Professional Documents
Culture Documents
07 Administration Tender Drawing
07 Administration Tender Drawing
DWG. NO. DRAWING TITLES SCALE(A3) DWG. NO. DRAWING TITLES SCALE(A3)
A-003 FINISHING SCHEDULE & ROOM SPECIFICATION NTS A-404 - 406 FENCE & GATE 1:400,1:20,1:50
A-004 FINISHING SCHEDULE & ROOM SPECIFICATION NTS A-407 - 410 GUARD HOUSE 1:50,1:100
REVISION 1
PAGE
B16
A16
NORTH NORTH
INDUSTRIAL WATER
RAIN WATER
A15
B15
OUTLET
OUTLET
SSP
B19
B18
A18
B14
A14
a
F
HH N1
HH S1
G
f ENTRANCE SIGNAGE
B13
A13
g (Inform later)
B12
A12
SB7
B11
A11
SUB GATE
B10
A10
SB6
SA6
B9
A9
SA5
B8
A8
SB5
SUB GATE
B7
A7
(By ODA)
SB4
OVERHEAD TRAFFIC SIGNAGE
A6
B6
SB3
A5
SA4
B5
LANE-IN
B4
A4
OVERHEAD SIGNAGE 1
B4
SA2
A3
B3
SA1
LANE-IN
OVERHEAD SIGNAGE 2
B2
A2
h-1 h
i
B1
HH S2
HH N2
A1
H
H-1
q
STO
P
LANE - OUT
OVERHEAD LOGISTICS WAREHOUSE
SIGNAGE
ADMINISTRATION
e BUILDING
REVISION 2
PAGE
1:1500
2023.07.03 MASTER PLAN SCALE 1:3000 A-001
ELECTRICITY WASTE WATER ELECTRICAL AND INDUSTRIAL WATER RAIN WATER
TELECOM FROM WAREHOUSE TO WAREHOUSE BOUNDARY LINE FROM WAREHOUSE
WASTE WATER
INDUSTRIAL WATER SLOPE 1 : 200 SLOPE 1 : 200 SLOPE 1 : 200 SLOPE 1 : 200 SLOPE 1 : 200 SLOPE 1 : 200 SLOPE 1 : 200
RAIN WATER
SLOPE 1 : 200
SLOPE 1 : 200
SLOPE 1 : 200
1 OPEN GUTTER
WITH RC. COVER
2 RC ROAD 6 M.
SLOPE 1 : 200
GL ±0.00
3
4 9 10 11 12 14 15 16 17 18 19 20 FUTURE
CAR PARKING
SLOPE 1 : 200
5
6 21 22 23 24 25 26 27 28 29 30 31 32
7
SERVICE
8 RC ROAD 6 M.
HANDICAP
PUMP
SLOPE 1 : 200
SLOPE 1 : 200
SLOPE 1 : 200
SLOPE 1 : 200
ROOM DROP OFF-2
5,300
WALKWAY
GL+0,150
SLOPE 1 : 200 SLOPE 1 : 200 SLOPE 1 : 200 SLOPE 1 : 200 SLOPE 1 : 200 SLOPE 1 : 200
GARBAGE J.
A
DRIVER M. TOILET
TENANT TENANT SERVER ROOM ME. ROOM ME. ROOM
7,500
J.
B102 A107
TRANSFORMER 6,863
SLOPE 1 : 200
GAR-
BAGE
CUSTOMS STATION W. TOILET
B
TENANT
OFFICE M. TOILET A106 TENANT
A108
TENANT
A109
TENANT
A110 WALKWAY
7,500
BOUNDARY LINE
BOUNDARY LINE
GL+0,150
TENANT TENANT
B101
28,500
PRAYER ROOM
W. TOILET A105 SLOPE 1 : 200
C
DROP OFF-1
7,500
GL ±0.00
SLOPE 1 : 200
PRAYER
TENANT
SLOPE 1 : 200
ROOM ENTRANCE HALL
GREASE A104 D
TRAP TANK TENANT OSS
FOOD COURT TENANT A102 A101
6,000
TENANT
B103 A103
SLOPE 1 : 200 E
WALKWAY
GL+0,150
RC ROAD 6 M.
SLOPE 1 : 200
SLOPE 1 : 200
SLOPE 1 : 200
SLOPE 1 : 200
SLOPE 1 : 200
SLOPE 1 : 200
SEPTIC
TANK
SLOPE 1 : 200 SLOPE 1 : 200 SLOPE 1 : 200 SLOPE 1 : 200 SLOPE 1 : 200 WALKWAY SLOPE 1 : 200
GL+0,150
3,000 6,000
SLOPE 1 : 200
SLOPE 1 : 200
SLOPE 1 : 200
SLOPE 1 : 200
SLOPE 1 : 200
SLOPE 1 : 200
GUARD HOUSE GATE: SLIDING STEEL GATE
W/ OP. PAINTED
CONNECT TO EXISTING SEWAGE MANHOLE FENCE : CONC. BLOCK W/ STEEL W/OP. PAINTED
CONTINUE FROM EXISTING
EXISTING BOX CULVERT
CONTINUE FROM EXISTING ELECTRICAL POLE
ELECTRICAL POLE LOGO WALL: RC. WALL W/ AEP PAINTED (CLEAR COAT)
BOUNDARY LINE IN OUT
6,000 6,000 7,500 7,500 7,500 7,500 7,500 7,500 MAIN ENTRANCE
57,000
NORTH
1 2 3 4 5 6 7 8 9
LAYOUT PLAN
SCALE 1:400
REVISION 2
PAGE
RC WITH WATERPROOF
CERAMIC TILE 600 x 600
LIGHTING LIGHTING
W/DUSTPROOF PAINT
HIGH LATION (Lux on floor) COLOR TYPE
W/AEP on M-BAR
CERAMIC TILE
on M-BAR
STAINLESS
H (mm.)
N/A
F1 F2 F3 F4 F5 F6 F7 W1 W2 W3 W4 W5 W6 W7 C1 C2 C3 C4 C5
1F ADMINISTRATION BUILDING
(A) ENTRANCE HALL 8,000 * 500 4000K DW -
* A/C SUPPLY - JET NOZZLE DIFFUSER TYPE
CORRIDOR-A1 3,000 500 4000K DW -
(B) TENANT B101 - B103 3,000 500 4500K RECESS TYPE 100
2F ADMINISTRATION BUILDING
(A) HALL & CORRIDOR-A2 3,000 500 4000K DW 100
TOILET-A2 (M), (W), JANITOR 2,700 N/A 200 4000K DW - * * WALL WATERPROOF COATING H=2,000 mm.
PANTRY-A2 2,700 200 4000K DW - *
CO-WORKING SPACE 3,000 500 4000K DW 100
REMARK : NEED TO SUBMIT LIGHTING LUX CALCULATION DOCUMENTS FOR EACH ROOMS BEFORE THE ORDER AND INSTALLATION.
REVISION 1
PAGE
INTERIOR SCHEDULE & ROOM SPECIFICATION
2023 / 03 / 07 ( REFERENCE ) SCALE NTS A-003
INTERIOR FINISHING SCHEDULE
RC WITH WATERPROOF
CERAMIC TILE 600 x 600
LIGHTING LIGHTING
W/DUSTPROOF PAINT
HIGH LATION (Lux on floor) COLOR TYPE
W/AEP on M-BAR
CERAMIC TILE
on M-BAR
STAINLESS
H (mm.)
N/A
F1 F2 F3 F4 F5 F6 F7 W1 W2 W3 W4 W5 W6 W7 C1 C2 C3 C4 C5
2F ADMINISTRATION BUILDING
BALCONY AREA-1 3,000 N/A N/A 300 4000K DW (WP) -
BALCONY AREA-2 EXPOSED N/A N/A 300 4000K LED LAMP (WP) -
(OUTDOOR TYPE)
TOILET-B2 (M), (W) 2,700 200 4000K DW - * * WALL WATERPROOF COATING H=2,000 mm.
KITCHEN ROOM 2,700 300 4000K V-SHAPE 100 * * * WALL WATERPROOF COATING H=2,000 mm.
STAFF TOILET-B2 2,700 N/A 200 4000K DW - * * * WALL WATERPROOF COATING H=2,000 mm.
REMARK : NEED TO SUBMIT LIGHTING LUX CALCULATION DOCUMENTS FOR EACH ROOMS BEFORE THE ORDER AND INSTALLATION.
GATE BUILDING SIGNAGE WALL RC. WALL t=150 mm., PLASTERING W/ AEP PAINTED (CLEAR COAT PAINT) ROOF ROOF ALUZINC STEEL SHEET (V-600) t=0.5 mm., TEMPER GLASS W/ ALUMINIUM FRAME
GATE SLIDING STEEL GATE W/ OP. ROOF INSULATION GLASSWOOL t50(24K) W/ ALUMINIUM FOIL W/ WIRE MESH
MAN DOOR SLIDING STEEL DOOR W/ OP. ROOF GUTTER RC. GUTTER W/POLYRETHANE COATING t=2 mm. WITH ROOF DRAIN
FENCE FENCE H300 mm. CONCRETE BLOCK t=90 mm., PLASTERING W/ OP. W/STEEL FENCE W/ OP. RC. ROOF & WATERPROOF RC. SLAB W/ POLYURETHANE COATING t=2 mm.
ROAD INTERNAL ROAD RC. ROAD WITH TRAFFIC PAINT DOWNSPOUT GALVANIZED STEEL PIPE W/ PAINT
ROAD GUTTER STEEL COVER / RC. COVER ON RC. GUTTER SERVICE STAIR STEEL LADDER W/ OP.
WALKWAY INTERLOCKING BLOCK PAVING DROP OFF 1 CANOPY ROOF ALUMINIUM CLADDING
CURB RC. CURB WITH TRAFFIC PAINT CANOPY GUTTER GALVANIZED STEEL W/ PAINT
CAR PARKING RC. ROAD WITH TRAFFIC PAINT, CONCRETE WHEEL STOPPER LIGHTING LED DOWNLIGHT (WP)
GENERATOR FLOOR CONCRETE STEEL TROWEL W/DUSTPROOF PAINT FLOOR CERAMIC TILE 600X600
ROOM WALL RC. WALL t=100 mm., PLASTERING W/ AEP PAINTED (CLEAR COAT PAINT) DROP OFF 2 CANOPY ROOF ALUMINIUM CLADDING, ALUZINC STEEL SHEET (V-600) t=0.5 mm.
OPENING STEEL DOOR W/ OP., ALU. GRILLE WINDOW CANOPY GUTTER GALVANIZED STEEL W/ PAINT
ROOF & GUTTER RC. ROOF & GUTTER W/POLYRETHANE COATING t=2 mm. LIGHTING LED DOWNLIGHT (WP)
GUARDHOUSE FLOOR CONCRETE STEEL TROWEL W/DUSTPROOF PAINT FLOOR INTERLOCKING BLOCK PAVING
WALL RC. WALL t=100 mm., PLASTERING W/ AEP PAINTED (CLEAR COAT PAINT) LOUVER EXTERNAL LOUVER PRECAST CONCRETE LOUVER, PLASTERING W/ AEP PAINTED (CLEAR COAT PAINT)
OPENING STEEL DOOR W/ OP., ALU. WINDOW W/ CLEAR GLASS WITH SAFETY FILM
ROOF ALUZINC STL. SHT. ROOFING V-750 t = 0.5 mm., ALUMINIUM COMPOSITE (SLIVER) WALL EXTERNAL WALL RC. WALL t=180 mm., PLASTERING W/ AEP PAINTED (CLEAR COAT PAINT)
GUTTER GALVANIZE STEEL GUTTER WITH ROOF DRAIN OPENING ALU. WINDOW W/ LAMINATED GLASS
LANDSCAPE LANDSCAPE LAWN, SHRUB, TREE AND HARDSCAPE ALU. DOOR W/ LAMINATED GLASS
ALUMINIUM GRILLE
REVISION 1
PAGE
INTERIOR SCHEDULE & ROOM SPECIFICATION
2023 / 03 / 07 ( REFERENCE ) SCALE NTS A-004
A
CANOPY LINE ABOVE
A-202
SLOPE 1 : 200
SLOPE 1 : 200
SLOPE 1 : 200
SLOPE 1 : 200
DROP-OFF 2
GL ±00
GL +0.150 BACONY LINE ABOVE
SLOPE 1 : 200 SLOPE 1 : 200 SLOPE 1 : 200 SLOPE 1 : 200 SLOPE 1 : 200 SLOPE 1 : 200
7,500
2 SQ.M. CH=1FL+3,000 19 SQ.M. 20 SQ.M.
B102 A107 64 SQ.M.
70 SQ.M. 57 SQ.M. HANDICAP
GARBAGE WAITER
DUMB
TOILET-A1
ROOM-B1 6 SQ.M.
5 SQ.M.SERVICE
ROOM
5 SQ.M. M. TOILET-A1
14 SQ.M. B
TENANT- TENANT-A108 TENANT-A109 TENANT-A110
(SERVICE OFFICE) (BANK) (BANK)
CORRIDOR-A1
A106 WASHING AREA-A1
CORRIDOR-B1
7,500
JANITOR- 8 SQ.M. TENANT-
B1 B101
1 SQ.M. 75 SQ.M. TENANT- PRAYER ROOM-A1
W. TOILET- COURTYARD A105 24 SQ.M.
203 SQ.M. 30 SQ.M.
28,500
1 B1 1FL -0.150 SLOPE 1 : 200
A-201 9 SQ.M. GL +0.150 CANOPY LINE ABOVE
C
HANDICAP
TOILET-B1 CORRIDOR-A1
5 SQ.M. 1FL ±00 OUT
WASHING CH=1FL+3,000
AREA-B1 CORRIDOR-B1 148 SQ.M.
7,500
6 SQ.M. 1FL ±00
CH=1FL+3,000 DROP-OFF 1
38 SQ.M. IN GL ±00
PRAYER ROOM-B1 ENTRANCE HALL
16 SQ.M. STR-B1 UP TENANT- 1FL ±00=GL+0.300 METAL
DETECTOR
CH=1FL+7,000 GL +0.150
X-RAY
A104 D
36 SQ.M. 148 SQ.M.
TENANT- OSS OFFICE-
FOOD COURT TENANT-B103 TENANT- A102 A101
6,000
39 SQ.M. 42 SQ.M. A103 80 SQ.M. 80 SQ.M.
36 SQ.M. STR-A1 UP
SLOPE
E 1 : 200
SLOPE 1 : 200
SLOPE 1 : 200
SLOPE 1 : 200
6,000 6,000 7,500 7,500 7,500 7,500 7,500 7,500
57,000
SLOPE 1 : 200 SLOPE 1 : 200 SLOPE 1 : 200 SLOPE 1 : 200 SLOPE 1 : 200 SLOPE 1 : 200
1 2 3 4 5 6 7 8 9
REVISION 1
PAGE
SLOPE 1:20
5,550
BACONY LINE
SERVICE DOOR LOUVER LINE SERVICE DOOR
SERVICE LADDER
BALCONY AREA-1
54 SQ.M. A
STR-A2
DOWN
M. TOILET-A2
STEEL HANDRAIL H=1,100 mm. 16 SQ.M. STORAGE-A2
M. LOCKER- 5 SQ.M.
A1
3 SQ.M.
CORRIDOR-A3
SINK
7,500
KITCHEN ROOM
9 SQ.M.
MD/GUEST MEETING ROOM-1 MEETING ROOM-2 WASH STORAGE-
STAFF TOILET-B2 DUMB 93 SQ.M. ROOM (10P) (8P) AREA-A2 A3
4 SQ.M. WAITER 22 SQ.M. 23 SQ.M. 24 SQ.M. 4 SQ.M. 30 SQ.M. W. TOILET-A2
VOID 12 SQ.M.
W. LOCKER- JANITOR-
A2
A1 2 SQ.M.PANTRY-A2
W. TOILET-B2 3 SQ.M. 2 SQ.M. MULTI-PURPOSE ROOM
4 SQ.M.
1FL+4,000 B
STORAGE-A4 CH=2FL+3,000
M. TOILET-B2 7 SQ.M. (140P) 160 SQ.M.
CORRIDOR-A2
6 SQ.M.
PRINT AREA-A1
7,500
7 SQ.M.
FIX DESK FREE
(32P) ADDRESS W
28,500
1 VOID CH=2FL+3,000
A-201 212 SQ.M. C
JAPANESE RESTAURANT RECEPTION AREA CORRIDOR-A2
1FL+4,000
224 SQ.M. 67 SQ.M.
MD. MANAGER (4P)
HALL
8,000
1FL+4,000
7,500
GLASS HANDRAIL H=1,100 mm.
CH=2FL+3,000 SLOPE 1:20
PHONE BOOTH
6 SQ.M.
INDIVIDUAL
DOWN VOID
MEETING FREE ADDRESS D
MEETING
MEETING ROOM-4
SHARED OFFICE
ROOM-1 (4 P) 6,875
(6 P) 9 SQ.M.
11 SQ.M. CO-WORKING ROOM
6,000
STR-A1
1FL+4,000
CH=2FL+3,000
MEETING ROOM-5 162 SQ.M. SHARED OFFICE
ROOM-2 (6 P)
STEEL HANDRAIL H=1,100 mm.
(4 P) OPEN MEETING 13 SQ.M.
12 SQ.M.
E
BALCONY AREA-2 165 SQ.M.
LOUVER LINE
BACONY LINE
REVISION 1
PAGE
1,750
RD RD RD RD A
RC. WALL W/TEXTURE
PAINTED (LIGHT GRAY)
FL+8,250
7,500
ZAM STEEL SHEET GUTTER t=0.1 mm. ON STEEL
FRAME W/PAINT
RD RD RD
RD RD B
7,500
RC. SLAB W/WATERPROOF
A
28,500
A-201
C
RC. GUTTER
7,500
RC. GUTTER
RD RD D
250
5,500
6,000
SIGNAGE: 2K COLOR
COATING ON SUS.
LETTER BOX t=100 mm.
250
1,750
RD RD RD RD
1,000 5,500 1,000
RC. GUTTER
TEMPERED GLASS 8mm.+8mm. ALUZINC STL. SHEET V-600 t=0.5 mm. W/GLASSWOOL t50 SIGNAGE: 2K COLOR COATING ON
WITH FILM (24K) ALUMINUM FOIL + WIREMESH SUS. LETTER BOX t=100 mm.
6,000 6,000 7,500 7,500 7,500 7,500 7,500 7,500
1,750 57,000 1,750
1 2 3 4 5 6 7 8 9
ROOF PLAN
SCALE 1:200
REVISION 1
PAGE
7,500
PANTRY-A1
F3
B102 A107
GARBAGE WAITER
ROOM-B1
DUMB
F4 F4 HANDICAP
F3
SERVICE F3 TOILET-A1
F1 ROOM
F1 M. TOILET-A1
B
CORRIDOR-A1
TENANT-
CORRIDOR-B1
7,500
JANITOR- F4 F4 F4 F4
B1 TENANT-
TENANT- PRAYER ROOM-A1
W. TOILET- B101 COURTYARD
A105
28,500
B1 F4 SLOPE 1 : 200
F4
F3 CANOPY LINE ABOVE
C
HANDICAP
F3
TOILET-B1 CORRIDOR-A1
OUT
F4
WASHING
7,500
AREA-B1 CORRIDOR-B1 F4
DROP-OFF 1
IN
PRAYER ROOM-B1 F4
STR-B1
F4 UP TENANT- ENTRANCE HALL
METAL
DETECTOR
X-RAY
A104 D
F4
TENANT- OSS OFFICE-
FOOD COURT TENANT-B103 TENANT- A102 A101
6,000
F4 F4 A103 F4 F4
STR-A1
F4 UP
SLOPE
E 1 : 200
1 2 3 4 5 6 7 8 9
F6 RC. WITH WATERPROOF (PU. t=2 mm.) F7 FLAMED FINISHING GRANITE STONE,
LAWN
REVISION 1
PAGE
SLOPE 1:20
BACONY LINE
SERVICE DOOR LOUVER LINE SERVICE DOOR
SERVICE LADDER
BALCONY AREA-1 F3 F6 F7
A
STR-A2
DOWN
M. TOILET-A2
STORAGE-A2
STEEL HANDRAIL H=1,100 mm.
M. LOCKER-A1 F3
F4 F4
CORRIDOR-A3
SINK
7,500
KITCHEN ROOM MD/GUEST MEETING ROOM-1 MEETING ROOM-2
STAFF TOILET-B2 WASH STORAGE-
DUMB F3 F6 ROOM (10P) (8P) AREA-A2 A3
WAITER F3 W. TOILET-A2
F3 VOID F4 F4 F4 F4 F3 JANITOR-
W. LOCKER-A1 PANTRY-A2
A2
W. TOILET-B2 F3 F4 F3 F4 MULTI-PURPOSE ROOM B
STORAGE-A4 F4
M. TOILET-B2 F3 F4
CORRIDOR-A2
PRINT AREA-A1
F4
7,500
FIX DESK FREE
(32P) ADDRESS W
28,500
VOID F4
C
JAPANESE RESTAURANT RECEPTION AREA CORRIDOR-A2
F4 MD. MANAGER (4P)
HALL F4
7,500
GLASS HANDRAIL H=1,100 mm. SLOPE 1:20
PHONE BOOTH
INDIVIDUAL
DOWN VOID
MEETING FREE ADDRESS D
MEETING SHARED OFFICE
MEETING ROOM-4 ROOM-1 (4 P)
(6 P)
F4
F4 CO-WORKING ROOM
6,000
STR-A1
F4
MEETING ROOM-5 SHARED OFFICE
ROOM-2 (6 P)
F3
STEEL HANDRAIL H=1,100 mm.
(4 P) OPEN MEETING
F4
F4 E
BALCONY AREA-2
F1 F6
LOUVER LINE
BACONY LINE
1 2 3 4 5 6 7 8 9
F6 RC. WITH WATERPROOF (PU. t=2 mm.) F7 FLAMED FINISHING GRANITE STONE,
LAWN
REVISION 1
PAGE
7,500
PANTRY-A1
B102 A107
GARBAGE WAITER
ROOM-B1
DUMB
HANDICAP
SERVICE TOILET-A1
ROOM
M. TOILET-A1
B
CORRIDOR-A1
TENANT-
CORRIDOR-B1
7,500
JANITOR-
B1 TENANT-
TENANT- PRAYER ROOM-A1
W. TOILET- B101 COURTYARD
A105
28,500
B1 SLOPE 1 : 200
CANOPY LINE ABOVE
C
HANDICAP
TOILET-B1 CORRIDOR-A1
OUT
WASHING
7,500
AREA-B1 CORRIDOR-B1
DROP-OFF 1
IN
PRAYER ROOM-B1
STR-B1 UP TENANT- ENTRANCE HALL
METAL
DETECTOR
X-RAY
A104 D
6,000
A103
STR-A1 UP
SLOPE
E 1 : 200
1 2 3 4 5 6 7 8 9
REVISION 1
PAGE
SLOPE 1:20
BACONY LINE
SERVICE DOOR LOUVER LINE SERVICE DOOR
SERVICE LADDER
BALCONY AREA-1
A
STR-A2
DOWN
M. TOILET-A2
STEEL HANDRAIL H=1,100 mm.
M. LOCKER-A1 STORAGE-A2
CORRIDOR-A3
SINK
7,500
KITCHEN ROOM MD/GUEST MEETING ROOM-1 MEETING ROOM-2
STAFF TOILET-B2 WASH STORAGE-
DUMB ROOM (10P) (8P) AREA-A2 A3
WAITER W. TOILET-A2
VOID
JANITOR-
W. LOCKER-A1 A2 PANTRY-A2
W. TOILET-B2 MULTI-PURPOSE ROOM B
STORAGE-A4
M. TOILET-B2
CORRIDOR-A2
PRINT AREA-A1
7,500
FIX DESK FREE
(32P) ADDRESS W
28,500
VOID
C
JAPANESE RESTAURANT RECEPTION AREA CORRIDOR-A2
7,500
GLASS HANDRAIL H=1,100 mm. SLOPE 1:20
PHONE BOOTH
INDIVIDUAL
DOWN VOID
MEETING FREE ADDRESS D
MEETING SHARED OFFICE
MEETING ROOM-4 ROOM-1 (4 P)
(6 P)
CO-WORKING ROOM
6,000
STR-A1
E
BALCONY AREA-2
LOUVER LINE
BACONY LINE
1 2 3 4 5 6 7 8 9
REVISION 1
PAGE
7,500
PANTRY-A1
B102 A107
GARBAGE WAITER
ROOM-B1
DUMB
HANDICAP
SERVICE TOILET-A1
ROOM
M. TOILET-A1
B
CORRIDOR-A1
TENANT-
CORRIDOR-B1
7,500
JANITOR-
B1 TENANT-
TENANT- PRAYER ROOM-A1
W. TOILET- B101 COURTYARD
A105
28,500
B1 SLOPE 1 : 200
CANOPY LINE ABOVE
C
HANDICAP
TOILET-B1 CORRIDOR-A1
OUT
WASHING
7,500
AREA-B1 CORRIDOR-B1
DROP-OFF 1
IN
PRAYER ROOM-B1
STR-B1 UP TENANT- ENTRANCE HALL
METAL
DETECTOR
X-RAY
A104 D
6,000
A103
STR-A1 UP
SLOPE
E 1 : 200
1 2 3 4 5 6 7 8 9
REVISION 1
PAGE
SLOPE 1:20
BACONY LINE
SERVICE DOOR LOUVER LINE SERVICE DOOR
SERVICE LADDER
BALCONY AREA-1
A
STR-A2
DOWN
M. TOILET-A2
STEEL HANDRAIL H=1,100 mm.
M. LOCKER-A1 STORAGE-A2
CORRIDOR-A3
SINK
7,500
KITCHEN ROOM MD/GUEST MEETING ROOM-1 MEETING ROOM-2
STAFF TOILET-B2 WASH STORAGE-
DUMB ROOM (10P) (8P) AREA-A2 A3
WAITER W. TOILET-A2
VOID
JANITOR-
W. LOCKER-A1 A2 PANTRY-A2
W. TOILET-B2 MULTI-PURPOSE ROOM B
STORAGE-A4
M. TOILET-B2
CORRIDOR-A2
PRINT AREA-A1
7,500
FIX DESK FREE
(32P) ADDRESS W
28,500
VOID
C
JAPANESE RESTAURANT RECEPTION AREA CORRIDOR-A2
7,500
GLASS HANDRAIL H=1,100 mm. SLOPE 1:20
PHONE BOOTH
INDIVIDUAL
DOWN VOID
MEETING FREE ADDRESS D
MEETING SHARED OFFICE
MEETING ROOM-4 ROOM-1 (4 P)
(6 P)
CO-WORKING ROOM
6,000
STR-A1
E
BALCONY AREA-2
LOUVER LINE
BACONY LINE
1 2 3 4 5 6 7 8 9
REVISION 1
PAGE
7,500
C4 C5 C5
B102 A107 C3
HANDICAP
GARBAGE WAITER
DUMB
C3 C3 TOILET-A1
ROOM-B1 C4
SERVICE
C4 ROOM
C1 M. TOILET-A1
C4 B
CORRIDOR-A1
TENANT- WASHING AREA-A1
CORRIDOR-B1
7,500
JANITOR- C4 C3 C3 C3
B1 TENANT-
TENANT- PRAYER ROOM-A1
W. TOILET- B101 COURTYARD
A105 C1
28,500
B1 C3 SLOPE 1 : 200
C4 C3 CANOPY LINE ABOVE
C
HANDICAP
TOILET-B1 CORRIDOR-A1
C4
WASHING C1 OUT
AREA-B1
7,500
C4 CORRIDOR-B1 C1
DROP-OFF 1
IN
PRAYER ROOM-B1
STR-B1
C1 UP TENANT- ENTRANCE HALL
METAL
DETECTOR
X-RAY
A104 D
C3
TENANT- OSS OFFICE-
FOOD COURT TENANT-B103 TENANT- A102 A101
6,000
C1 C3
A103 C3 C3
C3 STR-A1 UP
SLOPE
E 1 : 200
1 2 3 4 5 6 7 8 9
REVISION 1
PAGE
SLOPE 1:20
BACONY LINE
SERVICE DOOR LOUVER LINE SERVICE DOOR
SERVICE LADDER
BALCONY AREA-1 C4
A
STR-A2
DOWN
M. TOILET-A2
STORAGE-A2
CORRIDOR-A3
STEEL HANDRAIL H=1,100 mm.
M. LOCKER-A1 C4
SINK C1 C1
7,500
KITCHEN ROOM MD/GUEST MEETING ROOM-1 MEETING ROOM-2
STAFF TOILET-B2 WASH STORAGE-
DUMB C4 ROOM (10P) (8P) AREA-A2 A3
WAITER W. TOILET-A2
C4 VOID C2 C2 C2 C4 C1 C4 JANITOR-
W. LOCKER-A1 PANTRY-A2
A2
W. TOILET-B2 C4 C1 C4 MULTI-PURPOSE ROOM B
STORAGE-A4 C2
M. TOILET-B2 C4 C1
CORRIDOR-A2
PRINT AREA-A1
C2
7,500
FIX DESK FREE
(32P) ADDRESS W
28,500
VOID C2 C2
C
JAPANESE RESTAURANT RECEPTION AREA CORRIDOR-A2
C1 C1
MD. MANAGER (4P)
HALL
7,500
C1
GLASS HANDRAIL H=1,100 mm. SLOPE 1:20
PHONE BOOTH
INDIVIDUAL
DOWN VOID
MEETING FREE ADDRESS D
MEETING SHARED OFFICE C1
MEETING ROOM-4 ROOM-1 (4 P)
(6 P)
C2
C2 CO-WORKING ROOM
6,000
STR-A1
C2
MEETING ROOM-5 SHARED OFFICE
STEEL HANDRAIL H=1,100 mm.
(4 P) OPEN MEETING ROOM-2 (6 P)
C2
C2 E
BALCONY AREA-2
C5
LOUVER LINE
BACONY LINE
1 2 3 4 5 6 7 8 9
REVISION 1
PAGE
2,400
SLOPE 3%
RC. WALL W/TEXTURE SLOPE 3% OVERFLOW ROOF SLAB
PAINTED (LIGHT GRAY) SLOPE 250 300
SLOPE FL.+8,250
350
PC PANEL W/EP PAINTED
(BEIGE) RC. WALL W/TEXTURE
4,250
PAINTED (LIGHT GRAY)
CH=3,000
4,450
10,650
RC SLAB MUL TI-PURPOSE ROOM
W/WATERPROOF CORRIDOR-A2 2F
1,100
1FL+4,000 1FL+4,000 FL.+4,000
SLOPE SLOPE
DOWN SPOUT GALVANIZE STEEL .Ø100 mm. DOWN SPOUT GALVANIZE STEEL .Ø100 mm.
4,000
CH=3,000
CH=3,000
W/ WHITE PAINTED W/ WHITE PAINTED
INTERLOCKING BLOCK TENANT-A110 INTERLOCKING BLOCK
ENTRANCE HALL OPEN (BANK) M&E ROOM-1 1F
1,100
WALKWAY FL+0.00 FL+0.00 FL-50 WALKWAY
GL+150 SLOPE SLOPE GL+150 ROAD FL.±0.00
300
GL±0.00
STAIR
WIDTH
1,500
2,400
ROOF SLAB
SLOPE SLOPE FL.+8,250
Service ladder
Steel w/OP
4,250
STEEL HANDRAIL WITH OP. PAINTED
CH=3,000
CH=3,000
CH=3,000
10,650
OPEN
RESTAURANT BSEZ OFFICE RECEPTION CORRIDOR-A2 2F
1,100
200
450
STEEL .Ø100 mm.
4,000
CANOPY ALUMINUM COMPOSIT
CH=3,000
CH=3,000
CH=3,000
W/ WHITE PAINTED
3,000
CH=2,950
DROP OFF-1
INTERLOCKING BLOCK OPEN OPEN
TOILET-B1(H) TENANT-B101 CORRIDOR-A1 ENTRANCE HALL 1F
WALKWAY FL+0.00 FL+0.00 COURT YARD FL+0.00 FL+0.00 WALKWAY
GL+150 SLOPE CORRIDOR-B1
FL+0.00 FL-150 SLOPEGL+150 ROAD FL.±0.00
300
GL±0.00
1 2 3 4 5 6 7 8 9 SECTION 1
SCALE 1:200
REVISION 1
PAGE
700 700
2,400
1,000
ROOF SLAB
FL.+8,250
4,250
6,300
2,950
1F WALKWAY
FL.±0.00 ROAD GL+150
300
GL±0.00
1 2 3 4 5 6 7 8 9
ELEVATION A
SCALE 1:200
STEEL LADDER W/ OP. PC. PANEL W/EP PAINTED (BEIGE) ACRYLIC W/LED. BACK LIGHT
700 700
2,400
1,000
ROOF SLAB
FL.+8,250
DOWN SPOUT GALVANIZE STEEL
Ø100 mm. W/ WHITE PAINTED
4,250
10,650
ALUMINIUM COMPOSITE
2F BLACK COLOR RC. SLAB W/WATERPROOF
FL.+4,000
5,300
4,000
3,000
1F WALKWAY
FL.±0.00 ROAD GL+150
300
GL±0.00
A B C D E
ELEVATION B
SCALE 1:200
REVISION 1
PAGE
TOP PARAPET
FL.+10,650
2,400
ROOF SLAB
FL.+8,250
DOWN SPOUT GALVANIZE
STEEL Ø100 mm. W/ WHITE
PAINTED
4,250
ALUMINIUM COMPOSITE
10,650
6,300
2,950
1F WALKWAY
FL.±0.00 ROAD GL+150
300
GL±0.00
9 8 7 6 5 4 3 2 1
ELEVATION C
SCALE 1:200
PC. PANEL W/EP PAINTED RC. WALL W/TEXTURE STEEL LADDER W/ OP.
(BEIGE) PAINTED (LIGHT GRAY)
TOP PARAPET
FL.+10,650
2,400
ROOF SLAB
FL.+8,250
DOWN SPOUT GALVANIZE STEEL
Ø100 mm. W/ WHITE PAINTED
4,250
10,650
8,000
2,950
1F WALKWAY
FL.±0.00 ROAD GL+150
300
GL±0.00
E D C B A
ELEVATION D
SCALE 1:200
REVISION 1
PAGE
DROP-OFF 2
GL ±00
GL +0.150 BACONY LINE ABOVE
SD 02 SD 03 LSD 02 SD 02 SD 03 SD 04 SD 01 SD 01
7,500
2 SQ.M.LSD 02 CH=1FL+3,000 19 SQ.M. 20 SQ.M.
SD 03 B102 GD 02 GD 02 A107 64 SQ.M.
70 SQ.M. 57 SQ.M. HANDICAP
GARBAGE WAITER
DUMB
TOILET-A1 SL 01
ROOM-B1 6 SQ.M.
SD 03 5 SQ.M.SERVICE
ROOM
5 SQ.M. M. TOILET-A1
14 SQ.M. LSD 01 B
SD 02 SD 02 GD 03 TENANT-A108 TENANT-A109 TENANT-A110
TENANT-
WASHING AREA-A1 LSD 02 (SERVICE OFFICE) (BANK) (BANK)
CORRIDOR-A1
A106
CORRIDOR-B1
7,500
JANITOR- 8 SQ.M. LSD 01 TENANT- GD 02
B1 B101
1 SQ.M. 75 SQ.M. TENANT- PRAYER ROOM-A1
LSD 02 W. TOILET- COURTYARD A105 24 SQ.M.
203 SQ.M. 30 SQ.M.
28,500
B1 1FL -0.150 GD 03
9 SQ.M. LSD 01 GL +0.150 CANOPY LINE ABOVE
C
HANDICAP
TOILET-B1 SL 01 CORRIDOR-A1 GD 02 GD 02 GD 02
5 SQ.M. GD 04 1FL ±00 OUT
WASHING CH=1FL+3,000
AREA-B1 LSD 02 CORRIDOR-B1 148 SQ.M.
7,500
1FL ±00 GD 03 GD 01
6 SQ.M. CH=1FL+3,000 DROP-OFF 1
38 SQ.M. GD 03
IN GL ±00
PRAYER ROOM-B1 GD 02 GD 02 GD 02 ENTRANCE HALL
16 SQ.M. STR-B1 UP TENANT- 1FL ±00=GL+0.300 METAL
DETECTOR
CH=1FL+7,000 GL +0.150
X-RAY
A104 D
36 SQ.M. 148 SQ.M.
TENANT- OSS OFFICE-
FOOD COURT TENANT-B103 TENANT- A102 A101
6,000
39 SQ.M. 42 SQ.M.GD 02 A103 80 SQ.M. 80 SQ.M.
36 SQ.M. STR-A1 UP
GD 03
E
GD 03
BACONY LINE ABOVE
1 2 3 4 5 6 7 8 9
REVISION 1
PAGE
SLOPE 1:20
5,550
SD 03 LSD 01 LSD 01 LOUVER LINE SD 03 LSD 01 WD 04 BACONY LINE
SERVICE DOOR SERVICE DOOR
SERVICE LADDER
BALCONY AREA-1
54 SQ.M. A
STR-A2
DOWN
M. TOILET-A2
STEEL HANDRAIL H=1,100 mm. 16 SQ.M. STORAGE-A2
M. LOCKER- 5 SQ.M.
SDSINK
03 A1
3 SQ.M.
CORRIDOR-A3
7,500
KITCHEN ROOM
9 SQ.M.
MD/GUEST MEETING ROOM-1 MEETING ROOM-2 WASH STORAGE- LSD 01 LSD 05
STAFF TOILET-B2 DUMB 93 SQ.M. ROOM (10P) (8P) AREA-A2 A3
4 SQ.M. WAITER 22 SQ.M. 23 SQ.M. 24 SQ.M. 4 SQ.M. 30 SQ.M. W. TOILET-A2
VOID LSD 06 12 SQ.M.
W. LOCKER- JANITOR- LSD 02
A2
A1 2 SQ.M.PANTRY-A2
W. TOILET-B2 3 SQ.M. 2 SQ.M. MULTI-PURPOSE ROOM
4 SQ.M.
1FL+4,000 B
LSD 04 STORAGE-A4 LSD 02 CH=2FL+3,000
M. TOILET-B2 WD 01 WD 01 WD 01 LSD 03 WD 02 7 SQ.M. (140P) 160 SQ.M.
CORRIDOR-A2
6 SQ.M.
PRINT AREA-A1
7,500
7 SQ.M.
LSD 04 FIX DESK FREE WD 03
(32P) ADDRESS W
28,500
VOID CH=2FL+3,000
212 SQ.M. C
JAPANESE RESTAURANT RECEPTION AREA CORRIDOR-A2
1FL+4,000
224 SQ.M. AGD 01 LSD 0567 SQ.M. LSD 05
MD. MANAGER (4P)
HALL
8,000
1FL+4,000
7,500
GLASS HANDRAIL H=1,100 mm.
CH=2FL+3,000 SLOPE 1:20
AGD 01
STR-B1 DOWN MEETING ROOM-3 COFFEE CORNER
(8 P)
16 SQ.M. PRINT AREA-A2
PHONE BOOTH
WD 01 6 SQ.M.
INDIVIDUAL
DOWN VOID
D
MEETING FREE ADDRESS MEETINGWD 01
MEETING ROOM-4
SHARED OFFICE
ROOM-1 (4 P) 6,875
(6 P) 9 SQ.M.
11 SQ.M. WD 01 CO-WORKING ROOM
6,000
STR-A1
1FL+4,000 WD 01
CH=2FL+3,000
MEETING ROOM-5 162 SQ.M. SHARED OFFICE
ROOM-2 (6 P)
STEEL HANDRAIL H=1,100 mm.
(4 P) OPEN MEETING 13 SQ.M.
12 SQ.M. WD 01
E
BALCONY AREA-2 165 SQ.M.
LOUVER LINE
BACONY LINE
REVISION 1
PAGE
DROP-OFF 2
GL ±00
AW 34 AW 18 AW 19 AW 36 AG 01 AG 01
GL +0.150 BACONY LINE ABOVE
7,500
AW 12 AW 11 2 SQ.M. CH=1FL+3,000 19 SQ.M. 20 SQ.M.
B102 A107 64 SQ.M.
70 SQ.M. 57 SQ.M. HANDICAP
GARBAGE WAITER
DUMB
TOILET-A1
ROOM-B1 6 SQ.M.
5 SQ.M.SERVICE
ROOM
5 SQ.M. M. TOILET-A1
14 SQ.M. B
TENANT- TENANT-A108 TENANT-A109 TENANT-A110
(SERVICE OFFICE) (BANK) (BANK)
CORRIDOR-A1
A106 WASHING AREA-A1
CORRIDOR-B1
7,500
JANITOR- 8 SQ.M. TENANT- AW 13 AW 10
B1 B101
1 SQ.M. 75 SQ.M. TENANT- PRAYER ROOM-A1
AW 35 W. TOILET- COURTYARD A105 24 SQ.M.
203 SQ.M. 30 SQ.M.
28,500
B1 1FL -0.150
9 SQ.M. GL +0.150 CANOPY LINE ABOVE
C
AW 35
HANDICAP AW 17
TOILET-B1 AW 14 CORRIDOR-A1
5 SQ.M. AW 06 1FL ±00 AW 03 AW 03 AW 03 OUT
WASHING CH=1FL+3,000
AREA-B1 CORRIDOR-B1 148 SQ.M.
7,500
6 SQ.M. 1FL ±00
CH=1FL+3,000 DROP-OFF 1
38 SQ.M. IN GL ±00
AW 34 PRAYER ROOM-B1 AW 15 ENTRANCE HALL
16 SQ.M. STR-B1 UP AW 09 AW 05
TENANT- AW 04 AW 04 1FL ±00=GL+0.300 METAL
DETECTOR
CH=1FL+7,000 GL +0.150
X-RAY
A104 D
36 SQ.M. 148 SQ.M.
TENANT- OSS OFFICE-
FOOD COURT TENANT-B103 AW 08 TENANT- A102 A101
6,000
AW 16 80 SQ.M. 80 SQ.M.
39 SQ.M. 42 SQ.M. A103 AW 02
36 SQ.M. STR-A1 UP
1 2 3 4 5 6 7 8 9
REVISION 1
PAGE
SLOPE 1:20
5,550
BACONY LINE
SERVICE DOOR LOUVER LINE SERVICE DOOR
CORRIDOR-A3
SINK
7,500
KITCHEN ROOM AW 20
9 SQ.M.
AW 26 MD/GUEST MEETING ROOM-1 MEETING ROOM-2 WASH STORAGE-
STAFF TOILET-B2 DUMB 93 SQ.M. ROOM (10P) (8P) AREA-A2 A3
4 SQ.M. WAITER 22 SQ.M. 23 SQ.M. 24 SQ.M. 4 SQ.M. 30 SQ.M. W. TOILET-A2
AW 35 VOID 12 SQ.M.
W. LOCKER- JANITOR-
A2
A1 2 SQ.M.PANTRY-A2
W. TOILET-B2 3 SQ.M. 2 SQ.M. MULTI-PURPOSE ROOM
4 SQ.M.
1FL+4,000 B
STORAGE-A4 CH=2FL+3,000
M. TOILET-B2 AW 29 AW 29 AW 29
7 SQ.M. (140P) 160 SQ.M.
CORRIDOR-A2
6 SQ.M.
PRINT AREA-A1
7,500
AW 24 7 SQ.M. AW 20
FIX DESK FREE
(32P) ADDRESS W
AW 25 AW 25
BSEZ OFFICE PANTRY-A3 CANOPY-1
1FL+4,000 14 SQ.M.
28,500
1 VOID CH=2FL+3,000
A-201 212 SQ.M. C
JAPANESE RESTAURANT RECEPTION AREA CORRIDOR-A2
AW 27 1FL+4,000
224 SQ.M. 67 SQ.M.
MD. MANAGER (4P)
HALL
8,000
1FL+4,000
7,500
AW 24 AW 24 CH=2FL+3,000 GLASS HANDRAIL H=1,100 mm. AW SLOPE
20 1:20
AW 30
DOWN MEETING ROOM-3 COFFEE CORNER
STR-B1 AW 28
(8 P)
16 SQ.M. PRINT AREA-A2
PHONE BOOTH
6 SQ.M.
INDIVIDUAL
DOWN VOID
MEETING FREE ADDRESS D
MEETING
AW 27
AW 31 SHARED OFFICE 6,875
MEETING ROOM-4
(6 P) AW 32 ROOM-1 (4 P)
9 SQ.M.
11 SQ.M. CO-WORKING ROOM
6,000
AW 23 AW 23 1FL+4,000 STR-A1
CH=2FL+3,000 AW 21
AW 31 162 SQ.M. SHARED OFFICE
AW 27
STEEL HANDRAIL H=1,100 mm.
MEETING ROOM-5 ROOM-2 (6 P)
(4 P) OPEN MEETING AW 33 13 SQ.M.
12 SQ.M.
E
BALCONY AREA-2 165 SQ.M.
LOUVER LINE
AW 22 AW 22 AW 20 AW 20 AW 20 AW 20 BACONY LINE AW 20
REVISION 1
PAGE
*NOTE:
- ALL DIMENSIONS
MUST BE CHECKED
AND CONFIRM AT SITE
TYPE GLASS DOUBLE SWING DOOR GLASS DOUBLE SWING DOOR GLASS SWING DOOR
FRAME FRAMELESS + ALUMINUM W/POWDER COAT COLOR FRAMELESS + ALUMINUM W/POWDER COAT COLOR FRAMELESS + ALUMINUM W/POWDER COAT COLOR
GLASS CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM. CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM. CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM.
LOCK GLASS DOOR LOCK GLASS DOOR LOCK GLASS DOOR LOCK
ACCESSORIES FLOOR HINGE, PULL HANDLE FLOOR HINGE, PULL HANDLE FLOOR HINGE, PULL HANDLE
LOCATION MAIN ENTRANCE TENANT TENANT
REMARKS - - -
SYMBOL GD 04 UNITS 1 SD 01 UNITS 2 SD 02 UNITS 5
*NOTE:
- ALL DIMENSIONS
MUST BE CHECKED
AND CONFIRM AT SITE
TYPE GLASS DOUBLE SWING DOOR SWING STEEL DOOR SWING STEEL DOOR
FRAME FRAMELESS + ALUMINUM W/POWDER COAT COLOR STEEL w/OP STEEL w/OP
GLASS CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM. - CLEAR GLASS 6 MM. w/ SAFETY FILM
LOCK GLASS DOOR LOCK CYLINDER CASE LOCK CYLINDER CASE LOCK
ACCESSORIES FLOOR HINGE, PULL HANDLE BUTT HINGE, LEVER HANDLE + FLUSH BOLT + DOOR STOPPER + DOOR CLOSER BUTT HINGE, LEVER HANDLE + DOOR STOPPER + DOOR CLOSER
LOCATION SUB ENTRANCE ME. ROOM-1, ME. ROOM-2 SUB ENTRANCE, SERVER ROOM, TENANT (B101), DRIVER ROOM
REMARKS -
REVISION 1
PAGE
*NOTE:
- ALL DIMENSIONS
MUST BE CHECKED
AND CONFIRM AT SITE
TYPE SWING STEEL DOOR SWING STEEL DOOR SWING LIGHT STEEL DOOR
FRAME STEEL w/OP STEEL w/OP STEEL w/OP
GLASS - CLEAR GLASS 6 MM. w/ SAFETY FILM CLEAR GLASS 6 MM. w/ SAFETY FILM
LOCK CYLINDER CASE LOCK CYLINDER CASE LOCK -
ACCESSORIES BUTT HINGE, LEVER HANDLE, DOOR STOPPER, DOOR CLOSER BUTT HINGE, LEVER HANDLE, DOOR STOPPER, DOOR CLOSER BUTT HINGE, LEVER HANDLE, DOOR STOPPER, DOOR CLOSER
LOCATION GARBAGE ROOM - A1, GARBAGE ROOM - B1, BALCONY AREA - 1, BALCONY AREA - 1, STR - 2 M. + W. TOILET - A1, M. + W. TOILET - B1, M. + W. TOILET - A2, M. + W. LOCKER - A1
REMARKS STORAGE - A1 GLASS W/ FROST FILM
SYMBOL LSD 02 UNITS 8 LSD 03 UNITS 1 LSD 04 UNITS 2
*NOTE:
- ALL DIMENSIONS
MUST BE CHECKED
AND CONFIRM AT SITE
TYPE SWING LIGHT STEEL DOOR SWING LIGHT STEEL DOOR SWING LIGHT STEEL DOOR
FRAME STEEL w/OP STEEL w/OP STEEL w/OP
GLASS - CLEAR GLASS 6 MM. w/ SAFETY FILM -
LOCK CYLINDER CASE LOCK CYLINDER CASE LOCK
ACCESSORIES BUTT HINGE, LEVER HANDLE, DOOR STOPPER, DOOR CLOSER BUTT HINGE, LEVER HANDLE, DOOR STOPPER, DOOR CLOSER BUTT HINGE, LEVER HANDLE, DOOR STOPPER, DOOR CLOSER
LOCATION WASHING AREA - A1+ B1, JANITOR - A1 + B1 + A2, PANTRY - 1 + 2, STAFF TOILET B2 BSEZ OFFICE SUB ENTRANCE M. + W. TOILET - B2
REMARKS DINOC SHEET FINISH
REVISION 1
PAGE
*NOTE:
- ALL DIMENSIONS
MUST BE CHECKED
AND CONFIRM AT SITE
TYPE SWING LIGHT STEEL DOOR SWING LIGHT STEEL DOOR SINGLE SLIDING DOOR
FRAME STEEL w/OP STEEL w/OP GALVANIZED STEEL
GLASS CLEAR GLASS 6 MM. w/ SAFETY FILM CLEAR GLASS 6 MM. w/ SAFETY FILM -
LOCK CYLINDER CASE LOCK CYLINDER CASE LOCK SLIDING LOCK SET
ACCESSORIES BUTT HINGE, LEVER HANDLE, DOOR STOPPER, DOOR CLOSER, FLUSH BOLT BUTT HINGE, LEVER HANDLE, DOOR STOPPER, DOOR CLOSER HANGER, PULL HANDLE, SLIDING DOOR CLOSER
LOCATION MULTIPURPOSE ROOM KITCHEN ROOM HANDICAP TOILET -A1 + B1
REMARKS
*NOTE:
- ALL DIMENSIONS
MUST BE CHECKED
AND CONFIRM AT SITE
TYPE AUTOMATIC GLASS SLIDING DOOR SWING WOOD DOOR SWING WOOD DOOR
FRAME ALUMINUM W / POWDER COATED COLOR WOOD w/OP WOOD w/OP
GLASS CLEAR GLASS 6 MM. w/ SAFETY FILM. CLEAR GLASS 6 MM. w/ SAFETY FILM -
LOCK CYLINDER CASE LOCK CYLINDER CASE LOCK CYLINDER CASE LOCK
ACCESSORIES - BUTT HINGE, LEVER HANDLE, DOOR STOPPER, DOOR CLOSER BUTT HINGE, LEVER HANDLE, DOOR STOPPER, DOOR CLOSER, FLUSH BOLT
LOCATION CO-WORKING ROOM ENTRANCE, BSEZ OFFICE ENTRANCE MEETING ROOM - 1,2,3,4,5, MD/GUEST ROOM, SHARED OFFICE ROOM -1,2 STORAGE - A2
REMARKS SENSOR OPENING W/ PANIC OPEN LAMINATE FINISH LAMINATE FINISH
REVISION 1
PAGE
*NOTE:
- ALL DIMENSIONS
MUST BE CHECKED
AND CONFIRM AT SITE
*NOTE:
- ALL DIMENSIONS
MUST BE CHECKED
AND CONFIRM AT SITE
TYPE
FRAME
GLASS
LOCK
ACCESSORIES
LOCATION
REMARKS
REVISION 1
PAGE
SIZE: w9880xh3000
*NOTE:
- ALL DIMENSIONS
MUST BE CHECKED
AND CONFIRM AT SITE
SIZE: w44675xh3000
*NOTE:
- ALL DIMENSIONS
MUST BE CHECKED
AND CONFIRM AT SITE
REVISION 1
PAGE
2023/03/07
2023 / 03 / 07 WINDOW SCHEDULE -1 SCALE 1:100 A-309
SYMBOL AW 03 UNITS 3 AW 04 UNITS 2 AW 05 UNITS 1
*NOTE: GD
02
GD
02
GD
02
- ALL DIMENSIONS
MUST BE CHECKED
AND CONFIRM AT SITE
TYPE FIXED ALUMINUM WINDOW FIXED ALUMINUM WINDOW FIXED ALUMINUM WINDOW
FRAME ALUMINUM W / POWDER COATED COLOR ALUMINUM W / POWDER COATED COLOR ALUMINUM W / POWDER COATED COLOR
GLASS CLEAR GLASS 8 MM. + PVB 0.76 + CLEAR GLASS 8 MM. CLEAR GLASS 8 MM. + PVB 0.76 + CLEAR GLASS 8 MM. CLEAR GLASS 8 MM. + PVB 0.76 + CLEAR GLASS 8 MM.
LOCK - - -
ACCESSORIES - - -
LOCATION TENANT TENANT TENANT
REMARKS - - -
SYMBOL AW 06 UNITS 1 AW 07 UNITS 1
*NOTE: GD
03
- ALL DIMENSIONS
MUST BE CHECKED
AND CONFIRM AT SITE
REVISION 1
PAGE
2023/03/07
2023 / 03 / 07 WINDOW SCHEDULE -2 SCALE 1:100 A-310
SYMBOL AW 08 UNITS 8 AW 09 UNITS 7 AW 10 UNITS 1
*NOTE: GD
03
GD
03
GD
03
GD
03
- ALL DIMENSIONS
MUST BE CHECKED
AND CONFIRM AT SITE
TYPE FIXED ALUMINUM WINDOW FIXED ALUMINUM WINDOW FIXED ALUMINUM WINDOW
FRAME ALUMINUM W / POWDER COATED COLOR ALUMINUM W / POWDER COATED COLOR ALUMINUM W / POWDER COATED COLOR
GLASS CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM. CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM. CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM.
LOCK - - -
ACCESSORIES - - -
LOCATION TENANT TENANT TENANT
REMARKS - - -
SYMBOL AW 11 UNITS 1 AW 12 UNITS 1 AW 13 UNITS 1
*NOTE: GD
02
GD
02
GD
02
- ALL DIMENSIONS
MUST BE CHECKED
AND CONFIRM AT SITE
TYPE FIXED ALUMINUM WINDOW FIXED ALUMINUM WINDOW FIXED ALUMINUM WINDOW
FRAME ALUMINUM W / POWDER COATED COLOR ALUMINUM W / POWDER COATED COLOR ALUMINUM W / POWDER COATED COLOR
GLASS CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM. CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM. CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM.
LOCK - - -
ACCESSORIES - - -
LOCATION TENANT TENANT TENANT
REMARKS - - -
REVISION 1
PAGE
2023/03/07
2023 / 03 / 07 WINDOW SCHEDULE -3 SCALE 1:100 A-311
SYMBOL AW 14 UNITS 1 AW 15 UNITS 8 AW 16 UNITS 1
*NOTE: GD
03
GD
02
- ALL DIMENSIONS
MUST BE CHECKED
AND CONFIRM AT SITE
TYPE FIXED ALUMINUM WINDOW FIXED ALUMINUM WINDOW FIXED ALUMINUM WINDOW
FRAME ALUMINUM W / POWDER COATED COLOR ALUMINUM W / POWDER COATED COLOR ALUMINUM W / POWDER COATED COLOR
GLASS CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM. CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM. CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM.
LOCK - - -
ACCESSORIES - - -
LOCATION TENANT TENANT TENANT
REMARKS -SENSOR OPENING - -
SYMBOL AW 17 UNITS 1 AW 18 UNITS 1 AW 19 UNITS 1
*NOTE:
- ALL DIMENSIONS
MUST BE CHECKED
AND CONFIRM AT SITE
TYPE FIXED ALUMINUM WINDOW FIXED ALUMINUM WINDOW FIXED ALUMINUM WINDOW
FRAME ALUMINUM W / POWDER COATED COLOR ALUMINUM W / POWDER COATED COLOR ALUMINUM W / POWDER COATED COLOR
GLASS CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM. CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM. CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM.
LOCK - - -
ACCESSORIES - - -
LOCATION TENANT TENANT TENANT
REMARKS -SENSOR OPENING - -
REVISION 1
PAGE
2023/03/07
2023 / 03 / 07 WINDOW SCHEDULE - 4 SCALE 1:100 A-312
SYMBOL AW 20 UNITS 8 AW 21 UNITS 1 AW 22 UNITS 2
*NOTE:
- ALL DIMENSIONS
MUST BE CHECKED
AND CONFIRM AT SITE
TYPE FIXED ALUMINUM WINDOW FIXED ALUMINUM WINDOW FIXED ALUMINUM WINDOW
FRAME ALUMINUM W / POWDER COATED COLOR ALUMINUM W / POWDER COATED COLOR ALUMINUM W / POWDER COATED COLOR
GLASS CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM. CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM. CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM.
LOCK - - -
ACCESSORIES - - -
LOCATION ENTRANCE HALL (2F), MULTI-PURPOSE ROOM, CO-WORKING ROOM ENTRANCE HALL (2F) JAPANESE RESTAURANT
REMARKS - - -
SYMBOL AW 23 UNITS 2 AW 24 UNITS 3 AW 25 UNITS 2
*NOTE:
- ALL DIMENSIONS
MUST BE CHECKED
AND CONFIRM AT SITE
TYPE FIXED ALUMINUM WINDOW FIXED ALUMINUM WINDOW FIXED ALUMINUM WINDOW
FRAME ALUMINUM W / POWDER COATED COLOR ALUMINUM W / POWDER COATED COLOR ALUMINUM W / POWDER COATED COLOR
GLASS CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM. CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM. CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM.
LOCK - - -
ACCESSORIES - - -
LOCATION JAPANESE RESTAURANT JAPANESE RESTAURANT, BSEZ OFFICE JAPANESE RESTAURANT
REMARKS - - -
REVISION 1
PAGE
2023/03/07
2023 / 03 / 07 WINDOW SCHEDULE - 5 SCALE 1:100 A-313
SYMBOL AW 26 UNITS 1 AW 27 UNITS 3 AW 28 UNITS 4
*NOTE:
- ALL DIMENSIONS
MUST BE CHECKED
AND CONFIRM AT SITE
TYPE FIXED ALUMINUM WINDOW FIXED ALUMINUM WINDOW FIXED ALUMINUM WINDOW
FRAME ALUMINUM W / POWDER COATED COLOR ALUMINUM W / POWDER COATED COLOR ALUMINUM W / POWDER COATED COLOR
GLASS CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM. CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM. CLEAR GLASS 8 MM. LOW-E #2 + PVB 0.76 + CLEAR GLASS 8 MM.
LOCK - - -
ACCESSORIES - - -
LOCATION MD/ GUEST ROOM BSEZ OFFICE, MEETING ROOM-4, MEETING ROOM-5 MD/ GUEST ROOM, MEETING ROOM -1, MEETING ROOM -2, MEETING ROOM -3
REMARKS - - -
SYMBOL AW 29 UNITS 3 AW 30 UNITS 1 AW 31 UNITS 3
*NOTE:
- ALL DIMENSIONS
MUST BE CHECKED
AND CONFIRM AT SITE
TYPE FIXED ALUMINUM WINDOW FIXED ALUMINUM WINDOW FIXED ALUMINUM WINDOW
FRAME ALUMINUM W / POWDER COATED COLOR ALUMINUM W / POWDER COATED COLOR ALUMINUM W / POWDER COATED COLOR
GLASS CLEAR GLASS 8 MM. + PVB 0.76 + CLEAR GLASS 8 MM. CLEAR GLASS 8 MM. + PVB 0.76 + CLEAR GLASS 8 MM. CLEAR GLASS 8 MM. + PVB 0.76 + CLEAR GLASS 8 MM.
LOCK - - -
ACCESSORIES - - -
LOCATION MD/ GUEST ROOM, MEETING ROOM -1, MEETING ROOM -2 MEETING ROOM -3 MEETING ROOM - 4, MEETING ROOM -5
REMARKS - - -
REVISION 1
PAGE
2023/03/07
2023 / 03 / 07 WINDOW SCHEDULE -6 SCALE 1:100 A-314
SYMBOL AW 32 UNITS 1 AW 33 UNITS 1 AW 34 UNITS 3
*NOTE:
- ALL DIMENSIONS
MUST BE CHECKED
AND CONFIRM AT SITE
TYPE FIXED ALUMINUM WINDOW FIXED ALUMINUM WINDOW SLIDING ALUMINUM WINDOW
FRAME ALUMINUM W / POWDER COATED COLOR ALUMINUM W / POWDER COATED COLOR ALUMINUM W / POWDER COATED COLOR
GLASS CLEAR GLASS 8 MM. + PVB 0.76 + CLEAR GLASS 8 MM. CLEAR GLASS 8 MM. + PVB 0.76 + CLEAR GLASS 8 MM. CLEAR GLASS 8 MM. + SAFETY FILM
LOCK - - -
ACCESSORIES - - -
LOCATION SHARED OFFICE ROOM -1 SHARED OFFICE ROOM -2 PRAYER ROOM, DRIVER ROOM
REMARKS - - -
SYMBOL AW 35 UNITS 4 AW 36 UNITS 1 AG 01 UNITS 2
*NOTE:
- ALL DIMENSIONS
MUST BE CHECKED
AND CONFIRM AT SITE
TYPE AWINING ALUMINUM WINDOW FIXED ALUMINUM WINDOW ALUMINUM GRILL W / POWDER COATED COLOR
FRAME ALUMINUM W / POWDER COATED COLOR ALUMINUM W / POWDER COATED COLOR ALUMINUM W / POWDER COATED COLOR
GLASS CLEAR GLASS 8 MM. + SAFETY FILM CLEAR GLASS 8 MM. + SAFETY FILM -
LOCK - - -
ACCESSORIES - - -
LOCATION ALL TOILETS SERVER ROOM ME. ROOM -1 , ME. ROOM -2
REMARKS - -
REVISION 1
PAGE
2023/03/07
2023 / 03 / 07 WINDOW SCHEDULE -7 SCALE 1:100 A-315
1.3 1.1 1.2
1,000
MATERIALS LEGEND
1,000
3,300
PA.
1,300
TYPE SYMBOL DESCRIPTION
1 FLOOR
22,000
LA. 1.5 PEDESTRIAN WAY (INTERLOCKING BLOCK PAVING)
1.6 FLAMED FINISH GRANITE STONE THK. = 30 MM.
2,000 1.7 CONCRETE SEATING HEIGHT = 500 MM.
4,560 (SIZE 750 x 3000 MM.)(SIZE 750 x 4000 MM.)
1.8 CERAMIC TILE SIZE 600 x 600 MM.
(SIZE 750 x 4500 MM.) 1.7 1.7
FS. ±0.00 1.9 FLAMED FINISH STEPPING STONE
1.1 1.1 1.1 1.5 1.1 1.1 1.1 1.1 1.7 1.1 1.1 1.1 1.11.1 1.1
7,000 GRADING AND DRAINAGE LEGEND
PUMP
7,000 2,250
ROOM SYMBOL DESCRIPTION
5,300
FS. +150
3,100
2,800
2,600
1.4 1.2 1.2 1.2 1.1 FFL. FINISHED FLOOR LEVEL
1,000 1.6 5,665 6,000 4,790 FG. FINISHED GRADE
1.1 1.4 FS. FINISHED SURFACE
(SIZE 1500 x 2500 MM.) 1.1 PA. PLANTING AREA
TRANSFORMER 1.7
STATION 1.1 LA. LAWN AREA
1.1 1.4 SL. SLAB LEVEL
(SIZE 1500 x 2500 MM.)
1.7 GRADE LEVEL
1.1
32,131
2,300 PLANTING
LA.
29,331
1.6
1.1 (SIZE 1500 x 2500 MM.)
50,500
X-RAY
(SIZE 1500 x 2500 MM.)
TRAP TANK 1.1 1.7
(SIZE 1500 x 6500 MM.) (SIZE 1500 x 4000 MM.) (SIZE 1500 x 3000 MM.)
1.5 1.1 1.1 1.4 1.1 1.7 1.1 1.7 1.7 1.6 1.1 1.5
1.1 5,665 1.1
1.4 1.4
4,000 4,000 2,170
5,545
1.2 LA. FG. +450
1.3
1.9
(SIZE 500 x 6000 MM.)
LA. LA. 1.9
FG. +150 (SIZE 500 x 3000 MM.)
1.9 FS. +150 FS. ±0.00
(SIZE 500 x 4000 MM.)
REVISION 1
PAGE
H:1500
1.2 LA. LAWN AREA
FUTURE
1.3 REINFORCED CONCRETE ROAD THK. = 150 MM.
H:1500
FG. +150 H:1500 FG. +150 H:3000 1.4 CONCRETE STEEL TROWEL FINISHED
LA.
H:3000
H:200 1.5 PEDESTRIAN WAY (INTERLOCKING BLOCK PAVING)
H:3000 1.6 FLAMED FINISH GRANITE STONE THK. = 30 MM.
H:3000 1.7 CONCRETE SEATING HEIGHT = 500 MM.
1.8 CERAMIC TILE SIZE 300 x 300 MM.
H:10000
FS. ±0.00 1.9 FLAMED FINISH STEPPING STONE
X-RAY
TRAP TANK H:3000 AND MINIMAL FOLIAGE DIAMETER 3 M.
H:1500 H:3000 HIGH TREE SPECIES WITH HEIGHT MORE THAN
H:200
H:1500 10 M. AND MINIMAL FOLIAGE DIAMETER 5 M.
FS. +150 H:10000
SHRUB
H:1500 H:3000 H:3000 H:3000 H:1500 H:3000
H:1500
H:1500 SEPTIC SHRUBS IN GROUPING
TANK H:3000
H:3000 H:200 WITH HEIGHT 150 - 300 MM.
SHRUBS
H:1500 H:1500 H:3000 H:3000 H:3000 H:1500 H:3000
H:10000 H:10000 H:10000 H:600 WITH HEIGHT 300 - 600 MM.
H:1500 H:1500 H:1500 H:3000 H:1500 H:1500
H:1500 H:1500
PERENNIAL BORDER PLANTS
H:1500 H:1500 H:1500 +00
H:3000
+150 H:2000 WITH HEIGHT 1.7 - 2 M.
LA. +300 H:2000
Softscape Specification
scale 1:400
REVISION 1
PAGE
38,300
3,050 7,500 7,500 7,500 6,000 6,750
2,800 3,500 4,000 4,000 4,000 4,000 4,000 4,000 4,000 4,000
250 250 250 750 1,250 625 3,375
250
4
1,500 500 500 1,500 500
1,500 500
1,500 500
1,500 500
1,500 500 1,000
SLOPE 1 SLOPE 1 : 200
1,500 500 1,500
2,000
2,000
500
1,500 1,500
1,500
1,500
1,500
1,500
1,500
500
7,500
7,000
1,500
1,500
1,500
1,500
1,500
1,500
200
1 : 1,500
500 1,500
1,500
500 1,500
2,000
2,000
2,000
2,000
SLOPE 500
500
3
250
A B C D E
REFERENCES IMAGES FOR COURTYARD REFERENCES IMAGES FOR FLAMED FINISH GRANITE STONE
Area Percentage : 18.8% Area Percentage :39.39% Area Percentage : 41.84 %
COURTYARD BLOW-UP PLAN
scale 1:125
Front Building Courtyard Image Ref. Connective Corridor Courtyard Image Ref. Fuulerton Gray Ash Gray Outback-Sandblasted
Flamed Granite Flamed Granite Flamed Granite
REVISION 1
PAGE
3,000 1,300
3,000
3,000
3,000
3,000
CONC. BLOCK W/ STEEL W/OP. PAINTED
3,000
3,000
3,000
3,000
3,000
3,000
3,000
3,000
3,000
3,000
3,000
PUMP
3,000
ROOM
3,000
3,000
3,000
3,000
3,000
3,000
TRANSFORMER BOUNDARY LINE
3,000
BOUNDARY
LINE STATION
3,000
79,300
3,000
3,000
84,000
3,000
3,000
3,000
3,000
3,000
3,000
3,000
GREASE
3,000
METAL
DETECTOR
X-RAY
3,000
TRAP TANK
3,000
3,000
3,000
3,000
3,000
3,000
3,000
SEPTIC
3,000
TANK
3,000
3,000
3,000
3,000
3,000
GUARD HOUSE
3,000
3,000
OPENING
W2,550 OPENING W6,000
3,000
3,000
3,100 3,100 3,100 3,100 3,100 3,100 3,100 3,100 3,100 3,100 3,100 3,100 3,100 3,100 3,100 3,100 3,100 3,100 3,100 3,100 3,100 3,100 960 5,464 2,700
68,200
3,000
BOUNDARY LINE LOGO WALL: RC. WALL W/ AEP PAINTED (CLEAR COAT)
BOUNDARY IN OUT
LINE
MAIN ENTRANCE FENCE PLAN
SCALE 1:400
REVISION 1
PAGE
600
3,100
200 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 150 200
250
200
2,600
800
2,000
2,000
200
250
100 200
300
150
150
2,300
2,495
300
105
REVISION 1
PAGE
2,150
RC. WALL W/ AEP PAINTED (CLEAR COAT)
ACRYLIC TEXT
00
4,0
2,900
STEEL SLIDING GATE W/ OP. PAINTED RC. WALL W/ AEP PAINTED (CLEAR COAT)
RC. WALL W/ AEP PAINTED (CLEAR COAT)
350
300
300
2,050
2,200
710
150
150
1,000 2,900
3,900 4,000
REVISION 1
PAGE
±0.00
±0.00
01
555
750 GL±0.00
300
A
+0,100
+0,100
300
REST AREA RC. COUNTER
+0,100
ROOF LINE ABOVE
4,600
3,200
SD
01
A-409 +0,050 02
LOCKER
00
1:2
E
OP
SL
TOP H=1400
TOILET
1,650
AW
02 FL.-50 LOCKER
CH=2,900
CERAMIC TILE 300x300
WITH VENTILATION FAN
B
750
555
ROOF LINE ABOVE B
GALVANIZE STEEL PIPE A-409 ALUZINC STL. SHT. ROOFING V-750 t = 0.5 mm.
(PAINT : GRAY ) 445 1,900 2,900 1,445 ALUMINIUM COMPOSITE (SILVER COLOUR)
4,800 6,640
1 2
SLOPE 2:100
SLOPE 2:100
SLOPE 2:100
700
775
GUARD HOUSE : PLAN A
SCALE 1:50
1,550
A-408
3 1
SLOPE 1:200
A-408 A-408
4 ROOF
SLOPE 1:200
A-408
SLOPE 2:100
4,800
3,200
SLOPE 5:100
A-409
SLOPE 2:100
1,650
775
B
SLOPE 2:100
SLOPE 2:100
775
700
SLOPE 2:100
OVERFLOW
REVISION 1
PAGE
400
400
250 354 250
GL+3,250 GL+3,250
1,300
3,650
FENCE LINE
3,250
3,250
RC. COUNTER
RC. WALL t=130 mm. W/PLASTER
2,609
W/AEP PAINTED (CLEAR COAT PAINT) 350
300
1FL.=GL+100 1FL.=GL+100
WALKWAY
GL.+0.00 GL.+0.00
800 3,200 800 4,800 445
B A 2 1
GUARD HOUSE : ELEVATION - 2
GUARD HOUSE : ELEVATION - 1 scale A3 1:50
scale A3 1:50
ALUMINIUM COMPOSITE (SILVER COLOUR) RC. WALL t=130 mm. W/PLASTER RC. WALL t=130 mm. W/PLASTER
W/AEP PAINTED (CLEAR COAT PAINT) W/AEP PAINTED (CLEAR COAT PAINT)
TOP OF ROOF
TOP OF ROOF OVERFLOW
GL+3,650 SLOPE 5/100
GL+3,650
400
270
GL+3,250
GL+3,250
1,300
GALVANIZE STEEL PIPE (PAINT : GRAY )
600 250
ALUMINIUM COMPOSITE (SILVER COLOUR)
GALVANIZE STEEL PIPE (PAINT : GRAY )
3,520
3,650
3,250
3,250
300
2,000
1FL.=GL+100 1FL.=GL+100
WALKWAY
GL.+0.00 GL.+0.00
445 4,000 4,800
700 3,200 700
A B 1 2 2
GUARD HOUSE : ELEVATION - 3 GUARD HOUSE : ELEVATION - 4
scale A3 1:50 scale A3 1:50
REVISION 1
PAGE
400
250
GL+3,250
SLOPE 2/100
250
GYPSUM BOARD t=9 mm.
W/EP PAINTED on M-BAR
ALUMINIUM COMPOSITE (SILVER COLOUR)
3,650
3,250
CH=2,900
RC. COUNTER
CH=2,500
2,600
GALVANIZE STEEL PIPE (PAINT : GRAY ) BEARING
850
TOILET GUARD ROOM
FL.+0.00 WALKWAY
1FL.=GL+100 FL.-50 FL.-100 = GL.+0.00
GL.+0.00
1,895 2,905
4,800
GUARD HOUSE : SECTION - A
METAL SHEET
scale A3 1:50
1 2
WATER RESISTANT GYPSUM BOARD t=9 mm. W/AEP on M-BAR
ALUMINIUM COMPOSITE (SILVER COLOUR)
TOP OF ROOF
GL+3,650
SLOPE 2/100 SLOPE 2/100
400
GL+3,250
960
FENCE LINE
3,250
RC. SEATING
2,500
2,290
2,000
1,650 1,550
1,200 3,200
REVISION 1
PAGE
Ø1,
075
537
1,667
STAINLESS STEEL PIPE
1,500
963
134 134
1,667
269
1,500
2,500
B
134 134
3,000
269
6,667
134 134 2000 STAINLESS STEEL PIPE STAINLESS STEEL PIPE
269
6000
1,231
1,500
11
11
134 134
269
2,500
1,500
2000
537
CONCRETE CONCRETE
STEEL TROWEL SAND WASH OUT STEEL TROWEL
150 150
150
300
300
537 537
1,500 1,500 1,500 1,500
1,075
3,000 3,000
Flag pole plan 6,000
scale 1:30
Flag pole elevation
scale 1:30
REVISION 1
PAGE
A1 1:15
2023 / 03 / 07 FLAG POLE DETAIL - 1 SCALE A3 1:30 A-411
1,667
1,667
STAINLESS STEEL PIPE
1,667
2,500
2,500
6,667
6,667
STAINLESS STEEL PIPE STAINLESS STEEL PIPE STAINLESS STEEL PIPE
2000
6000
2,500
2,500
1,500 1,500 1,500 1,500
2000
269 269
STAINLESS STEEL CAP 269 269
917
20
130 20
20
130 20
20
130 20
20
150 150
150
150
300
300
300
130 20
150
B
A-413
A
A-413
1 250 250
500
Layout Plan
scale 1:50
A
A-413
EQ 20
EQ 20
ALUMINIUM COMPOSITE LED STRIP
ALUMINIUM COMPOSITE DARK GREY COLOR
DARK GREY COLOR ALUMINUM SHEET PANEL
EQ
EQ
ALUMINIUM COMPOSITE FOR LED LAYOUT
2,000
2,000
ACRYLIC PLATE THK 15 mm. WHITE COLOR ACRYLIC PLATE THK 15 mm.
EQ
EQ
ILLUMINATED W/ LED ILLUMINATED W/ LED
THK 15 mm. THK 15 mm.
EQ
EQ
ALUMINIUM COMPOSITE
100
100
DARK GREY COLOR
468 166140 187 520 242
1,498
1,498
BLACK COLOR THK 15 mm.
ACRYLIC LETTER Administration Building
50 89
ILLUMINATED W/ LED 50 89
WHITE COLOR THK 15 mm.
LED STRIP
500
500
RENOVABLE ACRYLIC PLATE RENOVABLE ACRYLIC PLATE
ILLUMINATED W/ LED ILLUMINATED W/ LED
32
32
500 500
500 500
RENOVABLE ACRYLIC PLATE
ILLUMINATED W/ LED ILLUMINATED W/ LED
9,000
9,000
9,000
32
32
468
32
500
500
6,600
6,600
32
468
500
500
ILLUMINATED W/ LED ILLUMINATED W/ LED
EQ
EQ
ALUMINIUM COMPOSITE
DARK GREY COLOR ALUMINIUM COMPOSITE
2,738
2,738
EQ
EQ
300 210
300 210
300
300
200 2,000 200 450 500 450 Front and Side elevations 200 2,000 200 Section A 450 500 450 Section B
2,400 1,400 scale 1:50 2,400 scale 1:50 1,400 scale 1:50
REVISION 1
PAGE
50
(WHITE COLOR)
415
205
2,100
50 50 50
40 40 40
2,260
90
50
RC. FOUNDATION
300
300
525
525
15010
160
160
350
REVISION 1
PAGE