No Description Status Remark Observation Info

Audit Environment

1 Check room temperature should be 15 - 24 C OK


Done

2 Check filters in cabinet for dust and dirt OK


Done

3 Check exhaust fan & thermostat functionality NOK


Done

4 Check fire extinguisher OK


Done

5 Check cleanliness of the room OK


Done

6 Check for safety and security in the room OK


Done

7 Check functionality test external alarm

- Mains fail OK
Done

- Module rectifier fail OK


Done

- Low battery OK
Done

- High temperature OK
Done

- Genset Running OK
Done

- Genset failed OK
Done

Audit Switch Power Supply & Battery & Standby Gen

1 Check real load of power cable OK


Done
2 Check the power cable connectivity OK
Done

3 Check power cable & MCB labeling OK


Done
4 Check rectifier load OK
Done

5 Check dual source power OK


Done

6 Check battery backup time OK


Done

7 Check battery physical condition OK


Done

8 Check Genset functionality & battery starter OK


Done

9 Check ATS OK
Done