IFH ENGINEERING PLC

አይ ኤፍ ኤች ኢንጅነሪንግ ኃ.የተ.የግል ማህበር

Ref No: IFH/BAC/082/14 Date: December 29, 2014

To: Road Design & Development Consultants/RDDC/PLC


Addis Ababa
Attn: Ato Berhanu Hailu, Resident Engineer
Ref: Ayat Round About- Sunshine Condominium Bole Arabsa
Asphalt Road Construction project Lot 3(Package 30 Bole
Arabssa 1&2)

Subject: Submission Binder Course and Wearing Course material from


Kality Batching Plant test result

Dear Sirs,

We hereby inform you that, we have jointly with your material inspector taken
the Binder Course and Wearing Course material from Kality Batching Plant.
We tested it in our Kality Laboratory. :

So the test results all according with the specification, and hence we have
attached the test results with this letter. Please check and give us approval.

Thanking you in advance for your timely cooperation, we remain.

Sincerely your

Wang Yang
General Manager
Encl: 55 pages Attachment

CC:
 Project Manager

P.O.Box: 2509 Tel: 00251-1-391971 Fax: 00251-1-392468


Address: Akaki Kaliti Sub-City; Woreda 5 Addis Ababa, Ethiopia