NOTE: GRADE OF CONCRETE :M25, GRADE OF STEEL :FE550,
SBC:-15.0 T/M2 AT DEPTH 1.50M,
01
GENERAL NOTES
1. DO NOT SCALE THE DRAWING. FOLLOW ONLY WRITTEN DIMENSIONS. ALL DIMENSIONS ARE
IN METERS UNLESS OTHERWISE MENTIONED.
2. CEMENT TO CONFORM TO THE SPECIFICATIONS IN I.S.8112-1982 AND OTHER RELEVANT
APPLICABLE STDS.
3. STEEL TO BE OF TESTED QUALITY. HYSD BARS OF PROOF STRESS >5000 Kg/cm² AND IN
ACCORDANCE WITH SPECIFICATIONS IN I.S. 1786-2008
4. AGGREGATES TO COMPLY WITH REQUIREMENTS OF I.S. 383-1970.
5. WATER USED FOR CONCRETING AND CURING SHALL BE IN ACCORDANCE WITH ARTICLE 4.3,
I.S. 456 - 2000
6. CEMENT CONCRETE FOR RCC WORKS IS M-25 R.M.CONCRETE OF M-25 IS TO BE USED FOR
RCC UNLESS MENTIONED OTHERWISE.
7. FABRICATION SHOULD CONFORM TO I.S.456-2000, I.S.13926, I.S.2502.
8. COVER FOR FOOTING -75 MM, ABUTMENT & PIER 40 MM, SLAB 25 MM AND
BEAM 25 MM.
9. LAPS TO BE STAGGERED & NOT MORE THAN 50% OF BARS SHALL BE SPLICED AT ONE
SECTION.
10. ADEQUATE CHAIRS, COVER BLOCKS TO BE PROVIDED FOR REINFORCEMENT.
11. DEVELOPMENT LENGTH OF 50 TIMES THE DIAMETER TO BE ADOPTED FOR ALL LAPPING.
12. PROVIDE 25MM ∅ PIN BARS BETWEEN TWO LAYERS OF BARS IN BEAM
13. CONSTRUCTION JOINTS, SHALL BE AS PER I.S. 11817.
14. THE CANTILEVERED BARS AT TOP SHALL BE ANCHORED 1.50 TIMES THE CANTILEVER
LENGTH AT THE BACK.
15. THE MAXIMUM OF THE TOP EXTRA BARS AT COLUMN SHALL BE ADOPTED FOR TWO
ADJACENT BEAMS.
16. FOUNDATION DETAILS ARE BASED ON SBC OF SOIL AS 15.00 T/M² AT A MIN 1.50 M DEPTH
BELOW NALA BED LEVEL.

370
17. THE FOUNDATION DEPTH AND SBC TO BE RECONFIRMED DURING EXECUTION.
18. THE DESIGN AND DRAWINGS TO BE APPROVED BY COMPETITIVE AUTHORITY BEFORE
EXECUTION.

APPROACH SLAB APPROACH SLAB


PROJECT NAME:
Construction of Retaining Wall on Left Side of
4000 Nigadi Devagiri MDR near Devarahubballi Matha @
Kalagatagi Constituency.

UNIT :
370

3000
370
4370

4370
RETAINING WALL RETAINING WALL MADIKOPPA BRIDGE

TITLE :

4500 4500 L-SECTION OF BRIDGE

REV. NO:
STATUS: GOOD FOR CONSTRUCTION R-0
DESIGNED:
ARC.Drg.No: SAINATH
370

/1
CHECKED:
500

500
STR.Drg.No: J.S.N
/1

LONGITUDINAL SECTION OF BOX CULVERT STRUCTURAL CONSULTANT: verified by:


JALAVAHINI MANAGEMENT SERVICES PVT. LTD.
"JALAVAHINI TECH PARK" 9th Cross, D.N.Koppa, Kelageri Road,
DHARWAD-580 008
PH :- 2775052, TELE FAX:- 0836- 2773226
BANGALORE DHARWAD STRUCTURAL ENGINEER

CLIENT: verified by:

EXECUTIVE ENGINEER
PUBLIC WORKS DEPARTMENT
DIVISION , DHARWAD
ASSISTANT ENGINEER (DESIGN)

AUTHORITY: checked by:

GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
C & B (NORTH), DHARWAD
TECHNICAL ENGINEER (DESIGN)

checked by: checked by: approved by:

EXECUTIVE ENGINEER(DESIGN)
checked by:

PROJECT NAME:
Construction of Retaining Wall on Left Side of Nigadi Devagiri MDR near Devarahubballi SUPERINTENDING ENGINEER SUPERINTENDING ENGINEER CHIEF ENGINEER
(PWP&IWTD,CIRCLE , DHARWAD) (DESIGN) C&B (N), DHARWAD
Matha @ Kalagatagi Constituency. ASSISTANT ENGINEER ASSISTANT EXECUTIVE ENGINEER EXECUTIVE ENGINEER
NOTE: GRADE OF CONCRETE :M25, GRADE OF STEEL :FE550,
SBC:-15.0 T/M2 AT DEPTH 1.50M,
02
GENERAL NOTES
1. DO NOT SCALE THE DRAWING. FOLLOW ONLY WRITTEN DIMENSIONS. ALL DIMENSIONS ARE
IN METERS UNLESS OTHERWISE MENTIONED.
2. CEMENT TO CONFORM TO THE SPECIFICATIONS IN I.S.8112-1982 AND OTHER RELEVANT
APPLICABLE STDS.
3. STEEL TO BE OF TESTED QUALITY. HYSD BARS OF PROOF STRESS >5000 Kg/cm² AND IN
ACCORDANCE WITH SPECIFICATIONS IN I.S. 1786-2008
4. AGGREGATES TO COMPLY WITH REQUIREMENTS OF I.S. 383-1970.
5. WATER USED FOR CONCRETING AND CURING SHALL BE IN ACCORDANCE WITH ARTICLE 4.3,
I.S. 456 - 2000
6. CEMENT CONCRETE FOR RCC WORKS IS M-25 R.M.CONCRETE OF M-25 IS TO BE USED FOR
RCC UNLESS MENTIONED OTHERWISE.
7. FABRICATION SHOULD CONFORM TO I.S.456-2000, I.S.13926, I.S.2502.
8. COVER FOR FOOTING -75 MM, ABUTMENT & PIER 40 MM, SLAB 25 MM AND
BEAM 25 MM.

7500
9. LAPS TO BE STAGGERED & NOT MORE THAN 50% OF BARS SHALL BE SPLICED AT ONE
SECTION.
10. ADEQUATE CHAIRS, COVER BLOCKS TO BE PROVIDED FOR REINFORCEMENT.
11. DEVELOPMENT LENGTH OF 50 TIMES THE DIAMETER TO BE ADOPTED FOR ALL LAPPING.
12. PROVIDE 25MM ∅ PIN BARS BETWEEN TWO LAYERS OF BARS IN BEAM
13. CONSTRUCTION JOINTS, SHALL BE AS PER I.S. 11817.

370
14. THE CANTILEVERED BARS AT TOP SHALL BE ANCHORED 1.50 TIMES THE CANTILEVER
LENGTH AT THE BACK.
15. THE MAXIMUM OF THE TOP EXTRA BARS AT COLUMN SHALL BE ADOPTED FOR TWO
ADJACENT BEAMS.
16. FOUNDATION DETAILS ARE BASED ON SBC OF SOIL AS 15.00 T/M² AT A MIN 1.50 M DEPTH
BELOW NALA BED LEVEL.
17. THE FOUNDATION DEPTH AND SBC TO BE RECONFIRMED DURING EXECUTION.
18. THE DESIGN AND DRAWINGS TO BE APPROVED BY COMPETITIVE AUTHORITY BEFORE
EXECUTION.

RTL :-98.375
TOP SLAB
PROJECT NAME:
Construction of Retaining Wall on Left Side of
Nigadi Devagiri MDR near Devarahubballi Matha @
Kalagatagi Constituency.

3000
UNIT :

WATER WAY MADIKOPPA BRIDGE


AHL :-98.467

370
TITLE :

NBL :-97.567 CORSS SECTION OF BRIDGE

G.L. RAFT LVL :-97.267 REV. NO:


STATUS: GOOD FOR CONSTRUCTION R-0
BOTTOM SLAB DESIGNED:
ARC.Drg.No: SAINATH
/1
CHECKED:
STR.Drg.No: J.S.N
/1

P.C.C 150MM
SAND BOULDER 300MM STRUCTURAL CONSULTANT:
JALAVAHINI MANAGEMENT SERVICES PVT. LTD.
verified by:

"JALAVAHINI TECH PARK" 9th Cross, D.N.Koppa, Kelageri Road,


DHARWAD-580 008
PH :- 2775052, TELE FAX:- 0836- 2773226

CROSS SECTION OF BOX CULVERT BANGALORE DHARWAD STRUCTURAL ENGINEER

CLIENT: verified by:

EXECUTIVE ENGINEER
PUBLIC WORKS DEPARTMENT
DIVISION , DHARWAD
ASSISTANT ENGINEER (DESIGN)

AUTHORITY: checked by:

GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
C & B (NORTH), DHARWAD
TECHNICAL ENGINEER (DESIGN)

checked by: checked by: approved by:

EXECUTIVE ENGINEER(DESIGN)
checked by:

PROJECT NAME:
Construction of Retaining Wall on Left Side of Nigadi Devagiri MDR near Devarahubballi SUPERINTENDING ENGINEER SUPERINTENDING ENGINEER CHIEF ENGINEER
(PWP&IWTD,CIRCLE , DHARWAD) (DESIGN) C&B (N), DHARWAD
Matha @ Kalagatagi Constituency. ASSISTANT ENGINEER ASSISTANT EXECUTIVE ENGINEER EXECUTIVE ENGINEER
NOTE: GRADE OF CONCRETE :M25, GRADE OF STEEL :FE550,
SBC:-15.0 T/M2 AT DEPTH 1.50M,
03
GENERAL NOTES
1. DO NOT SCALE THE DRAWING. FOLLOW ONLY WRITTEN DIMENSIONS. ALL DIMENSIONS ARE
IN METERS UNLESS OTHERWISE MENTIONED.
2. CEMENT TO CONFORM TO THE SPECIFICATIONS IN I.S.8112-1982 AND OTHER RELEVANT
APPLICABLE STDS.
3. STEEL TO BE OF TESTED QUALITY. HYSD BARS OF PROOF STRESS >5000 Kg/cm² AND IN
ACCORDANCE WITH SPECIFICATIONS IN I.S. 1786-2008
4. AGGREGATES TO COMPLY WITH REQUIREMENTS OF I.S. 383-1970.
5. WATER USED FOR CONCRETING AND CURING SHALL BE IN ACCORDANCE WITH ARTICLE 4.3,
I.S. 456 - 2000
6. CEMENT CONCRETE FOR RCC WORKS IS M-25 R.M.CONCRETE OF M-25 IS TO BE USED FOR
RCC UNLESS MENTIONED OTHERWISE.
7. FABRICATION SHOULD CONFORM TO I.S.456-2000, I.S.13926, I.S.2502.
8. COVER FOR FOOTING -75 MM, ABUTMENT & PIER 40 MM, SLAB 25 MM AND
BEAM 25 MM.

16 @ 150 mm c/c 12 @ 200 mm c/c 16 @ 150 mm c/c 9. LAPS TO BE STAGGERED & NOT MORE THAN 50% OF BARS SHALL BE SPLICED AT ONE
SECTION.
10. ADEQUATE CHAIRS, COVER BLOCKS TO BE PROVIDED FOR REINFORCEMENT.
11. DEVELOPMENT LENGTH OF 50 TIMES THE DIAMETER TO BE ADOPTED FOR ALL LAPPING.
12. PROVIDE 25MM ∅ PIN BARS BETWEEN TWO LAYERS OF BARS IN BEAM
13. CONSTRUCTION JOINTS, SHALL BE AS PER I.S. 11817.
14. THE CANTILEVERED BARS AT TOP SHALL BE ANCHORED 1.50 TIMES THE CANTILEVER
LENGTH AT THE BACK.
15. THE MAXIMUM OF THE TOP EXTRA BARS AT COLUMN SHALL BE ADOPTED FOR TWO
ADJACENT BEAMS.
16. FOUNDATION DETAILS ARE BASED ON SBC OF SOIL AS 15.00 T/M² AT A MIN 1.50 M DEPTH
BELOW NALA BED LEVEL.
17. THE FOUNDATION DEPTH AND SBC TO BE RECONFIRMED DURING EXECUTION.
18. THE DESIGN AND DRAWINGS TO BE APPROVED BY COMPETITIVE AUTHORITY BEFORE
EXECUTION.

12 @ 200 mm c/c 16 @ 150 mm c/c


12 @ 150 mm c/c
10 @ 200 mm c/c 10 @ 200 mm c/c
PROJECT NAME:
Construction of Retaining Wall on Left Side of
Nigadi Devagiri MDR near Devarahubballi Matha @
Kalagatagi Constituency.

3000
12 @ 150 mm c/c 12 @ 150 mm c/c UNIT :

MADIKOPPA BRIDGE
16 @ 150 mm c/c 4000 16 @ 150 mm c/c
16 @ 150 mm c/c 16 @ 150 mm c/c TITLE :

REINFORCEMENT DETAILS OF BRIDGE


16 @ 150 mm c/c 16 @ 150 mm c/c
16 @ 150 mm c/c 12 @ 150 mm c/c REV. NO:
STATUS: GOOD FOR CONSTRUCTION R-0
10 @ 200 mm c/c 10 @ 200 mm c/c
DESIGNED:
300 ARC.Drg.No:
/1
SAINATH
CHECKED:
STR.Drg.No: J.S.N
/1

10 mm bars
STRUCTURAL CONSULTANT: verified by:

16 @150 mm c/c 16 @ 150 mm c/c JALAVAHINI MANAGEMENT SERVICES PVT. LTD.

150
"JALAVAHINI TECH PARK" 9th Cross, D.N.Koppa, Kelageri Road,
16 @ 150 mm c/c DHARWAD-580 008
PH :- 2775052, TELE FAX:- 0836- 2773226
BANGALORE DHARWAD STRUCTURAL ENGINEER

REINFORCEMENT DETAILS OF BOX CULVERT CLIENT: verified by:

EXECUTIVE ENGINEER
PUBLIC WORKS DEPARTMENT
DIVISION , DHARWAD
ASSISTANT ENGINEER (DESIGN)

AUTHORITY: checked by:

GOVERNMENT OF KARNATAKA
PUBLIC WORKS DEPARTMENT
C & B (NORTH), DHARWAD
TECHNICAL ENGINEER (DESIGN)

checked by: checked by: approved by:

EXECUTIVE ENGINEER(DESIGN)
checked by:

PROJECT NAME:
Construction of Retaining Wall on Left Side of Nigadi Devagiri MDR near Devarahubballi SUPERINTENDING ENGINEER SUPERINTENDING ENGINEER CHIEF ENGINEER
(PWP&IWTD,CIRCLE , DHARWAD) (DESIGN) C&B (N), DHARWAD
Matha @ Kalagatagi Constituency. ASSISTANT ENGINEER ASSISTANT EXECUTIVE ENGINEER EXECUTIVE ENGINEER
NOTE: GRADE OF CONCRETE :M25, GRADE OF STEEL :FE550,
SBC:-15.0 T/M2 AT DEPTH 1.50M,
04
GENERAL NOTES
1. DO NOT SCALE THE DRAWING. FOLLOW ONLY WRITTEN DIMENSIONS. ALL DIMENSIONS ARE
IN METERS UNLESS OTHERWISE MENTIONED.

230
2. CEMENT TO CONFORM TO THE SPECIFICATIONS IN I.S.8112-1982 AND OTHER RELEVANT
APPLICABLE STDS.
3. STEEL TO BE OF TESTED QUALITY. HYSD BARS OF PROOF STRESS >5000 Kg/cm² AND IN
ACCORDANCE WITH SPECIFICATIONS IN I.S. 1786-2008
4. AGGREGATES TO COMPLY WITH REQUIREMENTS OF I.S. 383-1970.
5. WATER USED FOR CONCRETING AND CURING SHALL BE IN ACCORDANCE WITH ARTICLE 4.3,
I.S. 456 - 2000
6. CEMENT CONCRETE FOR RCC WORKS IS M-25 R.M.CONCRETE OF M-25 IS TO BE USED FOR
RCC UNLESS MENTIONED OTHERWISE.
7. FABRICATION SHOULD CONFORM TO I.S.456-2000, I.S.13926, I.S.2502.
8. COVER FOR FOOTING -75 MM, ABUTMENT & PIER 40 MM, SLAB 25 MM AND
BEAM 25 MM.
9. LAPS TO BE STAGGERED & NOT MORE THAN 50% OF BARS SHALL BE SPLICED AT ONE
SECTION.
10. ADEQUATE CHAIRS, COVER BLOCKS TO BE PROVIDED FOR REINFORCEMENT.
11. DEVELOPMENT LENGTH OF 50 TIMES THE DIAMETER TO BE ADOPTED FOR ALL LAPPING.
12. PROVIDE 25MM ∅ PIN BARS BETWEEN TWO LAYERS OF BARS IN BEAM
13. CONSTRUCTION JOINTS, SHALL BE AS PER I.S. 11817.
14. THE CANTILEVERED BARS AT TOP SHALL BE ANCHORED 1.50 TIMES THE CANTILEVER

2400
LENGTH AT THE BACK.
15. THE MAXIMUM OF THE TOP EXTRA BARS AT COLUMN SHALL BE ADOPTED FOR TWO
ADJACENT BEAMS.
16. FOUNDATION DETAILS ARE BASED ON SBC OF SOIL AS 15.00 T/M² AT A MIN 1.50 M DEPTH
BELOW NALA BED LEVEL.
17. THE FOUNDATION DEPTH AND SBC TO BE RECONFIRMED DURING EXECUTION.
18. THE DESIGN AND DRAWINGS TO BE APPROVED BY COMPETITIVE AUTHORITY BEFORE
EXECUTION.

12 @ 200 mm c/c

4370 12 @ 200 mm c/c


PROJECT NAME:
Construction of Retaining Wall on Left Side of
Nigadi Devagiri MDR near Devarahubballi Matha @
Kalagatagi Constituency.
8 @ 200 mm c/c
UNIT :

1000
MADIKOPPA BRIDGE

16 @ 200 mm c/c TITLE :

DETAILS OF RETAINING WALL

REV. NO:
STATUS: GOOD FOR CONSTRUCTION R-0

1000
DESIGNED:
ARC.Drg.No: SAINATH
/1
16 @ 100 mm c/c CHECKED:
STR.Drg.No: J.S.N
/1

1300 1450
500

500 STRUCTURAL CONSULTANT:


JALAVAHINI MANAGEMENT SERVICES PVT. LTD.
"JALAVAHINI TECH PARK" 9th Cross, D.N.Koppa, Kelageri Road,
verified by:

DHARWAD-580 008
PH :- 2775052, TELE FAX:- 0836- 2773226
BANGALORE DHARWAD STRUCTURAL ENGINEER

CLIENT: verified by:

8#@ 200 mm c/c 16#@ 150 mm c/c EXECUTIVE ENGINEER


PUBLIC WORKS DEPARTMENT
DIVISION , DHARWAD
3250 ASSISTANT ENGINEER (DESIGN)

AUTHORITY: checked by:

DETAILS OF RETAINING WALL GOVERNMENT OF KARNATAKA


PUBLIC WORKS DEPARTMENT
C & B (NORTH), DHARWAD
TECHNICAL ENGINEER (DESIGN)

checked by: checked by: approved by:

EXECUTIVE ENGINEER(DESIGN)
checked by:

PROJECT NAME:
Construction of Retaining Wall on Left Side of Nigadi Devagiri MDR near Devarahubballi SUPERINTENDING ENGINEER SUPERINTENDING ENGINEER CHIEF ENGINEER
(PWP&IWTD,CIRCLE , DHARWAD) (DESIGN) C&B (N), DHARWAD
Matha @ Kalagatagi Constituency. ASSISTANT ENGINEER ASSISTANT EXECUTIVE ENGINEER EXECUTIVE ENGINEER

You might also like