COURSE NAME SEMESTER /YEAR 2/1
Estimating
INSTRUCTIONAL PRE-
14 weeks None
DURATION REQUISITE(S)
Test (2)
Test 1: Chapter: 1,2,3 20%
Test 2: Chapter: 6,7
Project 15%
Chapter: 6,7
Coursework- 50%
Final exam – 50%
Pekerjaan
Pembantu teknikal
Penyelia tapak
Kerani tapak
Pembantu kejuruteraan
Kontraktor
Pegawai keselamatan dan kesihatan
Pembantu penyelidik
Pembantu Jurutera Kawalan kualiti
Koordinator Bahan
1.0 The Construction Industry In General
2.0 The Tender Procedure
3.0 The Contract Procedure
4.0 Standard Form of Contract P.W.D FORM 203/ 203A
5.0 The Preliminary Estimating Method
6.0 The build up rate method
7.0 The quantity Measurement
CHAPTER 1:
THE CONSTRUCTION
INDUSTRY IN GENERAL
CLO1:
Explain the fundamental concepts of construction industry in general, tender procedure and
contract procedure in Malaysia (C3, PLO 1)
PLO1:
Apply knowledge of applied mathematics, applied science, engineering fundamentals and an
engineering specialization as specified in DK1 to DK4 respectively to wide practical procedures
and practices
DK 1(Natural sciences):
A descriptive, formula-based understanding of the natural sciences applicable in a sub-discipline.
DK2(Mathematics):
Procedural mathematics, numerical analysis, statistics applicable in a sub-discipline.
DK3(Engineering fundamentals):
A coherent procedural formulation of engineering fundamentals required in an accepted sub-
discipline.
DK4(Specialist knowledge):
Engineering specialist knowledge that provides the body of knowledge for an accepted sub-
discipline.
The Construction Industry In General
i. Introduction
ii. Construction activities/stage involved
iii. The roles of :
- Design Team Members
- Construction Team Members
Areas of works
i. Building work
ii. Civil engineering
iii. Mechanical
iv. Water supply
v. Electrical
vi. Quarries
vii. Telecommunication and others.
Types of work (refer CIDB)
i. Civil Engineering Civil engineering construction
CIDB-code CE
CE 01 Road construction
B 05 Pile work
…B 28
i. Civil Engineering
Example of works:
Construction works
relating to:
- Ibs system
- interior design
- Tile installation
- Painting
- Pile and others
The Construction Activities/ stage involved
i. Feasibility study
ii. design
iii. tender
iv. contract
v. construction
vii. Maintenance
i. Feasibility Study
Scheme design - First phase in the design of a project where an architect/engineer prepares schematic diagrams
giving a general view of the components and the scale of the project after detailed discussions with the client
(owner).
Bill of quantity
Rate Total
amount
No. Description of item Unit Quantity
RM Sen RM Sen
Generally
All excavation are measured from
formation level unless otherwise stated
Surface excavation
Excavate oversite to reduce level;
maximum depth not exceeding 1.00m
depth, get out and cart away from site
including level and grading to surface
of excavation M3 200
hardcore
M2
200mm under raft foundation 350
Lean concrete
50mm thick under raft foundation M3 18
iii. Tender
Choosing the suitable contractor to build and finish
the construction project.
iv. Contract
Contract is an agreement between two or more
responsibilities parties and the agreement effective by
law
v. Construction
The contractor that has been appointed and has sign the contract
must build and finish the construction due to the time given and
cost that been agreed and also due to the specified qualities.
vi. Handover
- After completion the whole of works, the contractor shall hand over
the project to the client on or before the “Date for Completion”.
- The date of completion shall be the date of the commencement of
the Defect Liability Period (DLP)
- The contractor is responsible for any repair works through the
defect period of the project.
local authority JKR, JPS, TNB, IWK, District Council, city council and other2
Insurance company Kurnia insurances, RHB insurance, Takaful Malaysia, takaful
ikhlas Malaysia and others.
Suppliers Supply all types of material such as brick, cement, sand, tiles and
others.
Machinery rental: Machine, lorry, crane and others
LPIPM/CIDB
LEMBAGA PEMBANGUNAN
Ministry Of Enterpreneur
INDUSTRI PEMBINAAN MALAYSIA Development And
Cooperatives (MEDAC),
(Kem Kerja raya)
More than
RM 10 000 000.00
Contractor registration criteria
More than
RM 10 000 000.00
Application Procedure
Submit applications:
CONTOH
Pendaftaran
kod bidang
SIJIL TARAF BUMIPUTERA – Pusat khidmat kontraktor
- 51% daripada pemilikan saham syarikat
dimiliki oleh Bumiputera
- 51% daripada Ahli Lembaga Pengarah
dipegang oleh Bumiputera(Ketua Pegawai
Eksekutif, Pengarah urusan, Pengurus,
Akauntan/ Pengurus Kewangan)
CONTOH
exercise
1. Explain the role of the design team as per stated below:
i. Client
ii. Architect
iii. Civil engineer, mechanical engineer, electrical engineer
iv. Quantity surveyor
v. Land survey
4. Explain the roles of the design team members and builders team members.
6. State the financial limit for all grade of contractors registered with Construction