Assignment 1
Assignment Content
1. Assignment Description
In this assignment, you will act as the manager responsible for initiating an employee
satisfaction survey in a manufacturing company. You will outline the steps involved in
conducting the survey and develop a work breakdown structure (WBS) to ensure a
systematic approach to the project.
Instructions
4. Create a hierarchical structure that breaks down the steps identified in the
previous section into smaller, manageable tasks.
5. Start with the main phases or major deliverables of the project, and then
further divide them into sub-phases or tasks.
6. Use a tree-like structure, with main categories at the top and more detailed
tasks branching out beneath.
7. Assign appropriate names or codes to each task to ensure clarity and ease of
reference.
8. Include dependencies between tasks, if applicable, to indicate the order in
which they should be completed.
9. Select at least three key tasks from the WBS and provide a detailed description
for each.
10. Explain the purpose and objectives of each task, as well as the specific
activities or actions involved.
11. Highlight any resources or tools required for the completion of each task.
Report Writing
Assignment 2
Project Selection Model for a Marketing Survey Consulting Company
Test Content
1.Assignment Description
In this assignment, you will act as a consultant for a marketing survey consulting
company that is facing challenges in completing projects as committed. Your task is to
develop a project selection model that will help the company in choosing projects
they are confident of completing successfully within the given timeframe. The model
should consider various factors to ensure project feasibility and reduce the occurrence
of embarrassing situations.
Instructions
1. Research and familiarize yourself with the project selection process and best
practices in the consulting industry.
2. Identify and define the key criteria that should be considered when selecting
projects for the consulting company.
3. Examples of criteria may include project scope, resource availability, expertise
required, client requirements, and project timeline.
7. Apply the defined criteria and scoring system to evaluate a set of sample
projects.
8. Use hypothetical or real-world examples to assess the projects based on their
alignment with the company's capabilities and resources.
9. Score each project on each criterion and calculate an overall score for each
project.
10. Determine the minimum acceptable score or threshold for each criterion and
the overall project score.
11. Specify the criteria that a project must meet or exceed in order to be
considered for acceptance by the company.
12. Consider setting different thresholds based on the company's capacity and risk
tolerance.
13. Organize the identified criteria, weightage, scoring system, and acceptance
criteria into a project selection model.
14. Clearly present the model in a structured format, such as a table or matrix, for
ease of understanding and application.
15. Provide a clear explanation of the model, including how the criteria are
weighted and scored, and how the overall project score is calculated.
Discuss Implementation and Benefits
16. Discuss the implementation process of the project selection model within the
consulting company.
17. Highlight the benefits and advantages of using this model, such as improved
project success rate, better resource allocation, and enhanced client satisfaction.
18. Consider potential challenges or limitations of the model and propose
strategies to address them.
19. Reflect on the importance of project selection in the consulting industry and its
impact on the company's reputation and profitability.
20. Provide recommendations for continuous improvement of the project selection
model based on lessons learned and industry best practices.