Download as pdf
Download as pdf
You are on page 1of 12
‘tan CHART DIAGRAM FOR 17% 607(S)8- Soar Pavement \veioa Marke/Stud (Fash Type) Type 6105, ecumtins, saber, ated Ragusa nx Pace fiber Piatersss = sane TP canarssofewenan 0 Sor raver tveee any Siangcrtamawsits | Sam 2» Sie tate 1th Nene ea uprert fiarey on 2 Geodata 10 Concatecjony"A°e°8* ONE 98 ‘auiomect (Greg) ae EBS Come MEP 3 3p Seng maa ou sar ater Pure ise 35h 5 Damahion Ran a6 canoes Mae ee 1 eagefseniee ae Cana Goer) Sora Bh of ber acrrames _____bunarcy eomates) ‘eras eer ice acon rn ‘crma acne * 2 bing oe Gang re rg Hace wt rata = 7 nn La [See 4. esa of oa He fos es [5 ona ee ncn gc coe Eon ee ame 2. Onekatenaayat of Sor Fave eed = res «mate Sr Poneto Met ema: 9c Te oe! CONBTRUCIION MEFIODOLORY FEN sor(xje ~3044 PAENCY VUCVSLUE MARKGRYSTUD (FLUSKE TYPE} (MANPOWER REQUIREMENTS 4 4 Constracin Foreman + 2-Siled taborer 22 nll Corer ‘eoUTPMENT REQUIKWIRIETS “+ Blamend Caring Machine (00160 230¥) wth Water Pump (OMF-10) 5 Daralion Harner, Breaker (TE7OGAVR) {carefree Tek (2-5 tons) 5 pr Too sh 26 Boer ater Mal, Stl, Hes Rig ct, Tone maven ceCEMRENEIETS { Menlaneous materials such as grease, oth, chal, trafic gneve, et. Diamond Core Bt (Coring Plate) Replaced Every 500 Holes ‘Connection End (Coring Biace) Replaced Every 100 Holes ‘cohcneTE EPOXY smn ‘Vetume = (oy4y123/1000)5/1000) Volume = 0000059411 cu. ‘elu = (0.000059411 cur. )1000 t/t cum. ga/3.785 Wt) ‘Volume = 0.036 gal./pe- Replaced Every 100 Holes N= 4/300) N= 0.01 pieca/pe. REQUIREMENTS COMPUTATION FOR ITEM 607(1)8~SOLAR PAVEMENT LEVELLED MARKER/STUO Egupment Alowance = 5 rntes Egupment ficiency = 0% ‘See Borchar as reference Te (eas) + (5745)/0.80, 7203055 12030 T= (45/85) + (545)/0.80 7292659, 12025 ‘STEP - Epoxy Appcaton and instalation of Solar Pavement Leveled Marker/St Using Rubber Mose! STEPS -Ming of Concrete Epoxy Simutansousy Dane with Orientation Layout and arn of Siar Paverient Lovells Marker St Posto. i ippina of Covet! Hole Using. Demelhion Hamner (Breaker) ant Gare Dep ‘CONSTRUCTION/INSTALLATION PROCEDURAL STEPS ‘STEP 1 - nyo, Pustonng and Marking of Solor Pavement Leveled Marker/Sud Hoke ‘ection Ung Tae Measure and Meta! ing Guide. /ORKS AND HIGHWAYS SECRETARY esr si, “Thi has reference to you" later dated September 6, 2016 regaréng the request forthe Incision of te Rosdster Solar Pavarent Leveled Morkers/Stus n te Construction Cost Infermatin System (C15), SAND HIGHWAYS OFFICE OF THE SECRETARY September 8, 2016 MEMORANDUM 10 Director MA. NIEVA S. DE LA PAZ Inftrmeten Management Serve. BUREAU OF CONSTRUCTION nae 3,2 Mr, RYAN T. UBIO Brecutive Marketing OF cated May 23, 2016 (Annex °A") regarding the request ar Solar Pavement Leveled Markers/Studs unt “This has ceference to your fora cerieaion and soraval of Roa ces dation last May ected to concut actual fel om methodology, auto and standard unit cost of the which wa itll in Sorsogon Oty, under DPHH ~ Sorsogon 1* tn ts regard, two (2) t together with the je = Solr J attire. ocanro

You might also like