‘tan CHART DIAGRAM FOR 17% 607(S)8- Soar Pavement \veioa Marke/Stud (Fash Type) Type 6105,
ecumtins, saber, ated Ragusa nx Pace
fiber Piatersss = sane TP canarssofewenan 0 Sor raver tveee any
Siangcrtamawsits | Sam 2» Sie tate 1th Nene ea
uprert fiarey on 2 Geodata 10 Concatecjony"A°e°8* ONE 98
‘auiomect (Greg) ae
EBS Come MEP 3 3p Seng maa ou
sar ater Pure ise 35h
5 Damahion Ran a6 canoes Mae
ee
1 eagefseniee ae Cana
Goer)
Sora Bh of ber
acrrames _____bunarcy eomates)
‘eras eer ice acon rn ‘crma acne *
2 bing oe Gang re rg Hace wt rata
= 7
nn La
[See
4. esa of oa He fos es
[5 ona ee
ncn
gc coe Eon ee
ame
2. Onekatenaayat of Sor Fave eed =
res
«mate Sr Poneto Met ema:
9c Te oe!CONBTRUCIION MEFIODOLORY
FEN sor(xje ~3044
PAENCY VUCVSLUE MARKGRYSTUD (FLUSKE TYPE}
(MANPOWER REQUIREMENTS
4 4 Constracin Foreman
+ 2-Siled taborer
22 nll Corer
‘eoUTPMENT REQUIKWIRIETS
“+ Blamend Caring Machine (00160 230¥) wth Water Pump (OMF-10)
5 Daralion Harner, Breaker (TE7OGAVR)
{carefree Tek (2-5 tons)
5 pr Too sh 26 Boer ater Mal, Stl, Hes Rig ct, Tone
maven ceCEMRENEIETS
{ Menlaneous materials such as grease, oth, chal, trafic gneve, et.Diamond Core Bt (Coring Plate)
Replaced Every 500 Holes
‘Connection End (Coring Biace)
Replaced Every 100 Holes
‘cohcneTE EPOXY
smn
‘Vetume = (oy4y123/1000)5/1000)
Volume = 0000059411 cu.
‘elu = (0.000059411 cur. )1000 t/t cum. ga/3.785 Wt)
‘Volume = 0.036 gal./pe-
Replaced Every 100 Holes
N= 4/300)
N= 0.01 pieca/pe.
REQUIREMENTS COMPUTATION FOR ITEM 607(1)8~SOLAR PAVEMENT LEVELLED MARKER/STUO
Egupment Alowance = 5 rntes
Egupment ficiency = 0%
‘See Borchar as reference
Te (eas) + (5745)/0.80,
7203055
12030
T= (45/85) + (545)/0.80
7292659,
12025‘STEP - Epoxy Appcaton and instalation of Solar Pavement Leveled Marker/St Using
Rubber Mose!STEPS -Ming of Concrete Epoxy Simutansousy Dane with Orientation Layout and
arn of Siar Paverient Lovells Marker St Posto.i
ippina of Covet! Hole Using. Demelhion Hamner (Breaker) ant
Gare Dep‘CONSTRUCTION/INSTALLATION PROCEDURAL STEPS
‘STEP 1 - nyo, Pustonng and Marking of Solor Pavement Leveled Marker/Sud Hoke
‘ection Ung Tae Measure and Meta! ing Guide./ORKS AND HIGHWAYS
SECRETARY
esr si,
“Thi has reference to you" later dated September 6, 2016 regaréng the request forthe
Incision of te Rosdster Solar Pavarent Leveled Morkers/Stus n te Construction Cost
Infermatin System (C15),SAND HIGHWAYS
OFFICE OF THE SECRETARY
September 8, 2016
MEMORANDUM
10 Director MA. NIEVA S. DE LA PAZ
Inftrmeten Management Serve.BUREAU OF CONSTRUCTION
nae 3,2
Mr, RYAN T. UBIO
Brecutive Marketing OF
cated May 23, 2016 (Annex °A") regarding the request
ar Solar Pavement Leveled Markers/Studs unt
“This has ceference to your
fora cerieaion and soraval of Roa
ces
dation last May
ected to concut actual fel
om methodology, auto and standard unit cost of the
which wa itll in Sorsogon Oty, under DPHH ~ Sorsogon 1*
tn ts regard, two (2)
t together with the
je = Solr
J attire. ocanro