SRIPELANGI CONSTRUCTION SDN BHD PROJECT:

Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar,


44000 Kuala Kubu Bharu,
Hulu Selangor, Selangor.

REQUEST FOR INSPECTION FORM ARCHITECTURE

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : ANTI TERMITE TREATMENT


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO DESCRIPTION YES NO N/A REMARK

1 Type and grade


2 Location of application
3 Surface cleanliness

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep RA/COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT:
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar,
44000 Kuala Kubu Bharu,
Hulu Selangor, Selangor.

REQUEST FOR INSPECTION FORM ARCHITECTURE

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : WATERPROOFING WORKS


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO DESCRIPTION YES NO N/A REMARK

1 Type and grade


2 Location of application
3 Surface cleanliness
4 Number of coats / membranes
5 Turn up and dressing at termination
6 Ponding test
7 Protection

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep RA/COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT:
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar,
44000 Kuala Kubu Bharu,
Hulu Selangor, Selangor.

REQUEST FOR INSPECTION FORM ARCHITECTURE

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : PLASTERING WORKS


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO DESCRIPTION YES NO N/A REMARK

1 Before plastering, alignment, squareness and verticality, level


marking must be done. Check plastering area cleanliness.
2 Identify and check headstone done.
3 Check and ensure, electrical wiring, plumbing, exmet fixed at
wall / wall plates, ceiling work completed, flashing fixed,
telephone wiring fixed.
4 Check mortar used is as per specification normally 1:1/2:6 (1 part
cement : ½ part hydrated lime and 6 part of fine sand.
5 Ensure sequence of plastering, grooves line according as per
drawing (if any).
6 Use wooden float / trowel float for eveness, straightness of
corners and of wall maintained.
7 Check, no cracks along wall surface eveness, straightness of
corners ends of wall maintained.
8 Check surface eveness, straightness of corners and corner of
wall maintained at right angle.
9 Check no hollowness detected.
10 Check cleanliness, no mortar stains or point drips.
11 Others.

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep RA/COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT:
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar,
44000 Kuala Kubu Bharu,
Hulu Selangor, Selangor.

REQUEST FOR INSPECTION FORM ARCHITECTURE

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : CEILING WORKS


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO DESCRIPTION YES NO N/A REMARK

1 Ensure : Type, size, thickness, brand as per sample approved


and specification.
2 Ensure : Type, pattern and height of the ceiling fixed as specified.
3 Ensure : All M&E service, *air-cond, ventilation, *Electrical/
*PA Telephone, Fire protection, Hot & cold water services fixed.
4 Check ceiling suspension / joist beading, gap and property fixed.
5 Check no sagging, level rigidly secure and aligned edges.
6 Check ceiling panels shall be free from chipped, cracks and
broken.
7 Surface should be overall level and clean.
8 Alignment of rails should be visually straight.
9 No stain, spilling or leak marks.
10 No cracks visually seen.
11 Overall surface should be even, gaps between light fitting and
ceiling should be seen.
12 Others.

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep RA/COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT:
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar,
44000 Kuala Kubu Bharu,
Hulu Selangor, Selangor.

REQUEST FOR INSPECTION FORM ARCHITECTURE

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : ROOF - ROOF COVERING


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO DESCRIPTION SATISFACTORY REQUIRED REMARKS


FURTHER ACTION REMARK

1 Roof tiles
2 Accessories (ridge & hip capping)
3 Motor filling
4 Timber batten

FIXING / WORKMANSHIP
1 Roof pitch
2 Spacing
3 Lapping
4 Cutting (at abutment, opening, etc)
5 Nailing
6 Pointing & Bedding
7 Fascia

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep RA/COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT:
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar,
44000 Kuala Kubu Bharu,
Hulu Selangor, Selangor.

REQUEST FOR INSPECTION FORM ARCHITECTURE

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : ROOFING - GUTTERS AND FLASHING


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO DESCRIPTION SATISFACTORY REQUIRED REMARKS


FURTHER ACTION REMARK
1 Anodized Aluminium
2 Galvanished Iron
3 Accessories (clips, fixing, etc)

FIXING / WORKMANSHIP
1 Cutting
2 Lapping
3 Sealing
4 Junctions
5 Seams
6 Chase (in wall)
7 Pointing

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep RA/COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT:
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar,
44000 Kuala Kubu Bharu,
Hulu Selangor, Selangor.

REQUEST FOR INSPECTION FORM ARCHITECTURE

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : CARPENTRY AND JOINERY


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO DESCRIPTION SATISFACTORY REQUIRED REMARKS


FURTHER ACTION
1 Timber (specific type)
2 Boards
3 Sheets
4 Fixing
5 Finishing
6 Accessories

CONSTRUCTION / WORKMANSHIP
1 As per drawing
2 Jointing / fixing
3 Snugness
4 Plugging
5 Finishing
6 Workmanship overall

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep RA/COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT:
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar,
44000 Kuala Kubu Bharu,
Hulu Selangor, Selangor.

REQUEST FOR INSPECTION FORM ARCHITECTURE

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : RAINWATER GOODS AND UNDERGROUND DRAINAGE


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO DESCRIPTION SATISFACTORY REQUIRED REMARKS


FURTHER ACTION

RAINWATER GOODS
1 Downpipes (PVC)
2 Gutter
3 Fitting / Accessories - head, shoes, radius, bends clamps,
brackets.
CONSTRUCTION / WORKMANSHIP
1 Preparation (for casting in concrete)
2 Fixing
3 Jointing
4 Fall
5 Outlet
6 Position
7 Level
8 Others (specify)
UNDERGROUND DRAINAGE
1 Check gradient
2 Check pipes joint, bent and proper sand blinding
3 Grating
4 Others

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep RA/COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT:
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar,
44000 Kuala Kubu Bharu,
Hulu Selangor, Selangor.

REQUEST FOR INSPECTION FORM ARCHITECTURE

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : PROVISION FOR EMBEDMENT OF ARCHITECTURAL FIXING IN CONCRETE


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO DESCRIPTION SATISFACTORY REQUIRED REMARKS


FURTHER ACTION

1 Handrailing
2 Balustrading
3 Fixing / accessories - (Plates, Sockets, etc)
4 Others (specify)

CONSTRUCTION / WORKMANSHIP
1 Preparation (opening, plats, bolts-off, etc)
2 Position
3 Alignment
4 Fixing / jointing
5 Precaution against Bi-metalics / Electrolytic action
6 Protection
7 Others (specify)

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep RA/COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT:
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar,
44000 Kuala Kubu Bharu,
Hulu Selangor, Selangor.

REQUEST FOR INSPECTION FORM ARCHITECTURE

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : BRICK WORKS


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO DESCRIPTION SATISFACTORY REQUIRED REMARKS


FURTHER ACTION

1 Type, grade and dimensions


2 Location
3 Setting out and alignment
4 Cement motar mix
5 Damp proof course
6 Exmet / tierod
7 Bonding
8 Vertoca;out
9 Consistency of spacing
10 Size and location of openings
11 Verticality
12 Horizontality
13 Damaged brick wall

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep RA/COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT:
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar,
44000 Kuala Kubu Bharu,
Hulu Selangor, Selangor.

REQUEST FOR INSPECTION FORM ARCHITECTURE

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : TILING WORKS


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO DESCRIPTION YES NO N/A REMARK

1 Before tiling, check:


a) Type, size, colour, pattern are as specified and approved
sample.
b) All M&E services, ceiling, plumbing completed.
c) Check verticality of undercoat plastering.
d) Ensure all surface clean and marked all fitting, foxtures,
pattern position.
e) Check if water proofing used.
f) Accurately marked all fitting, fixtures, pattern / position and
protect all adjacent finish material.
2 During tiling, check:
a) Laid in correct pattern.
b) Check verticality / base mortar / glue.
c) Width of joints between tiles aligned and consistent.
d) Smooth surface even, levelled.
e) Pointing should be consistent.
f) Check angle finishes.
3 Ensures tiles are neatly cut at corners, stopcock, switches, door,
window frames and architrave's.
4 Check and hollow section base detected
5 Check cleanliness, no chipping, crack, stain and mortar dropping.
6 Other : Eveness of the colouring.
Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep RA/COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT:
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar,
44000 Kuala Kubu Bharu,
Hulu Selangor, Selangor.

REQUEST FOR INSPECTION FORM ARCHITECTURE

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : WALL TILING


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO DESCRIPTION YES NO N/A REMARK

1 Before tiling, check:


a) Type, size, colour, pattern are as specified and approved
sample.
b) All M&E services, ceiling, plumbing completed.
c) Check verticality of undercoat plastering.
d) Ensure all surface clean and marked all fitting, foxtures,
pattern position.
2 During tiling, check:
a) Laid in correct pattern.
b) Check verticality / base mortar / glue.
c) Width of joints between tiles aligned and consistent.
d) Smooth surface even, levelled.
e) Pointing should be consistent.
f) Check angle finishes.
3 Ensures tiles are neatly cut at corners, stopcock, switches, door,
window frames and architrave's.
4 Check and hollow section base detected
5 Check cleanliness, no chipping, crack, stain and mortar dropping.
6 Other : Eveness of the colouring.

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep RA/COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT:
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar,
44000 Kuala Kubu Bharu,
Hulu Selangor, Selangor.

REQUEST FOR INSPECTION FORM ARCHITECTURE

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : PAINTING WORKS


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO DESCRIPTION SATISFACTORY REQUIRED REMARKS


FURTHER ACTION
1 Colour scheme
2 Paint-Brand and samples
3 Material-as per approved sample
4 Preparation and painting plastered surfaces and ceiling
4.1 Surfaces dry
4.2 Remove dust and plaster spashes
4.3 Cracks-cut and made good
4.4 Floors and fittings covered and protected
4.5 First coat-alkali resisting primer
4.6 Internally-2 coats emulsion paint
4.7 Externally-2 coats fungus resisting emulsion paint
5 Preparation and painting work to timber surfaces
5.1 Knot, stop, rub down smooth and dust off
5.2 Under coat
5.3 2 coats resin based gloss finish
6 Skirting / plywood lining / handrailing
6.1 Fill, stain and varnish to gloss finish
7 Preparation and painting metal surfaces
7.1 Wire brush to remove dust, loose scale and remove
dust dirt grease etc
7.2 One coat metallic primer
7.3 Two coats alkyd resin based gloss finish
Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT:
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar,
44000 Kuala Kubu Bharu,
Hulu Selangor, Selangor.

REQUEST FOR INSPECTION FORM ARCHITECTURE

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : DOORS, WINDOW AND FRAMES


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS YES NO N/A REMARK

1 Type and grade


2 Dimensions
3 Setting out / positioning
4 Fixing
5 Alignment
6 Verticality
7 Squareness
8 Allowable gaps
9 Ease of opening and closing
10 Firmness
11 Grout / motar between fame and structure
12 Fire tagging on fire doors
13 Glazing: sealant, gasket

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT:
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar,
44000 Kuala Kubu Bharu,
Hulu Selangor, Selangor.

REQUEST FOR INSPECTION FORM ARCHITECTURE

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : IRONMONGERY
Location
Block : Structure/
Zone / grideline : Element :
Level :

NO DESCRIPTION YES NO N/A REMARK

1 Type and grade


2 Design
3 Colour
4 Dimensions
5 Keys provided in correct quantity
6 Accessories provided
7 Quantity received
8 Any defects on ironmongery?
9 Any ironmongery to be rejected?
If yes, state the quantity?

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT:
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar,
44000 Kuala Kubu Bharu,
Hulu Selangor, Selangor.

REQUEST FOR INSPECTION FORM ARCHITECTURE

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : INSTALLATION OF SANITARY FITTINGS


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO DESCRIPTION SATISFACTORY REQUIRED REMARKS


FURTHER ACTION
1 Sanitary Fitting / accessories (specify type)

INSTALLATION / WORKMANSHIP
1 Position (in relation to tiles, etc)
2 Fixing
3 Protection
4 WC
5 Basin
6 Kitchen Sink
7 Tab
8 Shower Rose
9 Long Bath
10 Soap Holder
11 Paper Holder
12 Mirror
13 Towel Rail
14 Floor Trap

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep RA / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT:
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar,
44000 Kuala Kubu Bharu,
Hulu Selangor, Selangor.

REQUEST FOR INSPECTION FORM ARCHITECTURE

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : GLAZIER
Location
Block : Structure/
Zone / grideline : Element :
Level :

NO DESCRIPTION SATISFACTORY REQUIRED REMARKS


FURTHER ACTION
1 Glass
2 Beading
3 Gasket / glazing compound

INSTALLATION / WORKMANSHIP
1 Bedding
2 Rebate
3 Gasket
4 Sealant
5 Cutting / exposed edges
6 Protection
7 Cleaning

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep RA / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT:
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar,
44000 Kuala Kubu Bharu,
Hulu Selangor, Selangor.

REQUEST FOR INSPECTION FORM ARCHITECTURE

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : UNDERGROUND PLUMBING WORKS


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS YES NO N/A REMARK

1 Identify position, depth and size of ground beam.


2 Check gradient are as per drawing.
3 Inspect and identify running of underground pipes and ensures
no obstruction.
4 Check size, length, diameter, product as per specification /
drawing.
5 Check alignment, depth of manholes, position of WC, floor waste
trap, gullies an fitting.
6 Check pipes joint, bent and proper sand blinding.
7 Others.

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT:
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar,
44000 Kuala Kubu Bharu,
Hulu Selangor, Selangor.

REQUEST FOR INSPECTION FORM ARCHITECTURE

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : PAVING - CARPETS


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO DESCRIPTION SATISFACTORY REQUIRED REMARKS


FURTHER ACTION
1 Carpet
2 Underlay
3 Fastening
4 Junction Strip

INSTALLATION
1 Cutting
2 Jointing
3 Fixing
4 Junction
5 Cleanliness
6 Protection

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT:
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar,
44000 Kuala Kubu Bharu,
Hulu Selangor, Selangor.

REQUEST FOR INSPECTION FORM ARCHITECTURE

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : FURNITURE
Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS YES NO N/A REMARK

1 Almari Kasut
2 Almari Pameran
3 Almari Bilik Menggosok
4 Almari Bilik Pembantu
5 Alamri Bilik Tetamu
6 Almari Dapur Kering
7 Almari Dapur Basah
8 Pantri
9 Almari Bilik Tidur Utama
10 Almari Bilik Tidur 1
11 Almari Bilik Tidur 2
12 Almari Bilik Tidur 3
13 Alamri Bilik Bacaan

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT:
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar,
44000 Kuala Kubu Bharu,
Hulu Selangor, Selangor.

REQUEST FOR INSPECTION FORM ARCHITECTURE

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : SECURITY GRILLS


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS YES NO N/A REMARK

1 Type and grade


2 Dimensions
3 Setting out / positioning
4 Fixing
5 Alignment
6 Verticality
7 Squareness
8 Allowable gaps
9 Ease of opening and closing
10 Firmness
11 Grout / motar between fame and structure
12 Fire tagging on fire doors
13 Glazing: sealant, gasket

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT:
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar,
44000 Kuala Kubu Bharu,
Hulu Selangor, Selangor.

REQUEST FOR INSPECTION FORM ARCHITECTURE

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : TURFING WORKS


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS YES NO N/A REMARK

1 Site clearing : Loose stone, gravels, tree stumps, undergrowth,


weeds to be removed.
2 Levelling : Cutting, filling, trimming of ground work.
3 Top soil : Spread approved topsoil over the site at average of
150mm thick.
4 Close turfing : Quality Axonopos Compresus (Cowgrass) without
any spacing between sod, sod thickness of 50mm (slope area,
each sod shall be stalked).
5 Spot turfing : Quality Axonopos Compresus (Cowgrass) to be
laid not more than 75mm spacing between sod. Sod thickness of
50mm.
6 Tamping.
7 Water after planting until growing.
8 Fertilizer.
9 Grass cutting.
10 Other.

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep RA / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT:
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar,
44000 Kuala Kubu Bharu,
Hulu Selangor, Selangor.

REQUEST FOR INSPECTION FORM ARCHITECTURE

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : PLANTING
Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS YES NO N/A REMARK

1 Pegging in correct position.


2 Hole Excavation 1x1x1m or 0.5x0.5m.
3 Top soil-darker shade of brown, grey or red parocity without
admixture of stones lumps plants or roots.
4 Planting Height.
5 The plant well grown, undamaged and good shape.
6 Trees shall be supported immediately after planting.
7 Watering
8 Fertilizer.
9 Prunning.
10 Other.

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep RA / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT:
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar,
44000 Kuala Kubu Bharu,
Hulu Selangor, Selangor.

REQUEST FOR INSPECTION FORM ARCHITECTURE

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : LANDSCAPE
Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS YES NO N/A REMARK

1 Type and grade


2 Location
3 Site separation : Loose stones, gravels, tree stumps,
undergrowth, weeds to be removed.
4 Condition of turfs : Free from defects, decay, disfiguring or rot,
sun or wind scalded injury, disease, insect or pest or anyform
of infestation.
5 Top soil : Spread over approved top soil of 75mm thick.
6 Close turfing : Quality Axonopus Compressus (Cowgrass) laid
but joint between sod, sod thickness of 50mm (slope area); each
sod shall be staked.
7 Spot turfing : Quality Axonopus Compressus (Cowgrass) to be
laid not more than 75mm spacing between sod; sod thickness of
50mm.
8 Level eveness of turfs planted.
9 Watering of turfs daily and till growth.
10 Fertilizer once a month.
11 Trimming of turfs once a month.

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep RA / COW
Date : Date: