HIRA 3 :- HIRA 3 – Road Rcc --- Note: Contact fo

1.       Concrete Pouring of Diapragm Wall with the help of 10 " Dia Tremie Pipe Mr. Chan
2. Lifting of Mechanical Grab Excavator and Placing it at required job location by 75 MT Crane Safety En
3.       Water proofing membranes works. Cont no.:
4.       Rain water pipe fixing
5.       Erection of Side cladding with the help of MEN LIFTER.
6.       CALIBRATION OF BATCHING PLANT
7.       Production of concrete with Bin system Batching Plant
8.       Production of concrete with Batching Plant with skip arrangement.
9.       BATCHING PLANT
10.    REINFORCEMENT
11.   Assembly of structural steel
12.   RCC/PCC / SCREED
13.   Loading and Unloading Structural Material
14.   BACK FILLING
15.   EXCAVATION FOR BUND WALL
16.   Lifting of main beam at various height with help of Crane
SIMPLEX INFRASTRUCTURES LIMITED
COASTAL GUJARAT POWER LIMITED,MUNDRA
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
FORMAT NO:
JOB TITLE : Lifting of Mechanical Grab Excavator and Placing it at required job location by 75 MT Crane
CONTROLLED
Sly ACTIVITY FINAL
HAZARDS/RISK CONSEQUENCES SEVERITY PROBABILITY RISK PRESENT CONTROL MEASURE SEVERITY PROBABILITY RISK RISK RESPONSIBILITY
No (JOB STEPS IN SEQUENCE) ASSESSMENT
RATING

1 Slings of grab excavator kept 1.Improper Stacking/ 1.Load should be kept on wooden
on low be trailer will be Body injury sleepers in stable possition.use ppe's
body injury 3 3 9 2 2 4 Tolerable ACCEPTABLE
placed on the hook of the
crane properly
2.Caught in b/w load and 2.No movement of load should be
sling/body injury body injury 3 3 9 allowed while placing the sliing on the 2 2 4 Tolerable ACCEPTABLE
hook of the crane

2 Grab excavator will be lifted 1.Uneven and loose body injury/ Property 1.Before using crane the area should
vertically by 1.5 to 2 m from surface/ toppling of damage checked and leveled properly.
the static position to clear the crane 5 5 25 2 2 4 Tolerable ACCEPTABLE
bed.
2.Improper body injury/ Property 2.Periodical maintenance by P&M
maintenance / crane damage Dep't. should be done and third party
failure 5 4 20 inspection detail (form 10) should be 2 2 4 Tolerable ACCEPTABLE
attached.
3.Untrained operator and body injury/ Property 3.Medical fit and trained operator
signal man / Crane damage should be deployed for the operation.
collapse 5 5 25 2 2 4 Tolerable ACCEPTABLE Site Engineer /
Project Manager

4.Improper assessment/ body injury/ Property 4.Proper assessment of crane safe


Fall of load damage working load at the particular radius
5 4 20 should be done according to load to 2 2 4 Tolerable ACCEPTABLE
be lifted w.r.t. load chart.

5. Improper barrication/ 5. Barrication should be provided in


body injury swing area and unauthorized entry
body injury 4 4 16 2 2 4 Tolerable ACCEPTABLE
should be strictly stopped.

3 Move the grab excavator in 1.Free swing of crane/hit body injury/ Property 1) Proper attention should be paid for
right direction so that any to structure or person damage any interaction.
interaction of swinging of the 4 4 16 2 2 4 Tolerable ACCEPTABLE
crane is not occurred.

2. Frequent movement of 2). No movement of persons is


person / body injury body injury 4 4 16 allowed under the load . 2 2 4 Tolerable ACCEPTABLE

4 Take the Grab Excavator up 1.Untrained operator and body injury/ Property 1).Medical fit and trained operator and
to the job location where signal man / fall of frame damage signal man should be deployed for the
excavation is to be done 5 5 25 operation. 2 2 4 Tolerable ACCEPTABLE

2.Improper barrication/ 2.Barrication should be provided


body injury around working area and
body injury 4 4 16 unauthorized entry should be strictly 2 2 4 Tolerable ACCEPTABLE
stopped.
5 Position the Grab Excavator 1.free swing of grab 1.Double leg sling should be used
properly to start excavation excavator/hit to structure body injury/ Property with guide rope at both ends.
process. and person 4 4 16 2 2 4 Tolerable ACCEPTABLE
damage Site Engineer /
Project Manager
2.Improper barrication/ 2.Barrication should be provided
body injury around working area and
body injury 4 4 16 unauthorized entry should be strictly 2 2 4 Tolerable ACCEPTABLE
stopped.
3. Movment of the 3. No unautorised person shall be
unauthorised person allowed at site location and authorised
close to excavated area Fall of a person / personal should wear safety belt and
5 5 25 proper attention should be paid all 2 2 4 Tolerable ACCEPTABLE
body injury
around the area

Prepared By Reviewed By Approved By

Name:

Designation:
SIMPLEX INFRASTRUCTURES LIMITED
COASTAL GUJARAT POWER LIMITED,MUNDRA
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
FORMAT NO:
JOB TITLE : Concrete Pouring of Diaphragm Wall with the help of 10 " Dia Tremie Pipe
Sl No
ACTIVITY (JOB STEPS IN CONTROLLED FINAL
HAZARDS/RISK CONSEQUENCES PROBABILITY SEVERITY RISK PRESENT CONTROL MEASURE PROBABILITY SEVERITY RISK RESPONSIBILITY
SEQUENCE) RISK RATING ASSESSMENT

1 Placement of the Tremie pipe 1.Improper Hanlding of matarial or


(10 " dia) upto the bottom of the fall of material Body Injury / 1. All the segment of the tremie pipe should be
4 3 12 2 2 4 Tolerable Acceptable
excavated pit in which Property damage properly handled.
reinforced cage is already
placed. 2. Improper securing of segments. Body injury / fall of 2. Proper care should be paid while securing all
material / property segments.
damage 3 3 9 2 2 4 Tolerable Acceptable

3. Fall of person in to the pit 3. Ensure all authorised person should wear
safety belt working near excavated pit while Site Engineer /
Body injury / fatal 5 5 25 pouring 2 2 4 Tolerable Acceptable
Manager

2 Proper pouring of concrete on 1. Improper handling of material / 1. The trunk of the pumper should be properly
to the tremie pipe Fall of material fixed to avoid splash.
Body injury / fall of
material / property 3 3 9 2. The area should be well barricaded and 2 2 4 TOLERABLE ACCEPTABLE
damage unauthorized entry should be restricted to avoid
injury

Prepared By Reviewed By Approved By

Name:

Designation: DPM
SIMPLEX INFRASTRUCTURES LIMITED
COASTAL GUJARAT POWER LIMITED,MUNDRA

Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
FORMAT NO:
JOB TITLE : Water proofing membranes works.
CONTROLLED
Sly ACTIVITY FINAL
HAZARDS/RISK CONSEQUENCES SEVERITY PROBABILITY RISK PRESENT CONTROL MEASURE SEVERITY PROBABILITY RISK RISK RESPONSIBILITY
No (JOB STEPS IN SEQUENCE) ASSESSMENT
RATING

1 Surface Hand injury / 1)Area shall have adequate TOLERABLE ACCEPTABLE


Preparation / Inhalation of gas/ ventilation.
Pre-cleaning Dust Body injury 3 3 9 2)Use of PPE (Hand gloves, 2 1 2
Goggles)
Site Engineer / Project
2 Liquithane Hand injury / 1)Worker should be well TOLERABLE ACCEPTABLE Manager
preparation mixing Inhalation of gas/ trained .
of two components. Dust Body injury / Burn 3 2 6 2)Use of PPE (Hand gloves, 2 2 4
Goggles , etc) .

3 Liquithane applied. Hand injury / 1)Area shall have adequate TOLERABLE ACCEPTABLE
Inhalation of gas/ Body injury / Fume ventilation.
Dust mist inhalation/ 4 4 16 2)Use of PPE (Hand 2 2 4
Death gloves,Goggles) . Site Engineer / Project
Manager
4 Post Cleaning Hand injury / Use of PPE (Hand gloves, TOLERABLE ACCEPTABLE
Inhalation of gas/ Body injury 3 3 9 Mask ,Goggles) 1 2 2
Dust

Prepared By Reviewed By Approved By

Name
Designation
SIMPLEX INFRASTRUCTURES LIMITED
COASTAL GUJARAT POWER LIMITED,MUNDRA
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)

JOB TITLE : Rain water pipe fixing at TG building FORMAT NO:

Sl ACTIVITY (JOB STEPS CONTROLLED FINAL RESPONSIBILIT


HAZARDS/RISK CONSEQUENCE PROBABILITY SEVERITY RISK PRESENT CONTROL MEASURE PROBABILITY SEVERITY RISK
No IN SEQUENCE) RISK RATING ASSESSMENT Y

1 Reaching to the place 1. Improper route to 5 5 25 1.Proper two no. of lifeline should be 2 2 4
reach the top of working use , fall arrestor should be use
place/fall of person 2. ladder should be fixed with proper
dimension and ppe rope.
Body Injury /
3.Use of PPE (Hand gloves, Goggles , TOLERABLE ACCEPTABLE
Fetal etc) .

2. Absence of PPE or not 5 5 25 1. Ensure availability of full body 2 2 4


used / fall of person Body Injury / harness and fall arrestor with
TOLERABLE ACCEPTABLE
Fetal supervison to ensure use.

2 Use of tools at height 1. Improper arrengment 1) Carry tools in a gunny bag or tie the
and Welding machine of lifeline , plateform, not tools with rope.
use for Fixing rain use of Fallarrestor can 2)Rope & pulley used for lifting of
water pipe cause fall of person and material should be free from any
material defect.
2. Electric shock due to Fatal 5 5 25 3)Worker should be well trained and 2 2 4 TOLERABLE ACCEPTABLE
improper tool use for drill/ use of proper tool.
welding . 4)Use of PPE (Hand gloves,
Goggles ,etc) , use of Fallarrestor.
Site Engineer /
Project Manager

3. Improper material 4 4 16 5. Material should be kept away from 2 2 4


handling / Fall of material open edge and tied with stable
Body Injury position. TOLERABLE ACCEPTABLE

4.Bad environmental 4 4 16 6. Carry out the work in sufficient day 2 2 4


condition ./ fall of person light and proper illumination should
be provided at night.
Body Injury TOLERABLE ACCEPTABLE

7. No work should be done during


stormy or windy weather
5. Untrained worker / Fall 5 5 25 8. Worker should be physically fit and 2 2 4
of person trained for work at height.
Body Injury TOLERABLE ACCEPTABLE

3 Coming down after 1. No use of fall arrestor 5 5 25 1. Ensure supervison to enforce use 2 2 4
work completion and Full Body Harness / fall arresto and full body harness.Tool
fall of person Body Injury box meeting TOLERABLE ACCEPTABLE

Prepared By Reviewed By Approved By


Name

Designation
SIMPLEX INFRASTRUCTURES LIMITED
COASTAL GUJARAT POWER LIMITED,MUNDRA
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
FORMAT NO:
JOB TITLE : Rain water pipe fixing
Sl No

ACTIVITY (JOB STEPS IN CONTROLLED FINAL


HAZARDS/RISK CONSEQUENCES PROBABILITY SEVERITY RISK PRESENT CONTROL MEASURE PROBABILITY SEVERITY RISK RESPONSIBILITY
SEQUENCE) RISK RATING ASSESSMENT

1 Placement of the scaffolding. 1. scaffolding may collapse.


1. Check for any loose and uneven surface and make
it compact.
2. Provide base plate of standard dimention below
every post/ standard
Serious injury 5 4 20 2 2 4 TOLERABLE ACCEPTABLE
3. Lock the structure with permanent structure building.

4.Provide sufficient no. of cross bracing to support the


standards.

2 Use of tools at height Electric 1. Improper handling of material / 1. Carry tools in a gunny bag or tie the tools with rope.
drill. Fall of material

Serious injury 3 3 9 2.Rope & pulley used for lifting of material should be 2 2 4 TOLERABLE ACCEPTABLE
free from any defect. Site Engineer /
Manager

3 Fixing rain water pipe 1. Improper arrengment of 1)Worker should be well trained and use of proper
plateform. / fall of person and tool.
material 2)Use of PPE (Hand gloves, Goggles ,etc)
Fatal 5 5 25 2 2 4 TOLERABLE ACCEPTABLE
2.) Electric shock due to improper
tool use for drill.

4 Up & down movement of 1.Improper route 1. Full body harness should be used by all the worker
persons for work. and it will be anchored at suitable position.

Fatal 4 5 20 2 2 4 TOLERABLE ACCEPTABLE


2. If possible ladder should be used for moving up and
down.

2. Stacking of loose material at 1. No loose material should be kept at height regular


scaffolding. supervison should be done.

2. Unauthorised entry should be stop near the work


and cordond of the area.
Body Injury 3 3 9 2 2 4 TOLERABLE ACCEPTABLE
3. Remove the barricade & allow the persons up &
down for work after checking the complete installed
scaffolding tower like bracing, locking pins & split pins,
etc.
5 Dismantling of scaffold 1.fall of scaffold material while 1. The area where dismantling takes place should be Site Engineer /
dismantling. barricaded and depute one person for communication Manager
to nearby area made.

Serious injury 4 4 16 2 2 4 TOLERABLE ACCEPTABLE

2. No throughing of material should be allowded.

2. Improper plateformfor working 1. Dismantling should be done by competent workmen.


on scaffolding

Fatal 5 5 25 2. Plateform should be provided for working at height 2 2 4 TOLERABLE ACCEPTABLE


and full body harness should be anchored at all the
times,

Prepared By Reviewed By Approved By

Name
Designation
SIMPLEX INFRASTRUCTURES LIMITED
COASTAL GUJARAT POWER LIMITED,MUNDRA
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
FORMAT NO:
JOB TITLE : Erection of Side cladding with the help of MEN LIFTER.

ACTIVITY (JOB STEPS IN CONTROLLED FINAL


Sl No HAZARDS/RISK CONSEQUENCES PROBABILITY SEVERITY RISK PRESENT CONTROL MEASURE PROBABILITY SEVERITY RISK RESPONSIBILITY
SEQUENCE) RISK RATING ASSESSMENT

1 Rreaching at job/height by MEN Topple of man lifter , Fall of Before use of man lifter operator should inspect
LIFTER. person , Failure of lift . the man lifter properly , proper Full body harness
Fatal / Serious injury 5 4 20 should be use and properly hanker . 2 2 4 TOLERABLE ACCEPTABLE

2 Lifting of sheet with the help of PP 1. Improper handling of material / 1.Rope & pulley used for lifting of material should
rope Fall of material be free from any defect.
Serious injury 4 4 16 2 2 4 TOLERABLE ACCEPTABLE
2. Tools like hand drill and screw should be kept in
bags and away from edge.

2. Improper platform / Fall of 1. Platform with sufficient width (900 mm ) should


person be provided.

Fatal 5 5 25 2 2 4 TOLERABLE ACCEPTABLE


2. Worker must wear safety belt while working at
all time with anchored to stable support.

3. Improper Connection / 1. Hand drill (Electrical tool )is double insulated


Electrocution and must be connected to 30 mA ELCB.

2) Ensure the Earthing. Site Engineer / Manager


Fatal 5 5 25 2 2 4 TOLERABLE ACCEPTABLE

2. Cable used for connection should be free from


any damage and restricte minimum joint.

3 Fixing of sheet by screwing 1. Improper handling of material / 1. Sheet should be handled by at least two worker
Fall of material and two person should be at ground level untill
fixing to be finished .

Serious injury 4 4 16 2 2 4 TOLERABLE ACCEPTABLE


2. Supervison should be proper while entire job to
restrict unauthorised entry.

4 Removal of lifting arrangment 1.Improper route / Fall of person 1. Full body harness should be used by all the
Fatal 5 5 25 worker and it will be anchored at suitable position. 2 2 4 TOLERABLE ACCEPTABLE

5 Completion of job 1. Impopre route / Fall of person 1. Full body harness should be used by all the
worker and it will be anchored at suitable position
Fatal 5 5 25 while coming down BY MEN LIFTER 2 2 4 TOLERABLE ACCEPTABLE

Prepared By Reviewed By Approved By

Name
Designation
SIMPLEX INFRASTRUCTURES LIMITED

COASTAL GUJARAT POWER LIMITED,MUNDRA


Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)

JOB TITLE : CALIBRATION OF BATCHING PLANT FORMAT NO:

Sl ACTIVITY (JOB STEPS IN CONSEQU CONTROLLED FINAL


HAZARDS/RISK PROBABILITY SEVERITY RISK PRESENT CONTROL MEASURE PROBABILITY SEVERITY RISK RESPONSIBILITY
No SEQUENCE) ENCES RISK RATING ASSESSMENT

1 Cleaning all load cells Hand injury / 1)Area shall have adequate Tolerable ACCEPTABLE
Inhalation of gas/Dust Body ventilation.
3 3 9 2)Use of PPE (Hand gloves, Mask , 2 1 2
injury
Goggles)
2 Keeping weights and Improper placing of 1) Safe distance should be Tolerable ACCEPTABLE
release the loads . load, slip of cell can maintained. Site Engineer / Project
Body
cause body injury 4 4 16 2)Operator should be well trained . 2 2 4 Manager
injury
3)Use of PPE (Hand gloves, Mask ,
Goggles)
3 Post Cleaning Hand injury / 1)Use of PPE (Hand gloves, Mask , Tolerable ACCEPTABLE
Inhalation of gas/Dust Body
2 3 6 Goggles) 1 2 2
injury

Prepared By Reviewed By Approved By

Name

Designation
SIMPLEX INFRASTRUCTURES LIMITED
TATA HOUSING PROJECT, SEC – 72, GURGAON.
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
JOB TITLE : Production of concrete with Bin system Batching Plant
CONTROLLE FINAL
S. ACTIVITY (JOB STEPS PROBABILIT SEVERIT PROBABILI RESPONSIBILI
HAZARDS/RISK CONSEQUENCES RISK PRESENT CONTROL MEASURE SEVERITY RISK D RISK ASSESSMEN
No IN SEQUENCE) Y Y TY TY
RATING T
1 Aggregates are dumped 1)Manual poring of cement 1. Proper lifting and placing of
in the plant area. into hopper so fall of cement bag .
person, inhalation body 2. Proper tool use for cutting cement
injury. 4 3 12 bag.
3. Use of proper PPE (Safety
goggles ,face mask, hand gloves)

Body injury/Fetal 2 2 4 TOLERABLE ACCEPTABLE


2) Worker may come in 1. All rotating parts like gears, chains
contact with the rotating & rollers should be guarded or
parts of the machines. 3 3 9 barricaded.

3)Inhalation of cement can 1.Use of proper PPE (Safety


cause silicosis . 5 4 20 goggles ,face mask, hand gloves)

2 Pulls the aggregates up 1) Injury due to unsafe 1. All rotating parts like gears, chains
to the walls work. 2) & rollers should be guarded or
Worker may come in barricaded.
contact with the rotating 2. Proper ramp for concrete
parts of the machines. unloading in bucket / pump should be
Body injury 4 4 16 provide. 2 2 4 TOLERABLE ACCEPTABLE
3. One signal man should be deputed
for proper signaling.
4. Adequate turning area and Site Engineer /
stoppage for mixer should be Manager
provided.
3 Aggregates,Water & 1) Injury due to unsafe 1. All rotating parts like gears, chains
Admixture are poured in work. 2) & rollers should be guarded or
the mixing drum. Worker may come in barricaded. 2. Proper ramp for
contact with the rotating concrete unloading in bucket / pump
parts of the machines. should be provide. 3. One
Body injury 3 3 9 signal man should be deputed for TOLERABLE ACCEPTABLE
proper signaling. 4. Adequate turning
area and stoppage for mixer should
be provided.

4 Constituents are mixed 1)Transit mixer may hit the 1) Trained person should be
and concrete is poured in cabin. 2) Worker deployed for concrete poring activity.
the transit mixer. may come in contact with 2) Transit mixer driver should be
the rotating parts of the trained.
machines Body injury/
5 4 20 2 2 4 TOLERABLE ACCEPTABLE
Property damage 2) Proper supervision should be
ensured.
3) Technical supervision should be
strictly followed.

Prepared By: Rajiv Singh Approved By: S. K Pal


Name: Rajiv Singh
Designation: Safety Engineer
SIMPLEX INFRASTRUCTURES LIMITED
TATA HOUSING PROJECT, SEC – 72, GURGAON.

Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)

JOB TITLE : Production of concrete with Batching Plant with skip arrangement. FORMAT NO:

ACTIVITY (JOB STEPS IN CONTROLLED FINAL RESPONSIBI


Sl No HAZARDS/RISK CONSEQUENCES PROBABILITY SEVERITY RISK PRESENT CONTROL MEASURE PROBABILITY SEVERITY RISK
SEQUENCE) RISK RATING ASSESSMENT LITY

1 Aggregates are dumped in 1)Manual poring of cement 1. Proper lifting and placing of cement bag .
the plant area into hoper so fall of 2. Proper tool use for cutting cement bag.
person ,inhalation body 4 3 12 3. Use of proper PPE (Safety goggles ,face
injury. mask, hand gloves )

2) Worker may come in 2. All rotating parts like gears, chains & rollers
contact with the rotating Body injury/Fetal should be guarded or barricaded. 2 2 4 TOLERABLE ACCEPTABLE
3 3 9
parts of the machines

3)In halation of cement can 1.Use of proper PPE (Safety goggles ,face
cause silicosis . 5 4 20 mask, hand gloves )

2 Pulls the aggregates up to 1) Injury due to unsafe work. 1. All rotating parts like gears, chains & rollers
the walls 2) Worker may come in should be guarded or barricaded.
contact with the rotating
parts of the machines.
2. Proper ramp for concrete unloading in
bucket / pump should be provide.

Body injury 4 4 16 2 2 4 TOLERABLE ACCEPTABLE

3. one signal man should be deputed for proper


signaling.
Site Engineer /
4. adequate turning area and stoppage for Manager
mixer should be provided.

3 Aggregates,Water & 1) Injury due to unsafe work. 1. All rotating parts like gears, chains & rollers
Admixture are poured in the 2) Worker may come in should be guarded or barricaded.
mixing drum. contact with the rotating 2. Proper ramp for concrete unloading in
parts of the machines. bucket / pump should be provide.
3. one signal man should be deputed for proper
Body injury 3 3 9
signaling.
4. adequate turning area and stoppage for
mixer should be provided.

4 Constituents are mixed and 1)Transit mixer may hit the 1) Trained person should be deployed for
concrete is poured in the cabin. concrit poring activity. 2) Transit mixer driver
transit mixer. 2) Worker may come in should be trained
contact with the rotating
parts of the machines Body injury/ Property
5 4 20 2) proper supervision should be ensured. 2 2 4 TOLERABLE ACCEPTABLE
damage

3) Technical supervision should be strictly


followed.

Prepared By Reviewed By Approved By


Name
Designation
SIMPLEX INFRASTRUCTURES LIMITED
TATA HOUSING PROJECT, SEC – 72, GURGAON.
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
JOB TITLE : BATCHING PLANT
CONTROLLE
S. ACTIVITY (JOB STEPS IN CONSEQUENCE SEVERIT PROBABILIT SEVERIT FINAL RESPONSIBILIT
HAZARDS/RISK PROBABILITY RISK PRESENT CONTROL MEASURE RISK D RISK
No SEQUENCE) S Y Y Y ASSESSMENT Y
RATING
1 Cement are conveyed by 1)Manual poring of cement 1. Proper lifting and placing of cement
head load from go-down to into hopper so fall of bag.
cutting platform person ,inhalation body 2. Proper tool use for cutting cement
injury. 4 3 12 bag.
3. Use of proper PPE (Safety
goggles ,face mask, hand gloves )
body injury/
2) Worker may come in 2. All rotating parts like gears, chains & 2 2 4 TOLERABLE ACCEPTABLE
Fatal
contact with the rotating rollers should be guarded or
parts of the machines. 3 3 9 barricaded.

3)Inhalation of cement can 1.Use of proper PPE (Safety


cause silicosis . 5 4 20 goggles ,face mask, hand gloves )

2 Aggregates,Water & 1) Injury due to unsafe 1. All rotating parts like gears, chains &
Admixture are poured in the work. rollers should be guarded or
mixing drum. 2) Worker may come in barricaded.
contact with the rotating
parts of the machines. 2. Proper ramp for concrete unloading Site Engineer / Manager
in bucket / pump should be provide.
body injury/
4 4 16 2 2 4 TOLERABLE ACCEPTABLE
Fatal
3. one signal man should be deputed
for proper signaling.

4. adequate turning area and stoppage


for mixer should be provided.

3 Constituents are mixed and 1)Transit mixer may hit the 1) Trained person should be deployed
concrete is poured in the cabin. for concrete poring activity.
transit mixer. 2) Worker may come in 2) Transit mixer driver should be
contact with the rotating trained.
parts of the machines body injury/
5 4 20 2 2 4 TOLERABLE ACCEPTABLE
Fatal 2) proper supervision should be
ensured.
3) Technical supervision should be
strictly followed.

Prepared By: Rajiv Singh Approved By: S. K Pal


Name: Rajiv Singh
Designation: Safety Engineer
SIMPLEX INFRASTRUCTURES LIMITED
TATA HOUSING PROJECT, SEC – 72, GURGAON.

Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
FORMAT NO:
JOB TITLE : REINFORCEMENT
Sl No ACTIVITY (JOB STEPS IN HAZARDS/RISK CONSEQUENCES PROBABILITY SEVERITY RISK PRESENT CONTROL MEASURE PROBABILITY SEVERITY RISK CONTROLLED RISK FINAL RESPONSIBILITY
SEQUENCE) RATING ASSESSMENT

1 Transportation of Reinforcement a)Injury to personnel 1.Provide red flags at the end of protruding rods.
Steel due to hit of protruding
rods beyond the truck body injury/ Property
4 5 20 2.Speed of the trailor /truck should be kept minimum. 2 2 4 TOLERABLE ACCEPTABLE
desk. damage
3.Load material in stable condition.
b)slippage of rods 1.Side stoppers should be ensured in the trailor /
from the trailor bed truck.
body injury/ Property
4 5 20 2.Wooden planks shall be used between the bed of 2 2 4 TOLERABLE ACCEPTABLE
damage
trailor and the rods.
3.Bars should be tied with trailor body

2 Unloading a)Fall of the load 1.The Crane capacity should be tested before lifting
body injury/ Property the load.
4 5 20 2.The weight being lifted should be less than crane 2 2 4 TOLERABLE ACCEPTABLE
damage SITE ENGINEER/
capacity.
MANAGER
b)Hitting of personnel 1.The ends of the load should be tied with rope to Name:
due to way. control the sway. Contact no:
2.The workman should use proper PPE.
body injury/ Property
4 4 16 2 2 4 TOLERABLE ACCEPTABLE
damage 3.The work should be carried out under proper
supervision.
4.Stack material on sleeper after loading.

3 a) Fall of the steel bar 1.The weight being lifted should be less than men
Placing of Reinforcement Steel
capacity.
4 4 16 2 2 4 TOLERABLE ACCEPTABLE
2.The workman should use proper PPE.
body injury/ Property
b)Hitting of personnel 1.The ends of the load should be tied with rope to
damage
due to way. control the sway.
3 3 9 2 2 4 TOLERABLE ACCEPTABLE
2.The workman should use proper PPE.

Prepared By Reviewed By Approved By

Name

Designation
SIMPLEX INFRASTRUCTURES LIMITED
TATA HOUSING PROJECT, SEC – 72, GURGAON.

Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
FORMAT NO:
JOB TITLE :Assembly of structural steel
PROB CONTROLLE
Sl ACTIVITY (JOB STEPS IN CONSEQU SEVE FINAL RESPONSI
HAZARDS/RISK PROBABILITY SEVERITY RISK PRESENT CONTROL MEASURE ABILIT RISK D RISK
No SEQUENCE) ENCES RITY ASSESSMENT BILITY
Y RATING
1 Unloading the item parts 1.Crane failure 1. Ensure the crane and load lifting
of length 10-12m 2.Sling Failure because of appliances are load tested and certified by a
(variable) from the Trailer/ loose D shackles, broken competent person and available with valid
Tractor sling etc documents.
3. Body part caught in 2. Ensure proper training imparted to
between. workers like riggers, signalman, fitters,
4. Fall of the entire load and welders and helpers.
injury to the persons near Body 3. Ensure proper supervision.
by. injury/ 4. Use proper SWL rated slings& ‘D’
4 3 12 2 2 4 TOLERABLE ACCEPTABLE
Property
shackles
damage
5. Ensure that the max safe load of the
crane is more than the weight of the load to
be lifted.
6. Use Proper PPE (viz., Safety Helmet,
Safety Shoe, Hand Gloves etc.)

2 Assembling of Column 1.Body parts caught in 1. Proper clearance (of both persons and
parts to form a 40m-length between objects) should be ensured in the vicinity. Site Engineer /
Manager
part by welding. 2.Shock Hazard 2.Proper Earthing
3.Radiation 3. Welding glass should be free from
4.Flash (Eye injury) damage.
Body
4. The welding machine should be
injury/
5 4 20 connected with proper cable connector. 2 2 4 TOLERABLE ACCEPTABLE
Property
damage 5. Ensure no molten slag is falling down and
use proper sheet / asbestos blanket to
prevent fall of molten slag and other
materials.
6.Welding machine should be proper
earthed
3 Assembling of two parts to 1.Body parts caught in 1.Required number of workers should be
form a single piece by between deployed
bolting 2. All the workers should be well
experienced and should be always in vigil.
5 5 25 3. Use Proper PPE (viz., Safety Helmet,
2 2 4 TOLERABLE ACCEPTABLE

Safety Shoe, Hand Gloves etc.)


4 Placing the assembled 1. Sling Failure due to 1. Ensure proper pep talk imparted to
part in a lifting position loose D shackles, Body workers before proceeding work.
(horizontal deteriorated slings, etc. injury/ 2. Ensure that the max safe load of the
2. Load may slip on ground Property crane is more than the weight of the load to
if not properly placed on damage be lifted.
required number of wooden 3. Use Proper PPE (viz., Safety Helmet,
sleepers/blockers. Safety Shoe, Hand Gloves etc.)
5 5 25 2 2 4 TOLERABLE ACCEPTABLE
3. Load may hit to the 4.Use proper D shackles and ensure its
nearby persons/objects strength and capacity
causing injury/property
damage.
4.Collapse of the load
Structure

5 Tying the steel wire rope 1.Body part/fingers caught 1. Use proper PPEs (Leather made Hand
slings to the structure for in between gloves, Hard hats, Safety shoes etc.)
lifting 2. Deploy experienced Riggers.
3. Persons working must wear safety shoes
3 3 6 & hand gloves. 2 2 4 TOLERABLE ACCEPTABLE

4. Sling distance shall be maintained based


on the CG of crane at site
Body
injury/
6 Movement of crawler 1. Contact/hit with any 1.An assistant/signal man should be there to
Property
crane to the load/ other mobile/stationary convey standard hand signals to guide the
damage
structure location for lifting bodies nearby. operator or he must be deployed
2.Body parts caught in with a Walkie-Talkie
between For communication. Signal persons to be
2 3 6 1 2 2 TOLERABLE ACCEPTABLE
trained before the start of work and walkie to
be tested before the work.
2. Area clearance should be ensured for
both persons and objects.

7 Lifting the respective 1. Sling Failure due to 1. Before lifting ensure the availability of a
member structure to the loose D shackles continuous lifeline made of poly propylene
particular level. deteriorated slings, etc. rope, tied column to column at both sides Site Engineer /
2. Load may slip from along the axis. Manager

rigging if not properly 2.Ensure the crane and load lifting


attached. appliances are load tested and certified by a
3. Fall of load and injury to competent person and available with valid
4 4 16 2 2 4 TOLERABLE ACCEPTABLE
the workers nearby. documents
4. Electrical hazards/Shock 3. Ensure that the max safe load of the
hazards crane is more than the weight of the load to
5. Knot failure of the steel be lifted
wire rope that is tied to
columns.
Body
injury/
injury/
8 Placement of assembly to 1. Fall of person from Property
1. All workers who are engaged should wear
the positionwith plumping height. damage full body harness/safety belts and hooked it
and alignment 2. Fall of materials/tools to the lifeline made of 8mm steel wire ropes.
from height 2.Ensure the availability of a continuous
3. Fall of load. lifeline made of poly propylene rope, tied
4.Body parts Caught in column to column at both sides along the
between. axis) and from row to row through respective
5.Body strain/Loss of 5 4 20 columns. 2 2 4 TOLERABLE ACCEPTABLE

Balance 3. They should use all other required PPEs


6.Hitting of truss structure
to persons /structures due
to free movement in air and
could result in injury/
property loss/load falling

9 Tightening the nut into the 1. Fall of person from 1. All workers who are engaged must be
bolt (if required). height. qualified for height pass & should wear full
2. Fall of materials/tools body harness/safety belts and hooked it to
from height. the lifeline made of polypropylene ropes or
3. Fall of load. 8mm steel wire ropes. 2.Ensure proper
3 3 6 2 1 2 TOLERABLE ACCEPTABLE
4. Body parts Caught in tightening of the nut to the anchor bolt before
between. releasing the slings.
5. Body strain/Loss of Body
Balance injury/
Property
10 Releasing the steel wire 1 to 5 same as above damage 1 to 5 same as above
rope sling from the body 6.Hitting of sling wire/D 6.Intense care should be maintained while
shackles to the body parts releasing.
of workers, while releasing 7.Ensure proper clearance from the sling Site Engineer /
3 3 6 while releasing
2 1 2 TOLERABLE ACCEPTABLE
Manager

Prepared By Reviewed By Approved By

Name
Designation
SIMPLEX INFRASTRUCTURES LIMITED
TATA HOUSING PROJECT, SEC – 72, GURGAON.

Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
JOB TITLE : PCC / SCREED FORMAT NO:

ACTIVITY (JOB STEPS IN PROBABILI PROBABILI CONTROLLED FINAL RESPONSIBIL


Sl No HAZARDS/RISK CONSEQUENCES SEVERITY RISK PRESENT CONTROL MEASURE SEVERITY RISK
SEQUENCE) TY TY RISK RATING ASSESSMENT ITY

1 Placing of concrete by Due to tool and tacles improper Use proper PPE.
manualy handeling body injury/
Property 4 5 20 2 2 4 TOLERABLE ACCEPTABLE

damage

2 Unloading of concrete on Hitting the concrete by transit mixer. 1. Stop block are to be placed.
pletform . 2. proper communication should be
body injury/
Property damage
4 5 20 ensured. 2 2 4 TOLERABLE ACCEPTABLE

3 Placing concrete Improper Lifting of mateial 1. The hose should not be bent more
that 60'C with the concrete load.

Site Engineer /
2. Care should be taken to keep up the Manager
continuous flow of concrete.

body injury/
Property 4 4 16 3. When the floor is in up word 2 2 4 TOLERABLE ACCEPTABLE

damage direction, utmost care is to be taken.

4. The operation should be supervised


by experienced supervisor.

Prepared By Reviewed By Approved By

Name

Designation
SIMPLEX INFRASTRUCTURES LIMITED
TATA HOUSING PROJECT, SEC – 72, GURGAON.

Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
FORMAT NO:
JOB TITLE : Rainforcemant /Structural Material loading & unloading by crane from trailer,truck .

Sl ACTIVITY (JOB STEPS IN CONSEQUENCE CONTROLLED RISK FINAL


HAZARDS/RISK PROBABILITY SEVERITY RISK PRESENT CONTROL MEASURE PROBABILITY SEVERITY RISK RESPONSIBILITY
No SEQUENCE) S RATING ASSESSMENT

1 Positioning of crane/Hydra near a) Accident due to collision 1) Training to signalman should be


trailer. with personnel . ensured before taking up the work. 2 2 4 TOLERABLE ACCEPTABLE
body injury/
3 4 12
Property damage 2) Signalman should give proper signal
to crane operator 2 2 4 TOLERABLE ACCEPTABLE

b) Toppeling of crane due to 1) Crane operator should have valid


uneven ground surface or licence.
uneven loading 2 2 4 TOLERABLE ACCEPTABLE

2) Ensure that no persons should


2 2 4 TOLERABLE ACCEPTABLE
body injury/ stand near crane swinging area.
4 5 20
Property damage
3) Marching route shall be checked in
advance and ensured clear. 2 2 4 TOLERABLE ACCEPTABLE

4) Safe working load (SWL) and last


date of test should displayed on the 2 2 4 TOLERABLE ACCEPTABLE
crane
Site Engineer /
2 Tying sling and D-shackle 1)Improper Selection of 1) Use hand gloves.
Manager
sling ,fall of load . 2)
Hand injury due to improper body injury 3 2 6 2 2 4 TOLERABLE ACCEPTABLE
handling.

3 Loading and unloading of a) Fall of material due to 1)Load should known and according
material with crane damage D-shackle,sling and to it sling should be selected .
pulley. 2) Inspect all slings, D-shackle for any
wear and tear before its use . 2 2 4 TOLERABLE ACCEPTABLE

3) check all safety devices for its


body injury/ healthiness 2 2 4 TOLERABLE ACCEPTABLE
4 4 16
Property damage
b) Improper assessment of 1) Never lift the load above the rated
load capacity of material . 2 2 4 TOLERABLE ACCEPTABLE

2) lifting machine and tool should be


third party inspected with valid form no.
10 2 2 4 TOLERABLE ACCEPTABLE

c) Injury due to fall of material body injury/ 1) Tag line should be tied to the lifting
on person standing nearby Property damage material. 2 2 4 TOLERABLE ACCEPTABLE

2) No one should be allowed to stand


4 4 16 below the lifted load. 2 2 4 TOLERABLE ACCEPTABLE

3) Area should be clear and barricaded


with a caution board. 2 2 4 TOLERABLE ACCEPTABLE
d) Injury due to caught in body injury 1) No person should be allowed in the
between the objects. 3 3 9 swinging area of crane. 2 2 4 TOLERABLE ACCEPTABLE

e) Collision of lifted material body injury/ 1) before carrying of the lifting Site Engineer /
with other material resulting in Property damage operation check the route that the Manager
material damage. material has to be lifted. 2 2 4 TOLERABLE ACCEPTABLE
3 5 15
2) Signalman should give proper signal
to crane operator 2 2 4 TOLERABLE ACCEPTABLE

4 Removing of sling, D shackle 1) Injury to finger or hand 1) No movement of load should be


allowded while removing sling. 2 2 4 TOLERABLE ACCEPTABLE
body injury 3 2 6
2) Use PPE like hand gloves and
helmet safety shoes etc. 2 2 4 TOLERABLE ACCEPTABLE

Prepared By Reviewed By Approved By


Name
Designation
SIMPLEX INFRASTRUCTURES LIMITED
TATA HOUSING PROJECT, SEC – 72, GURGAON.

Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
FORMAT NO:
JOB TITLE : Loading and Unloading Structural Material
Sl ACTIVITY (JOB STEPS IN CONTROLLED FINAL
HAZARDS/RISK CONSEQUENCES PROBABILITY SEVERITY RISK PRESENT CONTROL MEASURE PROBABILITY SEVERITY RISK RESPONSIBILITY
No SEQUENCE) RISK RATING ASSESSMENT
1 Positioning of crane/Hydra a) Accident due to collision 1) Training to signalman should be
with personnel . ensured before taking up the work. 2 2 4 TOLERABLE ACCEPTABLE
body injury/ Property
3 4 12
damage 2) Signalman should give proper signal
to crane operator 2 2 4 TOLERABLE ACCEPTABLE

b) Toppeling of crane due 1) Crane operator should have valid


to uneven ground surface licence.
or uneven loading 2 2 4 TOLERABLE ACCEPTABLE

2) Ensure that no persons should


2 2 4 TOLERABLE ACCEPTABLE
body injury/ Property stand near crane swinging area.
4 5 20
damage
3) Marching route shall be checked in
advance and ensured clear. 2 2 4 TOLERABLE ACCEPTABLE

4) Safe working load (SWL) and last Site Engineer /


date of test should displayed on the 2 2 4 TOLERABLE ACCEPTABLE Manager
crane
2 Tying sling and D-shackle a) Hand injury due to 1) Use hand gloves.
improper handling. body injury 3 2 6 2 2 4 TOLERABLE ACCEPTABLE

3 Loading and unloading of a) Fall of material due to 1) Inspect all slings, D-shackle for any
material with crane damage D-shackle,sling wear and tear before its use .
and pulley. 2 2 4 TOLERABLE ACCEPTABLE

2) check all safety devices for its


body injury/ Property healthiness 2 2 4 TOLERABLE ACCEPTABLE
4 4 16
damage
b) Improper assessment of 1) Never lift the load above the rated
load capacity of material . 2 2 4 TOLERABLE ACCEPTABLE

2) lifting machine and tool should be


third party inspected with valid form no. 2 2 4 TOLERABLE ACCEPTABLE
10

c) Injury due to fall of body injury/ Property 1) Tag line should be tied to the lifting
material on person damage material. 2 2 4 TOLERABLE ACCEPTABLE
standing nearby
2) No one should be allowed to stand
4 4 16 below the lifted load. 2 2 4 TOLERABLE ACCEPTABLE

3) Area should be clear and barricaded


with a caution board. 2 2 4 TOLERABLE ACCEPTABLE

d) Injury due to caught in body injury 1) No person should be allowed in the


between the objects. 3 3 9 swinging area of crane. 2 2 4 TOLERABLE ACCEPTABLE
e) Collision of lifted material body injury/ Property 1) before carrying of the lifting Site Engineer /
with other material resulting damage operation check the route that the Manager
in material damage. material has to be lifted. 2 2 4 TOLERABLE ACCEPTABLE
3 5 15
2) Signalman should give proper signal
to crane operator 2 2 4 TOLERABLE ACCEPTABLE

4 Removing of sling, D shackle 1) Injury to finger or hand 1) No movement of load should be


allowded while removing sling. 2 2 4 TOLERABLE ACCEPTABLE
body injury 3 2 6
2) Use PPE like hand gloves and
helmet safety shoes etc. 2 2 4 TOLERABLE ACCEPTABLE

Prepared By Reviewed By Approved By

Name
Designation
SIMPLEX INFRASTRUCTURES LIMITED
TATA HOUSING PROJECT, SEC – 72, GURGAON.

Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
FORMAT NO:
JOB TITLE : BACK FILLING
Sl ACTIVITY (JOB STEPS IN HAZARDS/RISK CONSEQUENC PROBABILI SEVERITY RISK PRESENT CONTROL MEASURE PROBABILI SEVERITY RISK CONTROLLED FINAL RESPONSIBILI
No SEQUENCE) ES TY TY RISK RATING ASSESSMENT TY

1 Clearing of site Tripping and cut injury 1. The area should be surveyed for
during housekeeping tripping hazards and workers shall be
Body injury/ briefed for the hazard.
2 2 4 1 2 2 TOLERABLE ACCEPTABLE
Property damage
2. All persons working shall use PPE's
like helmet, shoes etc.
2 Backfilling by mechanical m/c & 1. Injury due to tools and 1. Experienced persons shall be deployed
manualy tackles. who are aware of handling backfilling
Body injury/ tools.
5 5 25 2 2 4 TOLERABLE ACCEPTABLE Site Engineer /
Property damage 2. All persons working shall use PPE's Manager
like helmet, shoes etc.

2. Fall of person into the 1. Proper barricading with warning signs


pit. Body injury 4 4 16 to be put. 2 2 4 TOLERABLE ACCEPTABLE

3. Caught in between/ hit 1. Maintaine safe distance from m/c.


by the machine 2.Supervision require in case of working
Body injury 4 4 16 in dense area. 2 2 4 TOLERABLE ACCEPTABLE

Prepared By Reviewed By Approved By

Name

Designation
SIMPLEX INFRASTRUCTURES LIMITED
TATA HOUSING PROJECT, SEC – 72, GURGAON.

Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
JOB TITLE : EXCAVATION FOR BUND WALL FORMAT NO:

CONTROLLED RISK FINAL


Sl No ACTIVITY (JOB STEPS IN SEQUENCE) HAZARDS/RISK CONSEQUENCES PROBABILITY SEVERITY RISK PRESENT CONTROL MEASURE PROBABILITY SEVERITY RISK RESPONSIBILITY
RATING ASSESSMENT

1 Clearing of site Tripping and cut injury 1) The area should be surveyed for tripping
hazards and workers shall be briefed for the
hazard.
Body injury/
Property damage 2 3 6 2 2 4 TOLERABLE ACCEPTABLE

2)All persons working shall use PPE's like


helmet ,shoes etc.

2 Excavation 1) Injury due to tools and tackles. 1) Experienced persons shall be deployed who
are aware of handling excavation tools.
Body injury/
Property damage
3 2 6 2 2 4 TOLERABLE ACCEPTABLE
2) Safe distance between crew members to be
maintained to avoid hit injury.
Site Engineer / Manager

2) Fall of person into the pit. 1) Proper access ladder

2) Proper barricading with warning signs to be put.


Body injury 3 2 6 2 2 4 TOLERABLE ACCEPTABLE

3) Lighting the location during night time

3) Caving in 1) Remove excavated earth immediately.


Body injury 2 2 4 2) Do not keep heavy objects and mud near the 2 2 4 TOLERABLE ACCEPTABLE
edge of pit.
4) Fall of person due to leaving the 1) Impart safety instruction to all worker to guard
excavated area ovenight the area to avaoi fall.

Body injury 3 3 9 2)Proper demarcation around the pit by tape/ 2 2 4 TOLERABLE ACCEPTABLE

lighting and cordoning off the area with sturdy


barriers where ever possible.

5) Land slide due to bad weather/ 1) Keep 'Danger' sign board and cordon off the
loose nature of soil Body injury 2 2 4 hazardous area. 2 2 4 TOLERABLE ACCEPTABLE

6) Body injury due to fall from 1) Use ladder with guard which is to be secure at
ladder. bottom and top by using mechanized (slips)
means.
Site Engineer / Manager
2)Ladder should be properly stacke at required
Body injury 3 2 6 2 2 4 TOLERABLE ACCEPTABLE
angle.

3) steps of the ladder should be of standard


specification.
3 Removal of excavated materials Fall of stones, earth etc in the 1)Keep the removed earth at least 1.5 m away
excavated pit. from the pit.

Minor injury 2 2 4 2 2 4 TOLERABLE ACCEPTABLE


2) Do not allow structural material at edge of
excavation

Prepared By Reviewed By Approved By


Name

Designation
SIMPLEX INFRASTRUCTURES LIMITED
TATA HOUSING PROJECT, SEC – 72, GURGAON.

Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
FORMAT NO:
JOB TITLE : EXCAVATION

ACTIVITY (JOB STEPS IN CONSEQUENC CONTROLLED RISK FINAL


Sl No HAZARDS/RISK PROBABILITY SEVERITY RISK PRESENT CONTROL MEASURE PROBABILITY SEVERITY RISK RESPONSIBILITY
SEQUENCE) ES RATING ASSESSMENT

1 Clearing of site Tripping and cut injury 1) The area should be surveyed for
Body tripping hazards and workers shall
injury/
4 4 16 be briefed for the hazard. 2 2 4 TOLERABLE ACCEPTABLE
Property
damage 2)All persons working shall use PPE's
like helmet ,shoes etc.
2 Excavation 1) injury due to tools and 1) experienced persons shall be
tackles. deployed who are aware of handling
Body excavation tools.
injury/
5 5 25 2) Safe distance between crew 2 2 4 TOLERABLE ACCEPTABLE
Property
damage members to be maintained to avoid
hit injury.

2) fall of person into the pit. 1) proper access ladder

2) proper barricading with warning


signs to be put.
Site Engineer / Manager
Body injury 5 5 25 3) provide proper slope for stability 2 2 4 TOLERABLE ACCEPTABLE

of excavation.
4) lighting at Night time

3) Caving in 1) provide proper shoring.


2) Remove excavated earth
immediately.
3) Do not keep heavy objects and
Minor muck near the edge of pit.
injury / 5 5 25 4)Excavation from top to bottom 2 2 4 TOLERABLE ACCEPTABLE

Fatal
5) Provide benching where depth is
more than 3 mtrs. Keep area
de-watered at all time.
6) control wats flow.
d) fall of person due to 1) impart safety instruction to all
leaving the excavated area worker to guard against fall.
ovenight
Minor 2)proper demarcation around the
injury / 5 5 25 pit by tape/lighting and cordoning 2 2 4 TOLERABLE ACCEPTABLE

Fatal off the area with sturdy barriers


where ever possible.
e) land slide due to bad 1) propaer shoring should be done
weather. Minor
injury / 5 5 25 2) keep 'Danger' sign board and 2 2 4 TOLERABLE ACCEPTABLE

Fatal cordon off the hazardous area.

f) Body injury due to fall 1) use ladder with guard which is to Site Engineer / Manager
from ladder. be secure at bottom and top by using
mechanized (slips) means.
Minor
injury / 5 5 25 2)ladder should be tied from the top 2 2 4 TOLERABLE ACCEPTABLE

Fatal with a rope to avoid slipping.


3) steps of the ladder should be of
standard specification.

3 Removal of excavated Fall of heavy objects/ 1)Keep the removed earth at least
materials stones,boulders etc in the Minor 1.5 m away from the pit.
excavated pit. injury / 5 5 25 2 2 4 TOLERABLE ACCEPTABLE
2) Do not allow structural material
Fatal
at edge of excavation

Prepared By Reviewed By Approved By

Name
Designation
SIMPLEX INFRASTRUCTURES LIMITED
TATA HOUSING PROJECT, SEC – 72, GURGAON.
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
JOB TITLE : Dismantling of Overhead gantry crane FORMAT NO:
CONTROLLED
Sly ACTIVITY FINAL
HAZARDS/RISK CONSEQUENCES SEVERITY PROBABILITY RISK PRESENT CONTROL MEASURE SEVERITY PROBABILITY RISK RISK RESPONSIBILITY
No (JOB STEPS IN SEQUENCE) ASSESSMENT
RATING

1 Pre-cleaning of crane and Hand injury / Inhalation 1)Area shall have adequate clean and Tolerable ACCEPTABLE
near area . of gas/Dust proper housekeeping .
Body injury 3 2 6 2)Use of PPE (Hand gloves, Mask , 2 1 2
Goggles)

2 Dismantled of Hook along Improper Selection of 1)Load should known and according to Tolerable ACCEPTABLE
with the wire ropes. sling , ,Material fall or fall it sling should be selected .
of person if not proper 2)Personr should be well trained .
material handleling . Body injury 3 3 9 3)Proper tool should be used for 2 2 4
dismantled.
3)Use of PPE (Hand gloves, Goggles ,
etc) .
3 Dismantling the main IF Proper supervision for 1)Skilled supervisor for the job. Tolerable ACCEPTABLE
trolley. the job is not done can 2)Use guide rope while shifting of
cause fall of material , members with crane Site Engineer / Project
Body injury 3 3 9 1 2 2
person /body injury 3)Use of PPE (Hand gloves, Mask , Manager
Goggles) .

4 Dismantled main beams IF Proper supervision for 1)Skilled supervisor for the job. Tolerable ACCEPTABLE
and Shifting of material. the job is not done can 2)Use guide rope while shifting of
cause fall of material , Body injury /Death 4 4 16 members with crane 2 2 4
person /body injury 3)Use of PPE (Hand gloves, Mask ,
Goggles) .
5 Post Cleaning Hand injury / Inhalation Use of PPE (Hand gloves, Mask , Tolerable ACCEPTABLE
of gas/Dust Goggles)
Body injury / Fume Site Engineer / Project
2 3 6 1 2 2
mist inhalation Manager

Prepared By Reviewed By Approved By

Name
Designation
SIMPLEX INFRASTRUCTURES LIMITED
TATA HOUSING PROJECT, SEC – 72, GURGAON.
Hazard Identification & Risk Assessment and Control Measure Worksheet (HIRA)
JOB TITLE : Work at Height
ACTIVITY (JOB FINAL
S. CONSEQUENC PROBABILIT PROBABILIT CONTROLLED RESPONSIBILIT
STEPS IN HAZARDS/RISK SEVERITY RISK PRESENT CONTROL MEASURE SEVERITY RISK ASSESSM
No ES Y Y RISK RATING Y
SEQUENCE) ENT
1 Lifting of Shuttering
Material
&Reinforcement at
coloum.

ACCEPT
2 2 4 TOLERABLE
ABLE

2 Reinforcement
placing & binding

Fall of Person, fall of


Serious injury Site Engineer /
material, Shearing 5 5 25 ACCEPT
or Fatality 2 2 4 TOLERABLE Manager
off rope ABLE

3 Shuttering ACCEPT
TOLERABLE
ABLE

ACCEPT
2 2 4 TOLERABLE
ABLE

Prepared By: Rajiv Singh Approved By: S. K Pal


Name: Rajiv Singh
Designation: Safety Engineer