CHANGE HISTORY
APPLICABLE AREA
Corporation Infineon
Product Division SON
Cluster Front of Line
Location Melaka
Production Area/Business M1
Unit
Production Unit Die Bond
1. Process Description :
To attach a Cu clip on chip top with TOLL matrix lead frame using the 2009 SSI Die Bonder,
applicable with Soft Solder Technology. The evaluation results and sample build data was compiled
under one report where can be find inside E-register.
Composition PbSn2Ag2.5
2.2 GK Material.
Make sure collet used fulfill Design Rule requirement.
Soft Solder - Z8K00024666
2.2.1 Die Collet : 1.) Vespel Round Collet ( According to clip size)
,
tools,
vessels with size labels,
protective clothing,
connections for media (l/m)
4. Caution / Safety :
Manufacturing Operation
4.1 Clip bonded units must be kept in the N2 cabinet.
4.2 Handle the lead frames and clip only with plastic gloves.
4.3 Clip must store inside N2 cabinet inside lead frame container pack with plastic bag.
4.5 Place the clip inside bowl during production mode with minimum distances(as lowest )from
bowl base surface.
4.6 The lead frames left inside the indexer track (>2 minutes) during the machine stoppage has
to be cleared without bonding.
4.8 Any mishandling(packing box or plastic bag drop) clip must be scrap
4.11 Refer to SHE Work Instruction (Z8K00002741, Die Bond Diffusion and Soft Solder) for related
safety & health risks and safety instructions.
4.12 Exercise extreme caution in handling forming gas (88N12H, mixture of hydrogen) which is highly
flammable. Check forming gas pressure and flow rate. (RHA Z8F55491218 _ 4.0 Fire and
Explosion Risk)
5. Consignment / Arrival :
5.1 Clip transport to IFX in loose form in lead frame box/container with pack in plastic bag with
Estimated 5K quantity.
5.2 Open seal boxes must keep inside N2 cabinet.
6. Preparation:
6.1 Ensure that the correct bonding diagram / build sheet is displayed.
6.2 Ensure correct, clip and pick-up tool used are follow as stated in built sheet.
7. Process Procedure :
7.1 Machine Setting.
7.1.3 Forming gas flow rates. (Applicable for both TOLL Diffusion Soldering and TOLL Soft
Solder)
7.1.4 Solder feed length, L: (Applicable for all soft solder machines using writer only)
L=(X*Y*BLT)/ wire cross area.
7.2.4 In / output
a) Put the pre-assembly magazine onto the input magazine handler (Check orientation)
b) Put the magazine handler with empty magazines; check the magazine orientation.
8. Checks:
8.1 Equipment Used
a) Stereo microscope : V = 40X
b) SAT
9. Measures :
Stop the machine for corrective actions if defective level is out of control limit. If problem cannot be
solved, inform the shift leader or production executive or the process engineer. Identify and
segregate affected material as DDM lot for PE engineer and QA for disposition.
Reference document : Spec no.
MAL PS Deviation Handling Procedure (DDM) Z8K00051541,(*)
Routine check to be recorded in the JHAM / conversion check sheet.
11. Entries:
11.1 Production and quality data must be recorded in CAMSTAR and SPC chart.
12. Transport :
All bonded material must be transported in magazines
14. Storage:
If material is not able to wire bond immediately, the die+ clip bonded lead frame must be stored in
WIP cabinet.
15. Care and Maintenance:
Housekeeping on machine and work area to be done as per JHAM & TPM program.
16. Calibration:
Calibration Procedure
a) Prepare the X-Y recorder, place the frame brazed with the thermocouple from X-Y
recorder on the input side of the heater block. Set the chart speed to 200mm/min and
temperature range from 0°C to 500°C with K type.
b) Select INSTALL – CALIBRATE – LEADFRAME HANDLER – HEATER
CONTROLLER and press the ‘ start calibrate ‘ key , the machine will calibrate the
temperature by dummy index the frame which is already brazed with the thermo
coupler .
c) Run the machine and activate the X-Y recorder simultaneously. The temperature
profile will be recorded on the chart.
d) Ensure the temperature is identified on the chart for solder dispensing and bonding
position.
e) Compare the recorded temperature to the specification.
f) If it is not within specification, make necessary adjustment on menu TECH – NEW
MATERIAL – LEADFRAME – HEATER CONTROLLER and repeat the step from b to
e
a) Pick-up height
b) Y-axis
- Clear all leadframe from indexer assembly, remove the indexer centering plate .
- Fit the right -angle gauge into the bondhead toolholder , Select TEACH - NEW
MATERIAL - PICK & PLACE - BOND PROCESS menu , using the cursor key
- And bondhead up and down to move the bondhead to bond position and check
the gauge is exactly parallel with the indexer in Y-axis.
- The alignment can be adjust by the Y adjustment lock screw which is on the
bondhead.
17. Appendix:
1. Work Instruction for TO LinearFET
2. Process Handling Procedure for TOLL
3. SHE Safety Work Instruction for TOLL
4. Clip bond temperature profile
5. TO LinearFET Control plan
6. Conversion Procedure for Robust Packages
7. Production Work Flow for ESEC 2009 SSI Die Bonder
8. Process Work Instruction for soft solder Die Bonding TOLL
a) Blue foil are to be collected in the scrapped “Wafer Foil bin” and scrapped weekly to store.
b) Used collets are to be collected in “Used Collet Box” and to be sent for scrap.
c) Used wafer ring are collected into the “Wafer ring bin”.
d) Contaminated finger cot or gloves are to be collected in ”Red Bin“ and scrapped weekly to store.
Appendix 1
Work Instruction for TO Linear FET.
Appendix 2
Process Handling Procedure for TOLL
Appendix 3
SHE Safety Work Instruction for TOLL.
Appendix 4
Z8K00045290
Appendix 6
1.1 All Clip bond machine which is qualified for robust packages production must perform weekly
machine cleaning as standard practice of weekly JHAM activities.
1.2 Cleaning of machine should be carry out during morning shift by the machine owner and assist by PM
technician if any major breakdown.
1.3 Cleaning procedure and equipment needed should be followed as stated in robust cleaning OPL.
Appendix 7
Production Work Flow for ESEC 2009 Clip Bonder.
1.0 Start up
1.1 - Open valves for forming gas, compressed air cooling water, N2 and vacuum.
- Check specified pressures and flow rates.
1.2
- Align the collets against the clip positions.
- Feed the input handler with preassembly magazine with correct type of leadframe &
Title: Process Specification for Soft Solder Clip attach process.
Technical Nr.(TNS): Version / SqNr.: Status: Package Name: Pages:
orientation.
- Feed the magazine handler with empty magazines; check the magazine orientation.
- Pick up clip to check bond quality, orientation, placement and etc. according to
bonding diagram.
1.4 Start process with selection “RUN” mode on the MAIN menu.
2.1 Select the ' Run complete ' KEY at MAIN menu.
2.2 Once the indexer is empty, stop the machine by pressing ' Stop ' key
2.6 If you want to switch off the machine, follow the steps below.
3.1 Handle the leadframes only with plastic gloves of finger cots.
Appendix 8
Process Work Instruction for TO LinearFET
General
5) Housekeeping on machine and work area.
6) Calibration of machine :
i) Bond Force -1x / week / machine (Soft Solder),
-1x / conversion from Soft Solder to Diffusion /
Machine,
ii) Vespel Collet check/change (Robust) -1x / every 20k pick up / Conversion
iii) Temperature profile -1x / month / machine
v) Bond head perpendicular check -1x / week / machine (Soft Solder)