Professional Documents
Culture Documents
Hasil Test Pasir ADI GEN (Masuk TGL 17-11-2022)
Hasil Test Pasir ADI GEN (Masuk TGL 17-11-2022)
Hasil Test Pasir ADI GEN (Masuk TGL 17-11-2022)
DEPARTMENT
H.Office : JL Hasanudin, Bugis , Sumbawa Besar, Nusa Tenggara Barat
Laboratory : Koncrete Koboi
Ds Kelapis Sumbawa Besar Nusa Tenggara Barat
Project
Tested by Edi.w
Checked by Ardiyanto
100
90
80
70
Percent Passing
60
50
40
30
20
10
Sieve No.
0
PAN # 200 # 100 # 50 # 30 # 16 #8 #4 3/8 "
Checked by Tested by
( .....Ardiyanto...... ) ( .....Ardiyanto..... )
QA & QC ; R&D ; TECHNICAL CONCRETE & RAW MATERIAL
DEPARTMENT
H.Office : JL Hasanudin, Bugis , Sumbawa Besar, Nusa Tenggara Barat
Laboratory : Koncrete Koboi
Ds Kelapis Sumbawa Besar Nusa Tenggara Barat
Attention
Tested by Edi.w Fax. No.
Checked by Ardiyanto Copy to
Percentage of material finer than 75 micron (No. 200) by washing ( B - C ) / B x 100 % 2.70
Checked by Tested by
( .....Ardiyanto...... ) ( .................................... )
QA & QC ; R&D ; TECHNICAL CONCRETE & RAW MATERIAL
DEPARTMENT
H.Office : JL Hasanudin, Bugis , Sumbawa Besar, Nusa Tenggara Barat
Laboratory : Koncrete Koboi
Ds Kelapis Sumbawa Besar Nusa Tenggara Barat
Tested by Edi.w
Checked by Ardiyanto
Checked by Tested by
( .....Ardiyanto...... ) ( .................................... )
QA & QC ; R&D ; TECHNICAL CONCRETE & RAW MATERIAL
DEPARTMENT
H.Office : JL Hasanudin, Bugis , Sumbawa Besar, Nusa Tenggara Barat
Laboratory : Koncrete Koboi
Ds Kelapis Sumbawa Besar Nusa Tenggara Barat
Tested by Edi.w
Checked by Ardiyanto
Note :
Checked by Tested by
( .....Ardiyanto...... ) ( .................................... )