MECHANICAL LEGEND

GENERAL DEMOLITION NOTES:


LIST OF ABBREVIATIONS AND CONTROLS 1. PATCH AND MAKE GOOD (TO BASE BUILDING STANDARDS) MECHANICAL COMPONENTS AND
AFF ABOVE FINISHED FLOOR TOP OF DUCT FINISHES DAMAGED DURING THE RENOVATION. PROVIDE INSULATED CAPPED CURBS EQUAL
T.O.D.
TO OR BETTER THAN ROOF R-VALUE FOR FANS, GOOSE NECK OPENINGS AND VENTS BEING
C/W COMPLETE WITH T.O.P. TOP OF PIPE ADDED AND REMOVED.
RWL RAIN WATER LEADER U.O.D. UNDERSIDE OF DUCT
2. MECHANICAL TRADES BIDDING DEMOLITION WORK SHALL ALLOW FOR A FULL DAY ON SITE
F/A, T/A FROM ABOVE, TO ABOVE U.O.P. UNDERSIDE OF PIPE TO REVIEW EXISTING MECHANICAL SERVICES AND EQUIPMENT IN DEMOLITION AND RENOVATED
F/B, T/B FROM BELOW, TO BELOW U/S UNDERSIDE AREAS. ACCESS WILL BE GIVEN TO ROOF AND EXISTING MECHANICAL AND ELECTRICAL ROOMS
AS REQUIRED. SEE TENDER FORM FOR DATE OF MANDATORY SITE MEETING.
NTS NOT TO SCALE DN DOWN
O/A OUTSIDE AIR FRR FIRE RESISTANCE RATED 3. INCLUDE FOR DISPOSAL (FROM SITE) OF ALL REMOVED EQUIPMENT AND SERVICES,
DUCTWORK, PIPING, PLUMBING, ETC. INCLUDING INSULATION AND HANGERS.
R/A RETURN AIR U.N.O. UNLESS NOTED OTHERWISE
E/A EXHAUST AIR CTE CONNECT TO EXISTING 4. DEMOLISHED WORK SHALL INCLUDE FOR TEMPORARY AND PERMANENT WORK (I.E. SERVICE
S/A SUPPLY AIR DIMENSIONS) REQUIRED TO KEEP ACTIVE PREMISES IN OPERATION. COORDINATE TIMES,
ACCESS, TEMPORARY HOARDING, TEMPORARY SCAFFOLDING, TOOL/LIGHT POWER REQUIREMENTS AND
OTHER MISCELLANEOUS ITEMS NEEDED TO COMPLETE WORK WITH GENERAL CONTRACTOR
LIST OF SYMBOLS AND SERVICES IN OCCUPIED AREA AT NIGHT OR IN ACCORDANCE WITH THE OWNER APPROVED SCHEDULE.

EXISTING SERVICE RELOCATED ITEM 5. DEMOLITION OF EXTERIOR AND INTERIOR WALLS, ROOF CEILING AND FLOORS TO BE
SEQUENCED WITH THE OWNER. IN AREAS WHERE ADJACENT OCCUPANCIES ARE
REMOVED SERVICE REMOVE ITEM NOT IN THE DEMOLITION AREA BUT AFFECTED BY NOISE OF DEMOLITION, OR WHERE TRADE
REQUIRES ACCESS TO EXISTING OCCUPIED SPACES, CONTRACTOR SHALL COORDINATE TIMES OF
SUPPLY LINE XXXS WORK THROUGH THE OWNER.

RETURN LINE XXXR 6. SUPPLY AIR DUCTWORK AND PIPING NOT SHOWN HATCHED IS TO BE RETAINED, ANY DAMAGE
TO EXISTING INSULATION AND DUCTS TO BE REPAIRED TO MATCH EXISTING.

SANITARY DRAIN SAN CLEAN OUT CO 7. INSULATE NEW DUCT AND PIPE CAPS.

STORM DRAIN STW ? 8. DURING DEMOLITION WORK, ALL MECHANICAL SYSTEMS AND BUILDING SERVICES SERVING
FLOOR/ ROOF/ HUB/ AREA DRAIN
OCCUPIED AREAS. SHALL BE MAINTAINED OPERATIONAL. WHERE SYSTEM OR SERVICE
VENT PIPE V INTERRUPTIONS ARE REQUIRED, COORDINATE AFTER HOUR ACCESS REQUIREMENTS AND
PLUMBING FIXTURE TAG ? SECURITY EXECUTE WORK WITH CONSTRUCTION MANAGER.
DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT WATER RECIRC

PIPE ELBOW RISER / DROP P & T RELIEF VALVE

PIPE TEE DOWN BALANCING VALVE

STACK UP/ DOWN GLOBE VALVE

SHUT OFF VALVE SUPERVISED VALVE


S

GENERAL SCOPE NOTES:


M

2-WAY CONTROL VALVE PLUG VALVE 1. PROVIDE ENTIRELY NEW DDC SYSTEM THAT INCLUDES HARDWARE,
M SOFTWARE AND GRAPHICS. SYSTEM TO BE CAPABLE OF REMOTE
3-WAY CONTROL VALVE PRESSURE REDUCING VALVE DAIL-IN. INTERNET CONNECTION TO BE PROVIDED BY OWNER.

CHECK VALVE FLEXIBLE CONNECTION 2. PROVIDE ALL COMPONENTS AND COORDINATE WITH THE ELECTRICAL
TRADE FOR POWER CONNECTIONS. ALL ELECTRICAL POWER WIRING
UNION OR FLANGE PIPE ANCHOR COSTS FOR DDC SYSTEM TO BE ALLOWED FOR BY CONTROLS
CONTRACTOR, INCLUDING POWER DISTRIBUTION FROM BREAKER TO
STRAINER -Y OR BASKET PIPE GUIDE TRANSFORMER.
AUTOMATIC AIR VENT AAV
PUMP 3. PROVIDE DDC THERMOSTATS THAT ARE LCD TYPE UNITS WITH CO2
SENSORS IN THE WEIGHT ROOM FOR HV-2 AND THE GYM OFFICE FOR
DOUBLE CHECK VALVE ASSEMBLY DCVA REDUCED PRESSURE BACKFLOW RPBA HV-1. PROVIDE A BLANK THERMOSTAT WITH CO2 SENSOR IN THE
ASSEMBLY GYMNASIUM FOR HV-1. GYM OFFICE AND GYMNASIUM ARE TO BE
PRESSURE GAUGE AVERAGING THERMOSTATS.
AUTOFLOW CONTROL VALVE
CAP OR PLUG 4. ACCEPTABLE CONTROL SYSTEM MANUFACTURERS: DELTA CONTROLS,
THERMOMETER RELIABLE CONTROLS.
ACCEPTABLE CONTROLS CONTRACTORS: ESC AUTOMATION, FRASER
VALLEY CONTROLS, HUOLE ELECTRIC, WEBBER.
5. REFER TO MECH SPEC FOR FULL SCOPE DETAILS..

DUCTWORK STANDARD BRANCH

ROUND DUCT RISER


SINGLE LINE BRANCH
ROUND DUCT DROP
HEATING/COOLING COIL +/-
S/A OR O/A DUCT
TO OR FROM ABOVE
SUPPLY OUTLET
LIST OF SEPARATE PRICES Suite 180 - 200 Granville Street
S/A OR O/A DUCT Vancouver BC Canada V6C 1S4
TO OR FROM BELOW # DESCRIPTION T 604.687.1800
RETURN OR EXHAUST INLET
www.integralgroup.com
R/A OR E/A DUCT RE-LOCATE EXITING GAS FIRE DHWT, Project Reference No: ##-####-_##
TO OR FROM ABOVE ALL ASSOCIATED PIPING, AND
BALANCING DAMPER SEPARATE PRICE #1
HOUSEKEEPING PAD TO INCREASE
R/A OR E/A DUCT BD ACCESSIBILITY TO NEW BOILERS.
TO OR FROM BELOW
EQUIPMENT TAG -

DWG. NO. TITLE SCALE


M-01 TITLE SHEET NTS

M-02 PLANT ROOM PLANS 1/4"=1'-0"

M-03 HYDRONIC SCHEMATICS NTS

M-04 SCHEDULES NTS

M-05 DETAILS NTS


5
4 1 XB1-1
6 XCU-1
3 XP2-3 7 XDHWT-1 3 XP2-3 3 XP2-3

XT2-1

XRPBA
DEMOLITION NOTES: 9

1 REMOVE EXISTING GAS FIRED BOILER XB1-1 AND ASSOCIATED HEATING 2


SUPPLY AND RETURN PIPING, PUMPS AND VALVES AS SHOWN. CAP AND
MAKE GOOD FOR RECONNECTION. EXISTING COMBUSTION
AIR TO REMAIN
2 REMOVE EXISTING GAS PIPING GAS SHOWN. CAP AND MAKE GOOD
FOR RECONNECTION.

3 COMPLETELY REMOVE EXISTING PUMP AND REPLACE WITH NEW.


PUMP TO BE WIRED TO DDC.

4 COMPLETELY REMOVE EXISTING XB1-1 FLUE UP THROUGH ROOF.


CONTRACTOR TO PATCH AND MAKE GOOD ALL EXISTING BASE
BUILDING WALLS AND ROOF TO MATCH BASE BUILDING AS REQUIRED
8 XHV-2
FOR DEMOLITION OF DUCTWORK.
XHV-1
5 RELOCATE DOMESTIC WATER TEMPERING VALVES AND ASSOCIATED
PIPING AS REQUIRED TO POSITION BOILERS WITHIN 10" OF WALL.
MAINTAIN MINIMUM CLEARANCE REQUIREMENTS OF MANUFACTURER.

6 EXISTING CONDENSING UNIT SERVING XHV-2 LOCATED OUTSIDE EXISTING DUCTWORK


UNDER STAIR CASE TO BE COMPLETELY REMOVED INCLUDING TO REMAIN
REFRIGERANT PIPING.

7 EXISTING DOMESTIC HOT WATER TANK TO REMAIN. RELOCATE


SEISMIC BRACING TO OPPOSITE SIDE OF TANK TO ALLOW FOR
BOILER CLEARANCE.

8 COMPLETELY REMOVE EXISTING HV-2. CAP AND MAKE GOOD


EXISTING DUCTWORK CONNECTIONS AND MAKE GOOD FOR
RE-CONNECTION. CONTRACTOR TO COORDINATE DOWN TIME OF AHU
WITH CLIENT ON SITE AND PROVIDE TEMPORARY VENTILATION AS
REQUIRED. CONTRACTOR TO REVISE ELECTRICAL DISCONNECT
CONNECTION TO HV-1 AS REQUIRED.

9 REMOVE AND REPLACE EXISTING RPBP WITH NEW TO MATCH EXISTING


SIZE.

PLANT ROOM - DEMO


0 1 2 4 8

SCALE: 1 4" = 1'-0"

10 6 B1-1
10 6 B1-2
2
8 10 6 B1-3
CU-1
10 6 B1-4 XDHWT-1 1 P2-1 1 P2-2

9 ET2-1 13

RPBA
CONSTRUCTION NOTES:
1 Suite 180 - 200 Granville Street
CONNECT NEW PUMP AND ASSOCIATED PIPING/VALVES TO EXISTING 12
3 Vancouver BC Canada V6C 1S4
PIPING. ENSURE ALL NEW PUMP TRIM AND VALVES ARE INSTALLED AS
T 604.687.1800
SHOWN ON MECHANICAL DRAWINGS. RE-BALANCE NEW PUMP M

www.integralgroup.com
Project Reference No: ##-####-_##
2 CONNECT NEW PIPING TO EXISTING.
1 P2-3 11
3 CONNECT GAS TO EXISTING. PIPE NEW 12"ø GAS PIPE TO EACH BOILER
COMPLETE WITH SHUTOFF VALVE AND REGULATOR.
2
4 PROVIDE NEW GAS SOLENOID WIRED TO EMERGENCY GAS SHUTOFF
BUTTON TO DE-ACTIVATE BOILERS AND GAS SUPPLY TO BOILERS.
5 7 HV-2
5 ALL NEW ELECTRICAL WORK IS THE RESPONSIBILITY OF THE
CONTRACTOR TO DESIGN AND APPLY FOR THE REQUIRED PERMITS. 2
S XHV-1
6 MODIFY EXISTING BOILER HOUSE KEEPING PAD AS REQUIRED TO FIT
NEW BOILERS. 4
T
7 INSTALL NEW HV-2 AS PER MECHANICAL SCHEDULE AND
SPECIFICATIONS. ADJUST EXISTING DUCTWORK AND HYDRONIC PIPING
TO SUIT NEW HV-2 CONFIGURATION. CONTRACTOR TO REVISE WORKS
RELATED TO ELECTRICAL CONNECTION TO HV-2 AS REQUIRED
INCLDUING PERMITS COORDIATION AND INSTALLATION. NEW UNIT TO
MATCH DIMENSIONS OF EXISTING UNIT. ALLOW FOR NEW STRAINER,
ISOLATION VALVE AND BALANCING VALVE FOR HOT WATER HEATING
COIL. CONNECT NEW CONDENSATE DRAIN TO EXISTING.

8 NEW CONDENSING UNIT SERVING HV-2 LOCATED OUTSIDE UNDER


STAIRS. ALLOW FOR EXTENDING CHAIN LINK FENCE ENCLOSURE TO FIT
NEW UNIT.

9 NEW EXPANSION TANK TO MATCH EXISTING. MOUNT AT HIGH LEVEL


ABOVE WATER ENTRY STATION.
10 (4) NEW 6"ø BOILER FLUES UP THROUGH ROOF. ENSURE TERMINATIONS
AND MINIMUM DISTANCES FROM FLUE EXHAUST ARE INSTALLED AS PER
CSA AND MANUFACTURER'S REQUIREMENTS.
11 NEW 8"ø DHWT FLUE UP THROUGH ROOF. ENSURE TERMINATIONS AND
MINIMUM DISTANCES FROM FLUE EXHAUST ARE INSTALLED AS PER CSA
AND MANUFACTURER'S REQUIREMENTS.
12 INSULATED REFRIGERANT PIPING. ROUTE AS PER EXISTING
REFRIGERANT PIPING.

13 TO GYM OFFICE AND GYMNASIUM THERMOSTATS. REFER TO GENERAL


NOTES ON M-01. PLANT ROOM - NEW
0 1 2 4 8

SCALE: 1 4" = 1'-0"


2

DEMOLITION NOTES: 3 M
4"ø DCW
1"ø HWS/R TO
3 XP2-3 WEIGHT ROOM
RPBP HV-2
1 REMOVE EXISTING GAS FIRED BOILER XB1-1 AND ALL ASSOCIATED
HEATING PIPING, PUMP, AND VALVES SERVING EXISTING DOMESTIC
HOT WATER TANK. CAP AND MAKE GOOD FOR RECONNECTION.
EXPANSION
TANK
2 COMPLETELY REMOVE EXISTING 3-WAY VALVE AND REPLACE WITH
NEW. 3-WAY VALVE TO BE WIRED TO EXISTING DDC. UPDATE ALL BMS
XET2-1
GRAPHICS AND CONTROLS AS REQUIRED FOR CONTROL VALVES.

3 REMOVE EXISTING PUMP AND MAKE GOOD PIPING FOR


RECONNECTION.
2-12"ø HWR

2-12"ø HWS
2"ø NG TO
2-12"ø NG DHWT-1

2 2

M M

1-12"ø HWS/R TO
HV-1

LWCO XP2-2 3

XP2-1 3

CHEMICAL POT
XB1-1 1 FEEDER

1-1 4"ø HWS/R


DOWN

HYDRONIC SCHEMATIC - DEMO


SCALE: N.T.S.

1"ø HWS/R TO
CONSTRUCTION NOTES: 7 1 P2-3 WEIGHT ROOM
RPBP HV-2
1 CONNECT NEW PUMP AND ASSOCIATED PIPING/VALVES TO EXISTING
PIPING. ENSURE ALL NEW PUMP TRIM AND VALVES ARE INSTALLED AS
SHOWN ON MECHANICAL DRAWINGS. RE-BALANCE EXISTING PUMP TO EXPANSION
EXISTING FLOW NOTED ON MECHANICAL PUMP SCHEDULE. UPDATE ALL TANK
BMS GRAPHICS AND CONTROLS AS REQUIRED FOR NEW PUMPS.
2
ET2-1
2 CONNECT NEW PIPING TO EXISTING AND MATCH EXISTING PIPE SIZE.
CONTRACTOR TO CONFIRM EXACT PIPE SIZE ON SITE.
TO EXISTING
3 CONNECT GAS TO EXISTING. PIPE NEW 12"ø GAS PIPE TO EACH BOILER FLOOR DRAIN
COMPLETE WITH SHUTOFF VALVE AND REGULATOR.

4 PROVIDE NEW GAS SOLENOID WIRED TO EMERGENCY GAS SHUTOFF 200°F 180°F
BUTTON TO DE-ACTIVATE BOILERS AND GAS SUPPLY TO BOILERS. 2
4 S Suite 180 - 200 Granville Street
T T
2"ø NG TO Vancouver BC Canada V6C 1S4
5 PROVIDE 2" CAPPED CONNECTIONS C/W WITH ISOLATION VALVES FOR
EXISTING DHWT-1 3 T 604.687.1800
FUTURE DOMESTIC HOT WATER HEATING TIE IN.
5 www.integralgroup.com
2-12"ø NG M

6 PROVIDE 3" CAPPED CONNECTIONS C/W WITH ISOLATION VALVES FOR Project Reference No: ##-####-_##
3"ø HWS/R
FUTURE BOILERS 1-12"ø HWS/R
3 HEADER 18.5 GPM
7 PIPE NEW RPBP DRAIN, C/W AIR GAP TO EXISTING FLOOR DRAIN. (TYP)
M M

6 2

2 1-12"ø HWS/R TO
HV-1

1 P2-2

P2-1 1

B1-1 B1-2 B1-3 B1-4

FILTER
FLOW
INDICATOR
T

CROSS FOR OPTIONAL


2
CORROSION TEST

1-1 4"ø HWS/R TO


GROUND FLOOR CHEMICAL POT
RADIATION FEEDER

HYDRONIC SCHEMATIC - NEW


SCALE: N.T.S.
PUMP SCHEDULE
Electrical Details Motor Details

Design Selected Design Selected Electrical Electrical Frequency Motor Total Absorbed Motor Motor Manufacturer Model
TAG No. Description Location Notes
Capacity Capacity Head Head Voltage Supply (Hz) Starting Minimum Power Rating Speed
(gpm) (gpm) (ft w.g.) (ft w.g.) (V) Phase Method Efficiency (BHP) (BHP) (RPM)
(1 or 3) (%)

P2-1 Ground Floor Radiation Mechanical Room 9.6 10.6 15.0 18.2 115 1 60 INV 60 0.1 frac 1750 Grundfos Magna3 1, 2

P2-2 Heating & Ventilation Unit 1 Mechanical Room 22.5 24.8 18.0 21.8 115 1 60 INV 60 0.2 0.5 1750 Grundfos Magna3 1, 2

P2-3 Heating & Ventilation Unit 2 Mechanical Room 6.8 7.5 8.0 9.7 115 1 60 INV 60 0.0 farc 1750 Grundfos Magna3 1, 2

Notes

1) Constant speed pumping control c/w BACNET output/input

2) Complete with Magna Integrated Variable Speed Drive (VFD)

BOILER SCHEDULE (B1-1 to B1-4) AIR HANDLING UNIT SCHEDULE (HV-1) Expansion Tank Schedule
Manfacturer Engineered Air Bladder Expansion Tank Information ET2-1
Tag No. B1-1 to B1-4 Model LM2/C/R Location Mechanical Room

Boiler Information Supply Air Fan Service Heating Water

Location Mechanical Room Air Flow Rate (CFM) 2,000 Fan Speed * (RPM) 1275 Manufacturer Amtrol

Manufacturer Viessman External Static Pressure (in wg) 0.50 Absorbed Power * (HP) 0.85 Model Extrol
Total Static Pressure (in wg) 1.75 Motor Rating * (HP) 1.0
Model Vitocrossal 300 CU3A-57 Orientation Horizontal
Type Gas Fired High Mass Condensing Boiler Inverter Driven (Yes/No) No MCA* (Amps) 22.0
Material Steel
Fan Type Centrifugal MOCP* (Amps) 30.0
Working Pressure (psi) 15.0
Total Fan Efficiency * (%) 65 Electrical Supply 208/3/60
Design Information Maximum Working Pressure (psi) 125.0
Input Gas Requirement (BTUH) 199,000 Tank Volume (gal) 24
Heating Coil Information
Boiler Output Capacity (BTUH) 185,000 Dimensions (øxL) (Inch) 12 x 48
Air On Coil Temperature (°F) 53.0 Supply Water Temperature (°F) 200
Thermal Efficiency (%) 93.0 Acceptance Volume (gal) 15
Air Off Coil Temperature (°F) 84.0 Return Water Temperature (°F) 180
Min/Max Natural Gas Pressure (in w.g.) 4 / 14 Weight (lbs)
Duty (Btuh) 68,100 Water Flow Rate (gpm) 6.8
Water Flow (gpm) 18.5 Note:
Maximum Pressure Drop
Maximum Water Pressure Drop (ft w.g.) 2 1) All Tanks should be Bladder type, designed and constructed as per ASME Section V111, Division-1
Standards.
Maximum Operating Pressure (psi) 30
DX Cooling Coil Information
Weight (lbs) 352
Air On Coil Temperature (°F) 80.0 Sensible Cooling (BTU/HR) 48,168
CONDENSING UNIT SCHEDULE
Gas Type Natural Gas Air Off Coil Temperature (°F) 57.7 Total Cooling (BTU/HR) 59,500

Burner stages Fully Modulating Compressor Type Digital Scroll


Tag No. CU-1
Dimensions (WxDxH) (in) 26 x 31.5 x 67 Refrigerant R-410A
Boiler Information

Location Outdoor
Boiler Connections Supply Filtration
Manufacturer Engineered Air
Gas Valve (in) 3/4 Panel Filter Grade MERV 8
Model CUE52
Supply (in) 1 1/4

Return (in) 1 1/4 Supply Fan Sound Power Levels Total 63Hz 125Hz 250Hz 500Hz 1kHz 2kHz 4kHz 8kHz
Design Information
Flue Gas (in) 4 Intake * (dB(A))
Nominal Tons (Tons) 5
(in) Discharge * (dB(A))
Drain Valve 1
Compressor Stages 2
Condensate Drain (in) 3/4
Dimensions (L x W x H) (Inch) 69 x 41 x 42
Notes
Weight (lbs) 740
Unit to come complete with:
Electrical Requirements
Refrigerant R-410A
1) Variable capacity digital scoll compressor
Burner Motor HP frac.
2) Expoxy painted casing and fan and Heresite coated coils
Electrical Requirements Volt / Phase 120/1/60
3) TAMCO 1500SW dampers Electrical Information

4) Freezestat and flash intercoolers Voltage V / Ph 208


Notes Suite 180 - 200 Granville Street
MCA 43
Vancouver BC Canada V6C 1S4
1. CPVC flue gas system installed to manufacturer's recommnedations. Flue material is to be certified together with boiler T 604.687.1800
as a constructed unit. www.integralgroup.com
2. Complete with boiler control with cascade and/or DDC interface. Project Reference No: ##-####-_##
Notes

3. Complete with Viessman acid neaturalization sysetm. 1) Confirm existing voltage/phase and match existing.

4. Multiple boiler installation requires detached boiler native cascade control (Vitotronic 300-K MW2C Cascade Control) 2) Complete with Suction Accumulators, Low Pressure Bypasses, Discharge Holding Tanks

5. Any aluminum, baffle, fin, or fire tube down fired design is not considered equal. 3) Complete with epoxy painted casing and fan and heresite coated coils

6. Separate 120V/1Ph required for boilers and controllers 4) Contractor to confirm electrical data of existing condensing unit on site prior to submission of shop drawings.

7. Contractor resopnsible to register boiler with BC Safety Authority prior to substantial completion.
SUPPORT FOOT BOLTED
TO PUMP FLANGE

SUPPORT FOOT
CHEMICAL BALANCE LINE
CONSTRUCTED FROM 10mm
POT FEEDER
[3/8"] THICK STEEL PLATE.

VIBRATION ISOLATORS
AS SPECIFIED.
UNION

END VIEW
DRAIN VALVE
SEISMIC SPRING
ISOLATORS
ISOLATION BALL
UNION
VALVE

ISOLATION
ISOLATION BALL VALVE
PIPE SIZE AS
PUMP BALL VALVE
SHOWN ON PLAN

GATE VALVE GATE VALVE

P
300 Min.

SUCTION GUIDE COMBINATION BALANCING/


STRAINER CHECK VALVE OR LONG
SWEEP ELBOW &
INDIVIDUAL CHECK W/ CHEMICAL POT FEEDER
BALANCE VALVES. SCALE NTS
VIBRATION ISOLATORS
(SEE SPECIFICATION) MAX. 250mm [10"]
100mm [4"]CONC. PAD

FRONT VIEW

NOTES:
SUPPORT FOOT TO BE BOLTED TO THE FLOOR SLAB, THROUGH THE
CONC. PAD USING NEOPRENE WASHERS AND BUSHINGS ON THE BOLTS
(MIN. 2 BOLTS).

VERTICAL IN LINE PUMP INSTALLATION


SCALE NTS

FOR NPS 2-1/2 PIPE AND


LARGER. REFER TO SPEC. HANGER ROD
FOR INSERTS OR HIGH
DENSITY INSULATION AT
INSULATION PROTECTION
SHIELDS. LOCKING NUT
SUPPORT NUT

CLEVIS HANGER
REFER TO SPEC.

NOTES:
VAPOUR SEAL
PREFORMED PIPE
INSULATION. REFER TO
SPEC.

PIPE

INSULATION
PROTECTION SHIELD AT Suite 180 - 200 Granville Street
HANGER. REFER TO Vancouver BC Canada V6C 1S4
SPEC. T 604.687.1800
www.integralgroup.com
Project Reference No: ##-####-_##
HANGER DETAIL FOR PIPING WITH VAPOUR SEALED INSULATION
(FOR COLD PIPING 10°C [50°F] OR LESS)

HANGER ROD

LOCKING NUT
SUPPORT NUT

CLEVIS HANGER
REFER TO SPEC.

PREFORMED PIPE
INSULATION IF
REQ''D. REFER TO
SPEC.

PIPE

HANGER DETAIL FOR INSULATED HOT PIPING UP TO NPS


3 (75mm) OR ALL SIZES OF BARE PIPE

PIPE HANGERS
SCALE NTS