SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN

Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time :

The following works are/will be ready for inspection at (time) on (date)

INSPECTION FORM FOR EARTHWORK


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS OK NOT N/A REMARK

1 Obtain Pre-comp Plan


2 Setting out
3 Ensure Correctness of TBM
4 Excavation
5 Back filling
6 Compaction
7 Field Density test
8 Final Level
9 Joint Survey with consultant
10 Plotting of As-Built Drawing

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

INSPECTION FORM FOR EARTHWORK TO SLOPES


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS OK NOT N/A REMARK

1 Mobilization & demolisation


2 Survey works & as-built drawings
3 Cut to the required platform level including the formation of slopes
where required.
4 Fill to the required platform level including the formation of slopes
where required.
5 Removal of surplus earth to within site.
6 Close turfing to slopes.
7 Demolish any existing structure on site.
8 V-shape drain
9 New brick sump
10 Cascade drain

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

INSPECTION FORM FOR P.C. CULVERT DRAINAGE


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS OK NOT N/A REMARK

1 Approval material
2 Size / dimension
3 Visual Inspection
4 Install / laying of pipe culvert
a) base-lean base
b) level a gradient in order
c) alignment in order
d) concrete surround
e) joint connection
5 Backfilling
a) backfill material
b) compaction

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

INSPECTION FORM FOR PC DRAIN COVER


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS OK NOT N/A REMARK

1 Thickness of PC Slab
2 Size
3 Setting out
4 Final level

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

INSPECTION FORM SEWER PIPE INSTALLATION


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS OK NOT N/A REMARK

1 Material
2 Class
3 Laying
a) Excavation
b) Bending
c) Alignment
d) Gradient
e) Level
f) Jointing
g) Testing
4 Back Filling
a) Approved material
b) Compaction

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

INSPECTION FORM FOR SEWER MAN HOLE


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS OK NOT N/A REMARK

1 P.C Manhole / Brick manhole


2 Approved Material
3 Internal Alumina render
4 150mm Concrete Encasement
5 Provision for further sewer connection
6 Dimension
7 Setting out
a) Location
b) Level
8 Base
9 Stainless steel manhole cover
10 Stainless steel step iron

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

INSPECTION FORM FOR ROAD WORK


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS OK NOT N/A REMARK


(Premix work)
1 PRIME COAT
Surface preparation
a) Clean
b) Dry
Rate application
2 TAKE COAT
Surface preparation
a) Clean
b) Dry
Rate application
3 BINDER COURSE
a) Approved material
b) Compaction
c) Thickness
4 WEARING COURSE
a) Approved material
b) Compaction
c) Thickness
5 FINISH ROAD LEVEL
Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

INSPECTION FORM FOR ROAD WORK


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS OK NOT N/A REMARK

(Prior to Premix work)


1 SUB GRADE FORMATION
a) Cutting / Backfilling
b) Trimming / level
c) Compaction
d) Clean material

2 SUB - BASE
a) Approved material
b) Compaction
c) Thickness

3 BASE COURSE
a) Approved material
b) Compaction
c) Thickness

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

INSPECTION FORM FOR WATER RECTICULATION PIPE INSTALLATION


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS OK NOT N/A REMARK

1 Material
2 Class
3 Laying
a) Excavation
b) Bedding
c) Alignment
d) Gradient
e) Level
f) Jointing
g) Testing
4 Back Filling
a) Approved material
b) Compaction

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

CONCRETE REPLACEMENT CHECKLIST


Location
Block : Date
Zone / grideline : Estimated :
Conc Vol : m³
Level : Grade :
Structure / Element : Pour date/time :

NO ITEMS TO BE CHECKED BEFORE APPROVAL IS GIVEN Signature & Date


1 Setting out and alignment Contractor Consultant
2 Foundation (Clean up or compaction)
3 Forms - clean up or coatings (oil or sealer)
4 Foam insulation in place
5 Steel reinforcement
6 Waterstop
7 Metal tiles & anchorages
8 Equipment embedments (anchor bolts, etc)
9 Polythene sheeting in-place (paving)
10 Anti-termite
11 Electrical earthing
12 Pour clean-up (washed out, blow out)
13 Lighting for night placement
14 Vibrator & spares, other auxilliary equipment
15 Access for concrete trucks
16 Curing (water or membrane forming)
17 Opening / pipe sleeves for fire protection
18 Opening / pipe sleeves for communication
19 Opening / pipe sleeves for sanitary
20 Proper installation for electrical conduit
21 Proper installation for gas supply
We confirm that all the above work were in compliance with the contract documents. We request to proceed with the concreting work.

(Contractor's Representative) Name : Date :


For Consultant Use Only
Confirm

Architectural Consultant M&E Consultant (C&S Consultant)


Name : Name : Name :
Date : Date : Date :

TO BE COMPLETED BY CONTRACTOR AT COMPLETION OF CONCRETE POUR


Concrete batch number : Test Cube No :
Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

CHECKLIST FOR INSPECTION ON STATIC LOAD TEST


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS OK NOT N/A REMARK


PILE CONDITION
1 Pile installed date (> 14 days)
2 Pile head preparation / treatment
3 Sign of cracking
4 Straightness
5 Smoothness of Pile head
KENTLEDGE INSPECTION
1 Kentledge weight (.20% of test load)
2 Stability of Kentledge Support / Condition test platform
3 Levelling of Kentledge Support
4 Protection from rain water
5 Condition of dumpy level
6 Location of dumpy level
TESTING SET UP
1 Condition of dial gauges (Require 4 nos)
2 Calibration certificate for dial gauges
3 Support / stability of dial gauges
4 Condition of Pressure Jack
5 Calibration certificate for pressure jack
6 Load increment
7 Load test record
Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required

* To be recorded in the Load Test Record Form


Contractor's rep C&S RE / COW
Date : Date:
EMARK
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

CHECKLIST FOR INSPECTION ON PILING ( Precast and Spun Pile)


Location
Block : Structure/
Zone / grideline : Element :
Level :
NO INSPECTION ITEMS OK NOT N/A REMARK
PILE INSPECTION
1 Dimension
2 Overall integrity
3 Straightness
4 Sign of Cracking
5 Marking at 300 mm interval
6 Manufacturer date & name
7 Maturity of Pile (more than 28 days)
8 Pile reference number
9 Supplier test cube result
PILING RIG INSPECTION
1 Type / weight of hammer
2 Hammer drop height (mark at the rig)
3 Helmet condition
4 Cushion thickness (150mm)
PILING INSTALLATION
1 Setting out of pile
2 Drop height consistency
3 Verticality from two Plump-bobs location
4 Condition of pile during driving
5 Pile Driving Record for every 300mm depth
6 Record set at last 10 blows
7 Welding at Joint (Continuous)
8 Anti-rust paint
9 Location and pile deviation (< 75mm)
10 Condition of pile head after driving
11 Check pile group eccentricity
Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required

* To be recorded in the Load Test Record Form


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

PILE DRIVING RECORD

Point : Date driven :


Pile length : Pile Size :
Pile type : Pile seriel no :
Type of driving : from to Type of pile shoe :

Temporary
Type of hammer : Compression : mm

Hammer weight : tonnes Final set (10 blows) : mm


Hammer drop : mm

Penetration No. of blow Penetration No. of blow Penetration No. of blow Penetration No. of blow Penetration No. of blow
(m) (m) (m) (m) (m)

I certify that the piling work was supervised by me and all data recorded above are correct and properly checked.

Remarks:

Agreed by:

Cleint's Supervisor: Engineer / Clerk of Work:


Contractor's Supervisor: Recorded by:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

CHECKLIST FOR INSPECTION PILECAP


Location
Block : Structure/
Zone / grideline : Element :
Level :
NO INSPECTION ITEMS OK NOT N/A REMARK
FORMWORK AND LEVEL
1 Dimension
2 Setting out lines (Control Panels)
3 Level
4 Plumb / Verticality
5 Box up / Opening
6 Cast in / insert items (RWDP)
7 Rigidity / Propping / Scaffold
8 Tightness of joint
9 Cleanliness
10 Mould oil
11 Drop / Step Down
REINFORCEMENT
1 Vertical Reber - size / nos / type
2 Horizontal Reber - size / nos / type
3 Link / Ties - size / nos / type
4 Dowels - size / nos / type
5 Spacing
6 Cover / Spacer
7 Laps
8 Condition of rebars
9 Cleanliness openings
10 Additional Rebars / Trimmer bars
11 Rigidity
12 M&E Services checked
Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

CHECKLIST FOR INSPECTION ON NON SUSPENDED SLAB


Location
Block : Structure/
Zone / grideline : Element :
Level :
NO INSPECTION ITEMS OK NOT N/A REMARK
FORMWORK AND LEVEL
1 Compaction of soil
2 Anti termite
3 Crusher run
4 Polythene sheet
5 Lean concrete
6 Expansion joint location
7 Scupper drain
8 Level of concreting (mark on rebar)
9 Box up openings
10 Cleanliness
REINFORCEMENT
1 Rebar / BRC - size / nos / type
2 Anchorage
3 Spacing
4 Cover / spacer
5 Laps (1 full yield)
6 Condition of Rebars
7 Additional Rebars / Trimmer bars
M&E SERVICES
1 M&E Services checked

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

CHECKLIST FOR INSPECTION ON GROUND BEAM & SLAB


Location
Block : Structure/
Zone / grideline : Element :
Level :
NO INSPECTION ITEMS OK NOT N/A REMARK
FORMWORK AND LEVEL
1 Lean concrete
2 Dimension (Width and Depth)
3 Setting out Lines (Control points)
4 Level of concreting (mark on rebar)
5 Cast in / Box up
6 Rigidity / Props formwork condition
7 Tightness of Joints
8 Cleanliness
9 Mould oil
10 Drop / step down
REINFORCEMENT
1 Rebar / BRC - size / nos / type
2 Link / ties - size / nos / type
3 Starter bar for column / stiffener
4 Anchorage
5 Spacing
6 Cover / Spacer
7 Laps
8 Condition of Rebars / Trimer bars
9 Additional Rebars / Trimer bars
M&E SERVICES
1 M&E Services checked

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

CHECKLIST FOR INSPECTION ON UPPER BEAM & SLAB


Location
Block : Structure/
Zone / grideline : Element :
Level :
NO INSPECTION ITEMS OK NOT N/A REMARK
FORMWORK AND LEVEL
1 Dimension (Width and Depth)
2 Setting out Lines (Control points)
3 Level of concreting (mark on rebar)
4 Cast in / Box up
5 Rigidity / Props formwork condition
6 Tightness of Joints
7 Cleanliness
8 Mould oil
9 Drop / step down
REINFORCEMENT
1 Rebar / BRC - size / nos / type
2 Link / ties - size / nos / type
3 Anchorage
4 Spacing
5 Cover / Spacer
6 Laps
7 Condition of Rebars / BRC
8 Additional Rebars / Trimer bars
M&E SERVICES
1 M&E Services checked

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

CHECKLIST FOR INSPECTION ON COLUMN AND WALL


Location
Block : Structure/
Zone / grideline : Element :
Level :
NO INSPECTION ITEMS OK NOT N/A REMARK
FORMWORK AND LEVEL
1 Dimension
2 Setting out Lines (Control points)
3 Level
4 Plumb / Verticality
5 Box up / opening
6 Cast in / Insert items (RWDP)
7 Rigidity / Props formwork condition
8 Tightness of Joints
9 Cleanliness
10 Drop / step down
REINFORCEMENT
1 Vertical Rebar - size / nos / type
2 Horizontal Rebar - size / nos / type
3 Link / ties - size / nos type
4 Dowels - size / nos / type
5 Spacing
6 Cover / spacer
7 Laps
8 Condition of rebars
9 Cleanliness openings
10 Additional Rebars / Trimmer bars
11 Rigidity
12 M&E Services checked
Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : SETTING OUT


Location
Block : Structure/
Zone / grideline : Element :
Level :
NO DESCRIPTION YES NO N/A REMARK

1 Check boundry line


2 Check boundry stone
3 Check set back
4 Check T.B.M
5 Check grid line dimension
6 Check excavation area
7 Check pile position
8 Others

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : SEWERAGE WORKS


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS YES NO N/A REMARK

1 Check construction drawing for TBM, Manholes


2 Check the pipe sizes, depth and floe direction
3 Check excavation depth and report for unfavourable
4 Check the base of piping laying as specification
5 Check pipe laying, check the gradient
6 Check the placement of Rubber Ring seal between jointing
7 Check the plug is installed at 'T' inlet
8 Check the backfilling works, compaction to fill soil as per specified

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : RAFT FOUNDATION / FOOTING BASE


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO DESCRIPTION YES NO N/A REMARK

1 Check the norm excavation depth


2 Check the construction drawing for location, size, type
3 Check base condition as specified
4 Check base level
5 Check base clean from soil, mud / water

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : PILECAP / STUMP


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS YES NO N/A REMARK

1 Check cut off level


2 Check the lean concrete
3 Check cap / sump formwork : position, dimension plumb
Alignment, joint tightness, rigidity, cleanliness, mould
4 Check cap reinforcement :
Check size, numbers, spacing, cleanliness loop, positioning,
of bar, dist.bar
5 Check the column, stump reinforcement, bar, links, position
6 Other : to ensure backfilling works, compacting to fill as per
specified

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : GROUND FLOOR SLAB


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS YES NO N/A REMARK

1 Ensure all plumbing / electrical conduit work is completed and


check before placing of hardcore
2 Ensure hardcore base are levelled and compacted accordingly
3 Checked hardcore and sand blinding thickness and compaction level
4 Ensure DPC and anti termite chemical povided (if any)
5 Check reinforcement cover, size number, spacing, lap (if any)
6 Check cleanliness

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : R.C COLUMN


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS YES NO N/A REMARK


FORMWORK AND LEVEL
1 Dimension
2 Setting out lines
3 level
4 Plumb / Vertically
5 Box up / opening
6 Cast in / insert items (RWDP)
7 Rigidity / Propping / Scaffold
8 Tightness of joints
9 Cleanliness
10 Drop / step down
REINFORCEMENT
1 Vertical Rebar - size / nos / type
2 Horizontal Rebar - size / nos / type
3 Link / ties - size / nos type
4 Dowels - size / nos / type
5 Spacing
6 Cover / spacer
7 Laps
8 Condition of rebars
9 Cleanliness openings
10 Additional Rebars / Trimmer bars
11 Rigidity
12 M&E Services checked
Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : ROOF BEAM


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS YES NO N/A REMARK

1 Cleanliness
2 Check lean concrete, level, etc
3 a) Check formwork dimension, level, alignment joint tightness,
rigidity, mould oil
b) Check cateline of beam / centerline
c) Fixed in the right position and alignment
d) Size of beam. Length and strutting
4 a) Check reinforcement, cover, correct every bear size, quantity,
length and spacing
b) Check anchorage / laps / bent
c) Check link, strups / securely tying
5 Other : Check if any opening

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : R.C. STAIRCASE


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS YES NO N/A REMARK

1 Check clearance height / tread / riser.


2 Check formwork, dimension, level alignment, joint tightness rigidity,
props, struts, cleanliness and mould oil.
3 Fixed in the right position.
4 a) Check reinforcement, cover, every bar size, quality, length
spacing, laps, bent.
b) Check link, strups, security tying, anchorage, starter bar.
5 Others.

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : STEEL ROOF TRUSS FABRICATION / INSTALLATION


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS YES NO N/A REMARK

1 Treatment
2 Uniformity, straightness quality of members
3 Member sizes
4 Truss profile - Pitch of truss
5 Alignment
6 Verticality
7 Connection detail
8 Vertical bracing
9 Diagonal bracing
10 Horizontal bracing
11 Wall plate
12 Base / Timber bracket
13 Provision for tie member connections
14 Timber batten

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

INSPECTION FORM FOR FIRE HYDRANT


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS OK NOT N/A REMARK

1 Material approval
2 Position
3 Piping and connection
4 Valve and chamber
5 Painting

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

INSPECTION FORM FOR SURFACE DRAINAGE


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS OK NOT N/A REMARK

1 Alignment & setting out


2 Size / dimension
3 Visual inspection
4 Install / laying of pipe culvert
a) Concrete base
b) Level a gradient in order
c) Alignment in order
d) Concrete surround
e) Joint / connection
5 Brickwork & plastering

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

INSPECTION FORM FOR ROAD KERB


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS OK NOT N/A REMARK

1 Alignment & setting out


2 Concrete work
3 Kerb shape
4 Texture

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : COLD WATER PIPE (EXTERNAL)


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS YES NO N/A REMARK

1 Trench excavation - depth, dimension


2 Backfill material - sand / granular material
3 The cleanliness of qzipe
4 Check cracks for flaws & externally of pipe
5 Ends of pipe free from ensis oil, rust, dirt
6 Alignment of pipe
7 To check position of specials
8 Electric arc welding equipment
9 Welding
10 Air test on weld (joint)
11 Mechanical coupling & flange adaptor
- deadlines og joint ends
- to apply drying primer & external shertling mould
12 Flange joint - bolt tightening
- painted with 2 coats of bituminous paint
13 Pressure test & leakage test
14 Thrust block for bend, taper, tee
15 Valve chamber - size
16 Crossing over culvert
17 JBA marker
Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

ELEMENT : TREATMENT PLANT (VCP PIPE)


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS YES NO N/A REMARK

1 Pipe & fitting inspected for damage, size


2 Trench excavation - depth
3 Alignment of sewer pipe
4 Pipe embedment - bedding material
5 Invert level of pipe
6 Backfill of trench
7 Position of manhole
8 Invert level of manhole
9 Junction connection
10 Manhole - the slope of benching
- joints to pipe
- transition at entry & exits
- joints in the structure
- quality of concute finish
- water tightness of manhole cover & surround
11 After backfill - exfiltration test (water test)

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

INSPECTION FORM FOR CRIBWALL


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS OK NOT N/A REMARK


A FOOTING
1 Alignment & setting out
2 Plaement of steel bar
3 Concreting of RC footing

B CRIBWALL
1 Installation of cribwall component including HEADER & STRETCHER
2 Placement of geotextile
3 Vrusher run infilling within cribwall block

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW
Date : Date:
SRIPELANGI CONSTRUCTION SDN BHD PROJECT: CADANGAN MEMBINA DAN MENYIAPKAN
Lot 41, Tingkat 1, Jalan Dato' Muda Jaafar, MAKTAB RENDAH SAINS MARA (MRSM)
44000 Kuala Kubu Bharu, DI MUKIM SG. PANJANG, DAERAH SABAK
Hulu Selangor, Selangor. BERNAM, SELANGOR DARUL EHSAN.

REQUEST FOR INSPECTION FORM C&S

To : Ref. No :
Attention : Date :

Request by : Received by :
Name : Name :
Company : Company :
Time : Date : Time : Date

The following works are/will be ready for inspection at (time) on (date)

INSPECTION FORM FOR RUBBER WALL


Location
Block : Structure/
Zone / grideline : Element :
Level :

NO INSPECTION ITEMS OK NOT N/A REMARK

1 Approval material
2 Size / dimension
3 Visual inspection
4 Concrete base
5 Level and gradient in order
6 Alignment in order
7 Joint & connection

Inspection response : Remarks:

Inspection passed, works are allowed to proceed

Remedial work listed to be carried out. No further Inspection Required

Remedial work listed to be carried out. Re-inspection required


Contractor's rep C&S RE / COW