TIME LINE PEKERJAAN IMPROVEMENT PS SARPE

PROGRESS PEKERJAAN 07 JULI 2023 s/d 31 JANUARI 202

06/07 - 09/07

10/07 - 16/07

17/07 - 23/07

24/07 - 30/07

31/07 - 06/08

07/08 - 13/08
(Week)
Durasi

Bobot
No PROSES PEKERJAAN Qty

W01 W02 W03 W04 W05 W06


A PENGADAAN MATERIAL + FAT
1 Genset 30 KVA 4 12 13.66% 1.14% 1.14% 1.14% 1.14% 1.14% 1.14%
1.14% 1.14% 1.14% 1.14%
2 Genset 20 KVA 4 12 13.39% 1.12% 1.12% 1.12% 1.12% 1.12% 1.12%
1.12% 1.12% 1.12% 1.12%
3 Rect. 9 Slot (6 modul) 10 10 7.63% 0.76% 0.76% 0.76% 0.76% 0.76% 0.76%
0.76% 0.76% 0.76% 0.76%
4 Rect. 2U (3modul) 18 10 9.82% 0.98% 0.98% 0.98% 0.98% 0.98% 0.98%
0.98% 0.98% 0.98% 0.98%
5 Batt. Lith 100AH 50 12 15.90% 1.32% 1.32% 1.32% 1.32% 1.32% 1.32%
1.32% 1.32% 1.32% 1.32%
6 Batt. VRLA 100AH 3 12 1.99% 0.17% 0.17% 0.17% 0.17% 0.17% 0.17%
0.17% 0.17% 0.17% 0.17%
7 Eksternal Alarm Shelter 14 12 4.34% 0.36% 0.36% 0.36% 0.36% 0.36% 0.36%
0.36% 0.36% 0.36% 0.36%
8 Eksternal Alarm ODC 25 12 13.38% 1.11% 1.11% 1.11% 1.11% 1.11% 1.11%
1.11% 1.11% 1.11% 1.11%
9 Inverter 1 KVA 6 12 0.88% 0.07% 0.07% 0.07% 0.07% 0.07% 0.07%
0.07% 0.07% 0.07% 0.07%
B INSTALASI ON SITE
B1 SBU Sumbagut (24 lokasi) 3.63%
a Survey 2 0.09% 0.05% 0.05%

b Delivery Material to Site 3 0.09%

c Instalasi + QC/Commisioning
Genset 20 KVA 2 6 0.97%

Batt. Lith 100AH 10 4 1.06%

Eksternal Alarm Shelter 7 4 0.55%

Eksternal Alarm ODC 8 4 0.87%

B2 SBU Sumbagteng (10 lokasi) 3.59%


a Survey 2 0.09% 0.04% 0.04%
0.02%
b Delivery Material to Site 3 0.09%

c Instalasi + QC/Commisioning
Genset 30 KVA 1 4 0.46%

Genset 20 KVA 2 6 0.97%

Rect. 2U (3modul) 6 4 0.92%

Batt. Lith 100AH 10 4 1.06%

B3 SBU Sumbagsel (19 lokasi) 3.75%


a Survey 4 0.09% 0.02% 0.02% 0.02% 0.02%
0.01% 0.01%
b Delivery Material to Site 3 0.09%

c Instalasi + QC/Commisioning
Genset 30 KVA 3 6 1.38%

Rect. 9 Slot (6 modul) 4 4 0.57%

Batt. Lith 100AH 10 4 1.06%

Eksternal Alarm Shelter 7 4 0.55%

B4 SBU Kalimantan (27 lokasi) 4.43%


a Survey 5 0.11% 0.02% 0.02% 0.02% 0.02%
0.001% 0.00%
b Delivery Material to Site 6 0.11%

c Instalasi + QC/Commisioning
Rect. 9 Slot (6 modul) 2 3 0.29%

Rect. 2U (3modul) 8 4 1.23%

Batt. Lith 100AH 10 4 1.06%

Eksternal Alarm ODC 9 4 0.98%

Inverter 1 KVA 6 3 0.66%

B5 SBU Sulawesi dan IBT (25 lokasi) 3.62%


a Survey 4 0.09% 0.02% 0.02% 0.02% 0.02%
0.002% 0.01%
b Delivery Material to Site 6 0.09%

c Instalasi + QC/Commisioning
Rect. 9 Slot (6 modul) 4 3 0.57%

Rect. 2U (3modul) 4 3 0.61%


Batt. Lith 100AH 10 4 1.06%

Batt. VRLA 100AH 3 3 0.32%

Eksternal Alarm ODC 8 4 0.87%

RENCANA PROGRESS TOTAL PER MINGGU 7.0% 7.0% 7.1% 7.2% 7.2% 7.2%
RENCANA PROGRESS AKUMULASI 0.0% 7.0% 14.1% 21.2% 28.3% 35.5% 42.7%
REALISASI PROGRESS PER MINGGU 7.0% 7.0% 7.1% 7.1% 0.0% 0.0%
REALISASI PROGRESS AKUMULASI 0.0% 7.0% 14.1% 21.1% 28.2%
DEVIASI PROGRESS 0.0% 0.0% 0.1% 0.1%
T PS SARPEN LUAR JAWA BALI
ULI 2023 s/d 31 JANUARI 2024 DAN MASA PEMELIHARAAN 90 HARI
14/08 - 20/08

21/08 - 27/08

28/08 - 03/09

04/09 - 10/09

11/09 - 17/09

18/09 - 24/09

25/09 - 01/10

02/10 - 08/10

09/10 - 15/10

16/10 - 22/10

23/10 - 29/10

30/10 - 05/11

06/11 - 12/11

13/11 - 19/11

20/11 - 26/11

27/11 - 03/12

04/12 - 10/12
W07 W08 W09 W10 W11 W12 W13 W14 W15 W16 W17 W18 W19 W20 W21 W22 W23

1.14% 1.14% 1.14% 1.14% 1.14% 1.14%

1.12% 1.12% 1.12% 1.12% 1.12% 1.12%

0.76% 0.76% 0.76% 0.76%

0.98% 0.98% 0.98% 0.98%

1.32% 1.32% 1.32% 1.32% 1.32% 1.32%

0.17% 0.17% 0.17% 0.17% 0.17% 0.17%

0.36% 0.36% 0.36% 0.36% 0.36% 0.36%

1.11% 1.11% 1.11% 1.11% 1.11% 1.11%

0.07% 0.07% 0.07% 0.07% 0.07% 0.07%

0.03% 0.03% 0.03%

0.16% 0.16% 0.16% 0.16% 0.16% 0.16%

0.26% 0.26% 0.26% 0.26%

0.14% 0.14% 0.14% 0.14%

0.22% 0.22% 0.22%


0.03% 0.03% 0.03%

0.11% 0.11% 0.11% 0.11%

0.16% 0.16% 0.16% 0.16% 0.16% 0.16%

0.23% 0.23% 0.23% 0.23%

0.26% 0.26% 0.26%

0.03% 0.03% 0.03%

0.23% 0.23% 0.23% 0.23% 0.23% 0.23%

0.14% 0.14% 0.14% 0.14%

0.26% 0.26% 0.26% 0.26%

0.14% 0.14%

0.02%

0.02% 0.02% 0.02% 0.02% 0.02% 0.02%

0.10% 0.10% 0.10%

0.31% 0.31% 0.31% 0.31%

0.26% 0.26% 0.26% 0.26%

0.25% 0.25% 0.25% 0.25%

0.22% 0.22% 0.22%

0.02% 0.02% 0.02% 0.02% 0.02% 0.02%

0.19% 0.19% 0.19%

0.20% 0.20% 0.20%


0.26% 0.26% 0.26% 0.26%

0.11% 0.11% 0.11%

0.22% 0.22% 0.22%

7.1% 7.0% 7.0% 7.0% 5.3% 5.3% 0.1% 0.1% 0.4% 1.3% 1.7% 2.1% 2.5% 2.7% 3.1% 2.2% 1.1%
49.8% 56.8% 63.8% 70.9% 76.2% 81.5% 81.7% 81.8% 82.2% 83.5% 85.3% 87.4% 89.9% 92.6% 95.7% 97.9% 99.0%
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
11/12 - 17/12

W24

0.22%
18/12 - 24/12

W25
25/12 - 31/12

W26
01/01 - 07/01

W27
08/01 - 14/01

W28
15/01 - 21/01

W29
22/01 - 27/01

W30
28/01 - 31/01
W30
0.26%

0.14% 0.14%
0.22%

0.8% 0.1% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%


99.9% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0% 100.0%
0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
REPORT MINGGUAN PEKERJAAN IMPROVEMENT PS SARPEN LUAR JAWA BALI
LOKASI PENEMPATAN
No Proses Pekerjaan Progress Keterangan
A PENGADAAN MATERIAL
1 Genset 30 KVA PO sudah keluar tgl. 26-06-2023, lead time 12 minggu PO No. 2300001066
2 Genset 20 KVA PO sudah keluar tgl. 26-06-2023, lead time 12 minggu PO No. 2300001066
3 Rect. 9 Slot (6 modul) PO sudah keluar tgl. 21-06-2023, lead time 10 minggu PO No. 230001013
4 Rect. 2U (3modul) PO sudah keluar tgl. 21-06-2023, lead time 10 minggu PO No. 230001013
5 Batt. Lith 100AH PO sudah keluar tgl. 28-06-2023, lead time 12 minggu PO No. 230001014
6 Batt. VRLA 100AH PO sudah keluar tgl. 28-06-2023, lead time 12 minggu PO No. 230001014
7 Eksternal Alarm Shelter PO sudah keluar tgl. 26-06-2023, lead time 12 minggu PO No. 230001064
8 Eksternal Alarm ODC PO sudah keluar tgl. 26-06-2023, lead time 12 minggu PO No. 230001064
9 Inverter 1 KVA PO sudah keluar tgl. 21-06-2023, lead time 12 minggu PO No. 230001013
B INSTALASI ON SITE
B1 SBU Sumbagut (24 lokasi)
a Survey Rencana Week 05 - 06. Koordinasi detail jadwal dan rute dengan team SBU

B2 SBU Sumbagteng (10 lokasi)


a Survey Rencana Week 05. Koordinasi detail jadwal dan rute dengan team SBU

B3 SBU Sumbagsel (19 lokasi)


a Survey Rencana Week 05. Koordinasi detail jadwal dan rute dengan team SBU
TIMELINE IMPROVEMENT SARPEN 2023 SUMBAGUT
No SBU Site Name Change Reloks

1 Sumbagut GI Langsa
2 Sumbagut GI Lhokseumawe
3 Sumbagut POP GI Glugur
4 Sumbagut POP GI Pangkalan Brandan
5 Sumbagut POP PLN UP3 Medan
6 Sumbagut PoP ULP Tanjung balai
7 Sumbagut PoP ULP Stabat
8 Sumbagut PoP ULP Perdagangan
9 Sumbagut PoP UID Wilayah Aceh
10 Sumbagut PLN GI BELAWAN
11 Sumbagut PLN GI BINJAI
12 Sumbagut PLN GI PAYAGELI UP3 SIBOLGA
13 Sumbagut PLN GI SEI ROTAN
14 Sumbagut PLN GI TARUTUNG
15 Sumbagut PLN GI SIBOLGA
16 Sumbagut PLN GI RANTAU PRAPAT GI BANDA ACEH
17 Sumbagut PLN GI SALAK (SIEMPAT RUBE)
18 Sumbagut PLN KITSBU
19 Sumbagut PLN ULP HELVETIA
20 Sumbagut PLN ULP MEDAN TIMUR
21 Sumbagut PLN PIKITRING (UIP2) PLN ULP BARUS
22 Sumbagut PLN UPB PLN ULP PERDAGANGAN
23 Sumbagut PLN WILSU PLN ULP BALIGE
24 Sumbagut PLN ULP SIBUHUAN PLN ULP DELITUA
OVEMENT SARPEN 2023 SUMBAGUT
Material Qty Juli-Agustus 2023
31 1 2 3 4 5 6 7 8 9 Team Survey
Genset 20 KVA 1
Genset 20 KVA 1
Batt. Lith 100AH 2 Hendra
Batt. Lith 100AH 2
Batt. Lith 100AH 2 Hendra
Batt. Lith 100AH 1 Hendra
Batt. Lith 100AH 1 Hendra
Batt. Lith 100AH 1 Hendra
Batt. Lith 100AH 1
Eksternal Alarm Shelter 1 Hendra
Eksternal Alarm Shelter 1 Hendra
Eksternal Alarm Shelter 1
Eksternal Alarm Shelter 1 Hendra
Eksternal Alarm Shelter 1
Eksternal Alarm Shelter 1
Eksternal Alarm Shelter 1
Eksternal Alarm ODC 1
Eksternal Alarm ODC 1 Hendra
Eksternal Alarm ODC 1 Hendra
Eksternal Alarm ODC 1 Hendra
Eksternal Alarm ODC 1
Eksternal Alarm ODC 1 Hendra
Eksternal Alarm ODC 1 Hendra
Eksternal Alarm ODC 1 Hendra
Realitas Revisi Plan survey Status Survey Keterangan
08/08/1923
08/08/1923
31/07/1923 Done Survey
10/08/1923
31/07/1923 Done Survey
03/08/1923
01/08/1923 Done Survey
03/08/1923
09/08/1923
02/08/1923
01/08/1923 Done Survey Not Ready Tangki minyak Eksternal

02/08/1923 Done Survey

10/08/1923

02/08/1923
01/08/1923 Done Survey
02/08/1923 Done Survey

03/08/1923 Done Survey


04/08/1923 Done Survey
02/08/1923 Done Survey
Team Sumbagut
No Nama Posisi No KTP
1 Agus Susanto Leader Tim 3204340312860008
2 Lahdinamsyah Teknisi 1271200106880002
3 M.Hendra S Pengawas K3 dan Teknisi 1271021810790005
No HP
085862833177
82377231200
081262875533
NO SBU Lokasi SOW Qty Plan

24 25 26 27 28 29 30 31
1 Pekanbaru Upgrade Genset POP Area PKU Genset 30 KVA 1
2 Pekanbaru GI Dumai Genset 20 KVA 1
3 Pekanbaru FSM:OV Genset 20 KVA 1
4 Padang UPT Padang Rect. 2U 1
5 Padang Area Padang Rect. 2U 1
6 Padang Belanti Lama Rect. 2U 1
7 Pekanbaru Perawang Lama Rect. 2U 1
8 Pekanbaru Area Rengat Rect. 2U 1
9 Padang Kuranji Rect. 2U 1
10 Padang Prokitring Batt. Lith 100AH 2
11 Padang Belanti lama Batt. Lith 100AH 2
12 Pekanbaru Area Rengat Batt. Lith 100AH 2
13 Padang Area padang Batt. Lith 100AH 2
14 Padang UPT Padang Batt. Lith 100AH 2
n

1 Team Survey Realitas Revisi Plan survey Keterangan Team Sumbagteng


No Nama
1 Cecep Nurhidayat
2 Fery Sonjaya Laksana
3 Acep Suhendi
Posisi No KTP No HP
Leader Tim 085100277843
Pengawas K3 dan Teknisi 082147156700
Teknisi 082120104063
Agenda kegiatan Pro
No Nama kegiatan SBU SOW

Sumbagsel Batt. Lith 100AH


Sumbagsel Batt. Lith 100AH
Sumbagsel Batt. Lith 100AH
Sumbagsel Batt. Lith 100AH
Sumbagsel Batt. Lith 100AH
1 Survey Lokasi
Sumbagsel Batt. Lith 100AH
Sumbagsel Batt. Lith 100AH
Sumbagsel Batt. Lith 100AH
Sumbagsel Batt. Lith 100AH
Sumbagsel Batt. Lith 100AH
Sumbagsel Rect. 9 Slot
Sumbagsel Rect. 9 Slot
2 Survey Lokasi
Sumbagsel Rect. 9 Slot
Sumbagsel Rect. 9 Slot
Sumbagsel Eksternal Alarm Shelter
Sumbagsel Eksternal Alarm Shelter
Sumbagsel Eksternal Alarm Shelter
3 Survey Lokasi Sumbagsel Eksternal Alarm Shelter
Sumbagsel Eksternal Alarm Shelter
Sumbagsel Eksternal Alarm Shelter
Sumbagsel Eksternal Alarm Shelter
Sumbagsel Genset 30 KVA
4 Survey Lokasi Sumbagsel Genset 30 KVA
Sumbagsel Genset 30 KVA
Agenda kegiatan Project ICON PLUS Sumbagsel
Juli 2023
Lokasi
22 23 24 25 26
POP_1PLG014 KITSBS MINI SHELTER PLN
SEDUDUK PUTIH GI SHELTER PLN
POP_1PLG009 TALANG RATU GI SHELTER PLN
POP_1PLG005 KERAMASAN GI SHELTER PLN
POP_1PLG001 BUKIT SIGUNTANG GI SHELTER PLN
POP_1PLG004 BUNGARAN GI SHELTER PLN
POP_1PKB003 SUNGAI KEDUKAN GI MINI SHELTER PLN
POP_1PKB001 BETUNG GI SHELTER PLN
BUKIT ASAM GI SHELTER PLN
PRABUMULIH GI SHELTER PLN
MENGGALA GI SHELTER PLN
POP_1KTB002 BUKIT KEMUNING GI SHELTER PLN
POP_1KLA002 SUTAMI GI SHELTER PLN
TEGINENENG GI SHELTER PLN
TELUK BETUNG GI SHELTER PLN
BANGKO GI SHELTER PLN
GUMAWANG GI SHELTER PLN
BATURAJA GI SHELTER PLN
CURUP/PEKALONGAN GI SHELTER PLN
TEGINENENG GI SHELTER PLN
ADIJAYA GI SHELTER PLN
Lahat
ADIJAYA GI SHELTER PLN
POP_1PLG008 SEDUDUK PUTIH GI SHELTER PLN
bagsel
Juli 2023 Agustus 2023
Team Survey
27 28 29 30 31 1 2 3 4 5 6 7 8
Team Sumbagsel
Realitas Revisi Plan survey Keterangan No
1
2
3
Team Sumbagsel
Nama Posisi No KTP No HP
Ervan Ariston Leader Tim 1871102401870005 081366769576
Nur Khamidi Teknisi 160620709840004 082269845719
Eko Prasetyo Nugroho Pengawas K3 dan Teknisi 16710428099000004 0895410487900
KALIMANTAN
No Regional PoP Item Satuan Qt
1 Kalimantan Shelter GI Ulin Tapak Atas Rect. 9 Slot Set 1
2 Kalimantan Shelter POP UID Kaltimra Rect. 9 Slot Set 1
3 Kalimantan ULP Binuang Rect. 2U Set 1
4 Kalimantan ULP Rantau Rect. 2U Set 1
5 Kalimantan ULP Kandangan Rect. 2U Set 1
6 Kalimantan ULP Paringin Rect. 2U Set 1
7 Kalimantan GI Satui Rect. 2U Set 1
8 Kalimantan UP3 Singkawang Rect. 2U Set 1
9 Kalimantan ODC Tarakan Rect. 2U Set 1
10 Kalimantan KP PLN Sengayam Rect. 2U Set 1
11 Kalimantan KP PLN Sengayam Eksternal Alarm ODC Set 1
12 Kalimantan KP PLN Perangat Eksternal Alarm ODC Set 1
13 Kalimantan PLC PLN Tamiang Layang Eksternal Alarm ODC Set 1
14 Kalimantan UP3 Berau Eksternal Alarm ODC Set 1
15 Kalimantan Micro PoP Dinas Perdagangan Eksternal Alarm ODC Set 1
16 Kalimantan Micro POP Perpus Eksternal Alarm ODC Set 1
17 Kalimantan Micro Damkar Eksternal Alarm ODC Set 1
18 Kalimantan Micro PoP PUPR Eksternal Alarm ODC Set 1
19 Kalimantan ODC Samboja Eksternal Alarm ODC Set 1
20 Kalimantan GI Petung Batt. Lith 100AH Set 2
21 Kalimantan GI Kuaro Batt. Lith 100AH Set 2
22 Kalimantan GI Selat Kapuas Batt. Lith 100AH Set 2
23 Kalimantan Area/UP3 Palangkaraya Batt. Lith 100AH Set 2
24 Kalimantan Shelter POP UID Kaltimra Batt. Lith 100AH Set 2
25 Kalimantan GI Muara Komam Inverter 1 KVA Set 1
26 Kalimantan GI Longikis Inverter 1 KVA Set 1
27 Kalimantan GI Pelaihari Inverter 1 KVA Set 1
28 Kalimantan Shelter Pikitring Inverter 1 KVA Set 1
29 Kalimantan Shelter GI Kasongan Inverter 1 KVA Set 1
30 Kalimantan Shelter GI Sampit Inverter 1 KVA Set 1
Juli 2023
JADWAL SURVEY LOKASREMARK 18 19 20 21 22 23 24 25 26 27 28
Sunday, August 13, 2023
Wednesday, July 26, 2023 Done
Tuesday, August 15, 2023
Tuesday, August 15, 2023
Wednesday, August 16, 2023
Wednesday, August 16, 2023
Monday, August 14, 2023
Thursday, July 20, 2023 Done
Saturday, August 5, 2023
Sunday, July 30, 2023
Sunday, July 30, 2023
Thursday, August 3, 2023
Saturday, August 12, 2023
Friday, August 4, 2023
Tuesday, July 25, 2023 Done
Tuesday, July 25, 2023 Done
Tuesday, July 25, 2023 Done
Tuesday, July 25, 2023 Done
Thursday, July 27, 2023
Friday, July 28, 2023
Friday, July 28, 2023
Friday, August 11, 2023
Friday, August 11, 2023
Wednesday, July 26, 2023 Done
Saturday, July 29, 2023
Saturday, July 29, 2023
Monday, August 14, 2023
Tuesday, July 18, 2023 Done
Thursday, August 10, 2023
Thursday, August 10, 2023
Agustus 2023
29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Team Survey Realitas
Revisi Plan survey Keterangan Team Kalimantan
No Nama Posisi
1 Deni Eka Saputra Leader Tim
Khoirul Umam Pengawas K3 dan Teknisi
Fenny Pirdaus Teknisi
2 Rahmat Maulana Teknisi
No KTP No HP
6112011410850000 082254067900
6171042811860001 085245333737
61041722048000001 082159459908
1371111510890006 085248848412
SULAWESI IBT
No Regional PoP Item Satuan Qty
1 Sulawesi IBT Shelter GI Talise Rect. 9 Slot Set 1
2 Sulawesi IBT Shelter GI Mamuju Rect. 9 Slot Set 1
3 Sulawesi IBT Shelter GI Otam Rect. 9 Slot Set 1
4 Sulawesi IBT Shelter GI Marisa Rect. 9 Slot Set 1
5 Sulawesi IBT Shelter GI Unaha Rect. 2U Set 1
6 Sulawesi IBT Shelter Kolaka Utara Rect. 2U Set 1
7 Sulawesi IBT UP3 Kendari Rect. 2U Set 1
8 Sulawesi IBT ODC 2 Kabin PLN Rayon Tentena Rect. 2U Set 1
9 Sulawesi IBT Shelter GI Talise Batt. Lith 100AH Set 1
10 Sulawesi IBT Shelter GI Mamuju Batt. Lith 100AH Set 1
11 Sulawesi IBT Shelter PLN Topoyo Batt. Lith 100AH Set 1
12 Sulawesi IBT Shelter PLN Pasangkayu Batt. Lith 100AH Set 1
13 Sulawesi IBT Shelter GI Otam Batt. Lith 100AH Set 1
14 Sulawesi IBT Shelter GI Marisa Batt. Lith 100AH Set 1
15 Sulawesi IBT Shelter GI Moutong Batt. Lith 100AH Set 1
16 Sulawesi IBT UP3 Kendari Batt. Lith 100AH Set 1
17 Sulawesi IBT Shelter GI Tello Batt. Lith 100AH Set 1
18 Sulawesi IBT Shelter GI Sidrap Batt. Lith 100AH Set 1
19 Sulawesi IBT Micro PoP Imandi Batt. VRLA 100AH Bank 1
20 Sulawesi IBT Micro PoP Molibagu Batt. VRLA 100AH Bank 1
21 Sulawesi IBT Micro PoP KabinTaluditi Batt. VRLA 100AH Bank 1
22 Sulawesi IBT Micro PoP Amurang Eksternal Alarm ODC Set 1
23 Sulawesi IBT ODC 20 UKotamobagu Eksternal Alarm ODC Set 1
24 Sulawesi IBT PLC PLN Kotabunan Eksternal Alarm ODC Set 1
25 Sulawesi IBT Micro PoP Imandi Eksternal Alarm ODC Set 1
26 Sulawesi IBT Micro PoP Molibagu Eksternal Alarm ODC Set 1
27 Sulawesi IBT Kaja PLN Adow Eksternal Alarm ODC Set 1
28 Sulawesi IBT PoP kantor Camat Pinolosian Eksternal Alarm ODC Set 1
29 Sulawesi IBT PoP Kantor Camat Pinolosian Timur Eksternal Alarm ODC Set 1
Juli 2023
JADWAL SURVEY LOKASI KETERANGAN 21 22 23 24 25 26 27
Senin , 7 Agustus 2023
Rabu, 2 Agustus 2023
Rabu, 26 Juli 2023 Done
Jumat, 4 Agustus 2023
Senin, 7 Agustus 2023
Rabu, 9 Agustus 2023
Selasa, 8 Agustus 2023
Jumat, 21 Juli 2023 Done
Senin , 7 Agustus 2023
Rabu, 2 Agustus 2023
Rabu, 3 Agustus 2023
Jumat, 4 Agustus 2023
Rabu, 26 Juli 2023 Done
Jumat, 4 Agustus 2023
Senin,7 Agustus 2023
Senin, 7 Agustus 2023
Kamis, 27 Juli 2023
Jumat, 21 Juli 2023 Done
Jumat, 28 Juli 2023
Jumat, 28 Juli 2023
Rabu, 9 Agustus 2023
Jumat, 28 Juli 2023
Rabu, 26 Juli 2023 Done
Rabu, 26 Juli 2023 Done
Kamis, 27 Juli 2023
Kamis, 27 Juli 2023
Rabu, 26 Juli 2023 Done
Rabu, 26 Juli 2023 Done
Kamis, 27 Juli 2023
li 2023 Agustus 2023
28 29 30 31 1 2 3 4 5 6 7 8 9 10 Team Survey
Team Sulawesi
Realitas Revisi Plan survey Keterangan No Nama
1 Akram
2 Donald Chres Kowaas
3 Rahmat Awat Tobuhu
4 Akrab Kaso
Posisi No KTP No HP
Leader Tim 7371131202790000 0811464248
Teknisi 7173042512770001
Teknisi 7106060207810001
Pengawas K3 dan Teknisi 7202022605880003 085342127075

You might also like