1 1
MZSL MZCL
2 2
REMOTE CLOSE
SELECTED
REMOTE MZSL MZCL MZOL
SHOWN ON PID SHOWN ON PID SELECTED
MZS MZC
CLOSE OPEN
y, transferred, reproduced, copied, disclosed or used, without its prior written consent, for any purpose and in any way other than that for which it is
3 INTERMEDIATE
L-0-R
POSITION
O L/O/R
MZOL MZS MZC MZO
MHS C MZPL MJXL
3
E POWER OPEN
PROPRIETARY CONNECTION TO ACTUATOR ISOLATED
POSITION O
MHS C
POWER ISOLATION
E
3 I MJXS 3
CONTACTOR MXA ACTUATOR ALARM
MCS
MHS I MHXS-YYXXNNS-O (OPEN) E MHS
MHXS-YYXXNNS-C (CLOSE) POWER ISOLATED
MXA ACTUATOR ALARM MXL ACTUATOR STATUS
ed dated 28th December 2017, as amended, supplemented and/or restated from time to time.
MOV E
+
MOV SB
TYPICAL MV4 +
TYPICAL MV6
MOTORIZED VALVE OPERATED FROM DCS POSITION TRANSMITTER TO DCS
specifically furnished or outside the extent of the agreed upon right of use, as set out in the contract for the Lump Sum Turnkey for Package A1 Olefins Plant of LSP Complex Project between the Consortium of TPSK and Long Son Petrochemicals Company Limit
The present document or drawing is issued by the Consortium of TPSK for and on behalf of Long Son Petrochemicals Company Limited. The information contained in this document shall not, under any circumstances, be totally or partially, directly or indirectl
5 5
O REMOTE
AfnatulAfiqah
SiauLim Tan
MHS C MZSL Shahrudin
2021.07.27
CheangHong
Tan
SELECTED 2021.07.26
19:15:52 14:19:21 2021.07.28
17:03:05
+08'00'
E +08'00' +08'00'
MXA ACTUATOR ALARM 3 30 Jul 2021 ISSUE FOR CONSTRUCTION 4 AFS SLT CHT
MCS
MHS L/O/R
7 2 16 Nov 2020 ISSUE FOR CONSTRUCTION 3 HXN RKM CHT
7
MXL ACTUATOR STATUS MZS
MHXS-YYXXNNS-O (OPEN)
SB MHXS-YYXXNNS-C (CLOSE) 1 28 Aug 2020 ISSUE FOR CONSTRUCTION 2 HXN RKM CHT
MOV MHXS-YYXXNNS-E (ENABLE)
TYPICAL MV6 +
MOV A.IANNANTUONO M.MENCHINELLI
+ 0 14 Apr 2020 ISSUE FOR CONSTRUCTION 1 A.PONTANI
I.GALDI D.PASTORE
A.IANNANTUONO M.MENCHINELLI
B 20 Dec 2019 ISSUE FOR DETAILED DESIGN 2 A.PONTANI
C.MESTICHELLI D.PASTORE
MCS: MOV CONTROL SYSTEM A 17 Sep 2019 ISSUE FOR DETAILED DESIGN 1 AP AI/CM MM/DP
SB: EXTERNAL POSITION SWITCH JUNCTION BOX
REV DATE DESCRIPTION PREP CKD APPR/AUTH
036909C-1000-PID-0090-0016 1of1
Unit Disc Subj Ser.No
3
N/A Project Doc.Type