Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

EXPANSION OF SWTP 9 STAGE – 6 PHASE 1 PROJECT

SKID STEER LOADER INSPECTION CHECK LIST

VA TECH WABAG PROJECT REF. NO # 7200038411


Date: Location:-

Equipment Type: Equipment No:

Requirements Verify Check

1. Operator and Maintenance Manual


available.
2. Daily Prestart Inspection Checklist is
available for use.
3. Audible Alarm and other Warning
Devices fitted, operable and suitable
for site conditions.
4. Fire Extinguisher Fitted and charged.
5. Cabin Verify Check 6. Running Controls Verify Check

Cleanliness Tyres / Wheels undamaged

Front door/gate operational (If Idlers adjusted


fitted)
Handholds fitted and secured Drivers free from leaks

Seat – Adjustments operational 7. Hydraulics Verify Check


and Secure
Seat belt fitted and in good Rams
working order
Instruments Operational & Hoses / Connectors
Labelled
Pedals in Good Condition Pins / Mounting

Levers / Controls Operational (check for excessive wear, leaks and


creep)
Protective Mesh not damaged (If 8. Engine Verify Check
fitted)
Rear View Mirrors Engine Mountings

Reversing camera functional (If Safety Guards Fitted


fitted)
Dead man safety bar functional Exhaust Guarding

Boom maintenance step fitted Oil Leaks/levels checked

Horn and reverse alarm operable Coolant Leaks/levels checked

Warning devices and other lights Coolant System


(flashing, head, tail, etc.) are
appropriate for the environment in
which plant is being used. (check
environment noise criteria
particularly if working out of hours)
UHF Radio Fitted (If not fitted, has Vee Belt Condition
a hand held radio been supplied)

Document No: WABAG/SF-CH-048


EXPANSION OF SWTP 9 STAGE – 6 PHASE 1 PROJECT
SKID STEER LOADER INSPECTION CHECK LIST

VA TECH WABAG PROJECT REF. NO # 7200038411


Warning Signs - Seat belt must be Air Cleaner System
worn
Warning Signs - Dial Before You Dig Battery Condition / Mounting

9. Environmental Verify Check 10. Bucket Verify Check

Clean, free of organic materials Quick hitch pins and locks locked
(mud, dirt, weeds or seeds) prior to
arrival
Engine baffling or noise reduction Bucket teeth and cutting edge
equipment fitted as per undamaged
manufacturers specifications
Smoke from internal combustion
engines should not be visible for
more than ten seconds

TYRES – Record Tread Depth (if required)


POS 1 (LF) ____mm POS 2 (RF) ____mm
POS 3 (LM) ____mm POS 4 (RM) ____mm

General Comments:-

Inspected By:

Name: ------------------------------- Signature: --------------------------- Position: ------------------------ Company: ---------------------

Document No: WABAG/SF-CH-048

You might also like