EXISTING SERVICE RELOCATED ITEM 5. DEMOLITION OF EXTERIOR AND INTERIOR WALLS, ROOF CEILING AND FLOORS TO BE
SEQUENCED WITH THE OWNER. IN AREAS WHERE ADJACENT OCCUPANCIES ARE
REMOVED SERVICE REMOVE ITEM NOT IN THE DEMOLITION AREA BUT AFFECTED BY NOISE OF DEMOLITION, OR WHERE TRADE
REQUIRES ACCESS TO EXISTING OCCUPIED SPACES, CONTRACTOR SHALL COORDINATE TIMES OF
SUPPLY LINE XXXS WORK THROUGH THE OWNER.
RETURN LINE XXXR 6. SUPPLY AIR DUCTWORK AND PIPING NOT SHOWN HATCHED IS TO BE RETAINED, ANY DAMAGE
TO EXISTING INSULATION AND DUCTS TO BE REPAIRED TO MATCH EXISTING.
SANITARY DRAIN SAN CLEAN OUT CO 7. INSULATE NEW DUCT AND PIPE CAPS.
STORM DRAIN STW ? 8. DURING DEMOLITION WORK, ALL MECHANICAL SYSTEMS AND BUILDING SERVICES SERVING
FLOOR/ ROOF/ HUB/ AREA DRAIN
OCCUPIED AREAS. SHALL BE MAINTAINED OPERATIONAL. WHERE SYSTEM OR SERVICE
VENT PIPE V INTERRUPTIONS ARE REQUIRED, COORDINATE AFTER HOUR ACCESS REQUIREMENTS AND
PLUMBING FIXTURE TAG ? SECURITY EXECUTE WORK WITH CONSTRUCTION MANAGER.
DOMESTIC COLD WATER
2-WAY CONTROL VALVE PLUG VALVE 1. PROVIDE ENTIRELY NEW DDC SYSTEM THAT INCLUDES HARDWARE,
M SOFTWARE AND GRAPHICS. SYSTEM TO BE CAPABLE OF REMOTE
3-WAY CONTROL VALVE PRESSURE REDUCING VALVE DAIL-IN. INTERNET CONNECTION TO BE PROVIDED BY OWNER.
CHECK VALVE FLEXIBLE CONNECTION 2. PROVIDE ALL COMPONENTS AND COORDINATE WITH THE ELECTRICAL
TRADE FOR POWER CONNECTIONS. ALL ELECTRICAL POWER WIRING
UNION OR FLANGE PIPE ANCHOR COSTS FOR DDC SYSTEM TO BE ALLOWED FOR BY CONTROLS
CONTRACTOR, INCLUDING POWER DISTRIBUTION FROM BREAKER TO
STRAINER -Y OR BASKET PIPE GUIDE TRANSFORMER.
AUTOMATIC AIR VENT AAV
PUMP 3. PROVIDE DDC THERMOSTATS THAT ARE LCD TYPE UNITS WITH CO2
SENSORS IN THE WEIGHT ROOM FOR HV-2 AND THE GYM OFFICE FOR
DOUBLE CHECK VALVE ASSEMBLY DCVA REDUCED PRESSURE BACKFLOW RPBA HV-1. PROVIDE A BLANK THERMOSTAT WITH CO2 SENSOR IN THE
ASSEMBLY GYMNASIUM FOR HV-1. GYM OFFICE AND GYMNASIUM ARE TO BE
PRESSURE GAUGE AVERAGING THERMOSTATS.
AUTOFLOW CONTROL VALVE
CAP OR PLUG 4. ACCEPTABLE CONTROL SYSTEM MANUFACTURERS: DELTA CONTROLS,
THERMOMETER RELIABLE CONTROLS.
ACCEPTABLE CONTROLS CONTRACTORS: ESC AUTOMATION, FRASER
VALLEY CONTROLS, HUOLE ELECTRIC, WEBBER.
5. REFER TO MECH SPEC FOR FULL SCOPE DETAILS..
XT2-1
XRPBA
DEMOLITION NOTES: 9
10 6 B1-1
10 6 B1-2
2
8 10 6 B1-3
CU-1
10 6 B1-4 XDHWT-1 1 P2-1 1 P2-2
9 ET2-1 13
RPBA
CONSTRUCTION NOTES:
1 Suite 180 - 200 Granville Street
CONNECT NEW PUMP AND ASSOCIATED PIPING/VALVES TO EXISTING 12
3 Vancouver BC Canada V6C 1S4
PIPING. ENSURE ALL NEW PUMP TRIM AND VALVES ARE INSTALLED AS
T 604.687.1800
SHOWN ON MECHANICAL DRAWINGS. RE-BALANCE NEW PUMP M
www.integralgroup.com
Project Reference No: ##-####-_##
2 CONNECT NEW PIPING TO EXISTING.
1 P2-3 11
3 CONNECT GAS TO EXISTING. PIPE NEW 12"ø GAS PIPE TO EACH BOILER
COMPLETE WITH SHUTOFF VALVE AND REGULATOR.
2
4 PROVIDE NEW GAS SOLENOID WIRED TO EMERGENCY GAS SHUTOFF
BUTTON TO DE-ACTIVATE BOILERS AND GAS SUPPLY TO BOILERS.
5 7 HV-2
5 ALL NEW ELECTRICAL WORK IS THE RESPONSIBILITY OF THE
CONTRACTOR TO DESIGN AND APPLY FOR THE REQUIRED PERMITS. 2
S XHV-1
6 MODIFY EXISTING BOILER HOUSE KEEPING PAD AS REQUIRED TO FIT
NEW BOILERS. 4
T
7 INSTALL NEW HV-2 AS PER MECHANICAL SCHEDULE AND
SPECIFICATIONS. ADJUST EXISTING DUCTWORK AND HYDRONIC PIPING
TO SUIT NEW HV-2 CONFIGURATION. CONTRACTOR TO REVISE WORKS
RELATED TO ELECTRICAL CONNECTION TO HV-2 AS REQUIRED
INCLDUING PERMITS COORDIATION AND INSTALLATION. NEW UNIT TO
MATCH DIMENSIONS OF EXISTING UNIT. ALLOW FOR NEW STRAINER,
ISOLATION VALVE AND BALANCING VALVE FOR HOT WATER HEATING
COIL. CONNECT NEW CONDENSATE DRAIN TO EXISTING.
DEMOLITION NOTES: 3 M
4"ø DCW
1"ø HWS/R TO
3 XP2-3 WEIGHT ROOM
RPBP HV-2
1 REMOVE EXISTING GAS FIRED BOILER XB1-1 AND ALL ASSOCIATED
HEATING PIPING, PUMP, AND VALVES SERVING EXISTING DOMESTIC
HOT WATER TANK. CAP AND MAKE GOOD FOR RECONNECTION.
EXPANSION
TANK
2 COMPLETELY REMOVE EXISTING 3-WAY VALVE AND REPLACE WITH
NEW. 3-WAY VALVE TO BE WIRED TO EXISTING DDC. UPDATE ALL BMS
XET2-1
GRAPHICS AND CONTROLS AS REQUIRED FOR CONTROL VALVES.
2-12"ø HWS
2"ø NG TO
2-12"ø NG DHWT-1
2 2
M M
1-12"ø HWS/R TO
HV-1
LWCO XP2-2 3
XP2-1 3
CHEMICAL POT
XB1-1 1 FEEDER
1"ø HWS/R TO
CONSTRUCTION NOTES: 7 1 P2-3 WEIGHT ROOM
RPBP HV-2
1 CONNECT NEW PUMP AND ASSOCIATED PIPING/VALVES TO EXISTING
PIPING. ENSURE ALL NEW PUMP TRIM AND VALVES ARE INSTALLED AS
SHOWN ON MECHANICAL DRAWINGS. RE-BALANCE EXISTING PUMP TO EXPANSION
EXISTING FLOW NOTED ON MECHANICAL PUMP SCHEDULE. UPDATE ALL TANK
BMS GRAPHICS AND CONTROLS AS REQUIRED FOR NEW PUMPS.
2
ET2-1
2 CONNECT NEW PIPING TO EXISTING AND MATCH EXISTING PIPE SIZE.
CONTRACTOR TO CONFIRM EXACT PIPE SIZE ON SITE.
TO EXISTING
3 CONNECT GAS TO EXISTING. PIPE NEW 12"ø GAS PIPE TO EACH BOILER FLOOR DRAIN
COMPLETE WITH SHUTOFF VALVE AND REGULATOR.
4 PROVIDE NEW GAS SOLENOID WIRED TO EMERGENCY GAS SHUTOFF 200°F 180°F
BUTTON TO DE-ACTIVATE BOILERS AND GAS SUPPLY TO BOILERS. 2
4 S Suite 180 - 200 Granville Street
T T
2"ø NG TO Vancouver BC Canada V6C 1S4
5 PROVIDE 2" CAPPED CONNECTIONS C/W WITH ISOLATION VALVES FOR
EXISTING DHWT-1 3 T 604.687.1800
FUTURE DOMESTIC HOT WATER HEATING TIE IN.
5 www.integralgroup.com
2-12"ø NG M
6 PROVIDE 3" CAPPED CONNECTIONS C/W WITH ISOLATION VALVES FOR Project Reference No: ##-####-_##
3"ø HWS/R
FUTURE BOILERS 1-12"ø HWS/R
3 HEADER 18.5 GPM
7 PIPE NEW RPBP DRAIN, C/W AIR GAP TO EXISTING FLOOR DRAIN. (TYP)
M M
6 2
2 1-12"ø HWS/R TO
HV-1
1 P2-2
P2-1 1
FILTER
FLOW
INDICATOR
T
Design Selected Design Selected Electrical Electrical Frequency Motor Total Absorbed Motor Motor Manufacturer Model
TAG No. Description Location Notes
Capacity Capacity Head Head Voltage Supply (Hz) Starting Minimum Power Rating Speed
(gpm) (gpm) (ft w.g.) (ft w.g.) (V) Phase Method Efficiency (BHP) (BHP) (RPM)
(1 or 3) (%)
P2-1 Ground Floor Radiation Mechanical Room 9.6 10.6 15.0 18.2 115 1 60 INV 60 0.1 frac 1750 Grundfos Magna3 1, 2
P2-2 Heating & Ventilation Unit 1 Mechanical Room 22.5 24.8 18.0 21.8 115 1 60 INV 60 0.2 0.5 1750 Grundfos Magna3 1, 2
P2-3 Heating & Ventilation Unit 2 Mechanical Room 6.8 7.5 8.0 9.7 115 1 60 INV 60 0.0 farc 1750 Grundfos Magna3 1, 2
Notes
BOILER SCHEDULE (B1-1 to B1-4) AIR HANDLING UNIT SCHEDULE (HV-1) Expansion Tank Schedule
Manfacturer Engineered Air Bladder Expansion Tank Information ET2-1
Tag No. B1-1 to B1-4 Model LM2/C/R Location Mechanical Room
Location Mechanical Room Air Flow Rate (CFM) 2,000 Fan Speed * (RPM) 1275 Manufacturer Amtrol
Manufacturer Viessman External Static Pressure (in wg) 0.50 Absorbed Power * (HP) 0.85 Model Extrol
Total Static Pressure (in wg) 1.75 Motor Rating * (HP) 1.0
Model Vitocrossal 300 CU3A-57 Orientation Horizontal
Type Gas Fired High Mass Condensing Boiler Inverter Driven (Yes/No) No MCA* (Amps) 22.0
Material Steel
Fan Type Centrifugal MOCP* (Amps) 30.0
Working Pressure (psi) 15.0
Total Fan Efficiency * (%) 65 Electrical Supply 208/3/60
Design Information Maximum Working Pressure (psi) 125.0
Input Gas Requirement (BTUH) 199,000 Tank Volume (gal) 24
Heating Coil Information
Boiler Output Capacity (BTUH) 185,000 Dimensions (øxL) (Inch) 12 x 48
Air On Coil Temperature (°F) 53.0 Supply Water Temperature (°F) 200
Thermal Efficiency (%) 93.0 Acceptance Volume (gal) 15
Air Off Coil Temperature (°F) 84.0 Return Water Temperature (°F) 180
Min/Max Natural Gas Pressure (in w.g.) 4 / 14 Weight (lbs)
Duty (Btuh) 68,100 Water Flow Rate (gpm) 6.8
Water Flow (gpm) 18.5 Note:
Maximum Pressure Drop
Maximum Water Pressure Drop (ft w.g.) 2 1) All Tanks should be Bladder type, designed and constructed as per ASME Section V111, Division-1
Standards.
Maximum Operating Pressure (psi) 30
DX Cooling Coil Information
Weight (lbs) 352
Air On Coil Temperature (°F) 80.0 Sensible Cooling (BTU/HR) 48,168
CONDENSING UNIT SCHEDULE
Gas Type Natural Gas Air Off Coil Temperature (°F) 57.7 Total Cooling (BTU/HR) 59,500
Location Outdoor
Boiler Connections Supply Filtration
Manufacturer Engineered Air
Gas Valve (in) 3/4 Panel Filter Grade MERV 8
Model CUE52
Supply (in) 1 1/4
Return (in) 1 1/4 Supply Fan Sound Power Levels Total 63Hz 125Hz 250Hz 500Hz 1kHz 2kHz 4kHz 8kHz
Design Information
Flue Gas (in) 4 Intake * (dB(A))
Nominal Tons (Tons) 5
(in) Discharge * (dB(A))
Drain Valve 1
Compressor Stages 2
Condensate Drain (in) 3/4
Dimensions (L x W x H) (Inch) 69 x 41 x 42
Notes
Weight (lbs) 740
Unit to come complete with:
Electrical Requirements
Refrigerant R-410A
1) Variable capacity digital scoll compressor
Burner Motor HP frac.
2) Expoxy painted casing and fan and Heresite coated coils
Electrical Requirements Volt / Phase 120/1/60
3) TAMCO 1500SW dampers Electrical Information
3. Complete with Viessman acid neaturalization sysetm. 1) Confirm existing voltage/phase and match existing.
4. Multiple boiler installation requires detached boiler native cascade control (Vitotronic 300-K MW2C Cascade Control) 2) Complete with Suction Accumulators, Low Pressure Bypasses, Discharge Holding Tanks
5. Any aluminum, baffle, fin, or fire tube down fired design is not considered equal. 3) Complete with epoxy painted casing and fan and heresite coated coils
6. Separate 120V/1Ph required for boilers and controllers 4) Contractor to confirm electrical data of existing condensing unit on site prior to submission of shop drawings.
7. Contractor resopnsible to register boiler with BC Safety Authority prior to substantial completion.
SUPPORT FOOT BOLTED
TO PUMP FLANGE
SUPPORT FOOT
CHEMICAL BALANCE LINE
CONSTRUCTED FROM 10mm
POT FEEDER
[3/8"] THICK STEEL PLATE.
VIBRATION ISOLATORS
AS SPECIFIED.
UNION
END VIEW
DRAIN VALVE
SEISMIC SPRING
ISOLATORS
ISOLATION BALL
UNION
VALVE
ISOLATION
ISOLATION BALL VALVE
PIPE SIZE AS
PUMP BALL VALVE
SHOWN ON PLAN
P
300 Min.
FRONT VIEW
NOTES:
SUPPORT FOOT TO BE BOLTED TO THE FLOOR SLAB, THROUGH THE
CONC. PAD USING NEOPRENE WASHERS AND BUSHINGS ON THE BOLTS
(MIN. 2 BOLTS).
CLEVIS HANGER
REFER TO SPEC.
NOTES:
VAPOUR SEAL
PREFORMED PIPE
INSULATION. REFER TO
SPEC.
PIPE
INSULATION
PROTECTION SHIELD AT Suite 180 - 200 Granville Street
HANGER. REFER TO Vancouver BC Canada V6C 1S4
SPEC. T 604.687.1800
www.integralgroup.com
Project Reference No: ##-####-_##
HANGER DETAIL FOR PIPING WITH VAPOUR SEALED INSULATION
(FOR COLD PIPING 10°C [50°F] OR LESS)
HANGER ROD
LOCKING NUT
SUPPORT NUT
CLEVIS HANGER
REFER TO SPEC.
PREFORMED PIPE
INSULATION IF
REQ''D. REFER TO
SPEC.
PIPE
PIPE HANGERS
SCALE NTS