Industry Linkages and

Republic of the Philippines Department:


Development Office
ILOILO SCIENCE AND TECHNOLOGY UNIVERSITY
Document
La Paz, Iloilo City QF-SIP-04
Code:
STUDENT INTERNSHIP PROGRAM EXPERIENCE Rev. No.: 04
RECORD Effective Date: November 5, 2021

For the Month of June

New City Builders Incorporated


(SIP Center)

Name: Metchel E. Tenegra Program: Civil Engineering


Year and Section: 3-A Major/Specialization: BS in Civil Engineering
SIP Supervisor: Engr. Mark Lyndon D. Brillantes Training Period: June – August
__
Date Started: June 26, 2022 Date Finished:

Time No. of Insights or


Date Activities
IN OUT Hours Learnings

Attend Tool Box


Orientation about Able to understand
Introduction of basic Safety
5 hrs &
A Activities on Site Protocols and
6:45 12:00 15
M and Proper Safety Introduction of basic
mins
Protocols to be skills in Architectural
observe on Field.
Construction.

June
Reading lay out and
26,
Site Visit on every blue print.
2023
Unit. Familiarization of
Site Inspection the building
with Engr. structure and floor
4 hrs &
P Sanchez plan.
1:00 5:30 45
M Discussion on the Gathered more
mins
importance of information on the
understanding the importance of 3M’S
business of or Money,
construction. Manpower, and
Machinery.

Site Visit to Identify Been able to


Punchlist and understand the
June A Balance of Work differences of
7:00 12:00 5 hrs
27, M Check each Units Punchlist from
2023 if what are the Balance of Work.
punchlist. Punchlist are
considered as the
Prepared by: Verified by:

Metchel E. Tenegra Engr. George Sanchez


(Student-Intern) (SIP Center Supervisor)

Reproduce form if needed. Intern must put in record activities and experiential
insights/learnings from the start of the internship until the end of internship period.
Industry Linkages and
Republic of the Philippines Department:
Development Office
ILOILO SCIENCE AND TECHNOLOGY UNIVERSITY
Document
La Paz, Iloilo City QF-SIP-04
Code:
STUDENT INTERNSHIP PROGRAM EXPERIENCE Rev. No.: 04
RECORD Effective Date: November 5, 2021

Time No. of Insights or


Date Activities
IN OUT Hours Learnings

Minor problems or
issues that should
be repaired.
Balance of Work
belong to Major
Works that involve
materials to be
estimated in such
areas.

Inspection for
Punchlist in each Recognized different
unit. provisions that
P Checking if Zocalo should comply the
1:00 6:00 5 hrs
M of every unit specific
complied with the requirements for the
required design.
measurement.

Learned the
importance and
purposes of
waterproofing,
zocalo and block-
Explored wider out.
cope of As an inspector it is
Architecture and important to check if
June Design. the required
A 5
29, 7:00 12:00 Inspection together measurement,
M hours
2023 with the Bureau of design and layout
Veritas. are being complied
according to the
Checking of
design of Architect
Punchlist
or Interior Designer.

Prepared by: Verified by:

Metchel E. Tenegra Engr. George Sanchez


(Student-Intern) (SIP Center Supervisor)

Reproduce form if needed. Intern must put in record activities and experiential
insights/learnings from the start of the internship until the end of internship period.
Industry Linkages and
Republic of the Philippines Department:
Development Office
ILOILO SCIENCE AND TECHNOLOGY UNIVERSITY
Document
La Paz, Iloilo City QF-SIP-04
Code:
STUDENT INTERNSHIP PROGRAM EXPERIENCE Rev. No.: 04
RECORD Effective Date: November 5, 2021

Time No. of Insights or


Date Activities
IN OUT Hours Learnings

Observed the
methodology of
Inspection with
inspection.
Bureau of Veritas.
As dealing with
Discussion
P people on site
1:00 6:00 5 hrs Observation on
M especially for the
how Engineers
workers it is
deal with their
important to have a
people.
strong personality.

Enhanced
Punchlist
knowledge and
-Updated the data
ideas in data
to be turned over
organization and
to PIC
A interpersonal
7:00 12:00 5 hrs Join Inspection
M communications
with Bureau of
with different people
Veritas
on site.
June
30,
2023

Continued the
activities in the Exposure to the
P morning and Architectural
1:00 6:00 5 hrs
M checked the units Design.
to be turned over Develop creative
according to the mind and interior
inspectors. designing.
Prepared by: Verified by:

Metchel E. Tenegra Engr. George Sanchez


(Student-Intern) (SIP Center Supervisor)

Reproduce form if needed. Intern must put in record activities and experiential
insights/learnings from the start of the internship until the end of internship period.
Industry Linkages and
Republic of the Philippines Department:
Development Office
ILOILO SCIENCE AND TECHNOLOGY UNIVERSITY
Document
La Paz, Iloilo City QF-SIP-04
Code:
STUDENT INTERNSHIP PROGRAM EXPERIENCE Rev. No.: 04
RECORD Effective Date: November 5, 2021

Time No. of Insights or


Date Activities
IN OUT Hours Learnings
Visit mock up room
in 3rd Floor Visiting mock up
room enhances the
knowledge of how
each unit will come
up.
Identified the fully
furnished Unit.

Prepared by: Verified by:

Metchel E. Tenegra Engr. George Sanchez


(Student-Intern) (SIP Center Supervisor)

Reproduce form if needed. Intern must put in record activities and experiential
insights/learnings from the start of the internship until the end of internship period.