14 Agustu 2023
14 Agustu 2023
SISA DI INJEKSIKAN
bandingan 6
er/Air (L) 119.58041958 3.04
ncampuran 126.13636364
sa Jenis Semen 0.3289473684 6.5559441 30.06993
men Terinjeksi 19.93006993
0.8 0.08
40.4
2.35148515
Lokasi : Sandaran Kiri Stage : 2
Tanggal : 14-Aug-23 Lugeon : 1.17
Concrete : - Tekanan : 3
WPT : Single Test Keterangan : No Grouting
Berat (kg) Volume (lt) Koefisien Sisa
Rasio Campuran Batch
C W S C W S C S sebelumnya
1:10 50 500 0 16.447 500 0.000 516.447 0.032 0.000 0.0 0.000
1:8 50 400 0 16.447 400 0.000 416.447 0.039 0.000 0.0 0.000
1:6 50 300 0 16.447 300 0.000 316.447 0.052 0.000 0.0 0.000
1:4 50 200 0 16.447 200 0.000 216.447 0.076 0.000 0.0 0.000
1:3 50 150 0 16.447 150 0.000 166.447 0.099 0.000 0.0 0.000
1:2 50 100 0 16.447 100 0.000 116.447 0.141 0.000 0.0 0.000
1:1 50 50 0 16.447 50 0.000 66.447 0.248 0.000 0.0 0.000
1 : 0,8 50 40 0 16.447 40 0.000 56.447 0.291 0.000 0.0 0.000
Total Terinjeksi
Cement Take (Kg/m)
Sand Take (Kg/m)
SISA DI INJEKSIKAN
bandingan 6
er/Air (L) 119.58041958 3.04
ncampuran 126.13636364
sa Jenis Semen 0.3289473684 6.5559441 30.06993
men Terinjeksi 19.93006993
0.8 0.08
40.4
2.35148515