/A

Layout Plan

846
Location Map

Actual View

LIST OF PROJECTS IN INDUSTRIAL ZONE

No. Company name Nationality Business line


1 Minh Son Joint Stock Company Vietnam Tuynel brick
2 Thanh Thanh Dat Co., Ltd Vietnam Wood processing factory for export raw materials
3 Cat Phu Co., Ltd Vietnam Factory producing flooring and processing wood
chips for export
4 Phat Loi Co., Ltd Vietnam Carton paper packaging factory
5 Thanh Hue Co., Ltd Vietnam Mechanical enterprise and repair of vehicle and
construction machinery equipment

847
WESTERN GATE INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

Quang Hung commune, Quang Trach district, Quang Binh province


Address
Quang Binh Economic Zone Management Board
▪ Address: 17 Ly Thuong Kiet Street -Dong Hoi City - Quang Binh Province
Investor
▪ Tel: (84-232) 3 828 513 Fax: (84-232) 3 828 516
▪ Website: https://bqlkkt.quangbinh.gov.vn/3cms/
Mr. Duong Ngoc Anh- Officer of Planning and Construction Department-
Contact Person
Tel: (84) 984 806 001- Email: anhkktqb@gmail.com

▪ 60 km to Dong Hoi City


▪ 55 km to Dong Hoi Airport
Location
▪ 14 km to Hon La Port
▪ 2 km to National Road 1A

Production of consumer goods


Investment priorities
Electricity, electronics, refrigeration
Sectors
Investment Area Processing agricultural, forestry and aquatic products
Investment Restricted
No regulation
Sectors

Minimum wage [Area 3] According to Decree No. 38/2022/ND-CP dated June 12, 2022

Lease term 50 years

Minimum Lease Area No regulation

Limit for Construction ▪ Factory area: 20 m


Height ▪ Office area: 20 m
Permitted Construction ▪ Factory area: <60%
Rate ▪ Office area:<60%
▪ Total area: 118 ha
Planned area ▪ Total vacant leasable area: 72.6 ha
▪ Total area with full infrastructure ready to build factory: 1 ha

Factory Available for Rent Currently, the IZ does not have factory available for rent

Operation Status Under Construction, Licensed

Occupancy Rate and ▪ Occupancy Rate: 1.37 %


Number of Projects ▪ Number of Projects: 1

Number of Korean Projects 0

Lease fee ▪ Land lease fee: 0.21 USD/m2/year

▪ Management fee: None


▪ Infrastructure maintenance fee: 3,500 VND (~0.15 USD)/m2/year
Operating fee ▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 12,500 VND (~0.54 USD)/m3 for production activities; 15,000 VND (~0.67
USD)/m3 for service activities.

INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Many bank branches are located nearby

Tax service, State finance


2 km to the nearest Tax Department and State Treasury
office

Customs Service 1 km to Customs Office of Hon La Port Border Gate

848
Logistics Located in the Customs Office of Hon La Port Border Gate

Post office 2 km to Post Office of Quang Dong commune

Medicare 27 km to North Quang Binh General Hospital

Police, public security 1 km to Police station of Quang Dong commune

Universities, training
63 km to No.9 Vocational School
facilities, etc.

Recruitment N/A

Worker dormitory Not available

Worker's child education


1 km to the nearest preschool
facility

One-stop service 1 km

Road Width Main road: 21 m wide

Communication
Infrastructure of Industrial Available
Zone
Emergency Power
Self- equipped
generator

Fire-fighting facility N/A

Location Map

LIST OF PROJECT IN INDUSTRIAL ZONE

No Company Name Nationality Business line


1 Quang Phu Salt Cooperative Vietnam Exploiting, producing, processing
and trading salt products.

849
[- This Page is intentionally left blank -]

850
QUANG NAM

851
INVESTMENT ENVIRONMENT QUANG NAM

GENERAL INFORMATION

▪ Area: 10.438 km2


Area, Population
▪ Population: 1,519 million (2022 statistic)

▪ Quang Nam is a province in the central coast of Viet Nam


Geographical Location ▪ Quang Nam is located 820 km from Ha Noi capital to the north and it's located 900 km
from Ho Chi Minh City to the south.

▪ It's adjacent to Thua Thien - Hue Province and Da Nang City to the north

▪ It’s adjacent to Quang Ngai Province and Kon Tum Province to the south
Adjacent provinces
▪ It's adjacent to Lao People's Democratic Republic and Kon Tum Province to the west.

▪ It's adjacent to East Sea to the east

2022 statistic:

▪ GRDP: 116 thousand billion VND 4,94 billion USD

▪ GRDP: 11,2 %

▪ GRDP per capita: 76,7 million VND/year

GRDP ▪ Economic structure:

- Industry – Construction: 35 %;

- Argiculture, forestry, aquaculture: 13,3 %;

- Service: 31,7 %;

- Tax on products deducted allawance of products: 20 %

2022 statistic:

▪ Industry – Construction growth: 16,5 %


Industry growth
▪ Argiculture, forestry, aquaculture growth: 2,6 %

▪ Service growth: 7 %

PCI ▪ PCI score: 66,62 – ranked 22 out of 63 cities and provinces in Viet Nam (2022)

SOCIAL INFRASTRUCTURE

▪ Roadway: North - South route: 1A highway, Da Nang – Quang Ngai expressway,


coastal road Hoi An – Chu Lai. East - West route:14B highway,14E highway, 40B
highway, ĐT.617 highway.
Transportation ▪ Railway: North - South railway.

▪ Waterway: Quang Nam has 02 seaport: Ky Ha seaport and Tam Hiep seaport

 ▪ Other: The Chu Lai airport

852
Quang Nam Province have 313 km power lines 110 kV with 13 substations 110kV,
Electricity 464 km power lines 35 kV; 3.270 km power lines 22kV with 3.130 substations and
5.131 km low voltage lines; the percentage of household with electricity is 99,27 %.

There are 17 water supply systems in the urban area in the province. The total wattage
of water factories operating in the province is 212.700 m3/day/night

Water The coverage of the water supply network: Tam Ky, Hoi An, Dien Ban, Nui Thanh have
a large coverage of the water supply network (95%-98%)

.The other districts have a lower coverage of the water supply network (50%-60%)

Quang Nam Province have 287 preschoools, 233 primary schools, 183 secondary
Education schools, 58 high schools, 09 universities and colleges, 04 junior colleges, 17 center and
vocational schools (2021 statistic).

▪ Quang Nam Province have 287 health facilities including 37 hospitals, 09 regional
Medicare
polyclinics and 241commune, agency, enterprises clinics (2021 statistic).

INVESTMENT CONDITION

▪ 55,1% of population are in the working age (2022)


Human resource - The human resource is planned to be 170 thousand people in 2025, 200 thousand
people in 2035

Education level ▪ Trained labor rate: 69% (2022)

▪ Dien Ban town, the districts such as Dai Loc, Duy Xuyen, Nui Thanh, Que Son, Phu
Ninh, Thang Binh (area III): Minimum wage is 3.430.000 VND/month

- The districts such as Bac Tra My, Nam Tra My, Phuoc Son, Tien Phuoc, Nong Son,
Salary
Hiep Duc, Dong Giang, Nam Giang, Tay Giang (area IV): Minimum wage is 3.040.000
VND/month

▪ Incentives according to government regulations in Decree 31/2021/ND-CP on March


26th, 2021. The detail of incentives for every project according to the regulation of law
on tax, export, import, lands, credit:

- Tax incentives according to Decree 218/2013/ND-CP, Decree 91/2014/ND-CP,


Decree 12/2015/ND-CP, Decree 134/2016/ND-CP, Decree 18/2021/ND-CP by
Government, Decree 29/2021/ND-TTg by Prime Ministe

- Land incentives according to Decree 46/2014/ND/CP and Decree 135/2016/ND-CP


by Government

Investment incentives - Credit incentives according to Decree 32/2017/ND/CP by Government

▪ Incentives from the province:

- Incentive investment in agriculture, country in the province according to Resolution


45/2018/ND-HDND on December 6th, 2018 by Provincial People's Council and
Decision 522/QD-UBND on February 25th, 2021 by Provincial People's Commettee

- Incentive investment in clean water supply works in the province stage 2021 - 2025
according to Resolution 30/2021/NQ-HDND on September 26th, 2021 by Provincial
People's Council and Decision 2969/QD-UBND on October 20th, 2021 by Provincial
People's Commettee.

853
- Incentive investment in support to solid waste treatment in the province stage 2020 -
2030 according to Resolution 01/2020/ND-HDND on April 21th, 2020 by Provincial
People's Council, Resolution 1331/QD-UBND on May 20th, 2020 by Provincial
People's Commettee and Document 42/VP-TH on April 29th, 2020 by Office
Provincial People's Commettee

- Incentive to promote socialization of investment in somes fields in the province stage


2022 - 2025 according to Resolution 06/2022/NQ-HDND on January 12th, 2022 by
Provincial People's Council and Decision 1222/QD-UBND on May 6th, 2022 by
Provincial People's Commettee

▪ Some fields prioritized attracting investment:

- Prioritized the development of aviation industries, automotive industries, supporting


industries in the direction ecological industry zone, environmental protection.

- Prioritized the development of digital economic, developed on the basis of 4.0


technology such as ICT industry, digital, nano-technology, biological industry, new
materials, pharmaceuticals products, biology, agriculture application of high
Fields Attracting Investment technology, environmental technology, clean energy...;
- Prioritized the development of tourism, medical, healthcare, vocational training and
logistics industries, formed non-tariff zones, and exchange international.
- Prioritized the development of tourism oriented " green tourism"
- Prioritized the development of projets investment in develop realty, urban, large
scaled houses.
- Prioritized attracting, developing medicinal herbs into a key economic sector of
Quang Nam Province.

Map

Department of Planning and Investment

▪ Address: 02 Tran Phu street, Tam Ky City, Quang Nam, Viet Nam

▪ Contact person: Mrs. Truong Thi Yen Ngoc


Contact
▪ Mobile phone : 0983.039.929

▪ Room of investment promotion

▪ Tel : 0235.3.822.887

854
855
LIST OF INDUSTRIAL ZONES IN QUANG NAM PROVINCE

No Industrial zone Name Total Area (ha) Occupancy Rate Status


1 Chu Lai – Truong Hai Automobile – 243ha 73.9% In Operation
Mechanical Industrial Zone
2 Dien Nam – Dien Ngoc Industrial 375ha 85% In Operation
Zone
3 Tam Thang Industrial Zone 197ha 72.4% In operation
4 Bac Chu Lai Industrial Zone 361ha 60.0% In Operation
5 Chu Lai – Truong Hai Port Logistics 142ha 38.3% In Operation
Industrial Zone
6 Tam Hiep Port Logistics Industrial 417ha 62.3% In Operation
Zone
7 Dong Que Son Industrial Zone 211ha 23.0% In Operation
8 Thuan Yen Industrial Zone 148ha 35.9% In Operation
9 Tam Thang 2 Industrial Zone 103ha 12.1% In Operation
10 Tam Anh - Korea Industrial Zone 193ha 5.3% In Operation

QUANG NAM’S LOCATION MAP OF INDUSTRIAL ZONES

856
DONG QUE SON INDUSTRIAL ZONE

GENERAL INFORMATION
East Que Son Industrial Zone, 1A National Road, Huong An Commune, Que Son District,
Address Quang Nam province
Investor An Thinh Quang Nam JSC
▪ Add: East Que Son Industrial Zone, Huong An Commune, Que Son District, Quang Nam
Province
▪ Tel: (84-235) 3 886 999 ▪ Fax: (84-235) 3 886 999
▪ Website: http://ppcvietnam.com/
Contact Person Ms Michielin Nguyen- (84) 868 975 999 - dhuongnguyen@hotmail.com
Location ▪ 35 km from the center of Da Nang city
▪ 32 km from Da Nang International Airport
▪ 45 km from Tien Sa International Seaport
▪ 1A National Road across the IZ
Investment Area Priority Sectors for ▪ Manufacture and assembly of electric, electronic product,
Investment mechanical, textile, dyeing and yarning, …
▪ Production of construction materials, agriculture and forest
products, consumer goods, animal feeding,
Restricted Sectors for Polluted Sector
Investment
Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term ▪ Start date:
▪ End date: 2064
Minimum Lease Area 1 ha
Limit for Construction No limitation
Height
Permitted Construction Depending in height (from 30 – 55%)
Rate
Planned area ▪ Total area: 456.2 ha
- Phase 1: 211 ha
- Phase 2: 61.2 ha
- Phase 3: 184 ha
▪ Total Industrial Land area: 126 ha (Phase 1)
Factory Available for Rent ▪ Currently, the IZ does not have factory available for rent
Operation Status ▪ In operation
Occupancy Rate and ▪ Occupancy Rate: 23%
Number of Projects ▪ Number of Project: 14
Number of Korean None
Projects
Lease fee ▪ Infrastructure lease fee: 33 - 45 USD/ m2/ 46 years
Operating fee ▪ Management fee: 0.2 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 0.45 USD/m3
▪ Wastewater treatment fee: 0.48-0.58 USD/m3
▪ Waste treatment fee: N/A
INFRASTRUCTURE AND FACILITY
Financial institution Many banks are 4-8 km far from the IZ
Tax service, State finance 20 km to the IZ
office
Customs Service 20 km to the IZ
Logistics Warehouse available in the IZ; various means of delivery
Post office 1 km to the IZ
Medicare 4 km to the nearest hospital
Police, public security 1 lm to the IZ
Universities, training A vocational school to be 1 km far from the IZ
facilities, etc.
Recruitment There is a a wide range of labor force, as the population of Quang Nam reaches 1 million and
Da Nang reaches 1.5 million
Worker dormitory In Planning

857
Worker's child education NA
facility
One-stop service NA
Road Width Two-lane road, 17m wide each lane
IT & Tele-communication Telecommunication: broadcast station is within the IZ, high speed internet service available
Facilities
Emergency Power Self-equipped
generator
Fire-fighting facility Available, stationed along the main route of the IZ
Layout Plan

Location Map

Actual View

858
859
LIST OF TENANTS

No. Company name Nationality Business line


1 Golden Hatcher Wood Factory Taiwan Furniture production
2 Germton Export Garment Factory Hong Kong Children’s garment
3 Germton Children Toy Factory Hong Kong Children’s toy and accessories
4 Quang Nam Stone Factory Vietnam Stone and tile
5 Cat Laundry Factory Vietnam Laundry and industrial cleaning
6 Bien Dong Factory Vietnam Drinking water
7 Hoang Vu Brick Factory China Production of Ceramic Tiles
8 Dai Phu Concrete Factory Vietnam Concrete production
9 An Vietnam- Japan Factory Vietnam - Japan Concrete tube production
10 Dong Son Factory Vietnam Mechanical
11 Binh An Factory Vietnam Plastic tube production
12 Cuong Tuan Factory Vietnam, Wood processing
13 Cuong Phat Factory Vietnam Steel manufacture
14 Thanh Thanh Vietnam Steel manufacture

860
TAM HIEP PORT INDUSTRIAL AND LOGISTIC PARK INDUSTRIAL ZONE

GENERAL INFORMATION
Tam Hiep Commune, Nui Thanh District, Quang Nam Province
Address
Investor Truong Hai Auto Corporation
▪ Address: THACO Office, Commerce and Service Tower (floors 16, 17, 18), No. 10, Mai
Chi Tho Street, An Loi Dong Ward, District 2, Ho Chi Minh City
▪ Tel: (84-235) 356 5325/ (84-235) 356 7666
▪ Fax: (84-235) 356 5324
▪ Website: http://www.truonghaiauto.com.vn
Contact Person ▪ Mr Dinh Van Bao- (84) 912 547 779- Mail: baodvqnam@gmail.com
Location ▪ Adjacent to National Road 1A and North- South railway system
▪ 80 km from Da Nang International Airport and 07 km from Chu Lai Airport
▪ Next to Chu Lai seaport; 05 km from Ky Ha Port by waterways and 15 km from Ky Ha Port
by road
▪ 04 km from Nui Thanh railway station; 22 km from Tam Ky railway station.
Investment Area Priority Sectors for Automobile industry and supporting industry for automobile; high-
Investment tech industry, telecommunications, textile and garment industry,
wood processing, paper production, pharmaceutical and chemical
production., production of construction materials, food and
beverage production, plastic productions. Maritime logistic
services, air service,...
Restricted Sectors for Restrict Industries affecting the environment.
Investment
Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term 70 years
Minimum Lease Area 1 ha
Limit for Construction In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Height Residential Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction 60-70%
Rate
Planned area ▪ Total area: 417 ha
▪ Vacant leasable area: 140 ha
Factory Available for Rent ▪ Currently, the IZ does not have factory available for rent
Operation Status In Operation
Occupancy Rate and ▪ Occupancy Rate: 62.3%
Number of Projects ▪ Number of Projects: above 18
Number of Korean N/A
Projects
Lease fee ▪ Land lease fee: 25-30 USD/m2/ 50 years
▪ Port land lease fee: 35-40 USD/m2/year
▪ Payment: to be negotiated with IZ investor
Operating fee ▪ Infrastructure maintenance fee and Management fee: 0.15 USD/m2/year
▪ Electricity fee:
- Ordinary time: 0.06USD/kWh
- Low time: 0.04USD/kWh
- High time: 0.11USD
▪ Water fee: 0.41USD/m3
▪ Wastewater treatment fee:
- From level B to level A: 0.32 USD/m3
- From over level B to level A: 0.38 USD/m3
▪ Waste treatment fee:
- From level B to level A: 0.32 USD/m3
- From over level B rto level A: 0.38 USD/m3
INFRASTRUCTURE AND FACILITY
Financial institution 1 km to bank branch of Agribank, which sufficiently supply for the needs of the IZ
Tax service, State finance Nui Thanh District’ Tax department and State Treasury is located in Chu Lai OEZ
office
Customs Service ▪ There is an On- site Customs Office insides Chu Lai OEZ
Logistics Sea transport via Chu Lai Truong Hai Port

861
Post office Nui Thanh Post Office is located in Chu Lai OEZ
Medicare The Central General Hospital within Chu Lai OEZ has 500 beds, sufficiently support the IZ’s
demand
Police, public security Located within the North Chu Lai IZ
Universities, training 2 universities, 10 vocational colleges and over 40 campuses in Quang Nam
facilities, etc.
Recruitment Quang Nam Job Introduction Center is about 20km from Chu Lai OE
Worker dormitory
Worker's child education N/A
facility
One-stop service N/A
Road Width National Road 1A near the IZ has 3 lanes, two of which is 5 m wide, the other is 2m wide.
Other provincial roads majorly are one-lane
IT & Tele-communication Full service
Facilities
Emergency Power Available
generator
Fire-fighting facility Available
Layout Plan

Location map

Actual View

862
863
NORTH CHU LAI INDUSTRIAL ZONE

GENERAL INFORMATION
▪ Tam Hiep Commune, Nui Thanh District, Quang Nam Province.
Address
Investor Chu Lai Industrial Zone Infrastructure Development Limited Company (CIZIDCO)
▪ Address: Lot 05 – Road 01 – North Chu Lai Industrial Zone - Nui Thanh District - Quang
Nam Province
▪ Tel: (84-235) 3 567 589/(84-235) 2 233 126
▪ Fax: (84-235) 3 567 589
▪ Email: bacchulai.kcn@gmail.com
▪ Website: http://www.khucongnghiepchulai.vn/
Contact Person ▪ Mr Dinh Van Bao – (84) 912 547 779- baodvqnam@gmail.com
Location ▪ Land: National Road 1A and North – South railway pass across, 3 km from An Tan railway
station, 24km from Tam Ky railway station
▪ Seaport: 14 km to Ky Ha Port, 2.5 km from Truong Hai Water port, 90 km from Tien Sa
Dang Nang Sea Port
▪ Airport: 6 km from Chu Lai airport, 82 km from Da Nang International Airport (Da Nang
City)
Investment Area Priority Sectors for Agriculture, forestry and seafood processing, Building materials,
Investment mechanical, electronics, microelectronics, automation, civil goods.
Restricted Sectors for Restrict Industries affecting the environment.
Investment
Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term ▪ 70 years
Minimum Lease Area 1 ha
Limit for Construction ▪ Office Area: 2 floors
Height ▪ Factory Area: 12 m
Permitted Construction 70%
Rate
Planned area ▪ Total area: 361.4 ha
▪ Total leasable area: 176.9 ha
Factory Available for Rent ▪ Currently, the IZ does not have factory available for rent
Operation Status ▪ In operation
Occupancy Rate and ▪ Occupancy Rate: 50%
Number of Projects ▪ Number of Projects: 17 (in operation)
Number of Korean None
Projects
Lease fee ▪ Land lease fee: 22 USD/m2/ 50 years
▪ Factory lease fee: No factory for lease
▪ Payment: negotiable
Operating fee ▪ Infrastructure maintenance fee and management fee: 0.2 USD/m2/year
▪ Electricity fee:
- Ordinary time: 0.06 USD/kWh;
- Low time 0.04 USD/kWh;
- High time: 0.11 USD/kWh
▪ Water fee: 0.4 USD/m3
▪ Wastewater treatment fee:
- From level B to level A A: 0.32 USD/m3
- From above level B to level A: 0.38 USD/m3
INFRASTRUCTURE AND FACILITY
Financial institution 1km to the Agribank station, to sufficiently supply all needs of enterprises’ operation in the
IZ
Tax service, State finance Nui Thanh District’ Tax department and State Treasury is located in Chu Lai OEZ
office
Customs Service There is an On- site Customs Office insides Chu Lai OEZ
Inland Container Depot is located inside Chu Lai OEZ
Logistics Sea transport via Chu Lai Truong Hai Port
Post office Nui Thanh Post Office is located in Chu Lai OEZ
Medicare The Central General Hospital within Chu Lai OEZ has 500 beds, sufficiently support the IZ’s
demand

864
Police, public security Located within the North Chu Lai IZ
Universities, training 2 universities, 10 vocational colleges and over 40 campuses in Quang Nam
facilities, etc.
Recruitment Quang Nam Job Introduction Center is about 20km from Chu Lai OE
Worker dormitory N/A
Worker's child education N/A
facility
One-stop service Investment procedure is processed via one-stop service undertaken by CIZIDCO
Road Width National Road 1A near the IZ has 3 lanes, two of which is 5 m wide, the other is 2m wide.
Other provincial roads majorly are one-lane
IT & Tele-communication Available
Facilities
Emergency Power Available
generator
Layout Plan

Location map

Actual View

865
LIST OF TENANTS

No. Company Name Nationality Business line


1 CFG - Chu Lai Float Glass JSC. Vietnam Glass production
2 Minh Duong Chu Lai Wood Co., Ltd Vietnam Production of wooden products for household
3 VINH GIA CO., LTD Vietnam Production of products from wood; bamboo,
straw, and plaiting materials
4 Quan Chau Co.,ltd Vietnam Trading plastic products, paper and metal
packaging
5 Lam Son Steel Co., Ltd Vietnam Production of iron, steel, cast iron
6 Viet Khanh Co.,Ltd Vietnam Manufacturing, processing and trading metal
furniture products
7 SAI GON HAO HUNG CO., LTD Vietnam Bamboo, wood and processed wood
production
8 Chi Thanh Toughened Glass Co., Ltd Vietnam Sand sieve
9 Huu Toan Chu Lai Co., Ltd Vietnam Mechanical processing; metal treatment and
coating
10 MAPEI Vietnam Co., Ltd Italy Production of brick - stone mortar
11 Dat Quang Chu Lai Minerals JSC. Vietnam Wholesale of machinery, equipment and spare
parts
12 DACOTEX Blue Bird Co., ltd Vietnam Manufacturing and processing garments
13 Si Dung Co., Ltd Vietnam Manufacturing and trading concrete, cement
and plaster
14 Brothers Dic Ceramic JSC. Vietnam Production ceramic tiles
15 CCI Vietnam Co., Ltd Vietnam Manufacturing electronic components of Coil
craft
16 Forest Products Export JSC., Quang Nam Vietnam Planting and processing paper materials
Branch
17 Branch of Toughened Glass Co., Ltd Vietnam Processing glass and glass made product

866
THUAN YEN INDUSTRIAL ZONE

GENERAL INFORMATION
Address ▪ Hoa Thuan Ward, Tam Ky City, Quang Nam Province
Investor Tam Ky People’s Committee
▪ Address: 05 Le Lai stress, Tam Ky city, Quang Nam Province
▪ Tel: (84-235) 3 822 777
▪ Email: anhvu3211@gmail.com
▪ Website: http://trungtamcndvtamky.gov.vn
Contact Person ▪ Ms. Nguyen Thi Hai Yen- (84) 905 283 338- Mail: yenguyenptcn@gmail.com
▪ Mr. Pham Hoang Van- (84) 906 444 211- Mail: hoangvan.group2012@gmail.com
Location ▪ 1 km to Tam Ky City
▪ 30 km to Chu Lai Airport
▪ 70 km to Tien Sa Seaport
▪ 0.2 km to 1A National Road
Investment Area Priority Sectors for Eco-friendly industries such as: electronics, mechanicals, wood
Investment processing, agricultural product processing, production of construction
materials, high-quality furniture; supporting industry for automobile
and motorbike manufacture; supporting industry for garment
production; packaging and chemicals
Restricted Sectors Polluted industries
for Investment
Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term ▪ 50-70 years
Minimum Lease Area 1 ha
Limit for Construction In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Height Residential Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction 40%
Rate
Planned area ▪ Total area: 150 ha
▪ Total leasable area: 23.89 ha
Factory Available for Rent ▪ Currently, the IZ does not have factory available for rent
Operation Status ▪ In operation
Occupancy Rate and ▪ Occupancy rate: 17.93%
Number of Projects ▪ Number of Project: 16
Number of Korean 02
Projects
Lease fee ▪ Land lease fee: 15 USD/m2/50 years
▪ Payment: Full payment at once
Operating fee ▪ Management fee: N/A
▪ Electricity fee:
- Normal hour: 0.06 USD/KWh
- Low hour: 0.04 USD/KWh
- Peak hour: 0.12 USD/KWh
▪ Water fee: 0.46 USD/m3
▪ Wastewater treatment fee: N/A
▪ Waste treatment fee: N/A
INFRASTRUCTURE AND FACILITY
Financial institution 0.5 km to Vietcombank, Sacombank, BIDV, MB, Western bank, VD bank, Dong A bank,
Eximbank, Vietinbank, Agribank
Tax service, State finance 2km to the Quang Nam State Tax province and 1km to Tam Ky State Tax
office
Customs Service 6km to the Quang Nam Customs Agency
No Inland Container Depot nearby
Logistics 30km to the nearest Logistic Center
Post office 1.5 km to Quang Nam Mailing Post Office; 2 km to Tam Ky Mailing
Medicare 1.5km to Quang Nam General Hospital, 2km to Minh
Thien Hospital, 1.5 km to Thai Binh Duong Hospital
Police, public security 1km to Quang Nam Police Station and Tam Ky Police Station
Universities, training 2km to Quang Nam Economic and Technical College; 2km to Phuong Dong College, 2km to
facilities, etc. Quang Nam Vocational Training
867
Recruitment 1km to Quang Nam Job Introduction center
Worker dormitory N/A
Worker's child education N/A
facility
One-stop service N/A
Road Width Width ranges from 19.5-24m, with 2-4 lanes
IT & Tele-communication VNPT and Viettel provide telecommunication services in the IZ. The transmission line
Facilities system is directly connected to each company.
Emergency Power N/A
generator
Fire-fighting facility Water supply for firefighting is located 1.5 km from the IZ
Layout Plan

Location Map

Actual View

868
LIST OF TENANTS

No. Company name Nationality Business line


1 Phuoc Ky Nam Leather and Footwear JSC. Vietnam Manufacturing export shoes
2 Sportteam Garment Company Taiwan Manufacturing & processing export
garment
3 Quang Nam Electrical Construction JSC. Vietnam Manufacturing and trading electrical
equipment
4 Thuong Cao Trade and Service Export Import Vietnam Commercial business
Food Processing Co, Ltd
5 Viet Thai Trading-Service-Production Co., Ltd Vietnam Manufacturing and covering rubber
tires
6 Tam An II Co., Ltd Vietnam Manufacturing industrial gases
7 Minh Phuong Co., Ltd Vietnam Manufacturing & processing export
garment
8 Loc Thinh Phat Co., Ltd Vietnam Manufacturing and processing paper
9 Anh Ngan Quang Nam Co., Ltd Vietnam Manufacturing & processing
packaging
10 Quang Binh Seed JSC. Vietnam Processing and preserving seeds
11 Thuan Yen Packaging Co., Ltd Vietnam Packaging processing
12 Vinaconex 25 Centrifugal Concrete workshop Vietnam Producing commercial concrete
13 Hoa Cam Concrete JSC. Vietnam Manufacturing and processing medical
equipment
14 Shin Chang Vina Co., Ltd South Korea Manufacturing auto parts
15 J&G Vina Co., Ltd South Korea Manufacturing nutritious bottled water
16 Quang Nam Food JSC. Vietnam Processing export shoes

869
CHU LAI PORT INDUSTRIAL & LOGISTIC PARK

GENERAL INFORMATION
Tam Hiep Commune, Nui Thanh District, Quang Nam Province
Address
Investor Center of Infrastructure Development, Chu Lai Open Economic Zone Authority
▪ Address: Le Thanh Tong, Street, An Phu Ward, Tam Ky city, Quang Nam province
▪ Tel: (84-235) 382 5189
▪ Fax: (84-235) 382 5189
▪ Website: http://chulai.quangnam.gov.vn
Contact Person ▪ Mr. Dinh Van Bao- (84) 912 547 779- Mail: baodvqnam@gmail.com
Location ▪ Adjacent to National Road 1A
▪ 07 km to Chu Lai Airport and 80 km to Da Nang International Airport
▪ Next to Chu Lai seaport; 05 km to Ky Ha Port by waterways and 15 km to Ky Ha Port by
road
▪ 04 km to Nui Thanh railway station; 22 km to Tam Ky railway station.
Investment Area Priority Sectors for Investment on automobile industry and supporting industry for
Investment automobile; high-tech industry, telecommunications, textile and
garment industry, Maritime logistic services, air services,
Restricted Sectors for Projects that cause environment pollution
Investment
Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term 70 years
Minimum Lease Area 1 ha
Limit for Construction In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Height Residential Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction 60-70%
Rate
Planned area ▪ Total area: 173 ha
Factory Available for Rent ▪ Currently, the IZ does not have factory available for rent
Operation Status In Operation
Occupancy Rate and ▪ Occupancy Rate: around 58% (stage 1)
Number of Projects ▪ Number of Projects: 6
Number of Korean N/A
Projects
Lease fee ▪ Land lease fee: 25-30 USD/m2/50 year
▪ Port land lease fee: 35-40 USD/m2/50 year
▪ Payment: to be negotiated with IZ investor
Operating fee ▪ Infrastructure maintenance fee and Management fee: 0.15 USD/m2/year
▪ Water fee: 0.41 USD/m3
▪ Wastewater treatment fee:
- From level B to level A: 0.32 USD/m3
- From over level B to level A: 0.38 USD/m3
▪ Waste treatment fee:
- From level B to level A: 0.32 USD/m3
- From over level B to level A: 0.38 USD/m3
INFRASTRUCTURE AND FACILITY
Financial institution 01 km to Agribank station, which sufficiently supplies for the needs of the IZ
Tax service, State finance Tax department and State Treasury of Nui Thanh District is located in Chu Lai OEZ
office
Customs Service Ky Ha Customs Office is located in Chu Lai OEZ
Logistics Sea transport via Chu Lai Truong Hai port
Post office Nui Thanh Post Office is located in Chu Lai OEZ
Medicare The Central General Hospital within Chu Lai OEZ has 500 beds, sufficiently support the IZ’s
demand
Police, public security Located within the North Chu Lai IZ
Universities, training 2 universities, 10 vocational colleges and over 40 campuses in Quang Nam
facilities, etc.
Recruitment Quang Nam Job Introduction Center is about 20km from Chu Lai OE
Worker dormitory N/A

870
Worker's child education N/A
facility
One-stop service N/A
Road Width National Road 1A near the IZ has 3 lanes, two of which is 5 m wide, the other is 2m wide.
Other provincial roads majorly are one-lane
IT & Tele-communication Full service
Facilities
Emergency Power Available
generator
Fire-fighting facility Available
Layout Plan

Location map

Actual View

871
TAM THANG INDUSTRIAL ZONE

GENERAL INFORMATION
▪ Tam Thang commune, Tam Ky city , Quang Nam province
Address
Investor Chu Lai Industrial Zone Infrastructure Development Limited Company
▪ Address: Lot 05 – Road 01 – North Chu Lai Industrial Zone – Nui Thanh District – Quang
Nam Province
▪ Tel: (84-235) 3 567 589 Fax: (84-235) 3 567 589
▪ Email: bacchulai.kcn@gmail.com
▪ Website: http://www.khucongnghiepchulai.vn/
Contact Person ▪ N/A
Location ▪ Land: Next to National Road 1A
▪ Seaport: 25 from Chu Lai Seaport, 40 km from Ky Ha port, 60 km from Dung Quat
Seaport, 70 km from Tien Sa Da Nang Seaport.
▪ Airport: 35 km from Chu Lai airport, 70 km from Da Nang International Airport
Investment Area Priority Sectors for High-tech industry, Textile Industry, Electronics, and supporting
Investment industry.
Restricted Sectors for Polluted industries
Investment
Minimum wage [Area 2] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term ▪ 70 years
Minimum Lease Area 1 ha
Limit for Construction Office are: 2 floors
Height Factory area: 12m
Permitted Construction 60- 65%
Rate
Planned area ▪ Total area: 191.7 ha
▪ Vacant leasable area: 104.7 ha
Factory Available for Rent ▪ Currently, the IZ does not have factory available for rent
Operation Status ▪ In operation
Occupancy Rate and ▪ Occupancy Rate: 65%
Number of Projects ▪ Number of Projects: 9
Number of Korean N/A
Projects
Lease fee ▪ Land lease fee: 22 UDS/m2/ 50years
Operating fee ▪ Management fee and Infrastructure maintenance fee: 0.5 USD/m2/year
▪ Electricity fee:
- Normal hour: 0.06 USD/KWh
- Low hour: 0.04 USD/KWh
- Peak hour: 0.11 USD/KWh
▪ Water fee: 0.4 USD/m3
▪ Wastewater treatment fee:
- From level B to level A: 0.32 USD/m3
- From above level B to level A: 0.38 USD/m3
▪ Waste treatment fee:12.97 USD/ton
INFRASTRUCTURE AND FACILITY
Financial institution 3km to local bank branches of Vietcombank, BIDV, Dong A Bank, ACB,..
Tax service, State finance 2 km to Tam Ky Tax department and Tam Ky State Treasury
office
Customs Service 2 km km to Quang Nam Customs Office
Logistics Transportation via sea by Chu Lai Truong Hai seaport or Tien Sa Da Nang Seaport
Post office 3km to Quang Nam post office
Medicare 4km from Quang Nam General Hospital
Police, public security Located in the IZ
Universities, training 2 universities, 10 vocational colleges and more than 40 vocational training institutions
facilities, etc. nearby. Chu Lai Open Economic Zone is located near major training centers in Central
Vietnam such as Da Nang, Hue and Quy Nhon, so it is very convenient to provide high
quality human resources. About 30km from Chu Lai OEZ, including: Quang Nam
University, Phan Chu Trinh University, Quang Nam Technical and Economic College,
Quang Nam Vocational College

872
Recruitment 4.5 km to Quang Nam Job Introduction center
Worker dormitory N/A
Worker's child education N/A
facility
One-stop service N/A
Road Width N/A
IT & Tele-communication Available
Facilities
Emergency Power Huu Toa- Chu Lai JSC. in Chu Lai OEZ trades Power generator
generator
Fire-fighting facility Available
Layout Plan

Location Map

Actual View

873
TAM THANG II INDUSTRIAL ZONE

GENERAL INFORMATION
Address Chu Lai Open Economic Zone, Thang Binh District, Quang Nam Province
Investor Capella Land JSC.
▪ Address: F26, Vinaconex 9 Tower, Pham Hung Street, Hanoi, Vietnam
▪ Tel: (84) 96 442 0028 (Ms. Chuyen – Sales Director)
(84) 983 670 928 (Ms Ha – Sales Deputy Director)
(84) 35 323 9989 (Ms Tue – Sales Officer)
▪ Website: cpliz.com.vn
Contact Person ▪ Ms Chuyen - Sales Director - Mobile: (84) 96 442 0028
Email: chuyennh.cpl@gmail.com
▪ Ms Ha - Sales Deputy Director - Mobile: (84) 983 670 928
Email: hadtt.cpl@gmail.com
▪ Ms Tue – Sales Officer – Mobile: (84) 35 323 9989
Email: tueanh.cpl@gmail.com
Location ▪ 65 Km from Da Nang City (International Airport and Container Seaport)
▪ 6 Km from Tam Ky City, Quang Nam Province
▪ 30 Km from Chu Lai Airport
▪ 25 Km to Chu Lai Seaport
▪ 40 Km to Hoi An City
Investment Area Priority Sectors for Zoned as a multi industrial zone
Investment
Restricted Sectors for N/A
Investment
Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term N/A
Minimum Lease Area 1 ha
Limit for Construction No limit
Height
Permitted Construction ▪ Office Area: 60%
Rate ▪ Factory Area: 60%
Planned area ▪ Total area:103 ha
▪ Total vacant leasable area: 75ha
▪ Total area with full infrastructure ready to build factory:75 ha
Factory Available for ▪ Total area: None
Rent
Operation Status Active
Occupancy Rate and Occupancy Rate: 10%
Number of Projects
Number of Korean N/A
Projects
Lease fee ▪ Land lease fee: From 35 USD/m2/whole leasing term (50 years from 2017 to 2067)
▪ Payment:
- Method: Full payment at once, divided into three installments
- Period: Deposit: 30%; Second payment: 30% after IRC/ERC; Third payment: 40% after
handover leveled land.
Operating fee ▪ Management fee: 0.3USD/year
▪ Electricity fee: Regulated by EVN State Company. Normal hours: 0.07USD/kwh; Rush
hours: 0.11USD/kwh; Low hours: 0.04USD/KWh
▪ Water fee: about 0.41USD/m3
▪ Wastewater treatment fee: From B level is about 0.45 USD/m3
▪ Waste treatment fee: Customers will sign contract with a Service Environment Company.
INFRASTRUCTURE AND FACILITY
Financial institution Almost all major banks in Vietnam such as Viet A Bank, BIDV, Vietcombank, Agribank,...
have their bank branch located nearby the IZ
Tax service, State finance ▪ 8km to Quang Nam state treasury
office ▪ 10km to Quang Nam Tax Department
Customs Service 7 km to Customs Agency
Logistics 25km to Ky Ha Port; 25km to Thaco Logistic
Post office 7m to Quang Nam Post Office
Medicare ▪ 8m to Quang Nam Hospital
874
▪ 11 km to Tam Ky Hospital
Police, public security 9km to Quang Nam Police
Universities, training ▪ 9km to Quang Nam university
facilities, etc. ▪ 10km to Technological College
Recruitment 8km to Job Introduction Center of Quang Nam
Worker dormitory Near the residential area. No dormitory
Worker's child education There are many children education facility nearby in Tam Ky City.
facility
One-stop service Available
Road Width Main Road: 35m; Branch Road: 23.5m
IT & Tele- FTTH
communication Facilities
Emergency Power No
generator
Fire-fighting facility Set up along the roads of Industrial Park
Layout Plan

Location Map

Actual View

875
876
CHU LAI - TRUONG HAI AUTOMOTIVE MECHANICAL INDUSTRIAL ZONE

GENERAL INFORMATION
Tam Hiep Commune, Nui Thanh District, Quang Nam Province
Address
Investor Truong Hai Auto Joint Stock Corporation
▪ Address: THACO Office, Commerce and Service Tower (floors 16, 17, 18), No. 10, Mai
Chi Tho Street, An Loi Dong Ward, District 2, Ho Chi Minh City
▪ Tel: (84-235) 356 5325/ (84-235) 356 7666
▪ Fax: (84-235) 356 5324
▪ Website: http://www.truonghaiauto.com.vn
Contact Person ▪ Mr Dinh Van Bao- (84) 912 547 779- baodvqnam@gmail.com
Location ▪ Adjacent to National Road 1A and North- South railway system
▪ 80 km to Da Nang International Airport and 07 km to Chu Lai Airport
▪ 01 km to Chu Lai seaport; 05 km to Ky Ha Port by waterways and 15 km to Ky Ha Port by
road
▪ 04 km to Nui Thanh railway station; 22 km to Tam Ky railway station.
Investment Area Priority Sectors for Automobile industry and supporting industry for automobile
Investment
Restricted Sectors for Polluted industries
Investment
Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term 70 years
Minimum Lease Area 1 ha
Limit for Construction Office area: 2 floors
Height Factory area: 12m
Permitted Construction N/A
Rate
Planned area ▪ Total area: 243ha
▪ Leasable Area: 108 ha
Factory Available for Rent ▪ Currently, the IZ does not have factory available for rent
Operation Status ▪ In operation
Occupancy Rate and ▪ Occupancy Rate: 90%
Number of Projects ▪ Number of Projects: 29
Number of Korean N/A
Projects
Lease fee ▪ Land lease fee: to be negotiated with the IZ investor
▪ Payment: : to be negotiated with the IZ investor
Operating fee ▪ Management fee and Infrastructure maintenance fee: to be negotiated with the IZ investor
▪ Electricity fee:
- Ordinary time: 0.06 USD/ kWh
- Low time: 0.04 USD/ kWh
- High time: 0.11 USD/ kWh
▪ Water fee: 0.39USD/m3
▪ Wastewater treatment fee: no Water treatment factory available
▪ Waste treatment fee: N/A
INFRASTRUCTURE AND FACILITY
Financial institution Agribank station is 01 km from the IZ, which sufficiently supplies for the needs of the IZ
Tax service, State finance Nui Thanh District’ Tax department and State Treasury is located in Chu Lai OEZ
office
Customs Service ▪ There is an On- site Customs Office insides Chu Lai OEZ
▪ There is an ICD in Ky Ha port
Logistics Sea transport via Chu Lai Truong Hai Port
Post office Nui Thanh Post Office is located in Chu Lai OEZ
Medicare The Central General Hospital within Chu Lai OEZ has 500 beds, sufficiently support the IZ’s
demand
Police, public security Located within the North Chu Lai IZ
Universities, training 2 universities, 10 vocational colleges and over 40 campuses in Quang Nam
facilities, etc.
Recruitment Quang Nam Job Introduction Center is about 20km from Chu Lai OEZ

877
Worker dormitory
Worker's child education N/A
facility
One-stop service N/A
Road Width National Road 1A near the IZ has 3 lanes, two of which is 5 m wide, the other is 2m wide.
Other provincial roads majorly are one-lane.
IT & Tele-communication Full service
Facilities
Emergency Power Available
generator
Fire-fighting facility Available
Layout Plan N/A
Location Map

Actual View

878
DIEN NAM- DIEN NGOC INDUSTRIAL ZONE

GENERAL INFORMATION
Address Dien Ngoc Ward, Dien Ban town, Quang Nam province
Investor Quang Nam Da Nang Urban & Industrial Zone Development JSC.
▪ Address: 21 Le Hong Phong, Phuoc Ninh Ward, Hai Chau district, Da Nang City
▪ Tel: (84-236) 3 821 844
Contact Person ▪ Dang Thanh Trung- Deputy Head of Planning - Technical Department - (84) 903 525 190 -
Mail: Dangtrung1974@gmail.com
Location ▪ 4 km to the center of Da Nang City
▪ 15 km to Da Nang International Airport
▪ 21 km to Tien Sa Port
▪ 15 km to the nearest railway station
Investment Area Priority Sectors for ▪ Electronics, high technology industry
Investment ▪ Eco-friendly industry
Restricted Sectors for Polluted Industry
Investment
Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Lease term ▪ End date:
- Phase 1: 2046
- Phase 2: 2056
Minimum Lease Area 0.5 ha
Limit for Construction Factory area: 1-3 floor(s)
Height
Permitted Construction Factory area: 60%
Rate
Planned area ▪ Total area: 390 ha
▪ Total vacant leasable area: 223ha
▪ Total area with full infrastructure ready to build factory: 20 ha
Factory Available for ▪ Total area: 150ha
Rent
Operation Status ▪ In operation
Occupancy Rate and ▪ Occupancy Rate: 85%
Number of Projects ▪ Number of Projects: 65
Number of Korean 04
Projects
Lease fee ▪ Land lease fee:
Phase 1: 60USD/m2
Phase 2: 80 USD/m2
▪ Factory lease fee: 3.5 – 5USD/m2
▪ Payment:
- Period: full payment after signing the contract
Operating fee ▪ Management fee: 0.45 USD/m2/year
▪ Electricity fee: According to Government Regulation
▪ Water fee: 0.49 USD/m3
▪ Wastewater treatment fee: N/A
▪ Waste treatment fee: N/A
INFRASTRUCTURE AND FACILITY
Financial institution 1 km to Vietcombank- Dien Ban Branch
8 km to Agribank- Dien Ban Branch
8 km to BIDV- Dien Ban Branch

Tax service, State 9 km to Dien Ban Tax Department


finance office 8 km to Dien Ban State Treasury
Customs Service Dien Ban Custom Department is located within the IZ

Logistics N/A
Post office Inside the IZ
Medicare 8 km to Quang Nam General Hospital
Police, public security N/A
Universities, training 4km to Da Nang University
facilities, etc.
879
Recruitment 26km to Da Nang Job Introduction Center
Worker dormitory There is a dormitory project near the IZ
Worker's child Available
education facility
One-stop service Available

Road Width 9m wide and above


IT & Tele- N/A
communication
Facilities
Emergency Power Available
generator
Fire-fighting facility N/A
Layout Plan

Location Map

Actual View

880
LIST OF TENANTS

No Company Name Nationality Business line


1 RIEKER Vietnam Footwear Germany Producing and trading in shoes, shoe accessories and
Company leather; Design, manufacture and trade molds for shoe
soles and shoe accessories; Producing and trading raw
materials for footwear production.
2 Cheng Shing Vietnam Piston Taiwan Production and consumption of Piston used for explosion
Co., Ltd engines, spare parts and products made of metal produced
by the Company; Exercise the right to import all kinds of
Piston, related parts and components.
3 Heineken Vietnam Brewery Netherland Producing Beer
Co., Ltd - Quang Nam
4 Asia Pacific Engineering Canada Producing plastic beads and technical compounds
Compounds Co., Ltd
5 Lixil Inax Da Nang Japan Manufacturing, trading and installing showerheads,
Production Co., Ltd. sanitary equipment, equipment in the bathroom, kitchen
6 Uni - President Vietnam Co., Taiwan Producing flour, instant noodles, rice vermicelli, animal
Ltd, Branch in Quang Nam feed and aquatic products; Providing rental of storage
7 Viet Hoa Fisheries Feed Taiwan Producing aquaculture, cattle and poultry feed; Import of
JSC. cassava; import veterinary medicine
8 Vietnam Initation Co., Ltd Taiwan Producing plastic accessories for industrial and civil
equipment; Manufacturing molds related to plastic
products; Leasing excess land without demand
9 Viet Nam Family Import Manufacturing export wooden products; Plywood
Export Co., Ltd processing
10 Midori Safety Footwear Co., Japan Manufacturing and processing shoes, semi-finished
Ltd. Vietnam products and shoe parts (100% export)
11 Hydra Vietnam Co., Ltd Czech Producing, processing and exporting capacitors for
household use, motor devices, lights, pumps, fans and
lighting devices.
12 HASEGAWA Vietnam Co., Japan Producing specialized aluminum ladders (100% of
Ltd products are exported)
13 NGK SUNTORY Pepsico USA Producing beverages and mineral water
Vietnam Co., Ltd., Branch in
Quang Nam
14 Makitech Vietnam Co., Ltd. Japan Business lines: Production and trading of transport
support frames, transport pallets and other mechanical
equipment and accessories; Objective: Manufacture
mechanical equipment, transport frames, transport pallets
of Makitech (100% products are exported)
15 Denken Vietnam Automatic Japan Manufacturing and assembling DENKEN Vietnam
Control Co., Ltd automatic control panel
16 Quang Nam Industrial Taiwan Producing and processing export garments; trading
Valley View Co., Ltd products for export to foreign countries; Excess factory
rental
17 Sasaki Shoko Vietnam Co., Japan Chochin cage net production and trading, round net, bag
Ltd. mesh and other types of net, accessories included for
aquaculture.
18 PREMO S.L Company Producing electronic components of communication
equipment
19 M&H Industry Viet Nam Producing steel surfing: 10,000 products / year
Co., Ltd
20 HANSUM VINA Co., Ltd South Korea Producing PVC pipes
21 HONCHUAN Vietnam Co., Taiwan Factory manufacturing bottles, bottles, and bottles.
Ltd
22 Hanacans JSC. South Korea Producing finished cans and cans for aluminum cans
23 RELATS Company Spain Producing insulated wires and tubes
24 Sendatech Vietnam Co., Ltd Japan Producing RO filter core for water purification equipment;
producing and trading parts lids exposed to bottles of hot
and cold water machines
25 INTERCARE Co., Ltd South Korea
26 PHEVA Co., Ltd EU Producing cocoa, chocolate and candy
27 OKUDA Vietnam Co., Ltd Japan Processing garments

881
28 AGATA Company Japan Producing metal components; precision metal machining;
Manufacturing and assembling lifting, lowering, loading
and unloading equipment, conveyors, elevators, and other
industrial equipment
29 SC Global Vina Co., Ltd South Korea Producing suitcases, bags; garments
30 Jracking Viet Nam Storage China Warehouse shelves, steel racks and other mechanical
Solutions One Member Co., products
Ltd
31 Quoc Quang Electrical Gas China Producing electronic equipment
JSC.
32 Trung Dat Tuong Company Producing microphone speaker covers and microphone
brackets, electronic devices; plastic products
33 Minh Hoang II Garment Co., Vietnam Producing Jackets for export
Ltd
34 Viet Vuong II Co., Ltd II Vietnam Producing export products and pants and printing on
export products and pants
35 Tan Dat Packaging Co., Ltd Vietnam Producing carton packaging and kraff paper for domestic
consumption
36 Dong Phuong Co., Ltd Vietnam Processing export seafood
37 Central Petro Investment & Vietnam Producing all kinds of gas cylinders of quality standards
Manufacturing JSC.
38 Central Gas Co., Ltd Vietnam Producing civil gas cylinders of all kinds; Extraction of
gas cans of mini stainless steel shells 200 grams
39 Saigon - Central Paper JSC. Vietnam Producing paper products and carton packaging
40 Chi Viet Pre-Engineered Vietnam Producing steel, corrugated iron, steel purlin structure
Steel Buildings JSC.
41 Central Vietnam Vietnam Color tile production
Construction Material JSC.
Central
42 Central America One Vietnam Producing household and industrial metal products
Member Limited Company
43 Central Dong Nai Plastic Vietnam Producing uPVC and HDPE pipes for water supply and
JSC. drainage. Producing plastic packaging, PP tarpaulin and
civil and industrial uPVC plastic products; Producing foam
mattress, spring mattress and civil and industrial mousse.
44 Resource Fashion Co., Ltd Vietnam Manufacturing and processing export garments
45 Hong Hai Net Weaving Co., Vietnam Producing fishing net products, ropes and yarns for fishing
Ltd nets
46 Aquatic Resources Vietnam Producing aquatic food
Development JSC.
47 Quang Nam Green Road Vietnam Producing all kinds of clothing products
One Member Co., Ltd
48 Dong Tam Central JSC. Vietnam Producing high quality ceramic tiles. Enameled digital
inkjet printing and polished bricks of all kinds;
Manufacturing artificial packaging and granite tiles; excess
factory rental; Producing uPVC plastic doors and high
quality uPVC plastic partitions of all kinds
49 Tan Nam Ngoc Co., Ltd. Vietnam Producing centrifugal concrete pipes
50 Quang Minh Co., Ltd. Vietnam Manufacturing and trading interior plastic products and
water pipes
51 Thai Duong JSC. Vietnam Producing color and colorless tiles
52 Viet Ly Central Co., Ltd Vietnam Processing, recycling, producing recycled plastic beads
and plastic products to PE, PP scraps
53 Cam Ha JSC. Vietnam Export wood processing
54 Central Plastic JSC. Vietnam Producing small types of telecommunication cables and
electric cables., Manufacturing all kinds of pipes, tanks
and FRP items used in construction (Project 2)
55 Quang Hieu Food Co., Ltd Vietnam Production and trading of aquatic products for domestic
consumption and exporting products to foreign countries.
56 JSC. 559 Vietnam Industrial laundry factory
57 Ly Hong King Co., Ltd. Vietnam Manufacture all kinds of motorcycle parts and motorbike
assembly
58 Green Planet Co., Ltd Vietnam Cleaning blankets, bedspreads for high- class hotels

882
59 Hoan My Industrial Vietnam Manufacturing equipment to serve the needs of hygiene,
Production Co., Ltd. medical and industrial washing services
60 Nam Vuong Garment Co., Vietnam Producing clothes
Ltd
61 Hai Son Phuc Packaging Vietnam Producing all kinds of plastic packaging
Co., Ltd
62 Vietnam Techniques and Vietnam Producing fabrics and garment
Services Co., Ltd
63 Hung Cuong Steel Vietnam Producing steel pipes
Production and Trading JSC.
64 VIESKY Trading and Vietnam Producing oat water of all kinds
Service Co., Ltd
65 Song Khang Engineering Vietnam Manufacturing products with composite materials;
Co., Ltd

883
TAM ANH- KOREA INDUSTRIAL PARK

GENERAL INFORMATION
Address Tam Anh Bac Commune , Nui Thanh District, Quang Nam Province
Name of Investor Tam Anh – Han Quoc IP – Quang Nam Province
Investor ▪ Address: Tam Anh Bac Commune , Nui Thanh District, Quang Nam Province
▪ Hotline: 0901.976.685 (Mr Kim), 0935.372.412 (Ms Thi)
▪ Email cnvinatahq@gmail.com
▪ Website: cnvinakip.com

Contact Person Name - Position - Mobile: - Email:


Kim Jong Jin – Director – 0901.976.685
Nguyễn Thị Nguyệt Thi – Head of Department – 0935.372.412 cnvinatahq@gmail.com
Location Adjacent location
From Tam Ky city : 14km,
From Da Nang city : 70 km
- From Chu Lai airport : 20km,
- From Da Nang internationl airport : 70km
- From Tam Hiep Seaport (Quang Nam): 14km
- From Tien Sa Seaport (Da Nang): 92km
- Next to 1A Route
- Expressway between DaNang – Quang Ngai
- Connector between 1A Route and Thaco Truong Hai
Investment Sectors Priority Sectors for Investment
Food processing, Agricultural products project, Animal feeding processing, Material for
construction project, Paper and stationery manufacturing project, Mechanical project
Minimum wage [Regional III Minium Wage of Nui Thanh District :3,250,000đ/month]According to Decree
38/2022/ND-CP
Lease term ▪ Start date: 05/04/2013
▪ End date: 2063
Minimum Lease Area 1.5 ha
Limit for Construction - Factory construction area: 21m (5floors)
Height - Operating area] 21m (5floors)
- Technical area 13m (3floors)

Permitted Construction - Factory construction area: 70%


Rate - Operating area: 60%
- Technical area: 60%

Planned area ▪ Total area: 193.05 ha


▪ Total vacant leasable area: 25
▪ Total area with full infrastructure ready to build factory: 25 ha

Factory Available for Rent ▪ Total area: 4.3ha

Operation Status ▪ Under Construction and to be completed by {year}


1 Phrase: 90ha: Completed Infrastructure
2 Phrase: 100ha: Site clearance in progress
Occupancy Rate and ▪ 59,4 % (29.7/50 ha) and 6 Projects
Number of Projects

Number of Korean projects ▪ Three

Lease fee ▪ Land lease fee: 45USD/m² Until 2063

Operating fee ▪ Management fee: 0.04 USD/m2/year


▪ Electricity fee: Normal hours price: 0.07 USD/kwh.
Peak hours price: 0.11 USD/kwh.
Off-peak hours pricc: 0.04 USD/kwh.
Supplied by EVN State Company.
▪ Water fee: 0.46 USD/m3

884
Supplied by BBO Company
▪ Wastewater treatment fee: 0.55 USD/m3

INFRASTRUCTURE AND FACILITY


Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities,
training facilities, etc., Road Width,…

List of Projects in Industrial Zone

No. Name of Company Nationality Business line

1 C&N Vina CO.,LTD. South Korea Centralized wastewater treatment


plant Tam Anh Industrial Park -
Korea

2 Công ty TNHH Xây Dựng Thương Vietnam Linh Suong cold asphalt concrete
Mại và Dịch Vụ Linh Sương factory and mechanical processing

3 Công ty TNHH Đầu tư Công nghiệp Vietnam Factory area for rent
An Thanh
4 MHK2 C&N Vina CO.,LTD. South Korea Textile and dyeing factory for rent

5 Blue Ocean Industry Inc Producing products from non-metallic


minerals

6 Hangil Vina CO.,LTD South Korea Crane and crane spare parts factory

885
AGRO-FORESTRY INDUSTRIAL PARK

GENERAL INFORMATION
Address Tam Anh Nam Ward, Nui Thanh District, Quang Nam Province
Thaco-Chu Lai Investment Industrial Park Agriculture Company Limited
Investor ▪ Address: Automotive And Mechanical Industrial Park, Tam Hiep Ward, Nui Thanh
District, Quang Nam Province
▪ Tel: 02353.54.57.59
▪ Email
▪ Website: https://thacochulai.vn/
Contact Person Mr. Ngo Van Hai – Vice Director
Tel: 0938.906.206 Email: ngovanhai@thaco.com.vn

Location Adjacent location


- Road: Near National Highway 1A, 1km from Da Nang Quang Ngai Highway, 1km from
Da Nang Chu Lai coastal way.
- Airway: 10km from Chu Lai Airport, 80km from Da Nang Airport.
- Port:
- Domestic port: 42 km from Dung Quat port.
- International port: 2.5km from Chu Lai Port, 100km from Tien Sa Port
Investment Sectors Priority Sectors for Investment
- Production and supply of agricultural materials (Organic): Producing fertilizers and
nitrogen compounds; Manufacture of pesticides and other chemicals; Producing agricultural
and forestry materials; Trading in agricultural machinery, equipment, and spare parts;
- Plant research and development: Propagate and take care of annual seedlings;
- Processing and preserving fruits, vegetables, and aquatic products: Processing and
preserving aquatic products and aquatic products; Processing and preserving vegetables and
fruits;
- Food production: Manufacture of other foods not elsewhere classified; Producing
animal, poultry, and aquatic feed.
- Wood production and processing: Sawing, sawing, planing, and preserving wood;
Manufacture of plywood, veneer, plywood, and other thin boards; Production of construction
furniture
- Production of agricultural packaging materials: Production of wooden packaging;
Producing wrinkled paper, wrinkled paperboard, packaging from paper and board;
- Producing products from medicinal plants: Producing drugs, pharmaceutical chemicals,
and medicinal herbs.
- Training personnel for agricultural production
- Cold storage business services: Other business support services that have not been
classified yet
Minimum wage According to Decree 38/2022/ND-CP
3.640.000/month; 17.500/hour
Lease term ▪ End date 2069
Limit for Construction - Factory building area: 3 floors
Height - Operating area: 2 floors

Permitted Construction - Factory construction area: 55%


Rate - Operating area: 60%

Planned area ▪ Total area: 451ha


▪ Total vacant leasable area:
▪ Total area with full infrastructure ready to build factory:

Operation Status ▪ In Land Clearance Process

Lease fee N/A

886
INFRASTRUCTURE AND FACILITY
Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities,
training facilities, etc., Road Width,…
Infrastructure connection:
- Road: Near National Highway 1A, 1km from Da Nang Quang Ngai Highway, 1km from Da Nang Chu Lai coastal
way.
- Airway: 10km from Chu Lai Airport, 80km from Da Nang Airport.
- Port:
o Domestic port: 42 km from Dung Quat port.
o International Port: 2.5km from Chu Lai Port, 100km from Tien Sa Port
Utilities:
- Electricity: Low and medium-voltage electricity
- Water: 13.000 m3/ day
- Wastewater treatment: 2.200 m3/ day, upgradeable
IP services:
- Catering.
- Security.
- Landscape, green trees, etc
- Logistics.
- Construction, mechanic, and construction of electricity.
- Training and human resource supply.
IP infrastructure management
- IP security 24/7
- Maintain landscape, infrastructure & utilities.
- Thaco fire station, fire trucks.

887
EXPANDED TAM THANG INDUSTRIAL ZONE

GENERAL INFORMATION
Name of Investor
Investor ▪ Address: Binh Nam commune, Thang Binh District, Quang Nam province.
▪ Tel: 0235.3.22.33.126
▪ Email: bacchulai.kcn@gmail.com
▪ Website: khucongnghiepchulai.vn

Contact Person Name - Position - Mobile: - Email:


Mr. Le Cong Binh – Vice Director - 0935.121.636 – lecongbinh.tk@gmail.com
Mr. Nguyen Van Vinh – Head of Tam Thang IZ Management Board – 0905.519.028 –
vinhnt09@gmail.com
Location Adjacent location
- 6 km from Tam Ky city/ the capital;
- 36 km from Chu Lai airport; 70km from Danang airport;
- 27 km from Truong Hai sea port; 35km from Ky Ha seaport; 60km from Dung Quat sea port;
70km from Tien Sa Sea port.
- 8 km from Tam Ky railway station/highway/..
Investment Sectors Priority Sectors for Investment
attracting textile and textile auxiliaries industries; production of components and electrical -
electronic equipment; mechanical, auxiliary automotive, manufacturing machinery; high-tech
industry; Medicine processing; manufacturing of plastic products]
Minimum wage [Minimum wages in Region III] According to Decree 38/2022/ND-CP
Lease term ▪ Start date: 2022
▪ End date: 2072
Minimum Lease Area [1,5ha]
Planned area ▪ Total area: [242ha]
▪ Total vacant leasable area: [160ha]
▪ Total area with full infrastructure ready to build factory: [….ha]

Operation Status ▪ Active/Under Construction/Under Construction and to be completed by {2024}/In Land


Clearance Process: 41ha
Occupancy Rate and ▪ [02 projects, occupancy rate 25% ]
Number of Projects

Number of Korean ▪ [02 projects]


projects

Lease fee ▪ Land lease fee: [negotiate directly with Cizidco]


▪ Factory lease fee: [0]

Operating fee ▪ Management fee: [negotiate directly with Cizidco]


▪ Electricity fee: [according to the electricity price list of EVN Quang Nam at the time of use]
▪ Water fee: [following the current regulations]
▪ Wastewater treatment fee: [negotiate with Panko Tam Thang Co.,Ltd]
▪ Waste treatment fee:[following the current regulations]

INFRASTRUCTURE AND FACILITY


Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities,
training facilities, etc., Road Width.
- 7~13 km from the Banks;
- 9 km from Tam Ky City Tax; 12km from Quang Nam province Tax;
- 10 km from Quang Nam University

888
List of Projects in Industrial Zone

No. Name of Company Nationality Business line

1 Hyosung Quang Nam Co., Ltd. Korea Auxiliary automotive industry

889
[- This Page is intentionally left blank -]

890
QUANG NGAI

891
INVESTMENT ENVIRONMENT IN QUANG NGAI

USD/VND 23.510

GENERAL INFORMATION
Area 5135,2 km2
Population 1,245 million people (2022)
▪ Quang Ngai is located in South Central Coast region.
Geographical ▪ Located in the Key Economic Region of Central Vietnam as well as in the East – West Economic
Location Corridor
▪ Located 883 km south of Ha Noi, 838 km north of Ho Chi Minh City and 120 km south of Da Nang.
Adjacent ▪ Quang Nam Province to the north, Kon Tum and Gia Lai Province to the west, East Sea to the east, Binh
provinces Dinh Province to the south.
2022 statistic:
▪ Nominal GRDP (billion VND):
(5,13693054675955 billion
▪ Real GRDP (billion VND): 121.668
USD)
▪ GRDP growth: 8,08%
GRDP ▪ GRDP per capita (million
97,67 (4070 USD)
VND/year):
▪ Economic structure:
- Industry - Construction: 45,42%
- Agriculture. forestry and fishery: 15,62%
- Service: 23,03%
▪ Industry - Construction growth: 8,32%
▪ Agriculture, forestry and fishery
Industry growth 2,19%
growth:
▪ Service growth: 10,83%
Import turnover (billion USD): 3,49 (Growth rate: 0,314)
Import - Export
Export turnover (billion USD): 2,16 (Growth rate: 0,2)
Key Industry Industrial production has become a spearhead field, the focus of development of Quang Ngai province
PCI 65.18
Ranking 33
SOCIAL INFRASTRUCTURE
▪ Roadway: National Road 1A and Highway 24A connecting to the provinces of the Central Highlands,
Southern Laos, Myanmar and Northern Thailand; Danang - Quang Ngai highway; Dung Quat - Sa Huynh
coastal road.
▪ Railway: North-South railway runs through 8 large and small stations, of which Quang Ngai station is
the main station.
Transportation
▪ Waterway: Dung Quat seaport system has a depth of 19 - 21m, 90 km from the international maritime
route and 30 km from the inland seaport, receiving ships of up to 100,000 DWT. There are also Sa Ky
port and Ly Son island port, which are 30 km from the mainland.
▪ Airway: Chu Lai Airport is about 35 km to the North from Quang Ngai City, with routes to Hanoi and
Ho Chi Minh City during the day with Vietnam Airlines, Jetstar Pacific Airlines, and Vietjet Air.
Electricity for domestic use and production is supplied from the national grid through the 500 KV North-
Electricity
South line.
Water Quang Ngai water supply plant has capacity of about 45,000m3/day and night.
Education &
There are 2 universities, 2 colleges, many professional and vocational intermediate schools.
Training
Medicare Quang Ngai has 12 hospitals and many other small medical facilities.
INVESTMENT CONDITION
Human resource 53.94% of population are in the working age (2022)
Education level Trained labor rate: 61.43% (2022)

892
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): N/A
- Area II (4,160,000 VND/month): N/A
Salary - Area III (3,640,000 VND/month): Quang Ngai City, Binh Son and Son Tinh districts
- Area IV (3,250,000 VND/month): Ba To, Duc Pho, Minh Long, Mo Duc, Ly Son, Tu Nghia, Tra Bong,
Tay Tra, Son Tay, Son Ha, Nghia Hanh districts
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages
paid to employees working under employment contracts)
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
▪ Incentives from the province:
- Land rental incentives.
- Support up to 20% of investment in building essential technical infrastructure and resettlement areas of
the project.
Investment
- 30% support for construction of concentrated wastewater treatment facilities of industrial parks,
incentives
industrial complexes and functional areas in economic zones.
- Support for labor training.
Incentives and support for projects that encourage socialization:
- Exemption of land rental.
- Incentives on facilities leasing.
- Preferential cost of infrastructure investment (from 50-90%).
Support 70% of the total investment in building infrastructure and production facilities when investing
projects in agriculture and rural areas.
▪ Heavy and light industry sectors, including:
- Petrochemical
- chemical refining industry; energy (electricity, gas).
- Metallurgy industry, ship building and repair, mechanics manufacturing.
- Food industry, consumer goods, packaging, textile, footwear, construction materials.
- Manufacturing components, assembling cars, electrical and electronic equipment.
Fields Attracting
▪ Auxiliary industry.
Investment
▪ Logistics services.
▪ Investment in seaport business and maritime services.
▪ Investment in infrastructure business of industrial parks and urban areas.
▪ Services, tourism (hotels, restaurants, golf courses, resorts, entertainment areas ...)
▪ High-tech agriculture.
▪ Socialization projects.
Investment
▪ Up to now, Quang Ngai has 61 FDI projects with the total investment capital is about 1.988 billion US
attraction
dollars.
situation

893
Map

Quang Ngai Department Of Planning And Investment


▪ Address: 96 Nguyen Nghiem, Quang Ngai city

Contact ▪ Tel: 0255. 3822868

▪ Email: skhdt@quangngai.gov.vn
▪ Contact person:
- Ms. Tran Thi My Ai - Director of the Department of Planning and Investment of Quang Ngai province

LIST OF INDUSTRIAL PARKS IN DUNG QUAT ECONOMIC ZONE

No Industrial park Name Total Area (ha) Occupancy Rate Status


1 VSIP Quangngai Intergrated, Township and 660 70% In operation
Industrial Park
2 Quang Phu Indistrial Park 92.147 100% In operation
3 Tinh Phong Indistrial Park 140.72 100% In operation
4 Saigon-DungQuat Indistrial Park 118.25 100% In operation
5 Dungquat Industrial Township Park 160 0% Under
Construction

894
6 Binh Hoa - Binh Phuoc Light Industrial Zone 249.51 0% Under
Construction
7 Pho Phong Industrial Park 157 10% Under
Construction
8 Binh Thanh industrial, urban and service park 2.500 0% Under
Construction
9 Binh Hoa - Binh Phuoc Industrial Zone II 305 0% Under
Construction

895
LIST OF KOREAN INVESTMENT PROJECTS

No Name of project Company Name

1 Doosan Heavy Industry Doosan Enerbility Vietnam Co., LTD


2 SFP Vina SFP Vina Co., LTD
3 Providing Industrial services in Dungquat Economic Probank Vina Co., LTD
Zone

4 GEE Producing forest factory Hanvina Energy - KWON DEUK YONG Co., LTD
5 Branch of Kwang Jin Vietnam in Dung Quat Kwang Jin Vietnam Co., LTD

6 Wookwang Vietnam factory Wookwang Intrustrial Co., LTD

7 SamShin Valve Vina factory SamShin Limited

8 YooBong Vinafactory YooBong


9 P&L Vina project HanBit Export Packing Co., LTD
10 Nasan Electric Industries Vietnam Nasan Electric Industries Co., LTD

11 ĐongAh -Tire & Rubber factory ĐongAh -Tire & Rubber Co., Ltl

12 Investment Construction and infranstructure business Daeyoung Industrial Park Quang Ngai Co., Ltd
in Binh Hoa - Binh Phuoc Light Industrial Zone

13 SEDO – DUNG QUAT fabric production factory SEDO CAMPING Co., LTD

896
DUNG QUAT INDUSTRIAL TOWN

GENERAL INFORMATION
Address Binh Thanh commune, Binh Son District, Quang Ngai province
Hoang Thinh Dat Corporation
Investor ▪ Address: 9 Floor, Veam Building, lot D, D1 Area, Phu Thuong Ward, Tay Ho Dist., Hanoi
▪ Tel: (84-24) 6269 3838
▪ Email: info@htdcorp.vn
▪ Website: htdcorp.vn

Contact Person Name - Position - Mobile: - Email:


Hoang Minh Duc – Public Relations Manager – 086 800 3789
hoangduc@htdcorp.vn
Location Adjacent location
- 3km away from Da Nang-Quang Ngai Expressway
- 5 km from Chu Lai airport;
- 7 km from Dung Quat deep seaport;
- 8km away from Tri Binh railway station, 37km away from Quang Ngai railway station
- 1km away from National Route 1A
Investment Sectors Priority Sectors for  Manufacture and assembly of electrical, electronic and
Investment telecommunication equipment.
 Manufacture and assembly of automobile and aircraft
components.
 Productuion of medicine, pharmaceutical chemistry and
pharmaceuticals.
 Manufacture of chemicals and chemical products.
 Producing and processing foodstus, beverages.
 Leather production and related products.
 Mechanical (including plating which is a key stage of the
product).
 Manufacturing industry.
 Light industries and supporting industries.
Investment Restricted  All occupations are unprohibited by Vietnamese law
Sectors
Minimum wage 3,430,000 VND (USD 146.29)
Lease term ▪ Start date: from the date of signing the contract
▪ End date: August 9th 2066
Minimum Lease Area 1 Ha
Limit for Construction Building height limit
Height - Factory construction area: 8-40m
- Operating area: 8-20m

Permitted Construction Permissible building rate


Rate - Factory construction area: 60%
- Operating area: 60%

Planned area ▪ Total area in master plan: 496ha, Phase 1: 319ha, Phase 2: 177ha
▪ Total vacant leasable area: 100ha
▪ Total area with full infrastructure ready to build factory: 100ha

Factory Available for Rent N/A

Operation Status ▪ Active/Under Construction/Under Construction and to be completed by {year}/In Land


Clearance Process
Under Construction
Occupancy Rate and N/A
Number of Projects

Number of Korean projects N/A

897
Lease fee ▪ Land lease fee: 55USD/m2

▪ Factory lease fee: N/A

Operating fee ▪ Management fee: 0.05USD/m2/month


▪ Electricity fee: Peak hour: 0.13 USD/KWh
Normal hour: 0.08 USD/KWh
Off-peak hour: 0.05 USD/KWh
▪ Water fee: 0.45USD/m3 (According to regulations of the Provincial People’s Committee
on clean water price)
▪ Wastewater treatment fee: 0.25 – 0.85 USD/m3
▪ Waste treatment fee: According to the regulations of the service provider
INFRASTRUCTURE AND FACILITY
Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities,
training facilities, etc., Road Width,…
- Universities:
+ Center for vocational training-continuing education and career guidance in Binh Son district;
+ Dung Quat Vocational College of Engineering – Technology
- Hospitals:
+ Binh Son District Hospital;
+ Binh Son District General Hospital;
+ Binh Son district health center;
+ Binh Son Preventive Medicine Center;
+ Dung Quat General Hospital
- Banking:
The banking system in Binh Son district includes: BIDV, Vietcombank, ACB...
- Logistic Center: Dung Quat deep seaport

898
VSIP QUANG NGAI

GENERAL INFORMATION
Address No.8, Dai Lo Huu Nghi, VSIP, Tinh Phong commune, Son Tinh district, Quang Ngai
province, Vietnam
Vietnam-Singapore Industrial Park J.V.CO., LTD
Investor ▪ Address: No.8, Dai Lo Huu Nghi, VSIP, Thuan An City, Binh Duong province
▪ Tel: +84 274 3743 898
▪ Email: marketing@vsip.com.vn
▪ Website: https://www.vsip.com.vn

Contact Person Le Canh Tram Hang – Assistant Manager of IP Marketing Department – 0904 900841 –
hang.lct@vsip.com.vn

Location Adjacent location


- 08 km from Quang Ngai city;
- 130 km from Danang airport; 35km from Chu Lai airport;
- 130 km from Danang port; 22km from Dung Quat airport;
- 10 km from highway.
Investment Sectors Priority Sectors for Textiles and garment, Medical devices, Automotive, FMCG,
Investment F&B, Electronics, Furniture, precision mechanical….
Investment Restricted According to approved EIA
Sectors
Minimum wage Region 3 (According to Decree 38/2022/ND-CP)
Lease term ▪ Start date: 2012
▪ End date: 2082
Minimum Lease Area 10,000m2
Limit for Construction According to Government regulation
Height

Permitted Construction According to Government regulation


Rate

Planned area ▪ Total area: 660


▪ Total vacant leasable area: 40ha for year 2023
▪ Total area with full infrastructure ready to build factory: 40ha for year 2023

Factory Available for Rent N/A

Operation Status ▪ Active

Occupancy Rate and Occupancy rate: 70%


Number of Projects Number of projects: 34

Number of Korean projects 03

Lease fee ▪ Land lease fee: 80USD/m2


▪ Factory lease fee: N/A

Operating fee ▪ Management fee: VND 1,595/m2/month


▪ Electricity fee: according to EVN
▪ Water fee: VND 11,300/m3
▪ Wastewater treatment fee: VND 6,054/m3

INFRASTRUCTURE AND FACILITY

899
Distance from the nearest Banking, State Tax and Finance Agency, Universities, training facilities: 8km

Location/ Map

Hanoi

Quang Ngai

HCMC

900
901
[- This Page is intentionally left blank -]

902
QUANG NINH

903
INVESTMENT ENVIRONMENT IN QUANG NINH

USD/VND 23.510

GENERAL INFORMATION
Area 6,11 km2
Population 1.35 million people (2022)
▪ Quang Ninh is located in Northeast region.
Geographical
▪ Located in North East area, a cooperation area of Vietnam and China economic belt, ASEAN and China
Location
bridge, and Nam Ninh-Singapore economic corridor.
Adjacent ▪ The Province has China to the north with 118.8 km border line, Gulf of Tonkin to the East, Lang Son, Bac
provinces Giang, Hai Duong to the West, Hai Phong city to the South.
2022 statistic:
▪ Nominal GRDP (billion VND):
▪ Real GRDP (billion VND): 269.000 (11,36 billion USD)
▪ GRDP growth: 17,40%
GRDP ▪ GRDP per capita (million VND/year): 197,60 (8423 USD)
▪ Economic structure:
- Industry - Construction: 38,26%
- Agriculture. forestry and fishery: 11,88%
- Service: 41,33%
▪ Industry - Construction growth: 8,76%
Industry
▪ Agriculture, forestry and fishery growth: 5,25%
growth
▪ Service growth: 14,37%,

Import - Total: 15,05 billion USD


Export (Growth rate: 0,24)
Ha Long is a civilized, friendly sea tourism city, a world-renowned national tourism center. Tourism
development becomes a key economy with marine tourism products, heritage sites, parks of Ha Long Bay
honored as the World Heritage - Natural Wonder, mountainuous tourism associated with Dao ethnic cultural
identity, Dong Son - Ky Thuong nature reserve, Ha Long national rainforest park. Forming a tourism
Key Industry services center in Dong Son - Ky Thuong area with convenient transport infrastructure connecting from Ha
Long lowland to the highlands, making the most of land, natural resources advantages to attract strategic
investors with the goal of sustainable development. Investing in building transport infrastructure system
connecting highways with highland communes, ecological parks, etc. to develop the tourism and services
sectors
PCI 73,02
Ranking 1

SOCIAL INFRASTRUCTURE

▪ Roadway: 7 routes with 558.79 km length (National Road 18A, 18B, 18C, 10, 4, 279, 17B); mainly roads
with grade III and IV. The Province also has 02 Highway: Highway Noi Bai – Ha Long – Mong Cai connects
the Province with Hanoi and other provinces such as Bac Ninh, Hai Duong; Highway Ha Long- Van Don
(open for use in late 2018) connecting Hai Phong with Van Don Economic Zone; 01 Highway Projects under
Construction is Highway Mong Cai- Van Don (decrease Van Don- Mong Cai travel time from 2 hours to 50
Transportatio minutes)
n ▪ Railway: There is 65-km railway which is part of Kep – Ha Long rail route. There is also the Yen Vien-
Ha Long route. Besides, there is railway route specialized for coal industry.
▪ Waterway: There are 96 inland ports, 642 km of inland waterways in management. The Ha Long
International Cruise Port has been constructed and come into use in December 2018.
▪ Airway: Heliport Bai Chay in operation and heliport Tuan Chau for tourism. Recently the Van Don
International Airport has been completed and open to use

904
▪ Vietnam’s top region for coal resources - an advantageous condition for construction and operation of
power plants. The Province currently operates 04 thermal power plants, including: Wang Bi, Quang Ninh I
Electricity
& II, Cam Pha I & II and Mao Khe.
▪ Power transmission system 220KV, 500KV and power network 110KV
▪ The province has built a system of water plant with a sufficient capacity to meet domestic and production
demand including: Dien Vong, Dong Ho, Mao Khe, Uong Bi, Mong Cai and Quang Yen .
Water The province also has 69 lakes, dams of various kinds. The largest construction is Yen Lap Lake (located in
Yen Hung District) with 118 million m3 of reserves, capable of providing irrigation water for 10,000 hectares
and drinking water for 100,000 people.
▪ 04 universities, 06 colleges, 04 vocational colleges, 07 technical secondary-schools) and 11 vocational
Education
schools…
▪ 15 hospitals, 09 regional clinics, 10 provincial health centers, 14 district health centers, 186 health stations
Medicare
in communes and wards.

INVESTMENT CONDITION

Human
60% of population are in the working age (2022)
resource

▪ The minimum salary for the province is applied as follows (see appendix for detail amount):
- Area II: Ha Long, Mong Cai, Uong Bi, Cam Pha City
Salary - Area III: Towns of Quang Yen and Dong Trieu, Hoanh Bo district
- Area IV: Districts Van Don, Dam Ha, Co To, Tien Yen, Hai Ha, Binh Lieu and Ba Che
▪ The lowest wage for trained labor (including those trained by the enterprises) must be at least 7% higher
than the above referenced basic salary
▪ Incentives according to government regulations:
Investment - Exemption and reduction for land and water rent fee
incentives - Preferential tax rates and exemption, reduction period for corporate income tax.
- Import tax exemption

▪ Development of education, training, health care, manufacturing of high-tech products, new materials, new
energy, biotechnology, mechanical engineering, farming and processing of agriculture, forestry and fishery.
Fields ▪ Priotized areas for investment:
Attracting
- Regions with especially difficult socio-economic conditions: The Ba Che District, Binh Lieu District, Co
Investment
To Island and the island districts of the province.
- Regions with difficult socio-economic conditions: Van Don Island district.

Map

905
Quang Ninh Department of Planning and Investment
Address: 5th Floor Toa nha lien co quan 2,Nguyen Van Cu Road, Ha Long City , Quang Ninh
Contact Tel: (84-203) 3 835 693
Fax : (84-203) 3 838 071
Email: skhvdt@quangninh.gov.vn

906
LIST OF INDUSTRIAL ZONES IN QUANG NINH

No Industrial zone Name Total Area (ha) Occupancy Rate Status


1 Dong Mai Industrial Zone 160 80% In operation
3 Texhong Hai Ha Industrial Zone 660 100% In operation
4 Hai Yen Industrial Zone 184 50% In operation
5 Cai Lan Industrial Zone 305.3 100% In operation
6 Hai Ha Sea Port Industrial Zone 4,988 Under Construction
7 Song Khoai Industrial Zone 714 Under Land
Clearance Process
8 Nam Tien Phong Industrial Zone 487.4 Under Land
Clearance Process
9 Bac Tien Phong Industrial Zone 1,192.9 Under Land
Clearance Process
10 Hoanh Bo Industrial Zone 136.35 Under Legal
Process

QUANG NINH’S LOCATION MAP OF INDUSTRIAL ZONES

907
DONG MAI INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

Dong Mai ward, Quang Yen township, Quang Ninh province


Address
VIGLACERA CORPORATION
(Glass and Ceramics for Construction Corporation)
▪ Address: Tien Son Industrial Park, Hoan Son Commune, Tien Du District, Bac Ninh
Province.
Investor
▪ Head Office: The 2nd Floor, Viglacera Tower, No.1 Thang Long Boulevard, Ha Noi,
Vietnam.
▪ Tel: (84-24) 3 553 6688 Fax: (84-24) 3 553 7166
▪ Website: www.viglaceraip.com
▪ Mr. Dang The Nam - Deputy Manager of Business Department – (84) 903 405 099 -
Contact Person
namdt.vir@viglaceraland.vn

- Land: 107 km from Hanoi, Hanoi – Ha Long railway (Cai Lan sea port), which has modern
scale, design speed of 120km/h for passenger train and 80km/h for cargo train, is under
Location reform and innovation investment.
- Seaport: 27 km from Hai Phong port; 26 km from Cai Lan seaport
- Airport: 130 km from Noi Bai Aiprort; 75 km from Van Don Airport

Electronics, power industry, high techs, material for construction


Investment priorities
and mechanics, pharmaceuticals, foodstuffs, light industry,
Sectors
Investment Area consumer goods,…
Investment Restricted
Polluted sector
Sectors

Minimum wage [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019

Lease term ▪ End date: 2058

Minimum Lease Area 10,000 m2

Limit for Construction


Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Permitted Construction Residental Planning regulation (QCXDVN 01: 2008/BXD)
Rate
▪ Total area: 160 ha
Planned area ▪ Total vacant leaseable area: 40 ha
▪ Total area with full infrastructure ready to build factory: 40 ha

Factory Available for Rent NA

▪ In operation
Operation Status

Occupancy Rate and ▪ 60%


Number of Projects ▪ Above 2 Projects
Number of Korean
None
Projects

Lease fee ▪ Land lease fee: 80 USD/m2 (over project life)

▪ Management fee: 0.5 USD/m2/year (excluded 10% VAT)


▪ Electricity fee: As regulated by Government (see appendix)
▪ Water fee: 12, 810 VND/m3 excluded VAT (equivalent to 0.58 USD/m3) - Monthly
Operating fee
payment
▪ Wastewater treatment fee: 10, 145 VND/m3 excluded V.A.T (equivalent 0.46 USD/m3) -
monthly payment. The quantity is defined by 80% the amount of water supply.

INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Vietin Bank, Techcombank, Vietcombank

908
Tax service, State finance
30 km from Ha Long Tax Office
office

Customs Service Quang Ninh’s customs office is located at the centre of Ha Long city

Logistics Logistics services are inside the industrial zone.

Quang Ninh Post Office with modern informatics technology system for serving multi-
Post office
service communication such as data transfer, internet, IP telephone and video conference,

Medicare 10 km from Viet Nam – Thuy Dien Hospital

Police, public security Security Guard ensures security inside industrial park.

4 Universities (Quang Ninh industrial university, Ha Long university, Foreign trade


Universities, training
university – Quang Ninh branch, Mine geological university – Quang Ninh branch), 8
facilities, etc.
colleges, 2 secondary schools.

Recruitment Viglacera will support in recruitment

Dong Mai Urban area with more than 30 ha always ensure houses for workers living in the
Worker dormitory
IP.
Worker's child education
NA
facility

One-stop service NA

Road Width Road Width: 15 ~ 43 m, 2 lanes

Communication
The telecommunication system complies with international standards and is always available
Infrastructure of
for commnunication demand with high data transmission s
Industrial Zone
Emergency Power
None
generator

Fire-fighting facility Available. Water supply system for firefighting is located along each road.

Layout Plan

Location Map

909
Actual View

910
TEXHONG HAI HA INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

▪ Hai Ha Sea Port Industrial Zone, Quang Dien Town, Hai Ha District, Quang Ninh
Address
Texhong Vietnam Industrial Zone JSC
Investor ▪ Address: Hai Ha Sea Port Industrial Zone, Quang Dien Town, Hai Ha District, Quang Ninh
▪ Tel: (84-203) 3 762 268

Contact Person ▪ Ms. Pham Thi Thanh Huong – Chief Office – (84) 129 588 8168 - ptthuong1@texhong.com

- Located on the National Road 18 from Hanoi to Mong Cai (Quang Ninh), 120 km from
Hanoi Center - Close to Yen Vien (Hanoi) - Pha Lai – Ha Long – Cai Lan (Quang Ninh)
Railway and 8 km from Uong Bi Station
Location - 20 km from Cai Lan seaport (Ha Long, Quang Ninh) (with picking load of 50,000 tons of
bulk ships, 3,000TEU container goods)
- 50km from Hai Phong port (Hai Phong city) (with picking load of 25,000 tons of bulk ships,
1,000TEU container goods)
- 120 km from Noi Bai Airport (Hanoi) and 50 km from Cat Bi Airport (Hai Phong)

Investment priorities Sectors Textile industry


Investment Area
Investment Restricted Sectors Polluted Sector

Minimum wage [Area 4] According to Decree 90/2019/NĐ-CP dated 15th November 2019

▪ Start date: 25/04/2014


Lease term
▪ End date: 25/04/2064

Minimum Lease Area 10,000 m2

Limit for Construction


Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Permitted Construction Residental Planning regulation (QCXDVN 01: 2008/BXD)
Rate
▪ Total area: 660ha
Planned area ▪ Total industrial area: 485.3 ha
▪ Total vacant leasable land availabl for lease: 166.8 ha

Factory Available for Rent None

Operation Status ▪ In operation

Occupancy Rate and 100%


Number of Projects More than 10 projects
Number of Korean
None
Projects

Lease fee ▪ Land lease fee: 48-60 USD/m2/over project life

▪ Industrial service and Infrastructure maintenance fee: 0.31 USD/m2/year


▪ Electricity fee: As regulated by the Government (See appendix)
Operating fee ▪ Water fee: 10,100VND (~0.45 USD)/m3
▪ Wastewater treatment fee: 0.39 USD/m3 (monthly payment, chargeable volume is counted
at 80 % of supplied water volume)

INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Vietcombank

Tax service, State finance


5 km from Quang Trung Commune Tax Center
office

Customs Service Inside the zone

911
Logistics Inside the zone

Post office 5 km from Quang Chinh Commune Post Office, 7 km from Hai Ha Ward Post office

Medicare 5 km from Hai Ha Ward General Hospital

Police, public security • Industrial Park’s security team keeps watching 24/24h

Universities, training
NA
facilities, etc.

Recruitment Support from Hai Phong Economic Zone Management Board and infrastructure developers

Worker dormitory None

Worker's child education


None
facility

One-stop service NA

Road Width NA

Communication Modern communication system reaches the international standard and ready to meet full
Infrastructure of demands concerning on national and international communication services. Service Provider:
Industrial Zone VNPT, Viettel
Emergency Power
None
generator
Fire brigade station away from 1km; extinguishing water pipe and fire hydrants are located
Fire-fighting facility
along the main roads and branches in the park.

Layout Plan

Location Map

912
Actual View

913
HAI YEN INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

▪ Hai Yen ward, Mong Cai city, Quang Ninh province (Belonging to Mong Cai border gate
Address Economic Zone ;)
VIGLACERA CORPORATION
(Glass and Ceramics for Construction Corporation)
▪ Address: Tien Son Industrial Park, Hoan Son Commune, Tien Du District, Bac Ninh
Province.
Investor
▪ Head Office: The 2nd Floor, Viglacera Tower, No.1 Thang Long Boulevard, Ha Noi,
Vietnam.
▪ Tel: (84-24) 3 553 6688 Fax: (84-24) 3 553 7166
▪ Website: www.viglaceraip.com
▪ Mr. Dang The Nam - Deputy Manager of Business Department – (84) 903 405 099 -
Contact Person
namdt.vir@viglaceraland.vn
▪ Land: Located on the National Road 18, 170 km from Ha Long station, 07 km from Mong
Cai city to the West and 170km from Ha Long city, 310 km from Hanoi center.
▪ Seaport:
- 170km from Cai Lan seaport (Ha Long, Quang Ninh) (with picking load of 50,000 tons of
bulk ships, 3,000TEU container goods)
Location - 240km from Hai Phong port (Hai Phong city) (with picking load of 25,000 tons of bulk
ships, 1,000 TEU container goods)
- 30km Hai Ha seaport areas (Hai Ha seaport - Industrial Area, Hai Ha district) (According
to picking plan of 30,000 - 80,000 DWT vessels)
▪ Airport: 320 km from Noi Bai Airport (Hanoi), 140 km from Van Don Airport and 240 km
from Cat Bi Airport (Hai Phong)
Electronics, power industry, high techs, material for construction
Investment priorities
and mechanics, pharmaceuticals, foodstuffs, light industry,
Sectors
Investment Area consumer goods,…
Investment Restricted
Investment Restricted Sectors: Polluted sectors
Sectors

Minimum wage [Area 3] According to Decree 90/2019/NĐ-CP dated 15th November 2019

Lease term ▪ End date: 2057

Minimum Lease Area 10,000 m2

Limit for Construction


Maximum 3-storey buidling
Height
Permitted Construction
Maximum coverage: 60%
Rate
▪ Total area: 184 ha
Planned area ▪ Total vacant leaseable area: 30 ha
▪ Total area with full infrastructure ready to build factory: 30 ha

Factory Available for Rent None

Operation Status ▪ In operation

Occupancy Rate and ▪ 50%


Number of Projects ▪ 06 projects
Number of Korean
None
Projects

Lease fee ▪ Land lease fee: from 58 USD – 63 USD /m2

▪ Management fee: 0.5 USD/m2/year (excluded 10% VAT)


▪ Electricity fee: As regulated by Government (see appendix)
Operating fee ▪ Water fee: 12,810 VND/m3 excluded VAT (equivalent to 0.58 USD/m3) - Monthly payment
▪ Wastewater treatment fee: 10,145 VND/m3 excluded V.A.T (equivalent 0.46 USD/m3) -
monthly payment. The quantity is defined by 80% the amount of water supply.

914
INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Vietcombank, Techcombank

Tax service, State finance


8.3 km from Mong Cai Tax Office Department
office
All the custom procedures are easily done in the IZ and get incentives in Vietnam – China
Customs Service economic corridor
Enterprises can temporarily import to China and re-export from Feng Cheng (China) Seaport

Logistics Inside the zone

6.5 km from Mong Cai Post Office. Quang Ninh Post Office with modern informatics
Post office technology system for serving multi-service communication such as data transfer, internet, IP
telephone and video conference

Medicare 6 km from Mong Cai Hospital

Police, public security • Industrial Park’s security team keeps watching 24/24h

4 Universities (Quang Ninh industrial university, Ha Long university, Foreign trade


Universities, training
university – Quang Ninh branch, Mine geological university – Quang Ninh branch), 8
facilities, etc.
colleges, 2 secondary schools.

Recruitment Viglacera will support in recruitment

Worker dormitory Hai Yen Urban Area with 137 ha adjacent to Industrial Park

Worker's child education


NA
facility

One-stop service Inside the zone

Road Width Main Road: 2 lanes, 21.5 – 43.5 in width

Communication
Modern communication system reaches the international standard and ready to meet full
Infrastructure of
demands concerning on national and international communication services.
Industrial Zone
Emergency Power
NA
generator

Fire-fighting facility Available. Water supply system for firefighting is located along each road.

Layout Plan

915
Location Map

Actual View

916
CAI LAN INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

▪ Gieng Day ward and Bai Chay ward, Ha Long city, Quang Ninh province
Address
Quang Ninh Contrustion and Cement Joint Stock Company
▪ Address: Cai Lan Street, Bai Chay ward, Ha Long city, Quang Ninh province
Investor ▪ Tel: (84-203) 3 841 648/3 841 637 Fax: (84-203) 3 841 643
▪ Email: ctyxmxdqn@hn.vnn.vn or info@qncccom.vn
▪ Website: www.qncc.com.vn
Mr. Nguyen Van Hung – Cai Lan IZ Management Board – (84) 902 233 622 -
Contact Person
nguyenhung6868@gmail.com
- Located on the National Road 18 from Hanoi to Mong Cai (Quang Ninh). 140km from Ha
Noi Center and close to Cai Lan station
- Bordering Cai Lan seaport (Ha Long, Quang Ninh) (with picking load of 50,000 tons of
Location bulk ships, 3,000 TEU container goods)
- 70 km from Hai Phong port (Hai Phong city) (with picking load of bulk ships of 2.5 ten
thousand tons, 1,000 TEU container goods)
- 150 km from Noi Bai Airport (Hanoi) and 60 km from Cat Bi airport (Hai Phong)
Electronics, power industry, high techs, material for construction and
Investment priorities
mechanics, pharmaceuticals, foodstuffs, light industry, consumer
Sectors
Investment Area goods,
Investment
Investment Restricted Sectors: Polluted sectors
Restricted Sectors

Minimum wage [Area 2] According to Decree 90/2019/NĐ-CP dated 15th November 2019

Lease term 1997 -2047

Minimum Lease Area 10,000 m2

Limit for Construction


Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Permitted Construction Residental Planning regulation (QCXDVN 01: 2008/BXD)
Rate

Planned area ▪ Total area: 305.3 ha

Factory Available for Rent No

Operation Status ▪ In operation

Occupancy Rate and ▪ 100 %


Number of Projects ▪ 61 projects
Number of Korean
01
Projects
▪ Land lease fee:
- One-off payment for 45 years: 0.262 USD/m2/year
- One-off payment for 20 years: 0.366 USD/m2/year
Lease fee
- One-off payment for 10 years: 0.458 USD/m2/year
- One-off payment for 05 years: 0.530 USD/m2/year
- Annual payment: 0.608 USD/m2/year
▪ Infrastructure maintenance fee: 0.03 USD/m2/year
Operating fee ▪ Electricity fee: as regulated by the Government (see appendix)
▪ Water fee: 10,100VND (~0.45 USD)/m3

INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Agribank, Vietcombank, Sacombank

917
Tax service, State finance
5 Km from Ha Long Treasury Office
office

Customs Service 3 km from Cai Lan Port

Logistics Cai Lan International Container Terminal Company inside the zone

Post office 6 Km from Quang Ninh Post Office

Medicare 4 Km from Bai Chay General Hospital

Police, public security 9 Km Distance from Ha Long Police Station

4 Universities (Quang Ninh industrial university, Ha Long university, Foreign trade


Universities, training
university – Quang Ninh branch, Mine geological university – Quang Ninh branch), 8
facilities, etc.
colleges, 2 secondary schools.

Recruitment Supported by Industrial Zone Developer

Worker dormitory NA

Worker's child education


NA
facility

One-stop service NA

Road Width NA

Communication
Telecommunication: broadband ADSL service, telecommunication with IDD, fiber optic
Infrastructure of
capabilities, leased line. Telephone: number of line depend on investor’s demand.
Industrial Zone
Emergency Power
Available in the zone
generator
Fire brigade station away from 1km; extinguishing water pipe and fire hydrants are located
Fire-fighting facility
along the main roads and branches in the park.

Layout Plan

918
Location Map

Actual View

919
[- This Page is intentionally left blank -]

920
QUANG TRI

921
INVESTMENT ENVIRONMENT IN QUANG TRI

GENERAL INFORMATION

- Area: 4.702 km2


Area, Population
- Population (in 2022): 647.790 people

- Quang Tri province is in the North Central region of Vietnam with one city, one town
and eight districts.
- 600 km from Hanoi City; 1,120 km from Ho Chi Minh City and 170 km from Da
Nang City
Geographical Location
- Quang Tri is the focal point on the East-West Economic Corridor (EWEC), the
shortest trans-Asia route connecting countries in the region from Myanmar - Thailand -
Laos through Lao Bao international border gate to the Central region of Vietnam and
expanding to the ASEAN region.

It borders Quang Binh province to the North, Thua Thien - Hue province to the South,
Adjacent provinces Savannakhet and Salavan provinces of Laos to the West (with 179 km of land border),
the East Sea to the East with a coastline of 75 km.
2022 statistics:

+ GRDP: 40.822,51 billion VNĐ (1.74 billion USD)

+ GRDP growth: 7.17%

+ GRDP per capita: 62.83 million Dong/year (2.676 USD/year)

GRDP + Economic structure:

- Industry Construction: 29.23 %

- Agriculture. forestry and fishery: 20.26%

- Service: 45.99 %

- Tax on Goods: 4.52 %

2022 statistic

+ Industry Construction growth: 12.69 %


Industry growth
+ Agriculture, forestry and fishery growth: 1.09%

+ Service growth: 7.06%

PCI Score: 61.26 – ranked 59/63 cities and provinces in Vietnam (2022)

SOCIAL INFRASTRUCTURE

+ Roadway:
The transportation network throughout the province
is constantly being improved and constructed, not
only creating favorable traffic conditions and socioeconomic development but also
transforming landscapes, fundamentally changing the appearance of the province.
The North - South expressway from Cam Lo (Quang Tri) – La Son (Thua Thien - Hue)
- Tuy Loan (Da Nang) with a length of 175.5 km is about to be completed and put into
use in 2022. This high-speed road creating a parallel to National Highway 1A and
connecting Quang Tri with Da Nang and Quang Nam, shall strongly facilitate the
circulation of goods and economic development in the Central region of Viet Nam.
Transportation The North-South Expressway from Bai Vot (Ha Tinh) to Cam Lo (Quang Tri) with a
length of 267 km, is under construction, in order to connect and strengthen economic,
political, cultural centers, and economic zones, industrial parks, especially the key
economic regions of the Central region. It is expected to be basically completed in
2025 and put into operation from 2026.
The Highway 15D from the future My Thuy seaport to La Lay international border gate
is expected to be constructed in the period of 2022-2025. This will be a gateway to the
sea and a transport hub for the Central, Southern Laos and Northeastern Thailand.
Cam Lo - Lao Bao Expressway, approved by the Prime Minister of the road network
plan for the period of 2021 - 2030, with a vision to 2050 in Decision No. 1454/QD-TTg
dated September 1, 2021. This route, when completed, will help connect key economic

922
centers and important traffic hubs of Quang Tri province. From there, it helps to
improve transport capacity, meet the needs of socio-economic development, and
connect the East-West economic corridor of the country.
+ Railway: North-South

+ Waterway
*) Cua Viet Port is a general cargo port, including three cargo wharfs, one dedicated
berth for tourism and one yeti, receiving ships up to 5,000 DWT.
*) My Thuy deep-water seaport in the Quang Tri Southeast Economic Zone (the
nearest gateway to the East Sea of the EWEC) has a design scale of 685 ha and is
expected to handle cargo ships up to 100,000 DWT.
+ Quang Tri Airport has been approved by the Prime Minister for investment in the
form of Public Private Partnership (PPP) under the Decision No. 2148/QD-TTg
dated December 20, 2021. The airport is located in three communes of Gio Quang,
Gio Hai, and Gio Mai, Gio Linh district, and close to the National Highway 1A, 7
km from Dong Ha city to the North, about 5 km from Cua Viet beach to the East.
The Airport is designed with grade 4C (according to standards of International Civil
Aviation Organization-ICAO), capacity of 01 million passengers/year, 3,100 tons of
cargo/year, type of aircraft code C or equivalent, 5 parking spaces for code C aircraft
(capable of parking code E aircraft). The total planned
land area is 265.37 ha, of which 177.64 ha is the common use zone; 87.73 ha is the
civil aviation zone). The total investment is expected to be 5,822.9 billion VND.
The Quang Tri Airport Project is prioritized for investment in the period of 2021-2024.
Electricity Power is guaranteed to be supplied from the national grid through the North-South 500
kV transmission line; national grid system 220 kV and 110 kV synchronously.
Water Domestic water supply system with a capacity of 55,000 m3/day
01 University branch
03 Colleges
02 Vocational high schools
Quang Tri has vocational training centers that provide skilled labor for enterprises in
Education the province at a more competitive cost than other provinces.
Ischool Quang Tri owned and developed by Nguyen Hoang Group is also a place to
provide education and training services according to an international environment to
meet the families of domestic and foreign experts who come to do business and
investment in Quang Tri.
The whole province has 146 medical facilities with medical examination and treatment
functions (20 hospitals and regional general clinics; 125 health stations in communes,
Medicare
wards and town; 01 provincial disease control center); there are 2,200 hospital beds
(excluding the health stations).

INVESTMENT CONDITION

The labor force aged 15 and over is 332.758 people, accounting for 51.37% of the
population; in which, male accounted for 51.85% and female accounted for 48.15%.
The labor force in urban areas accounted for 33.29% and rural areas accounted for
Human resource 66.71%. Laborers working in economic sectors are estimated at 321,345 people,
accounting for 96.57% of the province's labor force.

- Create new jobs in 2022 for 15,658 workers, of which 2,166 people are exported.

The proportion of trained workers compared to the total number of employees is


Education level estimated at 70.28%, of which the rate of trained workers with degrees and certificates
is 32.5%.

Salary The regional minimum wages are applied as follows:


Quang Tri: Region IV: 3,250,000 VND/month.
+ Incentives according to government regulations: Tax, land and property
depreciation incentives
With regard to the forms of investment incentives specified in Clause 1, Article 15 of
the Law on Investment, Quang Tri province commits to implement: investors eligible
for investment incentives are entitled to the highest incentives within the framework
Investment incentives specified by the relevant Law on Investment.
+ Incentives from the province:

(i) Supporting the development of technical infrastructure systems inside and outside the
fence of projects implemented outside the IZ, functional areas of the EZ
Regarding traffic: The provincial budget supports investment in the construction of
roads inside and outside the project's fence, but not exceeding VND 03 billion.

923
Regarding electricity supply, water supply and drainage: The provincial budget
supports the construction of transformer stations, electricity lines, water supply and
drainage, but not more than 02 billion VND for all the above items.
(ii) Supporting the vocational training and human resource development
Each project is only supported once, up to a maximum of 100 million VND, each
employee is only supported for training once during their working time at the project
that using employees in the same training major.
For primary vocational training under 03 months: comply with current regulations of
the province.
For intermediate vocational training or workers using high technology: support
2,000,000 VND / 1 employee
For vocational training at college level: supporting VND 4,000,000/1 employee.
Supporting manufacturing and business premises to
relocate under decisions of state agencies
Support level
Each premise is supported with 30% of reasonable expenses for dismantling, moving
and installing equipment, machinery and workshops, but not exceeding 200,000,000
VND/premise.
Manufacturing premises subject to relocation as planned to change their business lines
in accordance with the law will be supported once to solve difficulties. The support
level is 200,000 VND/m2 of factory, but not exceeding 100,000,000 VND/premise.
(iii) Supporting market development, providing information
Support on product introduction
Free support in advertising, introducing images of businesses and products on the
website of Quang Tri province and other websites of the relevant departments and
localities upon requested.
To be considered and supported to introduce information and images about businesses
and products in the province's publications promoting investment, trade and tourism.
(iii) Support on providing information, consulting on investment and business
procedures
Investors, enterprises, organizations and individuals are provided with free of charge
information on the investment and business environment, planning of investment
sectors and industries, planning on land use; are able to access to land fund when
researching and conducting investment and business activities in Quang Tri province.
Free support and advice on business establishment procedures; dossiers of
administrative procedures on investment, business, procedures for land rent,
construction permit, environment and other
administrative procedures when required.
Free support on legal advice and problem handling during operation.
(iiiii) Support on investment, trade and tourism promotion
Enterprises and investors are provided with conditions and support to participate in
investment, trade and tourism promotion activities organized by the province
or when the province sends representatives to participate the events domestically and
internationally
The provincial budget provides partial funding support for investors who have
investment projects on the list of industries and sectors eligible for investment
incentives or investing in investment incentive areas when participating in conferences,
trade fairs and exhibitions to promote, search and expand the market. The support level
is 50% of the cost of booth rental and product transportation, but the maximum support
cannot exceed VND 40,000,000/enterprise/year.
Industry:
Energy; agro-forestry-fishery processing (especially
wood processing); silicate; textile & garment; assembling
components - machines and equipment
Agriculture:
High-tech agriculture, organic, natural farming.
Fields Attracting Investment Services – Tourism
Investing in eco-tourism and resort complexes in the coastal areas and the western
region of Quang Tri; commercial center/ supermarket; spiritual tourism; nostalgic
tourism.
Infrastructure:
Investing in infrastructure development of urban areas,
tourist areas, industrial parks, economic zones, airports and modern logistics services.
Map (Quang Tri)

924
- Quang Tri Province Investment, Trade and Tourism Promotion Agency (IPA)

+ Address: 06 Khóa Bảo, Đông Hà city, Quảng Trị province

+ Tel: (+84) 02333 681 777


Contact
+ Email: ipa@quangtri.gov.vn

+ Contact person: Nguyễn Đức Tân – Director

+ Fanpage: Visit Quang Tri

925
LIST OF INDUSTRIAL ZONES

NO INDUSTRIAL ZONE NAME TOTAL AREA OCCUPANCY RATE STATUS


(HA)
1 Nam Dong Ha Industrial Park 98,754 90% In operation
2 Quan Ngang Industrial Park 318,13 84,40% In operation
3 Quang Tri Industrial Park 481,2 Not yet used In operation
4 Tay Bac Ho Xa Industrial Park 214,77 Not yet used In operation
5 Trieu Phu Industrial Park 528,97 Not yet used In operation
6 Lao Bao Special Economic and 15.804 1.800 ha In operation
Commercial Zone
7 Dong Nam Economic Zone 23.792 4.870 ha In operation

LOCATION MAP OF INDUSTRIAL ZONES

926
NAM DONG HA INDUSTRIAL ZONE

GENERAL INFORMATION

Address Dong Luong district, Dong Ha city, Quang Tri province.

Investor Name: Quang Tri Economic Zones Authority


Address: 91 – Le Duan street – Dong Ha city –Quang Tri province
Tel: 0233.3859713
Fax: 0233.3551729
Website: http://bqlkkt.quangtri.gov.vn

Contact Person - Mr. Nguyen Duc Thien – Deputy Head;


Phone number: 0899236567
Email: 7771302@gmail.com

Location - Km from nearest City Center (Dong Ha city): 2km


- Km from nearest Airport:
+ 80km from Phu Bai airport (Thua Thien Hue province);
+ 170km from Da Nang international airport;
- Km from nearest Waterport:
+ 22km from Cua Viet port;
+ 135km from Chan May - Hue port;
+ 168km from Da Nang port.
- Km from nearest Highway and nearest Raiway:
Road route:
+ Located on the trans-A route;
+ Near National Highway 1A;
+ 10km from Ho Chi Minh road;
Railway Station: Located near Dong Ha Station

Investment Area Investment Priorities Sectors:


+ Production of building materials;
+ Leather shoes, garments and handicrafts industry;
+ Mechanical industry, electrical and electronic assembly, machinery and equipment,
means of transport...
- Prioritize industries that are clean, with less wastewater and less environmental
pollution.

Investment Restricted Sectors: Sectors that are not environmentally friendly, harmful to
human health and national security.

Minimum Lease Minimum wage in region 3 according to Decree 141/2017/ND-CP

Lease term The land lease term is not more than 50 years.

Minimum Lease Area No minimum rental area limit. Land area for lease according to the actual needs of the
project.

Limit for Construction Height - Factory construction area:

927
- Controller center:

Permitted Construction Rate Maximum building density 60%-70%

Planned Area - Total area: 98,754ha


- Total vacant leasable area: 75.579ha
Total area with full infrastrucure ready to buid factory: 75.579ha

Factory Available for Rent Total area: Investors build their own factories

Operation Status In operation

Occuphancy Rate and Number of - Occupancy Rate: 90.64%


Projects
- Number of projects in the zone: There are 37 registered investment projects with a total
investment capital of 2,277 billion VND

Number of Korean Projects None

Lease fee - Payment (Time and actual payment): Land rental with annual payment or one-time
payment of land rental
Form of land rent payment: annual payment or one-time payment for the entire operation
period of the project.
- Land lease fee (Land rental price):
+ Unit price of the land rental (annual payment): 500,000 VND/m2/year x 0.65% x 1.0
time = 3,250 VND/m2/year.
+ Unit price of one-time payment of land rental: The Provincial People's Committee
shall decide the specific land price for the case of one-time payment of land lease.

Operating fee - Management fee: Not yet.


- Electricity fee: The unit price of electricity for production according to the regulations
of the Ministry of Industry and Trade
- Water fee: Unit price of clean water consumption
+ For physical production: 12,500 VND/m3;
+ For daily activities: 7,200 VND/m3
- Wastewater treatment fee (Wastewater treatment fee):
- Waste treatment fee (Waste treatment fee):

INFORMATION OF INFRASTRUTURE AND FACILITY

Financial institution List name of popular banks in the zone (BIDV, Vietcombank, Vietinbank, Agribank,
Sacombank, LienVietPostBank, VPbank ….)

Tax service, State finance office Distance from the nearest State Tax and Finance Agency:
- Tax Department of Quang Tri province: 100m
- Dong Ha Tax Department: 500m
- The State Treasury of Quang Tri province: 1.5km

Customs Service - Quang Tri Customs Department: 500m

Distance form the nearest Inland Container Depot (Distance to Cua Viet Port): 22km

Logistics Distance form the nearest Logistics Center (Specific service, located inside the IP or how
many kilometers away from the IP)

Post office Distance form the nearest Mailing Post office (Distance to Dong Ha City Post Office):
1km

928
Medicare Distance form the nearest Hospital, Medicare Center + name of Hospital (Distance to
Quang Tri Provincial Hospital): 20m

Police, public security Distance form the nearest Police Station (Distance to Quang Tri Provincial Police):
200m

Universities, training facilities, Distance form the nearest Universities and Training Center + Name of
ect. Universities/Training Center:
-Distance to Hue University Campus: 300m
-Distance to Quang Tri Vocational School: 500m

Recruitment Support to introduce personnel: Quang Tri Employment Service Center

Worker dormitory Distance from the nearest Facility (Worker dormitory): Planning already, no investor yet

Worker’s child education facility Distance form the nearest Facility (Kindergarten and preschool for children):
- Ischool Quang Tri: 10m;
- Tuoi Hong Kindergarten: 200m;
- Hoa Phuong Kindergarten: 200m.

One-stop service Distance from the nearest Facility (Quang Tri Provincial Public Administration Service
Center): 6km

Road Width Traffic in the industrial park, number of lanes: 1-lane, 2-lane asphalt road

Communication Infrastructure of Communication Infrastructure: Radio, television, internet, etc.


industrial park

Emergency Power generator Emergency generator: substation 110kv.

Fire-fighting facility Available/Not Available: fire extinguisher, fire truck…

Detailed planning map of Nam Dong Ha Industrial Park

929
Photo of Nam Dong Ha Industrial
Park

930
QUAN NGANG INDUSTRIAL ZONE

GENERAL INFORMATION

Address Gio Linh district, Quang Tri province

Investor Name: Quang Tri Economic Zones Authority


Address: 91 – Le Duan street – Dong Ha city –Quang Tri province
Tel: 0233.3859713
Fax: 0233.3551729
Website: http://bqlkkt.quangtri.gov.vn

Contact Person Mr. Nguyen Duc Thien – Deputy Head;


Phone number: 0899236567
Email: 7771302@gmail.com

Location - Km from nearest City Center: 10km from Dong Ha city center
- Km from nearest Airport:
+ 90km from Phu Bai airport (Thua Thien Hue province)
+ 180km from Da Nang international airport;
- Km from nearest Waterport:
+ 15km from Cua Viet port;
+ 148km from Chan May - Hue port;
+ 182km from Da Nang port.
- Km from nearest Highway and nearest Raiway:
Road route:
+ Located on National Highway 1A route;
+ Near National Highway 9 (Road A);

Railway station: Located near Ha Thanh station

Investment Area Investment Priorities Sectors:


+ Production of building materials;
+ Leather and garment industry;
+ Mechanical industry, electrical and electronic assembly, machinery and
equipment, means of transport...
- Prioritize industries that are clean, with less wastewater and less environmental
pollution.

Investment Restricted Sectors: Sectors that are not environmentally friendly,


harmful to human health and national security.

Minimum Lease Minimum wage in region 4 according to Decree 141/2017/ND-CP

Lease term The land lease term is not more than 50 years.

Minimum Lease Area No minimum rental area limit. Land area for lease according to the actual needs
of the project.

Limit for Construction Height - Factory construction area:


- Controller center:

931
Permitted Construction Rate Maximum building density 60%

Planned Area - Total area: 318.13ha


- Total vacant leasable area: 231.16ha
-Total area with full infrastrucure ready to buid factory: 231.16ha

Factory Available for Rent Total area: Investors build their own factories

Operation Status In operation

Occuphancy Rate and Number of - Occupancy Rate: 84,40%


Projects
- Number of projects in the zone: There are 29 registered investment projects with
a total investment capital of 5.256 billion VND

Number of Korean Projects None

Lease fee - Payment (Time and actual payment): Land rental with annual payment or one-
time payment of land rental
Form of land rent payment: annual payment or one-time payment for the entire
operation period of the project.
- Unit price of the land rental (annual payment350,000 VND/m2/year x 0.65% x
1.0 time = 2,275 VND/m2/year.
+ Unit price of one-time payment of land rental: The Provincial People's
Committee shall decide the specific land price for the case of one-time payment
of land lease.
- Factory lease fee:

Operating fee - Management fee: 10 million/ha/year. Valid from 2017.


- Electricity fee: The unit price of electricity for production according to the
regulations of the Ministry of Industry and Trade
- Water fee: Unit price of clean water consumption
+ For physical production: 12,500 VND/m3;
+ For daily activities: 7,200 VND/m3
- Wastewater treatment fee (Wastewater treatment fee):
- Waste treatment fee (Waste treatment fee):

INFORMATION OF INFRASTRUTURE AND FACILITY

Financial institution List name of popular banks in the zone (BIDV, Vietcombank, Vietinbank,
Agribank, Sacombank, LienVietPostBank, VPbank ….)

Tax service, State finance office Distance form the nearest State Tax and Finance Agency:
-Distance to Gio Linh District Tax Department: 5km
-Distance to Gio Linh District State Treasury: 5km

Customs Service Distance from the nearest Customs Agency (Cua Viet port border gate Customs
Branch): 15km

Distance form the nearest Inland Container Depot (Cua Viet Port): 15km

Logistics Distance form the nearest Logistics Center (Specific service, located inside the
IP or how many kilometers away from the IP)

Post office Distance form the nearest Mailing Post office (Distance to Gio Linh Post Office):
3,5km

932
Medicare Distance form the nearest Hospital, Medicare Center + name of Hospital
(Distance to Gio Linh Hospital): 05km

Police, public security Distance form the nearest Police Station (Distance to Gio Linh Police Station):
05km

Universities, training facilities, ect. Distance form the nearest Universities and Training Center + Name of
Universities/Training Center:
-Distance to Hue University Campus: 7,5km
-Distance to Quang Tri Vocational School: 7km

Recruitment Support to introduce personnel: Quang Tri Employment Service Center

Worker dormitory Distance form the nearest Facility (Worker dormitory): Planning already, no
investor yet

Worker’s child education facility Distance form the nearest Facility (Kindergarten and preschool for children):
- Tuoi Hong Gio Linh Kindergarten: 3.5km;
- Hoa My Kindergarten: 1km;
- Gio Thanh Kindergarten: 1.5km.

One-stop service Distance from the nearest Facility (Quang Tri Provincial Public Administration
Service Center): 10km

Road Width Traffic in the industrial park, number of lanes: 1-lane, 2-lane asphalt road

Communication Infrastructure of Communication Infrastructure: Radio, television, internet, etc


industrial park

Emergency Power generator Emergency generator: substation 110kv.

Fire-fighting facility Available/Not Available: fire extinguisher, fire truck…

Detailed planning map of Quan Ngang Industrial Park

933
934
935
Photo of Quan Ngang Industrial Park

936
The location of Quan Ngang Industrial Park

937
LAO BAO SPECIAL ECONOMIC – COMMERCIAL ZONE

GENERAL INFORMATION

Address Huong Hoa district, Quang Tri province

Investor Name: Quang Tri Economic Zones Authority


Address: 91 – Le Duan street – Dong Ha city –Quang Tri province
Tel: 0233.3859713
Fax: 0233.3551729
Website: http://bqlkkt.quangtri.gov.vn

Contact Person - Mr. Nguyen Duc Thien – Deputy Head;


Phone number: 0899236567
Email: 7771302@gmail.com

Location - Km from nearest City Center: Southeast Quang Tri Economic Zone (dynamic
area): 80km from Dong Ha city center.
- Km from nearest Airport:
+ 155km from Phu Bai airport (Thua Thien Hue province);
+ 245km from Da Nang international airport;
- Km from nearest Waterport:
+ 93km from Cua Viet port;
+ 214km from Chan May - Hue port;
+ 251km from Da Nang port.
- Km from nearest Highway and nearest Raiway:
Road route: Located on the East-West Economic Corridor route (1,450 km long),
passing through 4 countries Myanmar, Thailand, Laos from Lao Bao international
border gate.
+ Distance from National Highway 1A: 80km;
Railway station: 80km from Dong Ha Station.

Investment Area Investment Priorities Sectors:


+ Building and trading functional zones’ infrastructure;
+ Clean energy production;
+ Production of building materials;
+ Leather shoes, garments and handicrafts Industry;
+ Mechanical industry, electrical and electronic assembly, machinery and
equipment, means of transport...
- Prioritize industries that are clean, with less wastewater and less environmental
pollution.

Investment Restricted Sectors: Sectors that are not environmentally friendly,


harmful to human health and national security.

Minimum Lease Minimum wage in region 4 according to Decree 141/2017/ND-CP

Lease term The land lease term is not more than 50 years.

Minimum Lease Area No minimum rental area limit. Land area for lease according to the actual needs of
the project.

938
Limit for Construction Height - Factory construction area:
- Controller center:

Permitted Construction Rate Maximum building density 45%-60%

Planned Area - Total area (Total planned development area): Total natural land area 15,804ha
.- Total vacant leasable area:
- Total area with full infrastructure ready to build factory (Area with infrastructure
ready for factory construction):

Factory Available for Rent Total area: Investors build their own factories

Operation Status In operation - under construction of infrastructure, in land clearance

Occuphancy Rate and Number of - Occupancy rate: the leased industrial land area is 1,757.27ha, reaching the
Projects occupancy rate of ...%
- Number of projects in the zone: There are 70 registered investment projects with
a total investment capital of 7,557 billion VND,

Number of Korean Projects None

Lease fee - Payment (Time and actual payment): Land rental with annual payment or one-
time payment of land rental
Form of land rent payment: annual payment or one-time payment for the entire
operation period of the project.
- Land lease fee (Land rental price):
+ Unit price of the land rental (annual payment): 350,000 VND/m2/year x 0.5% x
1.0 times = 1,750 VND/m2/year.
+ Unit price of one-time payment of land rental: The Provincial People's Committee
shall decide the specific land price for the case of one-time payment of land lease.
- Factory lease fee (Factory rental price):

Operating fee - Management fee: 10 million/ha/year. Valid from 2017.


- Electricity fee: The unit price of electricity for production according to the
regulations of the Ministry of Industry and Trade
- Water fee: Unit price of clean water consumption
+ For physical production: 12,500 VND/m3;
+ For daily activities: 7,200 VND/m3
- Wastewater treatment fee (Wastewater treatment fee):
- Waste treatment fee (Waste treatment fee):

INFORMATION OF INFRASTRUTURE AND FACILITY

Financial institution List name of popular banks in the zone (BIDV, Vietcombank, Vietinbank,
Agribank, Sacombank, LienVietPostBank, VPbank ….)

Tax service, State finance office Distance form the nearest State Tax and Finance Agency: Taxation and State
Treasury of Huong Hoa district is located in the area

Customs Service Distance form the nearest Customs Agency: Lao Bao Border Gate Customs is
located in the area

Distance form the nearest Inland Container Depot):


- Cua Viet Port: 93km
- My Thuy International Port: 100km

939
Logistics Distance form the nearest Logistics Center (Specific service, located inside the IP
or how many kilometers away from the IP)

Post office Distance form the nearest Mailing Post office: Huong Hoa district post office is
located in the area

Medicare Distance from the nearest Hospital, Medicare Center + name of Hospital: Huong
Hoa District General Hospital is located in the area

Police, public security Distance from the nearest Police Station: Huong Hoa Police Station is located in
the area

Universities, training facilities, ect. Distance form the nearest Universities and Training Center + Name of
Universities/Training Center
- Hue University Branch: 80km
- Quang Tri Vocational School: 80km

Recruitment Support to introduce personnel: Quang Tri Employment Service Center

Worker dormitory Distance form the nearest Facility (Worker dormitory): Planning already, no
investor yet

Worker’s child education facility Distance form the nearest Facility (Kindergarten and preschool for children): Lots
of preschools in Huong Hoa district

One-stop service Distance from the nearest Facility (Quang Tri Provincial Public Administration
Service Center): 80km

Road Width Traffic in the industrial park, number of lanes: 1-lane, 2-lane asphalt road

Communication Infrastructure of Communication Infrastructure: Radio, television, internet, etc.


industrial park

Emergency Power generator Emergency generator: substation 110kv.

Fire-fighting facility Available/Not Available (Thiết bị Cứu hỏa): fire extinguisher, fire truck…

Detailed planning map of Lao Bao Special Economic – Commercial Zone

940
Photo of Lao Bao Special Economic and Commercial Zone

941
Location of Lao Bao Special Economic and Commercial Zone

942
943
DONG NAM QUANG TRI ECONOMIC ZONE

GENERAL INFORMATION

Address Trieu Phong, Hai Lang and Gio Linh district, Quang Tri province.

Investor Name: Quang Tri Economic Zones Authority


Address: 91 – Le Duan street – Dong Ha city –Quang Tri province
Tel: 0233.3859713
Fax: 0233.3551729
Website: http://bqlkkt.quangtri.gov.vn

Contact Person - Mr. Nguyen Duc Thien – Deputy Head;


Phone number: 0899236567
Email: 7771302@gmail.com

Location - Km from nearest City Center: Dong Nam Quang Tri Economic Zone (dynamic
area) is 25km from Dong Ha city center.
- Km from nearest Airport:
+ 70km from Phu Bai airport (Thua Thien Hue province)
+ 160km from Da Nang international airport;
- Km from nearest Waterport:
+ Having Cua Viet Port with a tonnage of ships up to 5,000DWT;
+ 126km from Chan May - Hue port;
+ 164km from Da Nang port.
- Km from nearest Highway and nearest Raiway:
Road route: Dong Nam Quang Tri Economic Zone connects with East-West
Economic Corridor route (1,450 km long), passing through 4 countries starting
from Myanmar, Thailand, Laos to Vietnam through Lao Bao international border
gate and is the gateway towards the East Sea through Cua Viet port and My Thuy
port.
+ Near National Highway 1A;
Railway station: 4km from Ha Thanh Station, 5km from Dien Xanh Station.

Investment Area Investment Priorities Sectors:


+ Building and trading infrastructure of dynamic functional zones:
1. Non-tariff zone: 275 ha;
2. My Thuy seaport area: 955ha (The land area used for construction of My Thuy
port is 685ha, including the area on land 335ha and the area at sea 350ha);
3. Quang Tri Thermal Power Center: 650ha;
4. Multi-industry industrial zones, warehouses: 1,352ha;
5. Tourist areas: 471 ha.
+ Project on coastal tourism development;
+ Clean energy production;
+ Production of building materials;
+ Leather shoes, garments and handicrafts Industry;
+ Mechanical industry, electrical and electronic assembly, machinery and
equipment, means of transport...

944
- Prioritize industries that are clean, with less wastewater and less environmental
pollution.

Investment Restricted Sectors: Sectors that are not environmentally friendly,


harmful to human health and national security.

Minimum Lease Minimum wage in region 4 according to Decree 141/2017/ND-CP

Lease term The land lease term is not more than 50 years.

Minimum Lease Area No minimum rental area limit. Land area for lease according to the actual needs of
the project.

Limit for Construction Height - Factory construction area:


- Controller center:

Permitted Construction Rate Maximum building density 60%

Planned Area - Total area (Total planned development area): Total natural land area 23,792ha.
- Total vacant leasable area (Leaseable area):
1. Non-tariff zone: 275 ha;
2. My Thuy seaport area: 955ha. In which: The land area used for construction of
My Thuy port is 685ha (area on land 335ha, area at sea 350);
3. Quang Tri Thermal Power Center: 650ha;
4. Multi-industry industrial zones, warehouses: 1,352ha;
5. Tourist areas and services: 471 ha.
Total area with full infrastructure ready to build factory (Area with infrastructure
ready for factory construction): Promoting and attracting investors with projects in
infrastructure construction of functional areas.

Factory Available for Rent Total area: Investors build their own factories

Operation Status In operation, under construction of infrastructure and in land clearance

Occuphancy Rate and Number of -Occupancy rate: the leased industrial land area is 2,275.05ha, reaching the
Projects occupancy rate of ...%
- Number of projects in the zone: There are 56 registered investment projects with
a total investment capital of 306,809 billion VND

Number of Korean Projects 02 companies

Lease fee - Payment (Time and actual payment): Land rental with annual payment or one-
time payment of land rental
Form of land rent payment: annual payment or one-time payment for the entire
operation period of the project.
- Land lease fee (Land rental price):
+ Unit price of the land rental (annual payment): 350,000 VND/m2/year x 70% x
0.5% x 1.0 times = 1,225 VND/m2/year.
+ Unit price of one-time payment of land rental: The Provincial People's Committee
shall decide the specific land price for the case of one-time payment of land lease.
- Factory lease fee:

Operating fee - Management fee (Phí quản lý hạ tầng): Chưa thực hiện
- Electricity fee: The unit price of electricity for production according to the
regulations of the Ministry of Industry and Trade
- Water fee: Unit price of clean water consumption

945
+ For physical production: 12,500 VND/m3;
+ For daily activities: 7,200 VND/m3
- Wastewater treatment fee (Wastewater treatment fee):
- Waste treatment fee (Waste treatment fee):

INFORMATION OF INFRASTRUTURE AND FACILITY

Financial institution List name of popular banks in the zone (BIDV, Vietcombank, Vietinbank,
Agribank, Sacombank, LienVietPostBank, VPbank …)

Tax service, State finance office Distance from the nearest State Tax and Finance Agency
- Quang Tri Tax Department: 15km
- Gio Linh District Tax Department: 5km
- Trieu Phong District Tax Department: 10km
- Hai Lang District Tax Department: 5km
- The State Treasury of Quang Tri province: 15km
- Gio Linh District State Treasury: 5km
- State Treasury of Trieu Phong district: 10km
- Hai Lang District State Treasury: 5km

Customs Service Distance from the nearest Customs Agency:


-Cua Viet port border gate Customs Branch: located in the area
-Distance to Quang Tri Customs Department: 15km

Distance from the nearest Inland Container Depot: Cua Viet Port and My Thuy
International Port located in the area

Logistics Distance from the nearest Logistics Center (Specific service, located inside the IP
or how many kilometers away from the IP)

Post office Distance form the nearest Mailing Post office:


- Dong Ha City Post Office: 15km
- Gio Linh District Post Office: 5km
- Trieu Phong District Post Office: 10km
- Hai Lang District Post Office: 3km

Medicare Distance from the nearest Hospital, Medicare Center + name of Hospital:
-Quang Tri Provincial Hospital: 15km
-Gio Linh District General Hospital: 6km
-Trieu Phong District General Hospital: 10km
-Hai Lang District General Hospital: 5km

Police, public security Distance from the nearest Police Station:


- Quang Tri Provincial Police: 15km
- Gio Linh District Police: 6km
- Trieu Phong District Police: 10km
- Hai Lang District Police: 5km

Universities, training facilities, ect. Distance form the nearest Universities and Training Center + Name of
Universities/Training Center:
- Hue University Campus: 15km

946
- Quang Tri Vocational School: 15km

Recruitment Support to introduce personnel: Quang Tri Employment Service Center

Worker dormitory Distance from the nearest Facility (Worker dormitory): Planning already, no
investor yet

Worker’s child education facility Distance form the nearest Facility (Kindergarten and preschool for children): The
system of preschools in 3 districts of Gio Linh, Trieu Phong and Hai Lang

One-stop service Distance from the nearest Facility (Quang Tri Provincial Public Administration
Service Center): 15km

Road Width Traffic in the industrial park, number of lanes: 1-lane, 2-lane asphalt road

Communication Infrastructure of Communication Infrastructure: Radio, television, internet, etc


industrial park

Emergency Power generator Emergency generator: substation 110kv.

Fire-fighting facility Available/Not Available: fire extinguisher, fire truck…

Detailed planning map of Dong Nam Quang Tri Economic Zone

947
948
949
950
The Location of Dong Nam Quang Tri Economic Zone

951
AMBER TAY BAC HO XA INDUSTRIAL PARK

GENERAL INFORMATION

Address Vinh Linh District, Quang Tri province

Investor Name: Amber Holdings


Address: 10th Floor, Leadvisors Building, 41A Ly Thai To Street, Hoan Kiem
District, Hanoi.
Tel: +84 243 266 8561
Fax:
Email: info@amberasset.vn
Web: https://amberasset.vn/

Contact Person - Mr. Nguyen Duc Thien – Deputy Chief


Phone number: 0899236567
Email: 7771302@gmail.com

Location - Km from nearest City Center: 35km to Dong Ha city center


- Km from nearest Airport:
+ 30km to Quang Tri Airport
+ 71km to Dong Hoi Airport
+ 125km to Phu Bai Airport (Thua Thien Hue province);
- Km from nearest Waterport:
+ 15km to Cua Tung Seaport;
+ 35km to Cua Viet Seaport;
+ 60km to My Thuy Seaport;
+ 170km to Chan May (Hue city);
- Km from nearest Highway and nearest Raiway:
By road: The planning area is bordered by National Highway 1A, on the south
by National Highway 9D to Ben Quan town (old 571 route)
By Railway: 500m to Sa Lung Railway Station

Investment Area Investment Priorities Sectors:


+ Garment, Leather Footwear
+ Mechanical industry, electrical assembly, electronics, machinery and
equipment, means of transport ...
+ Producing products from wood, bamboo, products from straw and plaiting
materials
+ Food production and processing
+ Manufacture of metals and other non-metallic
mineral products
+ Warehouse
- Prioritize clean industries, less wastewater, less environmental pollution.

Investment Restricted Sectors: Sectors that are environmentally unfriendly,


detrimental to human health and national security.

Minimum Lease Minimum wage in region 4 according to Decree 141/2017/ND-CP

952
Lease term Until 2071.

Minimum Lease Area 10.000m2 (1 hectares)

Limit for Construction Height Limit for Construction Height:


- Factory construction area: 6m - 10m
- Operation construction area: From 2 - 5 floors, 10m - 20m

Permitted Construction Rate Permitted Construction Rate


- Factory construction area: 70%
- Operation construction area: 40%

Planned Area - Total area: 214,77ha, in which:


Zone A: 116,54ha; Zone B: 98,23ha
- Total vacant leasable area: 158,12ha, in which:
Zone A: 84,25ha; Zone B: 73,78ha
Total area with full infrastructure ready to build factory: In progress of
building infrastructure

Factory Available for Rent Total area:

Operation Status Carrying out procedures for deciding investment policies on infrastructure
construction and business projects of Tay Bac Ho Xa Industrial Park

Occupancy Rate and Number of - Occupancy rate: Updating


Projects
- Numbers of projects: Updating

Number of Korean Projects None

Lease fee - Payment: Divided into 04 period


Stage 1: Within 5 days from the time of signing the Deposit Contract => Pay
10% of the contract value
Stage 2: Within 10 days from the time of signing the Land Lease Contract =>
Pay 40% of the contract value
Stage 3: Within 05 days from the time of signing The Handover of a Rental
Property => Pay 40% of the contract value
Stage 4: Within 10 days after the notice to receive the Land Use Right
Certificate => Pay 10% of the contract value
Land lease payment method: Lump-Sum Payment for the whole period of
operation of the project.
- Land lease fee: 25-30 USD/m2
+ Land rental unit paid annually: 25 USD/m2
+ Land rental unit price paid once: Not available
- Factory lease fee: Updating

Operating fee - Management fee: 0,3USD/m2/lease term


- Electricity fee:
+ Rush hour: 2,759VND/KW
+ Normal hour: 1,536VND/KW
+ Off-peak hour: 970VND/KW

953
Others: With 13 years of experience in the field of renewable energy
development, mber Holdings has the ability to provide rooftop solar power on
demand and agreements with investors
- Water fee: estimated price around 14,000VNĐ/m3
- Wastewater treatment fee: estimated price around 9,000 VNĐ/m3
- Waste treatment fee: Updating

INFORMATION OF INFRASTRUTURE AND FACILITY

Financial institution BIDV, Vietcombank, Vietinbank, Agribank, Sacombank, LienVietPostBank,


VPbank ….
Tax service, State finance office Distance from the nearest State Tax and Finance Agency:

5,9km to Vinh Linh District Tax Department:

3,7km to Vinh Linh State Treasury

Customs Service 35km to Cua Viet Seaport Border Gate Customs Department

35km to Cua Viet Seaport

Logistics Distance from the nearest Logistics Center: Updating

Post office 4km to Vinh Linh Post Office

Medicare 4,5km to Vinh Linh Medical Center

Police, public security 5,6km to Vinh Linh Police Station

Universities,training facilities, ect. 40km to Hue University – Quang Tri Branch


38km to Quang Tri Vocational Intermediate School

Recruitment Recruitment Support: Quang Tri Employment Service Center

Worker dormitory Planned but at the moment, there is no investors for workers dormitory

Worker’s child education facility - 500m to Kindergarten No. 2 in Vinh Long commune;
- 3km to Hoa Phuong Kindergarten;
- 4km to Son Ca Kindergarten;

One-stop service 35km to Public Administrative Service Center of Quang Tri Province

Road Width Internal transportation system:


Main road: 30 – 45m
Side road: 13,5 – 19,5m

Communication Infrastructure of Communication infrastructure: meet international standard, get a connection


industrial park agreement with Viettel Telecommunications
Corporation Communication equipment: Radio, television, internet,...

Emergency Power generator Emergency Power Generator: 110kv substation

Fire-fighting facility Meet the standards agreed by the Department of Fire Protection and
Technology on fire protection solutions. Fire protection operates 24/7.
Fire protection equipment: throat on fire, fire extinguishers, Fire truck.
Detailed Planning Map of Tay Bac Ho Xa Industrial Park is divided into 02 zones:

Detailed Planning of Zone A:

954
Detailed Planning of Zone B:

955
956
[- This Page is intentionally left blank -]

957
SOC TRANG

958
INVESTMENT ENVIRONMENT IN SOC TRANG

GENERAL INFORMATION

 Area: 3.298,20 km2


Area, Population
 Population: million (2022 statistic)

 Soc Trang is a province in the Mekong Delta, located in the northeast of the Ca Mau peninsula -
Geographical location the southernmost land of the Mekong Delta.
 Located 62 km from Can Tho City and 231 km from Ho Chi Minh City.

 The North and the Northwest borders Hau Giang and Vinh Long provinces.
 The Southwest borders Bac Lieu province.
Neighboring provinces  The Northeast borders Tra Vinh province.
 The East and Southeast borders the East Sea.

2022 statistic:

 GRDP: 38.509 billion VND (1,65 billion USD)


 GRDP growth: 7,71%
 GRDP per capita: 2.338,95 USD/year
GRDP
Economic structure:

 Industry - Construction: 15,27%


 Agricalture, forestry and fishery: 43,16%
 Service: 38,41%
 Tax on Goods: 3,16%

2022 statistic:

Industry growth  Industry - Construction growth: 11,13%


 Agricalture, forestry and fishery growth: 4,07%
 Service growth: 11,56%

PCI Sorce: 65,17 - ranked 34 out of 63 cities and provinces in Vietnam (2021)

SOCIAL INFRASTRUCTURE

 Roadway: Soc Trang province connects with other provinces and cities in the Mekong Delta
and in Vietnam through the national highway system (5 routes, length 261km): 1 National
Highway, 60 National Highway, 61B National Highway, Quan Lo Phung Hiep Street, 91B
Carriage
National Highway (Nam Song Hau Street).
 Waterway: 02 national river routes, including Dai Ngai - Co Co rivers and canals (about 74.3
km in length), Cai Con canal - Quan Lo Phung Hiep (about 39km in length).

 Power supply mainly from these 220kV power stations: Soc Trang 2 (capacity 2x250MVA) and
Electricity Bac Lieu 2 (capacity 2x125MVA). Currently, the 220kV Vinh Chau power station is under
construction with capacity 250MVA.

Water  Hau river is the main source of fresh water supply for rivers and canals of Soc Trang province.

 0 university, 01 vocational college, 01 community college, 12 education centers, 01 school for


Education
children with disabilities and 479 schools (from preschool - kindergarten to high school).

 01 Center for Disease Control.


 05 public hospitals (including 02 polyclinics; 01 dermatology and psychiatry specialist hopital;
01 pulmonary tuberculosis specialist hopital; 01 obstetrics and gynecology specialist hopital).
Health Insurance
 03 private hospitals (including 01 polyclinic; 01 obstetrics and gynecology specialist hopital; 01
eye specialist hopital).
 11 district health centers.

959
INVESTMENT CONDITIONS

Human Resources 63,75% of population are in working age (2022)

Academic level Trained labor rate: 62,31% (2022)

 The minimum salary for the province is applied as follows:

+ Area III: Soc Trang city, Vinh Chau town, Nga Nam town.
Wage
+ Area IV: Long Phu district, My Xuyen district, Tran De district, My Tu district, Chau Thanh
district, Thanh Tri district, Ke Sach district, Cu Lao Dung district.

 The lowest wage for trained labor (including those trained by the enterprises): 3.687.000 VND

 Incentives according to government regulations: Preferential policies on corporate income tax


and land incentives comply with the current provisions of the Investment Law and relevant laws.
Investment incentives
 Incentives from the province: N/A

 Logistics services.
 Industrial and urban infrastructure.
 High-tech agriculture.
Investment attraction  Tourism.
fields  Renewable energy.
 Trade and services.
 Medicare.
 Education.

Map

Department of Planning and Investment

- Address: 21 Tran Hung Dao Street, Ward 3, Soc Trang City, Soc Trang Province.

Contact - Tel: 02993.822333

- Fax: N/A

- Email: sokhdt@soctrang.gov.vn

960
- Contact person:

+ Mr. Duong Van Ngoanh (Director)

961
LIST OF INDUSTRIAL ZONES

NO INDUSTRIAL ZONES NAME TOTAL AREA OCCUPANCY STATUS


RATE
1 An Nghiep Industrial Zone 251 ha 97% In operation

2 Tran De Industrial Zone 160 ha N/A Under construction of


infrastructure

3 Song Hau Industrial Zone 286 ha N/A Under making industrial


zone construction planning,
scale 1/2000
4 Dai Ngai Industrial Zone 200 ha N/A

5 My Thanh Industrial Zone 217 ha N/A

962
AN NGHIEP INDUSTRIAL ZONE

GENERAL INFORMATION
Address An Hiep Commune and Phu Tan Commune, Chau Thanh District, Ward 7, Soc Trang
City, Soc Trang Province
Investor Government
Contact information Management Board of Soc Trang Industrial Zones
Tel: 02993 611 936
Founded year 2005
Total area 251 ha
Area for rent 189 ha
Status In operation
Occupancy rate 97%
Number of projects 67
Number of Korean projects 4

TRAN DE INDUSTRIAL ZONE

GENERAL INFORMATION
Address Ngan Ro 1 Hamlet, Tran De Town, Tran De District, Soc Trang Province
Investor Be Tong Ha Thanh Joint Stock Company
Contact information N/A
Founded year 2020
Total area 160 ha
Area for rent 108 ha
Status Under construction of infrastructure
Occupancy rate N/A
Number of projects N/A
Number of Korean projects N/A

[- This Page is intentionally left blank -]

963
SON LA

964
INVESTMENT ENVIRONMENT IN SON LA

GENERAL INFORMATION

▪ Area: 323,5 km²


Area, Population
▪ Population: 1.184 million (2022 statistic)

Geographical Location ▪ Located in the Northwest region of Vietnam.

▪ In the North, it is about 250-300km from Hoa Binh


▪ In the west, about 200km from Dien Bien province
Adjacent provinces
▪ In the East, about 250km from Phu Tho province
▪ In the south, about 250km from Lai Chau province

2022 statistic:
▪ GRDP: 47.233 billion VND (2.0509 billion USD)
▪ GRDP growth: 8,71%
▪ GRDP per capita: 1.650 USD/year
GRDP
▪ Economic structure:
- Industry - Construction: 17,42%;
- Agriculture. forestry and fishery: 2,23%;
- Service: 7,91%;
- Tax on Goods: 2,96 %

2022 statistic:
Industry growth ▪ Industry - Construction growth: 29,55%
▪ Agriculture, forestry and fishery growth: 11,31%
▪ Service growth: 83,16%

PCI ▪ Score: 63.22– ranked 49th out of 63 provinces in Vietnam. (2021)

SOCIAL INFRASTRUCTURE

Road: There are 10 national highways/884.8km in Son La province, including:


- In the province, there are 19 provincial roads with a length of 1,005.4km.
Transportation ▪ Railway: No
▪ Waterway: Da River is 416km long (Hoa Binh reservoir bed is 230km long, Son
La reservoir bed is 186km long).

The industrial park has been invested in building a power supply system with the
scale: 6.50km of 35KV line; 01 transformer station with capacity 2500 KVA
(35/0.4); some factories have actively built their own substations from 35kv power
source.
▪ Power grid: The power grid in the industrial park has not been invested yet,
Electricity investors themselves connect from the line to the 2,500KVA substation or from the
substation to the factory.
▪ Currently, crossing the land in the direction of Northwest-Southeast of the
industrial park, there is a 110KV Son La - Hoa Binh high-voltage power line.
▪ About 500m from Mai Son Industrial Park, there is a 220KV substation of the
national electricity network.

965
▪ 220kV Son La station, capacity 2x250MVA, is responsible for transferring power
generated from small and medium-sized hydroelectric plants in the province, and
supplying loads to Son La, Phu Tho and Hoa Binh provinces.

▪ Water source for Van Ho industrial park - The water source is expected to be
taken from Na Sang Lake (with a capacity of about 400,000 m3), Xuan Nha
Water commune, Van Ho district. Connecting to the water supply system from Chieng Di
Water Plant in Moc Chau district
▪ Water source Mai Son Industrial Park - supplied from Nam Pan Mai Son stream

Education ▪ 1 university, 04 colleges.

Medicare ▪ 2 hospitals

INVESTMENT CONDITION

Human resource ▪ 66,86 % of population are in the working age (2022)

Education level ▪ Trained labor rate: 60,6% (2022)

▪ The regional minimum wage is applied as follows:


- Areas I, II, III, IV:
- Region IV: Minimum monthly salary is 3,250,000VND, minimum hourly wage is
Salary 15,600 VND. Apply to: Son La Province.
▪ The lowest salary of trained workers (even trained by enterprises) must be at least
7% higher than the above-mentioned base salary

▪ Incentives according to government regulations:


▪ Incentives from the province:
Son La is a province with extremely difficult socio-economic conditions in the area
of investment incentives, so investment projects in the province are entitled to the
forms of investment incentives according to the regulations. provisions of the
Investment incentives Investment Law 2020.
(1) Exemption and reduction of corporate income tax;
(2) Exemption from land rent and land use tax;
(3) Exemption from import tax on goods imported to create fixed assets; raw
materials, supplies and components imported for production in accordance with the
law on import and export tax;

▪ Priority project: Mai Son Industrial Park. Van Ho Industrial Park, Son La
Province.
Fields Attracting Investment - Producing and manufacturing electronic equipment; processing pharmaceutical
materials, agro-forestry products for export with high technology… and logistics
services.

966
Map

Contact the Management Board of Industrial Parks


▪ Address: No. 09, Khau Ca Street, Son La City, Son La Province
▪ Phone: 0212.3851774 Fax: 0212.3851774.
Fax: 0212.3851774
Contact
▪ Email: https://bqlkcn.sonla.gov.vn/
▪ Contact person: Tran Hong Thanh - Head of Investment, Construction and
Environment Management Department

LIST OF INDUSTRICAL ZONE

No Industrial zone Name Total Area (ha) Occupancy Rate Status


1 Mai Son Industrial Zone 150 70% In Operation
2 Van Ho Industrial Zone 240 0
Project in progress

967
LOCATION MAP OF INDUSTRIAL ZONES IN SON LA

968
MAI SON INDUSTRIAL ZONE

GENERAL INFORMATION
Address located in Muong Bang commune, Mai Son district
The Management Board of Industrial Parks
Investor ▪ Address: No. 09, Khau Ca Street, Son La City, Son La Province
▪ Phone: 0212.3851774 Fax: 0212.3851774.
Fax: 0212.3851774
▪ Email : bqlckcntinhsonla@gmail.com
▪ Website: Email: https://bqlkcn.sonla.gov.vn/
Contact Person Contact person: Tran Hong Thanh - Head of Investment, Construction and Environment
Management Department ; Phone: ; Email:

Location Mai Sơn industrial park: located in Muong Bang commune, Mai Son district, about 6 km
from National Highway 6, with the following border locations:
- The North borders the residential areas of Quynh Chau and Quynh Trai villages;
- To the south, it borders on forest land in Tien Xa village, Muong Bon commune;
- The East borders on agricultural land;
- The West borders on agricultural land and rocky mountains
Investment Sectors Priority Sectors for Producing and manufacturing electronic equipment; processing
Investment pharmaceutical materials, agro-forestry products for export
with high technology… and logistics services.

Investment Restricted N/A


Sectors
Minimum wage According to Decree 38/2022/ND-CP
Region IV: Minimum monthly salary is 3,250,000 VND, minimum hourly wage is 15,600
VND. Apply to: Son La Province.
Minimum Lease Area N/A
Limit for Construction Building height limit of the factory is 25m (maximum number of floors 5 floors)
Height

Permitted Construction 70 %
Rate

Planned area ▪ Total area: 63.7ha phase I


▪ Total vacant leasable area: 47.96 ha
▪ Total area with full infrastructure ready to build factory: None
Factory Available for Rent ▪ Total area: N/A

Operation Status Active/Under Construction /under construction of infrastructure and expected to be


completed by December 31, 2023 under ground clearance

Occupancy Rate and The occupancy rate is 71% and the number of projects in the industrial park is 5 factories in
Number of Projects operation.

Number of Korean projects 0

969
Lease fee ▪ Land lease fee: N/A
▪ Factory lease fee: N/A
Operating fee ▪ Management fee: N/A
▪ Electricity fee: N/A
▪ Water fee: N/A
▪ Wastewater treatment fee: N/A
▪ Waste treatment fee: N/A
INFRASTRUCTURE AND FACILITY
Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities,
training facilities, etc., Road Width,…
Picture

970
List of Tenants

No Name of Company Nationality Business line

1 Son La Petroleum Branch Vietnam Gas extraction

2 BHL Son La Agricultural Products Vietnam Processing tapioca starch


Processing Joint Stock Company

3 Son La Investment and Construction Vietnam Production of unburnt bricks


Joint Stock Company No. 1

4 Thanh Nhung Co., Ltd Vietnam Process the wood

971
VAN HO INDUSTRIAL ZONE

GENERAL INFORMATION
Address Thuong Cuong village, Van Ho commune, Van Ho district, Son La province.
The Management Board of Industrial Parks
Investor ▪ Address: No. 09, Khau Ca Street, Son La City, Son La Province
▪ Phone: 0212.3851774 Fax: 0212.3851774.
Fax: 0212.3851774
▪ Email : bqlckcntinhsonla@gmail.com
▪ Website: Email: https://bqlkcn.sonla.gov.vn/
Contact Person Contact person: Tran Hong Thanh - Head of Investment, Construction and Environment
Management Department ; Phone: ; Email:

Location The East borders Da Bac district and Mai Chau district, Hoa Binh province
The West borders Moc Chau district
The South borders Muong Lat district and Quan Hoa district, Thanh Hoa province
To the southwest, it borders Sop Bau district, Hua Phan province, Lao PDR
It borders Phu Yen district to the North with the boundary being the Da River.
Investment Sectors Priority Sectors for manufacturing and manufacturing electronic equipment;
Investment processing pharmaceutical materials, agricultural - forestry
products for export by high technology, environmentally
friendly...
Investment Restricted N/A
Sectors
Minimum wage N/A
Minimum Lease Area N/A
Limit for Construction N/A
Height

Permitted Construction N/A


Rate

Planned area The area for planning the subdivision is about 240 ha. In which, the land area for industrial
zones is 216.6 ha; The land area for residential arrangement, resettlement and social
infrastructure in residential area of Thuong Cuong village is 23.4 ha.
Operation Status N/A
Occupancy Rate and 0%
Number of Projects
Number of Korean projects N/A

Lease fee ▪ Land lease fee: N/A


▪ Factory lease fee: N/A
Operating fee ▪ Management fee: N/A
▪ Electricity fee: N/A
▪ Water fee: N/A
▪ Wastewater treatment fee: N/A
▪ Waste treatment fee: N/A

972
INFRASTRUCTURE AND FACILITY
Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities,
training facilities, etc., Road Width,…
Picture

973
[- This Page is intentionally left blank -]

974
TAY NINH

975
INVESTMENT ENVIRONMENT IN TAY NINH

GENERAL INFORMATION

▪ Area: 4041,65 km2


Area, Population
▪ Population: 1,19 Triệu (Số liệu 2022)
▪ Tay Ninh is located in the Southeast region and the Southern Key Economic
Region.
Geographical Location
▪ Tay Ninh is located at the bridge position between Ho Chi Minh City and the
capital Phnom Penh (Cambodia).
▪ Tay Ninh Province borders Ho Chi Minh City to the Southeast, Long An
Adjacent provinces [Các tỉnh lân cận Province to the South, Binh Duong and Binh Phuoc Provinces to the East, and
theo bốn hướng] Cambodia to the West and North. (3 provinces: Svay Rieng, Prey Veng and
Tbong Khmum)
2022 statistic:
▪ Real GRDP: 102,387 Billion VND 4.37 Billion USD
▪ GRDP growth: 9.56%
▪ GRDP per capita: 3304 USD/year
GRDP
▪ Economic structure:
- Industry - Construction: 45.5%;
- Agriculture, forestry and fishery: 20.24%;
- Services: 29.58%;
2022 statistic:
▪ Industry - Construction growth: 16,69%
▪ Agriculture, forestry and fishery growth: 2,7%
Industry growth
▪ Service growth: 9,61%
▪ Import - Export
- Import turnover: 6.464 Million USD
- Export turnover: 3.283,1 Million USD

PCI ▪ Score: 62,31, ranked 04 out of 63 cities and provinces in Vietnam. (2022)

SOCIAL INFRASTRUCTURE

▪ Roadway: Expressway Ho Chi Minh City - Moc Bai; Expressway Ho Chi Minh
City - Thu Dau Mot - Chon Thanh; Go Dau - Xa Mat expressway; Ho Chi Minh
road, section Chon Thanh - Duc Hoa; New planned national highways: NH.22C
connecting Binh Duong - Tay Ninh, NH.56B connecting Ba Ria - Vung Tau - Binh
Duong - Tay Ninh...
▪ Railways: Planning through Tay Ninh province with a regional and inter-
regional railway connecting Ho Chi Minh City - Tay Ninh connecting with Hanoi
- Ho Chi Minh City railway via the An Binh - Tan Kien, investment after 2030,
the planned route includes: Railway route Ho Chi Minh City - Go Dau - Moc Bai
with a gauge of 1,435mm, following the western corridor of CT.31, investment
Transportation
after 2030, orientation connecting transport to Cambodia, connecting the trans-
Asian railway network;
▪ Waterway: Tay Ninh - Ho Chi Minh City - Ba Ria - Vung Tau waterway
transport corridor (Cai Mep - Thi Vai port area), the volume of transport is about
31.5 ~ 35.5 million tons/year, serving the transport of goods and services.
transferring goods connecting the provinces of the Southeast and the Southwest
through Ho Chi Minh City to the Cai Mep - Thi Vai seaport.
▪ Airway: Tay Ninh province is submitting to the Prime Minister, the Ministry of
Transport to consider adding the master plan of Tay Ninh airport (civil airport and
cargo airport combined with tourism).
▪ The main power supply for Tay Ninh province is from the national grid through
the 500/220kV Cau Bong transformer station in Cu Chi, Ho Chi Minh City and
Electricity the 220/110kV Binh Long-2x125MVA substation in Tay Ninh province.
▪ 02 hydroelectric plants (CS2 hydropower plant and Dau Tieng hydroelectric
plant), capacity of each plant is 1.5MW.

976
▪ 01 biomass power plant using heat from waste in sugar production from
sugarcane (Thanh Thanh Cong Sugar Joint Stock Company) mainly provides
electricity for the operation of sugar factory, capacity 37MW.
▪ 10 solar power plants in Tay Ninh province with a total installed capacity of
808MW.
▪ Dau Tieng Reservoir, the largest irrigation project in the country (with an area of
270 km2 and a capacity of 1.58 billion m3 of water) is capable of irrigating about
100 thousand hectares of agricultural land.
Water ▪ The current domestic and urban water supply system has a total design capacity
of about 27,300m3/day. Particularly, the provincial Industrial Parks currently have
07 clean water supply plants with a total designed capacity of about 63,400m3/day.
The pH of groundwater ranges from 5-6, surface water ranges from 6.2-9.26.
▪ Number of vocational secondary education schools: 03
Education
▪ Number of colleges: 02
The number of medical examination and treatment establishments in Tay Ninh
Medicare province in 2021 is 117, including 16 hospitals; 7 regional polyclinics; 94 health
stations in communes, wards and towns

INVESTMENT CONDITION

Human resource ▪ 57.89% of population are in the working age (2022)

▪ Proportion of employees who have undergone professional training: 14.7%


Education level
(2020)
▪ The minimum salary for the province is applied as follows:
- Area II: 4.160.000 VND/month
Salary - Area III: 3.640.000 VND/month
▪ The lowest wage for trained labor (including those trained by the enterprises)
must be at least 7% higher than the above referenced basic salary
▪ Incentives according to government regulations
Tay Ninh province has 06 districts, 02 towns and 01 city; In which, the
Government provides investment incentives for corporate income tax, land use
tax, import and export tax, etc., by location, specifically:
Investment incentives
- Areas with extremely difficult socio-economic conditions: Tan Chau district,
Tan Bien district, Chau Thanh district, Ben Cau district;
- Areas with difficult socio-economic conditions: Hoa Thanh Town, Trang Bang
Town, Go Dau District, Duong Minh Chau District.
▪ Prioritized projects
- Processing and manufacturing industries such as food processing industry (cattle
meat, poultry, canned food, frozen), textile industry, rubber processing. The
province's abundant solar energy can significantly reduce product costs
- Focus on developing 03 tourism product systems, including: Key tourism
Fields Attracting Investment
products: spiritual tourism, cultural tourism, craft villages; Main tourism products:
tourism to historical sites, tourism associated with trade and services; Ecotourism;
Ancillary tourism products: entertainment tourism, medical tourism;
- Construction: Tay Ninh has the advantage of landscape along Vam Co Dong
River and Saigon River to develop riverside real estate development,

977
Map

Tay Ninh Departament of Planning and Investment


▪ Address: No. 300, Cach Mang Thang Tam street, Tay Ninh city, Tay Ninh.
Contact [Liên hệ] ▪ Tel: +84 2763 827638
▪ Email: thienthanh.khdt@gmail.com
▪ Contact person: Nguyen Thien Thanh

978
[- This Page is intentionally left blank -]

979
THAI BINH

980
INVESTMENT ENVIRONMENT IN THAI BINH

GENERAL INFORMATION

▪ Area: 1.546 km2


Area, Population
▪ Population: 1,878 million (2022 statistic)
▪ Located in the Northeastern region of Vietnam.
Geographical Location
▪ Located 120 km from Ha Noi
▪ Bordering Hung Yen province, Hai Dương province and Hai Phong city to the
Adjacent provinces north, Nam Đinh province and Ha Nam province to the west and southwest, the
Gulf of Tonkin to the east
2022 statistic:
▪ GRDP: 63.000 billion VND
▪ GRDP growth: 9,52%
▪ GRDP per capita: 56,4 million VND/year
GRDP
▪ Economic structure:
- Industry - Construction: 42,9%;
- Agriculture. forestry and fishery: 21,2%;
- Service: 29,6%;
- Tax on Goods: 6,3%
2022 statistic:
Industry growth ▪ Industry - Construction growth: 14,1%
▪ Agriculture, forestry and fishery growth: 2,56%
▪ Service growth: 8,15%

PCI ▪ Score: 65,78 – ranked 28 out of 63 cities and provinces in Vietnam. (2022)

SOCIAL INFRASTRUCTURE

▪ Roadway: In the province, traffic routes connecting the regions have been
formed
- Highway 10 connecting Nam Dinh - Thai Binh - Hai Phong
- Thai Binh - Ha Nam route
- Thai Binh – Cau Nghin route
- The inter-provincial route connects the ring road 5 of Hanoi capital with the
national highway 38 and the Hanoi
Transportation
- Hai Phong highway and La Tien bridge.
- Ninh Binh - Hai Phong expressway through Thai Binh province
- Coastal route
- Route of Thai Binh City - Con Vanh tourist site
▪ Railway:
▪ Waterway:
▪ Other:
Thai Binh has 2 thermal power plants with capacity
1,800MW to facilitate industrial development
According to the electricity development plan for the
period 2016-2025, with a view to 2030, approved by
People’s Committee of Thai Binh province and the
Electricity
Ministry of Industry of Vietnam, the power grid
system for industrial production has been provided to
the fences of industrial zones and industrial clusters.
Manufacturing and business are assured of a stable
power supply

Water

Education ▪ 2 university, 4 colleges and 26 vocational schools in the province

Medicare ▪ 29 hospitals

981
INVESTMENT CONDITION

Human resource 61% of population are in the working age (2022)

Education level ▪ Trained labor rate: 00% (2022)

▪ The minimum salary for the province is applied as follows:


- Area III (area Thai Binh city): 3.640.000 VNĐ/ month
Salary - Area IV (area the districts in Thai Binh province): 3.250.000 VNĐ/ month
▪ The lowest wage for trained labor (including those trained by the enterprises)
must be at least 7% higher than the above referenced basic salary
▪ Incentives according to government regulations:
- Apply the preferential corporate income tax rate of 10 percent for 15 years and
a four-year tax exemption and 50 percent tax reduction in the next nine years (for
projects in economic zone).
- Apply two-year corporate income tax exemption and 50 percent tax reduction
in the next 4 years (for projects outside economic zone).
Investment incentives - Exemption from import tax for goods creating fixed assets.
- Exemption from import tax on raw materials, supplies and components that
cannot be produced domestically for the production of investment projects for a
period of 5 years.
▪ Incentives from the province:
- Funding for vocational training does not exceed 5 million VND/employee.
- Support to carry out administrative procedures quickly and conveniently.
▪ Prioritized projects:
- Producing good for farming and rural areas; processing agricultural, forestry and
fishery products; sports instruments; mechanics, electrical and electronic devices;
medical equipment; supporting industries; manufacture-supporting services.
- Manufacturing export and consumer goods using local materials and labor.
- Industries that manufacture high-tech goods, utilize advanced
Fields Attracting Investment and sophisticated equipment, conserve land and energy, and
have a high added value, contributing to the stage budget and
are environmentally friendly.
- Industries, professions and products with local strengths and
other sectors, industries and trades suited for the province’s
industrial and handicraft development planning and establishing conditions for
environmental protection.

Map (Add Province map)

THAI BINH AUTHORITY OF ECONOMIC ZONE AND INDUSTRIAL


PARKS
Address: Ngo Gia Kham Street, Phuc Khanh Industrial Zone,Phu Khanh
Contact Ward,Thai Binh city
Phone: 0227.3644.813 - 0227.3644.100
Fax: 0227.3644.872
Website: https://bqlkcn.thaibinh.gov.vn/

982
LIST OF INDUSTRIAL ZONES

No Industrial zone Name Total Area Occupancy Rate Status


(ha)
1 Phuc Khanh 159,03 100,0% In Operation
2 Nguyen Duc Canh 75,06 100,0% In operation
3 Song Tra 150,48 42,5% In operation
4 Gia Le 84,70 100,0% In operation
5 Cau Nghin 211,52 24,9% In operation
6 Thaco 194,36 Under construction
7 Lien Ha Thai 588,84 31,8% In operation
8 Tien Hai 466,00 61,5% In operation
9 Hai Long 297,00 Under construction

10 Thụy Trường 255 Not yet established


11 Thụy Lương 225 Not yet established
12 Thái Đô 1 370 Not yet established
13 Thái Thọ 1 189,3 Not yet established
14 Thái Thọ 2 95 Not yet established
15 Đông Long 265 Not yet established
16 Hoàng Xuyên 120 Not yet established
17 Hoàng Minh 230 Not yet established
18 Tiền Hải (mở rộng) 321 Not yet established
19 Tiền Hải 2 325 Not yet established
20 Tiền Hải 3 100 Not yet established
21 Sông Lân 310 Not yet established
22 Hưng Phú 360 Not yet established
23 Tân Trường 435 Not yet established
24 Xuân Hải 200 Not yet established
25 Thái Thượng 785 Not yet established
26 Thái Đô 2 250 Not yet established
27 Trà Xuyên 230 Not yet established
28 Hoàng Long 785 Not yet established

983
LOCATION MAP OF INDUSTRIAL ZONES

984
CAU NGHIN IDICO INDUSTRIAL ZONE

GENERAL INFORMATION
Address Quynh Phu district, Thai Binh provice
Name of Investor IDICO Corporation
Investor ▪ Address: 151A Nguyen Dinh Chieu, Vo Thi Sau ward, 3 district, HCM provice
▪ Tel: (+84) 28 39312660
▪ Email: dautu@idico.com.vn
▪ Website: idico.com.vn

Contact Person Name: Vu Tuan Phuong


- Position: project management
- Mobile: 0915632288
- Email: phuong.vt@idico.com.vn
Location Adjacent location: The industrial zone boundary belongs to An Bai town and An Thanh
commune, Quynh Phu district, Thai Binh province
- 25 km from Thai Binh city/ the capital;
- 45 km from Cat Bi airport;
- 45 km from Dinh Vu port;
- 21 km from highway.
Investment Sectors Priority Sectors for - Mechanical equipment manufacturing spare parts;
Investment: - Processing agricultural products and food;
- Information technology electronics specialized and household
electronics;
- High quality building materials.
Investment Restricted - Production of harmful chemicals, textiles (with bleaching and
Sectors dyeing), leather.
Minimum wage According to Decree 38/2022/ND-CP
Lease term ▪ Start date:
▪ End date: 2062
Minimum Lease Area
Limit for Construction - 16 m
Height

Permitted Construction - 70%


Rate

Planned area ▪ Total area: 183,87 ha


▪ Total vacant leasable area: 123,66 ha
▪ Total area with full infrastructure ready to build factory: 29,58 ha

Factory Available for Rent ▪ Total area: None

Operation Status ▪ Stage 1 is active, stage 2 is in land clearance process


Occupancy Rate and ▪ 12,7% and 3 projects
Number of Projects

Number of Korean projects ▪ None

Lease fee ▪ Land lease fee: 70 USD


▪ Factory lease fee: None

985
Operating fee ▪ Management fee: 0,5 USD
▪ Electricity fee: State price
▪ Water fee: 0.45 USD
▪ Wastewater treatment fee: 13.900 VNĐ/m3
▪ Waste treatment fee: None

INFRASTRUCTURE AND FACILITY


Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities,
training facilities, etc., Road Width,…

List of Projects in Industrial Zone

No. Name of Company Nationality Business line


1

1 Environstar group Co., Ltd. America Medical garment

2 Mega Glory International Investment China Mechanical and plastic processing


Co.,Ltd

986
987
988
LIEN HA THAI (GREEN iP-1) INDUSTRIAL PARK

GENERAL INFORMATION
Address [Địa chỉ] Trụ sở:
Lien Ha Thai (Green iP-1) Industrial Park, Thai Thuy District, Thai Binh Province, Vietnam.

Investor Name of Investor: Green i-Park Corporation

▪ Address: 7th Floor, A Building, Sky Tower, No. 88 Lang Ha, Dong Da, Hanoi, Vietnam
▪ Tel: 02432006921
▪ Email: saleteam@gipgroup.vn
▪ Website: http://gipgroup.vn/
Contact Person Name - Position - Mobile: - Email: Dang Thi Hiep- Sales and Marketing Director-
0985033915- hiepdt@gipgroup.vn

Location Adjacent location


- Adjacent to coastal road and Ninh Binh-Hai Phong-Thai Binh highway
- Located on 39 national road, 37 national road, provincial road 456
- 130 km from Hanoi city/ the capital;
- 35 km from Cat Bi Internation airport;
- 40 km from Lach Huyen International Sea port;
- 30 km from Thai Binh city
- 50km from Nam Dinh Railway station.
Investment Sectors Priority Sectors for + Electronic and household appliances industry;
Investment + Automation and exact mechanics industry;
+ Automotive and electric cars industry;
+ Supporting industry, etc
Investment Restricted Leather footwear, textile dyeing, industries affecting the
Sectors environment.
Minimum wage According to Decree 38/2022/ND-CP
3.250.000 VND/month
Lease term ▪ Start date: 08th February 2021
▪ End date: 08th February 2071
Minimum Lease Area 1 ha
Limit for Construction unlimited, maximum building 7 floors
Height

Permitted Construction 60%


Rate

Planned area ▪ Total area: 588,84ha


▪ Total vacant leasable area: 212ha
Factory Available for Rent ▪ The factory for rent system has not yet been implemented.
Expected the 4 Quarter/2023 will implement the 1st stage
Operation Status Under construction and to be completed by 2023
Land Clearance Process complete 98%
Occupancy Rate and Occupancy Rate 47% and 7 projects in IP
Number of Projects

Number of Korean projects ▪ 2 projects

Lease fee ▪ Land lease fee: 90-95 USD/m2


▪ Factory lease fee: expected that 4 USD/m2

989
Operating fee ▪ Management fee: 10.000 m2/year
▪ Electricity fee: according to EVN price
▪ Water fee: 12.000 m3
▪ Wastewater treatment fee: 10.000 m2
▪ Waste treatment fee: according to the price of the supplier unit

INFRASTRUCTURE AND FACILITY


Distance from the nearest Banking:2km
Distance from nearest State Tax and Finance Agency: 2km
Distance from nearest Logistic Center: 30km
Distance from Universities, training facilities, etc.: 30km
Industrial Park’s road width: 19,5m- 22,5m

List of Projects in Industrial Zone

No. Name of Company Nationality Business line

1 Ohsung Vina Thai Binh Co., Ltd Korea Motor processing for export

2 JinYang Electronics Vina Co., Ltd Korea Pcb processing for export

3 Greenworks Thai Binh Vietnam Factory Project American Smart gardening equiments for export

4 Lotes Viet Nam Co., Ltd Taiwan Ram connector adapter processing for
export
5 Nam Tai International Thai Binh Co., Ltd Singapore Building Factories and office for rent

6 An Thai Auto Machine Company Vietnam Liquid cooling for car

7 Compal Electronics (Vietnam) Co., Ltd Taiwan Electronics processing and parking for
export

990
TIEN HAI INDUSTRIAL ZONE

GENERAL INFORMATION
Address [Địa chỉ]: Tien Hai dis. , Thai Binh province
Name of Investor: Viglacera Corporation - JSC
Investor ▪ Address: Viglacera Tower - No.1 Thang Long Avenue, Hanoi, Vietnam
▪ Tel: (+84-24) 3553 6664
▪ Email: info@viglacera.com.vn
▪ Website: http://www.viglacera.com.vn/

Contact Person Name: VIGLACERA REAL ESTATE COMPANY


Address: 2nd Floor, Viglacera Tower, No. 1 Thang Long Boulevard, Me Tri, Nam Tu Liem,
Hanoi
Tel: (+84) 24 3553 6688 | Hotline: (+84) 888 25 22 88
E-mail: vir@viglaceraland.vn
Website: https://viglaceraip.com

Location Adjacent location


- 24 km from Thai Binh city/ 120 km from Ha Noi capital;
- 33 km from CAT BI airport; 150 km from NOI BAI airport;
- 40 km from HAIPHONG port;
- 44 km from NAM DINH railway station/highway/..
Investment Sectors Priority Sectors for Manufacturing, processing industries, with priority given to
Investment industries using high technology, supporting industries,
production of new materials, agro-fishery processing,
agricultural service industries, high-value-added, export-value
industries, and industries saving energy and friendly to the
environment.
Investment Restricted Sectors affect badly to environment, polluted…
Sectors

Minimum wage According to Decree 38/2022/ND-CP


Zone 4: $140/person/month

Lease term ▪ Start date: 2017


▪ End date: 2067
Minimum Lease Area 1ha
Limit for Construction Maximum: 40 meter
Height

Permitted Construction Building Density: 70%


Rate Land using factor: 3.5 times
Green Density: 20%

Planned area ▪ Total area: 466ha


▪ Total vacant leasable area: 128ha
▪ Total area with full infrastructure ready to build factory: 70-80ha

Operation Status ▪ Active: 49 enterprises in Tien Hai IP


Occupancy Rate and ▪ 70%
Number of Projects

Number of Korean projects ▪ 1 company

Lease fee ▪ Land lease fee: Depends on the location and the area of land plot

991
Operating fee ▪ Management fee: $0.7/m2 (Excluding VAT)
▪ Electricity fee: following EVN price
▪ Water fee: $0.48/m3 (Excluding VAT)
▪ Wastewater treatment fee: $0.42/m3(Excluding VAT)

INFRASTRUCTURE AND FACILITY

Distance from the nearest Banking, nearest State Tax and Finance Agency, nearest Logistic Center, Universities,
training facilities, etc., Road Width,…
- Bank: 1km
- State Tax: 3km
- Thai Binh Customs: 25km
- ROAD: near route 39B (width: 32m). Road width in IP: 10.5m-22m

List of Projects in Industrial Zone

No. Name of Company Nationality Business line


1 FA THAI BINH JSC VIET NAM CNG Transportation

2 TOYODA GOSEI HAI PHONG Ltd, JAPAN Transport vehicles components


Co.
3 ASAHI KASEI VIET NAM JAPAN Transport vehicles components

4 BE BRIGHT TAIWAN Lights Production

5 VINH XUONG Ltd, Co. TAIWAN Labels Production

6 TRUNG NHAC Ltd, Co. TAIWAN Bag, Backpack production

7 EIV GLOBAL SINGAPORE Electronic Components

8 HONGXI TECHNOLOGY CHINA Electronic Components

9 SINHER TECHNOLOGY TAIWAN Laptop Components

992
[- This Page is intentionally left blank -]

993
THAI NGUYEN

994
INVESTMENT ENVIRONMENT IN THAI NGUYEN

GENERAL INFORMATION
Area 3,562 km2
Population 1,336 million people (2022)
▪ Thai Nguyen is located in Northeast region.
▪ Located in center of politics, economics of Vietnam’s Northern area and midland northeast mountainous
Geographical area
Location ▪ A transportation node with system of highway, railway, inland waterways connecting to other provinces
▪ 50 km from Noi Bai Airport, 200 km from China Border line, 75 km from Center of Hanoi and 200 km
from Hai Phong Port
Adjacent ▪ The Province has Bac Kan Province to the north, Vinh Phuc, Tuyen Quang Province to the west, Lang
provinces Son, Bac Giang Province to the east, Hanoi to the south.
2022 statistic:
▪ Real GRDP (billion VND): 150,19 6.41 billion USD
▪ GRDP growth: 8,59%.
▪ GRDP per capita (million VND/year): 107 (4575 USD)
GRDP
▪ Economic structure:
- Industry - Construction: 59,51%
- Agriculture. forestry and fishery: 10,46%
- Service: 30,03%
▪ Industry - Construction growth: 9,75%
Industry
▪ Agriculture, forestry and fishery growth: 4,23%.
growth
▪ Service growth: 7,35%.
Import turnover N/A
Export turnover 31 billion USD, up 6.6%
PCI 66.10
Ranking 25
SOCIAL INFRASTRUCTURE
 Roadway: National Highway 3 connecting Hanoi to Bac Kan; Cao Bang and Vietnam - China border
gate; National Highway 1B to Lang Son; Highway 37 to Bac Ninh, Bac Giang and Tuyen Quang; Ho Chi
Minh road; The Ring Road 5 in the Hanoi capital area is being invested and will connect the new National
Transportation Highway 37- National Highway 3 - Hanoi Lao Cai Expressway;
 Railway: connecting Thai Nguyen - Hanoi - Hai Phong - Lao Cai - Lang Son and North-South railway;
 Waterway: Da Phuc port connecting with the provinces of the Red River Delta and Hai Phong port.
200km from China border gate and Hai Phong port.
▪ Thai Nguyen province has 2 power systems including: the national grid system and the power system
Electricity purchased from China to ensure stable capacity and power quality; Thai Nguyen Power Company manages
and operates 15 110kV substations, 37 110kV transformers with a total capacity of 2,012MVA.
▪ Thai Nguyen Clean Water Joint Stock Company and Yen Binh Water Plant ensure the supply of clean
Water
water for daily life and production.
▪ 9 universities in which Thai Nguyen University has 7 schools (Industry, Agriculture, Forestry, Pedagogy,
Medicine, Science, Economics, Information Technology); Viet Bac University; University of Transport
Education & Technology; 12 colleges, 8 professional intermediate schools, 30 vocational training centers located in the
Training province are playing the role of both training centers and research and technology transfer centers; Annually
training over 100,000 students with qualifications and skills to meet the technical labor requirements for
Thai Nguyen province and the northern midland and mountainous provinces.
▪ Thai Nguyen is a regional center for health with over 520 medical examination and treatment facilities,
including 01 central general hospital, 05 provincial specialized hospitals, 07 district general hospitals...
Medicare
demand for health care and medical examination and treatment for people in the Northern mountainous
region.
INVESTMENT CONDITION
Human
44,9% of population are in the working age (2022)
resource

995
Education
Trained labor rate: 35,4% (2022)
level
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): N/A
- Area II (4,160,000 VND/month): Thai Nguyen, Song Cong, Pho Yen Cities
Salary - Area III (3,640,000 VND/month): Phu Binh, Phu Luong, Dong Hy, Hai Tu Districts
- Area IV (3,250,000 VND/month): Dinh Hoa and Vo Nhai District
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages
paid to employees working under employment contracts)
▪ Areas of investment incentives include:
+ Areas with extremely difficult socio-economic conditions, including: Vo Nhai, Dinh Hoa, Dai Tu, Phu
Luong, and Dong Hy districts.
+ Areas with difficult socio-economic conditions, including: Phu Binh district, Pho Yen city.
According to Appendix III, issued together with Decree No. 31/2021/ND-CP dated March 26, 2021 of the
Government detailing and guiding the implementation of a number of articles of the Investment Law.
▪ Industries and trades with investment incentives and investment incentives applicable in Thai
Nguyen province: According to Appendix II, issued together with Decree No. 31/2021/ND-CP dated March
26, 2021 of the Government .
Investment ▪ Incentives on land: According to the provisions of Decree 46/2014/ND-CP dated May 15, 2014 of the
incentives Government and Decision No. 37/2017/QD-UBND dated May 18
5
December 2017 of Thai Nguyen Provincial People's Committee promulgating Regulations on
implementation of preferential policies on land use for investment socialization activities in the fields of
education-training, vocational training, health, culture, etc. sports, environment, judicial expertise in Thai
Nguyen province.
▪ Tax incentives: According to the provisions of Decree 218/2013/ND-CP dated December 26, 2013 of the
Government detailing and guiding the implementation of the corporate income tax law.
▪ Other incentives: According to Decree No. 57/2018/ND-CP dated April 17, 2018 of the Government on
mechanisms and policies to encourage enterprises to invest in agriculture and rural areas.
▪ Some fields and projects attract investment: Infrastructure construction, Development of clean industries,
Fields
information technology, high-tech industries; Producing electricity and electronics; manufacture and
Attracting
assemble automobiles; software industry; mechanical engineering, metallurgy; Supporting industries,
Investment
plating, electronics, electrical equipment, medical equipment, assembly, consumer goods...

996
Map

Thai Nguyen Department of Investment and Planning

▪ Address: No.16A, Nha Trang Street, Trung Vuong district, Thai Nguyen city, Thai Nguyen
Contact
▪ Tel: 0208.3.855688

▪ Email: sokhdt@thainguyen.gov.vn

997
LIST OF INDUSTRIAL ZONES IN THAI NGUYEN

No Industrial zone Name Total Area (ha) Occupancy Rate Status


1 Song Cong Industrial Park I 195 97 In operation
2 Yen Binh Industrial Park 400 92,4 In operation
3 Nam Pho Yen Industrial Park 120 /263 60,7 In operation The
increased area
will make
construction
planning and
attract
investment
4 Diem Thuy Industrial Park 361,1
Zone A 191,1 98 In operation
Zone B 170 9,18 In operation
5 Song Cong II Industrial Park 250 98 In operation
6 Song Cong II Industrial Park Phase 2 300 - The construction
plan has been
approved, and
the investment
policy for
infrastructure
projects is being
submitted
7 Phu Binh Service Urban Industrial Park 900 - In which the
industrial zone
area is 675ha;
Approved the
construction
plan, attracting
investment in
infrastructure
projects
8 Yen Binh Industrial Park 2 301 - Planning to build
9 Yen Binh Industrial Park 3 300 - Planning to build
10 Thuong Dinh Industrial Park 130 - Planning to build
11 Tay Pho Yen urban service industrial park 1.128 - In which the
industrial zone
area is 868ha;
Planning to build

998
DIEM KHUY ZONE A INDUSTRIAL ZONE

GENERAL INFORMATION

Diem Thuy commune, Phu Binh district, Thai Nguyen province.


Address
- Investor's name: Thai Nguyen Industrial Park Management Board
- Address: Bach Quang Ward, Song Cong City, Thai Nguyen Province - Email:
Investor
bbt@bqlkcnthainguyen.gov.vn
- Website: http://bqlkcnthainguyen.gov.vn/
- Full name: Le Kim Phuc
Contact Person - Position: Head of Management Board of Thai Nguyen Industrial Parks
- Phone: 0913.313.151
Thai Nguyen province is on average 50 km from Noi Bai international airport, 200 km from the
Location Chinese border, 75 km from Hanoi center and 200 km from Hai Phong port, 20 km from Da Phuc
port. Expressway Hanoi - Thai Nguyen: about 60 minutes to Hanoi, about 50 minutes to Bac Ninh.

- Investment encouragement fields: Priority is given to attracting projects with high technology
content, advanced technology, modern management, high added value, spillover effects, technology
transfer in the fields: mechanical assembly, parts manufacturing, electrical and electronic;
Investment Area
production of consumer goods, household appliances; processing agricultural and forestry products;
- Areas of investment restriction: projects using outdated technology, consuming energy, and
potentially causing environmental pollution

- Start date: 2011


Lease term
- End date: 2061

Minimum Lease Area Based on the needs of investors and the actual situation of the land.

Factory Available for


10ha
Rent
Occupancy Rate and ▪ 98%
Number of Projects ▪ 74 Projects
Number of Korean
▪ 65 projects
Projects
- Land rental cost: According to the decision approving the land rental unit price of Thai Nguyen
Provincial People's Committee.
Lease fee
- Factory rental cost: According to the agreement between the factory leasing unit and the factory
sub-leasing unit.

999
LIST OF SOME NOTABLE TENANTS

No. Company Name Countries


1 Electronic component factory KSD VINA Korea
2 SAM HWA YANG HENG VINA-2 . PROJECT Korea
3 Vina CTS Thai Nguyen investment project Korea
4 Vietnam Factory ART Color Eco-Friendly Hong Kong
5 DongSung Vina project Korea
6 Samju Vina project Korea
7 Shinsung C&T Vina factory Korea
8 Young Jin Hi-Tech Vietnam Electronic Components Factory Korea
9 Factory manufacturing and assembling electronic components in Thai Nguyen Korea
10 High frequency quenching heat treatment processing project Japan
11 Doorien Vina factory Korea
12 Sekwang Vina Factory Korea
13 DHPMR VN factory project Korea
14 Factory Myungjin Electronic Vina Korea
15 Investment project to produce mobile phone cases Korea
16 The project of producing wood pellets, wood chips and sawdust UJU vina in Thai Korea
Nguyen
17 ASEA DAERYUN Vina Factory Project Korea
18 Chung-Sol Coschem Vietnam Factory Project Korea
19 Shin Hwa Contech Vina Factory Project Korea
20 Project of stamping and forming sheet metal, precision mechanical processing, malaysia
assembling accessories, manufacturing and manufacturing tools and molds.
21 Jukwang Precision Vina Factory Project Korea
22 Factory Alutec Vina Korea
23 Seohui Vina Factory Korea
24 Jung Jin Electronics Vina Factory Project Korea
25 KET VINA Factory - THAI NGUYEN Korea
26 Hanoi MaNi Co., Ltd - Pho Yen 2 Factory Japan
27 Design metal factory vina Korea
28 Emtec Vina Thai Nguyen Factory Korea
29 SSNEWTECH VIETNAM CO., LTD Korea
30 KC VINA factory Korea
31 CICT VINA Factory - THAI NGUYEN Korea
32 eRANG . Factory Korea
33 Factory producing electronic components NPD VINA Korea
34 AJU Vina factory Korea
35 UTI VINA factory project in Thai Nguyen Korea
36 Sam Hwa Yang Heng Vina Project Korea
37 Project TERRABEE Korea
38 Factory ALK Vina Korea
39 CS Art Vina Korea
40 Hadanbi vina factory project Hong Kong
41 DHM VINA Factory Project Korea
42 KPTU Vina factory Korea
43 woojinQPD factory Korea
44 Plus Partners Vina project Korea
45 Chang An Vina Factory - Thai Nguyen Korea
46 FULlandI TOOLS Vietnam Co., Ltd China
47 DHT VN factory Korea
1000
48 KHVATEC HANOI factory project Korea
49 G.S Electronics Co., Ltd Korea
50 Daham Vina Co., Ltd Korea
51 Production of Graphite Tanyuan Vina Hong Kong
52 Investment project to build PS-BHL wood processing factory Singapore
53 Samju vina 2 project Korea
54 KMS Vietnam Co., Ltd Korea
55 TH Technology Factory Korea
56 Daesin Thai Nguyen Factory Korea
57 Thai Nguyen SG Project Korea
58 Han-Viet Mold Vina project Korea
59 New One Vina factory project Korea
60 Young Diecasting Vina factory project Korea
61 Laser Flex Vina Co., Ltd - Thai Nguyen Branch Korea
62 wits vina factory project Korea
63 HSC Press Vina Co., Ltd Korea
64 Project AKM Electronics Vietnam Korea
65 Project Youi Precision Vina Co., Ltd Korea
66 KPE Vina project Korea
67 KHELTEC Vina factory project Korea
68 Factory Ziiu Hanoi 2 Korea
69 Seon Yeong Co., Ltd Korea
70 Gio Sun Vina Factory Korea
71 HSC Tech Vina Co., Ltd Korea
72 HA Vina Factory Project Korea
73 UTT Vina Co., Ltd Korea
74 HUALI VIETNAM PVC FLOOR PROJECT China

1001
SONG DONG II INDUSTRIAL ZONE

GENERAL INFORMATION

Tan Quang commune, Song Cong city, Thai Nguyen province


Address
- Investor's name: Thai Nguyen Industrial Park Management Board
- Address: Bach Quang Ward, Song Cong City, Thai Nguyen Province - Email:
Investor
bbt@bqlkcnthainguyen.gov.vn
- Website: http://bqlkcnthainguyen.gov.vn/
- Full name: Le Kim Phuc
Contact Person - Position: Head of Management Board of Thai Nguyen Industrial Parks
- Phone: 0913.313.151
- Thai Nguyen province is on average 50 km from Noi Bai international airport, 200 km from the
Location Chinese border, 75 km from Hanoi center and 200 km from Hai Phong port, 20 km from Da Phuc
port . Expressway Hanoi - Thai Nguyen: about 60 minutes to Hanoi, about 50 minutes to Bac Ninh.
- Fields of investment encouragement: Prioritize industries, fields, programs and projects with high
added value, using advanced and modern technologies for infrastructure development, digital
economy, digital transformation, green growth in the fields of: mechanical engineering, mechanical
engineering, automobile manufacturing and assembly, electronic goods production, electrical
Investment Area
equipment, wooden board production, equipment and tool production medical equipment, sports
equipment, etc.
- Areas of investment restriction: projects using outdated technology, consuming energy, and
potentially causing environmental pollution.
- Start date: 2021
Lease term
- End date: 2071

Minimum Lease Area Based on the needs of investors and the actual situation of the land.

Factory Available for


80ha
Rent
Occupancy Rate and ▪ 98%
Number of Projects ▪ 14 Projects
Number of Korean
▪ 8 projects
Projects
- Land rental cost: According to the decision approving the land rental unit price of Thai Nguyen
Provincial People's Committee.
Lease fee
- Factory rental cost: According to the agreement between the factory leasing unit and the factory
sub-leasing unit.

1002
LIST OF SOME NOTABLE TENANTS

No. Company Name Countries


1 Vietnam high-class shirt fabric factory Hong Kong
2 MDF Dongwha Vietnam Project Korea
3 Factory AJU Vina 2 Korea
4 Ket Vina II Factory - Thai Nguyen Korea
5 RESEARCH, DEVELOPMENT, BUSINESS, PRODUCTION OF ELECTRONIC Hong Kong
PRODUCTS AND PLASTIC PRODUCTS
6 Woltech Vietnam factory project Korea
7 Aone Vina project Korea
8 Stainless steel material precision casting and processing factory Republic of Seychelles
9 Hansol Harness Vina Factory Korea
10 Investment project to research, produce and consume PVC floor tiles with an output Republic of Seychelles
of 20,000,000m2 a year - phase 2
11 Project of Top Optoelectronice Vietnam Co., Ltd Singapore
12 Project on information science and technology of Vietnam Thac Boi Duc Hong Kong
13 Dowooinsys Vina Project Korea
14 Factory BIGL Vietnam Korea

1003
YEN BINH INDUSTRIAL ZONE

GENERAL INFORMATION

National Highway 3, Dong Tien, Pho Yen, Thai Nguyen


Address
- Investor's name: Yen Binh Development Investment Joint Stock Company
- Address: Lot 8, Yen Binh urban area, Dong Tien ward, Pho Yen city, Thai Nguyen province
Investor
- Email: info@yenbinhcorp.com
- Website: www.yenbinhcorp.com
- Full name: Hoang Minh Duc
- Position: Director of External Relations
Contact Person
- Phone number: 0868003789
- Email: hoangduc@htdcorp.vn
- 40 km from Hanoi Capital.
- 25 km from Noi Bai International Airport.
Location - 125 km from Hai Phong Maritime Authority.
- 160 km from Quang Ninh Maritime Authority
- Located next to Hanoi - Thai Nguyen Expressway.
- Areas of investment promotion:
+ High-tech industries
+ Producing electricity and electronics
Investment Area + Mechanical engineering
+ Precision mechanics
+ Other clean industries
- Areas of investment restriction: Industries prohibited by Vietnamese law

Minimum wage Minimum salary in Region II: 4,160,000 VND

Starting Date: From the date of signing the Land Sublease Contract.
Lease term
End date: April 19, 2067

Minimum Lease Area 01ha

- Factory construction area: 8m-40m


Building height limit: - Public service area: 8m-20m
- Land for construction of workers' houses: maximum 24m
- Factory construction area: 35%-60%
Permissible building
- Public service land: 65%-80%
rate
- Land for construction of workers' houses: 60%
- Total area: 400 hectares
Planned area - Area for rent: 27.35ha
- Area with infrastructure ready for factory construction: 27.35ha
Total factory area
Currently, there are 2 investors leasing factories in the industrial park.
available for rent

Operation Status Area in operation: 334.47ha

Occupancy Rate and ▪ 92,4%


Number of Projects ▪ 24 Projects
Number of Korean
▪ 9 projects
Projects
- Land rental cost: 120 – 130 USD/m2
- Factory rental cost: Depends on the lessors of the factory 17. Management fee.
- Cost of management, thinking and maintenance (annual payment): 0.05 USD/m2/month
- Electricity cost: Investors will pay monthly and pay EVN directly in Vietnamese cash
Lease fee + Off-peak hours: 1,100 VND/KWh=0.05 USD
+ Regular hours: 1,685 VND/KWh=0.08 USD
+ Rush hour: 3,076 VND/KWh=0.13 USD
- Water cost: According to regulations of Thai Nguyen People's Committee on clean water price
- Waste water treatment fee (according to wastewater quality): 0.25-0.85 USD/m
1004
- Infrastructure connection fee (one-time fee for construction survey): 6,000 USD (the above
price does not include value added tax)
INFRASTRUCTURE
 Distance from nearest Bank, nearest State Tax and Finance Authority, nearest Logistics Center, University, training
institution, etc., Road width:
 Banks: BIDV, Vietin Bank, Agribank, MB Bank.
 Universities: College of Technology and Industrial Economics, - Southern Thai Nguyen Vocational School.
 Tax agency: Pho Yen Tax Department.

LIST OF SOME NOTABLE TENANTS

No. Company Name Countries


1 Samsung Thai Nguyen hi-tech complex Korea
2 Hansol Vietnam Korea
3 Project Samsung Electro-Mechanics Vietnam Korea
4 Seung Woo Vina Factory Project Korea
5 Samsung Thai Nguyen high-tech complex - phase 2 Korea
6 Nitrogen gas production plant with capacity of 9000Nm3/hour German
7 Workshop for assembling USB cables and connectors, DLC data cables Korea
8 SEVT Hanoi Information Center Project Korea
9 GNP Yen Binh Industrial Center Hong Kong
10 Sunny Opotech Vietnam Factory Project Hong Kong
11 Trina Solar Energy Development Plant Project Singapore
12 Messer Hai Phong - Thai Nguyen Industrial Gas Production Plant Project 2 German

1005
SONG CONG I INDUSTRIAL ZONE

GENERAL INFORMATION

Song Cong city, Thai Nguyen


Address
Thai Nguyen Industrial Zone Infrastructure Development Joint Stock Company - Investor's name:
Thai Nguyen Industrial Park Infrastructure Development Joint Stock Company
Investor
- Address: Area B, Song Cong I Industrial Park, Bach Quang Ward, Song Cong City, Thai Nguyen
Province
- Full name: Hoang Cong Doan
Contact Person - Position: Director
- Phone number: 0912334205
- 60 km from Hanoi capital along Highway 3.
- 40 km from Noi Bai International Airport.
Location - 2.5 km from Hanoi - Thai Nguyen highway.
- 15 km from Da Phuc river port (from there to Cai Lan port nearly 100 km) - 1 km from Luong
Son station of Hanoi - Quan Trieu railway
- Areas of investment encouragement: It is a concentrated industrial zone of the province in which
the automobile assembly industry, mechanics, electronics, food and beverage processing, fast food
processing, vegetable and tube processing industry are developed. Pharmaceutical; medical
Investment Area
instruments, textiles, footwear, ceramics, glass, production of building materials, clean industry
with less pollution.....
- Areas of investment restriction: Industries prohibited by Vietnamese law.

Minimum wage Region II, the minimum salary is 4,160,000 VND/month.

Starting Date: 01/09/1999


Lease term
End date: 01/09/2049

Minimum Lease Area 0,3 ha

- Factory construction area: 1-:- 2 floors.


Building height limit:
- Executive building: 1-:- 5 floors
Permissible building - Factory construction area: ≤ 60%
rate - Executive building: ≤ 60%
- Total area: 196.88ha
Planned area - Area for rent: 150.65 ha
- Area with infrastructure ready for factory construction: 0ha
Total factory area
0 ha
available for rent
Area under operation: 119.8ha (Leased area by the province) - Area under construction and
Operation Status
expected completion: 106.35ha - Area under clearance: 0.9 ha.
Occupancy Rate and ▪ 97%
Number of Projects ▪ 24 Projects
Number of Korean
▪ 17 projects
Projects
- Cost of land rent:
+ Annual unit price (in 2022):
++ Lot1: 15,000 VND/m2/year
Lease fee
++ Lot2: 12,500 VND/m2/year
+ One-time unit price (in 2022): 750,000 VND/m2/26 years -:- 1,085,000 VND/m2/26 years.
- Factory rental cost: 60,422 VND/m2/month
- Management costs:
+ Annual unit price (in 2022): 2,106 VND/m2/year
Management fee. + One-time unit price (in 2022): 55,100 VND/m2/26 years.
16
- Cost of electricity production (low voltage electricity price):

1006
+ Normal hours: 1,685 VND/kW
+ Peak hours: 3,076 VND/kW
+ Off-peak hours: 1,100 VND/kW
- Production water cost: 17,500 VND/m3
- Waste water treatment fee: 11,000 VND/m3
- Waste treatment fee:
+ Hazardous waste (Sludge): 3,300 VND/kg
+ Normally: 350,000 VND/m3

LIST OF SOME NOTABLE TENANTS

No. Company Name Countries


1 Factory of Wiha VN Co., Ltd Germany
2 Truong Giang International Investment Company Limited VN China
3 BJSTEEL Vietnam Foundry Korea
4 The project of establishing JYS Vina Co., Ltd Korea
5 JEIL ENGINEERING Thai Nguyen Korea
6 Eco Korea Factory Korea
7 Project for manufacturing semiconductor devices Korea
8 Factory SR Tech Korea
9 BJ Industry Vina's private enterprise factory project Korea
10 Project Shinpoong tech vina Korea
11 Golden Tech Vina Factory - Thai Nguyen Korea
12 Project sunny optics vina Korea
13 Factory of Daerim Tech Vina Korea
14 Sung Nam Vina Project -Thai Nguyen Branch Korea
15 Project of plastic pellet factory Korea
16 rand . metal factory China
17 SN Vina project Korea
18 Construction project of Huamei Vietnam insulation material factory
19 JSJ Vina project Korea
20 GU&I Vina project Korea
21 Trung Viet Plating Factory China
22 Eurasian Metallurgical Plant Project China
23 Rand Metal Factory 2 China
24 Sodium Tungstate processing factory Korea

1007
NAM PHO YEN INDUSTRIAL ZONE

GENERAL INFORMATION

Thuan Thanh Ward and Trung Thanh Ward, Pho Yen City, Thai Nguyen Province
Address
Zone A: has an area of 48.43 ha, determined on the basis of expanding Trung Thanh Small
Industrial Park, located in a planned location in Trung Thanh ward, Pho Yen city, Thai Nguyen
province. At the end of 2007, the project was approved by Thai Nguyen Provincial People's
Committee for the investor, Le Trach Infrastructure Development Investment and Development
Co., Ltd with an investment capital of more than 8.5 million USD. Zone A has a term of operation
from 2007-2057.

Zone B: Has an area of 26.7 hectares, planned location in Thuan Thanh ward, Pho Yen city, Thai
Nguyen province. Nam Pho Yen Industrial Park Zone B project was first granted investment
certificate by Thai Nguyen Provincial People's Committee on April 17, 2008 to the investor, Xuan
Investor Kien Automobile Company Limited VINAXUKI.

Area C: has an area of 44.4 ha, planned location in Trung Thanh ward, Pho Yen city. The project
was granted an Investment Certificate by Thai Nguyen Provincial People's Committee to the
investor, Le Trach Infrastructure Development and Investment Co., Ltd (Taiwan) in 2013 and has a
term of operation from 2013-2063.

Thus, the total approved investment project area of Nam Pho Yen Industrial Park is 119.53
hectares, the rest according to the planning is difficult to deploy areas. Therefore, on June 12, 2014,
Nam Pho Yen Industrial Park was adjusted to reduce the planned area from 200 ha to 120 ha
(reducing 80 ha) according to Official Letter No. 886/TTg-KTN of the Prime Minister .
Nam Pho Yen Industrial Park is located adjacent to National Highway 3 and is located near the
Hanoi - Thai Nguyen Expressway, so the Industrial Park has the ability to conveniently connect
traffic with the central area, Specifically the industrial park. Nam Pho Yen:
- 10 km from SAMSUNG Thai Nguyen factory;
Location - 12 km from the intersection of Hanoi - Thai Nguyen Expressway
- 42 km from Hanoi city center;
- 29 km from Thai Nguyen city
- 23 km from Noi Bai International Airport
- 155 km from Hai Phong port
- Investment encouraged fields: Automobile assembly, mechanical engineering, electronics; Food
and beverage processing; Slaughter of livestock and poultry; Fast food processing; Processing
vegetables and fruits; Manufacture of pharmaceutical chemicals, medical instruments, veterinary
Investment Area
instruments; Textile, footwear, handicrafts industry, fine arts, ceramics, glass; Gas extraction;
Production of concrete structures, production of building materials...
- Areas of investment restriction: Industries prohibited by Vietnamese law

Minimum wage Region II, the minimum salary is 4,160,000 VND/month.

Starting Date: N/A


Lease term
End date: N/A

Operation Status Area under operation: 56,40ha.

Occupancy Rate and ▪ 60,7%


Number of Projects ▪ 6 Projects
Number of Korean
▪ 0 projects
Projects

LIST OF SOME NOTABLE TENANTS

No. Company Name Countries


1 Investment project on construction and infrastructure business of Trung Thanh Taiwan
Industrial Park (Zone C)
2 Newland manufacturing plant Republic of Mauritius

1008
3 Kien Dat Factory Republic of Seychelles
4 Animal feed factory of MNS FEED Thai Nguyen Netherlands
5 Hong Dat Factory Taiwan
6 Factory processing milk products Japan

1009
[- This Page is intentionally left blank -]

1010
THANH HOA

1011
INVESTMENT ENVIRONMENT IN THANH HOA

GENERAL INFORMATION

 Area: 11.111,4 km2


Area, Population
 Population: more than 3,7 million (2022 statistic)

 Thanh Hoa province is located in the Northem Central region of Viet Nam,
Geographical Location 150 km to the south of Ha Noi (the capital) and 1,560 km from Ho Chi Minh
City.

 The Western part of the province borders with the Lao People's Democratic
Adjacent provinces Republic, with a border line of213.6 km; the East is the Tonkin Gulf with a
coastline of 102 km.

2022 statistic:
 GRDP: 10,8 billion VND
 GRDP growth: 12,51%
 RDP per capita: 2924 USD/year
GRDP
 Economic structure:
 Industry - Construction: 48,4 %;
 Agriculture. forestry and fishery: 14,4 %;
 Service: 30,4 %;
Tax on Goods: 6,8 %

2022 statistic:

Industry growth  Industry - Construction growth: 16,33%


 Agriculture, forestry and fishery growth: 3,65%
 Service growth: 10,18%

PCI Score: 63.67- Ranked 47 out of 63 cities and provinces in Vietnam. (2021)

SOCIAL INFRASTRUCTURE

 Roadway: Roads running through: National Highway 1A, Ho Chi Minh trail;
National Highway 217; National Highway 10; 15; 45; 47; North- South
expressway; coastal road.
 Railway: north-south railway
 Waterway: Nghi Son Seaport, Planned area is 2,020 ha, including general
Transportation
wharfs, container wharfs, specialized wharfs and logistics service areas. Nghi
Son port is capable of exploiting hundred millions tons of goods per year and
receiving ships with a tonnage of over 100,000DWT.
 Other: Tho Xuan airport is planned to be an international airport by 2030.
Available domestic flights include routes to: Ho Chi Minh City, Can Tho,
Khanh Hoa (Nha Trang), Da Nang, Lam Dong (Da Lat), Ba Ria - Yung Tau

1012
(Con Dao), Dak Lak (Buon Ma Thuot), Binh Dinh (Quy Nhon), Kien Giang
(PhuQuoc).

▪ There are 13 hydropower plants with a total capacity of 610.66 MW (of which
11 are in the hydropower planning and 02 small hydroelectric plants are not in
the planning), the total investment is 18,170 billion VND; 01 600 MW thermal
power plant, total investment of 22,260 billion VND; 01 solar power plant with a
Electricity
capacity of 30 MW and about 623 rooftop solar power systems with a total
capacity of 63.6 MW, total investment of VND 1,400 billion; 03 biomass power
plants (at Lam Son, Nong Cong and Viet Dai sugar factories) with a total
capacity of 47.7 MW.

▪ The total amount of fresh water used annually for agriculture, daily life and
industry is about 3.54 billion m3. In which, water demand for agriculture is 3.25
billion m3 (accounting for 91.6%), water demand for domestic use is 254 million
Water m3 (accounting for 7.1%) and for production activities. industrial output is 43
million m3 (accounting for 1.3%). Thus, the total amount of water used for
agriculture, daily life and industry accounts for 17% of the total water volume of
the province and accounts for nearly 50% of the usable water.

▪ The province has 5 universities, 11 professional colleges and 80 vocational


Education training institutions. Education in certain themes or areas always ranks among
the country's top five in terms of quality.

▪ The local medical system includes 13 provincial hospitals, 25 district hospitals,


Medicare
27 district health centers, 02 central hospitals, and 16 non-public hospitals

INVESTMENT CONDITION

Human resource 67,5 % of population are in the working age (2022)

Education level Trained labor rate: 25,89% (2021)

 The minimum salary for the province is applied as follows:


 Area I, II, III, IV: III (160USD) and IV (140USD).
Salary
 The lowest wage for trained labor (including those trained by the enterprises)
must be at least 7% higher than the above referenced basic salary:250 USD

▪ Incentives according to government regulations:


- Incentives on land rental;
- Incentives on corporate income tax;
- Preferential import and export taxes;

▪ Legal Basis

Investment incentives - 2020 Investment Law;


- Decree 31/2021/ND-CP dated 26/03/2021 of the government elaborate some
articles of the Law on Investment;
- -Decision No. Decision 29/2021/QD-TTg dated October 6, 2021 on special
investment incentives;
- Decree 46/2014/ND-CP dated 15/5/2014 of the government on land and
water swface rental;

1013
- Decree 35/2017/ND-CP dated 03/4/2017 of the government on collecting
land rental, and water surface rental in EZs and high-tech zones;
- 2016 Laws on Export, Import;
- Decree 218/2013/ND-CP dated 26/12/2013 of the government, providing
details and guiding the implementation of Corporate Tax Law.
- Incentives from the province: Support enterprises to transport goods by
containers through Nghi Son port:

▪ For containers that open declarations at Department of Thanh Hoa


Customs
- 20-feet container: VND 2,000,000/container;
- 40-feet container: VND 3,000,000/container.

▪ For containers that do not open declarations at Department of Thanh Hoa


Customs
- 20-feet container: VND 700,000/container;

- 40-feet container:VND 1,000,000/container.

▪ Processing and manufacturing industry: petrochemical industry, chemical


industry, power production, supply industry, mechanical industry, electronics and
metal production, construction material production industry and textile industry.
▪ Agriculture: Applying high technology and organic technology to agricultural
Fields Attracting Investment activities to improve land use efficiency, increase crop and livestock productivity
and labor productivity. Orientation for the development of a number of major
agricultural industries is as follows: cultivation, animal husbandry, forestry and
fishery.
▪ Tourism: sea tourism; community eco-tourism and historical discovery tourism.

Map

Thanh Hoa Department of Planning and Investment


Contact ▪ Address: No. 45B Le Loi street, Lam Son District, Thanh Hoa
▪ Tel: 0237 3852 366

1014
▪ Fax: 0237 3851 451
▪ Email: bientapweb.skhdt@thanhhoa.gov.vn.

1015
LIST OF INDUSTRIAL ZONES IN THANH HOA PROVINCE
NO INDUSTRIAL ZONE NAME TOTAL OCCUPANCY STATUS
AREA (HA) RATE
1 Lam Son-Sao Vang High-Tech Park 537 10% In Operation
2 Hoang Long Industrial Zone 268.8 N/A In Operation
3 Bim Son A Industrial Zone 163 30% In Operation
4 Bim Son B Industrial Zone 222 75% (Phase 1) In Operation
5 Dinh Huong- Tay Bac Ga Industrial Zone 163 40% In Operation
6 Le Mon Industrial Zone 87.61 30% In Operation
7 Bai Tranh Industrial Zone 162.7
8 Ngoc Lac Industrial Zone 150 Under planning
9 Thach Quang Industrial Zone 140 0% In Operation

THANH HOA’S LOCATION MAP OF INDUSTRIAL ZONES

1016
NGHI SON ECONOMIC ZONE

GENERAL INFORMATION

Address Nghi Son District, Thanh Hoa Province

Investor

Mr. Quang – Deputy Head of Investment Department - Management Board of Nghi Son
Contact Person Economic Zone and Industrial Parks

Mobile: (+84) 91 8086526

Nghi Son Econormic Zone EZ) has the total area of 106,000 hectares (including 66,498 ha of
land area and 39,502 ha of water surface area). It is located in the South of Thanh Hoa
province, on the North-South transport axis, 40 kilometers from Thanh Hoa city, 190

kilometers from the South of Hanoi. Nghi Son is the bridge connecting the Northern and
Location Central regions, the Northwestern and the Southern regions, the South of Laos and Northeast
of Thailand. Nghi Son is targeted to become a multi-industry economic zone attracting heavy
industries and primary industries such as: oil refinery and petrochemical, high-quality
metallurgy, mechanics, thermal power, construction materials, production and processing of
consumer goods and export, investment of urban and tourism areas and so on. This target is
closely connected with effective construction and exploitation of Nghi Son port.

Priority Sectors for


Investment
Investment Area
Restricted Sectors for
Investment

Minimum wage [Area 4] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

▪ Start date:
Lease term
▪ End date:

Minimum Lease Area

Limit for Construction


Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residential Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction N/A
Rate

▪ Total area: 537 ha


Planned area
▪ Total vacant leasable area: N/A

Factory Available for Rent ▪ Total area: NA

Operation Status ▪ In operation

Occupancy Rate and ▪ Occupancy rate:


Number of Projects ▪ Number of Project:

1017
Number of Korean
Projects

Lease fee

Operating fee

1018
LAM SON-SAO VANG HIGH-TECH INDUSTRIAL ZONE

GENERAL INFORMATION

▪ Lam Son Town and Sao Vang Town of Tho Xuan District, Thanh Hoa province
Address

Cuong Thinh Thi Corporation & Mien Trung Group:

▪ Cuong Thinh Thi Corporation:

Address: Cau Yen Port, Ninh Phong Ward, Ninh Binh City, Ninh Binh Province

Tel: (84-229) 3 612 188 Fax: (84-229) 3 612 168

Mail: tapdoancuongthinhthi@gmail.com
Investor
▪ Mien Trung Group:

Address: No. 479 Tran Hung Dao Street, Nam Ngan Ward, Thanh Hoa City, Thanh Hoa
Province

Tel: N/A Fax: N/A

Website: http://mientrunggroup.com/

Contact Person ▪ N/A

- 40 Km to Thanh Hoa City

- 150 km to the south of Noi Bai International Airport (Hanoi)


Location
- 225 km to the South of Hai Phong Seaport

- Face to National Road 47

Industry; high-tech agriculture; microelectronics technology, precision


Priority Sectors for engineering, mechanical - electronic, optical - electronic and
Investment automation; new materials technology, nanotechnology;
Investment Area biotechnology, trading and service

Restricted Sectors
Polluted industries
for Investment

Minimum wage [Area 4] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

▪ Start date: When tenants are ready


Lease term
▪ End date: N/A

Minimum Lease Area 1 ha

Limit for Construction


Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residential Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction N/A
Rate

▪ Total area: 537 ha


Planned area
▪ Total vacant leasable area: N/A

1019
Factory Available for Rent ▪ Total area: NA

Operation Status ▪ In operation

Occupancy Rate and ▪ Occupancy rate: 10%


Number of Projects ▪ Number of Project: N/A

Number of Korean
None
Projects

Lease fee ▪ Land lease fee: 78 USD/m2/over project life

▪ Management fee: N/A

▪ Electricity fee: as regulated by the Government (see appendix)


Operating fee
▪ Water fee: N/A

▪ Wastewater treatment fee: N/A

INFRASTRUCTURE AND FACILITY

Financial institution VIETIN Bank, BIDV, Sacombank, VP Bank, Agribank

Tax service, State finance


18 km to the Tax Department and State Treasury of Tho Xuan District
office

About 50 km to Customs Department of Thanh Hoa province


Customs Service

▪ 8.8 km to Tho Xuan civil airport, which will be upgraded to an international airport;

▪ Adjacent to Ho Chi Minh road linking the Hoa Lac hi-tech park (Hanoi) with Lam Son -
Sao Vang; and Highway 47 connecting Thanh Hoa City with Lam Son - Sao Vang (40km).
As the two road will be renovated into highway, Hanoi- Lam Son Sao Vang (Thanh Hoa)
Logistics
route will allow shorter time to travel.

▪ Thanh Hoa is going to develop a highway linking the Nghi Son EZ with the Lam Son - Sao
Vang and a high-speed railway linking Thanh Hoa City, making Lam Son- Sao Vang a
crucial part of the economic zone system of Thanh Hoa

Post office About 20 km to Tho Xuan Post Office

Medicare About 20 km to Tho Xuan General Hospital

Police, public security Nearby

Universities, training
Thanh Hoa has 14 university and vocational schools in total
facilities, etc.

Recruitment The area has abundant and young population.

Worker dormitory N/A

Worker's child education


N/A
facility

1020
One-stop service About 50 km to Thanh Hoa Public Administration Center, which provides the service

Road Width N/A

IT & Tele-communication
N/A
Facilities

Emergency Power
N/A
generator

Fire-fighting facility N/A

Layout Plan

Location Map

Actual View

1021
1022
HOANG LONG INDUSTRIAL ZONE

GENERAL INFORMATION

Located across Hoang anh Commune, Hoang Long Commune, Hoang Minh Commune and
Address
Hoang Quang Commune of Hoang Hoa District, Thanh Hoa Province

FLC Group

▪ Address: 5th Floor, FLC Landmark Tower, Le Duc Tho Street, My Dinh 2 Ward, Nam Tu
Investor Liem District, Hanoi

▪ Tel: (+84) 24 3771 1111

▪ Website: https://www.flc.vn/

Contact Person ▪ Mr. Linh - Sales Executive - (84) 90 804 5945 - linhth@flc.vn

▪ Located in Thanh Hoa City.

▪ 34 km to Tho Xuan Airport


Location
▪ 75 km to Nghi Son Airport

▪ 75 km to Thanh Hoa railway station

- Electric industry, electronics, software industries;

- Biotechnology
Priority Sectors for
- Manufacturing and processing Agricultural and forestry products
Investment
Investment Area - Machinery installation and maintenance

- Production of household and handicraft products.

Restricted Sectors
Polluted Industries
for Investment

[Area 4] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries
Minimum wage

Lease term N/A

Minimum Lease Area 3,000 m2

Limit for Construction


Height
N/A
Permitted Construction
Rate

Planned area ▪ Total area: 268.8 ha.

Factory Available for Rent ▪ Currently, the IZ does not have factory available for rent

Operation Status ▪ In operation

Occupancy Rate and


▪ Occupancy Rate: N/A
Number of Projects

1023
▪ Number of Projects: 21

Number of Korean
None
Projects

▪ Land lease fee: currently exempted for 15 years


Lease fee
▪ Infrastructure lease fee: 55 – 65 USD/m2/50 year (including VAT)

▪ Management fee: 0.3USD/m2/year

▪ Electricity fee: as regulated by the Government (see appendix)

Operating fee ▪ Water fee: 0.457 USD/m3

▪ Wastewater treatment fee: 0.3USD/m3 (referance) from level B to level

▪ Waste treatment fee: Depend on unit price of supplier

INFRASTRUCTURE AND FACILITY

Financial institution Around 2 km to VIETIN Bank, BIDV, Sacombank, VP Bank, Agribank in Thanh Hoa City

Tax service, State finance


State Treasury and Tax department of Thanh Hoa, located in Thanh Hoa City
office

Customs Service Thanh Hoa Custom Office is to be located in the center of the ID

Inland Container Depot: N/A

Logistics

Post office 0.8 km to Thanh Hoa City Post Office

Medicare 0.4 km to Hong Duc Geeneral Hospital, 0.4 km to the Thanh Hoa General Hospital

2.5 km to Police station of Thanh Hoa City; 4 km to Public Security headquarter of Thanh
Police, public security
Hoa province.

Universities, training
Thanh Hoa has 14 universities and vocational schools in total.
facilities, etc.

Recruitment Close to a vast population area; a Job Introduction center to be located in Thanh Hoa city

Worker dormitory N/A

Worker's child education


Many preschools in Thanh Hoa City
facility

One-stop service Located and provided by Thanh Hoa Public Administration Center.

Road Width N/A

IT & Tele-communication
Available
Facilities

1024
Emergency Power
N/A
generator

Fire-fighting facility Available

Layout Plan

Location Map

Actual View

1025
Actual View

1026
LIST OF TENANTS
No. Company Name Nationality
1 LERON VIET NAM FOOTWEAR LIMITED. China
2 WINNER (VIET NAM) CO., LTD China
3 YULAI GLOBAL CO., LTD China
4 THANH HOA CONSTRUCTION CORPORATION Vietnam
5 HOANG LONG THANH HOA TRANSPORT CO., LTD Vietnam
6 DA LAN JSC. Vietnam
7 MR. NGUYEN LENH NGHIA Vietnam
8 LAM SON THANH HOA COMPANY Vietnam
9 MR. LUONG TRONG HO Vietnam
10 VINH OANH PRIVATE ENTERPRISE Vietnam
11 BIEN DONG CO., LTD. Vietnam
12 THANH TAM MANUFACTURE & IMPORT EXPORT CO., LTD Vietnam
13 BAGIACO Vietnam
14 THANH HOA MEAT PROCESSING - EXPORT JOIN STOCK COMPANY Vietnam
15 THIEN HUONG THANH HOA FISH SAUCE JSC. Vietnam
16 HUU NGHI FERTILIZER VENTURE JSC. Vietnam
17 FLC GROUP Vietnam
18 M&T INVESTMENT AND CONSTRUCTION JSC. Vietnam
19 HOANG TUAN CO., LTD Vietnam
20 PHUONG DONG EXPORT CO., LTD Vietnam
21 HUNG DUNG TRADING & SERVICE CO., LTD Vietnam

1027
BIM SON A INDUSTRIAL ZONE

GENERAL INFORMATION

Address Zone A, Bim Son Industrial Zone, Bac Son Ward, Bim Son Town, Thanh Hoa

Thanh Hoa VID Development JSC

▪ Address: Zone A, Bim Son Industrial Zone, Bac Son Ward, Bim Son Town, Thanh Hoa
Investor
▪ Tel: (84) 904151565

▪ Website: http://vidgroup.com.vn/

Contact Person Mr. Huan - (84) 989 76 586 - Email: huannm2@tniholdings.com/ huan792003@gmail.com

Located along the National Highway No. 1A connecting the North to the South of Vietnam

▪ Land: 123 km from Hanoi, 30 km from Thanh Hoa city; near Hanoi – Cau Gie – Ninh Binh
Location highway, National Road 1A

▪ Seaport: 120 km from Hai Phong seaport, 75 km from Nghi Son deep seaport.

▪ Airport: 40 km from Thanh Hoa airport.

Priority Sectors for


Textile, garment production
Investment
Investment Area
Restricted Sectors for
Polluted industries
Investment

Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

▪ Start date: 2013


Lease term
▪ End date: N/A

Minimum Lease Area N/A

Limit for Construction In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Height Residential Planning regulation (QCXDVN 01: 2008/BXD)

Permitted Construction
N/A
Rate

▪ Total area: 163 ha


Planned area
▪ Total vacant leasable area: 75 ha

Factory Available for Rent ▪ Currently, the IZ does not have factory available for rent

Operation Status ▪ In operation

Occupancy Rate and ▪ Occupancy Rate: 25%


Number of Projects ▪ Number of Projects: 18 projects)

Number of Korean
02
Projects

1028
▪ Land lease fee: 50-55 USD/m2 until 2063
Lease fee
▪ Payment: N/A

▪ Management fee: 0.35 USD/m2/year

▪ Electricity fee: as regulated by the Government (see appendix)

▪ Water fee: 17,000 VND (~0.7 USD)/m3

Operating fee ▪ Wastewater treatment fee:

- C level to A level: 0.6 USD/m3.

- B level to A level: 0.5 USD/m3

- A level: 0.2 USD/m3

INFRASTRUCTURE AND FACILITY

Financial institution VIETIN Bank, BIDV, Sacombank, VP Bank, Agribank nearby

Tax service, State finance 01 km to Bim Son Tax Department


office 2.5 km to Bim Son State Treasury

Thanh Hoa Customs office is located in the industrial park, the procedure is done quickly at
Customs Service
the unit in the industrial park

Logistics Various

Post office 2 km to Bim Son post office

Medicare 6 km to Bim Son General Hospital; 35 km to Thanh Hoa General Hospital

Police, public security 02 km to Bim Son post office

Universities, training
Thanh Hoa province has about 14 colleges and vocational schools
facilities, etc.

Population of Bim Son town is about 52,000 people, of which 60% are workers under 35 with
Recruitment a high labour training percentage. There is a Job Introduction Center in Thanh Hoa City, to be
40 km from the ID.

Worker dormitory Residential area for laborers was planed near the industrial park by Thanh Hoa province

Worker's child education


Within 6 km to several local preschools (Bac Son Ward Preschool, Dong Giao preschool)
facility

40 km to Thanh Hoa Public Administration Center in Thanh Hoa city, which provides one-
One-stop service
stop service

Main road: 36 m in width.


Road Width
Branch road: 22.5 m/ 17.5m in width.

Equipped with modern telecommunication system, meeting the communication demand of


IT & Tele-communication multi-services such as Internet, ADSL, Video Conference, VOIP, Fax, etc. An optical fiber
Facilities system is installed underground to every factory. Ensure high-speed date communication
without interruption.

1029
Emergency Power
Available
generator

Fire-fighting facility Available

Layout Plan

Location map

Actual View

1030
BIM SON B INDUSTRIAL ZONE

GENERAL INFORMATION

Km 289 National Highway 1A, Bim Son town, Thanh Hoa Province, Vietnam
Address

Hud4 Investment and Construction Joint Stock Company.

▪ Address: No. 662 – Ba Trieu Steet, Dien Bien District, Thanh Hoa City, Thanh Hoa
Province.
Investor
▪ Tel: (84-37) 3 850 135 Fax: (84-37) 3 710 245

▪ Email: banbimson@gmail.com

▪ Website: http://hud4.vn

Contact Person ▪ N/A

▪ Loacted along National Road 1A, with an industrial service railway station located inside

Location ▪ 90 Km To Nghi Son Port: 100 Km To Hai Phong Port.

▪ 130 km To Noi Bai International Airport; 70 km To Tho Xuan Airport

Priority Sectors for


Multi-sector industry zone
Investment
Investment Area
Restricted Sectors for
N/A
Investment

Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

▪ Start date: 2010


Lease term
▪ End date: 2060

Minimum Lease Area 10,000 m2

Limit for Construction


Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residential Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction N/A
Rate

▪ Total area 222 ha

Planned area Stage 1: 120 ha

Stage 2: 102 ha

Factory Available for Rent ▪ Currently, the IZ does not have factory available for rent

Operation Status In Operation

Occupancy Rate and ▪ Occupancy Rate of Stage 1: 75%


Number of Projects ▪ Number of Projects: 39

1031
Number of Korean
21
Projects

Lease fee ▪ Land lease fee: 20-22 USD/m2/50 years.

▪ Management fee: 0.21 USD/m2/year, monthly payment aat the end of the month

▪ Electricity fee: According to the price of the government EVN

Operating fee ▪ Water fee: According to the price of water supply stakeholder

▪ Wastewater treatment fee: N/A

▪ Waste treatment fee: According to the price of the service supplier

INFRASTRUCTURE AND FACILITY

BIDV, Agribank, Techcombank, Sacombank ... have branches in Bim Son town center (The
Financial institution
banks will open branches in Industrial Park soon.)

Tax service, State finance ▪ 7km to Tax department of Bim Son Town
office ▪ 4 km to State Treasury of Bim Son Town

40 km to Thanh Hoa Custome Office, located in Thanh Hoa City


Customs Service

Logistics N/A

Post office Bim Son town Postal , 2 Km from the Industrial Park.

Medicare 04 km to Bim Son Town Hospital

Police, public security 06 km to Bim Son General Hospital; 35 km to Thanh Hoa General Hospital

Universities, training
02 km to Bim Son post office
facilities, etc.

Recruitment Thanh Hoa has province about 14 colleges and vocational schoolss

Population of Bim Son town is about 52,000 people, of which 60% are workers under 35 with
Worker dormitory a high labor training percentage. There is a Job Introduction Center in Thanh Hoa City, to be
40 km from the IZ.

Worker's child education


Residential area for laborers was planned near the industrial park by Thanh Hoa province
facility

One-stop service Within 06 km to several local preschools (Bac Son Ward Preschool, Dong Giao preschool)

Main road system: 32.5 m wide


Road Width
Loop system: 26.5 m wide

IT & Tele-communication
Optical submarine cable system is connected directly to the wall fence each enterprise.
Facilities

Emergency Power
N/A
generator

1032
A general system to be installed in the IZ/ The throat of fire-fighting water supply was
Fire-fighting facility
installed in the internal roads in the Industrial Park, at a distance of 150m/throat.

Layout Plan

Location map

Actual View

1033
DINH HUONG - TAY BAC GA INDUSTRIAL ZONE

GENERAL INFORMATION

Dinh Huong – Tay Bac Ga Industrial Park,Thanh Hoa City , Thanh Hoa province.
Address

Phuc Hung Architecture Corporation (FUHUCORP)

▪ Address: Office of the Project Management Board of Vipark Industrial Park - Dong Cuong
commune, Thanh Hoa city, Thanh Hoa Province

Investor ▪ Tel: (84-24) 6651 4565 / (84-37) 3 915 879/(84) 968 698 845

▪ Fax: (84-37) 3915 879/ (84-4) 3511 3128.

▪ Email: vipark_th@yahoo.com.vn / khanhsfuhu@yahoo.com.vn

▪ Website: http://fuhucorp.com

Contact Person ▪ N/A

▪ 2km to the North of Thanh Hoa city center

▪ 150 km to Hanoi; near Hanoi – Cau Gie – Ninh Binh highway and National Road 1A.

Location ▪ 3 km to Thanh Hoa North- South Railway Station

▪ 7 km to Le Mon seaport; 45 km to Nghi Son deep seaport; 150 km to Hai Phong Seaport

▪ 32 km to Thanh Hoa Airport

S&M multi-sector IZ with preference to machinery


assembling, machinery repair; production of consumer
Priority Sectors for Investment
goods, agricultural and forest products, textile and
Investment Area garment.

Restricted Sectors for Restrict heavy industry, industries affecting the


Investment environment

Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

Lease term N/A

Minimum Lease Area 0.2 ha

Limit for Construction


Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural
Residential Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction N/A
Rate

▪ Total area: 162.7 ha

Planned area ▪ Vacant leasable area: N/A

▪ Total area with full infrastructure ready to build factory: N/A

Factory Available for Rent ▪ Currently, the IZ does not have factory available for rent

1034
Operation Status ▪ In operation

Occupancy Rate and ▪ Occupancy Rate: 40%


Number of Projects ▪ Number of Projects: 236

Number of Korean
04
Projects

Lease fee ▪ Land lease fee: 50 – 60 USD/m2/over project life

▪ Management fee: N/A

▪ Infrastructure maintenance fee: 0.35 USD/m2/year

▪ Electricity fee:

Ordinary time: 0.05 USD/KWh

Operating fee Low time: 0.03 USD/ KWh

High time: 0.1 USD/KWh

▪ Water fee: 0.34 USD/m3

▪ Wastewater treatment fee: N/A

▪ Waste treatment fee: N/A

INFRASTRUCTURE AND FACILITY

Financial institution Around 2 km to VIETIN Bank, BIDV, Sacombank, VP Bank, Agribank in Thanh Hoa City

Tax service, State finance


State Treasury and Tax department of Thanh Hoa, located in Thanh Hoa City
office

Customs Service Thanh Hoa Custom Office is to be located in the center of the IZ

Inland Container Depot: N/A

Logistics N/A

Post office 0.8 km to Thanh Hoa City Post Office

Medicare 0.4 km to Hong Duc Geeneral Hospital, 0.4 km to the Thanh Hoa General Hospital

2.5 km to Police station of Thanh Hoa City; 4 km to Public Security headquarter of Thanh
Police, public security
Hoa province.

Universities, training
Thanh Hoa has 14 university and vocational schools in total.
facilities, etc.

Recruitment Close to a vast population area; A Job Introduction center to be located in Thanh Hoa city

Worker dormitory N/A

Worker's child education


Many preschool in Thanh Hoa City
facility

1035
One-stop service Located and provided by Thanh Hoa Public Administration Center.

Main road: 2x 10.5 m wide with green space and pavement (2x 8m)
Road Width
Beanch road: 2 x 8 m wide with green space and pavement (2x 8m)

IT & Tele-communication Internationally well-qualified, ready to meet the needs of national and international
Facilities communication services. (ADSL Internet, telecommunication system available)

Emergency Power
N/A
generator

Internationally well-qualified, to be stationed in the main roads of the IZ, at a distance of


Fire-fighting facility
150m/throat

Layout Plan

Location Map

Actual View

1036
LIST OF TENANTS

No. Company Name Nationality


Phase 1
1 Viet Bac Mechanical Trading Co., Ltd Vietnam
2 Le Cuong Co., Ltd Vietnam
3 Thien Nong Thanh Hoa Jsc. (Minh Tien) Vietnam
4 Bac Trung Nam Jsc. Vietnam
5 Quang Cuong Trading Co., Ltd. Vietnam
6 Golden Health Co., Ldt Vietnam
7 Dong A Printing Co., Ltd Vietnam
8 Private Enterprise Hong Nhung Vietnam
9 Thanh Dinh Trading Service Co., Ltd Vietnam
10 Long Anh Trading Co., Ltd. Vietnam
11 Hai Son Co., Ltd Vietnam
12 Hai Thu Co., Ltd Vietnam
13 Minh Hung Construction & Trading Company Vietnam
14 Cuong Hieu Printing And Trading Co., Ltd Vietnam
15 Hoang Ha Trading Service Co., Ltd Vietnam
16 Hong Truong Electromechanics & Irrigation Construction Co., Ltd Vietnam
17 Hatuba Co., Ltd Vietnam
18 Tuan Thanh Trading Jsc. Vietnam
19 Hai Thinh Phat Automobile Jsc. Vietnam
20 Vinh Quang Co., Ltd Vietnam
21 Nguyen Khanh Hoa Co., Ltd Vietnam
22 Lam Son Trading Service Company Vietnam
23 Duc Thanh Co., Ltd Vietnam
24 Hong Ha Trading Jsc. Vietnam
25 Phuc Khiem Private Vocational Training Center Vietnam
26 Irrigation Construction Co., Ltd 212 Vietnam
27 Tien Dat Trading And Development Co., Ltd Vietnam
28 Thien Xuan- Lam Son Jsc. Vietnam
29 Kim Anh Garment Co., Ltd Vietnam
30 Dong Linh Co., Ltd Vietnam

1037
31 Van Xuan Co., Ltd Vietnam
32 Svt Trading & Industrial Co., Ltd Vietnam
33 Phuong Hoa Production And Trading Co., Ltd Vietnam
34 Vinh Loi Co., Ltd Vietnam
35 Chuong Phuong Private Enterprise Vietnam
36 Thanh Hoa Construction And Trading Jsc. Vietnam
37 Khanh Truong Co., Ltd Vietnam
38 Quang Vinh Investment And Construction Jsc. Vietnam
39 Viet Phuong Petroleum Co., Ltd Vietnam
40 North Central Plant Seed Jsc. Vietnam
41 Trong Tin Tm Manufacturing Co., Ltd Vietnam
42 Thien Phuc Service Trading Co., Ltd Vietnam
43 Thach Thanh Private Enterprise Vietnam
44 Xuan Hoa Co., Ltd Vietnam
45 Tu Thien Thanh Hoa Co., Ltd Vietnam
46 X20 Thanh Hoa Co., Ltd Vietnam
47 Viet Hung Trading Co., Ltd. Vietnam
48 Khac Anh Shipping And Trading Jsc. Vietnam
49 Hoi An Co., Ltd Vietnam
50 Tu Thanh Co., Ltd Vietnam
51 Truong Xuan Trading Jsc. Vietnam
52 Thuan Hung Transport & Telecommunication Co. Ltd Vietnam
53 Quang Dung Co., Ltd. Vietnam
54 Thinh Phat Private Enterprise (Thinh Phat Trading Services Co., Ltd.) Vietnam
55 Saigon Beer Jsc. (Sabeco), North Central Branch Vietnam
56 Dong Bac Trading & Construction Corporation Vietnam
57 Construction Jsc. And Tm Huy Hoang Vietnam
58 Thinh An Co., Ltd Vietnam
59 Tuyet Long Co., Ltd Vietnam
60 Chi Thanh Construction Company Vietnam
61 Tan Tien Construction And Trading Jsc Vietnam
62 Ky Hang Co., Ltd Vietnam
63 Anh Tai Co., Ltd Vietnam
64 Ngoc Tinh Manufacturing & Trading Co., Ltd Vietnam
65 Duc Minh Construction And Trading Co., Ltd Vietnam
66 Vinh Thien Jsc. Vietnam
67 Son Anh Co., Ltd Vietnam
68 Private Enterprise Nguyen Duy Cuong Vietnam
69 Thuan An Co., Ltd (Now Quy Luong Enterprise) Vietnam
70 Binh Minh Electronics Co., Ltd Vietnam
71 Thanh Hoa Vtyt Pharmaceutical Jsc. Vietnam
72 Minh Long Automobile Mechanical Co., Ltd Vietnam
73 Thanh Hoa Beer Jsc. Vietnam
74 Thanh Duc Hydroelectric Trading Co., Ltd Vietnam
75 306 Mechanical & Construction Jsc. Vietnam
76 Nhat Viet Glass Co., Ltd Vietnam

1038
77 Hoang Thai Thanh Hoa Trading Co., Ltd Vietnam
78 Hanh Hoa Medical Materials Equipment Jsc. Vietnam
79 Minh Hoi Private Enterprise Vietnam
80 Phuc Hong Son Co., Ltd Vietnam
81 Minh Trung Co., Ltd Vietnam
82 Phuc An Investment & Trading Co., Ltd Vietnam
83 Long Minh Automobile Mechanical Co., Ltd Vietnam
84 Dung Yen Automotive Mechanical Co., Ltd Vietnam
85 Truong Vinh Trading And Service Co., Ltd Vietnam
86 Song Toan Trading & Investment Co., Ltd Vietnam
87 Phung Hung Investment Construction & Trading Jsc. Vietnam
88 Binh Huong General Service Trading Co., Ltd Vietnam
89 Hai Chau Jsc. Vietnam
90 Xuan Loc Trading Co., Ltd Vietnam
91 Quang Dung Co., Ltd Vietnam
92 Long Dien Trade Co., Ltd Vietnam
93 Tang Anh Trading Co., Ltd Vietnam
94 Thinh An Co., Ltd Vietnam
95 Long Thanh Dat Contrustion Investment &Trading Jsc. Vietnam
96 Phu Vinh Jsc. Vietnam
97 Toan Thang Transport Construction Jsc. Vietnam
98 Duc Minh Transport And Trading Service Co., Ltd Vietnam
99 Thanh Son Private Enterprise Vietnam
100 Manh Linh Investment And Development Co., Ltd Vietnam
101 Dong Anh Mechanical And Electrical Jsc. Vietnam
102 Mien Trung Boiler And Thermal Equipment Jsc. Vietnam
103 Phuong Mai Trading Co., Ltd. Vietnam
104 Ngoc Dau Trading Jsc. Vietnam
105 Tu Dinh Tvtm Co., Ltd. Vietnam
106 Vinh Quang Co., Ltd Vietnam
107 Thanh Hoa Pharmaceutical Jsc. Vietnam
108 Thanh Hoa Song Da Jsc. Vietnam
109 Quang Minh Trading Co., Ltd. Vietnam
110 Hoang Thai Thanh Hoa Trading Co., Ltd Vietnam
111 Long Anh Trading Co., Ltd. Vietnam
112 Song Vu Co., Ltd Vietnam
113 Son Ha Trading Co., Ltd. Vietnam
114 Minh Quang Wire Mesh Co., Ltd Vietnam
115 Luan Chung Co., Ltd Vietnam
116 Thanh Hoa Investment & Construction Development Jsc. Vietnam
117 Duong Duc Trading And Construction Co., Ltd Vietnam
118 Hong Thang Trading Service Jsc Vietnam
119 Hong Thang Trading Service Jsc Vietnam
120 Thanh Hoa Food And Agricultural Products Jsc. Vietnam
121 Thanh Hoa Milk Jsc. Vietnam
122 Danco Thanh Hoa Jsc. Vietnam

1039
123 Truong Thi Construction - Mt Co., Ltd Vietnam
124 Thanh Hoa Import Export Jsc. Vietnam
125 Thanh Hoa Fishmeal Jsc. Vietnam
126 Anh Duong Advertisement Company Vietnam
127 Nhat Viet Glass Co., Ltd. Vietnam
128 Son Ha Trading Co., Ltd. Vietnam
129 Sports Pharmaceuticalprivate Enterprise Vietnam
130 Xuan Hoa Manpower Supply Jsc. Vietnam
131 Viet Hoa Construction And Trading Service Co., Ltd Vietnam
132 Thai Son Co., Ltd Vietnam
133 T&T Co., Ltd Vietnam
134 Thanh Hoa Petroleum Co., Ltd Vietnam
135 Ngoc Linh Trading Tourist Jsc. Vietnam
136 Urban Jsc. 12 Vietnam
137 Dong A Th Door Co., Ltd Vietnam
138 Thanh Hue Printing And Education Equipment Co., Ltd Vietnam
139 Company Ltd & Co Vietnam
140 Phoenix Co .,Ltd Vietnam
141 Iet Medical Technology Equipment Jsc. Vietnam
142 Quang Minh Construction And Development Jsc. Vietnam
143 Minh Hanh Trading And Service Co., Ltd Vietnam
144 Dong A Trading - Manufacturing Co., Ltd. Vietnam
Phase 2
1 Hanoi Newhope Co., Ltd, Thanh Hoa Branch China
2 Pai Kuan Co., Ltd China
3 Color Billion Co., Ltd China
4 Quang Minh Lighting Electric Co., Ltd China
5 Byeok Jin Vina Co., Ltd. South Korea
6 Wooju Vietnam Industrial Co., Ltd. South Korea
7 South Asia Garment Co., Ltd South Korea
8 Hoa Thinh Footwear Automated Co., Ltd China
9 Younghan Co., Ltd. South Korea
10 Fuhucorp Vietnam
11 Truong Thi Environment Construction Co., Ltd Vietnam
12 Hung Dung A-T Trading Jsc. Vietnam
13 Thanh Minh Mtc Co., Ltd Vietnam
14 Truong Xuan A-T Trading Jsc. Vietnam
15 Duc Dung Chi Co., Ltd Vietnam
16 Lien Hao Co., Ltd Vietnam
17 Dai Viet Manufacture And Investment Co., Ltd Vietnam
18 Phi Hung Trading Service Co., Ltd Vietnam
19 Khanh Phuong Construction And Trading Co., Ltd Vietnam
20 Toan Loc Construction And Trading Co., Ltd Vietnam
21 An Thanh Phong Agricultural Products Co., Ltd Vietnam
22 Ha Hoa Manufacture & Trading Co., Ltd Vietnam
23 Lan Son Trading Co., Ltd. Vietnam

1040
24 Sun Viet Jsc. Vietnam
25 Hong Thac Trading And Export-Import Co., Ltd Vietnam
26 An Phuc Thinh Co., Ltd Vietnam
27 Ha Hoa Production And Trading Co., Ltd Vietnam
28 Nhan Hoa Phuc Vinh Co., Ltd Vietnam
29 Hung Dung Manufacture And Trading Jsc. Vietnam
30 Hong Phat Design And Construction Consultant Co., Ltd Vietnam
31 Thanh Hoa Nicotex Jsc. Vietnam
32 Thanh Dat General Services And Trading Co., Ltd Vietnam
33 Lam Son Electrical Equipment Jsc. Vietnam
34 Lam Kinh Investment Development Co., Ltd Vietnam
35 Truong Thi Consulting And Construction Jsc. Vietnam
36 Vi Thanh Co., Ltd Vietnam
37 Kien Cuong Co., Ltd Vietnam
38 Thanh Hoa Electricity Jsc. Vietnam
39 Toan Huong Co., Ltd Vietnam
40 Mien Trung Boiler And Thermal Equipment Jsc. Vietnam
41 Hung Tuan Automobile And Mechanical Co., Ltd Vietnam
42 Son Giang Automobile Mechanical Co., Ltd Vietnam
43 Thanh Dat Consultant & Construction Jsc. Vietnam
44 Huesa-Th2 Co., Ltd Vietnam
45 Danh Thong Co., Ltd Vietnam
46 Trang Phong Mechanical And Trading Service Co., Ltd Vietnam
47 Thanh Dinh Trading Service Co., Ltd Vietnam
48 Dai Hai Ld Co., Ltd Vietnam
49 Thang Long Construction Investment Consulting Jsc. Vietnam
50 Xd Manh Thang Trading Co., Ltd Vietnam
51 Mr. Nguyen Tien Dung Vietnam
52 Yen Huy General Trading Co., Ltd. Vietnam
53 Chien Dung Construction Co., Ltd Vietnam
54 Viet Thuy Co., Ltd Vietnam
55 Thuy Xuyen Construction And Trading Service Co., Ltd Vietnam
56 Tien Dat Construction Jsc. Vietnam
57 Thao Ha Trading Co., Ltd. Vietnam
58 Phuc Tai Construction & Trading Co., Ltd Vietnam
59 Households Pham Thi Thao Individual Vietnam
60 Long Phu Manufacturing & Trading Co., Ltd. (Lot 40) Vietnam
61 Le Thi Loan Vietnam
62 503 Construction Jsc. Vietnam
63 Duc Dung Chi Co., Ltd Vietnam
64 Younghan Co., Ltd. (Lease Land Of Chien Dung Construction Co., Ltd) Vietnam
65 Long Phu Manufacturing & Trading Co., Ltd. Vietnam
66 Bach Gia An Co., Ltd. Vietnam
67 Trading Co., Ltd Province Vietnam
68 Cp Thanh Dat Electricity Company Vietnam
69 My Huong Trading & Service Co., Ltd Vietnam

1041
70 Hung An Co., Ltd Vietnam
71 Hoang Ha Son Co., Ltd Vietnam
72 Nam Long Import Export Jsc. Vietnam
73 Truong Xuan Trading Jsc. Vietnam
74 Crane Transportation Company, Thanh Hoa Rescue Vietnam
75 Xuan Nhu Transport Co., Ltd Vietnam
76 Quang Thuy Manufacturing & Trading Co., Ltd Vietnam
77 Son Trang Construction Jsc. Vietnam
78 Viet Decor Architecture And Construction Consultant Co., Ltd Vietnam
79 Minh Quang Construction Materials Trading Co., Ltd Vietnam
80 Vacic Construction Jsc. Vietnam
81 Kien Quoc Service And Trading Co., Ltd Vietnam
82 Co., Ltd Agricultural Products Vietnam
83 Hanoi - Phuc Hung Jsc. Vietnam
84 Lna Trading Co., Ltd Vietnam
85 Tay Thanh Co., Ltd. Vietnam
86 Lam Son Construction & Trading Co., Ltd Vietnam
87 Vietnam Industrial Gas Jsc. Vietnam
88 An Phat Manufacture And Trading Jsc. Vietnam
89 T&T Power Co., Ltd Vietnam
90 Thanh Nam Transport And Travel Services Co., Ltd Vietnam
91 Vietnam Herbal Essence Jsc. Vietnam

1042
LE MON INDUSTRIAL ZONE

GENERAL INFORMATION

Address Quang Hung Commune, Thanh Hoa City, Thanh Hoa Province

Thanh Hoa Industrial Zone Infrastructure Investment JSC.


Investor ▪ Address: Zone B, Le Mon Industrial Zone, Quang Hung Ward, Thanh Hoa City, Thanh Hoa
Province

Contact Person N/A

▪ 5 km to Thanh Hoa City (of Thanh Hoa Province), 160 km to Ha Noi City.

▪ 31 km to Tho Xuan Airport


Location
▪ 01 km to Le Mon Seaport, 60 km to Nghi Son Seaport.

▪ 05 km to National Road 1A

Priority Textile, consumer goods production and trading; footwear production;


Sectors for agricultural and forest product manufacture, mechanicals; production of high-
Investment quality construction materials; processing of traditional fine art products.
Investment Area
Restricted
Sectors for Polluted Sector
Investment

Minimum wage [Area 3] According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

▪ N/A
Lease term

Minimum Lease Area N/A

Limit for Construction


Height
In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential
Planning regulation (QCXDVN 01: 2008/BXD)
Permitted Construction
Rate

▪ Total area: 87.61ha


Planned area
▪ Total Industrial Land area: N/A

Factory Available for


▪ Total area: N/A
Rent

Operation Status ▪ In operation

Occupancy Rate and ▪ Occupancy rate: 30%


Number of Projects ▪ Number of project: 26

Number of Korean
None
Projects

1043
Lease fee N/A

Operating fee N/A

INFRASTRUCTURE AND FACILITY

Financial institution State Treasury and Tax department of Thanh Hoa, located in Thanh Hoa City

Tax service, State finance Thanh Hoa Custom Office is to be located in the center of the IZ
office Inland Container Depot: N/A

Customs Service N/A

Logistics N/A

Post office 0.8 km to Thanh Hoa City Post Office

Medicare 0.4 km to Hong Duc General Hospital, 0.4 km to the Thanh Hoa General Hospital

2.5 km to Police station of Thanh Hoa City; 4 km to Public Security headquarter of Thanh
Police, public security
Hoa province.

Universities, training
Thanh Hoa has 14 university and vocational schools in total.
facilities, etc.

Recruitment Close to a vast population area; a Job Introduction center to be located in Thanh Hoa City

Worker dormitory N/A

Worker's child education


Many preschool in Thanh Hoa City
facility

One-stop service Located and provided by Thanh Hoa Public Administration Center.

Road Width N/A

IT & Tele-communication
Available
Facilities

Emergency Power
Available
generator

Fire-fighting facility Available

Layout Plan N/A

1044
Location Map

Actual View

LIST OF TENANTS

No. Company Name Nationality


1 Than Nong Thanh Hoa Co., Ltd Vietnam
2 Visaco Jsc. Vietnam
3 Thanh Hoa Fishery Import Export Jsc Vietnam
4 Dixaco Vietnam
5 Tan Thanh 8 Co. Ltd Vietnam
6 Thanh Hoa Seed Jsc. Vietnam
7 Thanh Hoa Nomura Co., Ltd Japan

1045
8 Yotsuba Dress Vietnam Company Japan
9 Sun Jade Vietnam Footwear Co., Limited Vietnam
10 Sakurai Vietnam Co., Ltd. Japan
11 Viet Phuong Industrial Co., Ltd Vietnam
12 Phu Gia Agricultural Jsc. Vietnam
13 Thanh Nam Mechanical Thermal Electrical Co., Ltd Vietnam
14 Sam Minh Thanh Co., Ltd Vietnam
15 Branch Of Viet Nam Dairy Products Jsc. Vietnam
16 Tan Nam Phong Co., Ltd Vietnam
17 Aresa Vietnam Shoe Co., Ltd Taiwan
18 Hoang Hai Construction Jsc. Vietnam
19 Vedic Fansipan Pharmaceutical Co., Ltd Vietnam, India, Singapore
20 Thanh Tu Mechanical Co., Ltd Vietnam
21 Hong Duc Education Equipment Jsc. Vietnam
22 Aeonmed Vietnam Co., Ltd Thailand
23 Vicenza Development Investment Jsc. Vietnam
24 Urban Infrastructure Development Investment Corporation Vietnam
25 Huy Hoang Co., Ltd Vietnam
26 Song Ma Fertilizer Jsc. Vietnam

1046
[- This Page is intentionally left blank -]

1047
THUE THIEN HUE

1048
INVESTMENT ENVIRONMENT IN THUA THIEN HUE

GENERAL INFORMATION

 Area: 5033 km2


Area, Population
 Population: 1.133.713 (2022 stastic)
 Thua Thien Hue is located in Central Coast region of Vietnam.
Geographical Location  Thua Thien Hue is about 660km from Hanoi city and 1.080 km from Ho
Chi Minh city.
 In the North, from East to West, Thua Thien Hue has 111.671 long shared
border with Hai Lang, Dakrong, Huong Hoa district, Quang Tri province.
 In the South, the province shares 56.66km long shared border with Hien
district, Quang Nam province and 55. 82km long border with Hoa Vang
district, Da Nang city.
Adjacent provinces  The West, provincial border (national border also) stretches from the North
(the border of Thua Thien Hue, Quang Tri and Lao People's Democracy
Republic) to the South (the border of Thua Thien Hue province, Quang Nam
province and Lao People's Democracy Republic) is 87.97km in length.
 The East, Thua Thien Hue borders the East Sea. The total has 120km
coastline.

Statistic 2022

 GRDP: 8.56%
 GRDP growth: 10.9%
GRDP  GRDP per capita: 2,429 (USD)
 Economic structure
 Industry – Construction: 34.6%
 Agriculture, forestry and fishery: 10.6%
 Service: 46.4%
 Tax on goods: 8.4%
Statistic 2022
Industry growth  Industry – construction growth: 10.02%
 Agricultural, forestry and fishery growth: decreased 3.26%
 Service growth: 11.03%

PCI ▪ Score: 69.36 – ranked 6th out of 63 cities and provinces in Vietnam. (2022)

SOCIAL INFRASTRUCTURE

 Roadway: 2500km
 Railway: 101.2 km
Transportation  Waterway: 563km
 Other: Thua Thien Hue has Phu Bai international airport located on the
National Highway 1A, about 15km to the South of Hue city.
 Currently, Thua Thien Hue province receives electricity from the national
power system through the 110 kV Da Nang - Hue transmission lines (86 km
in length of 2xACSR-185 conductors), the Dong Hoi - Hue lines (single
circuit ACSR-185), and the 220 kV Hoa Khanh - Hue single circuit line (80
km in length, ACSR-400 conductor) through the following substations: Hue
Electricity 220 kV station with a capacity of 1x125 MVA voltage 220/110 kV. This
station has operated since August 2002, built on the basis of expanding the
110 kV Hue 1 station, located in Thuy An commune - Hue city (near Ngu
Binh). The 220 kV Hue station receives electricity from the 500 kV
substation via the 220 kV Da Nang - Hue transmission line.

 Thua Thien Hue province has abundant water resources, including surface
Water water resources of the Perfume River system, O Lau River, Nong River,
Truoi River, Cau Hai River, Bu Lu River, and A Sap River. The province is

1049
also the convergence point of most rivers before the water reaches the sea.
Therefore, the province also has brackish water resources including the Tam
Giang - Cau Hai lagoon system, the largest lagoon in Southeast Asia.

Education  9 universities, 5 colleges, and 33 vocational schools in the province.

 Thua Thien Hue province is identified as an intensive medical center of the


Central - Central Highlands and the whole country. The province has 03
medical units invested by the government to implement the project of the
Intensive medical center in the Central region - Central Highlands and the
whole country. These units are Hue Central Hospital, Hue University of
Medicine and Pharmacy, and the Central Center for Testing of
Pharmaceuticals, Chemicals, and Cosmetics. Moreover, Thua Thien Hue has
21 hospitals. Some of the well-known ones are:
Medicare
- Hue Central Hospital
- Hue University Hospital
- Hue University of Medicine and Pharmacy
- International Medical Center at Hue Central Hospital
- Thua Thien Hue Hue Rehabilitation Hospital
- Hue Nursing Hospital
- Hue Traditional Medicine Hospital
INVESTMENT CONDITION

Human resource 56.23% of population are in the working age (2022)

Education level Trained labor rate: over 50% (2020)

 Minimum salary: 130-150 USD/month;


 Average salary (USD/month): 220-250 USD/month;
 Middle management: 280-320 USD/month.
Salary  Mid-level technicians and engineers: 220-250 USD/month;
 Office staff: 220-250 USD/month;
 Skilled labor: 150-180 USD/month
 Unskilled labor: 130-150 USD/month.

 Prioritized projects: Thua Thien Hue province prioritizes industries with


advanced, high value-adding technology in order to ensure the participation
Fields Attracting Investment
of Vietnamese enterprises in the value chain and to protect harmonious
development among regions.

Map

Thua Thien Hue Department of Planning and Investment


 Address: 07 Ton Duc Thang street, Hue city, Thua Thien Hue province.
Contact  TEL: 0234-3822538
 Fax: 0234-3821264
 Email:skhdt@thuathienhue.gov.vn

1050
LIST OF INDUSTRIAL ZONES

No Industrial zone Name Total Area (ha) Occupancy Rate Status

1 Phu Bai Industrial zone 743,47 ha 30% Phu Bai Industrial Park phase 1, 2 is in
operation. Phu Bai Industrial Park
phase 3 and 4 are under contruction

2 Phong Dien Industrial zone 700 ha 32% Phong Dien Industrial Park A is looking
for infrastructure investors. Phong Dien
Industrial Park Zone B, C, Viglacera is
in operation
3 La Son Industrial zone 300 ha 29.3% In operation for about 86ha area. The
rest of the area is under contruction

4 Tu Ha Industrial zone 250 ha 7% In operation

5 Phu Da Industrial zone 250 ha 22% Looking for infrastructure investors

6 Quang Vinh Industrial zone 150 ha 17.6% Looking for infrastructure investors

7 Industrial zone in Chan May 336 ha 6.7% In operation


Lang Economic Zone

1051
PHU BAI INDUSTRIAL ZONE

GENERAL INFORMATION

Phu Bai Ward, Huong Thuy Town, Thua Thien Hue Province
Address

▪ PHU BÀ I INDUSTRIAL ZONE Phase I, II:


MTV IP Development & Investment Corporation
- Address: Phú Bài Ward, Hương Thủy Town, Thừa Thiên Huế Province
- Tel: 02343961357
- Ngô Hữu Quý - Sales & Marketing Deputy Manager – Mobile: 0914025521 - Email:
Investor quyngoctxl@yahoo.com.vn
▪ PHÚ BAI INDUSTRIAL ZONE Phase III, IV
Gilimex IP Co., Ltd
- Địa chỉ: 45 Nguyen Hue street, Vinh Ninh, Hue city, Thua Thien Hue Province
- Tel: 02343889996
- Mrs An Nhiên - Investment Manager – Mobile: 0764230240

▪ Road: Phu Bai industrial park is located near Highway 1A and North-South railway line, about 15
km from Hue City Center, the area is conveniently located in connection with the neighboring areas.
▪ Phu Bai industrial park is about 40km from Chan may deep water port, about 20 km from Thuan
Location An Seaport.
▪ Phu Bai industrial park is located adjacent to Phu Bai International Airport.

- Investment projects for industrial park infrastructure construction.


- Investment projects in high-tech engineering, information technology, clean industry, auxiliary
Investment area
industry, automotive assembly mechanics, motorcycles, beverage, support industry, auxiliary
industry for textile industry,…

Minimum wage According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

Lease term According to the operation term of the IP investor


Minimum Lease
According to investors' demand and in accordance with the approved planning
Area
Limit for
- Factory area: ≤ 3 floors
Construction
-Office area : ≤ 10 floors
Height
Permitted
≤ 65 % of the land area.
Construction Rate
▪ Total area:: 743.47 ha
- Phase I,II: 185 ha.
- Phase III: 43.17 ha.
- Phase IV: 515.3 ha.
Planned area ▪ Total area for IZ : 427 ha
- Phase I,II: 143.4 ha.
- Phase III 18.6 ha.
- Phase IV: 310 ha.
▪ Total land area can be leased (Phu Bai IV Industrial Park, Phase 2): 356 ha.
▪ Maintenance fee:
- Phu Bai Industrial Park Phase I, II: 0.35 USD / m2 / year.
- Phu Bai Industrial Park Phase IV: 0.3 USD / m2 / year.
▪ Electricity price:
+ For production (normal hours, not VAT):
* Supply voltage of 110kV or more: 1,536 vnd /Kwh (~0.066 USD/Kwh).
Operating fee
* Supply voltage from 22 kV to below 110kV: 1,555 VND /Kwh (~0.068 USD/Kwh).
* Supply voltage from 6 kV to 22kV: 1,611 VND /Kwh (~0.069 USD/Kwh).
* Supply voltage below 6 kV: 1,685 VND /Kwh (~0.072 USD/Kwh).
+ For business – services (normal hours, not VAT):
* Supply voltage of 22 kV or more: 2,442 vnd /Kwh (~0.105 USD/Kwh).
* Supply voltage from 6-22 kV: 2,629 vnd /Kwh (~0.113 USD/Kwh).
1052
* Supply voltage below 6 kV: 2,660 vnd /Kwh (~0,114 USD/Kwh).
▪ Water price: 13.655 VND / m3 (~0.6 USD/m3). (excluding VAT)
▪ Wastewater treatment fee: 6,257 vnd/m3 (~ 0.31 USD/m3) (wastewater treatment fee from
Column C - tcvn 5945: 2005 reach column B-QCVN 40:2011/BTNMT)
Factory Available
None
for Rent
- For Phu Bai Industrial Park Phase I, II: in operation
- For Phu Bai Industrial Park Phase III: under construction of infrastructure , and will be completed
Operation Status in 2025
- For Phu Bai Industrial Park Phase IV: under construction of infrastructure , will be completed in
2025
Occupancy Rate
and Number of 30% - 68 projects.
Projects
- Phase I, II: 2,15 - 2,5 USD/m2; 35 - 55 USD/m2;
Lease fee
- Phase IV: 33 - 38 USD/m2
In terms of Transportation: the internal transport system is invested in synchronization, and
completion, the area is located near Highway 1A, North–South Railway, located near Phu Bai
International Airport, about 15km from the center of Hue city. Convenient in connection with the
neighborhood and financial services, and telecommunications.
- Power supply system: has been completed investment, 110kV power line passes through the area,
ensuring the production and business activities of enterprises in the industrial zone.
Infrastructure and - Water supply system: Phu Bai water plant, capacity 15,000m3 / day and night, ensuring clean
facility water supply.
- Communication system: has been built in administrative units, ensuring the service of domestic
and international communication needs.
- Wastewater treatment system: there is already a wastewater treatment plant with a capacity of
6,500 m3 / day and night.
- About customs: there have been places for customs clearance to serve the needs of export and
import on the spot of enterprises, have bonded warehouses.

Map

1053
Image

1054
TU HA INDUSTRIAL ZONE

GENERAL INFORMATION

Address ▪ Tu Ha town, Huong Tra Town, Thua Thien Hue province

Name infrastructure investor Tu ha industrial zone, Phase I, 75ha:


- Investor name: Hello International Vietnam Co., Ltd.
Investor - Address: No. 4 street, Huong So Industrial Zone, Hue, Thua Thien Hue province.
- Phone: 0234.3589.933.
- Contact person: Mr. Vo Anh Tuan (01678496266)
▪ Tu ha industrial park is near Highway 1A and the North-South railway line, about 12 km north of
Hue city center, about 5km from Van Xa goods station, convenient in connection with the neighboring
areas.
Location ▪: Tu ha industrial park is about 60km from Chan may deep water port, about 10 km from Thuan An
Seaport.
▪: Tu ha industrial park is about 25 km from Phu Bai International Airport.

Minimum wage According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

Lease term According to the operation term of the IP investor

Minimum Lease
According to investors' demand and in accordance with the approved planning
Area
Limit for
-Factory area: ≤ 3 floors
Construction
-Office area : ≤ 10 floors
Height
Permitted
≤ 65 % of land area
Construction Rate
- Investment projects for industrial park infrastructure construction.
investment area - Clean industry, auxiliary industry, electrical industry, electronics, textile, leather, mechanical.

▪ Total area: 250 ha.


Planned area
▪ Total lease area: 126.7 ha

Factory Available
None
for Rent

* For infrastructure investment project of Hello International Vietnam Co., Ltd: in operation
Operation Status * For the remaining area: no infrastructure investors

Occupancy Rate
7%
and Number of
3 projects
Projects
- Land without infrastructure investment: 1,912 vnd/m2 / year (~0.09 USD / m2 / year).
Lease fee
- Land has invested infrastructure: 45 USD / m2
▪ Maintenance fee: 0.4 USD / m2 / year.
▪ Electricity fee
+ For production (normal hours, not VAT):
* Supply voltage of 110kV or more: 1,536 vnd /Kwh (~0.066 USD/Kwh).
* Supply voltage from 22 kV to below 110kV: 1,555 VND /Kwh (~0.068 USD/Kwh).
* Supply voltage from 6 kV to 22kV: 1,611 VND /Kwh (~0.069 USD/Kwh).
* Supply voltage below 6 kV: 1,685 VND /Kwh (~0.072 USD/Kwh).
Operating fee
+ For business – services (normal hours, not VAT):
* Supply voltage of 22 kV or more: 2,442 vnd /Kwh (~0.105 USD/Kwh).
* Supply voltage from 6-22 kV: 2,629 vnd /Kwh (~0.113 USD/Kwh).
* Supply voltage below 6 kV: 2,660 vnd /Kwh (~0,114 USD/Kwh).
▪ Water price: 13.655 VND / m3 (~0.6 USD/m3). (excluding VAT)
▪ Wastewater treatment fee: 6,257 vnd/m3 (~ 0.31 USD/m3) (wastewater treatment fee from Column
C - tcvn 5945: 2005 reach column B-QCVN 40:2011/BTNMT)

1055
-On transport: the internal transport system of the industrial park is being implemented investment in
construction.
- Power supply system: 110kV Power Line passes through the area, ensuring the production and
business activities of enterprises in the industrial zone.
- Water supply system: water source is used from the Quat Ha water plant, capacity of 12,000m3 / day
Infrastructure and
and night.
facility
- Communication system: has been built in administrative units, ensuring the service of domestic and
international communication needs.
- Wastewater treatment system: the industrial park is expected to be complete in the fourth quarter/of
2022, currently developing a project to build a wastewater treatment station with a capacity of 4,000
m3/day and night.

Map

Image

1056
LA SON INDUSTRIAL PARK

GENERAL INFORMATIONA

Address ▪ Lac Son Commune, Phu Loc district, Thua Thien Hue province.

- Investor name: Vitto Co., Ltd (La son Industrial Park Phase 1, 86 ha).
- Address: La son industrial park, Loc Son Commune, Phu Loc District, Thua Thien Hue Province
Investor - Phone: 0234.3688545
- Email: tthienhoa05@gmail.com
- Contact person: Tran Huu Thien (0918038895)

▪ La son industrial park is located near the province of Highway 14B connecting South East district
with Highway 1A, about 2km from Highway 1A, about 4km from the Truoi station, about 23km from
Hue City Center, convenient in connecting with neighboring areas.
Location ▪ La son industrial park is about 30km from Chan may deep water port, and about 25 km from Thuan
An Seaport.
▪ La son industrial park is about 9 km from Phu Bai International Airport.

Minimum wage According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

Lease term According to the operation term of the IP investor

Minimum Lease
According to investors' demand and in accordance with the approved planning
Area

Limit for
- Local industrial factory area: floors ≤ 15m
Construction
- Industrial Park area: floors ≤ 15m
Height

Permitted
≤ 65% of the land area.
Construction Rate

- Investment projects for industrial park infrastructure construction.


Investment area - Project to build a centralized wastewater treatment plant.
- Processing projects about products, Forest Products, mechanics and electronics…
▪ Total Planning Area: 300 ha
▪ Total area of industrial park land: 181 ha
Planned area
▪The total land area can be leased: 128 hectares.

▪ Maintenance fee: USD 0.19 / m2 / year.


▪ Electricity price:
+ For production (normal hours, not VAT):
* Supply voltage of 110kV or more: 1,536 vnd /Kwh (~0.066 USD/Kwh).
* Supply voltage from 22 kV to below 110kV: 1,555 VND /Kwh (~0.068 USD/Kwh).
* Supply voltage from 6 kV to 22kV: 1,611 VND /Kwh (~0.069 USD/Kwh).
Operating fee
* Supply voltage below 6 kV: 1,685 VND /Kwh (~0.072 USD/Kwh).
+ For business – services (normal hours, not VAT):
* Supply voltage of 22 kV or more: 2,442 vnd /Kwh (~0.105 USD/Kwh).
* Supply voltage from 6-22 kV: 2,629 vnd /Kwh (~0.113 USD/Kwh).
* Supply voltage below 6 kV: 2,660 vnd /Kwh (~0,114 USD/Kwh).
▪ Water price: 13.655 VND / m3 (~0.6 USD/m3). (excluding VAT)

1057
Factory Available
None
for Rent

* For Infrastructure Construction Investment Project of Vitto Co., Ltd (86 ha): in operation
Operation Status
* For projects belonging to La Son industrial park: looking for infrastructure investors
Occupancy Rate
29,3%
and Number of
9 projects
Projects
- Land without infrastructure investment: 682 vnd/m2 / year (~0.03 USD / m2 / year).
Lease fee
- Land has invested infrastructure: 0.7 USD / m2 / year (leased by Vitto Co., Ltd).
- On transport: the internal transport system is being implemented investment in construction, and
some roads have been completed.
- Power supply system: 110kV power line passes through the area, ensuring the production and
Infrastructure and business activities of enterprises in the industrial zone.
facility - Water supply system: water source is used from a shallow river water plant, capacity of 20,000m3 /
day and night, ensuring a clean water supply.
- Communication system: has been built in administrative units, ensuring the service of domestic and
international communication needs.

Map

Image

1058
PHONG DIEN INDUSTRIAL PARK

GENERAL INFORMATION

▪ Phong Dien District, Thua Thien Hue province.


Address
▪Phong Dien Industrial Zone B:
- Investor name: Prime Thien Phuc Co., Ltd
- Address: Phong Dien Industrial Zone B, Phong Dien District, Thua Thien Hue province.
- Phone: 02343861810
- Email: tanhv@prime.vn
- Contact person: Ha Van Tan (0905.669.667).
▪ Phong Dien Industrial Zone C:
- Investor name: Vina Hue C&N Co., Ltd-Korea
- Address: Phong Dien industrial zone, Phong Dien District, Thua Thien Hue Province.
- Representative office: 153 Van Lang, Phong Dien Town, Phong Dien District, Thua Thien Hue
Investor
Province.
- Phone: 02343558102
- Email: cnvinahue@gmail.com
- Contact person: Van Thi Mau (0903,549,534).
▪ Phong Dien Viglacera industrial park:
- Investor name: Viglacera Corporation-JSC.
- Address: Phong Dien Viglacera industrial park, Phong Dien District, Thua Thien Hue Province.
- Phone: 0435536688
- Email: namdt.vir@viglaceraland.vn
- Contact person: Dang the Nam (0903405099).
▪ Phong Dien industrial park is located near National Highway 1A and North-South Railway, about
42 km from Hue City Center, and convenient to connect with the neighboring areas.
▪ Phong Dien industrial park is about 98 km from Chan may deep water port, about 45 km from
Location Thuan An Seaport.
▪ Phong Dien industrial park is about 51 km from Phu Bai International Airport.

Minimum wage According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

Lease term According to the operation term of the IP investor

Minimum Lease
According to investors' demand and in accordance with the approved planning
Area

Limit for
- For factory building land: ≤ 25m
Construction Height

Permitted
≤ 65% of the land area.
Construction Rate

- Investment projects for industrial park infrastructure construction.


Investment area
- Clean industry, auxiliary industry, electrical industry, electronics, textile, leather, mechanical.

▪Total Planning Area: 700 ha.


- Zone A: 210.5 ha(adjustment: 155.95 ha).
- Zone B: 102.17 ha.
Planned area
- Zone B extension: 44.38 ha
- Zone C: 126.05 ha.
- Phong Dien Viglacera industrial park: 284.33 ha

Factory Available
None
for Rent
* For projects in Phong Dien Industrial Park: in operation
* For Infrastructure Construction Investment Project of Prime Thien Phuc Co., Ltd: in
operation
Operation Status
* For infrastructure construction investment project of South Korea C&N Vina Co., Ltd: in
operation
* For infrastructure construction investment project of Viglacera Corporation: in operation

1059
Occupancy Rate and - 31.4%
Number of Projects - 23 projects.

- Land without infrastructure investment: 837 vnd/m2 / year (~0.04 USD / m2 / year).
- Land has invested in infrastructure:
+ Industrial Zone B: 0.6 USD / m2 / year.
Lease fee
+ Industrial Zone C:
* 35 USD / m2 / year for non-wastewater occupations (garment and other fields)
* 40 USD / m2 / year for sewage treatment (textile dyeing and other fields)
+ Phong Dien Viglacera industrial park (rent of Viglacera Corporation): 27-32 USD / m2 / 50 years.

▪ Maintenance fee:
- Phong Dien Industrial Zone B: 0.17 USD / m2 / year.
- Phong Dien Industrial Zone C: 0.17 USD / m2 / year.
- Phong Dien Viglacera industrial park: 0.2 USD / m2 / year.
▪ Electricity price:
+ For production (normal hours, not VAT):
* Supply voltage of 110kV or more: 1,536 vnd /Kwh (~0.066 USD/Kwh).
Operating fee * Supply voltage from 22 kV to below 110kV: 1,555 VND /Kwh (~0.068 USD/Kwh).
* Supply voltage from 6 kV to 22kV: 1,611 VND /Kwh (~0.069 USD/Kwh).
* Supply voltage below 6 kV: 1,685 VND /Kwh (~0.072 USD/Kwh).
+ For business – services (normal hours, not VAT):
* Supply voltage of 22 kV or more: 2,442 vnd /Kwh (~0.105 USD/Kwh).
* Supply voltage from 6-22 kV: 2,629 vnd /Kwh (~0.113 USD/Kwh).
* Supply voltage below 6 kV: 2,660 vnd /Kwh (~0,114 USD/Kwh).
▪ Water price: 13.655 VND / m3 (~0.6 USD/m3). (excluding VAT)

- Transport: the internal transport system is invested in basic synchronization, is investing in


complete construction.
- Power supply system: 110kV power line passes through the area, ensuring the production and
business activities of enterprises in the industrial zone.
Infrastructure and
- Water supply system: currently the Long O River has 02 water supply plants (Phong Thu
facility
11,000m3 / day and night and Peace Chapter: 3,000 m3/day and night. In Phong Dien industrial
park, there were D 500 water pipes.
- Communication system: has been built in administrative units, ensuring the service of domestic
and international communication needs.

Map

1060
Image

1061
QUANG VINH INDUSTRIAL PARK

GENERAL INFORMATION

▪ Quang Vinh commune, Quang Dien District, Thua Thien Hue province.
Address
Investor ▪ There is no investment project for construction and industrial infrastructure business.

▪ Quang Vinh industrial park has 2 sides adjacent to roads: adjacent to the flood bypass road connecting to
provincial Highway 9 - about 9km from Phong Dien industrial park and adjacent to the road axis of the WB
project connecting to provincial Highway 11A, the Industrial Park is about 20km west of Van Xa station and
about 23 km from Hue city center, convenient in connecting to neighboring areas.
Location ▪ Quang Vinh industrial park is about 20 km from Dien LoC specialized Seaport, about 20km from Thuan An
seaport and about 75 km from Chan May deep water port.
▪ Quang Vinh industrial park is about 35 km from Phu Bai International Airport.

Minimum wage According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

Lease term According to the operation term of the IP investor

Minimum Lease
According to investors' demand and in accordance with the approved planning
Area
Limit for
- For factory building land: ≤ 5 floors
Construction
Height

Permitted
≤ 70% of the land area.
Construction Rate

- Investment projects for industrial park infrastructure construction.


- Investment projects in Marine Fisheries and agricultural products.
investment area
- Textile – dyeing-garment technology, textile industry.
- Agricultural production of fishing gear.
▪ Total Planning Area: 150 ha.
Planned area ▪ Total area of industrial park land: 150 hectares.
▪ Total leasable land area: 150 hectares.
▪ Maintenance fee: no infrastructure investors.
▪ Electricity price:
+ For production (normal hours, not VAT):
* Supply voltage of 110kV or more: 1,536 vnd /Kwh (~0.066 USD/Kwh).
* Supply voltage from 22 kV to below 110kV: 1,555 VND /Kwh (~0.068 USD/Kwh).
* Supply voltage from 6 kV to 22kV: 1,611 VND /Kwh (~0.069 USD/Kwh).
* Supply voltage below 6 kV: 1,685 VND /Kwh (~0.072 USD/Kwh).
Operating fee
+ For business – services (normal hours, excludingVAT):
* Supply voltage of 22 kV or more: 2,442 vnd /Kwh (~0.105 USD/Kwh).
* Supply voltage from 6-22 kV: 2,629 vnd /Kwh (~0.113 USD/Kwh).
* Supply voltage below 6 kV: 2,660 vnd /Kwh (~0,114 USD/Kwh).
▪ Water price: 13.655 VND / m3 (~0.6 USD/m3). (excluding VAT)
▪ Wastewater treatment Price: 6,300 VND / m3 (~0.27 USD/m3). (excluding VAT)
Factory Available
None
for Rent

Operation Status Looking for infrastructure and production investors

17.6%
2 projects
Occupancy Rate
and Number of
Projects
▪Land lease without invested in infrastructure:
- Land lease for investment in industrial park infrastructure: 420 vnd/m2 / year (~0.018 USD / m2 / year)
Lease fee - Land lease for business: 592 vnd / m2 / year (~0.026 USD / m2 / year)

- Transport: the internal transport system is being invested in construction.


- Power supply system: 110kV power line passes through the area, ensuring the production and business
activities of enterprises in the industrial zone.
Infrastructure and
- Water supply system: water source is used from the Quat Ha water plant, capacity of 12,000m3 / day and
facility
night.
- Communication system: has been built in administrative units, ensuring the service of domestic and
international communication needs.

Map

Image

1063
PHU DA INDUSTRIAL PARK

GENERAL INFORMATION
Phu Da commune, Phu Vang District, Thua Thien Hue province.
Address
Investor ▪ There is no investment project for construction and industrial infrastructure business.

▪ Phu Da industrial park is about 6km from National Highway 1A, about 19km from Hue City Center, the
Location area is about 8km from Phu Bai industrial park, about 10km from Huong Thuy Station, convenient for
connecting neighboring areas.
▪ Phu Da industrial park is about 6km from Thuan An seaport and about 49 km from Chan may deep water
port.
▪ Phu Da industrial park is about 8 km from Phu Bai International Airport.
Minimum wage According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

Lease term According to the operation term of the IP investor

Minimum Lease According to investors' demand and in accordance with the approved planning
Area
Limit for - For factory building land: ≤ 25 floors
Construction Height

Permitted Construction rate for warehouse production area ≤ 60% of the land area.
Construction Rate

Investment area - Investment project for industrial park infrastructure construction.


- Investment project to build a centralized wastewater treatment plant.
- Project for processing aquaculture feed, livestock and poultry.
- Seafood processing project, agricultural products.
- Apparel projects, electronics industry, household electricity,…
Planned area ▪ Total area: 250 ha.
▪ Total area of industrial park land: 250 ha.
▪ Total leasable land area: 221.7 hectares.
▪ Maintenance fee: no infrastructure investors.
Operating fee ▪ Electricity price:
+ For production (normal hours, excluding VAT):
* Supply voltage of 110kV or more: 1,536 vnd /Kwh (~0.066 USD/Kwh).
* Supply voltage from 22 kV to below 110kV: 1,555 VND /Kwh (~0.068 USD/Kwh).
* Supply voltage from 6 kV to 22kV: 1,611 VND /Kwh (~0.069 USD/Kwh).
* Supply voltage below 6 kV: 1,685 VND /Kwh (~0.072 USD/Kwh).
+ For business – services (normal hours, excluding VAT):
* Supply voltage of 22 kV or more: 2,442 vnd /Kwh (~0.105 USD/Kwh).
* Supply voltage from 6-22 kV: 2,629 vnd /Kwh (~0.113 USD/Kwh).
* Supply voltage below 6 kV: 2,660 vnd /Kwh (~0,114 USD/Kwh).
▪ Water price: 13.655 VND / m3 (~0.6 USD/m3). (excluding VAT)
▪ Wastewater treatment Price: 6,300 VND / m3 (~0.27 USD/m3). (excluding VAT)
Factory Available None
for Rent

1064
Operation Status Looking for infrastructure and production investors

Occupancy Rate 22%


and Number of - 10 projects
Projects

Lease fee ▪ Land lease without invested in infrastructure:


- Land lease for investment in industrial park infrastructure: 462 vnd / m2 / year (~0.02 USD / m2 / year.
- Land lease price for production and business: 1,047 vnd/m2/year (~ 0.05 USD/m2/year).

Number of Korean None


enterprises

Infrastructure and - Transport: the internal transport system has been invested in construction.
facility - Power supply system: there are 22/0,4 kV substations, the next time,the authority will invest 110 kv
substation.
- Water supply system, and communication system: ensure to serve the needs of investors.

Map

1065
Image

1066
SAIGON-CHANMAY INDUSTRIAL PARK AND NON-TARIFF ZONE

GENERAL INFORMATION

Tay Cang St., Loc Tien Ward, Phu Loc District, Thua Thien Hue Province.
Address
Name of industrial park infrastructure investor:
- Name of infrastructure investor: Saigon-Hue Investment Joint Stock Corporation (SGH)
- Address: 15 Nguyen Hue St, Hue City, Thua Thien Hue province.
Investor
- Phone: +84 234 36567899.
- Email:qthanh.sgh@gmail.com.
- Contact person: Do Quang Thanh (0946945345).

▪ The area is located near Highway 1A, North-South Railway, about 55km from Hue city center, about 35km
from Da Nang City Center, favorable in connecting the neighboring areas.
Location ▪ about 6 km from Chan May deep-water port, about 65km from Thuan An Seaport.
▪ About 45 km from Phu Bai International Airport.

Minimum wage According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

Lease term According to the operation term of the IP investor

Minimum Lease
According to investors' demand and in accordance with the approved planning
Area

Limit for - Factory area: ≤ 3 floors


Construction Height -Office area: ≤ 10 floors

Permitted
≤ 60% of the land area.
Construction Rate

- Infrastructure investment projects.


investment area
- The main industries are clean industry, high technical industry, manufacturing and machining,…

▪ The total area of the project is 659.06 ha of which 513.04 ha is commercial land, including:
Planned area + 138.94 ha of Industrial Land areas.
+ 374.10 ha of Non-Tariff Zone areas.

Factory Available
3 x 10000m2= 30000 m2
for Rent

* For infrastructure construction investment project of Saigon – Hue Investment Joint Stock
Company: in operation
Operation Status
* For the rest of the land: there are no infrastructure investors

Occupancy Rate
6.7%
and Number of
5 Projects
Projects

1067
- Land lease without infrastructure investment (expected): 2,000 vnd/m2 / year (~0.09 USD / m2 / year).
- Land rent has invested in infrastructure: 60 USD / m2 (until 2078)
Lease fee
- Office renting: 5 USD / m2 / month ( 01 office: 600 m2)
- Factory renting: 3 USD / m2 / month

Number of Korean
1 project
enterprise
▪ Maintenance fee: 0.4 USD/m2/year (exclusive of VAT).
▪ Electricity price:
+ For production (normal hours, excluding VAT):
* Supply voltage of 110kV or more: 1,536 vnd /Kwh (~0.066 USD/Kwh).
* Supply voltage from 22 kV to below 110kV: 1,555 VND /Kwh (~0.068 USD/Kwh).
* Supply voltage from 6 kV to 22kV: 1,611 VND /Kwh (~0.069 USD/Kwh).
Operating fee
* Supply voltage below 6 kV: 1,685 VND /Kwh (~0.072 USD/Kwh).
+ For business – services (normal hours, excluding VAT):
* Supply voltage of 22 kV or more: 2,442 vnd /Kwh (~0.105 USD/Kwh).
* Supply voltage from 6-22 kV: 2,629 vnd /Kwh (~0.113 USD/Kwh).
* Supply voltage below 6 kV: 2,660 vnd /Kwh (~0,114 USD/Kwh).
▪ Water price: 13.655 VND / m3 (~0.6 USD/m3). (excluding VAT)
- About the internal transport system: the transport routes in the region have been invested synchronously.
+ Route connecting QL 1A and Chan May port (located between the industrial zone and PTQ zone) has a
width of 36m, 44m expansion plan.
+ The route surrounding the industrial park has a current width of 12.5 m, according to the expansion plan of
33m.
+ Internal routes in the industrial park and KPTQ according to the plan have a width of 24m.
Infrastructure and - About the power supply system: currently, 03 110/22kV substations have been built with a capacity of 75
facility MVA and distribution network, enough to provide power supply for production and living of Rattan foot
area.
- About the water supply system: currently, the water supply for the Economic Zone has a capacity of 12,000
m3 / day and night, located in LoC Tien commune about 150m from Highway 1A.
- About wastewater system: the wastewater treatment system with a capacity of 4, 900m3 / day and night
- About telecommunications systems: have been built in administrative units, ensuring to serve domestic and
international communication needs.

1068
Map

Image

1069
[- This Page is intentionally left blank -]

1070
TIEN GIANG

1071
INVESTMENT ENVIRONMENT IN TIEN GIANG

USD/VND 23.510

GENERAL INFORMATION
Area 2,367 km2
Population 1,79 million people (2022)
▪ Tien Giang is located in Mekong Delta River region.
Geographical Location
▪ Located along 120 km of the North bank of Tien River, from Dong Thap Muoi to East Sea
▪ 70 km from Ho Chi Minh City to the southwest. Its administrative units are My Tho City, Go
Adjacent provinces Cong Town, Cai Lay Town and 8 districts, namely Cho Gao, Go Cong Tay, Go Cong Dong, Tan
Phuoc, Chau Thanh, Cai Lay, Cai Be and Tan Phu Dong.
2022 statistic:
▪ Nominal GRDP (billion VND): 62.881 (2,65488705932024 billion USD)
▪ Real GRDP (billion VND): 112.819 (4,76331011188516 billion USD)
▪ GRDP growth: 7,02%
GRDP ▪ GRDP per capita (million VND/year): 63,20 (2695 USD)
▪ Economic structure:
- Industry - Construction: 27.7%
- Agriculture. forestry and fishery: 37,00%
- Service: 35,30%
▪ Industry - Construction growth: 2,10%
Industry growth ▪ Agriculture, forestry and fishery growth: -1,76%
▪ Service growth: 0,00%
Import turnover (billion USD): 2,15 (Growth rate: 0,08)
Import - Export
Export turnover (billion USD): 3,87 (Growth rate: 0,246)
Key Industry Fisheries, agriculture
PCI 63.17
Ranking 50
SOCIAL INFRASTRUCTURE
▪ Roadway: Trung Luong - My Thuan expressway, national highway 1 with at least 4 lanes,
National Highway 50 with at least 2 lanes, National Highway 60 with at least 4 lanes, and National
Highway 30 with at least 2 lanes.
Transportation ▪ Waterway: Tien Giang has a dense system of rivers and canals along with the arterial inland
waterways (IWT) of the region passing through the Tien River, the Cho Gao canal handles more
than 70% of the IWT cargo transported between Ho Chi Minh City and Vietnam. The Mekong
Delta region has many conditions and advantages for the development of IWT transport.
Electricity ▪ National Power Network supplies for communes, towns, districts and industrial zones.
▪ The amount of water supplied from Dong Tam Water Plant and Binh Duc Water Plant is
Water 50,000m3/day, the remaining amount is supplied from surface water-using enterprises (businesses,
ponds in the project area) to produce domestic water. .
Education & Training N/A
▪ Tien Giang Provincial General Hospital located on National Highway 1 in Phuoc Thanh
Medicare Commune, My Tho City, has a scale of 1,000 beds, with a total investment of over VND 2,300
billion

1072
INVESTMENT CONDITION
Human resource 65,8% of population are in the working age (2022)
Education level Trained labor rate: 49,5% (2022)
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): N/A
- Area II (4,160,000 VND/month): My Tho City and Chau Thanh District
Salary - Area III (3,640,000 VND/month): N/A
- Area IV (3,250,000 VND/month): N/A
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum
wages paid to employees working under employment contracts)
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
Investment incentives
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
Fields Attracting Marine fishing, processing industry, production of rubber and plastic products, metal production,
Investment distribution of electricity, gas, hot water, steam
Investment attraction in 11 months of 2022 attracted 16 projects, an increase of 10 projects over the
Investment attraction same period; total registered investment capital is 4,448 billion dong, up 4.7 times over the same
situation period. It is expected that the whole year, the province will attract 17 projects, with a total registered
investment capital of 10,214 billion VND, up 92% over the same period.
Tien Giang has been approved by the Prime Minister to plan 7 industrial zones (IZs) with a total
Industrial zones
planning area of 2,083.5 ha.

Map

Tien Giang Department of Planning and Investment


▪ Address: No. 38, Nam Ky Khoi Nghia Street, Ward 1, City. My Tho, Tien Giang Province

Contact ▪ Tel: 0273 3873381

▪ Email: skhdt@tiengiang.gov.vn
▪ Contact person:
- N/A

1073
1074
LONG GIANG INDUSTRIAL PARK

GENERAL INFORMATION

Tan Lap 1 Commune, Tan Phuoc District, Tien Giang Province, Vietnam
Address
Long Jiang IPD
- Address: Tan Lap 1 commune, Tan Phuoc district, Tien Giang province.
- Phone number: 073 3 849 888.
- Fax number: 073 3 642 722.
- Representative:
+ Mr. Weng Ming Zhao - Chairman of the Board of Directors.
Investor + Mr. Yu Suo - General Director.
- Manufacturing business: exploiting and trading industrial parks.
- Type of business: One-member limited liability company.
- Investment Certificate No. 532043000007 issued by the Management Board of Tien Giang Industrial Parks
on November 26, 2007.
- Total investment capital: Total investment capital: 100 million USD.
- Charter capital: 20 million USD.
Distance to the nearest big city:: 50km . from the center of Ho Chi Minh City
Distance to Provincial Center: 15km from My Tho city center
Distance to nearest airport: 60km from Tan Son Nhat airport
Location Distance to the nearest railway station: 60km from Saigon station
Distance to the nearest river port: 15km . from My Tho port
Distance to the nearest seaport: 50km from the center of Ho Chi Minh City

Minimum wage According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

Lease term According to the operation term of the IP investor

Minimum Lease
According to investors' demand and in accordance with the approved planning
Area

Limit for
N/A
Construction Height

Permitted
N/A
Construction Rate

investment area Long Giang Industrial Park invites all manufacturing industries that do not pollute the environment.

Land for industry: 357.59 ha (66.22%)


Land for technical works: 13.37 ha (2.48%)
Land for internal roads: 64.13 ha (11.88%)
Planned area
Land for landscape trees: 70.18 ha (13%)
Land for storage: 20.94 ha (3.88%)
Land for services and entertainment: 13.79 ha (2.55%)

Factory Available
N/A
for Rent

1075
Operation Status In operation

Occupancy Rate
and Number of 90%
Projects

Lease fee - Land rent has invested in infrastructure: 60 USD / m2

Number of Korean
N/A
enterprise
Electric supplying system
- Total power capacity of up to 40 MVA is supplied from two medium voltage (22KV) power stations,
namely Tan Huong Station, 5 km from Long Giang Industrial Park and My Tho Station, 12 km from Long
Giang Industrial Park.

- In the future, when the demand for electricity increases, Long Giang Industrial Park will install its own
power station with a total capacity of 189 MVA (3 machines x 63 MVA).

Transportation system
- By road: from Long Giang Industrial Park to Ho Chi Minh City. Ho Chi Minh can go by

Infrastructure and 1A highway


facility City Expressway. Ho Chi Minh - Trung Luong, about 45 minutes to Binh Tan district
- Waterway: the transportation of goods is more convenient thanks to the wharf right at Long Giang
Industrial Park connecting to My Tho port and Hiep Phuoc port.

Water supply system


Long Giang Industrial Park self-supply water for factories in the Industrial Park. About quality Water is
drilled from underground wells and treated according to national standards for domestic water. Water
samples are sent for testing at the Pasteur Institute in Ho Chi Minh City on a monthly basis to ensure water
quality. As consumption increases, the water supply capacity can increase up to 48,000 m3 per day….

Waste water treatment system


- Waste water treatment plant with an operating capacity of 40,000 m3/day

1076
Map

1077
DICH VU DAU KHI SOAI RAP INDUSTRIAL PARK

GENERAL INFORMATION

Gia Thuan and Vam Lang communes in Go Cong Dong district, Tien Giang province, Vietnam
Address

Investor Vinashin Group.

Located along the Go Cong sea dike line in Vam Lang town, Go Cong Dong district.
East: bordering Soai Rap river.
West: bordering the sea dike road.
Location South: bordering Muong Nien canal.
North: adjacent to Hoi Dong Quyen channel.

Minimum wage According to Decree 38/2022/ND-CP dated 12th June 2022 on minimum salaries

Lease term According to the operation term of the IP investor

Minimum Lease
According to investors' demand and in accordance with the approved planning
Area

Limit for
N/A
Construction Height

Permitted
N/A
Construction Rate

focus on building manufacturing plants to serve the Oil and Gas industry such as: Petroleum Steel Pipe
investment area Factory (PV Pipe); Factory manufacturing oil and gas tanks; Oil and gas metal structure factory; Petroleum
welding rod factory; General service port area….

Planned area Total area: 285 ha

Factory Available
N/A
for Rent

Operation Status In operation

Occupancy Rate
and Number of 13,08% - 1 project
Projects

1078
Lease fee - Land rent has invested in infrastructure: 60 USD / m2

Number of Korean
N/A
enterprise

Map

1079
[- This Page is intentionally left blank -]

1080
TRA VINH

1081
INVESTMENT ENVIRONMENT IN TRA VINH

GENERAL INFORMATION
Area and • Area: 2,390.77 km2
Population • Population: 1,029 million people (according to 2022)
Location • Tra Vinh is a coastal province located in the southeast of the Mekong Delta, with a location stretching from
9031'46'' to 10004'5'' North latitude, 105057'16'' to 106036'04'' longitude. Winter.
• Tra Vinh province is 90 km from Can Tho City and about 200 km from Ho Chi Minh City if traveling by
National Highway 53. The distance between Tra Vinh and Ho Chi Minh City is only 130 km if traveling by
Highway 60.
• Tra Vinh borders on the North with Ben Tre province and is separated by the Co Chien River (a tributary of
Adjacent
the Tien River), the South borders with Soc Trang Province across the Hau River, the West borders with Vinh
provinces
Long Province, the East the East. is the East Sea
2022 statistic:
- GRDP: 72,441 bilion VND (3,150 bilion USD)
- GRDP growth: 3.45%.
- GRDP per capita: 2,746 USD/years.
GRDP - Economic structure:
+ Industry – Construction: 32.59%;
+ Agriculture, forestry and fishery: 30.29%;
+ Service: 31.03%;
+ Tax on Goods: 10%.
2022 statistic:
- Industry – Construction growth: 4.93%;
Industry growth
- Agriculture, forestry and fishery growth: 2.29%;
+ Service growth: 15.67%;
PCI • Score: 66.06 - ranked 26 out of 63 provinces in Vietnam. (2022)
SOCIAL INFRASTRUCTURE
- Roadway: Connected to Ho Chi Minh City by national highway 53, 60 and Highway 01, 02.
- Railway: Do not have.
Transportation - Waterway: Dinh An Port (Dinh An economic zone, Duyen Hai town, Tra Vinh province) expected to go into
operation in 2023, receiving ships of 20,000 DWT.
- Other: Do not have.
Power supply from the National Power station network 220/110/22kV provides elictricity to Tra Vinh with
Electricity
capacity of 1x250MVA and 1x125MVA at Chau Thanh district, Tra Vinh province.
Water Percentage of population using clean water: 99.2% urban area; rural area 77.19%.
Education & 01 university, 01 colleges and 01 vocational colleges in thprovince.
Training
Medicare - 01 hospitals.
INVESTMENT CONDITION
Human resource 52,60% of population are in the working age (2022)
Education level Trained labor rate: 10.80% (2022)
The minimum salary for the province is applied as follows: area I: 4.680.000 VNĐ/month (22.500 VNĐ/hour);
area II: 4.160.000 VNĐ/month (20.000 VNĐ/hour); area III 3.640.000 VNĐ/tháng (17.500 VNĐ/giờ); area IV:
Salary 3.250.000 VNĐ/month (15.600 VNĐ/hour).
- The lowest wage for trained labor (including those trained by the enterprises) must be at least 7% higher than
the above referenced basic salary: The minimum salary for area II, II, IV for the province.
- Incentives according to government regulations:
+ Incentives on corporate income tax: Decree No. 218/2013/ND-CP dated December 26, 2013 of the
Government.
+ Incentives on exemption and reduction of land rent, land use levy and land use tax: Decree No. 46/2014/ND-
Investment CP dated April 3, 2017 of the Government regulating the collection of land rent and water surface rent; Decree
incentives No. 35/2017/ND-CP dated April 3, 2017 of the Government stipulating the collection of land use levy, land
rent, and water surface rent in economic zones and hi-tech parks.
- Incentives from the province: Resolution No. 11/2016/NQ-HDND dated December 8, 2016 of the People's
Council of Tra Vinh province promulgating a number of preferential and investment support policies in Tra
Vinh province.

1082
Fields Processing industry, production and distribution of electricity, gas, hot water, steam and air-conditioning,
Attracting mining, ưater supply; waste management and treatment,
Investment
Investment In 2022, the province has attracted 08 investment projects, of which: 07 domestic projects with a total
attraction registered capital of about 12,836.02 billion VND and 01 foreign project with an investment capital of 3
situation million USD.
Map

Contact Department of Planning and Investment of Tra Vinh province


Address: 19A, Nam Ky Khoi Nghia Street, Ward 2, TPTV, Tra Vinh Province
Email: skhdt@travinh.gov.vn
Tel: 0294.3862289
Contact person: Mrs. Lam Thi Muoi - Manage Business and Investment Management Department.

1083
LIST OF INDUSTRIAL ZONE

NO LIST OF INDUSTRIAL TOTAL AREA OCCUPANCY RATE STATUS


ZONES (HA)

1 Long Duc Industrial Zone 98,006 100% in Operation

2 Co Chien Industrial Zone 199,98 N/A Clearance

3 Cau Quan Industrial Zone 120 N/A Proposing investment policy

4 Ngu Lac Industrial Zone in 936 N/A Attracting investmen


Dinh An Economic Zone

5 Don Xuan – Don Chau 934 N/A Attracting investmen


Industrial Zonein Dinh An
Economic Zone

6 Dinh An Industrial Zone in 591 N/A Attracting investmen


Dinh An Economic Zone

1084
LONG DUC INDUSTRIAL ZONE

GENERAL INFORMATION
Address Long Duc Commune, Tra Vinh City, Tra Vinh Province
Investor's name: Center for Infrastructure Management of Economic Zones, Industrial Parks.
Investor • Address: Long Duc commune, Tra Vinh city, Tra Vinh province
• Phone: 02943846699.
- Name: Trinh An Khe.
- Position: Director.
Contact Person
- Phone number: 0913739712.
- Email of person in charge
Adjacent location (Around areas)
- 127 km from Ho Chi Minh City;
Location - 127 km from Tan Son Nhat airport (Ho Chi Minh city);
- 135 km from Cat Lai port (Ho Chi Minh city);
- 66 km from the highway (CT01).
Priority investment fields: Attracting manufacturing plants that cause less environmental pollution.
Investment Area
Areas of investment restriction: Manufacturing factories cause environmental pollution.
The minimum regional salary is regulated by Decree 38/2022/ND-CP dated June 12, 2022 of the
Minimum wage
Government regulating the minimum wage for employees working under labor contracts.
• Start date: September 29, 2005.
Lease term
• Last day: May 29, 2055.
Minimum Lease Area No specified
Building height limit
Building height limit: - Factory construction area: maximum 2 floors.
- Operating area: up to 2 floors.
Permissible building rate
Permissible building rate - Factory construction area: maximum 70%.
- Operating area: up to 70%.
Total area: 98,006 ha.
Planned area • Leaseable area: 76.7 hectares (100% of the factory area has been leased).
• Area with infrastructure ready for factory construction: 0 ha.
Total factory area available • Total housing area for rent: 0 ha.
for rent
• Active
Operation Status
• The occupancy rate reaches 100% of the area and the number of projects in the area: 32 projects.
Occupancy Rate and Number
of Projects

Number of Korean Projects 01 project.


• Land rent: 2,550 VND/m2/year.
Lease fee
• Rental costs:
• Management fee: 2069 VND/m2/year.
• Electricity bill: According to the unit price of Vietnam Electricity Group.
• Water fee: According to the unit price of Tra Vinh Water Supply and Sewerage Joint Stock
Management fee
Company.
• Waste water treatment fee: 6,300 VND/m3.
• Waste treatment fee: Enterprises themselves negotiate with units with treatment function.

LIST OF SOME NOTABLE TENANTS


No. Name of the Company Countries Business fields

1085
1 My Lan Joint Stock Company Vietnam + Canada + - Producing and trading in high-grade chemical
British Virgin Islands materials for use in electronics, electro-optics and
(BVI) data storage.
2 My Lan Joint Stock Company Vietnam + Canada + - Producing automation and digital equipment for
British Virgin Islands medical, pharmaceutical, printing and security
(BVI) industries
3 My Lan Joint Stock Company Vietnam + Canada + - Producing specialized intelligent machines and
British Virgin Islands equipment
(BVI)
4 MyLan Optoelectronics Joint Stock Vietnam + Canada Research, develop and provide services for
Company functional polymeric media.
5 Rynan Smart Fertilizers Joint Stock Vietnam + Canada Research and produce smart fertilizers.
Company
6 Khanh Phong Co., Ltd Taiwan Production of cutting stone, grinding stone
7 CY VINA COMPANY LIMITED Korea Producing and processing all kinds of suitcases and
bags
8 YING HSIN Co., Ltd China Producing, trading and processing plastic products,
metal molds.
9 Leioula Garment Vietnam Co., Ltd Taiwan Producing all kinds of high-class underwear for
women
10 Yazaki EDS Vietnam Co., Ltd - Tra Vinh Japan Manufacture of electrical wiring harnesses installed
Branch in cars and motorcycles of all kinds
11 Hung Vy Garment Export Co., Ltd Virtue Sewing clothes for export
12 PCT Vietnam Co., Ltd USA Manufacture of equipment for the
telecommunications and cable television industry
13 Viet Tran Company Limited Vietnam Manufacture of power transmissions for cars and
motorcycles
14 Viet Tran Company Limited Vietnam Manufacture of electrical wiring harnesses installed
in cars and motorcycles of all kinds
15 Long Duc Co., Ltd Vietnam Producing cashew kernels for export
16 Hydraulic Construction Co., Ltd Vietnam Production of fresh concrete and precast concrete
structures
17 Tra Vinh Food Company Vietnam Food production and processing
18 Tra Vinh Food Company Vietnam Packaging manufacturer
19 An Lac Seafood Company Limited - TV Vietnam Producing, processing and processing frozen, dried
and seasoned agricultural, forestry and fishery
products
20 Ly Khai Minh Joint Stock Company Vietnam Production of aquatic feed
21 Nhat Nam Packaging Production Co., Ltd Vietnam Producing recycled plastic beads and plastic
packaging
22 Southern Seed Joint Stock Company Vietnam Plant seed production
23 Nguyen Trinh Company Limited Vietnam Processing, manufacturing iron and steel, powder
coating
24 Petrol and Gas Joint Stock Company TV Vietnam Retail business of petrol and oil
25 Tan Thuan Hung Trading Construction Vietnam Exploiting, supplying and trading in port services
One Member Co., Ltd
26 Postal Construction & Development Joint Vietnam Production of concrete columns
Stock Company
27 Hoa Sen sofa cutting and sewing joint Vietnam Sewing sofa upholstery
stock company
28 Phu Thanh Construction Joint Stock Vietnam Production of commercial concrete and precast
Company concrete components
29 Nguyen Trinh Brick-Tile-Concrete Vietnam Producing bricks, tiles, concrete structures
Components Co., Ltd
30 Dong Tien Thanh Mechanical Co., Ltd Vietnam Assemble tools for wire production
31 Nam Tien Tai Joint Stock Company Vietnam Production of chains, ropes
32 TV Bakery Co., Ltd Vietnam Production of cakes from flour

1086
1087
[- This Page is intentionally left blank -]

1088
TUYEN QUANG

1089
INVESTMENT ENVIRONMENT IN TUYEN QUANG

USD/VND 23.510

GENERAL INFORMATION
Area 5,867 km2
Population 0,78 million people (2022)
▪ Tuyen Quang is located in Northeast region.
▪ Tuyen Quang is a mountainous province, located in the center of the North-Western and North-Eastern
Geographical Location region of Vietnam
▪ 140 km from Hanoi, 110 km from Noi Bai Airport, 165 km from Thanh Thuy Border Gate, 220 km from
Lao Cai Gate, 220 km from Hai Phong Port
▪ The Province has Bac Kan and Thai Nguyen to the East, Vinh Phuc and Phu Tho Province to the South,
Adjacent provinces
Yen Bai to the West, Ha Giang and Cao Bang Province to the North
2022 statistic:
▪ Nominal GRDP (billion VND):
▪ Real GRDP (billion VND): 41.713 (1,77 billion USD)
▪ GRDP growth: 8,66%
GRDP ▪ GRDP per capita (million VND/year): 51,60 (2219 USD)
▪ Economic structure:
- Industry - Construction: 29,03%
- Agriculture. forestry and fishery: 26,89%
- Service: 39,99%
▪ Industry - Construction growth: 12,65%
Industry growth ▪ Agriculture, forestry and fishery growth: 4,57%
▪ Service growth: 8,42%
Import turnover (billion USD): 0,08 (Growth rate: -0,1693)
Import - Export
Export turnover (billion USD): 0,16 (Growth rate: -0,0952)
Key Industry Forestry, footwear
PCI 62,86
Ranking 52
SOCIAL INFRASTRUCTURE
▪ Roadway: National Road 2 from Hanoi to Ha Giang; National Road 37 from Thainguyen to Yen Bai;
National Road 2C from Vinh Phuc to Tuyen Quang; National Road 279 from Bac Kan to Ha Giang; Ho
Chi Minh Road from Cao Bang to Phu Tho; and Hai Phong – Kunming Expressway run through the
Transportation province area.
▪ Railway: No Railway
▪ Waterway: 03 waterports and 02 passenger river ports
▪ Airway: None
▪ National Power Network supplies for 100 % of communes, towns, districts and industrial zones. Power
network with 220kV và 110kV connects Thai Nguyen, Yen Bai and Tuyen Quang. There are 2
Electricity
hydropower plants including Tuyen Quang plant with capacity of 342 MW and Chiem Hoa with capacity
of 48 MW
▪ Water supply factory with capacity of 28,000 m3/day and night. Sufficient clean water supplying system
Water and waste water treatment plant meet the need of household and business/production activities in the
province.

1090
▪ 01 university (Tan Trao University), 01 college, 02 technical colleges, 06 intermediate training schools,
Education & Training
06 vocational centers
▪ 171 health care centers with 15 hospitals at provincial and district level, 141 medical stations in
Medicare
commune and ward.
INVESTMENT CONDITION
Human resource 55.8% of population are in the working age (2020)
Education level Trained labor rate: 60% (2020)
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): N/A
- Area II (4,160,000 VND/month): N/A
Salary - Area III (3,640,000 VND/month): Tuyen Quang City
- Area IV (3,250,000 VND/month): Chiem Hoa, Ham Yen, Lam Binh, Na Hang, Son Duong, Yen Son
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages
paid to employees working under employment contracts)
▪ Incentives according to government regulations:
- Exemption and reduction for land and water rent fee
- Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
Investment incentives ▪ Incentives from the province:
Projects that are on the list of those operating in sectors in which investment is prioritized will be exempt
from import duty on machinery and equipment to create fixed assets and components, spare parts and
parts in production lines, and raw materials. In addition, if fully satisfying the set conditions, investors
will not have to pay for infrastructure facilities built outside the fences of their projects.
Fields Attracting High technologies, mechanical engineering and supporting industries, commercial services, tourism, hi-
Investment tech agriculture, education-training, healthcare, sports and environmental protection
Investment attraction As of November 2022, Tuyen Quang has 18 FDI projects with the total investment capital is about 208.82
situation million USD
There are 2 industrial zones in Tuyen Quang:
Industrial zones - Long Binh An IZ
- Son Nam IZ

1091
Map

Tuyen Quang Department Of Planning And Investment


▪ Address: No.177 Tran Hung Đao Road, Minh Xuan Ward, Tuyen Quang City, Tuyen Quang Province

Contact ▪ Tel: (84-207) 3 817 299


▪ Contact person:
- Mr. Truong Xuan Quy – Director of Investment Promotion Center in Tuyen Quang – 0912 678 269 –
trxquysct@gmail.com
Mr. Thuan – Deputy Head of Tuyen Quang Idustrial Zones Management Board - 094 553 3456

1092
HOA PHU INDUSTRIAL ZONE

GENERAL INFORMATION
Address Son Nam Commune, Son Duong District, Tuyen Quang Province
Investor Tuyen Quang Industrial Park Infrastructure Development Company
Adjacent location (Around areas)
Location To Hanoi city road: 88km
To Noi Bai Airport: 100km
Mineral processing industry: feldspar, tungsten; construction material production industry such as:
Investment Area
high-grade facing bricks, unburnt bricks, precast concrete; garment industry, plastic industry, etc.
Lease term 50 years
Minimum Lease Area No specified
Building height limit: N/A
Permissible building rate N/A
Total area: 150ha
Planned area
• Active
Operation Status
• The occupancy rate reaches 60% of the area
Occupancy Rate and Number 5 projects
of Projects

Number of Korean Projects N/A.

Lease fee 20 USD/m2

Management fee • Management fee: 0.4 USD/m2

1093
[- This Page is intentionally left blank -]

1094
VINH LONG

1095
INVESTMENT ENVIRONMENT IN VINH LONG

GENERAL INFORMATION

▪ Area: 1.525,73 km2


Area, Population
▪ Population: 1,02 million (2022 statistic)
▪ Located in the South region of Vietnam.
Geographical Location
▪ Located 100 km from Ho Chi Minh city and 34 km from Can Tho city.
▪ To the east, it borders Ben Tre province; to the southeast, it borders Tra Vinh province; the
West borders Can Tho city; to the northwest, it borders Dong Thap province; to the northeast,
Adjacent provinces
it borders Tien Giang province; to the southwest, it borders Hau Giang province and Soc Trang
province.
2022 statistic:
▪ GRDP: 70.974,4 billion VND (3,02 billion USD)
▪ GRDP growth: 11,28%
GRDP ▪ GRDP per capita: 2.937,69 USD/year
▪ Economic structure:
- Industry - Construction: 17,51%;
- Agriculture. forestry and fishery: 36,72%;
- Service: 40,51%.
2022 statistic:
Industry growth ▪ Industry - Construction growth: 23,34%
▪ Agriculture, forestry and fishery growth: 2,01%
▪ Service growth: 15,82%

PCI ▪ Score: 64,40 – ranked 40 out of 63 cities and provinces in Vietnam. (2022)

SOCIAL INFRASTRUCTURE

▪ Roadway: There are 15 main roads with a total length of over 400km, including 05 national
highways (National Highway 1, National Highway 53, National Highway 54, National
Highway 57 and National Highway 80 and Ho Chi Minh – Can Tho Expressway crossing Vinh
Long).
▪ Railway: Ho Chi Minh City – Can Tho Railroad (passing through Vinh Long Province) has
Transportation
been included in the National Railroad Network Master Plan up to 2030.
▪ Waterway: There is an interlaced network of rivers with a total length of about 955km
including 03 national waterways, namely Tien river, Hau river and Mang Thit river.
▪ Other: Vinh Long City Center is about 43km from Can Tho International Airport and about
135km from Tan Son Nhat International Airport.
Vinh Long 220KV power station supplies electricity mainly to Vinh Long and Tra Vinh provinces.
220KV substations are the main power supply for all 03 substations of 110KV in the province (with
a total capacity of 125 MVA).
Regarding the power distribution grid, it is currently operating at voltage levels of 15KV and 22KV.
The entire medium voltage grid is designed at a 22KV level and currently has 2.105 km of medium
Electricity voltage lines.
The low-voltage grid has a total length of 3.547km and 5.241 distribution substations with a total
capacity of 413.952 KVA.
Currently, the national grid has covered 100% of communes, wards and townlets in the province,
meeting the needs of the people and serving well the production and business activities of
enterprises.

1096
Currently, the province has 12 water supply plants, with a total capacity of 48.800 m3 per day
Water and night and 150km of water supply pipes of all kinds, meeting the needs of daily life and
serving production and business.
▪ 03 universities and 01 university branch in the province, 02 colleges, 01 vocational secondary
Education
school.

Medicare ▪ 17 hospitals, district health centers

INVESTMENT CONDITION

Human resource ▪ 56,4% of population are in the working age (2022)

Education level ▪ Trained labor rate: 59,85% (2022)

▪ The minimum salary for the province is applied as follows: July 1, 2022 is 4.160.000
VND/month ≈ 177 USD/month (Region II) in Vinh Long City, Binh Minh Town; Long Ho
Salary and Mang Thit Districts apply salary the minimum is 3.640.000 VND/month ≈ 155
USD/month (Region III) and the remaining districts applying the minimum salary of 3.250.000
VND/month ≈ 138 USD/month (Region IV).
▪ Incentives according to government regulations:
- Corporate income tax incentives
- Export and import duties
- Exemption of land rent, reduction in land rent
▪ Incentives from the province:
- Support investment preparation costs;
- Support the construction of standard wastewater treatment plant;
- Provide credit support;
- Support transport technical infrastructure for projects beyond high-tech projects, industrial
Investment incentives zone, industrial clusters.
- Support investment in hi-tech agricultural zones and regions;
- Support investment projects of high-tech agriculture; safe vegetable production zones under
the Good Agricultural Practice (GAP); develop concentrated material zones for processing
vegetables, fruits; Construct high-quality rice fields;
- Support human resources training;
- Support advertising costs;
- Support investment promotion costs;
- Support business in technological reform;
- Support investor attraction costs.
▪ Prioritized projects:
- Industrial sector
- Agricultural - Rural sector
Fields Attracting Investment
- Culture - Tourism sector
- Urban - Housing sector
- Trading - Service sector

1097
Map

Vinh Long Investment Promotion and Business Support Center


▪ Address: 88B Vo Van Kiet, Sub-village 3, Ward 9, Vinh Long city, Vinh Long Province
Contact ▪ Tel: (84-270) 3 834 032
▪ Contact person: Mr. Huynh Quang Vinh - Deputy Director of Center for Investment
Promotion and Business Support (Tel: 0969.668.161)

1098
LIST OF INDUSTRIAL ZONES

No Industrial zone Name Total Area (ha) Occupancy Rate Status


1 Hoa Phu Industrial Zone 250,97 100% In operation
2 Binh Minh Industrial Zone 134,82 90 % In operation
3 Dong Binh Industrial Zone 350 0% Established in April 2021.
Currently, the site
clearance work is in
progress
4 Gilimex Vinh Long Industrial Zone 400 0% Established in September
2022. Currently, the site
clearance work is in progress
5 An Dinh Industrial Zone 200 0% Currently, investors are
carrying out project
investment procedures

LOCATION MAP OF INDUSTRIAL ZONE

1099
HOA PHU INDUSTRIAL ZONE

GENERAL INFORMATION
Address Long Duc Commune, Tra Vinh City, Tra Vinh Province
HOA PHU JOINT STOCK COMPANY
- Head office address: No. 1, N3, Hoa Phu Industrial Park, Hoa Phu commune, Long Ho district,
Investor Vinh Long province.
- Phone: 070.3962738 – 3822174; Fax: 070.3880357.
- Email: ctcphoaphu@yahoo.com.vn; Website: www.kcnhoaphu.com.vn.
Adjacent location (Around areas)
- Adjacent to National Highway 1A and about 60 km from the highway.
- Location in the region/area: 10km from Vinh Long city, 10km from Vinh Long city. Can Tho 20
km, Ho Chi Minh City 145 km.
Location - Distance to the airport: 25 km from Can Tho airport.
- Distance to the nearest ports such as:
+ Vinh Long port: 10 km, receiving ships with a tonnage of up to 5,000 tons.
+ Binh Minh Port: 20km, receiving ships with a tonnage of up to 10,000 tons.
+ Can Tho port: 35 km, receiving ships with a tonnage of up to 20,000 tons.
Priority investment fields: Consumer goods – household appliances; power electronics; crafts;
Investment Area textile; Food processing - food; pharmaceutical - cosmetic; packaging; mechanical; processing
animal feed, poultry and aquatic products, other industries with less pollution, ....
• Start date: 2010
Lease term
• End date: 2060
Minimum Lease Area No specified
Building height limit: N/A
Permissible building rate N/A
Total area: 250,97ha
121.59 ha, of which 94.8 ha of industrial land can be leased (92.47 ha has been leased, reaching
97.54%). It has been put into operation and attracted 18 investment projects with a total investment
capital of 619.36 billion VND and 220.9 million USD.
Planned area
- Hoa Phu Industrial Park, phase 2: 129.38ha, of which 94.95ha of industrial land can be leased
(50.64ha has been leased, reaching 53.33%). Has been put into operation and attracted 04
investment projects with total investment capital of 645 billion VND and 124.4 million USD.
• Active
Operation Status

• The occupancy rate reaches 100% of the area


Occupancy Rate and Number
of Projects

Number of Korean Projects N/A.

Lease fee 83 USD/m2

Management fee • Management fee: 0.4 USD/m2

BINH MINH INDUSTRIAL ZONE

1100
GENERAL INFORMATION
Address Long Duc Commune, Tra Vinh City, Tra Vinh Province
- Business name: HOANG QUAN MEKONG REAL ESTATE TV-TM-DV JSC
- Head office address: Lot B5, Binh Minh residential area, My Loi hamlet, My Hoa commune,
Binh Minh town, Vinh Long province.
Investor
- Phone: 0703.852020; Fax: 0703.852012
- Email: info@hoangquanmekong.com.vn;
- Website: www.hoangquanmekong.com.vn.
Adjacent location (Around areas)
- Location in the region/area: far from the city. Can Tho 05km, far from city. Vinh Long 30km, far
from city. Ho Chi Minh City 160km.
- Adjacent to National Highway 1A, Hau River, Can Tho Bridge and the road leading to Can Tho
Bridge.
- Distance to the airport: 15 km from Can Tho Airport.
Location - 30 km from Vinh Long Customs.
- Distance to the nearest harbour:
+ Binh Minh port within Binh Minh industrial zone: receive ships with a tonnage of up to 10,000
tons.
+ Vinh Long port: 30 km, receiving ships with a tonnage of up to 5,000 tons.
+ Can Tho port: 16 km, receiving ships with a tonnage of up to 20,000 tons.
- Distance from highway: about 80 km.
Processing agricultural and aquatic products; manufacturing consumer goods textiles, wood,
handicrafts, electricity, packaging; production of building materials, ceramic tiles, roofing sheets;
Investment Area
cosmetic chemical production; manufacture and install machinery and equipment for industrial and
agricultural production,...
Lease term up to 50 years (coming from 2006 to 2056
Minimum Lease Area 5.000m2
Building height limit: N/A
Permissible building rate N/A
Planned area Total area: 162ha.
• Active
Operation Status

• The occupancy rate reaches 90% of the area


Occupancy Rate and Number
of Projects

Number of Korean Projects N/A.

Lease fee 98 USD/m2

Management fee 0,1USD/m2/year

1101
[- This Page is intentionally left blank -]

1102
VINH PHUC

1103
INVESTMENT ENVIRONMENT IN VINH PHUC

GENERAL INFORMATION
Area 1,235 km2
Population 1,15 million people (2022)
▪ Vinh Phuc is located in Red River Delta region.
Geographical
▪ Located in the Red River Delta region, the northern key economic and planning zone of Hanoi capital city.
Location
▪ Located 50 km from Hanoi Center, 25 km from Noi Bai Airport
▪ The Province has Thai Nguyen and Tuyen Quang Province to the north, Phu Tho Province to the west and
Adjacent
northwest, Hanoi to the south and
provinces
southeast.
2022 statistic:
▪ Nominal GRDP (billion VND): 153.120 (6,51 billion USD)
▪ Real GRDP (billion VND): 95.304 (4,05 billion USD)
▪ GRDP growth: 9,54%
GRDP ▪ GRDP per capita (million VND/year): 127,85 (5438 USD)
▪ Economic structure:
- Industry - Construction: 48,99%
- Agriculture. forestry and fishery: 5,21%
- Service: 21,83%
▪ Industry - Construction growth: 13,41%
Industry growth ▪ Agriculture, forestry and fishery growth: 0,23%
▪ Service growth: 9,61%
Import turnover (billion USD): 13.7 (Growth rate: 16.42%)
Import - Export
Export turnover (billion USD): 14.98 (Growth rate: 21.09%)
Key Industry Electronics
PCI 68,81
Ranking 8
SOCIAL INFRASTRUCTURE
▪ Roadway: The Province is connected with numerous road system including: Noi Bai - Lao Cai highway,
National Road 2 parallel to Noi Bai – Lao Cai Highway, National Road 2B: 25-km National Road 2C: 48 km-
length National Road 23, Belt Road 5 and 4.5 of Hanoi. Several important routes
are under construction: Belt 3 Project (Huong Canh- Yen Lac), Bi La Bridge renovation project, Road linking
Tay Thien Attraction to National Road 2.
▪ Railway: Rail route Hanoi - Lao Cai runs through 05/09 administrative units of the Province with total length
of 35 km and 05 stations (Main stations are Phuc Yen and Vinh Yen)
Transportation
▪ Waterway: The province has diversified waterway system with 4 rivers including: Red River, Lo River, Ca Lo
River and Pho Day River – convenient for freight and passenger transportation. Port system includes 3 main
ports: Chu Phan and Vinh Thinh on Red River, Nhu Thuy on Lo River.
▪ Airway: 25 km from Noi Bai International Airport
▪ Vinh Phuc ICD Logistics Centre & Super Port is expected to start operations in the fourth quarter of 2023. The
83-ha ICD logistics centre and super port is expected to reach a customs clearance capacity of 530,000 TEUs per
year.
The province is located in advantageous region for power supply from
Electricity
national power network. Currently, the province has 08 power stations of

1104
110/35/22 KV and 01 station of 220/22 KV with a total capacity of more than
700 MVA
Water 07 clean water stations with total capacity of 57,600 m3 per day
Education &
04 universities, 06 colleges, 32 vocational centers
Training
▪ 434 healthcare establishments (including 17 hospitals; 01 sanatorium and rehabilitation hospital; 29 regional
Medicare polyclinics; 139 medical service units in communes, precincts; 248 others) with 3,989 patient beds
▪ Vinh Phuc Medical School provides training for medical staff in the province and neighboring region
INVESTMENT CONDITION
Human resource 47,7% of population are in the working age (2022)
Education level Trained labor rate: 78% (2022)
▪ The minimum salary for the province is applied as follows:
- Area I (4,680,000 VND/month): N/A
- Area II (4,160,000 VND/month): Vinh Yen and Phuc Yen cities; Binh Xuyen and Yen Lac districts
Salary - Area III (3,640,000 VND/month): Vinh Tuong, Tam Dao, Tam Duong, Lap Thach and Song Lo districts
- Area IV (3,250,000 VND/month): N/A
(Pursuant to Decree No. 38/2022/ND-CP dated June 12, 2022 on prescribing statutory minimum wages paid to
employees working under employment contracts)
▪ Incentives according to government regulations:
Investment - Exemption and reduction for land and water rent fee
incentives - Preferential tax rates and exemption period, reduction for corporate income tax.
- Import tax exemption
Fields Attracting Automobiles, electronics, support industries, technology agriculture, new materials, renewable energy, tourism,
Investment education-training, healthcare, the environment, and smart city development
Investment As of December 2022, the province has attracted 502 FDI projects with investment capital of $6.74 billion.
attraction Notable investors are Daewoo, YSL Group, Haesung Vina (Korea), Toyota, Honda, Sumitomo (Japan), Compal
situation (Taiwan), Piaggio (Korea), and Piaggio (Italy), De Heus (Netherlands), NorthStar Polaris and Weldex (USA).
Vinh Phuc has 9 industrial zones and clusters: Kim Hoa IZ (117 hectares), Binh Xuyen IZ (271 hectares), Binh
Xuyen II IZ (485 hectares), Khai Quang (262 hectares), Ba Thien IZ ( 327 hectares), Ba Thien II IZ (308
Industrial zones
hectares), Chan Hung IZ (131 hectares), Son Loi IZ (416 hectares) and Hoi Hop IZ (150 hectares). Vinh Phuc
continues to get governmental permission to open 14 new industrial zones with the total area of 5,576 hectares.

1105
Map

Department of Planning and Investment Vinh Phuc


▪ Address: 40 Nguyen Trai Street, Dong Da Ward, Vinh Yen City, Vinh Phuc Province

▪ Tel: (84-211) 3 862 480


Contact
▪ Email: sokhdt@vinhphuc.gov.vn
▪ Contact person:
- Mr. Nguyen Kim Khai - Director
- Tel: 84-903 205 09
- Email: khaink-sokhdt@vinhuc.gov.vn

1106
LIST OF INDUSTRIAL ZONES IN VINH PHUC

No Industrial zone Name Total Area (ha) Occupancy Rate Status


1 Ba Thien Industrial Zone 325.75 35% In operation
2 Ba Thien II Industrial Zone 308 83% In operation
3 Tam Duong II Industrial Zone - Zone A 136.17 50% In operation
4 Binh Xuyen Industrial Zone 287.7 98% In operation
5 Khai Quang Industrial Zone 216.24 96% In operation
6 Binh Xuyen II Industrial Zone 42.21 100% In operation
7 Thang Long Industrial Zone Vinh Phuc (for 213 82% In operation
Japanese only)
Kim Hoa Industrial Zone 50 100% In operation
(for Japanese only)
8 Tam Duong II Industrial Zone - Zone B 185.6 Under Construction
9 Chan Hung Industrial Zone 129.08 Under legal Process for Industrial
Zone Permit
10 Son Loi Industrial Zone 264.52 Under legal Process for Industrial
Zone Permit
11 Dong Soc Inđútrial Park 206ha Under Construction

VINH PHUC ’S LOCATION MAP OF INDUSTRIAL ZONES

1107
1108
BA THIEN I INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

Ba Thien Commune, Thien Ke Ward, Binh Xuyen district, Vinh Phuc province.
Address
▪ Vinh Phuc Industrial Zone Management Board
Investor ․ Address: 38 – 40 Nguyen Trai Road, Dong Da, Vinh Yen City, Vinh Phuc Province
․ Tel: (84-211) 3 843 403
Mr. Nguyen Cong Thang – Head of Investment Promotion Department of Vinh Phuc Industrial zone
Contact Person
management board – (84) 913 057 566 - congthangbqlkcn@gmail.com
▪ Land: 10 km from Vinh Yen City, 53 km from Hanoi City Center, 5 km from Noi Bai - Lao Cai Highway
Location ▪ Seaport: 168 km from Cai Lan sea port
▪ Airport: 20 km from Noi Bai Airport

Investment priorities
Sectors
Investment Area
Investment Restricted
Sectors

Minimum wage [Area 2] According to Decree 90/2019/NĐ-CP dated 15th November 2019

▪ Start date: 2007


Lease term
▪ Ending date: 2057

Minimum Lease Area 10,000 m2

Limit for Construction Height In accordance with Vietnam Building Code: Regional and Urban Planning and Rural Residential Planning
regulation (QCXDVN 01: 2008/BXD)
Permitted Construction Rate Construction area is not more than 65% of the total leased land lot

▪ Total area: 325.75 ha


Planned area
▪ Total industrial land: 202.82 ha

Factory Available for Rent ▪ NA

Operation Status ▪ In operation

Occupancy Rate and Number of ▪ 35%


Projects ▪ 27 Projects

Number of Korean Projects ▪ 14 projects

Lease fee ▪ Land lease fee: 45 USD/m2/project life

▪ Management fee: 0.2 USD/m2/year


▪ Infrastructure maintenance fee: 0.35 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee
▪ Water fee: 12,500 VND (~0.5 USD)/m3 for production activities, 14,000 VND (~0.63 USD)/m3 for service
activities.
▪ Waste water fee: 0.55 USD/m3

INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Techcombank, Vietcombank, Vietinbank

11 km from Vinh Phuc Tax office


Tax service, State finance office
16 km form Bac Ninh Treasury Office

Customs Service 15 km from Vinh Phuc Custom Department

1109
Logistics Available in Industrial Zone

Post office 2 km from Thien Ke Commune Post Office

11 km from Lac Viet Hospital


Medicare
17 km from Vinh Phuc General Hosptial
2 km from nearest Police Station
Police, public security
11 km from Vinh Phuc Provincial Police
Universities, training facilities,
11 km from Trung Vuong University
etc.

Recruitment Supported by IZ developers

Worker dormitory Distance from the nearest Facility: expected 2 years

Worker's child education


NA
facility

One-stop service 12 km from Public Administration Agency Vinh Phuc

Road Width From 2 to 4 road lane

Communication Infrastructure
The telecommunication system complies with international standards
of Industrial Zone

Emergency Power generator NA

Fire-fighting facility Available. Water supply system for firefighting is located along each road.

Layout Plan

Location Map

1110
Actual View

LIST OF PROJECTS IN INDUSTRIAL ZONE


No. Company Name Nationality Business line
1 Exon Vietnam Co., Ltd Taiwan Production and Trading of Seeds
2 Compal Vietnam Co., Ltd Taiwan Production of laptops, LCD screen
3 Intramedia Minhduc Inc. ( Vietnam ) Taiwan Electronic components for mobile phone and computer
4 Luc Tri Technology Co., Ltd. Taiwan Cooling fan for computer
5 Champtron Vietnam Co., Ltd Taiwan Production Civil eletric products
6 Dongyang Electronics Vn Co., Ltd. South Korea Component for mobile phones
7 Bang Joo Electronics Vn Jsc. South Korea Electronic component for cameras (esp. Lenses)
8 Cammsys Vietnam Jsc. South Korea
9 Daeduck Vietnam Co., Ltd South Korea Circuit board production for cameras and phones
10 Inter Flex Vina Co., Ltd South Korea Circuit board production
11 Ls Comunication Vina Co., Ltd South Korea Component for mobile phones
12 Aac Technologies Co., Ltd Singapore Component for mobile phones
13 Bangjoo Hi-Tech Vina Jsc. South Korea Component for mobile phones, cameras
14 Summit System Co., Ltd South Korea Circuit board production
15 Dm Vina Co., Ltd South Korea Film and tapes for cellphone and other electronic
devices.
Maintanance services
16 Vina Y-Ie Co., Ltd. South Korea Circuit board production; JIG mold production
17 Cgs Eletronics Vina Co., Ltd South Korea Component for mobile phones
18 Tk Tech Vietnam Co., Ltd. South Korea Circuit board productiom
19 Nanotech Vina Co., Ltd. South Korea Production and trading of components for mobile
phones
20 Smi Vina Co., Ltd Korea Circuit board productiom
21 Isu Exaboard Vietnam Co., Ltd. South Korea Circuit board productiom
22 Casadevall Vietnam Co., Ltd Hong Kong Production of laptops, LCD screen
23 Hong Pin (Viet Nam) Technology Co.,Ltd Taiwan Electronic Component production
24 Ocean Industry Corporation Vietnam Production of electrical equipment
25 Vietnam Japan Osaka Group Jsc. Vietnam Production of roof
26 Cnc Technology Vinh Phuc Jsc. Vietnam Production of plastic components for the electric,
electronics, automobile and motorbike assembly

1111
27 Cnc - Vina., Jsc Vietnam Manufacture of machinery, auxiliary equipment and for
the automotive industry,

1112
BA THIEN II INDUSTRIAL ZONE

GENERAL INFORMATION OF INDUSTRIAL ZONE

▪ Ba Thien II Industrial Park, Thien Ke Commun, Binh Xuyen District, Vinh Phuc Province
Address
▪ VINA CPK Company Limited
․ Address: Ba Thien II Industrial Park, Thien Ke, Binh Xuyen, Vinh Phuc
Investor
․ Tel: (84-211) 3 899 007
․ Website: http://bathien2ip.vn/vi/

Contact Person ▪ Mr. Hoang Thieu Son – Deputy General Director – (84) 903 000 709 – Son.hoang@asia-ip

- 50km from Hanoi


- 20km from Noi Bai International Airport
Location
- 160km from Hai Phong Port.
- 6km from Noi Bai – Lao Cai – China Expressway
Investment Ba Thien II Industrial Park welcomes high-tech & technology-intensive industries, and
priorities Sectors other non-pollution industries
Investment Area Investment
Restricted Industries cause pollution
Sectors

Minimum wage [Area 2] According to Decree 90/2019/NĐ-CP dated 15th November 2019

▪ Start date: 2009


Lease term
▪ End date: 2059

Minimum Lease Area 10,000 m2

Limit for Construction Height ▪ For buildings in industrial land: 18m (45m only for the chimney)
▪ For buildings in service area: 60
▪ For industrial land: 60%
Permitted Construction Rate ▪ For service area : 50%
▪ Total area: 308 ha
Planned area ▪ Total vacant leasable area: 220ha
▪ Total area with full infrastructure ready to build factory: 7.6ha

Factory Available for Rent NA

Operation Status In operation

Occupancy Rate and Number of ▪ 83%


Projects ▪ Above 30 projects

Number of Korean Projects 22 projects

▪ Land lease fee: 70- 75 USD/m2 until 2058 (excluded VAT) (Proposal to 30th June 2019)
▪ Factory lease fee:
▪ Payment: Payment method device to 4 periods:
- Signing Deposit Agreement : 10% of contract value
Lease fee
- Signing Land Sublease Agreement : 30% of contract value
- Handover land : 50% of contract value
- Issuance of red book: 10% of contract value
▪ Method: Transfer
▪ Management fee: 0.35 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee ▪ Water fee: approximately 0.6 USD/m3
▪ Wastewater treatment fee: 8,000 VND/m3 (~0.35 USD) (exclude VAT)
▪ Waste treatment fee: According to contract

1113
INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Techcombank, Vietcombank, Vietinbank

11 km from Vinh Phuc Tax office


Tax service, State finance office
16 km form Bac Ninh Treasury Office

Customs Service 15 km from Vinh Phuc Custom Department

Logistics Available in Industrial Zone

Post office 2 km from Thien Ke Commune Post Office

11 km from Lac Viet Hospital


Medicare
17 km from Vinh Phuc General Hosptial
2 km from nearest Police Station
Police, public security
11 km from Vinh Phuc Provincial Police

Universities, training facilities 11 km from Trung Vuong University

Recruitment Supported by IZ developers

Worker dormitory Distance from the nearest Facility: expected 2 years

Worker's child education


NA
facility

One-stop service 12 km from Public Administration Agency Vinh Phuc

Road Width From 2 to 4 road lane

Communication Infrastructure
The telecommunication system complies with international standards
of Industrial Zone

Emergency Power generator NA

Fire-fighting facility Available. Water supply system for firefighting is located along each road.

Layout Plan

1114
Location Map

Actual View

LIST OF PROJECTS IN INDUSTRIAL ZONE

No. Company Name Nationality Business line


1 Mt Vina Investment Co., Ltd Vietnam Supporting industry product
2 Nippon Paint Vinh Phuc Co., Ltd Japan High quality paint and paint solution,..
3 Suzukaku Vietnam Co., Ltd Japan Mecanical processing accessories for motobike
4 Dst Vina Co., Ltd South Korea Module camera for mobile phone
5 Vina Union Co., Ltd South Korea Manufacturing ignition parts, electronic circuit boards,
semiconductor components, door pads and rubber
magnets.
6 Sekonix Vina Co., Ltd South Korea Production of lenses and VCM for mobile phone
Electronic product maintanance
7 Vietnam Garments Manufacturing Limited Singapore Polo shirt productiom
8 Actro Vina Co., Ltd. South Korea camera, camera modules for phone and other devices

1115
9 New Flex Technology Vina Co., Ltd South Korea PCB production
10 Solum Vina Co., Ltd. South Korea Production of electronic components for TV, computer
screen, etc,..
11 Inoac Vietnam Co., Ltd Singapore Stationery products
12 Samjin Lnd Vina Co., Ltd South Korea Electronic products
13 Regina Miracle International Co., Ltd Hong Kong Underwear production
14 Im Vina Co., Ltd South Korea Module camera for mobile phone
15 Optrontec Vina, Co., Ltd South Korea Film and lense for mobile phone
16 Vina Total Co.,Ltd South Korea PCB production
17 Chemcos Vina Co., Ltd 100% Korean Tape production
18 Isc Vina Co., Ltd South Korea Semi-conduct related components
19 Nanos Vietnam Co., Ltd. South Korea Optical filter for camrea, phones..
20 Acro Vina Co., Ltd South Korea Ultrahard alloy for mechanical products
21 Dong San Vina Precision Co., Ltd South Korea Superprecision ceramic ball
22 Vina Newflex Co., Ltd South Korea Electronic component
23 Ymt Vina Co., Ltd - Vinh Phuc Branch South Korea Elastic/flexible circuit board production
24 Top Intercube Electronics Vina Co., Ltd. South Korea Camera module, Navigation, Black box, IP Camera,
Micro phone, Batter module, Set top box,… for mobile
phone
25 Act Vina Co., Ltd South Korea FPCB for mobile phone Production
26 Hanbo Enc Vina Co., Ltd South Korea Package production
27 Hyunwoo Vina Co., Ltd. South Korea PCB production
28 Tkr Manufacturing Vietnam Co., Ltd. Japan Mechanical processing and metal plating
29 Power Logics Ba Thien Vina Co., Ltd South Korea Electronic components production and assembly
30 Datatronic Vietnam Co., Ltd Hong Kong Magnetic product manufacture

1116
TAM DUONG II INDUSTRIAL ZONE - ZONE A

GENERAL INFORMATION OF INDUSTRIAL ZONE

▪ Kim Long Commune, Tam Duong District, Vinh Phuc Province


Address
▪ Vitto – Vinh Phuc Co., Ltd.
․ Address: Lot 1, Zone A, Tam Duong II Industrial Zone, Kim Long Commune, Tam Duong District, Vinh Phuc
Province
Investor
․ Tel: (84-211) 6 558 863
․ Website: www.vitto.vn

Contact Person ▪ Mr. Nguyen Hoang Anh – Head of Project Management Board – (84) 983 906 886

▪ Land: 4 km from Trans-Asean Way; 62 km from Ha Noi City Center


Location ▪ Seaport: 170 km from Cai Lan sea port
▪ Airport: 29 km from Noi Bai Airport
- Producing construction materials
Investment priorities - Manufacturing and assembling electronic components
Sectors - Mechanical Processing
Investment Area - Processing household goods
Investment
Textiles, Dyeing, Chemicals
Restricted Sectors

Minimum wage [Area 2] According to Decree 90/2019/NĐ-CP dated 15th November 2019

▪ Start date: 2014


Lease term
▪ End date: 2064

Minimum Lease Area 10,000 m2

Limit for Construction Height


1-2 floors for the factory, 1-4 floors for office, maximum height of each one is 4 meters. Entire works of the
construction “footprints” is not exceed 65% of the total area of the plot.
Permitted Construction Rate

Planned area ▪ Total area: 136.17 ha

Factory Available for Rent None

Operation Status ▪ In operation

Occupancy Rate and Number of ▪ 50%


Projects ▪ 1 project

Number of Korean Projects None

Lease fee ▪ Land lease fee: 45 – 50 USD/m2/whole project life

▪ Infrastructure maintenance fee (expected): 0.3 USD/m2/year


▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee ▪ Water fee: 12,500 VND (~0.5 USD)/m3 for production activities, 14,000 VND (~0.63 USD)/m3 for service
activities
▪ Wastewater treatment fee (expected): 0.42 USD/m3 (the system is under construction)

INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Vietinbank, Agribank Tam Dao Branch

4 km from Tam Dao Tax Department


Tax service, State finance office
11 km from Vinh Phuc State Treasury

1117
Customs Service 17.2 km from Vinh Phuc Customs Department

Logistics NA

Post office 5 km from Tam Dao Post Office

Medicare 5 km from Tam Dao Province Medical Center

Police, public security 24/7 security service.

Universities, training facilities,


5.6 km from Trung Vuong University
etc.

Recruitment Support from IZ developers

Worker dormitory NA

Worker's child education


NA
facility

One-stop service NA

Road Width NA

Communication Infrastructure
Telecommunication systems and international standards are always ready to meet the communication needs
of Industrial Zone

Emergency Power generator Available in the zone

Fire-fighting facility Available in the zone

Layout Plan

Location Map

1118
Actual View

LIST OF PROJECTS IN INDUSTRIAL ZONE

No. Company Name Nationality Business line

1 VITTO - VP CO.,LTD Vietnam Ceramic tile production

1119
BINH XUYEN INDUSTRIAL ZONE

GENERAL INFORMATION

▪ Binh Xuyen district, Vinh Phuc Province


Address
▪ An Thinh Vinh Phuc Construstion Investment Co., Ltd
Investor ․ Address: Binh Xuyen Industrial Zone, Vinh Yen City, Vinh Phuc Province
․ Tel: (84-211) 3 596 999 Fax: (84-211) 3 596 888

Contact Person ▪ Mr. Le Ngoc Thanh – Deputy Director - (84) 904 986 555 – ngocthanhat@gmail.com

▪ Land: Adjacent to National Road 2, Noi Bai - Lao Cai Highway and Hanoi- Lao Cai Railway, 8 km from Vinh
Yen and 45 km from Hanoi Center
Location
▪ Seaport: 160 km from Cai Lan sea port
▪ Airport: 20 km from Noi Bai Airpor
Investment priorities
Electronics, Mechanics.
Sectors

Investment Area Investment Restricted


Heavy-Industry, Textile & dying, Polluting industries
Sectors

Minimum wage [Area 2] According to Decree 157/2018/ND-CP dated 16th November 2018

▪ Start Date: 2007


Lease term
▪ Ending date: 2057

Minimum Lease Area 10,000 m2

▪ Total area: 287.7 ha


Planned area
▪ Total Industrial Land area: 211.64 ha

Factory Available for Rent NA

Operation Status ▪ In operation

Occupancy Rate/Number of ▪ 98%


Projects ▪ Above 97 projects

Number of Korean Projects 19 projects

▪ Land lease fee: 65 USD/m2


▪ Payment Method:
Lease fee - Signing the contract: 30%
- Receiving investment certificate: 50%
- Red book handover: 20%.

▪ Management fee: 0.3 USD/m2/year;


▪ Infrastructure maintenance fee: 0.3 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee
▪ Water fee: 12,500 VND (~0.5 USD)/m3 for production activities, 14,000 VND (~0.63 USD)/m3 for service
activities
▪ Waste water treatment fee: as quoted by supplier

INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Vietinbank,

2.4 km from Binh Xuyen Tax Department


Tax service, State finance office
950 m from Binh Xuyen State Treasury

Customs Service 10 km from Vinh Phuc Customs Department

1120
Logistics NA

Post office 950 m from Binh Xuyen Post Office

Medicare 3.6 km from Binh Xuyen District Medical Center

Police, public security 24/7 security service.

Universities, training facilities,


13.2 km from Trung Vuong University
etc.

Recruitment Support from IZ developers

Worker dormitory NA

Worker's child education


NA
facility

One-stop service NA

Road Width NA

Communication Infrastructure
Telecommunication systems and international standards are always ready to meet the communication needs
of industrial park

Emergency Power generator Available in the zone

Fire-fighting facility Available in the zone

Layout Plan

1121
Location Map

Actual View

1122
LIST OF PROJECTS IN INDUSTRIAL ZONE

No. Company Name Nationality Business line


1 Ich Thanh Co., Ltd Taiwan Tea processing for export
2 Woojin Viha Co., Ltd. (Formerly Daeyoung Viha) South Korea Package production and PP, PE Textile
3 Hannam Inc South Korea Garment production
4 Nts Vina Co., Ltd South Korea High-tech chips and probe bin manufacture and
trading
Trading of high tech product
5 Vietnam Tarng Hae Co.,Ltd Taiwan Production Automobile and motobike parts
6 Kingley Technology Industrial (Vietnam) Co., Ltd Taiwan Electronic Component production
7 Che Ye Hardware Co.,Ltd-2 Taiwan Electric Devices for household
8 Jhen Da Industry Co., Ltd Taiwan Electrostatic paint, iron paint, aluminum paint,
plastic paint
9 Krico Co., Ltd Taiwan Components for motor vehicles
10 Think Vietam Co.,Ltd Japan Jewery processing and handducraft item
processing
11 Piaggio Vietnam Co., Ltd. Italy Motobike assembly and manufactures
12 Kim Kuao Leng Industry Co,Ltd Taiwan Srew and metal product manufacture
13 Kakosi Co., Ltd Taiwan
14 Kohsei Multipack Vietnam Co., Ltd Japan plastic textile
15 Thanh Xuong Precision Industry Co., Ltd (Công Ty Taiwan Production of PC components
Tnhh Cn Chính Xác Thánh Xương)
16 Minda Vietnam Co., Ltd India Auto components for cars and motobike
17 Prec Vietnam Co., Ltd Japan Components for mechanicals
18 Giai Thang Co., Ltd. Taiwan Electronic components
19 Sunsco/Hanoi Japan Manufacturing and processing all kinds of steel
pipes,steel rolls; Steel product retailing and
trading
20 Minda Vietnam Automotive Company India Manufacture of auto components and parts for
cars and motorcycles;

+ Trading in components and auto parts for cars


and motorcycles;

+ Trading in materials for manufacturing


components and auto parts for cars and
motorcycles;

+ Trading in machinery and tools for


manufacturing automobile and motorcycle
components
21 Ohashi Tekko Vietnam Co., Ltd Japan Mechanical; Handling and coating metal;
Manufacturing metal products for kitchens and
cafeterias; Manufacturing civil and industrial
furniture products; Manufacturing civil electrical
goods; Manufacturing spare parts and accessories
for motor vehicles; Producing tools and tools in
construction field.
22 Prime Group Thailand Mining of germ stone and building materials,..
23 Ns Tech.Vina Co.,Ltd South Korea Production of earphones speaker diaphragram
24 Tanaka Vietnam Co., Ltd Japan Mechanical processing, metal treatment and
coating;

1123
25 Tm And Xnk Prime Co., Ltd Thailand Truck rental service f; Management consulting
services; Office management and support
services, office services; Trading agent activities;
Ofice support
26 Bc Chambard Bitumen Emulsion Jsc. France Producing and trading in asphalt emulsion
produced by the Company.
27 De Heus Co., Ltd In Vinh Phuc Netherlands Producing feed for cattle, poultry and aquatic
products.
28 Youngbag Micromotor Vietnam Co., Ltd. South Korea Manufacturing and processing electronic
components
29 Prime - Tien Phong Thailand Producing Ceramic tiles; Sublease excess offices
and factories.
30 First Rubber Co., Ltd Thailand Objectives: Manufacture, process spare parts and
accessories for motor vehicles
31 Hoa Ha Vietnam Co., Vinh Phuc Branch China Manufacturing and trading plastic productss.
32 Lx Vina Co., Ltd China Producing components for smart devices
33 Prime - Ngoi Viet Thailand + Producing roof tiles;

+ Producing Cotto bricks.


34 Inno Flex Vina Co., Ltd South Korea Manufacturing and processing electronic
components for mobile phones and other
electronic devices
35 Kyungil Optics Vietnam Co., Ltd. South Korea Manufacturing and processing electronic
components for mobile phones and other
electronic devices from IR-Filter
36 Innowave Vina Co., Ltd South Korea Manufacturing, processing, assembling electronic
components, telecommunication equipment, and
exam
37 Lien Loi Co., Ltd Taiwan Marble and Granite stone processing
38 Cdl Precision Technology (Vietnam) Co., Ltd China Electronic components for mobile phone
39 Vina Anydo Electronics Co., Ltd South Korea Electronic components for mobile phone
40 Star Engineers Vietnam Co., Ltd India Manufacturing and processing part and
components for motobike and môt vehicles
41 Cp Prime- Tien Phong Company No .: 192032000204 Thailand Granit tiles production
April 16, 2014; Msdn 2500212976 Changed For The
Second Time On February 4, 2016
42 Prime - Tien Phong Thailand High-quality ceramic tile production
43 Taipei Packing Vinh Phuc Co., Ltd. Taiwan Plastic products manufacture
44 Universal Stones Co., Ltd China Manufacturing and trading stone as buiding
materials
45 Kwang Seong Pungryuk Vina Co., Ltd. South Korea Buiding and equipment
46 Gs. Battery Vietnam Co., Ltd Japan High quality battery for cars, motobikes
47 Nagano Tech Vietnam Co., Ltd. Hong Kong non-metal processing
48 Woori & Tech Vina Co., Ltd South Korea FPCB Circuit board processing
49 Taesan Megatek Co., Ltd 100% Korean FPCB Circuit board processing
50 Hana Fb Vina Co., Ltd Korea Quoc FPCB Circuit board processing
51 Vietnam Titanium Polymer Compounds Co., Ltd. VN-Samoa-Singapore Plastic and rubber production
Joint Venture: 25-60-15
52 Svp Co., Ltd. Japan Mold production and processing
53 H&I Technology Vietnam Co., Ltd. South Korea Circuit board processing
54 Tipack Vietnam Co., Ltd South Korea Plastic products manufactures
55 Sj Electronics Vina Co., Ltd South Korea Circuit board quality control
56 Asia Recycle Prestige Jsc. (Expected) Japan Aluminum production
57 Kj Technology Vina Co., Ltd - South Korea FPCB Circuit board processing

1124
58 Credit Up 1 Vietnam Co., Ltd Taiwan Production of components for car, motobile and
moto vehicle
59 Pacific Yuel Vietnam Co., Ltd Japan Mechnical products

Joint venture: NB 475-


VN 53%
60 B&B Vina Co., Ltd South Korea Plastic products manufactures; helmet
manufacture, garment production
61 Kowa Global Co., Ltd Japan Rubber product processing
62 Vietnam Protop Safety Co., Ltd. South Korea Mechanical products for safety construction
(protection costumes, traffic notice sign,..)
63 Ft-Rf Vina Co., Ltd China: China 51-VN 49 Production of antennas, high-frequency cables
and connectors for electronic products
64 Vietnam Germany Steel Pipe Jsc Vietnam Steel pipe production
65 Dkh Minerals Jsc. Vietnam Manufacturing prefabricated steel, corrugated
iron, insulated partitions
66 Thuan Phong Co., Ltd Vietnam Tea production and processing
67 Binhxuyen Paper And Packaging Jsc. Vietnam Manufacturing carton packaging
68 Diamond Jsc. Vietnam Production of Composit roofing sheets
69 Phu Quang Jsc. Vietnam Production of mechanical products
70 Hawpro Company Vietnam Production of high-class handicraf
71 Viet Nhatinvestment And Trading Jsc Vietnam Manufacturing telecommunication cables, electric
cables and telecommunication materials
72 Viet Duc Steel Jsc Vietnam Manufacturing cold rolled steel sheets and large
steel pipes
73 Toan Thang International Jsc Vietnam Manufacturing solar water heater and PP
packaging Excess factory rental
74 Utech Vietnam Co., Ltd Vietnam Building system of warehouse and operating
office
75 Viet Duc Steel Production Jsc Vietnam Producing high quality steel and shaped steel
76 Bang Hau Co., Ltd Vietnam Manufacturing mechanical parts for trucks,
motobike and motor vehicles
77 Tuy Hoa Co., Ltd Vietnam Producing vegetable oil
78 Utech Vietnam Ltd Vietnam Construction of warehouse, cooling water,
cleaning solution,..
79 Nguyet Minh 2 Tse Co.,Ltd Vietnam Recycling of scrap metal, non-metal, industrial
waste
80 Vietnam- Germany Steel Jsc. Vietnam Manufacturing steel fabrication
81 Vinh Thanh Co., Ltd Vietnam Manufacturing and maintaning molds, spare
parts and accessories for motor vehicles.
82 Ssp Moulding Co., Ltd Vietnam Producing plastic products manufactured by the
company for the electronics industry; automobile,
motorbike and household plastic industries
83 Thanh Thang Technology Co., Ltd Vietnam Mechanical processing
84 Viet Nam Green Diamond Co.,Ltd Vietnam Production of color tiles, flat sheets and other
similar products such as partitions, colored
roofing sheets, artistic roofing tiles according to
the technology using Kura reinforced fiber
imported from Japan
85 Me Tran Binh Xuyen Co.,Ltd Vietnam Producing and supplying electric wires
manufactured by the Company for the electronics
industry and the automobile and motorbike
industry
86 Th Vinasun Fans Co.,Ltd Vietnam Production of industrial fans
87 Bh Tech Co., Ltd Vietnam
88 Pl Mechanics Co.,Ltd Vietnam Processing of steel plates and shaped steel

1125
89 Hai Thanh Viet Nam Jsc Vietnam Production of Refractory Materials Zincine
oxides and refractory materials used for cast iron
furnaces
90 Phuc Hung Building And General Trading Co.,Ltd Vietnam
91 Nguyet Minh 2 Tse Co.,Ltd Vietnam Processing and recycling of metal and non-
metallic wastes
92 Foshan.,Jsc Vietnam Production of precision molds used in ceramic tile
production
93 Loathanh E&C.,Jsc Vietnam Production of ventilation fans, wind pipe
machining and accessories
94 Minh Khoi Pro Co.,Jsc Vietnam Processing powder coating
95 Quoc Dat Trade Development And Investment Co., Ltd Vietnam Production of plastic bags and packaging
96 Phu Quang Jsc. Vietnam Production of plastic doors and steel door, office
furniture and Assembling water filtration
equipment,..
97 Green Global Trading And Production Investment Jsc. Vietnam Production of plastic bags and packaging

1126
KHAI QUANG INDUSTRIAL ZONE

GENERAL INFORMATION

Address ▪ Khai Quang Ward, Vinh Yen City, Vinh Phuc province

▪ Vinh Phuc Infrastructure Development JSC


․ Address: Khai Quang Industrial Zone, Vinh Yen City, Vinh Phuc Province
Investor
․ Tel: (84-211) 3 720 945 Fax: (84-211) 3 845 944
․ Email: idv@vpid.vn

Contact Person ▪ Mr. Nguyen Anh De – Deputy Director – (84) 983 282 399 – anhdecz@gmail.com

- Distance to center of Hanoi City: 60km


- Distance to Noi Bai Airport: 30km
Location
- Distance to Hai Phong port: 180km
- Distance to Noi Bai - Lao Cai Expressway / Hanoi - Lao Cai Railway: 10km / 5km
Electronics, precision engineering, automobile assembly,
Investment priorities Sectors
textile, cosmetics, high-class construction materials
Investment Area Investment Restricted Sectors Plating, weaving and dyeing

Minimum wage [Area 2] According to Decree 157/2018/ND-CP dated 16th November 2018

▪ Start Date: 09/2003


Lease term
▪ Ending date: 09/2052

Minimum Lease Area 5,000 m2

▪ Factory area: Average height: 2-storey; Maximum height: 5-storey


Limit for Construction Height
▪ Operation area: Average height: 5-storey
▪ Factory area: 60%
Permitted Construction Rate
▪ Operation area: 40%
▪ Total area: 216.24 ha
Planned area ▪ Total vacant leasable area: 12.63 ha
▪ Total area with full infrastructure ready to build factory: 1.19 ha

Factory Available for Rent NA

Operation Status ▪ In operation

Occupancy Rate/Number of ▪ 96%


Projects ▪ Above 84 projects

Number of Korean Projects 42 projects

Lease fee ▪ Land lease fee: 70 USD/m2

▪ Management fee: 0.35 USD/m2/year;


▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee ▪ Water fee: 12,500 VND (~0.5 USD)/m3 for production activities, 14,000 VND (~0.63 USD)/m3 for service
activities
▪ Waste water treatment fee: as quoted by supplier

INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Shinhan Bank, Maritime, VietinBank

4.4 km from Vinh Phuc Tax Department


Tax service, State finance office
5.3 km from Vinh Phuc State Treasury

1127
15 km from Vinh Phuc Customs Department
Customs Service
180km from nearest ICD

Logistics NA

Post office 4.2 km from Vinh Phuc Post Office

Medicare 5.2 km from Lac Viet Hospital

Police, public security 24/7 security service.

Universities, training facilities,


10 km from Trung Vuong University
etc.

Recruitment Support from IZ developers

Worker dormitory NA

Worker's child education


5 km from the zone
facility

One-stop service 2.8 km from public administration center

Road Width NA

Communication Infrastructure
Telecommunication systems and international standards are always ready to meet the communication needs
of industrial park

Emergency Power generator Available in the zone

Fire-fighting facility Available in the zone

Layout Plan

1128
Location Map

Actual View

LIST OF PROJECTS IN INDUSTRIAL ZONE

No. Company Name Nationality Business line


1 China Yuli Abrasive Belts - Vietnam - China Tape and sand paper production
Co.,Ltd
2 Vina Korea Co., Ltd. South Korea Garment
3 Vietnam Precision Industrial No.1 Co., Ltd. Taiwan Automobile part production
(Vpic1)
4 Shinwon Ebenezer Vietnam Co., Ltd. South Korea Garment
5 Dezen Industry Co., Ltd Taiwan Automobile part and electronic device production
6 Meisei Vietnam Co., Ltd. Japan Plastic mold production
7 Thk Vietnam Electronic Measuring China Production of: electric devices, solar equipments, truck
Equipment Co., Ltd parts, solar water heater
8 Sehwa Embroidery Vietnam Co., Ltd South Korea 3D printed embroidery products
9 Toan Hung Industry Co., Ltd. Taiwan Production of car, motobike, wheelchair components
10 Bangsun Vietnam Co., Ltd. South Korea Laundry services for garment
11 Haohsing Industry Co., Ltd. Taiwan Manufacturing and assembling purified water systems,
stainless steel water tanks; producing stainless steel
doors; producing massage machines, massage
chairs;Manufacturing, assembling and trading air chillers
by evaporation.
12 Cosmolink Vina Co., Ltd. South Korea Production of electric cable
13 Interpac Viet Nam Co,Ltd South Korea Plastic textile products

1129
14 Jin Sung Vietnam Co., Ltd. South Korea Manufacturing and trading all kinds of container
packaging
15 Kyb Vietnam Industrialco. Ltd Japan Manufacturing motorbike driving piles and processing
motorcycles and cars
16 Sun Hua Industrial Co. Ltd Taiwan Producing and processing rubber products
17 Vina-Kum Yang Co., Ltd. South Korea Garment production
18 Lam Vien Vp Industrial Company. Taiwan Car parts
19 Seoul Print Vina Co., Ltd. South Korea Garment processing
20 Phoenix Paint Manufacturing Co., Ltd Taiwan Paint manufacture and trading
21 Vietnam Daewoo Bus Co., Ltd. South Korea Manufacturing and assembling buses and bus parts,
trading bus, minibus, etc
22 Exedy Vietnam Co., Ltd. Japan Engine component production
23 Vinh Phuc Geo-Gear Industrial Company. Taiwan Items and parts for cars, motobikes,..
24 Sun Strong Way Co., Ltd. Taiwan Items and parts for cars, motobikes,..
25 Ghs Industrial Limited Company. Malaysia Manufacturing spare parts for motor vehicles;

+ Production of components for motor vehicles;

+ Processing details of components and spare parts for


motor vehicles.

+ Providing repair services for all types of sand blasting


machines;

+ Trading of spare parts and components for motor


vehicles
26 Toyo Taki Industry Vietnam Co., Ltd. Taiwan Plastic and metal product manufacturee
27 Hjc Vina Co., Ltd South Korea Helmet production and trading
28 Jahwa Vina Co., Ltd. South Korea Electronic component and devices
29 Viet Sheng Forging Industry And Industrial Taiwan Mechanical processing with automoble part and
Company. motobike accessories
30 Partron Vina Co., Ltd South Korea Mobile phone components production
31 Diamond Industry Co., Ltd. Taiwan Steel production
32 Midori Apparel Vietnam Co., Ltd; Japan Protection costume production
33 K.Source Hn Vietnam Co., Ltd. Taiwan Production and asembly of automobile part and
motobike accessories
34 Hirota Precision Vietnam Co., Ltd. (Vinh Japan Precision mechanical production and assembly of
Phuc) motobike accessories, electronic devices,..
35 J-Tech Vina Co., Ltd. South Korea Helmet production and processing
36 Hung Dea Co., Ltd. South Korea Helmet coverings
37 Hsien Yuan Technology Vietnam Co., Ltd. Taiwan Car. Motobike part production
38 Dkt Vina Co., Ltd South Korea FPCA production and trading
39 Haesung Vina Co., Ltd. South Korea Camera, lense production
40 The Pride Stc Vina Co., Ltd. South Korea Production of car seat covers, furniture covers and textile
products.
41 Wise Pacific Apparel Vn Co., Ltd South Korea Garment products
42 Okamoto Vietnam Engineering Co., Ltd. Japan Screw and menical items,..
43 Uju Vina Co., Ltd. South Korea Screw and menical items,..
44 Bhflex Vina Co., Ltd. South Korea Electronic component manufacture
45 Power Logics Vina Co., Ltd. South Korea Electronic component manufacture and mobile phone
assembly
46 Van Thong Co., Ltd. China Paper production

1130
47 Sindoh Vina Co., Ltd. South Korea Production of stationary machines amd devices
48 Trung Nguyen Foam Packing Co., Ltd. China Sponge products
49 Sup Vina Co., Ltd. South Korea Soft printed circuit boards quality control
50 Dong Woo Vina Co., Ltd South Korea Soft printed circuit boards production
51 Ch Flex Vina Co., Ltd.
52 Nuritech Vina Co., Ltd South Korea Soft printed circuit boards production
53 Amo Vina Co., Ltd; South Korea Electronic component production
54 Eunsun Vina Co., Ltd South Korea 3D printed embroidery products maufacture
55 Smart Industry Co., Ltd Sychell Metal and non-metal product treatment
56 Cp Prime Dai An Company Thailand Mining processing
57 Two-Keng Vina Co., Ltd South Korea Production of electronic components.
58 Khuon Duc Ap Luc Hamataki Co., Ltd. Taiwan Manufacture of non-ferrous metal casting molds;
Maintenance of non-ferrous metal molds
59 E-Bike Vietnam Co., Ltd China Manufacturing motorcycles and motorbikes

60 Mintech Vina Co., Ltd South Korea Processing of FPCB soft printed circuit board
61 Dae You Decal Vina Co.,Ltd South Korea Printing patterns and decoration of logos on helmets and
other objects
62 Orchem Vina Co., Ltd South Korea 2.1. Copper plating for PCB production;

2.2. Manufacture of copper plating chemicals


63 Gsr Vina Co., Ltd. South Korea Producing and processing tapes and films for mobile
phones and other electronic devices
64 Top Intercube Vina Co., Ltd South Korea Camera and camera component production
65 Sungjin Vina Co., Ltd. South Korea Processing jig jigs.
66 Jinyoung Hns Vina Co., Ltd. South Korea Supporting industry for mobile phone production
67 Dsp Tech Vina Co., Ltd South Korea Screen mask and filter device for printing industry
68 Tech Win Co., Ltd South Korea Electronic circuit boards processing Repairing,
maintaining and installing industrial machines.
69 Seyoung Electronics Vina Co., Ltd. South Korea Production of electronic components
70 Northstar Precision (Vietnam) Co., Ltd. Singapore 80.1% - Manufacturing spare parts and accessories for vehicles
Biritist Island 19.9% with engines and car engines
71 Chang Shin Vina Co., Ltd. (Expected) South Korea Manufacturing and processing electronic printed circuits
(excluding 1-layer, 2-layer printed circuits)
72 Advik Vietnam Co., Ltd India Production of components of motor and motor vehicles
73 World Ps Vina Co., Ltd. South Korea Production of film and related products
74 Daegun Daegun Co., Ltd South Korea circuit boad production and processing
75 Dai Hoa Plastic Co., Ltd Vietnam Manufacturing uPVC and HPDE plastic pipes
76 Cosmos Industrial No.1., Ltd Vietnam Production of precision mechanical products is mainly
provided to enterprises manufacturing and assembling
automobiles and motorcycles
77 Marado Cosmetic Co., Ltd Vietnam Producing cosmetics: lipstick, perfume, makeup,
shampoo, shower gel
78 Lavitec Technology Jsc. Vietnam Manufacture of printing auxiliary products (lot cleaning
solution, humidifier solution, print cleaning solution ...)
79 Tissue Linh An Co., Ltd Vietnam Production of high quality toilet paper.
80 Vinh Son Construction And Trading Jsc Vietnam Logistics services; Construction, maintenance and
maintenance of industrial park infrastructure, factory
leasing
81 Thanh Phuc Industrial Co., Ltd Vietnam Producing packaging and paper toys
82 Thanhphuc.,Jsc Vietnam Manufacturing uPVC reinforced plastic core plastic
doors, cement bricks and production, processing metal
products

1131
83 Thien My Industrial Co., Ltd Vietnam Manufacturing mechanical parts, plastic paint products,
plating
84 Inhson Construction And Trading Jsc. Vietnam Construction and sales of factories for small and medium
enterprises to hire production of supporting industries.

1132
BINH XUYEN II INDUSTRIAL ZONE

GENERAL INFORMATION

▪ Ba Hien Commune, Binh Xuyen district, Vinh Phuc province


Address
▪ Fuchuan Co., Ltd
Investor ․ Address: 2nd Floor, Block No. 11, Que Vo Industrial Zone, Van Duong Commune, Bac Ninh City
․ Tel: (84-241) 6 255 960 Fax: (84-241) 3 856 888
▪ Ms. Van Thi Hue – Marketing Executive – (84) 972 628 050 or (84-211) 3 888 608 -
Contact Person
Vanhue.fuchuan@gmail.com.
▪ Land: 15 km from Vinh Yen City, 50 km from Hanoi City, adjacent to Noi Bai - Lao Cai Highway
Location ▪ Seaport: 165 km from Cai Lan Sea port
▪ Airport: 20 km from Noi Bai Airport
Investment priorities
Electronics, Mechanics.
Sectors

Investment Area Investment Restricted


Heavy-Industry, Textile & dying, Polluting industries
Sectors

Minimum wage [Area 2] According to Decree 157/2018/ND-CP dated 16th November 2018

▪ Start Date: 2007


Lease term
▪ Ending date: 2057

Minimum Lease Area 10,000 m2

Planned area ▪ Total area: 42.21 ha

Factory Available for Rent None

Operation Status ▪ In operation

Occupancy Rate/Number of ▪ 100%


Projects ▪ 39 projects

Number of Korean Projects 30 projects

Lease fee ▪ Land lease fee: 50 – 55 USD/m2/over project life

▪ Management fee: 0.7 USD/m2/year;


▪ Infrastructure maintenance fee: 0.4 USD/m2/year
▪ Electricity fee: as regulated by the Government (see appendix)
Operating fee
▪ Water fee: 12,500 VND (~0.5 USD)/m3 for production activities, 14,000 VND (~0.63 USD)/m3 for service
activities
▪ Wastewater treatment fee: 0.5 USD/m3

INFORMATION OF INFRASTRUCTURE AND FACILITY

Financial institution Vietinbank,

2.4 km from Binh Xuyen Tax Department


Tax service, State finance office
950 m from Binh Xuyen State Treasury

Customs Service 10 km from Vinh Phuc Customs Department

Logistics NA

Post office 950 m from Binh Xuyen Post Office

1133
Medicare 3.6 km from Binh Xuyen District Medical Center

Police, public security 24/7 security service.

Universities, training facilities,


13.2 km from Trung Vuong University
etc.

Recruitment Support from IZ developers

Worker dormitory NA

Worker's child education


NA
facility

One-stop service NA

Road Width NA

Communication Infrastructure
Telecommunication systems and international standards are always ready to meet the communication needs
of industrial park

Emergency Power generator Available in the zone

Fire-fighting facility Available in the zone

Layout Plan

1134
Location Map

Actual View

LIST OF PROJECTS IN INDUSTRIAL ZONE

No. Company Name Nationality Business line


1 Inm Vina Co., Ltd Taiwan Packaging materials (tapes, PET,..) and car parts
2 Diostech Vina Co., Ltd. Number South Korea Camera lenses, voice coil motor for mobile phone
192043000231
3 Nedec Vn Co., Ltd South Korea Production of case, frame for hardware and may other
high tech products
4 Fuhua Co., Ltd., Branch Taiwan Factory construction for lease
5 Yingtong (Viet Nam) Electronic Technology China Cables, earphones
Co., Ltd
6 Ch Flex Co.,Ltd South Korea FPCB circuit board
7 Elk Dumo Vina Co., Ltd South Korea Electronic devices
8 Boulder Electronic (Viet Nam) Co.,Ltd Hong Kong Manufacture electronic transformers, power source wave
filters, electric induction coils, electric drives.
9 3e Viet Nam Electronics Co.,Ltd China Manufacturing and processing electronic components
including: bobbin, connectors;

- Producing and processing cables.

10 Kci Vina Co., Ltd South Korea Circuit boards for mobile phones and other electronic
devices.
11 Young Poong Electronic Vina Co., Ltd Circuit boards for mobile phones and other electronic
devices.
12 Tech On Viet Nam Co., Ltd South Korea Circuit boards for mobile phones
Painting and polishing products, ink,...

1135
13 Dynamix Material Science Co., Ltd Seychelles. Production of mixed rubber products.
14 Joinset Vina Co., Ltd. South Korea Electrical equipment, including: Electrical equipment for
closing circuit breakers or protecting circuits, or for
connecting or installing in electric circuits (details:
circuit breakers, relays, switches, readings) closed circuit
breakers, fuses, electrical pulse suppressors, plugs,
sockets, lamp holders and other connectors, connection
boxes), connectors for fiber optic, fiber optic or fiber
optic cables;

...
15 Gsp Hana Co., Ltd South Korea Manufacturing, processing parts of FPCB and PCB
16 Jixiang Denov Vina Co., Ltd. Korea-China: 71.16% - Manufacturing and processing (cutting, slotting, rolling,
28.84% laminating, laminating) electronic components for
mobile phones and other electronic devices
17 Sdt Vina Co., Ltd 100% Korean Manufacturing and processing FPCB circuit boards
18 El Tech Vina Co., Ltd- Vinh Phuc Branch 100% Korean Production of electronic components,
19 Final Vina Co., Ltd South Korea Manufacturing and processing electronic circuit boards
(FPCB) (excluding 1-layer, 2-layer printed circuits);

- Excess factory rental.


20 Venergy Solar Co., Ltd China Processing and assembling solar panels.
21 Kks Vina Co., Ltd South Korea Manufacturing, processing (gluing, sticking,
pressing ...): adhesive tape (tape), film for mobile phones
and other electronic devices.
22 Jy Electronics Vina Co., Ltd. (Expected) South Korea Manufacturing and processing electronic printed circuit
boards (FPCB) for mobile phones and other electronic
devices.
23 Mj Corp Vina Co., Ltd South Korea Machining (cutting, pressing) electronic components
include: electronic printed circuit board (FPCB), film for
mobile phones and other electronic devices
24 Terrasem Vina Co., Ltd South Korea Manufacturing and processing electronic printed circuits
(excluding printed circuits with 01 layers, 02 layers).
25 Sentronix Vietnam Co., Ltd. South Korea Manufacturing and processing heat sinks and integrated
circuits (IC).
26 Nft Flex Kovi Co., Ltd South Korea Processing and stamping electronic printed circuit
boards with high technical plastic form.
27 Vina Narae Electron Co.,Ltd South Korea Processing and manufacturing electronic circuit boards
28 Hanstech Vina Co., Ltd South Korea Producing and processing electronic circuit boards
(PCBs) (excluding printed circuit boards of 1 layer and 2
layers);

-
29 Asia Precision Vina Co., Ltd South Korea Manufacturing, processing and manufacturing JIG
molds, excess factory leasing; quality controlling of
circuit board
30 Dong Nam Megatek Vina Co., Ltd. South Korea + JIG mold repair;
31 Kh Electronics Vina Co., Ltd South Korea

Manufacturing electronic components; details:


Production, processing, assembly of electronic circuit
boards PCB and parts of electronic circuit boards PCB
(not including production, processing, assembly of
printed circuit boards 1 layer, 2 layers).

Processing electronic printed circuit boards (FPCB) for


mobile phones and other electronic devices (do not use
the technology to produce printed circuit boards 01
layers, 02 classes);
32 Eu-Tech Vina Co., Ltd South Korea Supporting components for mobile phone Production
33 Unielflex Vina Co., Ltd South Korea FPCB circuit board production

1136
34 Dawon Vietnam Electronics Co., Ltd. South Korea FPCB circuit board production and processing
35 Astra Visteon Vietnam Co.,Ltd Indonesia Trading of Display component for motobikes, car
36 Simon Tech Vina Co., Ltd South Korea FPCB circuit board production and processing
37 Er Vina Co., Ltd. South Korea Camera module for mobile phone production
38 Jy Vina Co.,Ltd South Korea FPCB circuit board production and processing
39 Myv Vina Project South Korea PCBs circuit board quality control

1137
DONG SOC INDUSTRIAL PARK

GENERAL INFORMATION
Address Vu Di commune, Van Xuan commune, Tu Trung town, Vinh Tuong district, Vinh Phuc province,
Vietnam.
Investors Vinh Phuc Trading Investment Co., Ltd
▪ Address: An Dinh Street, Dong Da Ward, Vinh Yen City, Vinh Phuc Province
Representative office in Hanoi: Room 506, 5th floor, Charm Vit tower, 117 Tran Duy Hung, Trung
Hoa, Cau Giay, Hanoi.
Tel: +84 24 37852348
Hotline: +84 89 889 3777
▪ Email: vpco.invest@gmail.com
▪ Website: www.vinhphucinvest.com
Contact representative Mrs. Nguyen Thi Thu Hang
Position: Deputy Director
Phone number: +84 978 581 185
Email: hangnt@vinhphucsteel.com
Location Surrounding Areas
- 50 km to Hanoi city
- 35Km to Noi Bai airport
- 176 Km to Hai Phong port
- 20Km to IC3 Interchange Noi Bai Lao Cai Expressway
- 70Km to Hanoi Hai Phong Expressway
Investment sector High technology, auxiliary technology, mechanical engineering, information technology,….

Minimum wage 4.160,000 VND/month/person


Lease term ▪ Start time: Expected 2024
▪ End time: Expected 2073
Minimum lease area 30.000m2

Height limit Factory building area: Up to 5 floors


Operating area: Up to 9 floors

Permissible building Factory building area: 70%


rate Operating area: 50%

Planned area ▪ Total area: 206,5603ha


▪ Total vacant leasable area:129,2643ha
▪ Total area with full infrastructure ready to build factory: N/A

Status In the process of clearance


Occupancy rate and N/A
number of projects in
the area
Number of Korean N/A
projects in the area
Lease cost ▪ [Land rental cost]: Expected from USD110/m2 depending on the time and each land lot.

▪ [Workshop rental cost]: N/A

1138
Deployment costs ▪ [Management cost]: expected USD0.5/m2/year
▪ Electricity cost]: According to the regulations of the State.
▪ [Water cost]: Currently, the price of the State is regulated at 15,000 VND/m3
▪ [Wastewater treatment fee]: expected: 14,500 VND/m3
▪ Waste treatment fee]: N/A

Layout map

INFRASTRUCTURE
Adjacent to Dong Soc CCN (rented to businesses: Korea Circuit Vina, Young Poong Vina; Partron Vina, GSR Vina, HJC Vina)
Within a radius of 4km: there are district health stations, banks, supermarkets, schools, commune and district People's Committees,
worker housing area (9ha).

1139
[- This Page is intentionally left blank -]

1140
YEN BAI

1141
INVESTMENT ENVIRONMENT IN YEN BAI

GENERAL INFORMATION

▪ Area: 6.892,68 km2


Area, Population
▪ Population: 842.6 million (2022 statistic)
▪ Yen Bai province is located in the Northwest region of Viet Nam, it is adjacent to the
Geographical Location Northeast
▪ 158 km from the center of Hanoi.
 To the east, it borders Tuyen Quang province and Phu Tho province
 The West borders Lai Chau province
Adjacent provinces
 To the south, it borders Son La province
 It borders Ha Giang province and Lao Cai province to the north.
2022 statistic:
▪ Real GRDP: 21.322 billion VND (9.09 billion USD)
▪ GRDP growth: 8,62%
GRDP ▪ GRDP per capita: 2024.09 USD/year
▪ Economic structure:
- Industry - Construction: 32,65%;
- Agriculture. forestry and fishery: 22,57%;
- Service: 40,50%;
2022 statistic:
Industry growth ▪ Industry - Construction growth: 13,4 %
▪ Agriculture, forestry and fishery growth: 4,96%
▪ Service growth: 7,67 %

▪ Import turnover: 0.092 billion USD


Import - Export
▪ Export turnover: 0.29 billion USD

PCI ▪ Score: 63.09 – ranked 51 out of 63 cities and provinces in Vietnam. (2021)

SOCIAL INFRASTRUCTURE

▪ Roadway: National highways 32, 37 and 70 run through the province. The Noi Bai - Lao
Cai expressway is completed as a traffic bridge of the Northwest with the Northern Delta
provinces.
Transportation ▪ Railway: the Hanoi - Yen Bai - Lao Cai railway line connects to Con Ming (China) is
upgraded
▪ Waterway: There are two main waterways, the Red River and Thac Ba Lake. The Red
River route is 115 km long, the waterway on Thac Ba Lake is 83 km long.
▪ In the province, there are 105 hydropower projects in the small hydropower development
planning, with a total installed capacity of more than 900 MW.
Electricity
▪ 25 hydroelectric plants have completed annual power generation, supplying the national
grid with more than 1.8 billion kWh/year
▪ Yen Bai has two main river systems: Thao and Chay rivers. This is a large source of
surface water for the province with a volume of tens of billions of m3 per year, providing
Water
irrigation water for agricultural, forestry and domestic production. Besides, the province
also has about 24,700 hectares of ponds and lakes

1142
▪ In 2022, the whole province has 51 more preschools and high schools recognized to meet
national standards, exceeding 31 schools, equaling 110.9% of the plan, bringing the total
Education
number of preschools and high schools recognized to meet provincial standards. to 315
schools, reaching the rate of 71.2%.

Medicare ▪ 12 hospital and 9 district medical centers

INVESTMENT CONDITION

Human resource ▪ 62% of population are in the working age (2022)

Education level ▪ Trained labor rate: 66% (2022)

▪ The minimum salary for the province is applied as follows:


- Area I, II, III, IV:
Salary
▪ The lowest wage for trained labor (including those trained by the enterprises) must be at
least 7% higher than the above referenced basic salary
▪ Incentives according to government regulations: Corporate Income Tax Law No.
32/2013/QH13; Law on Import and Export Tax No. 107/2016/QH13; Decree No. 46/2014/
Decree-CP on land rent, water surface rent exemption.
▪ Incentives from the province:
- Support 50% of the cost of ground leveling but not more than 3 billion VND/project
Investment incentives
- The province invests in the construction of infrastructure works on traffic, electricity,
water to the project fence
- For infrastructure construction and business projects, 50% of construction investment
costs shall be supported but not exceeding VND 3 billion for projects from 30 ha to
under 50 ha; no more than 5 billion VND for projects of 50 hectares or more
▪ Prioritized projects:
- Exploiting, manufacturing, processing, trading, importing and exporting all kinds of
marble, granite and other stones, stone powder...
- Exploiting and building ore, lead and zinc ore selection factories
- Invest in a factory producing wood panels and flooring for furniture production, interior
Fields Attracting Investment
decoration, construction...
- Sewing of clothing (other than fur clothing); Manufacture of knitted and crocheted
garments.
- Manufacture of garments for export; print; embroidery on garment materials
- Growing and processing tea and other agricultural products

1143
Map

Yen Bai Department of Planning and Investment


▪ Address: No. 1183, Yen Ninh Street, Yen Bai city, Yen Bai
Contact ▪ 0216.3852.409
▪ Fax: 0216.3851.626
▪ Email: sokehoachdautu@yenbai.gov.vn

1144
LIST OF INDUSTRIAL ZONES IN YEN BAI

No Industrial zone Name Total Area (ha) Occupancy Rate Status


1 South Yen Bai Industrial Zone 400 54.63% In operation
2 Minh Quan Industrial Zone 112 21.9% In operation
3 Au Lau Industrial Zone 118.35 27.14% In operation
4 North Van Yen Industrial Zone 72 44.94 % In operation

YEN BAI ’S LOCATION MAP OF INDUSTRIAL ZONES

1145
[- This Page is intentionally left blank -]

1146
1147

You might also like