Batch started on. Batch completed on. Manufacturing Date. Expiry Date.
29/09/2020 05/10/2020 SEP/20 AUG/23
GENERAL INSTRUCTION
FIRST AID MEASURES:-
1. In case of contact with skin and eye, flush with copious amount of water
2. Shift victim to fresh air
3. If wallowed and found necessary seek medical aid immediately
Verification of batch assembly Assemble dispensed RM with lubricants in batch assembly room
1. Start to unload the materials into mixer as per sequence noted in MFR
run the mixer as per time stipulated in MFR for that particular product.
2. When mixing is over, clean the mixer using filtered water, teepol followed by rinse of R.O. water
1. Start to unload the materials into Granulator as per sequence noted in MFR
run the Granulator as per time stipulated in MFR for that particular product.
2. When Granulator is over, clean the Granulator using filtered water, teepol followed by rinse of R.O.
water
3. Collect the Granulator materials in a plastic container having cleaned status label.
1. Start to unload the materials into Tablet punching as per sequence noted in MFR
run the Tablet punching as per time stipulated in MFR for that particular product.
2. When Tablet punching is over, clean the Tablet punching using vacuum,
3. Collect the Tablet materials in a plastic container having cleaned status label.
Step 11 :- Packing
Random sampling of packed goods by _____of Q.A department was found O.K/defective.
Total Qty. Transfer to finished goods store ___OK______
Total retain sample transfer to Q.A dept. With transfer slip ___OK_____
Total no. Of analytical sample given ___ 5_____
In process sample given ___ 5_____
Leak test sample given ____5____
After release from QC department, transfer the checked tablet to packing department as per SOP for
transfer of tablet to packing Area (SOP No. :001)
Transferred by:-_______________ received by:-_________________
Sing and Date Sing and Date