PCC Works -Post Checks involves checking the poured concrete surface at a Godrej Properties development called Nurture to ensure it meets requirements, and checking that curing using hessian cloth or ponding is done for 10 days by contractor Adiraj Enterprises. The work is part of hardscape phase tasks and includes two checkpoints to check the concrete surface and curing.
PCC Works -Post Checks involves checking the poured concrete surface at a Godrej Properties development called Nurture to ensure it meets requirements, and checking that curing using hessian cloth or ponding is done for 10 days by contractor Adiraj Enterprises. The work is part of hardscape phase tasks and includes two checkpoints to check the concrete surface and curing.
PCC Works -Post Checks involves checking the poured concrete surface at a Godrej Properties development called Nurture to ensure it meets requirements, and checking that curing using hessian cloth or ponding is done for 10 days by contractor Adiraj Enterprises. The work is part of hardscape phase tasks and includes two checkpoints to check the concrete surface and curing.
Tower Floor Ground Floor Unit(s) Activity PCC Works -Post Checks WIR Created By WIR Status WIR Created Date WIR Closed Date Contractor Nurture- Adiraj Enterprises Phase Hardscape
TASKS HISTORY
SI # Location Task Applicant Status Scheduled Date Closed Date
1 PCC Works -Post Checks
SI # Checkpoint Client Comments Contractor Comments Last Status Photos
1 Check after concreting pouring, ensure the surface of PCC is finished as per requirements. 2 Check Curing must be done using the hessian cloth / ponding for 10 Days