Sr. AS PER NIT Add Above % (82.95%) AS PER NEW PHE SOR
Item Particulars Qty. Unit Difference
No. Rate Amount Rate Amount Rate Amount
1 2 3 4 5 6 7 8 9 10 11 12
Site Clearance of grass and crops including rooting
1 301 1800.00 Sqm 0.60 1080.00 1.10 1976.00 348.00 626400.00 -625320.00
out.
(a) Excavation is soft or Ordinary Soil including 50m
2 2801 4562.19 Cum 64.00 291980.00 117.09 534178.00 201.00 917000.19 -625020.19
lead and 1.5m lift with dressing.
(b) Excavation in Hard Soil including 50m lead and
3 2802 798.76 Cum 72.00 57511.00 131.72 105216.00 266.00 212470.16 -154959.16
1.5m lift with dressing.
Excavation in hard moorum and moorum with
4 2803 boulders including 50m lead and 1.5m lift wit 112.33 Cum 89.00 9997.00 162.83 18290.00 384.00 43134.72 -33137.72
dressing.
Excavation in disintegrated rock including 50m lead
5 2805 509.23 Cum 177.00 90134.00 323.82 164900.00 384.00 195544.32 -105410.32
and 1.5m lift with dressing.
Excavation in Soft Rock including 50m lead and 1.5m
6 2806 70.01 Cum 315.00 22053.00 576.29 40346.00 465.00 32554.65 -10501.65
lift with dressing.
Excavation in Hard Rock including 50m lead and 1.5m
7 2807 0.00 Cum 770.00 0.00 1408.72 0.00 664.00 0.00 0.00
lift (b) Blasting prohibited.
8 2804 Extra rate for Item No. 2802 to 2803 Cum 0.00 0.00
(i) Beyond 1.5m to 3.00m 0.00 Cum 4.00 0.00 7.32 0.00 0.00 0.00 0.00
(i) Beyond 3.0m to 4.50m 0.00 Cum 5.00 0.00 9.15 0.00 0.00 0.00 0.00
(i) Beyond 4.50m to 6.00m 0.00 Cum 7.00 0.00 12.81 0.00 0.00 0.00 0.00
(i) Beyond 6.00m to 7.50m 0.00 Cum 10.00 0.00 18.30 0.00 0.00 0.00 0.00
(i) Beyond 7.50m to 9.00m 0.00 Cum 12.00 0.00 21.95 0.00 0.00 0.00 0.00
Extra rate for wet excavation below sub soil water for
9 411 Cum 0.00
item (401, 402, 408, 409)
(i) Soft Soil 2281.10 Cum 19.20 43797.00 35.13 80127.00 40.20 91700.22 -47903.22
(ii) Hard Soil 399.38 Cum 21.60 8627.00 39.52 15782.00 53.20 21247.02 -12620.02
(iii) Moorum 56.17 Cum 26.70 1500.00 48.85 2744.00 76.80 4313.86 -2813.86
Cement concrete 1:2:4 with graded metal of
10 715 b 178.06 Cum 2576.00 458683.00 4712.79 839160.00 5910.00 1052334.60 -593651.60
maximum size- (b) 40mm
Extra for mechanical vibration of cement concrete or
11 721 178.06 Cum 51.00 9081.00 93.30 16614.00 0.00 0.00 9081.00
plum conctete
Extra for additional 1.50m height or part there of (a)
12 722 178.06 Cum 22.00 3917.00 40.25 7167.00 0.00 0.00 3917.00
1.50m to 3.0m
Shuttering for faces of concrete for step in sloping
13 724 178.06 Cum 80.00 14245.00 146.36 26061.00 231.00 41131.86 -26886.86
foundatin
(i) Up to 5 HP 720.00 Hrs 106.00 76320.00 193.93 139627.00 0.00 0.00 76320.00
(ii) More than 5HP to 10HP 360.00 Hrs 168.00 60480.00 307.36 110648.00 0.00 0.00 60480.00
(c) Erection of canal gate for otem 2606 (a) & (b) 0.55 Ton 16880.00 9284.00 30881.96 16985.00 0.00 0.00 9284.00
Sr. AS PER NIT Add Above % (82.95%) AS PER NEW PHE SOR
Item Particulars Qty. Unit Difference
No. Rate Amount Rate Amount Rate Amount
1 2 3 4 5 6 7 8 9 10 11 12
28 1103 a 6mm thick cement plaster to ceiling in- 1:3 393.41 Sqm 53.00 20851.00 96.96 38146.00 0.00 0.00 20851.00
Improved terrace flooring 40mm thick in cement
concrete 1:2:4 with 20mm graded metal laid in panels
29 1017 318.84 Sqm 159.00 50696.00 290.89 92748.00 5954.00 1898373.36 -1847677.36
including finishing with neat cement floating. Curing.
Etc. complete.
b window 4.32 Sqm 1674.00 7232.00 3062.58 13230.00 0.00 0.00 7232.00
b ventilators 1.44 Sqm 2209.00 3181.00 4041.37 5820.00 0.00 0.00 3181.00
Earth work for bund and for canal banks needing dam
speficiation in hearting or casing with approved soils
including dressing, breaking of clods, laying in layers
41 415 b of 15cm thickness, cutting and finishing U/S and D/S 1265.63 Cum 99.00 125297.00 181.12 229232.00 266.00 336657.58 -211360.58
slops of bunds including 50m lead and 1.5m lift of all
materials and all other charges but excluding
watering and compaction.
750mm dia pipe 6800.00 Rm 12314.00 83735200.00 22528.46 153193548.00 16036.00 109044800.00
400mm dia pipe 560.00 Rm 4237.00 2372720.00 7751.59 4340891.00 5642.00 3159520.00
500mm x 400mm dia. 10.00 No. 25597.00 255970.00 46829.71 468297.00 31925.00 319250.00
600mm x 500mm dia. 6.00 No. 17192.00 103152.00 31452.76 188717.00 21442.00 128652.00
500mm dia. 4.00 No. 205360.00 821440.00 375706.12 1502824.00 256125.00 1024500.00
400mm dia. 4.00 No. 109242.00 436968.00 199858.24 799433.00 136247.00 544988.00
150mm dia. (IN PLACE OF 80MM) 6.00 No. 6849.00 41094.00 12530.25 75181.00 14928.00 89568.00
Sr. AS PER NIT Add Above % (82.95%) AS PER NEW PHE SOR
Item Particulars Qty. Unit
No. Rate Amount Rate Amount Rate Amount
1 2 3 4 5 6 7 8 9 10 11 12
401 b (b) Excavation in hard soil including 50m lead and 1.5m 42.00 Cum 72.00 3024.00 131.72 5532.00 266.00 11172.00
lift with dressing.
716 b Cement concrete 1:3:6 with graded metal of maximum 7.20 Cum 2115.00 15228.00 3869.39 27860.00 5029.00 36208.80
size- (b) 40mm
721 Extra for mechanical vibration of cement concrete or 7.20 Cum 51.00 367.00 93.30 672.00 0.00 0.00
plum concrete
722 Extra for additional 1.50m height or part there of (a) 2.16 Cum 22.00 48.00 40.25 87.00 0.00 0.00
1.50m to 3.0m
13
-9171360.00 NEW SOR (18.13.2, P.No.- 51)
13
13
367.00
48.00
13
-5276.60 calculation (new sor)
-1995.21 calculation (new sor)
-40214719.17
-4831623.00
-45046342.17
-201074.00
-45247416.17
-452.47