PCC Works -During Checks involves checking that the grade of concrete, mixing, compaction, and level of poured concrete complies (PCC) during construction of the ground floor at Nurture tower for Godrej Properties. Tasks include verifying appropriate concrete grade and mixing, compaction is done correctly, level is maintained, and taking cube samples if required. The contractor is Nurture- Adiraj Enterprises for the hardscape phase.
PCC Works -During Checks involves checking that the grade of concrete, mixing, compaction, and level of poured concrete complies (PCC) during construction of the ground floor at Nurture tower for Godrej Properties. Tasks include verifying appropriate concrete grade and mixing, compaction is done correctly, level is maintained, and taking cube samples if required. The contractor is Nurture- Adiraj Enterprises for the hardscape phase.
PCC Works -During Checks involves checking that the grade of concrete, mixing, compaction, and level of poured concrete complies (PCC) during construction of the ground floor at Nurture tower for Godrej Properties. Tasks include verifying appropriate concrete grade and mixing, compaction is done correctly, level is maintained, and taking cube samples if required. The contractor is Nurture- Adiraj Enterprises for the hardscape phase.
PCC Works -During Checks involves checking that the grade of concrete, mixing, compaction, and level of poured concrete complies (PCC) during construction of the ground floor at Nurture tower for Godrej Properties. Tasks include verifying appropriate concrete grade and mixing, compaction is done correctly, level is maintained, and taking cube samples if required. The contractor is Nurture- Adiraj Enterprises for the hardscape phase.
Tower Floor Ground Floor Unit(s) Activity PCC Works -During Checks WIR Created By WIR Status WIR Created Date WIR Closed Date Contractor Nurture- Adiraj Enterprises Phase Hardscape
TASKS HISTORY
SI # Location Task Applicant Status Scheduled Date Closed Date
1 PCC Works -During Checks
SI # Checkpoint Client Comments Contractor Comments Last Status Photos
1 Check the grade of concrete and its mixing done approriately 2 Check Compaction done for concrete 3 Check the level of PCC is maintained 4 Cube sample taken if reqired