B1-Final As Built

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

Ref No.

CSC/URB/00007/13/05/2015 Date: 13-05-2015

Document Transmittal
SOUQ WAQIF UNDER GROUND CAR PARKING
PARKING MANAGEMENT/PARKING GUIDANCE SYSTEM
FINAL AS-BUILT SHOP DRAWING LIST
CSD BASEMENT 1
S. DRAWING TITLE SDS Rev. DRAWING NO. REV. REMARKS
NO. No. No.
HARD AND
SOFT
1 Souq Waqif-Underground Car Park SDS- 00 UCC/KCD/SWCP- 00 1 copies
Basement– 1 (Zone 1 - OVERALL)(AS CPM- 1611/ASB/PMS/
BUILT LAYOUT) Parking Management 0056 E/
System Coordination Layout PART 1/2 B1/Z1/CSD/
2056
2 Souq Waqif-Underground Car Park SDS- 00 UCC/KCD/SWCP- 00 1 copies
Basement– 1 (Zone 1 - OVERALL)(AS CPM- 1611/ASB/PMS/
BUILT LAYOUT) Parking Management 0056 E/
System SECTION DETAILS PART 2/2 B1/Z1/CSD/
2056
3 Souq Waqif-Underground Car Park SDS- 00 UCC/KCD/SWCP- 00 1 copies
Basement– 1 (Zone 2 - OVERALL)(AS CPM- 1611/ASB/PMS/
BUILT LAYOUT) Parking Management 0061 E/
System Coordination Layout PART 1/2 B1/Z2/CSD/
2061
4 Souq Waqif-Underground Car Park SDS- 00 UCC/KCD/SWCP- 00 1 copies
Basement –1 (Zone 2 - OVERALL)(AS CPM- 1611/ASB/PMS/
BUILT LAYOUT) Parking Management 0061 E/
System SECTION DETAILS PART 2/2 B1/Z2/CSD/
2061
5 Souq Waqif-Underground Car Park SDS- 00 UCC/KCD/SWCP- 00 1 copies
Basement– 1 (Zone 3 - OVERALL)(AS CPM- 1611/ASB/PMS/
BUILT LAYOUT) Parking Management 0066 E/
System Coordination Layout PART 1/2 B1/Z3/CSD/
2066
6 Souq Waqif-Underground Car Park SDS- 00 UCC/KCD/SWCP- 00 1 copies
Basement –1 (Zone 3 - OVERALL)(AS CPM- 1611/ASB/PMS/
BUILT LAYOUT) Parking Management 0066 E/
System SECTION DETAILS PART 2/2 B1/Z3/CSD/
2066
Prepared By: Approved By:

MOHAMMAD SAJJAD YOUSUF ALLAN JOSEPH


(AutoCAD Operator) (Project Manager)