Report of Bid Evaluation Committee w.r.t.

Evaluation of Financial Bids


received against NIT No. MD/EZICGM/RDSS/CSR/NITI 131 dated
08.02.2023

After recommendation of Bid Evaluation Committee w.r.t. Techno-Commercial Bid


received against NIT No. MD/EZ/CGM/RDSS/CSR/NIT/ 131 dated )8.02.2023. price bid of
Qualified bidder was opened on 16.02.2023.

2 On openng of price bid the percentage rate received are delineated here under in
increasing order of percentage rate quoted by the bidders:
Name of Bidder Estimated Cost Quoted Quoted Cost Rank of Total Quoted price
S.
Without GST Bidder with GST
No. without GST Rate

Ms Hi Tech,Construction -7.09% 38,57,48,750 L-l 45.51,83.526


41,51,85,395
|Group. Mumbai
M/s Eltel Power Private L-2 47,16,44,796
2 41,51,85,395 -3.73% 39,96,98,980
Limited. Satna
M/s Giriraj Associates, -3.26% 40,16,50,351 L-3 47,39,47.4 14
3 41,51,85,395
Narsinghpur
4 M/s Power Solutions, Bhopal 41,51,85,395 -2.89% 40,31,86,537 L-4 47,57,60,114

M/s Sakar Engitech Pvt. Ltd., -1.11% L-5 48,44,80.668


5 41,51,85,395 41,05,76,837
Jaipur
M/s MDP Infra (india)Private 42,24,5 1,139 L-6 49,84,92,345
6 41,51,85,395 1.75%
Limited. Gwalior
M/s Dee Vee Projects Limited, 4.04% 43,19,58,885 L-7 50,97,11,484
7 41,51,85,395
Korba (C.G.)
M/s Kailash Electricals, 4.16% 43,24,57,107 L-8 S1,02,99,387
41,51,85,395
Kanpur
M/s Star DeltaTransformers 41,51,85,395 6.98% 44,41,65,336 L-9 52,41,15,096
LId., Bhopal

3 From above it is clear that M/s Hi Tech, Construction Group, Mumbai is L-l bidder
as per the terms and conditions mentioned in the bid document. The price quoted by L-l
bidder seems justified looking into the fact that the project is to be executed during the span
of 24 Months in only one Block i.e. Chitrangi of Singrauli disctrict. Therefore, L-l bidder
might have quoted total cost lesser than estimated cost keeping view of lesser profit margin
and other expenditure.

4. The Committee members, after careful examination, recommend to put up proposal


before BoD, for issuing Notification of Award to L-1 Bidder i.e. M/s HiTech, Construction
Group, Mumbai.
Signature Not Verified

CGM (RDSS) CGM (S&P) CGM (Works) A


Digitally signed by SANJAY BHAGWATKAR
Date: 2023.05.24 15:08:34 IST