WORK DONE REPORT
Project : ASL HARMONY
Scope : Electric
Location : PT. ASL Shipyard Indonesia
2
WORK DONE REPORT
Project : ASL HARMONY
Scope : Electric
Location : PT. ASL Shipyard Indonesia
3
LIST CALIBRATION TANK GAUGING
4
TANK AFTER
NO TANK SYSTEM REMARK
NO SENSOR 1 AENSOR 2
1 1 BALLAST New New
2 2 FW CARGO 4.044 4.044 ADA ISI
3 3 FW CARGO 4.046 4.046 ADA ISI
4 4 FW CARGO 4.031 4.033
5 6 BALLAST 4.023 New
6 7 BALLAST 4.03 4.031
7 8 BALLAST New New
8 9 FW CARGO ADA ISI
9 10 BALLAST New
10 11 BALLAST New
11 12 BALLAST New
12 13 BALLAST New
13 14 FW CARGO 4.032 4.03
14 15 FW CARGO 4.032 4.03
15 18 FW CARGO 5.4 5.4
16 19 FW CARGO 4.028 4.03
17 20 FW CARGO ADA ISI
18 21 FW CARGO 4.048 4.049
19 22 BALLAST New New
20 23 BALLAST 4.035 New
21 24 BALLAST 4.00 4.00
22 25 BALLAST 4.06 4.01
23 26 BALLAST New New
24 42 FO CARGO 4.002 4.006
25 43 FO CARGO 4.025 4.028
26 44 FO CARGO 4.030 4.028
27 45 FO CARGO 4.030 4.030
28 46 FO CARGO 4.030 4.028
29 47 FO CARGO 4.026 4.026
30 48 FO CARGO 4.023 4.027
31 49 FO CARGO 4.030 4.028
32 50 FO CARGO ADA ISI
33 51 FO CARGO ADA ISI
34 71 FO CARGO ADA ISI
35 75 FW CARGO 4.051 4.058
36 79 BALLAST 4.028 4.029
37 80 UREA 4.030 New
38 81 BALLAST 4.035 4.035
39 82 BALLAST New New
40 83 BALLAST New 4.030
41 84 BALLAST 4.036 4.035
42 85 FW CARGO New New
43 86 FW CARGO 4.030 New
44 87 BALLAST 4.025 4.030
45 88 BALLAST New New
46 89 BALLAST 4.030 New
47 97 BALLAST 4.035 4.033
Prepared by : Verified by :
PT.Maju Pratama Sejahtera ASL Electric in-charge
Alim Mukhtar Mr. Ulbusri
5
Date : Date :