Delivery Schedule

Project start date:


1
21-08-2023.

Kick Off Meeting:


2
17-08-2023.

Frozen 3D model
3 for PSA (issued by
ODS): 21-08-2023.

Issue Register
4 Stress Calculations
(issued by ODS):
21-08-2023.

PSA Basis of
Analysis (Input
5 Data issued by
Supplier): 29-08-
2023.

PSA BoD (by ODS or


optional by
6 Supplier): parallel –
ready before start
report
PSA
7 recommendations:
25-09-2023

SSA Recommendations SET-1/2/3


SSA Basis of Design (BoD)