PDU5000

Quick Guide

Issue: 01
Date: 2018-08-10

HUAWEI TECHNOLOGIES CO., LTD.


1 Safety Precautions
1. General safety precautions
To ensure human safety and equipment security, pay attention to all the precautions marked on the
equipment and instructed in the product documentation.
The "NOTICE", "CAUTION", "WARNING", and "DANGER" statements in this document do not
represent all the safety instructions. They are only supplements to the safety instructions.
2. Local laws and regulations
Comply with local laws and regulations when operating the equipment. The safety instructions in
the document are only supplements to the local laws and regulations.
3. Personnel requirements
Personnel who plan to install or maintain Huawei equipment must receive a thorough training,
understand all necessary safety precautions, and be able to perform all operations correctly.
• Only trained and qualified personnel are allowed to install, operate, and maintain the equipment.
• Only personnel certified or authorized by Huawei are allowed to replace or change the equipment
or components (including software).
• Any fault or error that might cause safety problems must be reported immediately to a supervisor.
4. Grounding requirements
• When installing the equipment, ground it first.
• When removing the equipment, disconnect the ground cable finally.
• Do not damage the ground conductor.
• Do not operate the equipment in the absence of a properly installed ground conductor.
• The equipment must be grounded permanently. Before operating the equipment, check the
electrical connection of the equipment to ensure that it is securely grounded.
5. Personal requirements
• Do not operate the equipment or cables during thunderstorms.
• Remove the AC power connector and do not use the fixed terminal or touch the terminal or
antenna connector in a thunderstorm.
• Before operating the equipment, wear electrostatic discharge (ESD) clothes, ESD gloves, and an
ESD wrist strap. Do not wear conductors such as jewelry or watches when operating the
equipment.
• In the case of a fire, immediately leave the building or the equipment area, and turn on the fire
alarm bell or make an emergency call. Never enter a building or equipment area that is on fire.
6. Equipment requirements
• Before operations, ensure that the equipment is firmly secured to the floor or other solid objects,
such as a wall or an installation rack.
• Do not block the air vent while the system is operating.
• Tighten the screws using tools when installing panels.
• After installation, remove the packing materials from the equipment area.

1
2 Overview
Dimensions of the PDU5000 (H x W x D): 131.85 mm x 482.60 mm x 502.70 mm

Rear view of the PDU5000

Front view of the PDU5000

No. Component Name No. Component Name


UPS input and output terminal
1 2 Ground bar
blocks
3 Branch terminal block 4 Signal terminal block
Maintenance bypass circuit
5 6 UPS input circuit breaker
breaker
7 UPS output circuit breaker 8 Branch switch
Surge protective device (SPD)
9 10 SPD
switch

3 Unpacking and Acceptance


• Unpack the equipment and visually inspect its appearance to check whether the equipment is
paint-peeling, misshapen, scratched, or soaked. If so, record the information and contact the
equipment carrier and the local Huawei office immediately.
• Check against the packing list that the equipment and components are correct and complete. If
some components are missing or do not conform to the packing list, record the information and
contact Huawei or the local Huawei office immediately.

2
4 Installing the PDU5000
Plan the installation position for the PDU5000 based on the following figure.

Front view of the PDU5000

5 Installing PDU5000 Cables


Install cables for the PDU5000 by referring to the following figure.

Rear view of the PDU5000

3
6 Check Before Power-On
No. Check Item Check Result
1 All cables are correctly connected based on the Schematic Diagram. □Passed □Failed
2 Ground cables are securely connected. □Passed □Failed
Redundant parts of the ground cables and power cables are cut off
3 □Passed □Failed
instead of coiled.
Power cables and ground cables are routed and bundled separately from
4 □Passed □Failed
other types of cables.
5 All circuit breakers are OFF. □Passed □Failed
6 The appearance is intact without any damage. □Passed □Failed
7 All labels are correct, clear, and complete. □Passed □Failed
The surrounding area of the cabinet contains no waste tape, cable ties,
8 □Passed □Failed
paper, or packing materials.
All bolts are tightened, especially the bolts used for electrical connection.
9 Flat washers and spring washers are installed properly in the correct □Passed □Failed
sequence.
Cables are bundled neatly, and cable ties are secured evenly and
10 □Passed □Failed
properly in the same direction.
11 Cables are routed for ease of future maintenance and expansion. □Passed □Failed
12 There is no unnecessary adhesive tape or cable tie on the cables. □Passed □Failed
Exposed parts near the wiring terminals and lugs are wrapped in PVC
13 □Passed □Failed
insulation tape or heat shrinking tubing.
Flat and spring washers are properly installed on each bolt of a wiring
14 □Passed □Failed
terminal.
The power and signal cables are routed in accordance with the weak-
15 □Passed □Failed
and strong-current cable routing specifications and the cable routing plan.

7 Power-On Commissioning
1. Turn on the SPD circuit breaker.
2. Turn on the external power input circuit breaker.
3. Turn on the UPS input switch.
4. Set UPS parameters after UPS startup, then start the inverter, and turn on the UPS output switch.
5. Turn on all output circuit breakers of the PDU5000 in sequence and check that the output voltage
is normal by using a multimeter.
6. After checking that the parameters are normal, turn off all the circuit breakers one by one and
disconnect the power supply.

NOTE
When switching on the circuit breakers, observe whether there is any abnormal phenomenon, such
as sparks or unsmooth switching on/off.

4
Elementary diagram of the PDU5000

Terminal blocks of the PDU5000:

XT1 XT2
QFS-2 1 L QF7-1 1 L
Main Input QF7
QF2-4 2 N N 2 N
QF1-1 3 L QF6-1 3 L
UPS Input QF6
QFBP-4 4 N N 4 N
QF2-1 5 L QF5-1 5 L
UPS Output QF5
N 6 N N 6 N
QF4-1 7 L
QF4
N 8 N
XT3 QF3-1 9 L
QF3
FS-COM 1 N/A N 10 N
SPD:DO
QFS-11 2 N/A
SM-COM 3 COM
UPS:MBS
SM-NC 4 NC

5
8 Routine Maintenance
Operation
Item Interval Reference Standard Troubleshooting
Guide
1. The cables are not
Connections of damaged.
Visual Take measures
input and output Monthly 2. The terminals are intact,
observation depending on the severity.
power cables secure, and free from
spark signs and rust.
Appearance of
Visual Take measures
power distribution Quarterly The appearance is intact.
observation depending on the severity.
components
Measure the Check that the air
Operating temperature: –
Operating temperature conditioner and
5°C to +40°C
temperature and Quarterly and humidity dehumidifier in the
Relative humidity: 5%–
humidity using a point equipment room function
95% RH
thermometer. properly.
Dust on the Check The white paper that you
If the white paper is dirty,
surface of the Yearly whether there use to wipe the equipment
clean the PDU5000.
PDU5000 is dust. is clean.

9 Troubleshooting
Symptom Possible Causes Troubleshooting Measures
• The SPD circuit breaker is
not turned on.
• Check that the SPD circuit breaker is turned
The surge • The SPD ground cable is
on.
protection function not connected.
• Check that the SPD ground cable is connected.
fails. • The surge protection
• Replace the surge protection module
module is abnormal. The
SPD window is red.
• Use a multimeter to check whether there is a
The rear-end
• The switch trips abnormally. short circuit. Turn on the switch again, and
device power input
• The UPS is faulty. check whether the system is overloaded.
is abnormal.
• Restart the UPS. If the UPS is faulty, replace it.
The UPS does not • The output power cable is
report faults, but not securely connected. • Check the output power cable connection.
has no output • The output circuit breaker • Replace the circuit breaker.
voltage. is abnormal.

10 Parts Replacement
NOTICE
Only engineers certified by Huawei or its agents are allowed to perform operations. Otherwise,
personal injury or equipment damage may occur, and the device faults caused are beyond the
warranty scope of Huawei.

6
10.1 Replacing a Circuit Breaker
Prerequisites:
• Tools: electroprobe, insulation gloves, flat-head screwdriver, Phillips screwdriver, multimeter
• A spare circuit breaker of the same model is available and functional.

NOTICE

1. Replacing circuit breakers for PDU5000 results in service interruptions.


2. The upstream user switch for the PDU5000 must be OFF. Ensure that the input is disconnected
during replacement.

Procedure:
Step 1 Turn off the upstream user switch. Remove the input power cable, UPS input and output
power cables, cabinet power cable, and signal cable from the rear of the PDU5000, and mark the
connection positions.
NOTICE
After removing cables, wrap exposed terminals with insulation tape and do not block cable
labels. If cable labels are blocked, cables may be connected incorrectly later.
Step 2 Remove the PDU5000, and remove the top and front covers of the PDU5000.
Step 3 (Optional) Remove the copper bar of the circuit breaker on PDU5000.

Removing the copper bar

Step 4 Remove the faulty circuit breaker using a screwdriver.


Step 5 Replace the faulty circuit breaker on the PDU5000 with a new one.
Step 6 (Optional) Insert the removed copper bar into the circuit breaker and secure it with screws.
Step 7 Reinstall the removed top and front covers of the PDU5000.
Step 8 Secure the PDU5000 to the cabinet, and install the PDU5000.
Step 9 Install cables for the PDU5000 and perform power-on commissioning.

7
10.2 Replacing a Surge Protection Module

DANGER
• Do not replace a surge protection module during a thunderstorm.
• Before replacing a surge protection module, wear protective insulation gloves.

Prerequisites:
• Tools: protective insulation gloves, electroprobe
• Material: A spare surge protection module of the same model is
available and functional.
Procedure:
Step 1 Switch the SPD circuit breaker to OFF.
Step 2 Remove the protective panel of the SPD.
Step 3 Detect the L1, L2, L3, and N voltages to
the PE using an electrical tester pen to check
whether there is voltage, as shown in the right
figure, and verify that the faulty SPD has no
voltage before replacing the faulty surge protection
module.
Step 4 Hold the faulty surge protection module Measuring the voltage
and pull it out, as shown in the following figure.

DANGER

During replacement, do not touch the electriferous components in the PDU5000.

Replacing a surge protection module

Step 5 Install a new surge protection module.


Step 6 Reinstall the protective panel of the SPD and switch the SPD circuit breaker to ON.

8
11 Technical Specifications
Item Specifications
Operating temperature –5°C to +40°C
Storage temperature –40°C to +70°C
Relative humidity 5%–95% RH (non-condensing)
Altitude ≤ 4000 m
Rated operating frequency 50 Hz
Rated operating voltage 220 V AC
Installation mode Installed inside a cabinet
Protection level IP20

Huawei Technologies Co., Ltd.


Huawei Industrial Base, Bantian, Longgang
Shenzhen 518129 People's Republic of China
www.huawei.com