Wood Cocoon
Wood Cocoon
works
Material:
7- 4 UNITS CHS (SS304) 88.90∅ X7.62mm THK. VERTICAL FRAME (AS PER
APPROVED MATERIAL)
Storage at site:
1- The store on site shall be clean, dry area.
2- All products shall be protected from dirt and risk of damage from others
working like flooring, plaster, top coat for walls, and tiles works etc.
3- Humidity on site should be within the range during storage and
installation on site.
4- All products shall be stacked level and flat , on timber support covered
to avoid marking on the finished surface .
5- Condition of temperature and humidity during storage and installation
shall be as close as possible to those expected in the occupied building .
6- After installation there shall not be sudden or extreme change in
temperature and humidity.
7- Storage and installation temperature shall be 20 to 30 on site.
Identifications:
Proper labeling shall be done to identify the product on site.
Manufacturing:
1- Cutting wood, acrylic, SS tubes and fins and preparing as per
approved shop drawings using 3D CNC machinery.
2- Smoothing wood and preparing surfaces for painting.
3- Filling wood surfaces defects using natural putty filler.
4- Staining wood color by solvent base stain.
5- Smoothing wood and soft sanding.
6- Spraying on the wood one coat of polyurethane top coat gloss.
7- Make grove for acrylic.
8- Engrave wood to receive horizontal SS fins.
9- Making wooden bracelets to cover the vertical stainless tubes of the
same type of woodز
CONSTRUCTION METHODOLOGY
CIVIL WORKS
SUBSTRUCTURES
- Fix baseplate to floor by Hilti bolts as per approved shop drawings/material approval.
- Welding SS vertical tubes.
- Welding SS horizontal tubes.
SUPERSTRUCTURES
When the substructures are suitably advanced the construction of the reinforced.
Scaffolding will be erected on site at this stage, to assist with the material distribution during the frame
construction by IMAR.
INSTALLATION