KONDISI PENANGANAN SESUAI EKSISTING

KEDALAMAN KEDALAMAN qc
STA ZONASI SPT DESC DESC STA REKOMENDASI
(m) (m) (kg/cm2)
0-1 <10 clay
9+000 - 9+275 Z5 2 >20 sand STRIPPING CBR 2.5%/ R-1
1-4 10-20 clay 9+100
9+275 - 9+750 Z6 2 >20 clay 0-1 <10 clay STRIPPING CBR 2.5%/ R-1
9+750 - 10+250 Z6 4 5-10 clay 1-4 10-20 clay STRIPPING CBR 2.5%/ R-1
10+250 - 10+400 Z6 4 5-10 clay 0-4 10-20 clay STRIPPING CBR 2.5%
10+400 - 11+000 Z6 4 5-10 clay 1-3 10-20 clay STRIPPING CBR 2.5%/ R-1
11+000 - 11+250 Z6 6 5-10 clay 0-4 10-20 clay STRIPPING CBR 2.5%
11+250 - 11+650 Z6 6 5-10 clay 1-4 10-20 clay STRIPPING CBR 2.5%/ R-1
11+650 - 12+100 Z6 4 5-10 clay 0-4 <10 clay STRIPPING CBR 2.5%/ R-1
12+100 - 12+800 Z7 4 10-20 clay 0-4 10-20 clay *STRIPPING CBR 2.5%
12+800 - 13+025 Z7 4 10-20 clay 1-4 10-20 clay *STRIPPING CBR 2.5%/ R-1
13+025 - 13+950 Z8 4 5-10 clay 0-4 10-20 clay *STRIPPING CBR 2.5%
13+950 - 14+500 Z9 2 >20 clay 2-7 10-20 clay *STRIPPING CBR 2.5%/ R-2
14+500 - 15+000 Z9 2 >20 clay 0-5 <10 clay **REPLACEMENT + PRELOADING
15+000 - 15+500 Z9 4 5-10 clay 0-3 <10 clay **REPLACEMENT + PRELOADING
15+500 - 16+000 Z9 4 10-20 clay 0-5 <10 clay **REPLACEMENT + PRELOADING
0-7 <10 clay
16+000 - 17+590 Z9 4 >20 clay **PVD + PRELOADING
10-12 10-20 clay 16+300-16+400
17+590 - 18+500 Z11 6 10-20 clay 3-8 10-20 clay **PVD + PRELOADING
18+500 - 18+900 Z11 6 10-20 clay 2-6 <10 clay **PVD + PRELOADING
0-5 <10 clay
18+900 - 19+500 Z11 6 10-20 clay **PVD + PRELOADING
5-8 10-20 clay
19+500 - 20+050 Z12 6 <5 clay 0-5 <10 clay **REPLACEMENT + PRELOADING
20+050 - 20+200 Z13 6 10-20 clay 0-6 10-20 clay **PVD + PRELOADING
• STA 9+000 – 13+950 terdapat tanah lempung lunak sd 4 m (sesuai dengan DED) dengan rekomendasi stripping sd Replacement 1m
• STA 13+950 – 14+500 terdapat tanah lempung lunak sd 4 m (sesuai dengan DED) dengan rekomendasi stripping sd Replacement 2m
• STA 14+500 – 16+000 terdapat tanah lempung lunak sd 5 m dengan rekomendasi Replacement & Preloading (butuh konfirmasi data lab konsolidasi)
• STA 16+000 –20+200 terdapat tanah lempung lunak 5 sd 8 m dengan rekomendasi PVD & Preloading (butuh konfirmasi data lab konsolidasi)

09
J A L A N T O L P R O B O L I N G G O - B A N Y U WA N G I PA K E T 2 9