CHECK LIST REINFORCEMENT WORKS - PRE, DURING & POST CHECK
Company Godrej Properties Project Nurture
Tower Floor Ground Floor Unit(s) Activity REINFORCEMENT WORKS - PRE, DURING & POST CHECK WIR Created By WIR Status WIR Created Date WIR Closed Date Contractor Nurture- Adiraj Enterprises Phase Hardscape
TASKS HISTORY
SI # Location Task applicant Status Scheduled Date Closed Date
1 REINFORCEMENT WORKS - PRE, DURING & POST CHECK
SI # Checkpoint Client Comments Contractor Comments Last Status Photos
1 Name, date and number of the GFC drawing 2 Is the area prepared for starting reinforcement (shuttering complete, cleaned, oiled, taped & required safety measures has been taken) 3 Aproved bar bending schedule available and the area to be reinforced compatible with the approved drawings? 4 Are the required tools available at site to ensure correct work? 5 Is the reinforcement stacked on wooden runners and free from oil, mud, grease and other forms of contamination? 6 Is the overlapping of rebar for correct length and the laps are staggered? 7 Are the development length provided for Beams/Columns as per drawing/BBS? 8 Are the dowels for columns, beams and slabs in place checked for proper length as per the bar bending plan or schedule? 9 Are the required hooks fixed and is the chainheight or the upper layer of reinforcement correct? Can the chair support the construction load without displacement of rebar? 10 Is the reinforcement done as per specification and drawing [numbers, spacing, shape]?(Tolerance 10mm for effective depth 200mm &15mm for depth above 200mm) 11 Are cover blocks provided and fixed as per specifications,have beam and column joints checked for sufficient cover bIocks?(Tolerance to Cover+5mm) 12 Is the rebar assembly well tied and able to take construction loads & forces? 13 Is the binding wire of correct size 16 to 22 gauge black annealed steel wire used? Are the ends of the binding wire turned away from the surface? 14 Has the consultant inspected the reinforcement before the concreting has started? 15 Check for support system for reinforcement works as per technical specification requirements 16 Check the top level of the reinforcement ( excluding cover ) as per approved GFC drawing