SRIPELANGI CONSTRUCTION SDN.

BHD.
Inspection Checklist - Pilecap / Stump

Project :

Main Contractor : Sub Contractor :

Location of Inspection :

Inspection Date : Ref. No:

Status of Acceptability Remark/


Ref. Nature of Inspection
Yes No Re-inspection

Prior concreting
1 Check cut off level
2 Check the lean concrete
Check cap / stump formworks :
- position and dimension
- plumb
3
- alignment
- joint tightness and rigidity
- cleanliness of mould
Cap reinforcement
4 - size, numbers, spacing
- position of bar and distance
Check the column, stump reinforcement
- bar size and numbers
5
- links and position
- lapping and spacer
Post Concreting
1 Backfilling works
2 Compaction to fill as per specification

Inspection Status Remarks

Inspection passed, works allowed to proceed

Remedial work as listed, No further inspection required

Remedial work as listed. RE-INSPECTION required

Check By Verify By Client Rep

SPC/PRJ/FR-05-7/Rev 0