DRAWN BY MANISH National Highways & Infrastructure “Consultancy Services for Preparation of Detailed Project Report for 2 lane with REINFORCEMENTDETAIL Development Corporation Limited. Rail Vikas Nigam Limited R2 JULY 2023 DRAFT DPR earthern shoulder of road section from Tuivai Bridge on NH-102B to Parva-I via Mimbung DESIGN BY AMIT OF BOX CULVERT (TYP.) 3rd Floor, PTI building, 4-Parliament in association with (SHEET-01 OF 02) - Ngopa - Hnahlan - Zokhawthar - Vaphai - Farkawn - Thekpui - Lungkawlh - Thingsai - R1 JAN 2023 FINAL FEASIBILITY REPORT Street, New Delhi-110001 S.Vanlaiphai - Lungzarhtum - Chhuarlung - Chakhang - Chheihlu - Zawngling - Khopai - CHECKED BY A.G. Shweta Technophile Consultants Pvt.Ltd. R0 NOV 2022 DRAFT FEASIBILITY REPORT Longmasu - Vathuampui - Parva-II in the State of Mizoram. DRAWING NO. (Vaphai to Thekpui Section) A3 REV. DATE DESCRIPTION OF REVISIONS RVNL/STC/NHIDCL/MIZ/VT/CUL/BOX/REIN. NOTES:-
FAVOURABLE ZONE:-
UNFAVOURABLE ZONE:-
FAVOURABLE BOND CONDITION
UNFAVOURABLE BOND CONDITION
REFERENCE DRAWINGS:-
LEGENDS:-
CLIENT: PROJECT: DPR CONSULTANTS: TITLE:
DRAWN BY MANISH National Highways & Infrastructure “Consultancy Services for Preparation of Detailed Project Report for 2 lane with REINFORCEMENTDETAIL Development Corporation Limited. Rail Vikas Nigam Limited R2 JULY 2023 DRAFT DPR earthern shoulder of road section from Tuivai Bridge on NH-102B to Parva-I via Mimbung DESIGN BY AMIT OF BOX CULVERT (TYP.) 3rd Floor, PTI building, 4-Parliament in association with (SHEET-02 OF 02) - Ngopa - Hnahlan - Zokhawthar - Vaphai - Farkawn - Thekpui - Lungkawlh - Thingsai - R1 JAN 2023 FINAL FEASIBILITY REPORT Street, New Delhi-110001 S.Vanlaiphai - Lungzarhtum - Chhuarlung - Chakhang - Chheihlu - Zawngling - Khopai - CHECKED BY A.G. Shweta Technophile Consultants Pvt.Ltd. R0 NOV 2022 DRAFT FEASIBILITY REPORT Longmasu - Vathuampui - Parva-II in the State of Mizoram. DRAWING NO. (Vaphai to Thekpui Section) A3 REV. DATE DESCRIPTION OF REVISIONS RVNL/STC/NHIDCL/MIZ/VT/CUL/BOX/REIN.