Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

OUTLET

TO THE NEAREST
MAIN SEWER
(VERIFY ON SITE)

BALCONY ROOF SHEET PERIMETER LINE


SEPTIC TANK SECOND FLOOR ROOFED BALCONY PERIMETER LINE (ABOVE)

(3.00 x 1.50 x 1.50M) SECOND FLOOR ROOFED BALCONY PERIMETER LINE

(VERIFY LOC.)
SUB-ROOF
DIRTY KITCHEN
ROOFED PRIVATE / FAMILY BALCONY SLOPE
INLET
KITCHEN SINK
(DOUBLE BOWL)
LAUNDRY
CO
OVERHANG CAB.
/ DRYER W-3 D-6 W-2
3" PVC PIPE S-1000
VS ROOF FLASHING
FIGURINE / BOOK 01 02 03
D-2 W-5
2" PVC PIPE S-1000

KITCHEN SINK REF.


W-4 SHELVES
DS
WINE CB
SEWER PIPE / HOUSE DRAIN (4" DIA. PVC PIPE S.1000)

VSRACK D-5
&
(DOUBLE BOWL)
D-2 DN.

ETC. 16 15 14 13 12 01-16
CLEAN KITCHEN STO. BLW. STEPS 04

11 05
CNP-01
LAV BEDROOM 02

ROOF FLASHING
SHOE RACK STAIR SHELVES (ALONG STRINGER)
2" PVC PIPE S-1000 06
10

CONCRETE GUTTER
CNP-04
FD
D-3 KITCHEN CENTER
09 07 MAIN ROOF
W-6 ISLAND
COUNTERTOP
08
W-1
W-4 SMALL HALL 08
W-1
SLOPE
07 09

FD
D-4 06
D-4
10

05
D-3 11
2" PVC PIPE S-1000
FD
SHOWER W-6 WC 2" PVC
04 SHOWER PIPE S-1000
SECOND FLOOR WALL EXTENSION PERIMETER LINE (ABOVE)

SECOND FLOOR WALL EXTENSION PERIMETER LINE (ABOVE)

SECOND FLOOR WALL EXTENSION PERIMETER LINE (ABOVE)


CB FD3" PVC LAV SHOWER
CNP-04 FD
03 PIPE S-1000
SS
3" PVC
FD DS
SOIL PIPE (4" DIA. PVC PIPE S.1000) PIPE S-1000
SOIL PIPE (4" DIA. PVC PIPE S.1000) WC

SECOND FLOOR WALL EXTENSION PERIMETER LINE

ROOF FLASHING
VS CO VS
02
RISER CO SS (VS)
WC CNP-04
FD 01-16
01
CNP-03 LAV DS
CO SHOWER

H A L L W A Y
STEPS 2" PVC

W-6 W-6 VS FD D-4


CO PIPE S-1000
3" PVC
W-6

)
FD

00
UP MASTERS PIPE S-1000

10
W-6 WARDOBE

S.
D-3 D-4 VS (OPEN-TYPE)
D-3

PE

CONCRETE GUTTER
PI
RISER

C
(60 x 90cm)

PV
.
IA
"D
D-2

(4
CO
D-4

PE
W-4

3" PVC PIPE S-1000


LIVING AREA / FAMILY HALL

PI
IL
W-4

SO
ENTRY D-1 FD D-3 CNP-04
STOOP 01 BEDROOM 03
2" PVC
WC FD PIPE S-1000 LAV

SOIL PIPE (4" DIA. PVC PIPE S.1000)


D-2 DS

ROOF FLASHING
CB BEDRM. 05
WARDOBE
(OPEN-TYPE)

(NOTE 01: TO BE DECIDED UPON ACTUAL CONSTRUCTION IF THERE WILL BE WALL PARTITION) W-4 (60 x 60cm)
MAIN ROOF
SLOPE

CONCRETE GUTTER
CNP-04
(NOTE 02: PROVIDE FUTURE EMERGENCY EXIT DOOR
D-2 3" PVC
PIPE S-1000 FD
IF THE "OPEN AREA / SPACE"
WILL BE CONVERTED INTO D-4 SHOWERVS
A COMMERCIAL SPACE / ROOM) MASTERS BEDROOM CNP-04
(BEDROOM 01)
OPEN AREA / SPACE WC
BEDROOM 04 CO
W-6
ENTRY D-1 CNP-04 FD
W-4 D-3
STOOP 02 BEDRM. 04 3" PVC
LAV
W-4 WARDOBE PIPE S-1000

DS
W-4 W-4 CB W-2 (OPEN-TYPE)
(60 x 60cm)
W-2
ROOF FLASHING
TO THE NEAREST
MAIN SEWER CNP-02 CNP-02
(VERIFY ON SITE)

SOIL AND STORM DRAINAGE LAYOUT SOIL AND STORM DRAINAGE LAYOUT SOIL AND STORM DRAINAGE LAYOUT
P (GROUND FLOOR PLAN) P (GROUND FLOOR PLAN) P (ROOF PLAN)
SCALE: 1:80 MTS. SCALE: 1:80 MTS. SCALE: 1:80 MTS.
2 1 2 2 2 3

MASTER PLUMBER / SANITARY ENGINEER: PROJECT TITLE: OWNER: R.A. 9266: SHEET CONTENT: ADDENDUM: SHEET NO:
SEC. 33. Ownership of plans, specification and other
MARIETTA O. GERMAN, rmp.
MASTER PLUMBER
contract documents. Drawings and specification and
other contract documents duly signed, stamped or
sealed, as instruments of service, are the intellectual
"A S S H O W N" P-2
property and documents of the architect, whether the
PRC No: 0012768 VALIDITY: 07-25-2025
PROPOSED TWO-STOREY RESIDENTIAL BUILDING NIEVES ABINA ISHIKAWA object for which they are made is executed or not. It
shall be unlawful for any person to duplicate or to CHECKED BY: MARIETTA O. GERMAN, rmp. DESCRIPTION OF REVISIONS: DATE:
ISSUED ON: 01-05-2023

2 3
PTR No: 8323593
make copies of said documents for use in the
ISSUED AT: TACLOBAN CITY repetition and for other projects or buildings, whether DESIGNED BY: MARIETTA O. GERMAN, rmp.
09163032387 executed partly or in whole, without the written
PROJECT LOCATION: BRGY. SULANGAN, GU I UAN, EASTERN SAMAR APPROVED BY: consent of architect or author of said documents. DRAFTED BY: MARIETTA O. GERMAN, rmp.

You might also like