CEILING
12 PCS. HARDIFLEX NO. 1/4 650.00 7,800.00
10 PCS. METAL FURRING 120.00 1,200.00
15 PCS. WALL ANGLE 40.00 600.00
4 PCS. CARRYING CHANNEL 120.00 480.00
20 PCS. FURRING CLIP 10.00 200.00
1 BOX BLIND RIVETS 5/32x1/2 250.00 250.00
TOTAL: 10,730.00
LABOR: 6,000.00
LABOR-MATERIAL: 16,730.00
ELECTRICAL
LABOR-MATERIAL: 10,000.00
PLUMBING
LABOR-MATERIAL: 10,000.00
TILES
75 PCS. TILES 60x60 220.00 16,500.00
8 BAGS CEMENT 260.00 2,080.00
3 BAGS ADHESIVE 280.00 840.00
1/4 ELF WHITE SAND 1,300.00 1,300.00
TOTAL: 20,720.00
LABOR: 10,000.00
LABOR-MATERIAL: 30,720.00
PAINT
LABOR-MATERIAL: 25,000.00
BAR COUNTER
LABOR-MATERIAL: 25,000.00
CABINET: 5,000.00
OVERALL TOTAL:
432,000.00