Inspection Pilecap Stump PRJ-FRXX
Inspection Pilecap Stump PRJ-FRXX
BHD.
Inspection Checklist - Pilecap / Stump
Project :
Location of Inspection :
Prior concreting
1 Check cut off level
2 Check the lean concrete
Check cap / stump formworks :
- position and dimension
- plumb
3
- alignment
- joint tightness and rigidity
- cleanliness of mould
Cap reinforcement
4 - size, numbers, spacing
- position of bar and distance
Check the column, stump reinforcement
- bar size and numbers
5
- links and position
- lapping and spacer
Post Concreting
1 Backfilling works
2 Compaction to fill as per specification
SPC/PRJ/FR-05-7/Rev 0