Professional Documents
Culture Documents
2023 PPMP Hmes
2023 PPMP Hmes
ICT EQUIPMENT
Desktop Set
Processor: 12th Gen Intel® Core™ i5 (16-
Core, 24MB Cache, 2.1GHz to 5.1GHz)
Operating System: Windows 11 Pro
Memory: 64GB
2 Hard Drive: 512GB M.2 PCIe NVMe SSD 2 80,000.00 2 2 160,000.00
(Boot) + 2TB 7200RPM 3.5" SATA HDD
(Storage)
Ports: Front and Rear
Wireless: Intel Kille Wi-Fi 6E 1675i
Monitor: 27″ 4K Ultra HD vivid display
with optional touch
Keyboard: Multimedia Keyboard; Black
Mouse: Wireless Optical
OTHER SUPPLIES AND EQUIPMENT
(Semi-Expendable)
Smart TV
Screen Size: 55”
3 With HDMI, USB, and Other Connection 3 30,000.00 3 3 90,000.00
Ports
OLED Display
Screen Resolution: Full HD
Refresh Rate: 100-120fps
FURNITURES
Wooden Armchair
4 with built-in locker or bottom 80 1,500.00 80 80 120,000.00
compartment for storage
INFRASTRUCTURE
5 Construction of pathway (entrance gate) 20 sqm 800,000.00 1
and school fence 1 800,000.00
TOTAL 1,250,000.00
NOTE: Technical Specifications for each Item/Project being proposed shall be submitted as part of the PPMP
08/14/2023 Page 1 of 39
2019 PPMP
08/14/2023 Page 2 of 39
2019 PPMP
08/14/2023 Page 3 of 39
2019 PPMP
Sub Total
OFFICE EQUIPMENT
Sub Total
OTHER PROPERTY PLANT AND EQUIPMENT
Sub Total
INSURANCE
Sub Total
TOTAL 15,488,600.00
NOTE: Technical Specifications for each Item/Project being proposed shall be submitted as part of the PPMP
08/14/2023 Page 4 of 39
2019 PPMP
08/14/2023 Page 5 of 39
2019 PPMP
08/14/2023 Page 6 of 39
2019 PPMP
08/14/2023 Page 7 of 39
2019 PPMP
Toilet Tissue paper, 2ply, 12 roll, 12 pack 243 49,000.00 0.00 10 3 10 210 10
08/14/2023 Page 8 of 39
2019 PPMP
08/14/2023 Page 9 of 39
2019 PPMP
08/14/2023 Page 10 of 39
2019 PPMP
08/14/2023 Page 11 of 39
2019 PPMP
08/14/2023 Page 12 of 39
2019 PPMP
Arnis Body Armor for Live stick for Secondary 2 21,600.00 0.00 2
08/14/2023 Page 13 of 39
2019 PPMP
08/14/2023 Page 14 of 39
2019 PPMP
NOTE: Technical Specifications for each Item/Project being proposed shall be submitted as part of the PPMP
Submitted By:
IMELDA M. ASUNCION
District Supervisor
08/14/2023 Page 15 of 39
2019 PPMP
END-USER/UNIT: SECONDARY
Fund Code:
Projects, Programs and Activities (PAPs)
QUANTITY ESTIMATED Mode of Inflation SCHEDULE /MILESTONE OF ACTIVITIES
CODE GENERAL DESCRIPTION
BUDGET Procurement Amount
SIZE Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
TEXTBOOKS and INSTRUCTIONAL MATERIALS
8
CCTV Camera 8 Channel 99,000.00 0.00
channel
16
CCTV 8 Channel HIGH Resolution Bullet channel
2 sets 200,000.00 0.00
Camera 18.5 LED Monitor with 2
DVR
16
channel
CCTV Camera with 2 DVR 16 channel 20,000.00 0.00
with 2
DVR
LCD Projector 1 40,000.00 0.00 1
ID Card Printer 1 100,000.00 0.00 1
Sub Total 5,227,240.00
OTHER EQUIPMENT
Photocopier 1 50,000.00 0.00 1
Risograph Machine (Gestetner DX2430) 1 140,000.00 0.00 1
Speaker with amplifier (Konzert) 1 22,000.00 0.00 1
Air Condinioner Inverter 1.5 HP (window
2 75,000.00 0.00 2
type)
Air Condinioner Inverter 2 HP (window type) 2 100,000.00 0.00 2
08/14/2023 Page 16 of 39
2019 PPMP
END-USER/UNIT: SECONDARY
Fund Code:
Projects, Programs and Activities (PAPs)
QUANTITY ESTIMATED Mode of Inflation SCHEDULE /MILESTONE OF ACTIVITIES
CODE GENERAL DESCRIPTION
BUDGET Procurement Amount
SIZE Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
Air Condinioner Inverter 1.5HP (Split type) 2 150,000.00 0.00 2
Sewing Machine 1 5,670.00 0.00 1
Oven 1 8,100.00 0.00 1
Washing Machine With Dryer 2 23,825.00 0.00 1 1
Electric Stove 1 4,050.00 0.00 1
Flat Iron 1 2,300.00 0.00 1
Laminating Machine 2 4,600.00 0.00 2
Refrigerator 1 155,000.00 0.00 1
08/14/2023 Page 17 of 39
2019 PPMP
END-USER/UNIT: SECONDARY
Fund Code:
Projects, Programs and Activities (PAPs)
QUANTITY ESTIMATED Mode of Inflation SCHEDULE /MILESTONE OF ACTIVITIES
CODE GENERAL DESCRIPTION
BUDGET Procurement Amount
SIZE Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
Angel Grinder 1 4,000.00 0.00 1
Paper Cutter/Trimmer with ruler 2 2,260.00 0.00 2
Laminating Film 500 1,500.00 0.00 500
Braille Slate, Stylus 3 3,060.00 0.00 3
Braille Paper 3 1,260.00 0.00 3
Plastic Sealer 2 3,600.00 0.00 2
Hearing Aide Batteries 10 4,200.00 0.00 10
Ironing Board 1 680.00 0.00 1
Clinical Thermometer 3 7,290.00 0.00 3
Hot Compress 3 1,620.00 0.00 3
Ice Bag 2 220.00 0.00 2
Scissors 5 1,150.00 0.00 5
Manicure Set 5 8,100.00 0.00 5
Foot Bath 2 2,000.00 0.00 2
Hair Blower 2 4,050.00 0.00 2
Cutting Board 3 1,830.00 0.00 3
Colander 3 1,560.00 0.00 3
Can Opener 3 1,230.00 0.00 3
Sauce Pan 2 1,500.00 0.00 2
Spade Shovel 2 1,620.00 0.00 2
Garden Fork 2 500.00 0.00 2
Trowel 2 540.00 0.00 2
Flower Shears 2 610.00 0.00 2
Frying Pan 2 1,620.00 0.00 2
Wooden Spoon 3 405.00 0.00 3
Measuring Spoon 2 270.00 0.00 2
Tongs 3 480.00 0.00 3
Fish Turner 3 1,350.00 0.00 3
Peeler 3 540.00 0.00 3
Hedge Shears 2 1,960.00 0.00 2
Wired Microphone (Yamaha) 5 4,100.00 0.00 1 4
Wireless Microphone 1 set 2,000.00 0.00 1
White Board with wheels (24inx36in) 6 13,000.00 0.00 6
Cordless Landline Phone 1 3,000.00 0.00 1
Two way Radio 2 3,000.00 0.00 2
Alcohol, ethyl , 1 gallon 370 117,000.00 0.00 25 45 25 250 25
Liquid Soap, 500ml 40 21,000.00 0.00 5 5 5 5
Toilet Tissue paper, 2ply, 12 roll, 12 pack 140 44,000.00 0.00 10 10 110 10
Tissue, interfoldedpaper towel, 150roll 140 44,000.00 0.00 10 10 110 10
Trash Bag Black 37"x40" XL 10 pieces
300 48,000.00 0.00 25 25 225 25
roll/pack
Trash Bin or can 50 5,000.00 0.00 50
08/14/2023 Page 18 of 39
2019 PPMP
END-USER/UNIT: SECONDARY
Fund Code:
Projects, Programs and Activities (PAPs)
QUANTITY ESTIMATED Mode of Inflation SCHEDULE /MILESTONE OF ACTIVITIES
CODE GENERAL DESCRIPTION
BUDGET Procurement Amount
SIZE Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
Diswashing Liquid, 1 gallon 70 25,000.00 0.00 15 15 30 10
Air Freshener, aerosol type, 150g 50 25,000.00 0.00 15 15 10 10
Cleaner, toilet bowl and urinal, 900ml-
50 25,000.00 0.00 15 15 10 10
1000ml
Detergent Powder, all purpose, 1kg 30 9,000.00 0.00 15 15
Disinfecting Spray, aerosol type,400g 110 38,820.00 0.00 15 15 80
Disinfectant Solution 20 7,000.00 0.00 20
Furniture Cleaner, aerosol type, 400g 30 15,000.00 0.00 15 15
Rags, All cotton 50 10,000.00 0.00 25 25
Baygon Spray (waterbase) 30 14,040.00 0.00 15 15
Broom 50 5,000.00 0.00 50
Wooden Broom (Walis Tingting) 50 3,000.00 0.00 50
Window Cleaning Mop, Brush 2 1,890.00 0.00 2
Paracetamol (Biogesic) 6 720.00 0.00 2 2 2
Katinco (30g) 6 540.00 0.00 2 2 2
whiteflower oil ( 10ml.) 6 1,200.00 0.00 2 2 2
Spine Boards 1 5,000.00 0.00 1
Portable Medical Oxygen Tank (Small) 1 4,000.00 0.00 1
Digital Sphygmomanometer 1 21,060.00 0.00 1
Stethoscope (Aneroid Sphygmomanometer
2 3,600.00 0.00 2
with dual head Stethoscope
wheel-chair 2 14,000.00 0.00 2
Neck brace 2 400.00 0.00 2
Hot Compress bag 5 120.00 0.00 5
Betadine 2 358.00 0.00 2
Cool box (8 liters) 1 6,000.00 0.00 1
flourescent tube 40 watts 100 10,000.00 0.00 100
electrical tape (3M brand) 10 590.00 0.00 10
junction box 30 150.00 0.00 30
electrical outlet 30 1,110.00 0.00 30
electrical extension (5 meters) 5 325.00 0.00 5
fire extinguisher (red) 4 800.00 0.00 4
Futsal ball 3 1,500.00 0.00 3
TCX Shuttle Cock 15 2,400.00 0.00 15
Goal of Futsal 2 8,160.00 0.00 2
Basketball GG7 2 2,400.00 0.00 2
Mikasa MVA 33D 3 1,995.00 0.00 3
GTO Tournament Volleyball net 1 1,800.00 0.00 1
Yonex Astroxx 99 Pro 6 2,790.00 0.00 6
100m Tape Measure 1 1,200.00 0.00 1
Sepaktakraw Training Ball 10 10,000.00 0.00 10
Sepaktakraw Rubber Ball 10 10,000.00 0.00 10
08/14/2023 Page 19 of 39
2019 PPMP
END-USER/UNIT: SECONDARY
Fund Code:
Projects, Programs and Activities (PAPs)
QUANTITY ESTIMATED Mode of Inflation SCHEDULE /MILESTONE OF ACTIVITIES
CODE GENERAL DESCRIPTION
BUDGET Procurement Amount
SIZE Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
Sepaktakraw Net 2 4,000.00 0.00 2
Interlocking Rubber mat 50 50,000.00 0.00 25 25
Dinner plate 12 2,400.00 0.00 12
Salad bowl 12 3,000.00 0.00 12
Salad fork 12 1,800.00 0.00 12
Fish Fork 12 840.00 0.00 12
Dinner fork 12 1,680.00 0.00 12
Dinner spoon 12 1,680.00 0.00 12
Bread Plate 12 1,680.00 0.00 12
Butter knife 12 960.00 0.00 12
dessert spoon 12 960.00 0.00 12
water glass 12 1,000.00 0.00 12
champagne glass 12 1,500.00 0.00 12
Wine glass 12 2,000.00 0.00 12
Pitcher Glass 10 5,000.00 0.00 10
Frying pan -BIG 4 8,800.00 0.00 4
Apron 25 7,250.00 0.00 25
Fordable table 1 3,412.76 0.00 1
Bond Paper (A4) 1210 reams 351,207.86 0.00 1210
Bond Paper (Short) 410 reams 51,298.00 0.00 410
Hard Copy Bond Paper (Long) 1050 175,205.86 0.00 1050
RISO Paper Long 500 50,000.00 0.00 500
RISO INK (BPS-413S C-4) 12 24,000.00 0.00 12
RISO TONER (shibakawa SI002) 14 20,300.00 0.00 14
INK Gestetner 40 32,000.00 0.00 40
RISO INK (CiV-3130) 2 3,600.00 0.00 2
RISO INK (CiV-1200) 3 5,400.00 0.00 3
12
RISO INK (S-7220UA) 12 boxes 27,600.00 0.00
boxes
RISO Master Roll (BPS-41GBS C-4) 5 20,476.16 0.00 5
RISO Masterl Roll (Shibakawa RZ RV/EV A4) 14 31,800.00 0.00 14
Master Roll (Gestetner) 80 96,000.00 0.00 80
RISO Masterl Roll (CV/A4 - L A) 6 rolls 17,100.00 0.00 6 rolls
Epson Ink - Genuine Black 003 52 37,000.00 0.00 52
Epson Ink - Genuine Cyan 003 52 37,000.00 0.00 52
Epson Ink - Genuine Yellow 003 52 37,000.00 0.00 52
Epson Ink - Genuine Magenta 003 52 37,000.00 0.00 52
Epson Ink - Genuine Black 664 32 28,380.00 0.00 32
Epson Ink - Genuine Cyan 664 32 28,380.00 0.00 32
Epson Ink - Genuine Yellow 664 32 28,380.00 0.00 32
Epson Ink - Genuine Magenta 664 32 28,380.00 0.00 32
Printer Ink Catridge- Cannon 810 (Blk) 5 5,400.00 0.00 5
08/14/2023 Page 20 of 39
2019 PPMP
END-USER/UNIT: SECONDARY
Fund Code:
Projects, Programs and Activities (PAPs)
QUANTITY ESTIMATED Mode of Inflation SCHEDULE /MILESTONE OF ACTIVITIES
CODE GENERAL DESCRIPTION
BUDGET Procurement Amount
SIZE Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
Printer Ink Catridge- Cannon 811 (Colored) 5 6,300.00 0.00 5
HP Ink GT53 9 16,650.00 0.00 9
HP Ink Genuine GT52 (Cyan) 9 16,650.00 0.00 9
HP Ink Genuine GT52 (Yellow) 9 16,650.00 0.00 9
HP Ink Genuine GT52 (Magenta) 9 16,650.00 0.00 9
Photocopier Toner-Develop INEO165e 16 boxes 112,000.00 0.00 16
08/14/2023 Page 21 of 39
2019 PPMP
END-USER/UNIT: SECONDARY
Fund Code:
Projects, Programs and Activities (PAPs)
QUANTITY ESTIMATED Mode of Inflation SCHEDULE /MILESTONE OF ACTIVITIES
CODE GENERAL DESCRIPTION
BUDGET Procurement Amount
SIZE Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
4,322,000.00 0.00
Sub Total 4,322,000.00
TEELEPHONE EXPENSE
57,200.00 0.00
Sub Total 57,200.00
INTERNET EXPENSES
97,300.00 0.00
Sub Total 97,300.00
OTHER GENERAL SERVICES PROGRAM
3,588,545.57 0.00
Sub Total 3,588,545.57
OTHER MAINTENANCE AND OPERATING EXPENSES
Cash Incentives (Awards) 67,000.00 0.00 1
Yearend Conference 170,000.00 0.00 1
GAD Activities 60,000.00 0.00 1
InService Training for Teachers 95,500.00 0.00 1
Meals 168,750.00 0.00 230
Plaques 12,000.00 0.00 20
Certificate Frame 3,000.00 0.00 20
Certificate Holder 5,000.00 0.00 50
Tarpaulin 1,500.00 0.00 1
Chairs 5,750.00 0.00 230
Tables 4,000.00 0.00 20
Citizenship Development Program (Scouting) 130,500.00 0.00
Sub Total 723,000.00
OTHER MAINTENANCE AND OPERATING EXPENSES - Sports Expenses
110,000.00 0.00 1
Sub Total 110,000.00
END-USER/UNIT: SECONDARY
Fund Code:
Projects, Programs and Activities (PAPs)
QUANTITY ESTIMATED Mode of Inflation SCHEDULE /MILESTONE OF ACTIVITIES
CODE GENERAL DESCRIPTION
BUDGET Procurement Amount
SIZE Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
1 package of
Construction of Roof from Gate to New
serviceable 105,000.00 0.00 1
Ynares Building
material
Improvement of Instructional Classroom /
1 200,000.00 0.00 1
Intervention / Remedial Room
Construction of Covered Pathway in San
Pathway 200,000.00 0.00 1
Miguel - Annex (2 meters wide)
Improvement of School Canteen in San School
30,000.00 0.00 1
Miguel Annex (Tile Installation) Canteen
Comfort
Repair of Comfort room in San Miguel School Room in San
20,000.00 0.00 1
Canteen Miguel Annex
Canteen
Installation of Screendoors in School Canteen 2
20,000.00 0.00 1
(San Miguel Annex) (for Entrance and Exit) screendoors
Installation of Divider between kitchen &
countertop (half glass & half plywood) (San Divider 25,000.00 0.00 1
Miguel Annex Canteen) Ciudad Office
Repair of Comfort room in Ciudad Campus
Comfort 20,000.00 0.00 1
Office
Room
Ciudad
School
Repair of Comfort room in Ciudad Campus
Canteen 25,000.00 0.00 1
School Canteen
Comfort
Room
School
School Canteen Improvement and Lavatory Canteen
40,000.00 0.00 1
Replacement (Ciudad Campus) Ciudad
Campus
Tiling of Conference Room 1 80,000.00 0.00 1
Repairs of Kitchen/pantry of principal office 200,000.00 0.00
Sub Total 1,070,000.00
GRAND TOTAL 23,363,863.82
NOTE: Technical Specifications for each Item/Project being proposed shall be submitted as part of the PPMP
Submitted By:
IMELDA M. ASUNCION
District Supervisor
08/14/2023 Page 23 of 39
2019 PPMP
08/14/2023 Page 24 of 39
2019 PPMP
08/14/2023 Page 25 of 39
2019 PPMP
NOTE: Technical Specifications for each Item/Project being proposed shall be submitted as part of the PPMP
Submitted By:
IMELDA M. ASUNCION
District Supervisor
08/14/2023 Page 26 of 39
2019 PPMP
END-USER/UNIT:
Fund Code:
Projects, Programs and Activities (PAPs)
QUANTITY ESTIMATED Mode of Inflation SCHEDULE /MILESTONE OF ACTIVITIES
CODE GENERAL DESCRIPTION
BUDGET Procurement Amount
SIZE Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
TEXTBOOKS and INSTRUCTIONAL MATERIALS
BRB4 Program - Key Stage 1
Quarter 3 12,500 1,812,500.00 0.00 12,500
Quarter 4 12,500 1,812,500.00 0.00 12,500
Pre-School Workbook (Key Stage I) 5539 1,000,000.00 0.00 5539
Reading Materials (Key Stage I) 4600 700,000.00 0.00 4600
Textbooks 150 150,000.00 0.00 150
Tablet 10 260,000.00 0.00 5 5
8
CCTV Camera 8 Channel 99,000.00 0.00
channel
16
CCTV 8 Channel HIGH Resolution Bullet channel
2 sets 200,000.00 0.00
Camera 18.5 LED Monitor with 2
DVR
16
channel
CCTV Camera with 2 DVR 16 channel 20,000.00 0.00
with 2
DVR
Epson Printer L3110 14 156,000.00 0.00 4 10
Epson Printer L3210 9 169,000.00 0.00 4 3 2
Epson Printer L6170 7 130,000.00 0.00 5 2
Epson Printer L4150 3 50,000.00 0.00 3
Sub Total 9,885,580.00
OTHER EQUIPMENT
Photocopier 4 365,000.00 0.00 3 1
08/14/2023 Page 27 of 39
2019 PPMP
END-USER/UNIT:
Fund Code:
Projects, Programs and Activities (PAPs)
QUANTITY ESTIMATED Mode of Inflation SCHEDULE /MILESTONE OF ACTIVITIES
CODE GENERAL DESCRIPTION
BUDGET Procurement Amount
SIZE Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
Sound System, XTREME 100WXS 2.0 CH
Power Amplifier With PL Speaker; Bluetooth
4 331,352.00 0.00 4
FM, USB, SD Card Reader, LED Display with
VFD Display and Remote Control (AV-155n)
DSLR Camera (Canon) 3 180,000.00 0.00 3
Air Conditioner (Split Type) 2HP 4 253,680.00 0.00 4
Air Conditioner (Split Type) 1.5HP 1 50,000.00 0.00 1
Air Conditioner (Window Type) 2HP 2 46,193.00 0.00 2
Air Conditioner - Inverter (Window Type)
3 315,000.00 0.00 3
1HP
Megaphone 2 29,677.00 0.00 2
Sewing machine 2 20,000.00 0.00 2
Risograph Machine (Gestetner DX2430) 1 140,000.00 0.00 1
Speaker with amplifier (Konzert) 1 22,000.00 0.00 1
Air Condinioner Inverter 1.5 HP (window
2 75,000.00 0.00 2
type)
Air Condinioner Inverter 2 HP (window type) 2 100,000.00 0.00 2
08/14/2023 Page 28 of 39
2019 PPMP
END-USER/UNIT:
Fund Code:
Projects, Programs and Activities (PAPs)
QUANTITY ESTIMATED Mode of Inflation SCHEDULE /MILESTONE OF ACTIVITIES
CODE GENERAL DESCRIPTION
BUDGET Procurement Amount
SIZE Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
Sub Total 2,875,817.00
OTHER SUPPLIES AND MATERIALS
Teachers Table 25 375,000.00 0.00 25
Teachers Chair 25 78,750.00 0.00 25
Office table and chairs 3 55,000.00 0.00 3
Executive Table 1 39,900.00 0.00 1
Conference Table
-3 CT good for 15-20 persons
5 300,000.00 0.00 5
-2 CT
good for 12-18 persons
Biometrics 7 80,000.00 0.00 4 3
Ladder
1 20,000.00 0.00 1
-28 ft. Fiberglass Extensionladder
Sofa Set/Sala Set 4 60,000.00 0.00 4
Dinning table and chairs (6, 14, 16 seaters) 3 301,200.00 0.00 3
Armchairs for intermediate 80 250,000.00 0.00 40 40
Big Water Tank/Water Storage 1 50,000.00 0.00 1
Trash Bag Black 37"x40" XL 10 pieces
10 10,000.00 0.00 10
roll/pack
Diswashing Liquid, 1 gallon 10 5,000.00 0.00 10
Air Freshener, aerosol type, 150g 10 5,000.00 0.00 10
Cleaner, toilet bowl and urinal, 900ml-
10 5,000.00 0.00 10
1000ml
Toner Catridge, DocuCentre S2010 5 42,000.00 0.00 5
Drum, DocuCenter S2010 1 10,000.00 0.00 1
special paper ( for certificate) 100 26,900.00 0.00 100
packaging tape (200 meters) 100 5,600.00 0.00 25 25 25 25
double adhesive 100 2,800.00 0.00 25 25 25 25
ballpen HBW Black 100 900.00 0.00 100
ballpen HBW Blue 100 900.00 0.00 100
ballpen HBW Red 100 900.00 0.00 100
Specialty Board (A4) 30 Packs 10,500.00 0.00 30
Specialty Board (Letter) 30 packs 10,800.00 0.00 30
Specialty Board (Long) 30 packs 11,400.00 0.00 30
Staple Wire #35 30 Packs 1,101.16 0.00 30
Customized Planner 170 34,000.00 0.00 170
Customized Tote Bag 170 25,000.00 0.00 170
Angel Grinder 1 4,000.00 0.00 1
Paper Cutter/Trimmer with ruler 2 2,260.00 0.00 2
Laminating Film 500 1,500.00 0.00 500
Braille Slate, Stylus 3 3,060.00 0.00 3
Braille Paper 3 1,260.00 0.00 3
Plastic Sealer 2 3,600.00 0.00 2
Hearing Aide Batteries 10 4,200.00 0.00 10
Ironing Board 1 680.00 0.00 1
Clinical Thermometer 3 7,290.00 0.00 3
08/14/2023 Page 29 of 39
2019 PPMP
END-USER/UNIT:
Fund Code:
Projects, Programs and Activities (PAPs)
QUANTITY ESTIMATED Mode of Inflation SCHEDULE /MILESTONE OF ACTIVITIES
CODE GENERAL DESCRIPTION
BUDGET Procurement Amount
SIZE Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
Hot Compress 3 1,620.00 0.00 3
Ice Bag 2 220.00 0.00 2
Scissors 5 1,150.00 0.00 5
Manicure Set 5 8,100.00 0.00 5
Foot Bath 2 2,000.00 0.00 2
Hair Blower 2 4,050.00 0.00 2
Cutting Board 3 1,830.00 0.00 3
Colander 3 1,560.00 0.00 3
Can Opener 3 1,230.00 0.00 3
Sauce Pan 2 1,500.00 0.00 2
Spade Shovel 2 1,620.00 0.00 2
Garden Fork 2 500.00 0.00 2
Trowel 2 540.00 0.00 2
Flower Shears 2 610.00 0.00 2
Frying Pan 2 1,620.00 0.00 2
Wooden Spoon 3 405.00 0.00 3
Measuring Spoon 2 270.00 0.00 2
Tongs 3 480.00 0.00 3
Fish Turner 3 1,350.00 0.00 3
Peeler 3 540.00 0.00 3
Hedge Shears 2 1,960.00 0.00 2
Wired Microphone (Yamaha) 5 4,100.00 0.00 1 4
Wireless Microphone 1 set 2,000.00 0.00 1
White Board with wheels (24inx36in) 6 13,000.00 0.00 6
Cordless Landline Phone 1 3,000.00 0.00 1
Two way Radio 2 3,000.00 0.00 2
Alcohol, ethyl , 1 gallon 370 117,000.00 0.00 25 45 25 250 25
Liquid Soap, 500ml 40 21,000.00 0.00 5 5 5 5
Toilet Tissue paper, 2ply, 12 roll, 12 pack 140 44,000.00 0.00 10 10 110 10
Tissue, interfoldedpaper towel, 150roll 140 44,000.00 0.00 10 10 110 10
Trash Bag Black 37"x40" XL 10 pieces
300 48,000.00 0.00 25 25 225 25
roll/pack
Trash Bin or can 50 5,000.00 0.00 50
08/14/2023 Page 30 of 39
2019 PPMP
END-USER/UNIT:
Fund Code:
Projects, Programs and Activities (PAPs)
QUANTITY ESTIMATED Mode of Inflation SCHEDULE /MILESTONE OF ACTIVITIES
CODE GENERAL DESCRIPTION
BUDGET Procurement Amount
SIZE Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
Wooden Broom (Walis Tingting) 50 3,000.00 0.00 50
Window Cleaning Mop, Brush 2 1,890.00 0.00 2
Paracetamol (Biogesic) 6 720.00 0.00 2 2 2
Katinco (30g) 6 540.00 0.00 2 2 2
whiteflower oil ( 10ml.) 6 1,200.00 0.00 2 2 2
Spine Boards 1 5,000.00 0.00 1
Portable Medical Oxygen Tank (Small) 1 4,000.00 0.00 1
Digital Sphygmomanometer 1 21,060.00 0.00 1
Stethoscope (Aneroid Sphygmomanometer
2 3,600.00 0.00 2
with dual head Stethoscope
wheel-chair 2 14,000.00 0.00 2
Neck brace 2 400.00 0.00 2
Hot Compress bag 5 120.00 0.00 5
Betadine 2 358.00 0.00 2
Cool box (8 liters) 1 6,000.00 0.00 1
flourescent tube 40 watts 100 10,000.00 0.00 100
electrical tape (3M brand) 10 590.00 0.00 10
junction box 30 150.00 0.00 30
electrical outlet 30 1,110.00 0.00 30
electrical extension (5 meters) 5 325.00 0.00 5
fire extinguisher (red) 4 800.00 0.00 4
Futsal ball 3 1,500.00 0.00 3
TCX Shuttle Cock 15 2,400.00 0.00 15
Goal of Futsal 2 8,160.00 0.00 2
Basketball GG7 2 2,400.00 0.00 2
Mikasa MVA 33D 3 1,995.00 0.00 3
GTO Tournament Volleyball net 1 1,800.00 0.00 1
Yonex Astroxx 99 Pro 6 2,790.00 0.00 6
100m Tape Measure 1 1,200.00 0.00 1
Sepaktakraw Training Ball 10 10,000.00 0.00 10
Sepaktakraw Rubber Ball 10 10,000.00 0.00 10
Sepaktakraw Net 2 4,000.00 0.00 2
Interlocking Rubber mat 50 50,000.00 0.00 25 25
Dinner plate 12 2,400.00 0.00 12
Salad bowl 12 3,000.00 0.00 12
Salad fork 12 1,800.00 0.00 12
Fish Fork 12 840.00 0.00 12
Dinner fork 12 1,680.00 0.00 12
Dinner spoon 12 1,680.00 0.00 12
Bread Plate 12 1,680.00 0.00 12
Butter knife 12 960.00 0.00 12
dessert spoon 12 960.00 0.00 12
water glass 12 1,000.00 0.00 12
08/14/2023 Page 31 of 39
2019 PPMP
END-USER/UNIT:
Fund Code:
Projects, Programs and Activities (PAPs)
QUANTITY ESTIMATED Mode of Inflation SCHEDULE /MILESTONE OF ACTIVITIES
CODE GENERAL DESCRIPTION
BUDGET Procurement Amount
SIZE Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
champagne glass 12 1,500.00 0.00 12
Wine glass 12 2,000.00 0.00 12
Pitcher Glass 10 5,000.00 0.00 10
Frying pan -BIG 4 8,800.00 0.00 4
Apron 25 7,250.00 0.00 25
Fordable table 1 3,412.76 0.00 1
Bond Paper (A4) 1,710 351,207.86 0.00 1710
Bond Paper (Short) 410 51,298.00 0.00 410
Bond Paper (Long) 1550 175,705.86 0.00 1550
RISO Paper Long 500 50,000.00 0.00 500
RISO INK (BPS-413S C-4) 12 24,000.00 0.00 12
RISO TONER (shibakawa SI002) 14 20,300.00 0.00 14
INK Gestetner 40 32,000.00 0.00 40
RISO INK (CiV-3130) 2 3,600.00 0.00 2
RISO INK (CiV-1200) 3 5,400.00 0.00 3
12
RISO INK (S-7220UA) 12 boxes 27,600.00 0.00
boxes
RISO Master Roll (BPS-41GBS C-4) 5 20,476.16 0.00 5
RISO Masterl Roll (Shibakawa RZ RV/EV A4) 14 31,800.00 0.00 14
Master Roll (Gestetner) 80 96,000.00 0.00 80
RISO Masterl Roll (CV/A4 - L A) 6 rolls 17,100.00 0.00 6 rolls
Epson Ink - Genuine Black 003 52 37,000.00 0.00 52
Epson Ink - Genuine Cyan 003 52 37,000.00 0.00 52
Epson Ink - Genuine Yellow 003 52 37,000.00 0.00 52
Epson Ink - Genuine Magenta 003 52 37,000.00 0.00 52
Epson Ink - Genuine Black 664 32 28,380.00 0.00 32
Epson Ink - Genuine Cyan 664 32 28,380.00 0.00 32
Epson Ink - Genuine Yellow 664 32 28,380.00 0.00 32
Epson Ink - Genuine Magenta 664 32 28,380.00 0.00 32
Printer Ink Catridge- Cannon 810 (Blk) 5 5,400.00 0.00 5
Printer Ink Catridge- Cannon 811 (Colored) 5 6,300.00 0.00 5
HP Ink GT53 9 16,650.00 0.00 9
HP Ink Genuine GT52 (Cyan) 9 16,650.00 0.00 9
HP Ink Genuine GT52 (Yellow) 9 16,650.00 0.00 9
HP Ink Genuine GT52 (Magenta) 9 16,650.00 0.00 9
Photocopier Toner-Develop INEO165e 16 boxes 112,000.00 0.00 16
Sub Total 3,929,994.80
TRAINING/SEMINARS
Various Seminars and Trainings 1,670,000.00 0.00
Training Kits - GAWAD TaySenHigh 0.00
Tarpaulin 4x6 1,500.00 0.00
Plastic Folder with handle 150.00 0.00
Cartolina paper 28.00 0.00
Pilot pen 56.00 0.00
08/14/2023 Page 32 of 39
2019 PPMP
END-USER/UNIT:
Fund Code:
Projects, Programs and Activities (PAPs)
QUANTITY ESTIMATED Mode of Inflation SCHEDULE /MILESTONE OF ACTIVITIES
CODE GENERAL DESCRIPTION
BUDGET Procurement Amount
SIZE Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
Spiral Notebook 70.00 0.00
Face Mask KN 95 32.50 0.00
Alcohol 135.00 0.00
Certificate 85.00 0.00
Certificate holder 115.00 0.00
Training Kits - IN-SERVICE TRAINING
Tarpaulin 4x6 1,500.00 0.00
Plastic Folder with handle 150.00 0.00
Cartolina paper 28.00 0.00
Pilot pen 56.00 0.00
Spiral Notebook 70.00 0.00
Face Mask KN 95 35.00 0.00
Alcohol 135.00 0.00
Certificate 85.00 0.00
Certificate holder 115.00 0.00
Sub Total 1,674,345.50
TRAVEL EXPENSES
300,000.00 0.00
Sub Total 300,000.00
REPAIR & MAINTENANCE OF EQUIPMENT
200,000.00 0.00
Sub Total 200,000.00
WATER EXPENSES
5,150,002.95 0.00
Sub Total 5,150,002.95
ELECTRICITY EXPENSES
11,322,000.00 0.00
Sub Total 11,322,000.00
TEELEPHONE EXPENSE
215,200.00 0.00
Sub Total 215,200.00
INTERNET EXPENSES
385,754.00 0.00
Sub Total 385,754.00
OTHER GENERAL SERVICES PROGRAM
12,588,545.57 0.00
Sub Total 12,588,545.57
OTHER MAINTENANCE AND OPERATING EXPENSES
Year End Conference/Seminars 200,000.00 0.00
Cash Incentives (Awards) 67,000.00 0.00
Yearend Conference 170,000.00 0.00
GAD Activities 60,000.00 0.00
InService Training for Teachers 95,500.00 0.00
08/14/2023 Page 33 of 39
2019 PPMP
END-USER/UNIT:
Fund Code:
Projects, Programs and Activities (PAPs)
QUANTITY ESTIMATED Mode of Inflation SCHEDULE /MILESTONE OF ACTIVITIES
CODE GENERAL DESCRIPTION
BUDGET Procurement Amount
SIZE Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
Meals 168,750.00 0.00
Plaques 12,000.00 0.00
Certificate Frame 3,000.00 0.00
Certificate Holder 5,000.00 0.00
Tarpaulin 1,500.00 0.00
Chairs 5,750.00 0.00
Tables 4,000.00 0.00
Citizenship Development Program (Scouting) 130,500.00 0.00
Sub Total 923,000.00
OTHER MAINTENANCE AND OPERATING EXPENSES - Sports Expenses
110,000.00 0.00 1
Sub Total 110,000.00
08/14/2023 Page 34 of 39
2019 PPMP
END-USER/UNIT:
Fund Code:
Projects, Programs and Activities (PAPs)
QUANTITY ESTIMATED Mode of Inflation SCHEDULE /MILESTONE OF ACTIVITIES
CODE GENERAL DESCRIPTION
BUDGET Procurement Amount
SIZE Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
Upgrading of electrical wiring (FMES) 1 100,000.00 0.00 1
Repair of Comfort Room (KES) 100,000.00 0.00 1
Repair of Perimeter fence improvement 1 100,000.00 0.00 1
(KES)
Construction of pathway-Entrance gate and
1 100,000.00 0.00 1
School Fence (HMES)
Principals Office Renovation (TES) 1 100,000.00 0.00 1
Upgrading of Electrical Service Entrance
1 100,000.00 0.00 1
(TES)
Upgrading of Electrical Wiring (SFES) 1 100,000.00 0.00 1
Repairs of Comfort Room at the 3rd Floor 1 package of
and the Ceiling at the 4th Floor of Principal- serviceable 105,000.00 0.00 1
Led Building material of
1 package
Construction of Roof from Gate to New
serviceable 105,000.00 0.00 1
Ynares Building
material
Improvement of Instructional Classroom /
1 200,000.00 0.00 1
Intervention / Remedial Room
Construction of Covered Pathway in San
Pathway 200,000.00 0.00 1
Miguel - Annex (2 meters wide)
Improvement of School Canteen in San School
30,000.00 0.00 1
Miguel Annex (Tile Installation) Canteen
Comfort
Repair of Comfort room in San Miguel School Room in San
20,000.00 0.00 1
Canteen Miguel Annex
Canteen
Installation of Screendoors in School Canteen 2
20,000.00 0.00 1
(San Miguel Annex) (for Entrance and Exit) screendoors
Installation of Divider between kitchen &
countertop (half glass & half plywood) (San Divider 25,000.00 0.00 1
Miguel Annex Canteen)
Ciudad Office
Repair of Comfort room in Ciudad Campus
Comfort
Ciudad 20,000.00 0.00 1
Office
Room
School
Repair of Comfort room in Ciudad Campus
Canteen 25,000.00 0.00 1
School Canteen
School
Comfort
School Canteen Improvement and Lavatory Canteen
Room
40,000.00 0.00 1
Replacement (Ciudad Campus) Ciudad
Campus
Tiling of Conference Room 1 80,000.00 0.00 1
Repairs of Kitchen/pantry of principal office 200,000.00 0.00
Sub Total 3,470,000.00
GRAND TOTAL 60,139,239.82
NOTE: Technical Specifications for each Item/Project being proposed shall be submitted as part of the PPMP
Submitted By:
IMELDA M. ASUNCION
District Supervisor
08/14/2023 Page 35 of 39
2019 PPMP
08/14/2023 Page 36 of 39
2019 PPMP
08/14/2023 Page 37 of 39
2019 PPMP
08/14/2023 Page 38 of 39
2019 PPMP
NOTE: Technical Specifications for each Item/Project being proposed shall be submitted as part of the PPMP
Submitted By:
IMELDA M. ASUNCION
District Supervisor
08/14/2023 Page 39 of 39